Prabisha Bhandari
Direct Dial: [phone removed]
Email: [email removed]
August 28, 2026
Public Utilities Regulatory Authority
Ten Franklin Square
New Britain, Connecticut 06051
Re:
Docket No. 26-08-05 - Annual Energy Storage Solutions Program Review –
Year 6
Dear Commissioners:
The Office of Consumer Counsel (“OCC”) submits these written comments in response
to the Public Utilities Regulatory Authority’s (“Authority”) Notice of Request for Written
Comments, as issued in the above-referenced docket on August 12, 2026. OCC offers the
following comments for the Authority’s consideration.
1. Recommended Programmatic Changes
The Authority’s Notice, through prompt 1, requests written comments on the Program
Administrators’ annual report and proposed modifications. More specifically:
a. Whether the Program Administrators’ recommended changes would advance the
objectives of the ESS Program and, if so, how.
Overall, OCC agrees that the Program Administrator’s proposed changes would advance
the objectives of the ESS program. The recommendations are largely necessary restrictions,
clarifying changes, and updates to align with the removal of passive dispatch from the program
under Construct 5, advancing objectives 3 and 5 of ESS. Supplement B: EVSE Enrollment and
the updates to the New Technology Application serve to phase in integration of bidirectional EV
as it is pending PURA approval. This integration of bidirectional EVs could provide an
opportunity for greater grid reliability and peak shaving and may contribute to overall storage
deployment goals via inclusion of vehicles as mobile storage resources.
The annual report also identifies the C&I sector as critical to achieving the ESS
program’s overall MW goals. However, it notes that the C&I pipeline remains constrained by
both a lack of new applications and delays in bringing approved projects into commercial
operation. Given the importance of commercial projects to overall program performance, OCC
agrees that close monitoring of the C&I pipeline must be prioritized. If C&I application rates do
not improve by the Year 7 annual review, a more detailed and concrete process for identifying
and addressing barriers to both new applications and project completion would be beneficial. The
recommendation should also provide specific actions and timelines for addressing the identified
barriers.
b. If any proposed changes do not advance the Program’s objectives, identify the specific
concerns and recommend alternative approaches
Although OCC agrees that the proposed changes advance program objectives, OCC takes
this opportunity to highlight a few areas of concern. To provide flexibility to different business
types, the Program Administrators recommend adjusting the insurance requirements for Eligible
Contractors and TPOs from $1 million in general liability, auto insurance, and workers
compensation to only $1 million in general liability insurance. ESS Program Manual Redlines, p.
40. OCC seeks clarification as to whether this adjustment has the potential to shift any risk
towards customers or ratepayers.
OCC also seeks further clarifications on proposed updates to legacy system size
requirements and add-ons. While OCC does not object to the concept of enabling legacy systems
to increase capacity through add-ons and size adjustments due to change orders, OCC cautions
that the current incentive rate raises the question of how the Program Administrators will discern
increases within reason to avoid exploitation of these allowances. OCC also questions whether
the proposed blended performance incentive rate for add-ons, which would retain legacy
customer enrollment, aligns with the reasoning to phase out passive dispatch compared to the
option to convert the legacy enrollment to Construct 5.
OCC reiterates its long-held view that ratepayer-funded incentives should be tied to
performance. However, in recognition of the lower enrollment incentive available through
Construct Five and the administrative complexities involved in enforcing the clawback, OCC
would not oppose the Program Administrator’s proposal to limit the clawback mechanism to
only C&I commercial priority customers and third party owned residential systems. See ESS
Joint Technical Meeting, August 7, 2026. Such a framework would allow for more targeted
enforcement of the mechanism, likely reducing administrative burdens while also maintaining
protection against inefficient use of ratepayer funds.
2. Bidirectional EV Participation
Through prompt 2, the Authority requests stakeholder input on both the Bidirectional EV Report
and the EDCs’ recommended interconnection changes for bidirectional EVs. More specifically:
a. Whether participation in the ESS Program provides greater overall benefits to
ratepayers than participation in Connecticut's managed charging program for
bidirectional EVs, assuming participation would be limited to a single program.
OCC concurs with the assumption that participation at this time should be limited to a
single program. Allowing a customer to participate in both programs may result in duplicative
incentives, where a participant receives two incentives for providing similar benefits. For the
purposes of bidirectional EV demand response, it seems that ESS and Managed Charging
approach the same behavior choice from opposite directions: one incentivizes customers to shift
charging to off-peak times, while the other incentivizes customers to dispatch during demand
response events. In practice, however, the two are inherently linked, as engaging in dispatch
necessarily precludes simultaneous charging. This potential for duplicative incentives should be
addressed before dual-program implementation is established. At this time, however, OCC does
not have sufficient information or cost-benefit data to determine which program would provide
greater overall benefits to ratepayers. Additional information regarding the costs, benefits,
participation levels, and expected ratepayer impacts of bidirectional EVs is needed before OCC
can reach such a conclusion.
b. Whether eligibility should initially be limited to commercial bidirectional EVs or
whether residential bidirectional EVs should also be eligible beginning in Program
Year 6.
OCC agrees with the report’s recommendation to initially limit eligibility to commercial
bidirectional EVs. A focus on commercial bidirectional EVs may offer greater potential for nearterm impact, particularly given the importance of the commercial sector to achieving ESS’
overall goals. As discussed in the report, residential customer usage patterns are highly
individualized, and are less predictable than commercial customer. Bidirectional EV Report, p.
28. Residential DERM integration capabilities and the technological complexities associated
with residential bidirectional EVs indicate that inclusion of light duty V2G is premature at this
time. Id. at 61. Limiting program edibility to commercial bidirectional EVs could allow the
program to continue supporting residential bidirectional EVs as an emerging resource while
aligning efforts with the larger objective of increasing meaningful C&I participation and
deployment.
c. Whether residential bidirectional EVs should be eligible at this time, and, if not,
suggest what milestones or conditions should be satisfied before they are incorporated
into the ESS Program.
At this time, OCC supports limiting eligibility to commercial bidirectional EVs. At a
minimum, it seems prudent to await completion of the Bidirectional Energy IES pilot to ensure
that the resulting data and lessons learned can meaningfully inform the development and
expansion of bidirectional EVs within the ESS program. OCC reiterates that guardrails against
collecting duplicative incentives for similar behaviors must be established to promote efficient
use of ratepayer funds prior to eligibility expansion. The appropriate conditions and milestones
should remain iterative, as more conditions are likely to emerge as experience is gained through
the pilot and the commercial sector.
d. Whether the Report's recommended technical requirements, including DERMS
integration, telemetry requirements, UL certification requirements, and ISO 15118-20
communications standards, are appropriate given current market readiness,
interoperability, implementation costs, and expected ratepayer benefits.
Overall, OCC agrees with the recommended technical requirements for bidirectional EVs
within the ESS program. The PA’s recommendation to enroll the EVSE (rather than the specific
EV) and to maintain the current ESS telemetry requirements for bidirectional EVs seems
reasonable at this time to support program flexibility. However, OCC cautions against the
potential future removal of the reporting requirement, which requires stored kWh data to be
provided at 15-minute intervals. Id. at p.51. While OCC understands that there may be practical
complications regarding consistency with the 15-minute reporting intervals, we caution against
its removal, as telemetry delays could hinder troubleshooting and program performance.
e. Whether any additional modifications to the ESS Program or the proposed
bidirectional EV interconnection process are necessary to facilitate cost effective
participation while maintaining Program integrity and protecting ratepayers.
OCC appreciates the Authority’s focus on cost-effective program design to protect
ratepayers. As additional benefit and cost information becomes available, ongoing assessment of
the RIM value will be important to identify any further efficiencies that can be deployed.
Additionally, given the goal of the successor solar tariff programs is to also incentivize pairing
solar and storage to leverage grid benefits of solar, it will be necessary to align program goals
and structure to ensure the highest net benefit at lowest cost is achieved in both programs.
OCC appreciates the opportunity to submit these written comments and thanks the Authority and
PAs for their continued work on the EES Program.
Respectfully submitted,
STATE OF CONNECTICUT
OFFICE OF CONSUMER
COUNSEL
CLAIRE E. COLEMAN
CONSUMER COUNSEL
By: /s/ Prabisha Bhandari
Prabisha Bhandari
Julie Lelek
Staff Attorneys
Alex Wang
Economist
cc: Service List