A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Compliance filingFiled by Eversource Energy

Compliance Filing, Order No. No

Part of

Docket 26-08-07Open

Innovative Energy Solutions Program Cycle 5

Type of filing
Compliance filing (Compliance Filing)
Date filed
October 1, 2026
Filed by
Eversource Energy
Files
24
As listed on the current system: Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)

Files

Text of Joint Cover Letter re Compliance No 4.pdf

Extracted from the file · 2,292 characters
October 1, 2026 Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-07, Innovative Energy Solutions Program Cycle 05 – Compliance with Order No. 4 in Docket No. 17-12-03RE05 – Documentation for Innovative Energy Solutions Program Cycle 5 Dear Mr. Gaudiosi: Order No. 4 of the March 30, 2022 Final Decision of the Public Utilities Regulatory Authority (the “Authority”) in Docket No. 17-12-03RE05, PURA Investigation into Distribution System Planning of the Electric Distribution Companies –Innovative Technology Applications and Programs (Innovation Pilots) (the “Final Decision”) states: No later than September 16, 2022, the EDCs shall submit as compliance (i.e., not for Authority approval) in the appropriate IES Program cycle docket (i.e., Docket No. 22-08-07) a Grid Needs Assessment, Customer Needs Assessment, Existing Program Inventory, and Preferred Focus Areas, and any other documentation or information proposed in the Implementation Plan to be provided prior to the beginning of the first IES Program cycle. The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) and Avangrid subsidiary, The United Illuminating Company (“UI”, together with Eversource the “Electric Distribution Companies” or “EDCs”) hereby jointly submit as compliance the attached “Required Documentation for Innovative Energy Solutions Program Cycle 5” containing the information required by Order No. 4 of the Final Decision. The EDCs also submit associated attachments to that document as referenced therein (ES-Attachments 1-5 and UI-Attachments 112). Should you have any questions regarding this filing, please do not hesitate to contact Marrina Gallant, Energy Efficiency Consultant, at [email removed]; or Michael Crowley, Manager – Clean Energy Policy, UI, at [email removed]. -1- The undersigned certify that a copy of this filing was served on all parties on this service list in this proceeding on this date. Sincerely, Vincent P. Pace Vincent P. Pace Assistant General Counsel On Behalf of Eversource Energy Michael Crowley Michael Crowley Manager – Clean Energy Policy On Behalf of The United Illuminating Company Attachments cc: Service List -2-

Text of 26-08-07 Comp Order 4.pdf

Extracted from the file · 54,741 characters
CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 1 of 29 Docket No. 26-08-07 Docket No. 17-03-12RE05, Compliance Order No. 4: Required Documentation for Innovative Energy Solutions Program Cycle 5 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 2 of 29 Introduction On October 2, 2019, the Connecticut Public Utilities Regulatory Authority (“PURA”) issued its Equitable Modern Grid Decision outlining PURA’s framework for realizing an equitable modern electric grid in Connecticut.1 On October 8, 2019, PURA initiated Docket No. 17-12-03RE05, PURA Investigation into Distribution System Planning of the Electric Distribution Companies—Innovative Technology Applications and Programs (“Innovation Pilots”), to investigate a prospective structure to support the ongoing development of innovative technology applications and programs. On March 30, 2022, PURA issued its Final Decision (“Decision”) in Docket No. 17-12-03RE05, establishing the Innovative Energy Solutions Program (“IES Program” or “Program”) as part of its Equitable Modern Grid initiative to encourage the development of novel programs, technologies, products, and services. 2 The Decision outlines the IES Program’s design, structure, and governance and established four goals for the Program: 1. Support (or remove barriers to) the growth of Connecticut’s green economy; 2. Enable a cost-effective, economy-wide transition to a decarbonized future; 3. Enhance customers’ access to a more resilient, reliable, and secure commodity; and 4. Advance the ongoing energy affordability dialogue in the state, particularly in underserved communities. The Decision’s Order No. 43 required the Electric Distribution Companies (“EDCs”), collectively, The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) and Avangrid subsidiary, The United Illuminating Company (“UI”), to submit as compliance an EDC IES Report for IES Program PURA Docket No. 17-12-03, PURA Investigation into Distribution System Planning of the Electric Distribution Companies, Interim Decision (Oct. 2, 2019). Please see PURA’s Framework for an Equitable Modern Grid webpage for all Equitable Modern Grid filings. 2 PURA Docket No. 17-12-03RE05, PURA Investigation into Distribution System Planning of the Electric Distribution Companies—Innovative Technology Applications and Programs, Decision (Mar. 30, 2022). 3 PURA Docket No. 17-12-03RE05, PURA Investigation into Distribution System Planning of the Electric Distribution Companies, Final Decision, March 30, 2022, Order No. 4, p. 35. 1 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 3 of 29 Cycle 1 by September 16, 2022. 4 Attachment B of the Decision, Figure 16—Summary of EDC Requirements, requires the EDCs to jointly file an updated EDC IES Report three months prior to the beginning of each Program cycle.5 On January 1, 2027, IES Program Cycle 5 will begin. The EDCs hereby submit as compliance with Order No. 4 and Attachment B of the Decision, the following IES Program Cycle 5 documentation: • Grid needs assessment; • Customer needs assessment; • Existing Program inventory; • Preferred focus areas; and • Any other information required of the EDCs for IES Program Cycle 5. Section One: Grid Needs Assessment This section illustrates the current and future state of the power grid in Connecticut, as shaped by parallel efforts like Distributed Energy Resources (“DER”) integration and alignment with PURA’s resilience and reliability goals. For the EDCs, the integration of DERs with building and transportation electrification present both opportunities and challenges. While the EDCs agree that DERs have ample potential to support the grid, the technologies (e.g., hardware, software, algorithms, etc.) needed to accurately measure, control, and remunerate these participants remain largely open ended, as does the question of equity and impact to non-participating customers. A notable challenge for the EDCs is to find novel tariffs and communications to encourage customerowned assets to integrate and mitigate issues for a mutually beneficial outcome that can potentially reduce the need for costly system upgrades while achieving customer needs (e.g., vehicle departure times and acceptable thermostat settings). Ultimately, this means the EDCs must establish a way to PURA Docket No. 22-08-07, Connecticut Electric Distribution Companies’ Innovation Pilots Framework, Compliance Order No. 4, Documentation for Innovative Energy Solutions Program 23-e 1, (Sep. 16, 2022). 5 PURA Docket No. 17-12-03RE05, Innovative Energy Solutions Program Design Document, Mar. 30, 2022, Attachment B, Figure 16-Summary of EDC Requirements, p. 46. 4 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 4 of 29 properly obtain, analyze, forecast, and communicate data, as well as ways to quantify the various benefits of each participant’s actions to the grid while prioritizing solutions that generate multiple benefits. The following are data publications that both EDCs separately provide, containing valuable grid needs information: • Docket No. 17-12-03RE03. Per Order No. 8 of Docket No. 17-12-03RE03,6 the EDCs submit annually, for PURA’s review and approval, a map of circuits that meet the grid edge criteria. Specifically, “grid edge” is defined as (1) the top 10 percent of circuits with the highest number of outages per customer during major storms since July 1, 2012, and (2) the top 10 percent of circuits with the longest outages due to major storms since July 1, 2012. This information is shared to assist potential participants and battery providers with prioritization efforts. • Docket No. 17-12-03RE08. As part of this docket, the EDCs submit a detailed historical storm analysis report detailing the number of events at each event level (1-5) and costs incurred per category, in addition to other information. The EDCs also provide information on the age of various types of electrical equipment across their individual Connecticut footprints. The EDCs also collect and provide two customer-centric performance metrics by circuit: (1) Customers Experiencing Multiple Interruptions (“CEMI”) and (2) Customers Experiencing Long Interruption Durations (“CELID”).7 1.1 Eversource Eversource currently provides a wide array of information to PURA and other stakeholders through various mechanisms. As part of the Docket No. 17-12-03RE05: Innovation Pilots docket, Eversource has PURA, Docket No. 17-12-03RE03, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – Electric Storage, Decision, Jul. 28, 2021, Order No. 8, p. 52. 7 See data response Q-LF-002 to Docket No. 17-12-03RE08 that states the EDCs will provide their EDC’s 2021 CEMI and CELID performance measurements by circuit. 6 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 5 of 29 compiled a list of information provided through each mechanism and simplified some of the information reporting formats. • CT DER Queue. The CT DER Queue provides a live overview of queued DERs in Connecticut. • Hosting Capacity Maps. Eversource publicly provides system information on its parcel-based Hosting Capacity Maps including substation hosting capacity, operating voltages, bulk substation rating (“MVA”), DER online, and DER in queue for each circuit.8 Eversource shares this data with the intent of making DER providers aware of where the distribution system can accommodate further distribution generation without requiring significant infrastructure upgrades. Eversource shares this data with the intent of making DER providers aware of where the distribution system can accommodate further distribution generation without requiring significant infrastructure upgrades. • Transmission and Distribution Reliability Performance (“TDRP”) Report. Through its annual TDRP Report, Eversource publicly provides system reliability metrics for the preceding four years through the System Average Interruption Duration Index (“SAIDI”), the System Average Interruption Frequency Index (“SAIFI”), and the Customer Average Interruption Duration Index (“CAIDI”), as well as the target value for each metric for the running year. The SAIDI and SAIFI, inclusive of major storms, are part of the TDRP Report and attempt to quantify system resilience. The TDRP Report also presents the percentage of outages per cause and enumerates the planned and ongoing resilience and reliability projects employed with quantitative indicators of program completion as available (e.g., devices installed, miles addressed, budget spent year to date). As outlined below, the EDC’s filed TDRP Report provides a comprehensive system overview for public information on the system. Attachment 1 SAIDI, SAIFI, and CAIDI (Goals and Actuals) by Area Work Center for the past five years 8 Publicly accessible circuit-based hosting capacity maps have discontinued and replaced with parcel-based maps. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 6 of 29 Appendix 1 Causes of outages over past five years, by cause (e.g., lightning, vehicle accident, etc.), number of interruptions, customer minutes interrupted, and total customers interrupted, by region Appendix 8 Substation data: SAIDI, SAIFI, CAIDI, by substation, voltage, and circuit Appendix 9 Transmission System data: 69 kilovolt (“kV”) circuit miles, 115 kV circuit miles, 345 kV circuit miles, by non-tree overhead wire and underground, distribution system data: 5 kV circuit miles, 15 kV circuit miles, 25 kV circuit miles, 35 kV circuit miles, by tree overhead wire, aerial cable, spacer cable, other overhead, and underground Appendix 11 SAIDI worst 100 circuit list, by division, circuit, and SAIDI metric for past five years Appendix 13 SAIDI/SAIFI 4 percent worst circuit list, circuit code and rank (by SAIFI) Appendix 14 Reliability Corrective Action Plans, for top 100 circuit list, circuit code, and descriptive action Appendix 17 Circuits experiencing multiple outages Eversource has also included the following documents to this filing: ES-Attachment 1 Historic Interconnections ES-Attachment 2 2026 TDRP Report ES-Attachment 3 Substation Feeder List ES-Attachment 4 CEMI and CELID Data ES-Attachment 5 Eversource Grid Modernization Cyber Security Plan CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 7 of 29 1.2 United Illuminating UI provides extensive system data which details the system, its performance, and ongoing improvements in order to provide critical information and in turn, uncover opportunities for participants in RE05 IES Program. The EDC’s DER Queue and Hosting Capacity Maps show areas of opportunity for DER integration and highlight areas where DERs could fulfill system upgrade needs. The Underserved Communities and Load Capacity Map helps identify opportunities for investments to underserved populations, as well as helping identify prudent electric vehicle (“EV”) charging stations and level 2 chargers that could be interconnected with minimal system investment. • CT DER Queue. Provides an overview of queued DERs in Connecticut. • Hosting Capacity Maps. The EDC also publicly provides system information on its Hosting Capacity Maps including substation hosting capacity, operating voltages, bulk substation rating (MVA), DER online and in queue for each circuit.9 UI shares this data with the intent of making DER providers aware of where the distribution system can accommodate further distribute generation without requiring significant infrastructure upgrades. Similarly, the EDC also provides an Underserved Community and Load Capacity Map that lists remaining available load capacity of distribution circuits to help developers identify where Level 2 and Direct Current Fast Charging (“DCFC”) stations can likely be interconnected with minimal system reinforcement. • 2024 Clean and Renewable Energy Report. As part of 24-08-01, the 2024 Clean and Renewable Energy Report (see UI-Attachment 2) details the rapid rate of interconnections, success of existing Connecticut DER programs, and state-specific progress toward decarbonization. • UI Transmission and Distribution System Annual Report for 2025. The UI-Attachment 1 / Docket No. 86-12-03 and 24-08-09 compliance filing provides an in-depth overview of the existing system. The TDRP Report (see UI-Attachment 1) provides an official record of the EDC’s system performance to shed light on further opportunities. As outlined below, the EDC’s filed TDRP Report provides a comprehensive system overview for public information on the system. 9 UI also shares a Site Hosting Map for EV chargers (last updated June 2023). CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 8 of 29 Appendix 4 Transmission and distribution system miles per construction type and voltage level Appendix 10 Excel file of substation/circuit reliability circuit data—2024 Appendix 11 Five-year outage by cause summary Appendix 14 Tier 1 worst performing circuits Appendix 15 Tier 2 worst performing circuits Appendix 17 Status of previous corrective actions Section 2: Customer Needs Assessment Across both EDCs, customers value power quality and reliability as well as affordability. Connecticut customers desire fewer and shorter outages, greater ability to manage and measure their usage, and improved affordability. See additional details below about each EDC’s customer needs assessment. 2.1 Eversource Eversource’s “Voice of the Customer” team is tasked with regularly evaluating customer opinions and sentiments toward Eversource in a variety of areas, such as outage experiences, the billing and payment process, and views on the price of energy. The Voice of the Customer team achieves this through several channels, including standardized internal customer satisfaction surveys, on-demand quantitative and qualitative research, analysis of results gathered in the J.D. Power Electric Utility Residential study, and through the Eversource Advisory Group, the Company’s online community. Through these channels, the Voice of the Customer team is able to identify potential gaps in customer needs and conduct additional specific research to develop and refine programs and offerings to fill those gaps. Eversource leverages the J.D. Power Electric Residential Study, an independent industry-leading source of research, data, and insights, to further assess customer needs and satisfaction drivers. The study contains eight dimensions, weighted (based on derived customer importance) and calculated into an Overall Customer Satisfaction Index. The factors include: (1) Total Monthly Cost; (2) Trust; (3) Safety & CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 9 of 29 Reliability; (4) Ease of Doing Business; (5) Information Provided; (6) People; (7) Problem Resolution; and (8) Digital Channels. Affordability concerns have been the dominant driver of satisfaction among customers for the last several years. In terms of affordability, it is important for customers to have a clear understanding of what they are paying for (supply, local delivery, transmission, and public benefits) and an ability to manage usage through energy-saving tools in order to derive value in what they are paying. There is opportunity to better help customers understand their bill and increase customer awareness of Connecticut’s conservation and load management (“C&LM”) programs that are designed to help lower their usage. There is a correlation between Eversource’s C&LM programs and overall customer satisfaction. J.D. Power research shows customers who are aware of and have participated in C&LM programs are more satisfied with Eversource. Therefore, customers have an increasing need for more usage management capabilities to understand their usage on a timelier (daily) basis. With more realtime usage insights, customers have more control in how they use energy and would have the ability to course correct throughout the billing period to help drive down costs. Similar to the J.D. Power results, Eversource’s internal research shows that the EDC’s efforts to help customers manage their monthly usage and provide fair pricing are the most correlated with overall satisfaction. There is also a correlation among Connecticut customers that during peak usage periods, their ease of understanding different charges on their bill go down. This subset of customers has a much lower overall satisfaction rating than customers who find their bill easy to understand. Therefore, presenting the opportunity to help customers understand their bill better and communicating the valueadd of providing safe and reliable electric service is important in driving customer satisfaction. To accomplish this, Eversource has made several enhancements over recent years, such as redesigning customer bills to provide greater transparency and launching additional education campaigns to enhance bill understanding. To further assist customers, Eversource conducts extensive testing on all communications regarding assistance programs to ensure ease of understanding. Eversource also participates in the Energy Affordability Customer Communications Working Group, where further suggestions for communication enhancements are gathered from stakeholders within Connecticut. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 10 of 29 While affordability has tended to be a dominant concern among customers, providing reliable service remains an expected responsibility of Eversource from customers. Results from internal research show that providing reliable service is the most positively impactful customer sentiment theme for customer satisfaction. Research following either blue-sky outages or storms indicates that restoring power quickly and providing proactive communications are the most important drivers of satisfaction. Eversource has implemented enhanced communication strategies, particularly for storm events, to keep customers better informed during their outage. 2.2 United Illuminating The Customer Needs Assessment provides a view of UI’s system and offerings from the perspective of the customer. Avangrid also uses J.D. Power, an independent industry-leading research, data, and analysis provider. The J.D. Power study looks at numerous utilities across the country to determine how customers perceive them. UI uses the study’s information not only to compare their performance against those of their peers but also to find out what customers want. Internally at UI, they try to capture what customers want by listening to “The Voice of the Customer.” This methodology allows the customers themselves to tell the EDC what they want. UI has used this information to make a number of enhancements including providing Outage Alerts, Energy Analyzer, Understand Your Usage, and Account Alerts. Based on the research, the two largest customer needs are Power Quality & Reliability and Price. J.D. Power’s research also shows Power Quality & Reliability was the top response by 25 percent of UI customers, while Price represented 20 percent of customer responses. When looking at customer’s rankings for Power Quality & Reliability, the UI Transmission and Distribution System Annual Report for 2024 (see UI-Attachment 1) provides good contextual information surrounding performance. On the topic of Price, as of the year 2020, the cost of electricity in Connecticut ranked amongst the highest in the contiguous 48 states; however, there is a correlation between customer satisfaction and use of UI’s Energy Analyzer tool. This correlation shows the more customers can understand their usage, the more satisfied they are. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 11 of 29 Power Quality & Reliability present several opportunities for innovation in the form of new devices, sensing equipment and system hardening assets. The opportunities here are infinite from communication and data devices to repurposing existing technologies to address power quality. This need also allows for customer communication in real-time activities taking place that could affect the power quality of their service as well as fellow customers located on the same feed or substation. In addition, this could present opportunities for two-way power flow to be utilized to address voltage, feeder loading, or even outages. Smart technologies could sense and call for specific needs requiring curtailment or customers to export generated or stored energy. Financial incentives could come into play based on the actions being asked. Price is a challenging topic but offers opportunity. UI’s suite of C&LM programs directly address the consumption numbers by aiding customers in conversion to more efficient equipment which lowers overall consumption. One need that could aid price sensitivity in a decoupled environment would be added load through either customer acquisition or alternative uses. To entice others to set up business in the State of Connecticut, a potential novel economic development rate tariff structure could potentially spur businesses to consider relocation of electric intensive businesses to Connecticut. In Docket 22-08-08, UI proposes a more traditional economic development incentive through the “Economic Development Rate-Rider EDR Tariffs” which provides five years of discounted rates based on dollar volume of capital investment or quantity of increased employees. Ultimately a novel tariff could offer financial incentives to use electricity to power different sectors like transportation or even for everyday needs like heat or hot water. Section 3: Existing Program Inventory The EDCs have developed and administered a number of programs aimed at addressing customer needs, including C&LM, electric vehicle (“EV”), and storage programs (collectively, “Existing Programs”). The EDCs’ administration of C&LM programs address a wide cross section of offerings aimed at helping businesses and residents alike use energy more efficiently. The EDCs’ administration of EV programs promotes EV chargers and EV Make Ready Work to drive the continued electrification of Connecticut’s transportation system, including battery storage and solar. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 12 of 29 To ensure innovators do not propose a project already completed or administered, the EDCs have compiled a list of ongoing Existing Program projects below. In cases where a proposed project touches on the items referenced, the EDCs strongly encourage innovators to look into the Existing Program offerings further and highlight how their proposed project differs from and will build on the learnings of programs/initiatives already undertaken by the EDCs. The following section lists the Existing Programs available in Connecticut. 3.1 Connecticut Programs 3.1.1 Financing and Rates Flexible Payment Plans The EDCs each have an extended payment plan allowing several months to pay a past due balance, a Matching Payment Program10 (“MPP”), and arrearage forgiveness programs where qualifying customers can reduce and/or eliminate their past due balances by making their monthly payments. Energy Conservation Loan Program These emergency loans are available for the purchase of high efficiency boilers and furnaces. Micro Loan Program The program offers zero percent interest loans for customers who install high efficiency measures recommended through the Home Energy SolutionsSM program. Measures include high efficiency insulation, heat pumps, and hot water heater equipment. Smart-E Loans Smart-E Loans help customers upgrade their home’s energy performance including installation of high efficiency HVAC, solar photovoltaic (“PV”), EV recharging stations, and insulation. Eversource’s Flexible Payment Plans include the Matching Payment Program, New Start (Eversource’s arrearage forgiveness program), and an explanation of Eversource’s Flexible Payment Plans. UI’s Flexible Payment Plans include the Matching Payment Program and UI Bill Forgiveness Program. 10 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 13 of 29 3.1.2 Upfront C&LM Discounts, Incentives, and Rebates11 Advanced power strip rebates Rebates offered for purchasing Tier 2 advanced power strips Air purifier rebates Rebates offered for purchasing ENERGY STAR® certified air purifiers Air source heat pump incentives Rebates offered for purchasing eligible high efficiency air source heat pumps Electronically Commutated Instant discount at participating distributors Motor (ECM) Boiler Circulator Pump, Ground source heat pump Incentives for installations of qualifying ground source heat rebates pumps Heat recovery ventilator Instant discount for qualifying products (Heating Fuel Type Gas, Oil, or Propane) Home Energy Solutions - Core The rebates listed below are only available when Services program recommended by a Home Energy Solutions program contractor: • Advanced Duct Sealing. Rebate offered to a Home Energy Solutions contractor for duct sealing • Insulation. Rebate offered (per square foot) for the installation of high efficiency insulation 11 All C&LM programs, incentives, and rebates administered by the EDCs can be found on EnergizeCT.com. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 14 of 29 Home Energy Solutions - Income No-cost home audit and incentives for comprehensive home Eligible program energy upgrades for income-qualified homeowners and renters including insulation (for Home Energy SolutionsIncome Eligible participants) Multifamily Initiative Various incentives are available for residential buildings with 5+ or more units through the Multifamily Initiative Residential heat pump water Rebate offered for the installation of qualifying ENERGY Heater incentive STAR certified heat pump water heater units Residential New Construction Offers guidance from energy specialists and rebates based program on home’s Home Energy Rating System (“HERS”) Index Residential pool pump rebate Rebates offered for the installation of ENERGY STAR certified variable-speed pool pumps Residential triple pane window Offered for the installation of ENERGY STAR certified triple incentive pane windows Smart thermostats Rebates and instant discounts are offered to residential customers for the purchase of smart thermostats at retail stores or through Eversource Savings Center or UI Smart Solutions 3.1.3 Electric Vehicle, Solar, and Battery Storage • CT Solar Lease. Lease offered to reduce upfront costs of installing solar PV systems; • Low- and Moderate-Income Solar Energy. Financing for installation of solar PV systems; • Residential Solar Hot Water. Leases and loans available for installation of solar hot water systems; CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 15 of 29 • Tax Credits. Solar energy systems may qualify for tax credits that can reduce tax liability; • Energy Storage Solutions. Upfront rebates and ongoing performance incentives for behind-themeter (“BTM”) battery storage systems; and • CT EV Program. Upfront rebates for electric vehicle supply equipment (“EVSE”) and ongoing incentives for participation in the Managed Charging Program.12 3.1.4 Pay for Performance • Demand Response. Incentives earned for reduction of energy consumption during peak events using connected devices or through load curtailment. 3.2 Analysis and Evaluation Independent evaluation, measurement, and verification (“EM&V”) is an integral component of the Companies’ energy efficiency, demand management and EV charging programs.13 The EM&V process allows the Companies to verify program savings, estimate future savings, identify ways to improve program delivery and results, and expand the reach of program by identifying barriers to participation. EM&V studies include impact evaluations, process evaluations and market studies in the residential and commercial and industrial sectors. Final evaluation reports can be accessed using the following links: 12 13 • C&LM Program Evaluations • Connecticut EV Infrastructure Program Cycle 1 2022-2024 EM&V Report • Connecticut Energy Storage Solutions—Final Evaluation Report Eversource Managed Charging Program and UI’s Managed Charging Program. Energy Efficiency Board website for final reports of C&LM program evaluations. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 16 of 29 3.3 Digital Customer-Facing Offers The Connecticut Energy Efficiency Dashboard provides high-level information regarding the C&LM programs and customer participation. The Companies offer rebates and instant discounts for the online purchase of advanced power strips, appliances, electronics, and smart thermostats (Eversource Savings Center or UI Smart Solutions). 3.4 Electric Efficiency Partners Offers The Connecticut Electric Efficiency Partners (“EEP”) program, which PURA stated has now evolved into the IES program14, was established by Section 16-243v of the Connecticut General Statutes.15 The primary goal of the statutory EEP program was to reduce electricity consumption through the use of demand-side technologies. By a Decision dated June 4, 2008, PURA’s predecessor, the Connecticut Department of Public Utility Control, established the EEP program rules and guidelines for issuance of a certificate of public convenience and necessity to recognize eligibility as a partner, the processes for recognition of eligible technologies, and grant application.16 The EEP program focused on enhanced demand-side management technologies that conserve electricity and reduce electric distribution customers’ electric demand in the state, specifically, peak electric demand. Past approved EEP technologies included: • Away mode setback • Building automation control systems • Direct digital control for HVAC systems • Duty cycle optimization controllers for Heating, ventilating, air conditioning, and refrigeration systems (“HVACR”) 14 PURA Docket No. 17-12-03RE05, PURA Investigation into Distribution System Planning of the Electric Distribution Companies—Innovative Technology Applications and Programs, Decision (Mar. 30, 2022) at 5-6. 15 Conn. Gen. Stat. 16-243v codified Public Act No. 07-242, An Act Concerning Electricity and Energy Efficiency, signed by Governor M. Jodi Rell on Jun. 4, 2007. 16 Docket No. 07-06-59, DPUC Review of the Connecticut Electric Efficiency Partners Program. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 17 of 29 • HVACR systems • Energy saving algorithms • Gas chillers • Ice based thermal storage (direct expansion) • Real-time electric meter data acquisition system (Wattifi Connect) • Real-time energy feedback • Real-time water use feedback • Solar assisted air conditioning • Water use occupancy sensed thermostat setback / away mode setback 3.5 References • Current Energize ConnecticutSM Residential C&LM programs • Current and previous C&LM plans • Previous evaluations of the C&LM programs (including market saturation and potential studies) • Statewide Energy Efficiency Dashboard, which provides high-level program information • EEP offerings (currently suspended) Section 4: Preferred Focus Areas Based on the EDCs’ grid and customer needs, here are a sample of focus areas that the EDCs and developers may consider for the IES Program in the future. These are not meant to be limiting or exclusive and do not represent proposals by the EDCs. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 18 of 29 • • Clean renewable energy projects: • Building renewable generation utilization • Hot water technologies Beneficial building electrification projects (not already covered by C&LM programs, see section 3.1) including: o High efficiency heating and cooling technologies (e.g., residential air and ground source heat pumps) • o High efficiency hot water technologies (e.g., residential heat pump water heaters) o Insulation and air sealing o Whole home energy use optimization o Building management systems o Decarbonization strategies for manufacturing and commercial processes Transportation electrification projects (not already covered by other Connecticut programs, see section 3) including: o Co-located EV charging with battery storage o Electrified ride share o Fleet electrification technologies o Solutions around uptime and reliability o Innovative managed charging solutions beyond single-family residential Section 5: Market Outreach Plan During each IES cycle initiation, the EDCs will conduct outreach to attract third-party developers. The EDCs have two key roles with market outreach: CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 19 of 29 1) Support the IES Program Administrator in general market outreach; and 2) Conduct market outreach to develop Pathway 3/Phase 1 proposals. The EDCs expect that the Program Administrator will be generally responsible for the market outreach for the IES Program. The EDCs will support the Program Administrator by leveraging existing EDC channels. This includes the Announcements section and IES Program page, the IES Program page on the respective EDC websites, Energize CT social media accounts, and EDC contractor newsletters, as available. Pathway 3 Market Outreach includes communications to and for groups and associations most likely to attract third-party developers proposing IES projects as well as some broader outreach to maximize reach. Broad outreach channels to be used for recruitment and submission of innovation technologies, ideas and partners may include: • Notice on EnergizeCT.com and EDC websites • Posts on EnergizeCT.com and EDC social media accounts, as well as the UI newsletter • A joint press release pitched to both broad and energy industry publications • Public notice advertisements In addition to the outreach channels above, the EDCs will conduct outreach to groups and associations that the target audience is likely to follow and/or subscribe to with a request to disseminate information regarding the program including webinar details. The EDCs will provide these organizations with newsletter and social media copy that they can easily share with their constituents and members via their preferred, available channel(s). These groups and associations may include • American Council for an Energy-Efficient Economy (“ACEEE”) • American Public Power Association • Association of Energy Engineers (“AEE”) CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 20 of 29 • Association of Energy Service Professionals (“AESP”) • Chambers of Commerce • Connecticut Green Bank • Connecticut Green Building Council • Connecticut Innovations • Energy Efficiency Board • Grid Forward • GridWise Alliance • IRENA • National Commission on Grid Resilience • New England Women in Energy • Northeast Energy Efficiency Partnership (“NEEP”) • Organizations that have submitted Research, Development and Demonstration (“RD&D”) proposals via the Energy Efficiency Board • Smart Electric Power Association • UCONN Sustainability • Yale University Climate Connections CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 21 of 29 The EDCs will also consider posting on RFP Bid Boards, as available, relevant, and applicable. For Pathway 3, the EDCs will select partnerships with developers for Phase 1 proposals. The process will include: • Outreach to developers. Through channels and with lists described above, the EDCs will inform developers of opportunities to propose ideas to Eversource for Pathway 3 projects. • Request for information. Through this outreach, the EDCs will issue a streamlined Request for Information (“RFI”) for developers to submit basic proposal information to the EDCs including the developer’s firm name, a description of the proposed idea, the anticipated value to Connecticut customers, rationale for its alignment with the IES Program framework, and the expected roles of both the developer, and EDC. • Meetings. Based on the RFI, the EDCs will schedule meetings with developers that submit ideas within scope of the IES Program framework and are potentially feasible for an EDC/developer partnership (e.g., the EDC can conduct its defined role, the idea is specific enough to move forward to Phase 1). The EDCs may request written follow-up information and/or additional meetings to evolve or adjust the idea into a feasible Pathway 3 project. • Scoring. EDC staff will score the ideas and feasibility based on multiple metrics including quality of the idea, value to the EDCs and customers, feasibility of implementation for the EDC, qualifications of the proposing company/team. • Decision. Based on the above scoring, the EDCs will decide whether to move forward in the current cycle with each developer. The EDCs prefer to move forward with multiple Pathway 3 projects into Phase 2. Section 6: Project Integration Plan The EDCs will support the integration and interconnection of appropriate projects deemed safe for deployment within the IES Program. All pilot proposals or projects requiring interconnection will be required to follow the PURA-approved process. For example, on April 8, 2018, Eversource and UI jointly CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 22 of 29 submitted guidelines in Docket No. 03-01-15RE04 to assist power-generating customers wishing to interconnect with the Electric Power System (“EPS”). These guidelines are designed to ensure that all generator interconnections to the EPS do not adversely impact the reliability of the EPS. The EDCs are bound by the PURA-approved Guidelines for Interconnection, which state that “all customers will be treated fairly and uniformly, on a first-come, first-serve basis, without preferential treatment and in a non-discriminatory manner.” Based on this requirement, all interconnection applications are to be reviewed in the order in which they are received. During the IES Market Outreach, PURA, the Innovation Advisory Council, and the EDCs will remind developers to be cognizant of the utility interconnection process timelines, so that the developers can plan their project timelines accordingly. For the IES application process, each EDC will have a separate intake process to facilitate these pilot projects through a review and approval process, which may include coordination across multiple established programs and processes (e.g., procurement, IT security, interconnection, C&LM, etc.). The EDCs’ existing interconnection process is designed to facilitate standard generator projects and equipment as best as possible; however, this process could be cumbersome for any non-standard projects and equipment proposed in pilot projects. The pilot project process will be tailored where necessary, which will enable the EDCs to remain flexible and best provide prioritization when appropriate without disrupting or conflicting with existing operational processes. While the EDCs anticipate that some innovative projects can be evaluated through the existing processes and other may need a distinct evaluation, the EDCs plan to follow existing processes in place for initial submission and approval of projects proposing to interface with their control systems. During the solicitation phase, third-party developers must be made aware that any project or asset proposing to connect to the EDC’s control systems must meet all North American Reliability Corporation (“NERC”) compliance requirements and conform to all cybersecurity needs prior to such interface. Those requirements will be identified using existing processes to determine integration needs. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 23 of 29 6.1 Eversource Eversource anticipates that project integration will be an iterative process that, depending on the pathways selected, begins during the initial project development or review phase to assess the innovation’s potential impacts on and interactions with the existing electric grid or company systems and plan accordingly. The Eversource representative on the Innovation Advisory Council will serve as the primary liaison between innovators and the Company, helping connect project teams with appropriate documentation, guidance materials, and subject matter experts necessary for successful integration planning. Depending on the complexity and risk of the innovation, an initial pilot phase within a limited test environment may be required prior to deployment at scale. Testing of the innovation in a limited environment in advance of at-scale deployment will help minimize unintended impacts to existing systems or processes. 6.2 United Illuminating The UI Project Integration Plan will follow pre-established procedures to allow customers to integrate their innovations with the electric grid or company systems. The Manager – Clean Energy Policy will act as a liaison to connect innovators with the correct documentation, guides, and subject matter experts to ensure efficient and timely integration. While it is unknown what innovations will arise from the IES Program, UI will have a streamlined process to integrate the innovation for piloting. If the innovation is electric system hardware intended to go onto the UI grid, the UI Guidebook of Requirements (Integration Plan Appendix A) will clearly lay out and define standards and policies that would need to be followed. To interconnect a generator, UI has a pre-established PURA approved Interconnection process (Integration Plan Appendix B). If the innovation is intended to work with UI’s billing or software systems, the EDC would intend to minimize the cost and impact on rate payers by utilizing a testing environment. This testing environment would look, feel, and operate identically to UI’s system of record. The testing environment would protect against negative disruption to the systems of record should the innovation “fail (fast)” or have an unintended consequence. The UI Data Privacy and Security Programs will provide guidance to ensure CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 24 of 29 safe and secure integration that keeps the EDC’s customers and systems safe, while allowing UI to test the innovations. Similar to interconnection guidelines, the EDC recommends sharing information regarding their Data Privacy and Security frameworks early in the process to ensure potential submitters are aware of potential considerations in the development of their proposals. UI has included the following documents as attachments: • UI-Attachment 3: UI Guidebook of Requirements • UI-Attachment 4a: Guidelines for Generator Interconnection • UI-Attachment 4b: Generator Interconnection Technical Requirements Section 7: Data Privacy and Security Plan For Docket No. 17-12-03RE02, PURA Investigation into Distribution System Planning of the Electric Distribution Companies - Advanced Metering Infrastructure’s Data Access and Privacy Policy, the EDCs created a Joint Connecticut Electric Distribution Companies Cybersecurity and Privacy Framework ("Framework”).17 The Framework focuses on ensuring adequate attention is given to cybersecurity and customer privacy challenges to address new and emerging threats. This Framework provides a common language for understanding and managing cybersecurity risk and incorporates cybersecurity best practices and industry standards consistent with leading cybersecurity authorities. The Framework consists of six main parts: • Information security management; • Risk methodology; • Security design principles; See Docket No. 17-12-03RE02, UI Correspondence dated Dec. 17, 2021, Attachment 1 – Joint Privacy Framework for CT; Docket No. 17-12-03RE02, Eversource Correspondence dated Dec. 17, 2021, Joint Privacy Framework for CT. 17 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 25 of 29 • Cybersecurity capabilities to manage risk; • Privacy management; and • Vendor assurance. Section 2.6 of the Framework outlines the importance of protecting against supply chain threats to information systems and assets. A comprehensive strategy for protecting against supply chain risks includes: • Performing adequate due diligence and risk assessment of potential new vendors; • Validation of vendor security controls to ensure the design and operating effectiveness to mitigate the risks identified appropriately by the respective EDC; • Periodic monitoring of the vendor contract to ensure compliance to the EDC agreed terms and conditions; • Enforcing policy and procedure compliance; • Ensuring the protection of customer information at rest and in motion; • Providing methods for allowing customer opt-in prior to releasing any customer information unrelated to the normal delivery of energy; and • Appropriate security terms within legal agreements with third parties that require that the third parties have adequate security and privacy controls to protect the EDCs’ customer information. In terms of data compilation and transfer, the EDCs have a variety of tools used to provide suppliers with energy-related data. Where possible, we use a combination of customer authorization and Electronic Data Interface (“EDI”) transfers. For developers that require access to customer energy data, they would enter into a Supplier Services Agreement with each Company that specifies all required protocols and security measures. Due to the Connecticut General Assembly’s recent passage of consumer protection CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 26 of 29 law legislation,18 the EDCs will continue to review their Framework to ensure the protection of customer information at rest and in motion. 7.1 Eversource In addition to the above, referenced information, Eversource created a Grid Modernization Cyber Security Plan (Docket No. 17-12-03RE02).19 The plan summarizes how Eversource’s Cybersecurity Program enhances the security of grid modernization technologies and data. Eversource’s overall approach to cybersecurity follows in principle, the National Institute of Standards and Technology (“NIST”) Guidelines for Smart Grid Cyber Security, NISTIR 7628, and the DataGuard Energy Data Privacy Program, developed by the US Department of Energy. Adherence to these standards ensures that security measures and risk management efforts align appropriately with grid modernization processes and technologies under Eversource’s responsibility. Eversource’s Grid Modernization Cyber Security Plan includes the following topics: • Risk management; • Cybersecurity technical requirements; • Data privacy; • Threat and vulnerability management; • Information sharing and communications; • Event and incidence response, continuity of operations; • Supply chain and external dependencies management; See Connecticut General Assembly, SB 6, An Act Concerning Personal Data Privacy and Online Monitoring, effective Jul. 1, 2023. 19 See Docket No. 17-12-03RE02, Eversource Correspondence dated Dec. 17, 2021, Cyber Security Plan Final July 2020 ES GridMod. 18 CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 27 of 29 • Workforce management; and • Cybersecurity program management. Eversource shares its privacy policy with its customers20 which sets forth the EDC’s policies concerning the information it collects and uses and the measures Eversource takes to protect and limit access to customer information. The document includes information such as: • What information we collect and how we collect it; • How we use information we collect; • How do we share your information; • How we safeguard your information; • How you can safeguard your information; • How you can control your information and how we communicate with you; • Using social media sites; • How you can access, change or correct your information; • Our linking policy; • Protecting children’s privacy online and the Eversource school programs; and • Additional privacy terms for Connecticut residents. Eversource has included the following documents as attachments: • 20 ES-Attachment 5 ES-Grid Modernization Cyber Security Plan Privacy policy last updated on Nov. 22, 2024. CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 28 of 29 7.2 United Illuminating Data privacy and security are essential to the work UI performs on a daily basis, allowing the EDC to interact with personal data and allow others to use it in a safe and secure manner under the guidance of its corporate policy. Data privacy and security are comprised of privacy, data classification, and thirdparty rules. UI’s privacy policy references how Avangrid’s Operating Companies treat personally identifiable information (“PII”) from all stakeholders. The Personal Data Privacy Policy (see UI-Attachment 11) established by the Board of Directors, establishes the principles employees will exemplify with regard to personal data, and the standard of care customers, employees and suppliers can expect. The Binding Corporate Rules (hereinafter referred to as “BCRs”) express the global commitment of all the companies which compose the Iberdrola Group bonded to these BCRs (Iberdrola, S.A. a controlling company and each of its controlled undertakings which are also bonded to these BCRs, hereinafter “Iberdrola Group” and each of its bonded companies, the “Group Companies”) with privacy and data protection and establish the framework of appropriate guarantees for the transfer and the processing of personal data between them. • The privacy notice describes, among other things: (i) the types of information the EDC collects from the customer when they use the UI website (the “Site”); (ii) how the EDC uses the information collected through the Site; and (iii) with whom and why the EDC shares the information; • Data classification rule is for the protection of all Avangrid Operating Companies’ information and data assets throughout lifecycle; and • Third-party rules establish the security and business practices required when engaging a new or existing third party to ensure the proper security controls are assessed when a third party is accessing, storing, processing, or transmitting Avangrid Operating Company information or access to UI’s facilities. Annex 1 (see UI-Attachment 7) Is the contract required when a third party will be processing, storing or accessing company or personal data/information. Annex 2 (see UI-Attachment 8) is an industry standard document to understand the third-party security CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDCs’ Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 October 1, 2026 Page 29 of 29 posture. The Third-Party Risk evaluation is the actual third-party cyber review. Annexes 1 and 2 are the result and recommendation of the Third-Party Risk Evaluation process. UI has included the following documents as attachments: UI-Attachment 5 Third Party Risk Evaluation Form 2025 UI-Attachment 6 Avangrid Third Party Risk Management Rule UI-Attachment 7 Annex 1 AVANGRID Data Security Rider 2024 UI-Attachment 8 Annex 2 AVANGRID Use of AI Assessment UI-Attachment 9 Data Classification Rule (2019) UI-Attachment 10 Interval-Data-Request 2025 UI-Attachment 12 Binding Corporate Rules 2025

Text of ES-Attachment 2a 2026 TDRP-Appendix 8.pdf

Extracted from the file · 37,625 characters
CL1 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 1 of 23 Appendix 8: Data Year 2025 Substation Voltage Circuit ALBANY ALBANY ALBANY ALBANY BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BARBOUR HILL BARBOUR HILL BARBOUR HILL BARBOUR HILL BARBOUR HILL BARBOUR HILL BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS 4.8 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 36C4 36C7 36C8 36C9 13F61 13F62 13F63 13F64 13F65 13F66 13F67 13F68 13F71 13F72 23J1 23J2 23J31 23J32 23J33 23J36 210B4 21K1 21K11 21K2 21K3 21K4 21K6 21K7 21K8 11N81 11N83 11N84 11N85 11N86 11N87 Circuit Customers Served 505 487 342 335 137 1723 478 2200 1816 2157 1165 1229 2546 1989 2680 1826 701 2620 1730 2617 416 556 2106 1362 951 697 1025 1565 1946 1946 1215 1478 1736 2872 393 SAIDI 3 9 30 122 4 29 6 17 60 26 5 7 91 35 35 10 18 25 4 113 5 23 119 86 103 0 103 109 129 74 91 305 31 29 111 SAIFI 0.030 0.060 0.280 0.790 0.450 0.470 0.070 0.200 0.990 0.160 0.030 0.110 0.520 0.520 0.330 0.060 0.130 0.160 0.110 0.850 0.020 0.110 1.600 0.890 0.370 0.000 0.800 0.760 1.330 2.320 0.310 0.980 0.400 0.540 1.110 CAIDI 108 136 106 155 11 61 81 83 61 160 128 66 176 68 105 166 142 154 37 132 179 200 74 97 275 116 128 143 97 32 294 309 76 53 100 Three or More 53 141 35 80 599 37 46 46 202 788 476 185 CL2 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 2 of 23 Substation Voltage Circuit BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 23 23 23 23 23 23 23 23 23 11N88 11N89 201C1 201C2 201C3 201C4 6A10 6A11 6A3 6A4 6A5 6A6 6A7 6A8 6A9 6A25 11H62 11H64 11H65 11H67 11H72 11H74 11H75 11H76 11H77 11H79 11H12 11H31 3B02 3B03 3B05 3B06 3B07 3B08 3B11 3B12 3B13 Circuit Customers Served 2508 1961 3 59 263 2 690 885 1144 806 1275 681 1030 114 1527 2578 3019 1382 1820 1235 3379 2635 3637 1800 2571 2024 235 791 277 75 2685 1181 2977 1418 1077 1424 2545 SAIDI 124 35 111 111 111 111 16 25 83 35 128 4 19 64 19 28 15 39 33 8 6 2 2 23 51 65 7 48 16 21 16 8 142 125 18 54 50 SAIFI 0.680 0.400 1.000 1.000 1.000 1.000 0.100 0.170 0.590 0.200 1.100 0.030 0.100 0.710 0.130 0.120 0.110 0.400 0.380 0.390 0.060 0.020 0.040 0.570 0.590 0.530 0.130 0.700 0.030 0.080 0.100 0.030 1.580 1.320 0.150 0.500 0.340 CAIDI 182 87 111 111 111 111 165 143 141 178 117 132 182 90 144 217 131 98 89 22 95 95 74 41 87 123 55 69 452 265 162 255 90 94 121 107 147 Three or More 83 67 59 419 39 23 CL3 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 3 of 23 Substation Voltage Circuit BLOOMFIELD BOKUM BOKUM BOKUM BOKUM BOKUM BOULEVARD BOULEVARD BRANFORD BRANFORD BRANFORD BRANFORD BRANFORD BRANFORD BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BROOK ST BROOK ST BROOKLYN BROOKLYN BROOKLYN BUCKINGHAM BULLS BRIDGE BUNKER HILL BUNKER HILL BUNKER HILL BUNKER HILL BUNKER HILL BUNKER HILL 23 13.8 13.8 27.6 27.6 27.6 4.8 4.8 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 4.8 23 23 23 8.32 23 13.8 13.8 13.8 13.8 13.8 13.8 3B14 15L5 15L6 15L12 15L46 15L68 4503 4504 11J30 11J40 11J41 11J43 11J45 11J58 11K41 11K42 11K43 11K44 11K45 11K46 11K47 11K49 306A4 11K6 17F2 17F3 30Y10 30Y8 30Y9 31K1 11M3 12B31 12B32 12B33 12B34 12B35 12B36 Circuit Customers Served 991 1177 1008 2105 1275 3278 311 325 3264 752 3385 4313 3620 1452 1078 1557 1499 348 636 2146 128 1380 138 1087 676 488 2150 2159 1386 561 2946 794 1451 1349 858 1541 2740 SAIDI 21 78 43 44 28 198 142 3 44 91 33 9 41 161 156 61 31 7 14 25 13 20 4 0 1 3 177 441 1 535 488 111 27 48 32 124 6 SAIFI 0.340 1.170 0.600 0.320 0.880 2.310 1.070 0.050 0.350 1.110 0.620 0.180 0.170 0.960 1.140 0.530 0.220 0.030 0.150 0.410 0.120 0.200 0.010 0.000 0.010 0.010 1.400 2.840 0.010 2.800 2.440 0.500 0.540 0.230 0.150 2.380 0.100 CAIDI 61 66 72 137 32 85 132 72 124 82 54 52 241 167 137 115 142 205 95 62 105 99 334 162 104 190 126 155 94 191 200 219 51 210 209 52 66 Three or More 2100 329 190 413 27 316 951 397 1045 26 13 707 CL4 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 4 of 23 Substation Voltage Circuit BUNKER HILL BURRVILLE BURRVILLE BYRAM BYRAM BYRAM CAMPVILLE CAMPVILLE CANAL ST CANAL ST CANAL ST CANAL ST CANAL ST CANTON CANTON CANTON CANTON CANTON CANTON CANTON CANTON CARD ST CARD ST CARD ST CARD ST CARD ST CARMEL HILL CARMEL HILL CARMEL HILL CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS 13.8 23 23 13.2 13.2 13.2 23 27.6 23 23 23 23 23 23 23 23 23 23 23 23 27.6 23 23 23 23 23 23 23 23 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 12B37 29J1 29J2 13C2 13C3 13C4 44J3 14R31 15Q1 15Q4 15Q5 15Q6 15Q7 5R1 5R2 5R3 5R4 5R5 5R6 5R7 5R80 11F10 11F12 11F13 11F14 11F9 11S13 11S14 11S15 4R07 4R08 4R09 4R10 4R11 4R12 4R13 4R14 Circuit Customers Served 3933 2009 1516 1856 1264 1513 1252 3 2209 502 2209 3126 889 1780 3457 3105 4365 2844 1180 4078 9 3432 2793 2989 5290 3534 1619 2784 3221 1040 1004 957 812 1353 504 776 690 SAIDI 102 397 107 9 55 84 60 312 12 118 64 15 3 1,167 74 46 133 471 49 165 601 96 199 121 148 91 372 82 153 180 159 177 25 176 102 96 52 SAIFI 1.230 2.980 0.830 0.050 0.350 0.390 0.560 2.000 0.070 0.990 0.750 0.180 0.030 3.180 0.590 0.310 0.870 2.170 0.290 1.190 1.880 0.500 1.240 1.310 0.940 1.030 4.020 0.720 1.640 1.210 1.060 1.010 0.080 1.430 1.220 0.470 0.280 CAIDI 83 133 130 175 155 213 107 156 167 118 85 84 114 366 125 147 152 217 167 138 318 191 161 93 157 89 92 114 93 149 150 175 308 123 84 202 187 Three or More 220 1232 3 14 2 478 913 55 67 151 894 360 119 406 436 520 445 1417 46 797 136 120 86 536 39 2 CL5 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 5 of 23 Substation Voltage Circuit CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR LN CENTER ST CENTER ST CENTER ST CENTER ST CHIPPEN HILL CHIPPEN HILL CHIPPEN HILL CHIPPEN HILL CHIPPEN HILL CHRISTIAN ST CHRISTIAN ST COLUMBIA COLUMBIA COMPO COMPO COMPO COMPO COMPO COMPO CORNWALL COS COB COS COB COS COB COS COB RR DANIELSON DANIELSON DANIELSON TURBINE DARIEN DARIEN DARIEN DARIEN DARIEN 13.2 13.2 13.2 13.2 23 4.8 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 8.32 13.2 13.2 13.2 13.2 4.8 4.8 23 13.2 13.2 13.2 13.2 13.2 4R15 4R16 4R17 4R18 41L1 24F1 24F2 24F3 24F4 15U1 15U2 15U3 15U4 15U5 31C1 31C2 20Y1 20Y2 23K11 23K12 23K14 23K15 23K16 23K17 37J1 11R1 11R2 11R3 35K4 22A2 22A3 15C8 13S10 13S5 13S6 13S7 13S8 Circuit Customers Served 263 1443 1067 1040 1327 1026 1047 689 815 2513 3239 2858 3676 694 2518 675 1378 1036 1303 635 1536 485 887 405 988 960 112 1203 813 661 978 2563 2173 1095 1077 758 1973 SAIDI 8 42 94 45 39 4 2 27 21 18 36 28 18 1 613 204 121 205 93 31 109 28 70 130 346 136 954 13 79 160 3 279 113 58 31 261 7 SAIFI 0.140 0.580 0.630 0.480 0.150 0.040 0.060 0.310 0.510 0.120 1.170 0.260 0.210 0.030 2.430 1.410 0.620 1.760 1.080 0.510 0.420 0.230 0.210 2.240 1.550 0.840 2.750 0.070 0.370 1.060 0.080 1.900 0.700 0.240 0.260 2.350 0.040 CAIDI 55 73 149 95 260 89 41 87 42 142 31 110 83 51 252 145 194 117 86 61 256 120 324 58 223 162 347 179 209 150 35 146 161 242 120 111 175 Three or More 50 13 9 61 24 139 1058 118 1 122 62 18 180 49 16 694 257 6 345 CL6 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 6 of 23 Substation Voltage Circuit DARIEN DEEP RIVER DEEP RIVER DEEP RIVER DOOLEY DOOLEY DOOLEY DOOLEY DOOLEY DOOLEY EAST BANTAM EAST BANTAM EAST HAMPTON EAST HAMPTON EAST HAMPTON EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN 13.2 4.8 4.8 4.8 13.2 13.2 13.2 13.2 13.2 13.2 23 8.32 4.8 4.8 4.8 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13S9 13Q1 13Q2 13Q4 30K11 30K12 30K13 30K14 30K15 30K16 19U2 19U1 23A1 23A2 23A3 32G1 32G13 32G2 32G3 32G7 32G8 32G9 21P1 21P2 21P3 21P4 21P5 21P6 300J1 7L81 7L83 7L85 7L86 7L87 7L88 7L89 7L90 Circuit Customers Served 1106 671 582 204 2962 1486 1504 1577 656 2586 1470 1781 446 715 762 1462 2798 3606 3468 1419 3186 3346 1876 2106 1818 3768 1861 58 171 886 1197 2452 830 1930 5654 1937 2661 SAIDI 17 55 48 110 39 220 171 168 99 25 211 322 135 70 3 32 31 14 19 23 54 44 55 44 20 55 68 56 58 4 18 16 7 4 32 56 43 SAIFI 0.080 1.260 1.120 1.510 0.550 0.710 1.340 2.150 0.550 0.170 0.990 1.620 2.050 0.230 0.030 0.370 0.500 0.280 0.250 0.820 0.590 0.380 0.430 0.430 0.130 0.280 1.940 0.050 0.160 0.070 1.020 0.170 0.070 0.050 0.230 0.230 0.380 CAIDI 210 43 43 73 71 309 128 78 179 145 213 198 66 303 95 89 62 50 73 29 92 117 129 103 154 194 35 1,094 343 61 18 91 103 80 135 241 113 Three or More 10 51 35 28 49 262 732 23 248 199 1 127 395 34 CL7 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 7 of 23 Substation Voltage Circuit EAST ROCKS EAST ROCKS ENFIELD ENFIELD ENFIELD ENFIELD ENFIELD ENFIELD ENFIELD ESSEX ESSEX FALLS VILLAGE FALLS VILLAGE FALLS VILLAGE FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FLANDERS FLANDERS FLANDERS FLANDERS FLANDERS FLANDERS FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL 13.8 13.8 23 23 23 23 23 27.6 27.6 4.8 4.8 13.2 13.2 13.2 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 17R11 17R12 12C3 12C4 12C5 12C6 12C7 12C47 12C48 16M2 16M3 4L06 4L08 4L09 1C01 1C02 1C03 1C06 1C08 1C19 1C20 1C21 308B2 11Y1 11Y2 11Y3 11Y6 11Y7 11Y8 24A10 24A11 24A12 24A13 24A14 24A15 24A16 24A17 Circuit Customers Served 1434 1594 333 5154 2264 1801 2393 4 3489 490 756 908 626 828 707 3294 12 3257 1468 1804 3641 2267 141 3181 3009 3433 1726 2364 2153 2062 948 244 1686 966 1251 1145 1766 SAIDI 52 53 107 95 127 24 83 962 19 25 58 484 1,231 605 32 76 85 16 40 41 36 37 104 140 52 58 17 65 28 37 171 0 58 46 32 29 136 SAIFI 0.470 0.200 0.700 0.290 1.120 0.180 0.470 3.000 0.250 0.070 0.270 1.850 3.760 3.550 0.250 0.600 0.660 0.150 0.280 0.420 0.250 0.470 0.360 1.560 1.250 0.920 0.140 1.200 0.680 0.630 0.540 0.000 0.330 0.480 0.270 0.240 1.610 CAIDI 110 263 152 326 114 134 178 321 76 339 215 262 327 170 129 126 128 107 141 99 140 80 288 89 42 63 118 55 42 60 312 54 172 95 119 122 85 Three or More 143 35 51 26 4 244 366 529 19 29 15 899 748 757 223 117 249 CL8 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 8 of 23 Substation Voltage Circuit FLAX HILL FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FRANCONIA FRANCONIA FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FREDERICK FREDERICK FREDERICK FREIGHT ST FREIGHT ST FREIGHT ST FREIGHT ST FREIGHT ST FRYBROOK FRYBROOK FRYBROOK FRYBROOK FRYBROOK FRYBROOK 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 23 23 23 23 23 23 24A19 12A10 12A11 12A12 12A14 12A15 12A3 12A4 12A5 12A6 12A7 12A8 12A9 22H14 22H18 1B03 1B06 1B07 1B08 1B09 1B10 1B11 1B12 34D6 34D7 34D9 11W44 11W45 11W46 11W47 246D1 13B10 13B21 13B25 13B27 13B7 13B9 Circuit Customers Served 1626 2220 1474 2740 2678 284 236 923 2752 881 1988 1209 2902 1750 1364 989 236 1529 2807 81 2418 986 1920 553 689 788 1372 1830 868 1808 167 3619 1439 4388 1958 372 3323 SAIDI 105 22 33 99 12 9 24 16 21 34 39 90 35 43 25 29 4 9 34 50 66 9 166 5 7 17 4 17 259 42 538 180 57 141 80 149 272 SAIFI 0.620 0.440 0.150 0.720 0.170 0.060 1.020 0.600 0.130 0.390 0.570 1.790 0.630 0.300 0.170 0.210 0.080 0.080 0.210 1.000 0.480 0.050 0.770 0.040 0.040 0.180 0.090 0.270 0.490 1.020 1.010 0.830 0.490 0.810 0.740 1.040 1.940 CAIDI 171 50 215 137 73 152 23 26 154 88 70 51 56 145 149 132 57 117 160 51 136 161 214 112 160 95 48 62 521 41 529 215 117 174 108 142 140 Three or More 35 144 91 217 21 326 27 404 34 16 951 CL9 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 9 of 23 Substation Voltage Circuit GALES FERRY GALES FERRY GALES FERRY GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GRANBY STREET GRANBY STREET GRANBY STREET GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREENWICH GREENWICH GREENWICH GREENWICH GREENWICH GREENWICH GREENWICH HADDAM HADDAM HADDAM 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 4.8 4.8 4.8 23 23 23 23 23 23 23 23 13.2 13.2 13.2 13.2 13.2 13.2 13.2 23 23 23 11B1 11B2 11B61 1K02 1K03 1K04 1K05 1K06 1K07 1K09 1K10 1K11 1K12 1K13 1K14 1K16 2904 2906 2907 30R10 30R12 30R13 30R14 30R15 30R7 30R8 30R9 28F1 28F10 28F11 28F2 28F3 28F6 28F8 11C10 11C12 11C13 Circuit Customers Served 2690 1745 2293 985 626 2809 1787 2757 684 17 1702 2379 1447 1147 2318 1476 427 197 748 3025 1595 3223 3148 1439 2589 3827 3605 643 378 2389 892 1519 765 1836 1043 2489 4069 SAIDI 180 128 170 19 1 63 107 60 23 33 30 16 146 47 9 192 17 27 5 194 58 102 340 176 199 230 75 14 206 11 81 74 799 93 509 306 213 SAIFI 1.360 0.900 1.380 0.150 0.010 0.160 1.020 0.550 0.100 0.170 0.170 0.310 0.290 0.370 0.050 0.360 0.210 0.130 0.040 0.980 0.520 1.330 2.230 0.620 1.540 1.730 0.820 0.080 0.420 0.050 0.650 0.410 1.150 0.830 1.840 3.430 1.670 CAIDI 132 142 123 125 92 382 105 108 226 189 173 53 491 127 182 525 81 211 138 198 110 77 152 283 129 133 91 173 491 195 124 180 692 112 277 89 128 Three or More 407 105 494 13 2 13 320 47 366 1165 5 467 980 23 160 13 28 365 1568 728 CL10 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 10 of 23 Substation Voltage Circuit HADDAM HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HARTFORD AVE HARTFORD AVE HARWINTON HARWINTON HOPEWELL HOPEWELL HOPEWELL HOPEWELL HOPEWELL HOPEWELL HUNTINGTON RD JEFFERSON HILL JUDD BROOK JUDD BROOK JUDD BROOK KIMBERLY CLARK LAKEVIEW LAKEVIEW LAKEVIEW LAKEVIEW LAKEVIEW 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 23 23 4.8 4.8 4.8 4.8 23 23 23 23 23 23 23 23 23 8.32 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 11C14 12F42 12F43 12F44 12F49 12F51 12F52 12F55 300L2 300L4 312B2 12F46 12F47 12F48 12F2 12F4 23D3 23D7 13Y1 13Y2 22R1 22R2 22R3 22R4 22R5 22R6 28P6 26F1 32R1 32R2 32R3 24N1 31A1 31A15 31A6 31A8 31A9 Circuit Customers Served 3140 138 72 1287 2232 994 1406 3929 2 2 2 3261 2787 3633 75 6 615 900 880 2580 2374 2672 2233 1943 3564 2517 1667 1138 5210 3207 2729 6 1165 1472 1589 853 1060 SAIDI 273 160 580 629 37 178 143 14 305 305 304 25 97 200 852 195 104 42 723 199 143 79 32 96 108 25 98 287 117 150 41 1,387 91 67 124 64 60 SAIFI 1.450 1.580 4.160 3.480 0.560 2.050 1.560 0.220 1.000 1.000 1.000 0.160 1.670 1.360 3.530 0.830 1.060 1.140 5.090 1.160 0.680 0.670 0.170 1.240 0.920 0.520 0.720 2.840 0.820 0.900 0.370 3.000 1.060 0.540 0.730 0.600 0.360 CAIDI 188 101 139 180 66 87 92 64 305 305 304 153 58 146 241 235 98 37 142 171 208 119 181 77 118 48 136 101 142 166 111 462 86 124 169 107 168 Three or More 427 1299 84 146 783 1003 168 848 366 93 136 30 28 16 504 494 320 48 6 23 131 12 27 CL11 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 11 of 23 Substation LOUNSBURY MADISON MADISON MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANSFIELD MANSFIELD MANSFIELD MANSFIELD MANSFIELD MANSFIELD MIANUS MIANUS MIANUS MIANUS MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER Circuit Voltage Circuit Customers Served 766 4.8 39M1 4.8 27G1 633 4.8 27G3 612 3A01 4209 23 3A02 3526 23 23 3A03 3149 2328 23 3A04 23 3A05 1508 23 3A06 686 23 3A07 552 23 3A08 2754 23 3A09 2175 23 3A10 2731 23 3A11 4489 23 3A12 3100 13.8 12J17 894 13.8 12J4 2480 13.8 12J5 3236 13.8 12J6 916 27.6 12J33 2523 27.6 12J38 1583 13.2 16Q1 624 13.2 16Q2 1044 13.2 16Q7 474 13.2 16Q8 735 13.8 146C1 304 13.8 146C2 244 13.8 146C3 163 30 13.8 146C4 13.8 28M1 3528 13.8 28M11 2742 13.8 28M12 1724 13.8 28M13 1096 13.8 28M2 1944 13.8 28M3 2000 13.8 28M5 21 13.8 28M6 1962 SAIDI 408 163 12 36 33 54 163 162 112 23 27 5 25 45 29 35 165 94 157 174 111 189 314 8 28 63 17 189 328 25 57 115 143 125 35 170 102 SAIFI 2.180 2.310 0.100 0.320 0.230 0.340 0.940 0.880 0.670 0.120 0.400 0.030 0.460 0.350 0.420 0.210 1.300 1.180 1.060 1.480 1.040 0.830 0.840 0.090 0.120 0.540 0.150 1.740 3.030 0.390 0.570 0.880 0.700 1.060 0.260 0.900 0.950 CAIDI 187 71 118 111 141 160 172 183 168 193 68 155 56 128 69 165 127 80 148 118 107 227 374 87 231 117 117 108 108 65 101 131 205 118 133 188 107 Three or More 338 111 125 2 174 105 164 23 672 486 81 677 72 59 94 30 65 92 40 139 217 CL12 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 12 of 23 Substation Voltage Circuit MIDDLE RIVER MIDDLE RIVER MIDDLEBURY MONROE MONROE MONROE MOOSUP MOOSUP MYSTIC MYSTIC MYSTIC MYSTIC MYSTIC MYSTIC MYSTIC N GREENWICH N GREENWICH N GREENWICH N GREENWICH N GREENWICH NE SIMSBURY NE SIMSBURY NE SIMSBURY NEW ST NEW ST NEW ST NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON 13.8 13.8 4.8 23 23 23 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 23 23 23 4.8 4.8 4.8 23 23 23 23 23 23 23 23 23 23 23 28M8 28M9 18J1 15Y1 15Y2 15Y3 19Y1 19Y2 13K1 13K2 13K3 13K4 13K5 13K6 13K8 27K1 27K3 27K5 27K7 27K9 43F2 43F3 43F6 2H01 2H02 2H04 4A1 4A10 4A11 4A12 4A2 4A3 4A4 4A5 4A6 4A7 4A8 Circuit Customers Served 914 280 296 205 2160 1036 1388 718 2283 2545 1562 1660 2053 1389 1107 615 549 295 524 614 3302 3818 4282 431 597 957 1485 455 1735 3771 721 1812 304 1518 2301 1643 3254 SAIDI 229 93 137 51 61 16 131 306 40 69 111 24 33 73 203 191 265 216 113 355 193 85 128 17 19 59 35 87 267 21 57 86 22 28 21 9 4 SAIFI 1.020 2.000 0.350 0.390 0.470 0.200 1.180 3.220 0.700 0.590 1.160 0.700 0.300 0.790 1.600 1.280 1.490 1.210 0.760 2.160 0.570 0.690 1.010 0.140 0.420 0.370 0.780 0.870 1.200 0.430 0.380 0.870 0.230 0.240 0.100 0.050 0.030 CAIDI 225 47 384 131 127 80 111 95 58 116 96 35 109 93 126 149 177 179 148 164 339 123 127 115 47 157 45 101 222 49 146 98 99 113 205 181 126 Three or More 15 5 695 133 137 75 288 41 78 32 12 305 170 69 105 102 79 32 27 32 CL13 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 13 of 23 Substation Voltage Circuit NEWINGTON NEWTOWN NEWTOWN NEWTOWN NEWTOWN NEWTOWN NIANTIC NIANTIC NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH CANAAN NORTH CANAAN NORTH CANAAN NORTH CANAAN NORTH KENT NORTH LITCHFIELD NORTH SQUARE 23 13.8 13.8 13.8 13.8 13.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 4.8 4.8 23 23 23 23 23 23 23 23 23 23 13.2 13.2 13.2 13.2 23 23 4.8 4A9 12M1 12M3 12M4 12M5 12M6 21Y2 21Y3 13H91 13H92 13H93 13H94 13H96 13H97 13H98 13H99 13H1 13H2 13H3 13H4 2A1 2A11 2A14 2A15 2A17 2A3 2A4 325G1 325G2 393A1 5L01 5L02 5L03 5L04 23R1 42J1 25G1 Circuit Customers Served 2643 655 1219 1824 2705 904 1236 765 667 2347 878 225 1764 3042 1048 3181 1645 1048 1423 588 530 191 18 2108 916 1994 1220 2 4 5 201 1334 6 1061 687 1158 350 SAIDI 47 46 61 33 116 111 63 21 23 22 113 250 33 51 99 19 46 19 22 15 155 92 209 55 21 31 209 522 518 6 1,031 104 455 815 1,497 194 73 SAIFI 0.350 0.250 0.570 0.650 0.600 1.330 1.460 1.090 0.160 0.210 2.010 3.000 0.580 0.550 0.910 0.250 0.690 0.090 0.440 0.290 1.830 0.260 0.610 0.330 0.310 0.590 1.660 1.000 1.000 1.000 4.530 0.550 2.000 5.720 4.620 3.330 1.080 CAIDI 135 186 108 51 193 83 43 19 141 102 56 83 58 93 109 75 68 194 51 52 85 353 344 166 70 52 126 522 518 6 227 188 228 143 324 58 68 Three or More 65 26 159 11 1 568 217 33 66 109 28 37 243 200 26 959 671 829 CL14 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 14 of 23 Substation Voltage Circuit NORTH SQUARE NORTH SQUARE NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK OAK ST OAKVILLE 4.8 4.8 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.16 4.8 25G2 25G3 2N05 2N10 2N14 2N16 300U1 300U3 301B1 301B2 301B4 301D1 301D2 301D4 301F2 301F3 302P1 320P2 320P3 320P5 388F2 388F3 388F4 N25 N60 9S13 9S14 9S15 9S16 9S18 9S19 9S24 9S25 9S27 N7 5S01 17Q1 Circuit Customers Served 1437 647 160 2333 794 1152 545 632 517 552 874 576 393 582 600 577 557 570 332 483 810 320 551 5089 2139 2085 2281 1417 2082 338 1706 353 2009 1630 27 343 1034 SAIDI 4 90 282 5 0 21 119 109 217 92 1 5 5 68 28 16 19 123 487 2 254 69 200 1 1 34 35 81 11 4 17 17 62 61 14 2 114 SAIFI 0.050 1.630 1.980 0.040 0.010 0.110 1.160 0.420 0.870 0.800 0.010 0.100 0.110 0.270 0.110 0.170 0.200 0.580 0.990 0.010 1.180 0.210 1.000 0.000 0.000 0.430 0.420 0.320 0.070 0.020 0.430 0.180 0.630 0.710 1.000 0.050 0.920 CAIDI 70 55 142 133 70 182 102 260 248 116 115 48 44 250 250 98 92 211 490 117 215 323 201 678 552 79 85 252 149 169 40 92 98 86 14 47 124 Three or More 169 77 12 234 4 CL15 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 15 of 23 Substation Voltage Circuit OAKVILLE OXFORD OXFORD OXFORD PEACEABLE PEACEABLE PEACEABLE PEACEABLE PEACEABLE PEPPERIDGE PEPPERIDGE PEPPERIDGE PINE ORCHARD PINEWOODS PLUMTREE PLUMTREE PLUMTREE PORTLAND PORTLAND PORTLAND PORTLAND PORTLAND PORTLAND PROSPECT PROSPECT PROSPECT PROSPECT PUTNAM LAKE RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIVERTON RD RIVERTON RD 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 23 13.8 13.8 13.8 13.2 13.2 23 23 23 23 27.6 27.6 27.6 27.6 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 4.8 17Q2 26N1 26N2 26N7 12N14 12N15 12N16 12N17 12N19 28A1 28A3 28A4 36A1 42P2 30G1 30G2 30G3 21H14 21H15 21H12 21H13 21H8 21H9 146J1 169G1 22E32 22E36 485 22N1 22N2 22N3 22N4 22N5 22N6 22N7 14N3 14N2 Circuit Customers Served 577 327 2504 1802 1545 700 906 1772 1277 1644 1004 1046 187 606 2102 943 2193 1535 1570 1409 3500 3087 3487 2 7 2 18 11 2375 1705 2020 1914 1681 1691 1556 2830 584 SAIDI 11 26 127 70 380 50 85 223 335 43 80 76 201 154 69 58 51 89 31 10 45 47 121 6 10 83 725 66 106 78 78 205 77 206 360 579 697 SAIFI 0.080 0.070 0.380 0.730 2.130 0.270 0.300 1.310 2.540 0.270 0.490 1.040 2.660 1.390 0.470 1.000 0.590 0.760 0.220 0.140 0.490 0.470 0.770 1.000 1.000 1.000 2.000 1.000 1.020 0.770 0.440 1.140 0.760 2.040 2.140 1.640 2.540 CAIDI 135 340 329 96 178 188 276 169 132 157 163 73 76 111 149 58 87 117 141 73 92 101 158 6 10 83 363 66 104 101 175 179 102 101 168 353 274 Three or More 57 667 33 253 455 15 60 255 124 53 44 213 32 83 62 353 230 56 5 301 14 346 732 611 307 CL16 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 16 of 23 Substation ROBERT ST ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY RIVER ROCKY RIVER ROCKY RIVER ROCKY RIVER ROCKY RIVER ROCKY RIVER ROOD AVE ROOD AVE ROOD AVE S NAUGATUCK S NAUGATUCK S NAUGATUCK S NAUGATUCK S NAUGATUCK SALISBURY SALISBURY SANDY HOOK SANDY HOOK SANDY HOOK Circuit Voltage Circuit Customers Served 534 4.16 8F01 13.8 14W10 2183 13.8 14W12 2773 14W4 2203 13.8 14W5 2572 13.8 13.8 14W6 2640 2460 13.8 14W7 13.8 14W8 2561 13.8 14W9 3879 23 391A2 666 23 3R01 1357 23 3R02 3121 23 3R03 3897 23 3R04 2617 23 3R05 2168 23 3R06 3181 23 3R11 3899 23 3R12 948 13.8 12Y10 1610 13.8 12Y12 2507 13.8 12Y14 2205 13.8 12Y15 3141 13.8 12Y8 1488 13.8 12Y9 2812 23 24J1 4695 23 24J2 118 23 24J3 121 13.8 21L1 3546 3601 13.8 21L2 13.8 21L3 2884 13.8 21L6 1885 13.8 21L8 1965 13.2 21J3 1772 13.2 21J4 1630 23 37F1 3244 23 37F2 2110 23 37F3 1188 SAIDI 6 44 44 45 43 52 51 54 25 10 104 18 46 31 14 54 23 0 8 32 212 150 181 218 5 24 29 35 27 71 113 53 1,028 962 160 103 99 SAIFI 0.070 0.450 0.670 0.720 0.420 0.490 0.540 0.430 0.300 1.010 1.170 0.130 0.580 0.420 0.110 0.510 0.490 0.000 0.080 0.160 1.970 1.040 1.610 1.420 0.030 0.150 0.120 0.270 0.330 0.470 1.560 0.280 6.140 3.960 1.400 0.760 0.710 CAIDI 82 99 65 63 104 106 96 126 83 11 89 134 79 75 123 105 48 142 105 194 108 144 112 153 134 164 241 127 83 152 72 186 167 243 114 136 140 Three or More 138 121 130 33 72 86 18 31 230 13 19 21 625 272 585 519 2 82 456 1774 1140 724 209 21 CL17 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 17 of 23 Substation Voltage Circuit SAYBROOK SAYBROOK SAYBROOK SCHOOL HOUSE RD SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SHAWS HILL SHAWS HILL SHAWS HILL SHAWS HILL SHAWS HILL SHAWS HILL SHERWOOD SHERWOOD SHERWOOD SHERWOOD SHERWOOD SHUNOCK SHUNOCK SHUNOCK SHUNOCK SILVER SIMSBURY ROAD SIMSBURY ROAD SIMSBURY ROAD SKUNGAMAUG SKUNGAMAUG SOUTH END SOUTH END SOUTH END 13.8 13.8 13.8 4.8 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 4.8 13.8 13.8 13.2 13.2 13.2 22D2 22D3 22D4 16S2 27H1 27H11 27H12 27H2 27H3 27H4 27H6 27H7 27H9 24H2 24H3 24H4 24H5 24H6 24H9 18P1 18P2 18P4 18P8 18P9 32P1 32P3 32P4 32P5 30A2 4403 4404 4405 49S1 49S2 1G16 1G20 1G21 Circuit Customers Served 1522 1449 2310 278 3727 1659 2813 1367 697 1620 2466 2202 3167 127 1509 1129 234 2522 521 886 882 1139 1049 1155 987 1680 1976 2779 1334 205 367 384 2759 2500 909 727 1084 SAIDI 72 4 37 2 87 12 90 27 30 60 31 38 124 29 38 2 69 64 1 37 109 68 23 41 113 68 131 14 41 208 40 218 155 116 135 0 25 SAIFI 1.060 0.050 0.320 0.040 0.530 0.100 0.740 0.130 0.770 0.470 0.230 0.850 1.250 0.070 0.340 0.020 1.320 0.260 0.010 0.590 0.400 0.970 0.110 0.160 0.770 1.190 1.950 0.440 0.440 1.040 1.100 2.000 2.280 1.190 0.460 0.000 0.170 CAIDI 69 84 114 50 165 114 121 196 39 126 133 45 99 418 111 87 52 246 115 62 273 70 207 248 147 57 67 33 92 199 36 109 68 98 289 76 141 Three or More 15 56 395 29 355 62 13 1 3 56 426 779 7 1120 238 CL18 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 18 of 23 Substation Voltage Circuit SOUTH END SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WOODSTOCK SOUTH WOODSTOCK SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON 13.2 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 1G28 113 116 119 120 128 130 300F2 300F4 301G3 301L3 301L4 322G1 322G3 322G4 375C1 386R2 386R3 386R4 N1 N200 14L1 14L2 14L3 14L4 14L5 14L6 26E8 26E9 4C11 4C12 4C13 4C14 4C15 4C16 4C17 4C18 Circuit Customers Served 3504 1953 250 38 604 2132 194 939 872 498 515 527 844 824 558 400 652 1096 594 4872 4028 479 1661 2422 920 758 1168 3431 1553 1729 1622 1340 1778 2011 1743 2869 1168 SAIDI 208 81 32 117 67 27 41 261 4 70 18 241 898 166 39 947 12 40 10 3 14 5 64 16 42 27 11 381 357 110 75 3 11 18 90 36 120 SAIFI 1.690 0.400 0.640 1.470 1.140 0.270 0.270 1.220 0.030 0.730 0.010 1.020 2.420 0.330 0.180 3.440 0.020 0.260 0.020 0.010 0.060 0.060 1.100 0.230 0.700 0.340 0.190 2.090 2.630 0.850 0.420 0.070 0.220 0.130 0.630 0.420 0.910 CAIDI 123 203 51 80 59 101 148 214 120 95 1,554 237 371 505 211 275 505 153 356 206 227 80 59 72 61 80 63 182 136 129 176 52 54 141 142 85 132 Three or More 1068 1 355 399 11 1212 650 10 98 CL19 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 19 of 23 Substation SOUTHINGTON SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWICK SOUTHWICK STEPSTONE STEPSTONE STEPSTONE STEPSTONE STEVENSON STONINGTON STONINGTON STONY HILL STONY HILL STONY HILL STONY HILL STONY HILL STONY HILL STONY HILL SUFFIELD SUFFIELD THOMASTON THOMASTON THOMASTON THOMASTON THOMASTON THOMPSON Circuit Voltage Circuit Customers Served 1665 13.8 4C19 23 300Z2 379 23 300Z3 1182 301M3 264 23 301M4 523 23 23 303Q1 490 670 23 303Q3 23 304J2 488 23 47N14 100 23 47N2 1748 23 47N3 3582 23 47N8 3480 23 47N9 612 13.8 29A1 732 23 29A3 2789 13.8 35L8 1575 13.8 35L9 2306 23 35L10 1665 23 35L7 1765 8.32 14A1 765 4.16 21U1 233 4.16 21U2 708 13.8 48C10 2371 13.8 48C4 902 13.8 48C5 1212 13.8 48C6 2032 13.8 48C7 2458 13.8 48C8 1570 1367 13.8 48C9 23 36M1 1063 23 36M2 2599 13.2 2B4 1690 13.2 2B5 2123 13.2 2B6 1264 13.2 2B7 787 13.2 2B8 328 23 23Q8 2403 SAIDI 38 4 14 391 315 16 168 1 54 15 44 21 18 161 127 167 97 31 176 251 9 6 102 295 101 124 83 51 2 50 108 30 49 95 93 95 272 SAIFI 0.820 0.070 0.170 2.000 2.000 0.100 0.990 0.010 1.120 0.090 0.700 0.090 0.360 0.460 1.130 2.390 0.880 0.830 0.790 2.560 0.150 0.020 2.360 0.830 0.870 0.910 0.610 0.490 0.010 0.580 0.660 0.210 0.330 0.880 1.040 0.710 1.330 CAIDI 47 65 83 195 157 165 169 127 48 166 64 238 51 344 113 70 110 38 222 98 61 270 43 356 116 136 136 104 184 86 164 145 148 108 90 134 204 Three or More 64 18 469 472 184 129 89 1000 68 80 73 108 114 18 28 298 CL20 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 20 of 23 Substation Voltage Circuit THOMPSON TODD RD TODD RD TODD RD TODD RD TODD RD TODD RD TOMAC AVE TOMAC AVE TORRINGTON TERMINAL TORRINGTON TERMINAL TORRINGTON TERMINAL TRACY TRACY TRACY TRACY TRACY TRACY TRACY TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TUNNEL TUNNEL TUNNEL 23 13.8 13.8 13.8 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 23 23 23Q9 30L23 30L24 30L25 30L26 30L27 30L28 12H16 12H19 8A1 8A2 8A3 14M22 14M24 14M29 14M39 14M7 14M8 14M9 11A50 11A51 11A53 11A54 11A55 11A56 11A57 11A58 11A71 11A72 11A73 11A74 11A75 11A76 11A77 12S1 12S2 12S3 Circuit Customers Served 1921 1885 2029 1367 3248 606 1170 650 540 1945 2715 42 664 582 2791 2804 1198 1591 1291 432 257 1922 1114 611 174 18 3079 1381 1843 2899 3064 934 2684 2596 584 1887 336 SAIDI 232 23 15 26 3 0 22 5 16 9 90 417 285 31 155 100 4 92 178 50 70 69 12 77 8 239 41 25 26 32 60 45 24 102 121 84 100 SAIFI 2.900 0.200 0.150 0.190 0.040 0.010 0.120 0.040 0.070 0.050 0.860 3.040 2.600 0.070 0.990 0.620 0.030 0.910 1.350 0.880 0.280 0.820 0.160 0.790 0.190 0.940 0.200 0.510 0.350 0.240 0.650 0.710 0.300 0.690 0.570 0.960 1.310 CAIDI 80 116 97 138 73 42 184 121 232 164 105 137 110 415 155 160 113 101 132 58 253 84 79 97 45 253 200 48 74 133 92 64 78 148 210 87 76 Three or More 1161 6 42 305 59 51 120 186 25 653 34 529 36 CL21 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 21 of 23 Substation Voltage Circuit TUNNEL TUNNEL UNCASVILLE UNCASVILLE UNCASVILLE UNCASVILLE UNCASVILLE UNCASVILLE WATERFORD WATERFORD WATERFORD WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERTOWN WATERTOWN WATERTOWN WELLS WELLS WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD 23 23 13.2 13.2 13.2 13.2 13.2 27.6 23 23 23 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 4.8 4.8 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 12S4 12S5 1Q01 1Q02 1Q03 1Q5 1Q6 1Q21 36F2 36F5 36F6 117A1 117A4 22M1 22M10 22M12 22M13 22M14 22M15 22M16 22M2 22M3 22M4 22M6 22M8 22M9 25R1 25R2 25R3 3803 3805 14H1 14H2 14H3 14H4 14H5 14H6 Circuit Customers Served 2030 1572 2756 1044 2327 29 2296 3 1219 796 4638 4 4 1700 1335 659 845 1043 1459 1517 813 1423 1524 1514 300 2751 154 163 575 578 718 2412 1532 2856 1297 662 1782 SAIDI 157 265 108 67 46 68 37 102 12 170 46 23 23 131 213 87 29 46 10 99 64 55 21 45 25 43 251 219 148 160 155 53 133 22 77 47 195 SAIFI 1.270 2.870 0.970 0.860 0.690 1.000 0.340 1.000 0.100 1.270 0.540 1.000 1.000 0.970 0.630 1.010 0.110 0.240 0.040 0.630 1.040 0.560 0.160 0.620 0.140 0.550 1.610 1.430 1.810 1.150 1.560 0.730 1.210 0.210 0.530 2.180 0.840 CAIDI 124 92 111 78 67 68 110 102 119 134 85 23 23 135 334 87 249 186 245 158 62 98 130 73 174 79 156 153 82 139 100 74 110 102 144 22 232 Three or More 100 626 515 27 7 166 195 6 11 102 41 80 20 76 1 57 46 105 35 CL22 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 22 of 23 Substation WEST GOSHEN WEST GOSHEN WESTBROOK WESTBROOK WESTBROOK WESTON WESTON WESTON WESTON WESTPORT WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIMANTIC WILLIMANTIC WILTON WILTON WILTON WILTON Circuit Voltage Circuit Customers Served 741 23 33M1 23 33M2 283 4.8 20S1 479 20S2 576 4.8 20S3 277 4.8 13.8 21M1 778 1178 13.8 21M15 13.8 21M2 1090 13.8 21M3 639 13.8 27F14 912 13.2 7A71 665 13.2 7A72 796 13.2 7A73 2720 13.2 7A74 700 13.2 7A76 378 13.2 7A77 1932 13.2 7A78 1607 13.2 7A79 2839 13.2 7A80 847 13.2 7A81 1381 13.2 7A82 357 13.2 9L01 1639 13.2 9L02 210 13.2 9L03 1201 13.2 9L04 2020 13.2 9L05 3062 13.2 9L06 2383 13.2 9L07 1165 2060 13.2 9L08 13.2 9L09 1049 13.2 9L10 639 27.6 14S31 3 4.8 14S3 522 13.8 35A1 686 13.8 35A10 728 13.8 35A11 1678 13.8 35A3 443 SAIDI 253 57 147 197 245 173 332 136 170 121 1 2 86 14 551 34 21 49 29 2 44 26 27 15 36 18 27 33 23 70 32 94 6 14 147 204 161 SAIFI 2.410 1.160 1.260 1.940 2.340 0.970 2.430 1.510 1.660 0.430 0.020 0.010 0.360 0.580 2.710 0.210 0.170 0.380 0.060 0.010 0.200 0.610 0.860 0.130 0.170 0.160 0.150 0.210 0.150 0.510 0.270 0.660 0.050 0.150 0.570 0.970 1.050 CAIDI 105 50 117 102 105 178 137 90 102 280 64 134 235 26 203 161 126 127 469 180 219 42 31 113 207 117 177 158 150 135 119 142 117 90 258 208 153 Three or More 312 76 88 20 490 166 23 235 52 116 49 7 20 16 CL23 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 23 of 23 Substation Voltage Circuit WILTON WILTON WILTON WILTON WINCHESTER WINDSOR LOCKS WINDSOR LOCKS WINDSOR LOCKS WINDSOR LOCKS WINDSOR LOCKS WINSTED WOLCOTT WOLCOTT WOLCOTT YALE AVE YALE AVE 13.8 13.8 13.8 13.8 4.8 23 23 23 23 27.6 23 4.8 4.8 4.8 4.8 4.8 35A4 35A6 35A7 35A8 29W1 14K5 14K6 14K7 14K9 14K44 33B7 24R1 24R2 24R3 25L1 25L2 Circuit Customers Served 345 1001 956 1300 946 1777 4073 2608 2113 4 1363 688 854 498 603 208 SAIDI 73 32 188 164 228 6 60 42 44 1,113 122 52 22 5 69 44 SAIFI 0.450 0.180 1.560 0.810 2.000 0.160 0.880 0.320 0.450 1.500 0.570 0.500 0.170 0.050 1.060 0.240 CAIDI 161 174 120 203 114 36 68 129 98 743 213 105 132 93 65 183 Three or More 7 206 19 319 460 220 163

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 37,625 characters
CL1 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 1 of 23 Appendix 8: Data Year 2025 Substation Voltage Circuit ALBANY ALBANY ALBANY ALBANY BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BALDWIN BARBOUR HILL BARBOUR HILL BARBOUR HILL BARBOUR HILL BARBOUR HILL BARBOUR HILL BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BATES ROCK BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS 4.8 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 36C4 36C7 36C8 36C9 13F61 13F62 13F63 13F64 13F65 13F66 13F67 13F68 13F71 13F72 23J1 23J2 23J31 23J32 23J33 23J36 210B4 21K1 21K11 21K2 21K3 21K4 21K6 21K7 21K8 11N81 11N83 11N84 11N85 11N86 11N87 Circuit Customers Served 505 487 342 335 137 1723 478 2200 1816 2157 1165 1229 2546 1989 2680 1826 701 2620 1730 2617 416 556 2106 1362 951 697 1025 1565 1946 1946 1215 1478 1736 2872 393 SAIDI 3 9 30 122 4 29 6 17 60 26 5 7 91 35 35 10 18 25 4 113 5 23 119 86 103 0 103 109 129 74 91 305 31 29 111 SAIFI 0.030 0.060 0.280 0.790 0.450 0.470 0.070 0.200 0.990 0.160 0.030 0.110 0.520 0.520 0.330 0.060 0.130 0.160 0.110 0.850 0.020 0.110 1.600 0.890 0.370 0.000 0.800 0.760 1.330 2.320 0.310 0.980 0.400 0.540 1.110 CAIDI 108 136 106 155 11 61 81 83 61 160 128 66 176 68 105 166 142 154 37 132 179 200 74 97 275 116 128 143 97 32 294 309 76 53 100 Three or More 53 141 35 80 599 37 46 46 202 788 476 185 CL2 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 2 of 23 Substation Voltage Circuit BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BEACON FALLS BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BERLIN BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLACK ROCK BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD BLOOMFIELD 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 23 23 23 23 23 23 23 23 23 11N88 11N89 201C1 201C2 201C3 201C4 6A10 6A11 6A3 6A4 6A5 6A6 6A7 6A8 6A9 6A25 11H62 11H64 11H65 11H67 11H72 11H74 11H75 11H76 11H77 11H79 11H12 11H31 3B02 3B03 3B05 3B06 3B07 3B08 3B11 3B12 3B13 Circuit Customers Served 2508 1961 3 59 263 2 690 885 1144 806 1275 681 1030 114 1527 2578 3019 1382 1820 1235 3379 2635 3637 1800 2571 2024 235 791 277 75 2685 1181 2977 1418 1077 1424 2545 SAIDI 124 35 111 111 111 111 16 25 83 35 128 4 19 64 19 28 15 39 33 8 6 2 2 23 51 65 7 48 16 21 16 8 142 125 18 54 50 SAIFI 0.680 0.400 1.000 1.000 1.000 1.000 0.100 0.170 0.590 0.200 1.100 0.030 0.100 0.710 0.130 0.120 0.110 0.400 0.380 0.390 0.060 0.020 0.040 0.570 0.590 0.530 0.130 0.700 0.030 0.080 0.100 0.030 1.580 1.320 0.150 0.500 0.340 CAIDI 182 87 111 111 111 111 165 143 141 178 117 132 182 90 144 217 131 98 89 22 95 95 74 41 87 123 55 69 452 265 162 255 90 94 121 107 147 Three or More 83 67 59 419 39 23 CL3 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 3 of 23 Substation Voltage Circuit BLOOMFIELD BOKUM BOKUM BOKUM BOKUM BOKUM BOULEVARD BOULEVARD BRANFORD BRANFORD BRANFORD BRANFORD BRANFORD BRANFORD BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BRISTOL BROOK ST BROOK ST BROOKLYN BROOKLYN BROOKLYN BUCKINGHAM BULLS BRIDGE BUNKER HILL BUNKER HILL BUNKER HILL BUNKER HILL BUNKER HILL BUNKER HILL 23 13.8 13.8 27.6 27.6 27.6 4.8 4.8 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 4.8 23 23 23 8.32 23 13.8 13.8 13.8 13.8 13.8 13.8 3B14 15L5 15L6 15L12 15L46 15L68 4503 4504 11J30 11J40 11J41 11J43 11J45 11J58 11K41 11K42 11K43 11K44 11K45 11K46 11K47 11K49 306A4 11K6 17F2 17F3 30Y10 30Y8 30Y9 31K1 11M3 12B31 12B32 12B33 12B34 12B35 12B36 Circuit Customers Served 991 1177 1008 2105 1275 3278 311 325 3264 752 3385 4313 3620 1452 1078 1557 1499 348 636 2146 128 1380 138 1087 676 488 2150 2159 1386 561 2946 794 1451 1349 858 1541 2740 SAIDI 21 78 43 44 28 198 142 3 44 91 33 9 41 161 156 61 31 7 14 25 13 20 4 0 1 3 177 441 1 535 488 111 27 48 32 124 6 SAIFI 0.340 1.170 0.600 0.320 0.880 2.310 1.070 0.050 0.350 1.110 0.620 0.180 0.170 0.960 1.140 0.530 0.220 0.030 0.150 0.410 0.120 0.200 0.010 0.000 0.010 0.010 1.400 2.840 0.010 2.800 2.440 0.500 0.540 0.230 0.150 2.380 0.100 CAIDI 61 66 72 137 32 85 132 72 124 82 54 52 241 167 137 115 142 205 95 62 105 99 334 162 104 190 126 155 94 191 200 219 51 210 209 52 66 Three or More 2100 329 190 413 27 316 951 397 1045 26 13 707 CL4 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 4 of 23 Substation Voltage Circuit BUNKER HILL BURRVILLE BURRVILLE BYRAM BYRAM BYRAM CAMPVILLE CAMPVILLE CANAL ST CANAL ST CANAL ST CANAL ST CANAL ST CANTON CANTON CANTON CANTON CANTON CANTON CANTON CANTON CARD ST CARD ST CARD ST CARD ST CARD ST CARMEL HILL CARMEL HILL CARMEL HILL CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS 13.8 23 23 13.2 13.2 13.2 23 27.6 23 23 23 23 23 23 23 23 23 23 23 23 27.6 23 23 23 23 23 23 23 23 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 12B37 29J1 29J2 13C2 13C3 13C4 44J3 14R31 15Q1 15Q4 15Q5 15Q6 15Q7 5R1 5R2 5R3 5R4 5R5 5R6 5R7 5R80 11F10 11F12 11F13 11F14 11F9 11S13 11S14 11S15 4R07 4R08 4R09 4R10 4R11 4R12 4R13 4R14 Circuit Customers Served 3933 2009 1516 1856 1264 1513 1252 3 2209 502 2209 3126 889 1780 3457 3105 4365 2844 1180 4078 9 3432 2793 2989 5290 3534 1619 2784 3221 1040 1004 957 812 1353 504 776 690 SAIDI 102 397 107 9 55 84 60 312 12 118 64 15 3 1,167 74 46 133 471 49 165 601 96 199 121 148 91 372 82 153 180 159 177 25 176 102 96 52 SAIFI 1.230 2.980 0.830 0.050 0.350 0.390 0.560 2.000 0.070 0.990 0.750 0.180 0.030 3.180 0.590 0.310 0.870 2.170 0.290 1.190 1.880 0.500 1.240 1.310 0.940 1.030 4.020 0.720 1.640 1.210 1.060 1.010 0.080 1.430 1.220 0.470 0.280 CAIDI 83 133 130 175 155 213 107 156 167 118 85 84 114 366 125 147 152 217 167 138 318 191 161 93 157 89 92 114 93 149 150 175 308 123 84 202 187 Three or More 220 1232 3 14 2 478 913 55 67 151 894 360 119 406 436 520 445 1417 46 797 136 120 86 536 39 2 CL5 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 5 of 23 Substation Voltage Circuit CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR HEIGHTS CEDAR LN CENTER ST CENTER ST CENTER ST CENTER ST CHIPPEN HILL CHIPPEN HILL CHIPPEN HILL CHIPPEN HILL CHIPPEN HILL CHRISTIAN ST CHRISTIAN ST COLUMBIA COLUMBIA COMPO COMPO COMPO COMPO COMPO COMPO CORNWALL COS COB COS COB COS COB COS COB RR DANIELSON DANIELSON DANIELSON TURBINE DARIEN DARIEN DARIEN DARIEN DARIEN 13.2 13.2 13.2 13.2 23 4.8 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 8.32 13.2 13.2 13.2 13.2 4.8 4.8 23 13.2 13.2 13.2 13.2 13.2 4R15 4R16 4R17 4R18 41L1 24F1 24F2 24F3 24F4 15U1 15U2 15U3 15U4 15U5 31C1 31C2 20Y1 20Y2 23K11 23K12 23K14 23K15 23K16 23K17 37J1 11R1 11R2 11R3 35K4 22A2 22A3 15C8 13S10 13S5 13S6 13S7 13S8 Circuit Customers Served 263 1443 1067 1040 1327 1026 1047 689 815 2513 3239 2858 3676 694 2518 675 1378 1036 1303 635 1536 485 887 405 988 960 112 1203 813 661 978 2563 2173 1095 1077 758 1973 SAIDI 8 42 94 45 39 4 2 27 21 18 36 28 18 1 613 204 121 205 93 31 109 28 70 130 346 136 954 13 79 160 3 279 113 58 31 261 7 SAIFI 0.140 0.580 0.630 0.480 0.150 0.040 0.060 0.310 0.510 0.120 1.170 0.260 0.210 0.030 2.430 1.410 0.620 1.760 1.080 0.510 0.420 0.230 0.210 2.240 1.550 0.840 2.750 0.070 0.370 1.060 0.080 1.900 0.700 0.240 0.260 2.350 0.040 CAIDI 55 73 149 95 260 89 41 87 42 142 31 110 83 51 252 145 194 117 86 61 256 120 324 58 223 162 347 179 209 150 35 146 161 242 120 111 175 Three or More 50 13 9 61 24 139 1058 118 1 122 62 18 180 49 16 694 257 6 345 CL6 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 6 of 23 Substation Voltage Circuit DARIEN DEEP RIVER DEEP RIVER DEEP RIVER DOOLEY DOOLEY DOOLEY DOOLEY DOOLEY DOOLEY EAST BANTAM EAST BANTAM EAST HAMPTON EAST HAMPTON EAST HAMPTON EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST HARTFORD EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST MERIDEN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN EAST NEW BRITAIN 13.2 4.8 4.8 4.8 13.2 13.2 13.2 13.2 13.2 13.2 23 8.32 4.8 4.8 4.8 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13S9 13Q1 13Q2 13Q4 30K11 30K12 30K13 30K14 30K15 30K16 19U2 19U1 23A1 23A2 23A3 32G1 32G13 32G2 32G3 32G7 32G8 32G9 21P1 21P2 21P3 21P4 21P5 21P6 300J1 7L81 7L83 7L85 7L86 7L87 7L88 7L89 7L90 Circuit Customers Served 1106 671 582 204 2962 1486 1504 1577 656 2586 1470 1781 446 715 762 1462 2798 3606 3468 1419 3186 3346 1876 2106 1818 3768 1861 58 171 886 1197 2452 830 1930 5654 1937 2661 SAIDI 17 55 48 110 39 220 171 168 99 25 211 322 135 70 3 32 31 14 19 23 54 44 55 44 20 55 68 56 58 4 18 16 7 4 32 56 43 SAIFI 0.080 1.260 1.120 1.510 0.550 0.710 1.340 2.150 0.550 0.170 0.990 1.620 2.050 0.230 0.030 0.370 0.500 0.280 0.250 0.820 0.590 0.380 0.430 0.430 0.130 0.280 1.940 0.050 0.160 0.070 1.020 0.170 0.070 0.050 0.230 0.230 0.380 CAIDI 210 43 43 73 71 309 128 78 179 145 213 198 66 303 95 89 62 50 73 29 92 117 129 103 154 194 35 1,094 343 61 18 91 103 80 135 241 113 Three or More 10 51 35 28 49 262 732 23 248 199 1 127 395 34 CL7 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 7 of 23 Substation Voltage Circuit EAST ROCKS EAST ROCKS ENFIELD ENFIELD ENFIELD ENFIELD ENFIELD ENFIELD ENFIELD ESSEX ESSEX FALLS VILLAGE FALLS VILLAGE FALLS VILLAGE FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FARMINGTON FLANDERS FLANDERS FLANDERS FLANDERS FLANDERS FLANDERS FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL FLAX HILL 13.8 13.8 23 23 23 23 23 27.6 27.6 4.8 4.8 13.2 13.2 13.2 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 17R11 17R12 12C3 12C4 12C5 12C6 12C7 12C47 12C48 16M2 16M3 4L06 4L08 4L09 1C01 1C02 1C03 1C06 1C08 1C19 1C20 1C21 308B2 11Y1 11Y2 11Y3 11Y6 11Y7 11Y8 24A10 24A11 24A12 24A13 24A14 24A15 24A16 24A17 Circuit Customers Served 1434 1594 333 5154 2264 1801 2393 4 3489 490 756 908 626 828 707 3294 12 3257 1468 1804 3641 2267 141 3181 3009 3433 1726 2364 2153 2062 948 244 1686 966 1251 1145 1766 SAIDI 52 53 107 95 127 24 83 962 19 25 58 484 1,231 605 32 76 85 16 40 41 36 37 104 140 52 58 17 65 28 37 171 0 58 46 32 29 136 SAIFI 0.470 0.200 0.700 0.290 1.120 0.180 0.470 3.000 0.250 0.070 0.270 1.850 3.760 3.550 0.250 0.600 0.660 0.150 0.280 0.420 0.250 0.470 0.360 1.560 1.250 0.920 0.140 1.200 0.680 0.630 0.540 0.000 0.330 0.480 0.270 0.240 1.610 CAIDI 110 263 152 326 114 134 178 321 76 339 215 262 327 170 129 126 128 107 141 99 140 80 288 89 42 63 118 55 42 60 312 54 172 95 119 122 85 Three or More 143 35 51 26 4 244 366 529 19 29 15 899 748 757 223 117 249 CL8 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 8 of 23 Substation Voltage Circuit FLAX HILL FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FORESTVILLE FRANCONIA FRANCONIA FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FRANKLIN DR FREDERICK FREDERICK FREDERICK FREIGHT ST FREIGHT ST FREIGHT ST FREIGHT ST FREIGHT ST FRYBROOK FRYBROOK FRYBROOK FRYBROOK FRYBROOK FRYBROOK 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 23 23 23 23 23 23 24A19 12A10 12A11 12A12 12A14 12A15 12A3 12A4 12A5 12A6 12A7 12A8 12A9 22H14 22H18 1B03 1B06 1B07 1B08 1B09 1B10 1B11 1B12 34D6 34D7 34D9 11W44 11W45 11W46 11W47 246D1 13B10 13B21 13B25 13B27 13B7 13B9 Circuit Customers Served 1626 2220 1474 2740 2678 284 236 923 2752 881 1988 1209 2902 1750 1364 989 236 1529 2807 81 2418 986 1920 553 689 788 1372 1830 868 1808 167 3619 1439 4388 1958 372 3323 SAIDI 105 22 33 99 12 9 24 16 21 34 39 90 35 43 25 29 4 9 34 50 66 9 166 5 7 17 4 17 259 42 538 180 57 141 80 149 272 SAIFI 0.620 0.440 0.150 0.720 0.170 0.060 1.020 0.600 0.130 0.390 0.570 1.790 0.630 0.300 0.170 0.210 0.080 0.080 0.210 1.000 0.480 0.050 0.770 0.040 0.040 0.180 0.090 0.270 0.490 1.020 1.010 0.830 0.490 0.810 0.740 1.040 1.940 CAIDI 171 50 215 137 73 152 23 26 154 88 70 51 56 145 149 132 57 117 160 51 136 161 214 112 160 95 48 62 521 41 529 215 117 174 108 142 140 Three or More 35 144 91 217 21 326 27 404 34 16 951 CL9 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 9 of 23 Substation Voltage Circuit GALES FERRY GALES FERRY GALES FERRY GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GLENBROOK GRANBY STREET GRANBY STREET GRANBY STREET GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREEN HILL GREENWICH GREENWICH GREENWICH GREENWICH GREENWICH GREENWICH GREENWICH HADDAM HADDAM HADDAM 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 4.8 4.8 4.8 23 23 23 23 23 23 23 23 13.2 13.2 13.2 13.2 13.2 13.2 13.2 23 23 23 11B1 11B2 11B61 1K02 1K03 1K04 1K05 1K06 1K07 1K09 1K10 1K11 1K12 1K13 1K14 1K16 2904 2906 2907 30R10 30R12 30R13 30R14 30R15 30R7 30R8 30R9 28F1 28F10 28F11 28F2 28F3 28F6 28F8 11C10 11C12 11C13 Circuit Customers Served 2690 1745 2293 985 626 2809 1787 2757 684 17 1702 2379 1447 1147 2318 1476 427 197 748 3025 1595 3223 3148 1439 2589 3827 3605 643 378 2389 892 1519 765 1836 1043 2489 4069 SAIDI 180 128 170 19 1 63 107 60 23 33 30 16 146 47 9 192 17 27 5 194 58 102 340 176 199 230 75 14 206 11 81 74 799 93 509 306 213 SAIFI 1.360 0.900 1.380 0.150 0.010 0.160 1.020 0.550 0.100 0.170 0.170 0.310 0.290 0.370 0.050 0.360 0.210 0.130 0.040 0.980 0.520 1.330 2.230 0.620 1.540 1.730 0.820 0.080 0.420 0.050 0.650 0.410 1.150 0.830 1.840 3.430 1.670 CAIDI 132 142 123 125 92 382 105 108 226 189 173 53 491 127 182 525 81 211 138 198 110 77 152 283 129 133 91 173 491 195 124 180 692 112 277 89 128 Three or More 407 105 494 13 2 13 320 47 366 1165 5 467 980 23 160 13 28 365 1568 728 CL10 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 10 of 23 Substation Voltage Circuit HADDAM HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HANOVER ST HARTFORD AVE HARTFORD AVE HARWINTON HARWINTON HOPEWELL HOPEWELL HOPEWELL HOPEWELL HOPEWELL HOPEWELL HUNTINGTON RD JEFFERSON HILL JUDD BROOK JUDD BROOK JUDD BROOK KIMBERLY CLARK LAKEVIEW LAKEVIEW LAKEVIEW LAKEVIEW LAKEVIEW 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 23 23 4.8 4.8 4.8 4.8 23 23 23 23 23 23 23 23 23 8.32 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 11C14 12F42 12F43 12F44 12F49 12F51 12F52 12F55 300L2 300L4 312B2 12F46 12F47 12F48 12F2 12F4 23D3 23D7 13Y1 13Y2 22R1 22R2 22R3 22R4 22R5 22R6 28P6 26F1 32R1 32R2 32R3 24N1 31A1 31A15 31A6 31A8 31A9 Circuit Customers Served 3140 138 72 1287 2232 994 1406 3929 2 2 2 3261 2787 3633 75 6 615 900 880 2580 2374 2672 2233 1943 3564 2517 1667 1138 5210 3207 2729 6 1165 1472 1589 853 1060 SAIDI 273 160 580 629 37 178 143 14 305 305 304 25 97 200 852 195 104 42 723 199 143 79 32 96 108 25 98 287 117 150 41 1,387 91 67 124 64 60 SAIFI 1.450 1.580 4.160 3.480 0.560 2.050 1.560 0.220 1.000 1.000 1.000 0.160 1.670 1.360 3.530 0.830 1.060 1.140 5.090 1.160 0.680 0.670 0.170 1.240 0.920 0.520 0.720 2.840 0.820 0.900 0.370 3.000 1.060 0.540 0.730 0.600 0.360 CAIDI 188 101 139 180 66 87 92 64 305 305 304 153 58 146 241 235 98 37 142 171 208 119 181 77 118 48 136 101 142 166 111 462 86 124 169 107 168 Three or More 427 1299 84 146 783 1003 168 848 366 93 136 30 28 16 504 494 320 48 6 23 131 12 27 CL11 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 11 of 23 Substation LOUNSBURY MADISON MADISON MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANCHESTER MANSFIELD MANSFIELD MANSFIELD MANSFIELD MANSFIELD MANSFIELD MIANUS MIANUS MIANUS MIANUS MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER MIDDLE RIVER Circuit Voltage Circuit Customers Served 766 4.8 39M1 4.8 27G1 633 4.8 27G3 612 3A01 4209 23 3A02 3526 23 23 3A03 3149 23 3A04 2328 23 3A05 1508 23 3A06 686 23 3A07 552 23 3A08 2754 23 3A09 2175 23 3A10 2731 23 3A11 4489 23 3A12 3100 13.8 12J17 894 13.8 12J4 2480 13.8 12J5 3236 13.8 12J6 916 27.6 12J33 2523 27.6 12J38 1583 13.2 16Q1 624 13.2 16Q2 1044 13.2 16Q7 474 13.2 16Q8 735 13.8 146C1 304 13.8 146C2 244 13.8 146C3 163 13.8 146C4 30 13.8 28M1 3528 13.8 28M11 2742 13.8 28M12 1724 1096 13.8 28M13 13.8 28M2 1944 13.8 28M3 2000 13.8 28M5 21 13.8 28M6 1962 SAIDI 408 163 12 36 33 54 163 162 112 23 27 5 25 45 29 35 165 94 157 174 111 189 314 8 28 63 17 189 328 25 57 115 143 125 35 170 102 SAIFI 2.180 2.310 0.100 0.320 0.230 0.340 0.940 0.880 0.670 0.120 0.400 0.030 0.460 0.350 0.420 0.210 1.300 1.180 1.060 1.480 1.040 0.830 0.840 0.090 0.120 0.540 0.150 1.740 3.030 0.390 0.570 0.880 0.700 1.060 0.260 0.900 0.950 CAIDI 187 71 118 111 141 160 172 183 168 193 68 155 56 128 69 165 127 80 148 118 107 227 374 87 231 117 117 108 108 65 101 131 205 118 133 188 107 Three or More 338 111 125 2 174 105 164 23 672 486 81 677 72 59 94 30 65 92 40 139 217 CL12 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 12 of 23 Substation Voltage Circuit MIDDLE RIVER MIDDLE RIVER MIDDLEBURY MONROE MONROE MONROE MOOSUP MOOSUP MYSTIC MYSTIC MYSTIC MYSTIC MYSTIC MYSTIC MYSTIC N GREENWICH N GREENWICH N GREENWICH N GREENWICH N GREENWICH NE SIMSBURY NE SIMSBURY NE SIMSBURY NEW ST NEW ST NEW ST NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON NEWINGTON 13.8 13.8 4.8 23 23 23 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 23 23 23 4.8 4.8 4.8 23 23 23 23 23 23 23 23 23 23 23 28M8 28M9 18J1 15Y1 15Y2 15Y3 19Y1 19Y2 13K1 13K2 13K3 13K4 13K5 13K6 13K8 27K1 27K3 27K5 27K7 27K9 43F2 43F3 43F6 2H01 2H02 2H04 4A1 4A10 4A11 4A12 4A2 4A3 4A4 4A5 4A6 4A7 4A8 Circuit Customers Served 914 280 296 205 2160 1036 1388 718 2283 2545 1562 1660 2053 1389 1107 615 549 295 524 614 3302 3818 4282 431 597 957 1485 455 1735 3771 721 1812 304 1518 2301 1643 3254 SAIDI 229 93 137 51 61 16 131 306 40 69 111 24 33 73 203 191 265 216 113 355 193 85 128 17 19 59 35 87 267 21 57 86 22 28 21 9 4 SAIFI 1.020 2.000 0.350 0.390 0.470 0.200 1.180 3.220 0.700 0.590 1.160 0.700 0.300 0.790 1.600 1.280 1.490 1.210 0.760 2.160 0.570 0.690 1.010 0.140 0.420 0.370 0.780 0.870 1.200 0.430 0.380 0.870 0.230 0.240 0.100 0.050 0.030 CAIDI 225 47 384 131 127 80 111 95 58 116 96 35 109 93 126 149 177 179 148 164 339 123 127 115 47 157 45 101 222 49 146 98 99 113 205 181 126 Three or More 15 5 695 133 137 75 288 41 78 32 12 305 170 69 105 102 79 32 27 32 CL13 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 13 of 23 Substation Voltage Circuit NEWINGTON NEWTOWN NEWTOWN NEWTOWN NEWTOWN NEWTOWN NIANTIC NIANTIC NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NOERA NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH BLOOMFIELD NORTH CANAAN NORTH CANAAN NORTH CANAAN NORTH CANAAN NORTH KENT NORTH LITCHFIELD NORTH SQUARE 23 13.8 13.8 13.8 13.8 13.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 4.8 4.8 23 23 23 23 23 23 23 23 23 23 13.2 13.2 13.2 13.2 23 23 4.8 4A9 12M1 12M3 12M4 12M5 12M6 21Y2 21Y3 13H91 13H92 13H93 13H94 13H96 13H97 13H98 13H99 13H1 13H2 13H3 13H4 2A1 2A11 2A14 2A15 2A17 2A3 2A4 325G1 325G2 393A1 5L01 5L02 5L03 5L04 23R1 42J1 25G1 Circuit Customers Served 2643 655 1219 1824 2705 904 1236 765 667 2347 878 225 1764 3042 1048 3181 1645 1048 1423 588 530 191 18 2108 916 1994 1220 2 4 5 201 1334 6 1061 687 1158 350 SAIDI 47 46 61 33 116 111 63 21 23 22 113 250 33 51 99 19 46 19 22 15 155 92 209 55 21 31 209 522 518 6 1,031 104 455 815 1,497 194 73 SAIFI 0.350 0.250 0.570 0.650 0.600 1.330 1.460 1.090 0.160 0.210 2.010 3.000 0.580 0.550 0.910 0.250 0.690 0.090 0.440 0.290 1.830 0.260 0.610 0.330 0.310 0.590 1.660 1.000 1.000 1.000 4.530 0.550 2.000 5.720 4.620 3.330 1.080 CAIDI 135 186 108 51 193 83 43 19 141 102 56 83 58 93 109 75 68 194 51 52 85 353 344 166 70 52 126 522 518 6 227 188 228 143 324 58 68 Three or More 65 26 159 11 1 568 217 33 66 109 28 37 243 200 26 959 671 829 CL14 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 14 of 23 Substation Voltage Circuit NORTH SQUARE NORTH SQUARE NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORTHWEST HARTFORD NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK NORWALK OAK ST OAKVILLE 4.8 4.8 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.16 4.8 25G2 25G3 2N05 2N10 2N14 2N16 300U1 300U3 301B1 301B2 301B4 301D1 301D2 301D4 301F2 301F3 302P1 320P2 320P3 320P5 388F2 388F3 388F4 N25 N60 9S13 9S14 9S15 9S16 9S18 9S19 9S24 9S25 9S27 N7 5S01 17Q1 Circuit Customers Served 1437 647 160 2333 794 1152 545 632 517 552 874 576 393 582 600 577 557 570 332 483 810 320 551 5089 2139 2085 2281 1417 2082 338 1706 353 2009 1630 27 343 1034 SAIDI 4 90 282 5 0 21 119 109 217 92 1 5 5 68 28 16 19 123 487 2 254 69 200 1 1 34 35 81 11 4 17 17 62 61 14 2 114 SAIFI 0.050 1.630 1.980 0.040 0.010 0.110 1.160 0.420 0.870 0.800 0.010 0.100 0.110 0.270 0.110 0.170 0.200 0.580 0.990 0.010 1.180 0.210 1.000 0.000 0.000 0.430 0.420 0.320 0.070 0.020 0.430 0.180 0.630 0.710 1.000 0.050 0.920 CAIDI 70 55 142 133 70 182 102 260 248 116 115 48 44 250 250 98 92 211 490 117 215 323 201 678 552 79 85 252 149 169 40 92 98 86 14 47 124 Three or More 169 77 12 234 4 CL15 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 15 of 23 Substation Voltage Circuit OAKVILLE OXFORD OXFORD OXFORD PEACEABLE PEACEABLE PEACEABLE PEACEABLE PEACEABLE PEPPERIDGE PEPPERIDGE PEPPERIDGE PINE ORCHARD PINEWOODS PLUMTREE PLUMTREE PLUMTREE PORTLAND PORTLAND PORTLAND PORTLAND PORTLAND PORTLAND PROSPECT PROSPECT PROSPECT PROSPECT PUTNAM LAKE RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIDGEFIELD RIVERTON RD RIVERTON RD 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 23 13.8 13.8 13.8 13.2 13.2 23 23 23 23 27.6 27.6 27.6 27.6 4.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 4.8 17Q2 26N1 26N2 26N7 12N14 12N15 12N16 12N17 12N19 28A1 28A3 28A4 36A1 42P2 30G1 30G2 30G3 21H14 21H15 21H12 21H13 21H8 21H9 146J1 169G1 22E32 22E36 485 22N1 22N2 22N3 22N4 22N5 22N6 22N7 14N3 14N2 Circuit Customers Served 577 327 2504 1802 1545 700 906 1772 1277 1644 1004 1046 187 606 2102 943 2193 1535 1570 1409 3500 3087 3487 2 7 2 18 11 2375 1705 2020 1914 1681 1691 1556 2830 584 SAIDI 11 26 127 70 380 50 85 223 335 43 80 76 201 154 69 58 51 89 31 10 45 47 121 6 10 83 725 66 106 78 78 205 77 206 360 579 697 SAIFI 0.080 0.070 0.380 0.730 2.130 0.270 0.300 1.310 2.540 0.270 0.490 1.040 2.660 1.390 0.470 1.000 0.590 0.760 0.220 0.140 0.490 0.470 0.770 1.000 1.000 1.000 2.000 1.000 1.020 0.770 0.440 1.140 0.760 2.040 2.140 1.640 2.540 CAIDI 135 340 329 96 178 188 276 169 132 157 163 73 76 111 149 58 87 117 141 73 92 101 158 6 10 83 363 66 104 101 175 179 102 101 168 353 274 Three or More 57 667 33 253 455 15 60 255 124 53 44 213 32 83 62 353 230 56 5 301 14 346 732 611 307 CL16 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 16 of 23 Substation ROBERT ST ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKVILLE ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY HILL ROCKY RIVER ROCKY RIVER ROCKY RIVER ROCKY RIVER ROCKY RIVER ROCKY RIVER ROOD AVE ROOD AVE ROOD AVE S NAUGATUCK S NAUGATUCK S NAUGATUCK S NAUGATUCK S NAUGATUCK SALISBURY SALISBURY SANDY HOOK SANDY HOOK SANDY HOOK Circuit Voltage Circuit Customers Served 534 4.16 8F01 13.8 14W10 2183 13.8 14W12 2773 14W4 2203 13.8 14W5 2572 13.8 13.8 14W6 2640 13.8 14W7 2460 13.8 14W8 2561 13.8 14W9 3879 23 391A2 666 23 3R01 1357 23 3R02 3121 23 3R03 3897 23 3R04 2617 23 3R05 2168 23 3R06 3181 23 3R11 3899 23 3R12 948 13.8 12Y10 1610 13.8 12Y12 2507 13.8 12Y14 2205 13.8 12Y15 3141 13.8 12Y8 1488 13.8 12Y9 2812 23 24J1 4695 23 24J2 118 23 24J3 121 13.8 21L1 3546 13.8 21L2 3601 13.8 21L3 2884 13.8 21L6 1885 13.8 21L8 1965 1772 13.2 21J3 13.2 21J4 1630 23 37F1 3244 23 37F2 2110 23 37F3 1188 SAIDI 6 44 44 45 43 52 51 54 25 10 104 18 46 31 14 54 23 0 8 32 212 150 181 218 5 24 29 35 27 71 113 53 1,028 962 160 103 99 SAIFI 0.070 0.450 0.670 0.720 0.420 0.490 0.540 0.430 0.300 1.010 1.170 0.130 0.580 0.420 0.110 0.510 0.490 0.000 0.080 0.160 1.970 1.040 1.610 1.420 0.030 0.150 0.120 0.270 0.330 0.470 1.560 0.280 6.140 3.960 1.400 0.760 0.710 CAIDI 82 99 65 63 104 106 96 126 83 11 89 134 79 75 123 105 48 142 105 194 108 144 112 153 134 164 241 127 83 152 72 186 167 243 114 136 140 Three or More 138 121 130 33 72 86 18 31 230 13 19 21 625 272 585 519 2 82 456 1774 1140 724 209 21 CL17 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 17 of 23 Substation Voltage Circuit SAYBROOK SAYBROOK SAYBROOK SCHOOL HOUSE RD SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SCITICO SHAWS HILL SHAWS HILL SHAWS HILL SHAWS HILL SHAWS HILL SHAWS HILL SHERWOOD SHERWOOD SHERWOOD SHERWOOD SHERWOOD SHUNOCK SHUNOCK SHUNOCK SHUNOCK SILVER SIMSBURY ROAD SIMSBURY ROAD SIMSBURY ROAD SKUNGAMAUG SKUNGAMAUG SOUTH END SOUTH END SOUTH END 13.8 13.8 13.8 4.8 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 4.8 4.8 4.8 13.8 13.8 13.2 13.2 13.2 22D2 22D3 22D4 16S2 27H1 27H11 27H12 27H2 27H3 27H4 27H6 27H7 27H9 24H2 24H3 24H4 24H5 24H6 24H9 18P1 18P2 18P4 18P8 18P9 32P1 32P3 32P4 32P5 30A2 4403 4404 4405 49S1 49S2 1G16 1G20 1G21 Circuit Customers Served 1522 1449 2310 278 3727 1659 2813 1367 697 1620 2466 2202 3167 127 1509 1129 234 2522 521 886 882 1139 1049 1155 987 1680 1976 2779 1334 205 367 384 2759 2500 909 727 1084 SAIDI 72 4 37 2 87 12 90 27 30 60 31 38 124 29 38 2 69 64 1 37 109 68 23 41 113 68 131 14 41 208 40 218 155 116 135 0 25 SAIFI 1.060 0.050 0.320 0.040 0.530 0.100 0.740 0.130 0.770 0.470 0.230 0.850 1.250 0.070 0.340 0.020 1.320 0.260 0.010 0.590 0.400 0.970 0.110 0.160 0.770 1.190 1.950 0.440 0.440 1.040 1.100 2.000 2.280 1.190 0.460 0.000 0.170 CAIDI 69 84 114 50 165 114 121 196 39 126 133 45 99 418 111 87 52 246 115 62 273 70 207 248 147 57 67 33 92 199 36 109 68 98 289 76 141 Three or More 15 56 395 29 355 62 13 1 3 56 426 779 7 1120 238 CL18 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 18 of 23 Substation Voltage Circuit SOUTH END SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH MEADOW SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WINDSOR SOUTH WOODSTOCK SOUTH WOODSTOCK SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON SOUTHINGTON 13.2 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 1G28 113 116 119 120 128 130 300F2 300F4 301G3 301L3 301L4 322G1 322G3 322G4 375C1 386R2 386R3 386R4 N1 N200 14L1 14L2 14L3 14L4 14L5 14L6 26E8 26E9 4C11 4C12 4C13 4C14 4C15 4C16 4C17 4C18 Circuit Customers Served 3504 1953 250 38 604 2132 194 939 872 498 515 527 844 824 558 400 652 1096 594 4872 4028 479 1661 2422 920 758 1168 3431 1553 1729 1622 1340 1778 2011 1743 2869 1168 SAIDI 208 81 32 117 67 27 41 261 4 70 18 241 898 166 39 947 12 40 10 3 14 5 64 16 42 27 11 381 357 110 75 3 11 18 90 36 120 SAIFI 1.690 0.400 0.640 1.470 1.140 0.270 0.270 1.220 0.030 0.730 0.010 1.020 2.420 0.330 0.180 3.440 0.020 0.260 0.020 0.010 0.060 0.060 1.100 0.230 0.700 0.340 0.190 2.090 2.630 0.850 0.420 0.070 0.220 0.130 0.630 0.420 0.910 CAIDI 123 203 51 80 59 101 148 214 120 95 1,554 237 371 505 211 275 505 153 356 206 227 80 59 72 61 80 63 182 136 129 176 52 54 141 142 85 132 Three or More 1068 1 355 399 11 1212 650 10 98 CL19 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 19 of 23 Substation SOUTHINGTON SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWEST HARTFORD SOUTHWICK SOUTHWICK STEPSTONE STEPSTONE STEPSTONE STEPSTONE STEVENSON STONINGTON STONINGTON STONY HILL STONY HILL STONY HILL STONY HILL STONY HILL STONY HILL STONY HILL SUFFIELD SUFFIELD THOMASTON THOMASTON THOMASTON THOMASTON THOMASTON THOMPSON Circuit Voltage Circuit Customers Served 1665 13.8 4C19 23 300Z2 379 23 300Z3 1182 301M3 264 23 301M4 523 23 23 303Q1 490 23 303Q3 670 23 304J2 488 23 47N14 100 23 47N2 1748 23 47N3 3582 23 47N8 3480 23 47N9 612 13.8 29A1 732 23 29A3 2789 13.8 35L8 1575 13.8 35L9 2306 23 35L10 1665 23 35L7 1765 8.32 14A1 765 4.16 21U1 233 4.16 21U2 708 13.8 48C10 2371 13.8 48C4 902 13.8 48C5 1212 13.8 48C6 2032 13.8 48C7 2458 13.8 48C8 1570 13.8 48C9 1367 23 36M1 1063 23 36M2 2599 13.2 2B4 1690 2123 13.2 2B5 13.2 2B6 1264 13.2 2B7 787 13.2 2B8 328 23 23Q8 2403 SAIDI 38 4 14 391 315 16 168 1 54 15 44 21 18 161 127 167 97 31 176 251 9 6 102 295 101 124 83 51 2 50 108 30 49 95 93 95 272 SAIFI 0.820 0.070 0.170 2.000 2.000 0.100 0.990 0.010 1.120 0.090 0.700 0.090 0.360 0.460 1.130 2.390 0.880 0.830 0.790 2.560 0.150 0.020 2.360 0.830 0.870 0.910 0.610 0.490 0.010 0.580 0.660 0.210 0.330 0.880 1.040 0.710 1.330 CAIDI 47 65 83 195 157 165 169 127 48 166 64 238 51 344 113 70 110 38 222 98 61 270 43 356 116 136 136 104 184 86 164 145 148 108 90 134 204 Three or More 64 18 469 472 184 129 89 1000 68 80 73 108 114 18 28 298 CL20 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 20 of 23 Substation Voltage Circuit THOMPSON TODD RD TODD RD TODD RD TODD RD TODD RD TODD RD TOMAC AVE TOMAC AVE TORRINGTON TERMINAL TORRINGTON TERMINAL TORRINGTON TERMINAL TRACY TRACY TRACY TRACY TRACY TRACY TRACY TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TRIANGLE TUNNEL TUNNEL TUNNEL 23 13.8 13.8 13.8 13.8 13.8 13.8 13.2 13.2 13.2 13.2 13.2 23 23 23 23 23 23 23 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 13.8 23 23 23 23Q9 30L23 30L24 30L25 30L26 30L27 30L28 12H16 12H19 8A1 8A2 8A3 14M22 14M24 14M29 14M39 14M7 14M8 14M9 11A50 11A51 11A53 11A54 11A55 11A56 11A57 11A58 11A71 11A72 11A73 11A74 11A75 11A76 11A77 12S1 12S2 12S3 Circuit Customers Served 1921 1885 2029 1367 3248 606 1170 650 540 1945 2715 42 664 582 2791 2804 1198 1591 1291 432 257 1922 1114 611 174 18 3079 1381 1843 2899 3064 934 2684 2596 584 1887 336 SAIDI 232 23 15 26 3 0 22 5 16 9 90 417 285 31 155 100 4 92 178 50 70 69 12 77 8 239 41 25 26 32 60 45 24 102 121 84 100 SAIFI 2.900 0.200 0.150 0.190 0.040 0.010 0.120 0.040 0.070 0.050 0.860 3.040 2.600 0.070 0.990 0.620 0.030 0.910 1.350 0.880 0.280 0.820 0.160 0.790 0.190 0.940 0.200 0.510 0.350 0.240 0.650 0.710 0.300 0.690 0.570 0.960 1.310 CAIDI 80 116 97 138 73 42 184 121 232 164 105 137 110 415 155 160 113 101 132 58 253 84 79 97 45 253 200 48 74 133 92 64 78 148 210 87 76 Three or More 1161 6 42 305 59 51 120 186 25 653 34 529 36 CL21 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 21 of 23 Substation Voltage Circuit TUNNEL TUNNEL UNCASVILLE UNCASVILLE UNCASVILLE UNCASVILLE UNCASVILLE UNCASVILLE WATERFORD WATERFORD WATERFORD WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERSIDE WATERTOWN WATERTOWN WATERTOWN WELLS WELLS WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD WEST BROOKFIELD 23 23 13.2 13.2 13.2 13.2 13.2 27.6 23 23 23 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 13.2 4.8 4.8 4.8 4.8 4.8 13.8 13.8 13.8 13.8 13.8 13.8 12S4 12S5 1Q01 1Q02 1Q03 1Q5 1Q6 1Q21 36F2 36F5 36F6 117A1 117A4 22M1 22M10 22M12 22M13 22M14 22M15 22M16 22M2 22M3 22M4 22M6 22M8 22M9 25R1 25R2 25R3 3803 3805 14H1 14H2 14H3 14H4 14H5 14H6 Circuit Customers Served 2030 1572 2756 1044 2327 29 2296 3 1219 796 4638 4 4 1700 1335 659 845 1043 1459 1517 813 1423 1524 1514 300 2751 154 163 575 578 718 2412 1532 2856 1297 662 1782 SAIDI 157 265 108 67 46 68 37 102 12 170 46 23 23 131 213 87 29 46 10 99 64 55 21 45 25 43 251 219 148 160 155 53 133 22 77 47 195 SAIFI 1.270 2.870 0.970 0.860 0.690 1.000 0.340 1.000 0.100 1.270 0.540 1.000 1.000 0.970 0.630 1.010 0.110 0.240 0.040 0.630 1.040 0.560 0.160 0.620 0.140 0.550 1.610 1.430 1.810 1.150 1.560 0.730 1.210 0.210 0.530 2.180 0.840 CAIDI 124 92 111 78 67 68 110 102 119 134 85 23 23 135 334 87 249 186 245 158 62 98 130 73 174 79 156 153 82 139 100 74 110 102 144 22 232 Three or More 100 626 515 27 7 166 195 6 11 102 41 80 20 76 1 57 46 105 35 CL22 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 22 of 23 Substation WEST GOSHEN WEST GOSHEN WESTBROOK WESTBROOK WESTBROOK WESTON WESTON WESTON WESTON WESTPORT WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WESTSIDE WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIAMS ST WILLIMANTIC WILLIMANTIC WILTON WILTON WILTON WILTON Circuit Voltage Circuit Customers Served 741 23 33M1 23 33M2 283 4.8 20S1 479 20S2 576 4.8 20S3 277 4.8 13.8 21M1 778 13.8 21M15 1178 13.8 21M2 1090 13.8 21M3 639 13.8 27F14 912 13.2 7A71 665 13.2 7A72 796 13.2 7A73 2720 13.2 7A74 700 13.2 7A76 378 13.2 7A77 1932 13.2 7A78 1607 13.2 7A79 2839 13.2 7A80 847 13.2 7A81 1381 13.2 7A82 357 13.2 9L01 1639 13.2 9L02 210 13.2 9L03 1201 13.2 9L04 2020 13.2 9L05 3062 13.2 9L06 2383 13.2 9L07 1165 13.2 9L08 2060 13.2 9L09 1049 13.2 9L10 639 27.6 14S31 3 522 4.8 14S3 13.8 35A1 686 13.8 35A10 728 13.8 35A11 1678 13.8 35A3 443 SAIDI 253 57 147 197 245 173 332 136 170 121 1 2 86 14 551 34 21 49 29 2 44 26 27 15 36 18 27 33 23 70 32 94 6 14 147 204 161 SAIFI 2.410 1.160 1.260 1.940 2.340 0.970 2.430 1.510 1.660 0.430 0.020 0.010 0.360 0.580 2.710 0.210 0.170 0.380 0.060 0.010 0.200 0.610 0.860 0.130 0.170 0.160 0.150 0.210 0.150 0.510 0.270 0.660 0.050 0.150 0.570 0.970 1.050 CAIDI 105 50 117 102 105 178 137 90 102 280 64 134 235 26 203 161 126 127 469 180 219 42 31 113 207 117 177 158 150 135 119 142 117 90 258 208 153 Three or More 312 76 88 20 490 166 23 235 52 116 49 7 20 16 CL23 dba Eversource Energy Docket 86-12-03 Order 12 Docket 25-08-09 Attachment 2 March 31, 2026 Appendix 8, Page 23 of 23 Substation Voltage Circuit WILTON WILTON WILTON WILTON WINCHESTER WINDSOR LOCKS WINDSOR LOCKS WINDSOR LOCKS WINDSOR LOCKS WINDSOR LOCKS WINSTED WOLCOTT WOLCOTT WOLCOTT YALE AVE YALE AVE 13.8 13.8 13.8 13.8 4.8 23 23 23 23 27.6 23 4.8 4.8 4.8 4.8 4.8 35A4 35A6 35A7 35A8 29W1 14K5 14K6 14K7 14K9 14K44 33B7 24R1 24R2 24R3 25L1 25L2 Circuit Customers Served 345 1001 956 1300 946 1777 4073 2608 2113 4 1363 688 854 498 603 208 SAIDI 73 32 188 164 228 6 60 42 44 1,113 122 52 22 5 69 44 SAIFI 0.450 0.180 1.560 0.810 2.000 0.160 0.880 0.320 0.450 1.500 0.570 0.500 0.170 0.050 1.060 0.240 CAIDI 161 174 120 203 114 36 68 129 98 743 213 105 132 93 65 183 Three or More 7 206 19 319 460 220 163

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Extracted from the file · 53,452 characters
[Sheet: _8_Appendix8Output] Appendix 8: Data Year 2025 Substation | Voltage | Circuit | Circuit Customers Served | SAIDI | SAIFI | CAIDI | Three or More ALBANY | 4.8 | 36C4 | 505 | 3 | 0.03 | 107.94117647058823 ALBANY | 4.8 | 36C7 | 487 | 9 | 0.06 | 136.17647058823528 ALBANY | 4.8 | 36C8 | 342 | 30 | 0.28 | 105.81818181818181 ALBANY | 4.8 | 36C9 | 335 | 122 | 0.79 | 155.03396226415092 BALDWIN | 13.8 | 13F61 | 137 | 4 | 0.45 | 11 BALDWIN | 13.8 | 13F62 | 1723 | 29 | 0.47 | 61.47484662576688 BALDWIN | 13.8 | 13F63 | 478 | 6 | 0.07 | 80.57894736842104 BALDWIN | 13.8 | 13F64 | 2200 | 17 | 0.2 | 82.80043859649125 BALDWIN | 13.8 | 13F65 | 1816 | 60 | 0.99 | 60.8707182320442 | 53 BALDWIN | 13.8 | 13F66 | 2157 | 26 | 0.16 | 159.90651558073648 BALDWIN | 13.8 | 13F67 | 1165 | 5 | 0.03 | 128.45652173913044 BALDWIN | 13.8 | 13F68 | 1229 | 7 | 0.11 | 65.64383561643835 BALDWIN | 13.8 | 13F71 | 2546 | 91 | 0.52 | 175.71396226415098 | 141 BALDWIN | 13.8 | 13F72 | 1989 | 35 | 0.52 | 67.52190476190476 BARBOUR HILL | 13.8 | 23J1 | 2680 | 35 | 0.33 | 104.65894039735097 BARBOUR HILL | 13.8 | 23J2 | 1826 | 10 | 0.06 | 166.02521008403363 BARBOUR HILL | 23 | 23J31 | 701 | 18 | 0.13 | 142.48913043478262 BARBOUR HILL | 23 | 23J32 | 2620 | 25 | 0.16 | 154.39252336448592 | 35 BARBOUR HILL | 23 | 23J33 | 1730 | 4 | 0.11 | 37.4795918367347 BARBOUR HILL | 23 | 23J36 | 2617 | 113 | 0.85 | 132.17544642857146 | 80 BATES ROCK | 13.8 | 210B4 | 416 | 5 | 0.02 | 178.66666666666666 BATES ROCK | 13.8 | 21K1 | 556 | 23 | 0.11 | 199.89062500000003 BATES ROCK | 13.8 | 21K11 | 2106 | 119 | 1.6 | 74.44240450103644 | 599 BATES ROCK | 13.8 | 21K2 | 1362 | 86 | 0.89 | 96.63726298433629 | 37 BATES ROCK | 13.8 | 21K3 | 951 | 103 | 0.37 | 275.4606741573034 BATES ROCK | 13.8 | 21K4 | 697 | 0 | 0 | 115.99999999999999 BATES ROCK | 13.8 | 21K6 | 1025 | 103 | 0.8 | 128.26997578692493 | 46 BATES ROCK | 13.8 | 21K7 | 1565 | 109 | 0.76 | 143.10535117056855 | 46 BATES ROCK | 13.8 | 21K8 | 1946 | 129 | 1.33 | 97.06868764389867 | 202 BEACON FALLS | 13.8 | 11N81 | 1946 | 74 | 2.32 | 32.18077348066299 | 788 BEACON FALLS | 13.8 | 11N83 | 1215 | 91 | 0.31 | 293.6445623342175 BEACON FALLS | 13.8 | 11N84 | 1478 | 305 | 0.98 | 309.1403148528404 | 476 BEACON FALLS | 13.8 | 11N85 | 1736 | 31 | 0.4 | 76.29337094499296 BEACON FALLS | 13.8 | 11N86 | 2872 | 29 | 0.54 | 53.098922003804724 | 185 BEACON FALLS | 13.8 | 11N87 | 393 | 111 | 1.11 | 100.1578947368421 BEACON FALLS | 13.8 | 11N88 | 2508 | 124 | 0.68 | 182.03619381202572 | 83 BEACON FALLS | 13.8 | 11N89 | 1961 | 35 | 0.4 | 86.78802992518703 | 67 BEACON FALLS | 13.8 | 201C1 | 3 | 111 | 1 | 111 BEACON FALLS | 13.8 | 201C2 | 59 | 111 | 1 | 111 BEACON FALLS | 13.8 | 201C3 | 263 | 111 | 1 | 111 BEACON FALLS | 13.8 | 201C4 | 2 | 111 | 1 | 111 BERLIN | 13.8 | 6A10 | 690 | 16 | 0.1 | 164.87142857142857 BERLIN | 13.8 | 6A11 | 885 | 25 | 0.17 | 143.11392405063287 BERLIN | 13.8 | 6A3 | 1144 | 83 | 0.59 | 141.1426470588235 BERLIN | 13.8 | 6A4 | 806 | 35 | 0.2 | 178.14197530864197 BERLIN | 13.8 | 6A5 | 1275 | 128 | 1.1 | 116.65198863636364 BERLIN | 13.8 | 6A6 | 681 | 4 | 0.03 | 132.38095238095238 BERLIN | 13.8 | 6A7 | 1030 | 19 | 0.1 | 181.9115044247788 BERLIN | 13.8 | 6A8 | 114 | 64 | 0.71 | 90.02439024390245 BERLIN | 13.8 | 6A9 | 1527 | 19 | 0.13 | 143.72195121951225 BERLIN | 23 | 6A25 | 2578 | 28 | 0.12 | 217.06606606606607 BLACK ROCK | 13.8 | 11H62 | 3019 | 15 | 0.11 | 131.07648725212465 BLACK ROCK | 13.8 | 11H64 | 1382 | 39 | 0.4 | 97.61811722912967 BLACK ROCK | 13.8 | 11H65 | 1820 | 33 | 0.38 | 89.00000000000001 BLACK ROCK | 13.8 | 11H67 | 1235 | 8 | 0.39 | 21.651639344262293 BLACK ROCK | 13.8 | 11H72 | 3379 | 6 | 0.06 | 95.20276497695852 BLACK ROCK | 13.8 | 11H74 | 2635 | 2 | 0.02 | 95.40983606557377 BLACK ROCK | 13.8 | 11H75 | 3637 | 2 | 0.04 | 73.67567567567568 BLACK ROCK | 13.8 | 11H76 | 1800 | 23 | 0.57 | 41.35922330097086 BLACK ROCK | 13.8 | 11H77 | 2571 | 51 | 0.59 | 86.70841487279844 BLACK ROCK | 13.8 | 11H79 | 2024 | 65 | 0.53 | 123.0027777777778 | 59 BLACK ROCK | 4.8 | 11H12 | 235 | 7 | 0.13 | 55 BLACK ROCK | 4.8 | 11H31 | 791 | 48 | 0.7 | 68.94054054054055 BLOOMFIELD | 23 | 3B02 | 277 | 16 | 0.03 | 451.6 BLOOMFIELD | 23 | 3B03 | 75 | 21 | 0.08 | 265 BLOOMFIELD | 23 | 3B05 | 2685 | 16 | 0.1 | 161.66071428571445 BLOOMFIELD | 23 | 3B06 | 1181 | 8 | 0.03 | 255.12820512820514 BLOOMFIELD | 23 | 3B07 | 2977 | 142 | 1.58 | 90.18571125715495 | 419 BLOOMFIELD | 23 | 3B08 | 1418 | 125 | 1.32 | 94.39627659574465 | 39 BLOOMFIELD | 23 | 3B11 | 1077 | 18 | 0.15 | 121.2469879518072 BLOOMFIELD | 23 | 3B12 | 1424 | 54 | 0.5 | 107.1312154696133 BLOOMFIELD | 23 | 3B13 | 2545 | 50 | 0.34 | 147.1775486827033 | 23 BLOOMFIELD | 23 | 3B14 | 991 | 21 | 0.34 | 60.65507246376811 BOKUM | 13.8 | 15L5 | 1177 | 78 | 1.17 | 66.37472924187728 BOKUM | 13.8 | 15L6 | 1008 | 43 | 0.6 | 72.13071895424838 BOKUM | 27.6 | 15L12 | 2105 | 44 | 0.32 | 137.0131004366812 BOKUM | 27.6 | 15L46 | 1275 | 28 | 0.88 | 32.249332146037396 BOKUM | 27.6 | 15L68 | 3278 | 198 | 2.31 | 85.44032109488086 | 2100 BOULEVARD | 4.8 | 4503 | 311 | 142 | 1.07 | 132.28059701492535 BOULEVARD | 4.8 | 4504 | 325 | 3 | 0.05 | 72.11111111111113 BRANFORD | 23 | 11J30 | 3264 | 44 | 0.35 | 123.82586206896553 | 329 BRANFORD | 23 | 11J40 | 752 | 91 | 1.11 | 82.03214285714284 | 190 BRANFORD | 23 | 11J41 | 3385 | 33 | 0.62 | 53.77075471698114 | 413 BRANFORD | 23 | 11J43 | 4313 | 9 | 0.18 | 51.952201257861645 BRANFORD | 23 | 11J45 | 3620 | 41 | 0.17 | 241.32268370607036 BRANFORD | 23 | 11J58 | 1452 | 161 | 0.96 | 166.99857651245551 BRISTOL | 13.8 | 11K41 | 1078 | 156 | 1.14 | 137.39674796747968 | 27 BRISTOL | 13.8 | 11K42 | 1557 | 61 | 0.53 | 114.91456077015644 BRISTOL | 13.8 | 11K43 | 1499 | 31 | 0.22 | 142.1051051051051 BRISTOL | 13.8 | 11K44 | 348 | 7 | 0.03 | 205 BRISTOL | 13.8 | 11K45 | 636 | 14 | 0.15 | 95.45454545454547 BRISTOL | 13.8 | 11K46 | 2146 | 25 | 0.41 | 61.94388327721661 BRISTOL | 13.8 | 11K47 | 128 | 13 | 0.12 | 105 BRISTOL | 13.8 | 11K49 | 1380 | 20 | 0.2 | 99.1276595744681 BRISTOL | 13.8 | 306A4 | 138 | 4 | 0.01 | 334 BRISTOL | 4.8 | 11K6 | 1087 | 0 | 0 | 162 BROOK ST | 4.8 | 17F2 | 676 | 1 | 0.01 | 104 BROOK ST | 4.8 | 17F3 | 488 | 3 | 0.01 | 190.11111111111111 BROOKLYN | 23 | 30Y10 | 2150 | 177 | 1.4 | 126.316539608883 | 316 BROOKLYN | 23 | 30Y8 | 2159 | 441 | 2.84 | 155.19957640925398 | 951 BROOKLYN | 23 | 30Y9 | 1386 | 1 | 0.01 | 93.52380952380952 BUCKINGHAM | 8.32 | 31K1 | 561 | 535 | 2.8 | 190.96376350921804 | 397 BULLS BRIDGE | 23 | 11M3 | 2946 | 488 | 2.44 | 199.546803494661 | 1045 BUNKER HILL | 13.8 | 12B31 | 794 | 111 | 0.5 | 219.37810945273628 | 26 BUNKER HILL | 13.8 | 12B32 | 1451 | 27 | 0.54 | 50.631847133757965 BUNKER HILL | 13.8 | 12B33 | 1349 | 48 | 0.23 | 210.42356687898084 | 13 BUNKER HILL | 13.8 | 12B34 | 858 | 32 | 0.15 | 208.97727272727275 BUNKER HILL | 13.8 | 12B35 | 1541 | 124 | 2.38 | 52.21214596949891 | 707 BUNKER HILL | 13.8 | 12B36 | 2740 | 6 | 0.1 | 66.16312056737588 BUNKER HILL | 13.8 | 12B37 | 3933 | 102 | 1.23 | 82.97532894736837 | 220 BURRVILLE | 23 | 29J1 | 2009 | 397 | 2.98 | 133.14435914552726 | 1232 BURRVILLE | 23 | 29J2 | 1516 | 107 | 0.83 | 129.84273232724382 | 3 BYRAM | 13.2 | 13C2 | 1856 | 9 | 0.05 | 175.23529411764704 BYRAM | 13.2 | 13C3 | 1264 | 55 | 0.35 | 154.78097345132744 BYRAM | 13.2 | 13C4 | 1513 | 84 | 0.39 | 212.65499999999997 CAMPVILLE | 23 | 44J3 | 1252 | 60 | 0.56 | 106.64456981664318 | 14 CAMPVILLE | 27.6 | 14R31 | 3 | 312 | 2 | 156.33333333333334 | 2 CANAL ST | 23 | 15Q1 | 2209 | 12 | 0.07 | 166.69753086419757 CANAL ST | 23 | 15Q4 | 502 | 118 | 0.99 | 118.36526946107787 CANAL ST | 23 | 15Q5 | 2209 | 64 | 0.75 | 85.36330718165358 | 478 CANAL ST | 23 | 15Q6 | 3126 | 15 | 0.18 | 84.0547703180212 CANAL ST | 23 | 15Q7 | 889 | 3 | 0.03 | 113.58620689655173 CANTON | 23 | 5R1 | 1780 | 1167 | 3.18 | 366.2433909058866 | 913 CANTON | 23 | 5R2 | 3457 | 74 | 0.59 | 124.70588235294116 | 55 CANTON | 23 | 5R3 | 3105 | 46 | 0.31 | 146.8222676200204 | 67 CANTON | 23 | 5R4 | 4365 | 133 | 0.87 | 152.1999477260849 | 151 CANTON | 23 | 5R5 | 2844 | 471 | 2.17 | 217.18632534024633 | 894 CANTON | 23 | 5R6 | 1180 | 49 | 0.29 | 166.71181556195964 CANTON | 23 | 5R7 | 4078 | 165 | 1.19 | 138.37366474938372 | 360 CANTON | 27.6 | 5R80 | 9 | 601 | 1.88 | 318.2941176470588 CARD ST | 23 | 11F10 | 3432 | 96 | 0.5 | 191.4463768115942 | 119 CARD ST | 23 | 11F12 | 2793 | 199 | 1.24 | 160.63730569948186 | 406 CARD ST | 23 | 11F13 | 2989 | 121 | 1.31 | 92.66845192552913 | 436 CARD ST | 23 | 11F14 | 5290 | 148 | 0.94 | 156.84981026562818 | 520 CARD ST | 23 | 11F9 | 3534 | 91 | 1.03 | 88.82037239868565 | 445 CARMEL HILL | 23 | 11S13 | 1619 | 372 | 4.02 | 92.35806253832007 | 1417 CARMEL HILL | 23 | 11S14 | 2784 | 82 | 0.72 | 113.75792079207925 | 46 CARMEL HILL | 23 | 11S15 | 3221 | 153 | 1.64 | 93.11308287710027 | 797 CEDAR HEIGHTS | 13.2 | 4R07 | 1040 | 180 | 1.21 | 148.51385589865396 | 136 CEDAR HEIGHTS | 13.2 | 4R08 | 1004 | 159 | 1.06 | 149.63187325256294 | 120 CEDAR HEIGHTS | 13.2 | 4R09 | 957 | 177 | 1.01 | 175 | 86 CEDAR HEIGHTS | 13.2 | 4R10 | 812 | 25 | 0.08 | 307.5294117647059 CEDAR HEIGHTS | 13.2 | 4R11 | 1353 | 176 | 1.43 | 122.73059125964014 | 536 CEDAR HEIGHTS | 13.2 | 4R12 | 504 | 102 | 1.22 | 84.0129659643436 | 39 CEDAR HEIGHTS | 13.2 | 4R13 | 776 | 96 | 0.47 | 201.52162162162165 | 2 CEDAR HEIGHTS | 13.2 | 4R14 | 690 | 52 | 0.28 | 187.2615384615384 CEDAR HEIGHTS | 13.2 | 4R15 | 263 | 8 | 0.14 | 55.30769230769232 CEDAR HEIGHTS | 13.2 | 4R16 | 1443 | 42 | 0.58 | 72.82836710369486 CEDAR HEIGHTS | 13.2 | 4R17 | 1067 | 94 | 0.63 | 149.21893491124268 | 50 CEDAR HEIGHTS | 13.2 | 4R18 | 1040 | 45 | 0.48 | 94.72564612326043 | 13 CEDAR LN | 23 | 41L1 | 1327 | 39 | 0.15 | 259.8333333333333 CENTER ST | 4.8 | 24F1 | 1026 | 4 | 0.04 | 88.53061224489797 CENTER ST | 4.8 | 24F2 | 1047 | 2 | 0.06 | 40.873015873015866 CENTER ST | 4.8 | 24F3 | 689 | 27 | 0.31 | 87.46511627906976 CENTER ST | 4.8 | 24F4 | 815 | 21 | 0.51 | 41.98345153664301 CHIPPEN HILL | 13.8 | 15U1 | 2513 | 18 | 0.12 | 142.4361370716511 | 9 CHIPPEN HILL | 13.8 | 15U2 | 3239 | 36 | 1.17 | 31.038501833420636 | 61 CHIPPEN HILL | 13.8 | 15U3 | 2858 | 28 | 0.26 | 110.10040160642568 | 24 CHIPPEN HILL | 13.8 | 15U4 | 3676 | 18 | 0.21 | 82.87376237623762 | 139 CHIPPEN HILL | 13.8 | 15U5 | 694 | 1 | 0.03 | 50.85185185185185 CHRISTIAN ST | 23 | 31C1 | 2518 | 613 | 2.43 | 252.43524416135864 | 1058 CHRISTIAN ST | 23 | 31C2 | 675 | 204 | 1.41 | 144.6796218487395 | 118 COLUMBIA | 13.8 | 20Y1 | 1378 | 121 | 0.62 | 194.14086146682195 | 1 COLUMBIA | 13.8 | 20Y2 | 1036 | 205 | 1.76 | 116.50929978118155 | 122 COMPO | 13.8 | 23K11 | 1303 | 93 | 1.08 | 86.0395201129146 | 62 COMPO | 13.8 | 23K12 | 635 | 31 | 0.51 | 60.67477203647415 COMPO | 13.8 | 23K14 | 1536 | 109 | 0.42 | 256.44072948328284 COMPO | 13.8 | 23K15 | 485 | 28 | 0.23 | 120.11304347826086 | 18 COMPO | 13.8 | 23K16 | 887 | 70 | 0.21 | 324.28865979381436 COMPO | 13.8 | 23K17 | 405 | 130 | 2.24 | 58.39867841409692 CORNWALL | 8.32 | 37J1 | 988 | 346 | 1.55 | 223.32529335071703 | 180 COS COB | 13.2 | 11R1 | 960 | 136 | 0.84 | 162.07540173053158 | 49 COS COB | 13.2 | 11R2 | 112 | 954 | 2.75 | 347.0292207792208 COS COB | 13.2 | 11R3 | 1203 | 13 | 0.07 | 178.63440860215056 COS COB RR | 13.2 | 35K4 | 813 | 79 | 0.37 | 209.2801302931596 DANIELSON | 4.8 | 22A2 | 661 | 160 | 1.06 | 150.20792079207916 | 16 DANIELSON | 4.8 | 22A3 | 978 | 3 | 0.08 | 35.05813953488372 DANIELSON TURBINE | 23 | 15C8 | 2563 | 279 | 1.9 | 146.4476696647588 | 694 DARIEN | 13.2 | 13S10 | 2173 | 113 | 0.7 | 161.47406434668414 | 257 DARIEN | 13.2 | 13S5 | 1095 | 58 | 0.24 | 241.83333333333334 | 6 DARIEN | 13.2 | 13S6 | 1077 | 31 | 0.26 | 120.47902097902096 DARIEN | 13.2 | 13S7 | 758 | 261 | 2.35 | 110.96588366890376 | 345 DARIEN | 13.2 | 13S8 | 1973 | 7 | 0.04 | 174.78571428571425 DARIEN | 13.2 | 13S9 | 1106 | 17 | 0.08 | 209.65555555555554 | 10 DEEP RIVER | 4.8 | 13Q1 | 671 | 55 | 1.26 | 43.45882352941177 | 51 DEEP RIVER | 4.8 | 13Q2 | 582 | 48 | 1.12 | 42.9206106870229 | 35 DEEP RIVER | 4.8 | 13Q4 | 204 | 110 | 1.51 | 72.83225806451613 | 28 DOOLEY | 13.2 | 30K11 | 2962 | 39 | 0.55 | 71.37160120845917 | 49 DOOLEY | 13.2 | 30K12 | 1486 | 220 | 0.71 | 308.9858757062146 DOOLEY | 13.2 | 30K13 | 1504 | 171 | 1.34 | 127.94449950445988 | 262 DOOLEY | 13.2 | 30K14 | 1577 | 168 | 2.15 | 78.1136296732411 | 732 DOOLEY | 13.2 | 30K15 | 656 | 99 | 0.55 | 179.21978021978023 DOOLEY | 13.2 | 30K16 | 2586 | 25 | 0.17 | 144.54845814977975 | 23 EAST BANTAM | 23 | 19U2 | 1470 | 211 | 0.99 | 212.858024691358 | 248 EAST BANTAM | 8.32 | 19U1 | 1781 | 322 | 1.62 | 197.81620689655182 | 199 EAST HAMPTON | 4.8 | 23A1 | 446 | 135 | 2.05 | 66.06666666666668 | 1 EAST HAMPTON | 4.8 | 23A2 | 715 | 70 | 0.23 | 302.77108433734935 EAST HAMPTON | 4.8 | 23A3 | 762 | 3 | 0.03 | 95.44 EAST HARTFORD | 23 | 32G1 | 1462 | 32 | 0.37 | 88.68014705882351 EAST HARTFORD | 23 | 32G13 | 2798 | 31 | 0.5 | 61.88513037350245 EAST HARTFORD | 23 | 32G2 | 3606 | 14 | 0.28 | 49.9296724470135 EAST HARTFORD | 23 | 32G3 | 3468 | 19 | 0.25 | 73.41536748329618 EAST HARTFORD | 23 | 32G7 | 1419 | 23 | 0.82 | 28.9279588336192 EAST HARTFORD | 23 | 32G8 | 3186 | 54 | 0.59 | 91.5117739403453 | 127 EAST HARTFORD | 23 | 32G9 | 3346 | 44 | 0.38 | 117.1614420062696 EAST MERIDEN | 13.8 | 21P1 | 1876 | 55 | 0.43 | 128.88452088452084 EAST MERIDEN | 13.8 | 21P2 | 2106 | 44 | 0.43 | 102.73471615720524 EAST MERIDEN | 13.8 | 21P3 | 1818 | 20 | 0.13 | 153.8663967611336 EAST MERIDEN | 13.8 | 21P4 | 3768 | 55 | 0.28 | 194.44413407821236 EAST MERIDEN | 13.8 | 21P5 | 1861 | 68 | 1.94 | 35.203974606679544 | 395 EAST MERIDEN | 13.8 | 21P6 | 58 | 56 | 0.05 | 1094 EAST NEW BRITAIN | 13.8 | 300J1 | 171 | 58 | 0.16 | 343 EAST NEW BRITAIN | 13.8 | 7L81 | 886 | 4 | 0.07 | 60.53846153846154 EAST NEW BRITAIN | 13.8 | 7L83 | 1197 | 18 | 1.02 | 17.730519480519483 EAST NEW BRITAIN | 13.8 | 7L85 | 2452 | 16 | 0.17 | 90.5125284738041 | 34 EAST NEW BRITAIN | 13.8 | 7L86 | 830 | 7 | 0.07 | 103.24193548387098 EAST NEW BRITAIN | 13.8 | 7L87 | 1930 | 4 | 0.05 | 80.30973451327436 EAST NEW BRITAIN | 13.8 | 7L88 | 5654 | 32 | 0.23 | 135.42509225092252 EAST NEW BRITAIN | 13.8 | 7L89 | 1937 | 56 | 0.23 | 240.68362831858408 EAST NEW BRITAIN | 13.8 | 7L90 | 2661 | 43 | 0.38 | 112.74193548387096 EAST ROCKS | 13.8 | 17R11 | 1434 | 52 | 0.47 | 109.56104651162796 | 143 EAST ROCKS | 13.8 | 17R12 | 1594 | 53 | 0.2 | 263.43343653250776 ENFIELD | 23 | 12C3 | 333 | 107 | 0.7 | 152.41702127659576 ENFIELD | 23 | 12C4 | 5154 | 95 | 0.29 | 326.4083665338647 | 35 ENFIELD | 23 | 12C5 | 2264 | 127 | 1.12 | 113.85259433962261 | 51 ENFIELD | 23 | 12C6 | 1801 | 24 | 0.18 | 134.02102102102103 ENFIELD | 23 | 12C7 | 2393 | 83 | 0.47 | 178.15111111111116 | 26 ENFIELD | 27.6 | 12C47 | 4 | 962 | 3 | 320.6666666666667 | 4 ENFIELD | 27.6 | 12C48 | 3489 | 19 | 0.25 | 75.67415730337079 ESSEX | 4.8 | 16M2 | 490 | 25 | 0.07 | 339 ESSEX | 4.8 | 16M3 | 756 | 58 | 0.27 | 215.01463414634145 FALLS VILLAGE | 13.2 | 4L06 | 908 | 484 | 1.85 | 261.5963139120096 | 244 FALLS VILLAGE | 13.2 | 4L08 | 626 | 1231 | 3.76 | 327.42905692438416 | 366 FALLS VILLAGE | 13.2 | 4L09 | 828 | 605 | 3.55 | 170.2687733605165 | 529 FARMINGTON | 23 | 1C01 | 707 | 32 | 0.25 | 128.71823204419888 FARMINGTON | 23 | 1C02 | 3294 | 76 | 0.6 | 125.60839160839157 | 19 FARMINGTON | 23 | 1C03 | 12 | 85 | 0.66 | 128 FARMINGTON | 23 | 1C06 | 3257 | 16 | 0.15 | 106.62984496124028 FARMINGTON | 23 | 1C08 | 1468 | 40 | 0.28 | 141.05424528301882 FARMINGTON | 23 | 1C19 | 1804 | 41 | 0.42 | 98.96601307189545 FARMINGTON | 23 | 1C20 | 3641 | 36 | 0.25 | 140.03506907545164 | 29 FARMINGTON | 23 | 1C21 | 2267 | 37 | 0.47 | 79.78191985088542 | 15 FARMINGTON | 23 | 308B2 | 141 | 104 | 0.36 | 288.17647058823525 FLANDERS | 23 | 11Y1 | 3181 | 140 | 1.56 | 89.36549648946836 | 899 FLANDERS | 23 | 11Y2 | 3009 | 52 | 1.25 | 42.00608626620797 | 748 FLANDERS | 23 | 11Y3 | 3433 | 58 | 0.92 | 62.61494974874368 | 757 FLANDERS | 23 | 11Y6 | 1726 | 17 | 0.14 | 118.046875 FLANDERS | 23 | 11Y7 | 2364 | 65 | 1.2 | 54.85160380683821 | 223 FLANDERS | 23 | 11Y8 | 2153 | 28 | 0.68 | 41.685286103542246 | 117 FLAX HILL | 13.8 | 24A10 | 2062 | 37 | 0.63 | 59.99155794320796 FLAX HILL | 13.8 | 24A11 | 948 | 171 | 0.54 | 312.08846153846173 FLAX HILL | 13.8 | 24A12 | 244 | 0 | 0 | 53.99999999999999 FLAX HILL | 13.8 | 24A13 | 1686 | 58 | 0.33 | 171.84210526315798 FLAX HILL | 13.8 | 24A14 | 966 | 46 | 0.48 | 95.15811965811965 FLAX HILL | 13.8 | 24A15 | 1251 | 32 | 0.27 | 119.2264705882353 FLAX HILL | 13.8 | 24A16 | 1145 | 29 | 0.24 | 122.32246376811597 FLAX HILL | 13.8 | 24A17 | 1766 | 136 | 1.61 | 84.70031545741331 | 249 FLAX HILL | 13.8 | 24A19 | 1626 | 105 | 0.62 | 170.5534653465346 FORESTVILLE | 13.8 | 12A10 | 2220 | 22 | 0.44 | 49.68591691995948 FORESTVILLE | 13.8 | 12A11 | 1474 | 33 | 0.15 | 215.2068965517242 FORESTVILLE | 13.8 | 12A12 | 2740 | 99 | 0.72 | 137.07164328657313 FORESTVILLE | 13.8 | 12A14 | 2678 | 12 | 0.17 | 73.47712418300652 FORESTVILLE | 13.8 | 12A15 | 284 | 9 | 0.06 | 151.66666666666663 FORESTVILLE | 13.8 | 12A3 | 236 | 24 | 1.02 | 23.446280991735538 FORESTVILLE | 13.8 | 12A4 | 923 | 16 | 0.6 | 26.38571428571428 FORESTVILLE | 13.8 | 12A5 | 2752 | 21 | 0.13 | 154.23116883116876 FORESTVILLE | 13.8 | 12A6 | 881 | 34 | 0.39 | 88.15273775216137 FORESTVILLE | 13.8 | 12A7 | 1988 | 39 | 0.57 | 69.61829375549695 FORESTVILLE | 13.8 | 12A8 | 1209 | 90 | 1.79 | 50.61865189289012 | 35 FORESTVILLE | 13.8 | 12A9 | 2902 | 35 | 0.63 | 55.78145336225598 | 144 FRANCONIA | 13.8 | 22H14 | 1750 | 43 | 0.3 | 144.81714285714284 FRANCONIA | 13.8 | 22H18 | 1364 | 25 | 0.17 | 148.9484978540773 FRANKLIN DR | 13.2 | 1B03 | 989 | 29 | 0.21 | 132.42396313364057 FRANKLIN DR | 13.2 | 1B06 | 236 | 4 | 0.08 | 57 FRANKLIN DR | 13.2 | 1B07 | 1529 | 9 | 0.08 | 116.96153846153848 FRANKLIN DR | 13.2 | 1B08 | 2807 | 34 | 0.21 | 159.83059210526312 FRANKLIN DR | 13.2 | 1B09 | 81 | 50 | 1 | 50.617283950617285 FRANKLIN DR | 13.2 | 1B10 | 2418 | 66 | 0.48 | 136.18966977138018 | 91 FRANKLIN DR | 13.2 | 1B11 | 986 | 9 | 0.05 | 160.62068965517238 FRANKLIN DR | 13.2 | 1B12 | 1920 | 166 | 0.77 | 214.43981170141228 | 217 FREDERICK | 4.8 | 34D6 | 553 | 5 | 0.04 | 112 FREDERICK | 4.8 | 34D7 | 689 | 7 | 0.04 | 160.05882352941177 FREDERICK | 4.8 | 34D9 | 788 | 17 | 0.18 | 94.78082191780823 FREIGHT ST | 13.8 | 11W44 | 1372 | 4 | 0.09 | 47.5483870967742 FREIGHT ST | 13.8 | 11W45 | 1830 | 17 | 0.27 | 62.16932270916333 FREIGHT ST | 13.8 | 11W46 | 868 | 259 | 0.49 | 520.7569444444445 FREIGHT ST | 13.8 | 11W47 | 1808 | 42 | 1.02 | 40.85583647122109 | 21 FREIGHT ST | 13.8 | 246D1 | 167 | 538 | 1.01 | 529 FRYBROOK | 23 | 13B10 | 3619 | 180 | 0.83 | 214.63693219223157 | 326 FRYBROOK | 23 | 13B21 | 1439 | 57 | 0.49 | 116.98587570621471 | 27 FRYBROOK | 23 | 13B25 | 4388 | 141 | 0.81 | 173.53792331374208 | 404 FRYBROOK | 23 | 13B27 | 1958 | 80 | 0.74 | 107.8067169294037 | 34 FRYBROOK | 23 | 13B7 | 372 | 149 | 1.04 | 142.27948717948723 | 16 FRYBROOK | 23 | 13B9 | 3323 | 272 | 1.94 | 140.10954665016246 | 951 GALES FERRY | 13.8 | 11B1 | 2690 | 180 | 1.36 | 132.33179222192004 | 407 GALES FERRY | 13.8 | 11B2 | 1745 | 128 | 0.9 | 142.46831432192647 | 105 GALES FERRY | 13.8 | 11B61 | 2293 | 170 | 1.38 | 122.63336475023561 | 494 GLENBROOK | 13.2 | 1K02 | 985 | 19 | 0.15 | 125.12820512820515 GLENBROOK | 13.2 | 1K03 | 626 | 1 | 0.01 | 91.83333333333333 GLENBROOK | 13.2 | 1K04 | 2809 | 63 | 0.16 | 382.049356223176 GLENBROOK | 13.2 | 1K05 | 1787 | 107 | 1.02 | 104.99945533769063 GLENBROOK | 13.2 | 1K06 | 2757 | 60 | 0.55 | 107.5324254215305 GLENBROOK | 13.2 | 1K07 | 684 | 23 | 0.1 | 225.74647887323945 GLENBROOK | 13.2 | 1K09 | 17 | 33 | 0.17 | 188.99999999999997 GLENBROOK | 13.2 | 1K10 | 1702 | 30 | 0.17 | 172.61744966442959 | 13 GLENBROOK | 13.2 | 1K11 | 2379 | 16 | 0.31 | 53.026560424966796 GLENBROOK | 13.2 | 1K12 | 1447 | 146 | 0.29 | 491.4120370370372 | 2 GLENBROOK | 13.2 | 1K13 | 1147 | 47 | 0.37 | 127.16511627906978 GLENBROOK | 13.2 | 1K14 | 2318 | 9 | 0.05 | 182.3730158730159 GLENBROOK | 13.2 | 1K16 | 1476 | 192 | 0.36 | 525.3142329020334 | 13 GRANBY STREET | 4.8 | 2904 | 427 | 17 | 0.21 | 81.17777777777778 GRANBY STREET | 4.8 | 2906 | 197 | 27 | 0.13 | 211 GRANBY STREET | 4.8 | 2907 | 748 | 5 | 0.04 | 138.26666666666665 GREEN HILL | 23 | 30R10 | 3025 | 194 | 0.98 | 197.51373074346955 | 320 GREEN HILL | 23 | 30R12 | 1595 | 58 | 0.52 | 109.785290628707 | 47 GREEN HILL | 23 | 30R13 | 3223 | 102 | 1.33 | 77.03908794788275 | 366 GREEN HILL | 23 | 30R14 | 3148 | 340 | 2.23 | 152.44766368413576 | 1165 GREEN HILL | 23 | 30R15 | 1439 | 176 | 0.62 | 282.5049944506104 | 5 GREEN HILL | 23 | 30R7 | 2589 | 199 | 1.54 | 129.0898203592814 | 467 GREEN HILL | 23 | 30R8 | 3827 | 230 | 1.73 | 133.36424041075202 | 980 GREEN HILL | 23 | 30R9 | 3605 | 75 | 0.82 | 91.3921700978739 | 23 GREENWICH | 13.2 | 28F1 | 643 | 14 | 0.08 | 172.94339622641508 GREENWICH | 13.2 | 28F10 | 378 | 206 | 0.42 | 490.7295597484278 GREENWICH | 13.2 | 28F11 | 2389 | 11 | 0.05 | 194.49999999999994 GREENWICH | 13.2 | 28F2 | 892 | 81 | 0.65 | 124.14897260273975 | 160 GREENWICH | 13.2 | 28F3 | 1519 | 74 | 0.41 | 180.052380952381 GREENWICH | 13.2 | 28F6 | 765 | 799 | 1.15 | 691.68778280543 | 13 GREENWICH | 13.2 | 28F8 | 1836 | 93 | 0.83 | 112.14986910994766 | 28 HADDAM | 23 | 11C10 | 1043 | 509 | 1.84 | 276.5304528891203 | 365 HADDAM | 23 | 11C12 | 2489 | 306 | 3.43 | 89.25037989479834 | 1568 HADDAM | 23 | 11C13 | 4069 | 213 | 1.67 | 127.86873438189036 | 728 HADDAM | 23 | 11C14 | 3140 | 273 | 1.45 | 187.7254044599911 | 427 HANOVER ST | 13.8 | 12F42 | 138 | 160 | 1.58 | 100.89954337899543 HANOVER ST | 13.8 | 12F43 | 72 | 580 | 4.16 | 139.24666666666667 HANOVER ST | 13.8 | 12F44 | 1287 | 629 | 3.48 | 180.45914050322867 | 1299 HANOVER ST | 13.8 | 12F49 | 2232 | 37 | 0.56 | 65.52727272727273 HANOVER ST | 13.8 | 12F51 | 994 | 178 | 2.05 | 86.8611383709519 | 84 HANOVER ST | 13.8 | 12F52 | 1406 | 143 | 1.56 | 91.7794452023647 | 146 HANOVER ST | 13.8 | 12F55 | 3929 | 14 | 0.22 | 64.07701019252549 HANOVER ST | 13.8 | 300L2 | 2 | 305 | 1 | 305 HANOVER ST | 13.8 | 300L4 | 2 | 305 | 1 | 305 HANOVER ST | 13.8 | 312B2 | 2 | 304 | 1 | 304 HANOVER ST | 23 | 12F46 | 3261 | 25 | 0.16 | 153.09818181818187 HANOVER ST | 23 | 12F47 | 2787 | 97 | 1.67 | 58.152276632302396 | 783 HANOVER ST | 23 | 12F48 | 3633 | 200 | 1.36 | 146.25362027353165 | 1003 HANOVER ST | 4.8 | 12F2 | 75 | 852 | 3.53 | 241.35471698113207 HANOVER ST | 4.8 | 12F4 | 6 | 195 | 0.83 | 235 HARTFORD AVE | 4.8 | 23D3 | 615 | 104 | 1.06 | 98.32006125574273 | 168 HARTFORD AVE | 4.8 | 23D7 | 900 | 42 | 1.14 | 37.05043646944714 HARWINTON | 23 | 13Y1 | 880 | 723 | 5.09 | 141.81100958324052 | 848 HARWINTON | 23 | 13Y2 | 2580 | 199 | 1.16 | 171.0802798134577 | 366 HOPEWELL | 23 | 22R1 | 2374 | 143 | 0.68 | 208.40368098159527 | 93 HOPEWELL | 23 | 22R2 | 2672 | 79 | 0.67 | 118.6052338530067 | 136 HOPEWELL | 23 | 22R3 | 2233 | 32 | 0.17 | 181.13164556962025 HOPEWELL | 23 | 22R4 | 1943 | 96 | 1.24 | 77.2964948453608 | 30 HOPEWELL | 23 | 22R5 | 3564 | 108 | 0.92 | 118.36840500152485 | 28 HOPEWELL | 23 | 22R6 | 2517 | 25 | 0.52 | 48.26525998492843 | 16 HUNTINGTON RD | 23 | 28P6 | 1667 | 98 | 0.72 | 135.95458298926505 JEFFERSON HILL | 8.32 | 26F1 | 1138 | 287 | 2.84 | 101.11320754716978 | 504 JUDD BROOK | 23 | 32R1 | 5210 | 117 | 0.82 | 142.19209302325578 | 494 JUDD BROOK | 23 | 32R2 | 3207 | 150 | 0.9 | 165.71526586620925 | 320 JUDD BROOK | 23 | 32R3 | 2729 | 41 | 0.37 | 110.8743818001978 | 48 KIMBERLY CLARK | 13.8 | 24N1 | 6 | 1387 | 3 | 462.3333333333333 | 6 LAKEVIEW | 13.8 | 31A1 | 1165 | 91 | 1.06 | 86.49233252623085 | 23 LAKEVIEW | 13.8 | 31A15 | 1472 | 67 | 0.54 | 123.73507462686568 LAKEVIEW | 13.8 | 31A6 | 1589 | 124 | 0.73 | 168.89230769230767 | 131 LAKEVIEW | 13.8 | 31A8 | 853 | 64 | 0.6 | 106.68932038834944 | 12 LAKEVIEW | 13.8 | 31A9 | 1060 | 60 | 0.36 | 168.29947916666666 | 27 LOUNSBURY | 4.8 | 39M1 | 766 | 408 | 2.18 | 186.83114558472553 | 338 MADISON | 4.8 | 27G1 | 633 | 163 | 2.31 | 70.6709809264305 | 111 MADISON | 4.8 | 27G3 | 612 | 12 | 0.1 | 117.92537313432837 MANCHESTER | 23 | 3A01 | 4209 | 36 | 0.32 | 111.27709090909094 MANCHESTER | 23 | 3A02 | 3526 | 33 | 0.23 | 141.38274605103283 | 125 MANCHESTER | 23 | 3A03 | 3149 | 54 | 0.34 | 159.8371877890842 | 2 MANCHESTER | 23 | 3A04 | 2328 | 163 | 0.94 | 172.18350702310835 | 174 MANCHESTER | 23 | 3A05 | 1508 | 162 | 0.88 | 182.89387144992529 | 105 MANCHESTER | 23 | 3A06 | 686 | 112 | 0.67 | 168.0478260869565 MANCHESTER | 23 | 3A07 | 552 | 23 | 0.12 | 193 MANCHESTER | 23 | 3A08 | 2754 | 27 | 0.4 | 68.45040214477211 | 164 MANCHESTER | 23 | 3A09 | 2175 | 5 | 0.03 | 155.42253521126764 MANCHESTER | 23 | 3A10 | 2731 | 25 | 0.46 | 55.605055292259095 MANCHESTER | 23 | 3A11 | 4489 | 45 | 0.35 | 128.2901587301588 MANCHESTER | 23 | 3A12 | 3100 | 29 | 0.42 | 69.1144578313253 | 23 MANSFIELD | 13.8 | 12J17 | 894 | 35 | 0.21 | 164.8115183246073 MANSFIELD | 13.8 | 12J4 | 2480 | 165 | 1.3 | 126.78770086526582 | 672 MANSFIELD | 13.8 | 12J5 | 3236 | 94 | 1.18 | 79.72850796968909 | 486 MANSFIELD | 13.8 | 12J6 | 916 | 157 | 1.06 | 147.93833504624877 | 81 MANSFIELD | 27.6 | 12J33 | 2523 | 174 | 1.48 | 117.50919754732072 | 677 MANSFIELD | 27.6 | 12J38 | 1583 | 111 | 1.04 | 107.09261501210653 | 72 MIANUS | 13.2 | 16Q1 | 624 | 189 | 0.83 | 227.13243761996162 MIANUS | 13.2 | 16Q2 | 1044 | 314 | 0.84 | 373.56492027334843 | 59 MIANUS | 13.2 | 16Q7 | 474 | 8 | 0.09 | 86.86666666666666 MIANUS | 13.2 | 16Q8 | 735 | 28 | 0.12 | 230.5434782608695 MIDDLE RIVER | 13.8 | 146C1 | 304 | 63 | 0.54 | 117 MIDDLE RIVER | 13.8 | 146C2 | 244 | 17 | 0.15 | 117 MIDDLE RIVER | 13.8 | 146C3 | 163 | 189 | 1.74 | 108.15087719298245 | 94 MIDDLE RIVER | 13.8 | 146C4 | 30 | 328 | 3.03 | 108.18681318681318 | 30 MIDDLE RIVER | 13.8 | 28M1 | 3528 | 25 | 0.39 | 64.91839656406587 | 65 MIDDLE RIVER | 13.8 | 28M11 | 2742 | 57 | 0.57 | 101.01588310038122 | 92 MIDDLE RIVER | 13.8 | 28M12 | 1724 | 115 | 0.88 | 130.66382140512147 | 40 MIDDLE RIVER | 13.8 | 28M13 | 1096 | 143 | 0.7 | 204.8673602080625 MIDDLE RIVER | 13.8 | 28M2 | 1944 | 125 | 1.06 | 118.32801932367151 | 139 MIDDLE RIVER | 13.8 | 28M3 | 2000 | 35 | 0.26 | 133.25139664804468 MIDDLE RIVER | 13.8 | 28M5 | 21 | 170 | 0.9 | 188 MIDDLE RIVER | 13.8 | 28M6 | 1962 | 102 | 0.95 | 106.9978734715577 | 217 MIDDLE RIVER | 13.8 | 28M8 | 914 | 229 | 1.02 | 224.54438502673796 MIDDLE RIVER | 13.8 | 28M9 | 280 | 93 | 2 | 46.5 MIDDLEBURY | 4.8 | 18J1 | 296 | 137 | 0.35 | 384.0283018867925 MONROE | 23 | 15Y1 | 205 | 51 | 0.39 | 130.5061728395062 MONROE | 23 | 15Y2 | 2160 | 61 | 0.47 | 127.46518375241773 | 15 MONROE | 23 | 15Y3 | 1036 | 16 | 0.2 | 80.07211538461539 MOOSUP | 4.8 | 19Y1 | 1388 | 131 | 1.18 | 110.95694360218315 | 5 MOOSUP | 4.8 | 19Y2 | 718 | 306 | 3.22 | 95.15939524838014 | 695 MYSTIC | 13.8 | 13K1 | 2283 | 40 | 0.7 | 58.183063511830646 MYSTIC | 13.8 | 13K2 | 2545 | 69 | 0.59 | 115.52068286277087 | 133 MYSTIC | 13.8 | 13K3 | 1562 | 111 | 1.16 | 95.53047775947283 | 137 MYSTIC | 13.8 | 13K4 | 1660 | 24 | 0.7 | 34.51489361702128 MYSTIC | 13.8 | 13K5 | 2053 | 33 | 0.3 | 109.16930379746834 MYSTIC | 13.8 | 13K6 | 1389 | 73 | 0.79 | 92.79566003616634 | 75 MYSTIC | 13.8 | 13K8 | 1107 | 203 | 1.6 | 126.25547445255476 | 288 N GREENWICH | 13.2 | 27K1 | 615 | 191 | 1.28 | 148.8746835443038 | 41 N GREENWICH | 13.2 | 27K3 | 549 | 265 | 1.49 | 177.27649208282583 | 78 N GREENWICH | 13.2 | 27K5 | 295 | 216 | 1.21 | 179.0252100840337 | 32 N GREENWICH | 13.2 | 27K7 | 524 | 113 | 0.76 | 147.75561097256852 | 12 N GREENWICH | 13.2 | 27K9 | 614 | 355 | 2.16 | 163.76934635612324 | 305 NE SIMSBURY | 23 | 43F2 | 3302 | 193 | 0.57 | 339.4596602972398 | 170 NE SIMSBURY | 23 | 43F3 | 3818 | 85 | 0.69 | 123.11181988742962 | 69 NE SIMSBURY | 23 | 43F6 | 4282 | 128 | 1.01 | 126.50921658986171 | 105 NEW ST | 4.8 | 2H01 | 431 | 17 | 0.14 | 114.515625 NEW ST | 4.8 | 2H02 | 597 | 19 | 0.42 | 46.87301587301587 NEW ST | 4.8 | 2H04 | 957 | 59 | 0.37 | 156.6914600550964 NEWINGTON | 23 | 4A1 | 1485 | 35 | 0.78 | 44.52429667519181 | 102 NEWINGTON | 23 | 4A10 | 455 | 87 | 0.87 | 100.58838383838383 | 79 NEWINGTON | 23 | 4A11 | 1735 | 267 | 1.2 | 222.15406698564595 | 32 NEWINGTON | 23 | 4A12 | 3771 | 21 | 0.43 | 49.23676202069386 NEWINGTON | 23 | 4A2 | 721 | 57 | 0.38 | 146.39501779359432 NEWINGTON | 23 | 4A3 | 1812 | 86 | 0.87 | 98.19233186675048 NEWINGTON | 23 | 4A4 | 304 | 22 | 0.23 | 98.75714285714284 NEWINGTON | 23 | 4A5 | 1518 | 28 | 0.24 | 113.1216931216931 | 27 NEWINGTON | 23 | 4A6 | 2301 | 21 | 0.1 | 205.325 | 32 NEWINGTON | 23 | 4A7 | 1643 | 9 | 0.05 | 180.79999999999998 NEWINGTON | 23 | 4A8 | 3254 | 4 | 0.03 | 125.59047619047621 NEWINGTON | 23 | 4A9 | 2643 | 47 | 0.35 | 134.75425531914894 | 65 NEWTOWN | 13.8 | 12M1 | 655 | 46 | 0.25 | 185.87878787878788 NEWTOWN | 13.8 | 12M3 | 1219 | 61 | 0.57 | 108.18390804597708 NEWTOWN | 13.8 | 12M4 | 1824 | 33 | 0.65 | 51.35976627712857 | 26 NEWTOWN | 13.8 | 12M5 | 2705 | 116 | 0.6 | 193.12645794966238 | 159 NEWTOWN | 13.8 | 12M6 | 904 | 111 | 1.33 | 83.11643270024774 | 11 NIANTIC | 4.8 | 21Y2 | 1236 | 63 | 1.46 | 43.479512735326686 | 1 NIANTIC | 4.8 | 21Y3 | 765 | 21 | 1.09 | 19.31823599523242 NOERA | 13.8 | 13H91 | 667 | 23 | 0.16 | 141.27927927927928 NOERA | 13.8 | 13H92 | 2347 | 22 | 0.21 | 101.85271317829458 NOERA | 13.8 | 13H93 | 878 | 113 | 2.01 | 56.284419263456094 | 568 NOERA | 13.8 | 13H94 | 225 | 250 | 3 | 83.45037037037036 | 217 NOERA | 13.8 | 13H96 | 1764 | 33 | 0.58 | 57.5701923076923 | 33 NOERA | 13.8 | 13H97 | 3042 | 51 | 0.55 | 92.63157894736844 NOERA | 13.8 | 13H98 | 1048 | 99 | 0.91 | 108.73277661795409 NOERA | 13.8 | 13H99 | 3181 | 19 | 0.25 | 74.55104551045511 | 66 NOERA | 4.8 | 13H1 | 1645 | 46 | 0.69 | 67.6684256816183 NOERA | 4.8 | 13H2 | 1048 | 19 | 0.09 | 193.92233009708738 NOERA | 4.8 | 13H3 | 1423 | 22 | 0.44 | 50.885937500000004 | 109 NOERA | 4.8 | 13H4 | 588 | 15 | 0.29 | 51.775862068965516 NORTH BLOOMFIELD | 23 | 2A1 | 530 | 155 | 1.83 | 84.60717948717947 NORTH BLOOMFIELD | 23 | 2A11 | 191 | 92 | 0.26 | 353.3 NORTH BLOOMFIELD | 23 | 2A14 | 18 | 209 | 0.61 | 343.5454545454545 NORTH BLOOMFIELD | 23 | 2A15 | 2108 | 55 | 0.33 | 165.67275280898878 NORTH BLOOMFIELD | 23 | 2A17 | 916 | 21 | 0.31 | 69.9438596491228 | 28 NORTH BLOOMFIELD | 23 | 2A3 | 1994 | 31 | 0.59 | 51.869127516778526 | 37 NORTH BLOOMFIELD | 23 | 2A4 | 1220 | 209 | 1.66 | 125.9552165354331 | 243 NORTH BLOOMFIELD | 23 | 325G1 | 2 | 522 | 1 | 522 NORTH BLOOMFIELD | 23 | 325G2 | 4 | 518 | 1 | 518 NORTH BLOOMFIELD | 23 | 393A1 | 5 | 6 | 1 | 6 NORTH CANAAN | 13.2 | 5L01 | 201 | 1031 | 4.53 | 227.29166666666666 | 200 NORTH CANAAN | 13.2 | 5L02 | 1334 | 104 | 0.55 | 188.48517520215637 | 26 NORTH CANAAN | 13.2 | 5L03 | 6 | 455 | 2 | 227.5 NORTH CANAAN | 13.2 | 5L04 | 1061 | 815 | 5.72 | 142.56269566650192 | 959 NORTH KENT | 23 | 23R1 | 687 | 1497 | 4.62 | 323.9842569269522 | 671 NORTH LITCHFIELD | 23 | 42J1 | 1158 | 194 | 3.33 | 58.30145152928978 | 829 NORTH SQUARE | 4.8 | 25G1 | 350 | 73 | 1.08 | 67.94736842105264 NORTH SQUARE | 4.8 | 25G2 | 1437 | 4 | 0.05 | 70.09302325581395 NORTH SQUARE | 4.8 | 25G3 | 647 | 90 | 1.63 | 55.495750708215304 | 169 NORTHWEST HARTFORD | 23 | 2N05 | 160 | 282 | 1.98 | 141.99685534591194 | 77 NORTHWEST HARTFORD | 23 | 2N10 | 2333 | 5 | 0.04 | 133.11340206185568 NORTHWEST HARTFORD | 23 | 2N14 | 794 | 0 | 0.01 | 69.88888888888889 NORTHWEST HARTFORD | 23 | 2N16 | 1152 | 21 | 0.11 | 181.7462686567164 NORTHWEST HARTFORD | 23 | 300U1 | 545 | 119 | 1.16 | 102.41823899371069 NORTHWEST HARTFORD | 23 | 300U3 | 632 | 109 | 0.42 | 260.49248120300757 NORTHWEST HARTFORD | 23 | 301B1 | 517 | 217 | 0.87 | 247.7395143487859 NORTHWEST HARTFORD | 23 | 301B2 | 552 | 92 | 0.8 | 115.69230769230768 NORTHWEST HARTFORD | 23 | 301B4 | 874 | 1 | 0.01 | 115.00000000000001 NORTHWEST HARTFORD | 23 | 301D1 | 576 | 5 | 0.1 | 48 NORTHWEST HARTFORD | 23 | 301D2 | 393 | 5 | 0.11 | 44 NORTHWEST HARTFORD | 23 | 301D4 | 582 | 68 | 0.27 | 250.225 NORTHWEST HARTFORD | 23 | 301F2 | 600 | 28 | 0.11 | 250 NORTHWEST HARTFORD | 23 | 301F3 | 577 | 16 | 0.17 | 98.27272727272727 NORTHWEST HARTFORD | 23 | 302P1 | 557 | 19 | 0.2 | 91.63793103448278 NORTHWEST HARTFORD | 23 | 320P2 | 570 | 123 | 0.58 | 210.99999999999997 NORTHWEST HARTFORD | 23 | 320P3 | 332 | 487 | 0.99 | 490.17272727272723 NORTHWEST HARTFORD | 23 | 320P5 | 483 | 2 | 0.01 | 117.33333333333334 NORTHWEST HARTFORD | 23 | 388F2 | 810 | 254 | 1.18 | 215.0615866388309 NORTHWEST HARTFORD | 23 | 388F3 | 320 | 69 | 0.21 | 322.99999999999994 NORTHWEST HARTFORD | 23 | 388F4 | 551 | 200 | 1 | 200.64972776769508 NORTHWEST HARTFORD | 23 | N25 | 5089 | 1 | 0 | 678.1999999999999 NORTHWEST HARTFORD | 23 | N60 | 2139 | 1 | 0 | 552 NORWALK | 13.8 | 9S13 | 2085 | 34 | 0.43 | 78.97359735973598 NORWALK | 13.8 | 9S14 | 2281 | 35 | 0.42 | 84.58811261730969 NORWALK | 13.8 | 9S15 | 1417 | 81 | 0.32 | 251.94553376906316 | 12 NORWALK | 13.8 | 9S16 | 2082 | 11 | 0.07 | 149.41558441558442 NORWALK | 13.8 | 9S18 | 338 | 4 | 0.02 | 169 NORWALK | 13.8 | 9S19 | 1706 | 17 | 0.43 | 40.213896457765664 NORWALK | 13.8 | 9S24 | 353 | 17 | 0.18 | 91.72727272727273 NORWALK | 13.8 | 9S25 | 2009 | 62 | 0.63 | 98.1483516483516 | 234 NORWALK | 13.8 | 9S27 | 1630 | 61 | 0.71 | 86.46345657781598 | 4 NORWALK | 4.8 | N7 | 27 | 14 | 1 | 14 OAK ST | 4.16 | 5S01 | 343 | 2 | 0.05 | 47.00000000000001 OAKVILLE | 4.8 | 17Q1 | 1034 | 114 | 0.92 | 123.93619246861927 OAKVILLE | 4.8 | 17Q2 | 577 | 11 | 0.08 | 134.95833333333334 OXFORD | 13.8 | 26N1 | 327 | 26 | 0.07 | 340.16 OXFORD | 13.8 | 26N2 | 2504 | 127 | 0.38 | 328.5979487179489 | 57 OXFORD | 13.8 | 26N7 | 1802 | 70 | 0.73 | 96.0324283559577 PEACEABLE | 13.8 | 12N14 | 1545 | 380 | 2.13 | 178.06898638426628 | 667 PEACEABLE | 13.8 | 12N15 | 700 | 50 | 0.27 | 187.87301587301582 PEACEABLE | 13.8 | 12N16 | 906 | 85 | 0.3 | 275.57857142857137 | 33 PEACEABLE | 13.8 | 12N17 | 1772 | 223 | 1.31 | 169.21846943138098 | 253 PEACEABLE | 13.8 | 12N19 | 1277 | 335 | 2.54 | 131.67865928659282 | 455 PEPPERIDGE | 13.8 | 28A1 | 1644 | 43 | 0.27 | 156.90909090909088 | 15 PEPPERIDGE | 13.8 | 28A3 | 1004 | 80 | 0.49 | 162.61122244488976 | 60 PEPPERIDGE | 13.8 | 28A4 | 1046 | 76 | 1.04 | 73.35110294117645 | 255 PINE ORCHARD | 4.8 | 36A1 | 187 | 201 | 2.66 | 75.54108216432867 | 124 PINEWOODS | 23 | 42P2 | 606 | 154 | 1.39 | 110.50943396226414 | 53 PLUMTREE | 13.8 | 30G1 | 2102 | 69 | 0.47 | 148.75935288169865 PLUMTREE | 13.8 | 30G2 | 943 | 58 | 1 | 57.85189075630251 | 44 PLUMTREE | 13.8 | 30G3 | 2193 | 51 | 0.59 | 86.92171910974669 | 213 PORTLAND | 13.2 | 21H14 | 1535 | 89 | 0.76 | 116.50638297872344 | 32 PORTLAND | 13.2 | 21H15 | 1570 | 31 | 0.22 | 141.40285714285713 PORTLAND | 23 | 21H12 | 1409 | 10 | 0.14 | 72.58823529411764 PORTLAND | 23 | 21H13 | 3500 | 45 | 0.49 | 91.70804597701151 | 83 PORTLAND | 23 | 21H8 | 3087 | 47 | 0.47 | 100.8701923076923 | 62 PORTLAND | 23 | 21H9 | 3487 | 121 | 0.77 | 157.56951672862454 | 353 PROSPECT | 27.6 | 146J1 | 2 | 6 | 1 | 6 PROSPECT | 27.6 | 169G1 | 7 | 10 | 1 | 10 PROSPECT | 27.6 | 22E32 | 2 | 83 | 1 | 83 PROSPECT | 27.6 | 22E36 | 18 | 725 | 2 | 362.77777777777777 PUTNAM LAKE | 4.8 | 485 | 11 | 66 | 1 | 66 RIDGEFIELD | 13.8 | 22N1 | 2375 | 106 | 1.02 | 103.82082820828204 | 230 RIDGEFIELD | 13.8 | 22N2 | 1705 | 78 | 0.77 | 101.20572720422005 | 56 RIDGEFIELD | 13.8 | 22N3 | 2020 | 78 | 0.44 | 175.4591611479028 | 5 RIDGEFIELD | 13.8 | 22N4 | 1914 | 205 | 1.14 | 179.30541647701406 | 301 RIDGEFIELD | 13.8 | 22N5 | 1681 | 77 | 0.76 | 101.79469164715061 | 14 RIDGEFIELD | 13.8 | 22N6 | 1691 | 206 | 2.04 | 101.01559792027729 | 346 RIDGEFIELD | 13.8 | 22N7 | 1556 | 360 | 2.14 | 168.1016491754123 | 732 RIVERTON RD | 23 | 14N3 | 2830 | 579 | 1.64 | 353.4870745368378 | 611 RIVERTON RD | 4.8 | 14N2 | 584 | 697 | 2.54 | 273.58266129032245 | 307 ROBERT ST | 4.16 | 8F01 | 534 | 6 | 0.07 | 82 ROCKVILLE | 13.8 | 14W10 | 2183 | 44 | 0.45 | 98.96859169199595 | 138 ROCKVILLE | 13.8 | 14W12 | 2773 | 44 | 0.67 | 65.28860489882855 | 121 ROCKVILLE | 13.8 | 14W4 | 2203 | 45 | 0.72 | 63.0068493150685 | 130 ROCKVILLE | 13.8 | 14W5 | 2572 | 43 | 0.42 | 104.01935483870967 | 33 ROCKVILLE | 13.8 | 14W6 | 2640 | 52 | 0.49 | 106.44164759725398 | 72 ROCKVILLE | 13.8 | 14W7 | 2460 | 51 | 0.54 | 95.51051051051049 | 86 ROCKVILLE | 13.8 | 14W8 | 2561 | 54 | 0.43 | 125.56451612903224 | 18 ROCKVILLE | 13.8 | 14W9 | 3879 | 25 | 0.3 | 82.93474576271184 | 31 ROCKY HILL | 23 | 391A2 | 666 | 10 | 1.01 | 10.646017699115045 ROCKY HILL | 23 | 3R01 | 1357 | 104 | 1.17 | 88.90875000000005 | 230 ROCKY HILL | 23 | 3R02 | 3121 | 18 | 0.13 | 133.55868544600938 ROCKY HILL | 23 | 3R03 | 3897 | 46 | 0.58 | 78.61390467861825 ROCKY HILL | 23 | 3R04 | 2617 | 31 | 0.42 | 75.38224637681158 | 13 ROCKY HILL | 23 | 3R05 | 2168 | 14 | 0.11 | 122.6733067729083 ROCKY HILL | 23 | 3R06 | 3181 | 54 | 0.51 | 104.89159561510358 | 19 ROCKY HILL | 23 | 3R11 | 3899 | 23 | 0.49 | 48.32053941908712 ROCKY HILL | 23 | 3R12 | 948 | 0 | 0 | 142 ROCKY RIVER | 13.8 | 12Y10 | 1610 | 8 | 0.08 | 104.95588235294119 ROCKY RIVER | 13.8 | 12Y12 | 2507 | 32 | 0.16 | 194.2289156626506 | 21 ROCKY RIVER | 13.8 | 12Y14 | 2205 | 212 | 1.97 | 107.85576259489305 | 625 ROCKY RIVER | 13.8 | 12Y15 | 3141 | 150 | 1.04 | 143.67011879378617 | 272 ROCKY RIVER | 13.8 | 12Y8 | 1488 | 181 | 1.61 | 112.40706860706848 | 585 ROCKY RIVER | 13.8 | 12Y9 | 2812 | 218 | 1.42 | 153.38074999999995 | 519 ROOD AVE | 23 | 24J1 | 4695 | 5 | 0.03 | 133.95675675675676 ROOD AVE | 23 | 24J2 | 118 | 24 | 0.15 | 163.83333333333334 ROOD AVE | 23 | 24J3 | 121 | 29 | 0.12 | 240.60000000000002 S NAUGATUCK | 13.8 | 21L1 | 3546 | 35 | 0.27 | 127.27373737373745 | 2 S NAUGATUCK | 13.8 | 21L2 | 3601 | 27 | 0.33 | 83.35966386554624 S NAUGATUCK | 13.8 | 21L3 | 2884 | 71 | 0.47 | 152.47612049963269 | 82 S NAUGATUCK | 13.8 | 21L6 | 1885 | 113 | 1.56 | 72.26943881000676 | 456 S NAUGATUCK | 13.8 | 21L8 | 1965 | 53 | 0.28 | 186.2667844522968 SALISBURY | 13.2 | 21J3 | 1772 | 1028 | 6.14 | 167.45796195901877 | 1774 SALISBURY | 13.2 | 21J4 | 1630 | 962 | 3.96 | 242.96269349845184 | 1140 SANDY HOOK | 23 | 37F1 | 3244 | 160 | 1.4 | 114.39568661971835 | 724 SANDY HOOK | 23 | 37F2 | 2110 | 103 | 0.76 | 136.27521793275218 | 209 SANDY HOOK | 23 | 37F3 | 1188 | 99 | 0.71 | 139.51650943396226 | 21 SAYBROOK | 13.8 | 22D2 | 1522 | 72 | 1.06 | 68.54084158415843 | 15 SAYBROOK | 13.8 | 22D3 | 1449 | 4 | 0.05 | 83.57317073170731 SAYBROOK | 13.8 | 22D4 | 2310 | 37 | 0.32 | 113.53978779840847 SCHOOL HOUSE RD | 4.8 | 16S2 | 278 | 2 | 0.04 | 49.583333333333336 SCITICO | 23 | 27H1 | 3727 | 87 | 0.53 | 165.058198380567 | 56 SCITICO | 23 | 27H11 | 1659 | 12 | 0.1 | 113.9318181818182 SCITICO | 23 | 27H12 | 2813 | 90 | 0.74 | 120.9141221374045 | 395 SCITICO | 23 | 27H2 | 1367 | 27 | 0.13 | 196.24210526315792 SCITICO | 23 | 27H3 | 697 | 30 | 0.77 | 39.001855287569576 SCITICO | 23 | 27H4 | 1620 | 60 | 0.47 | 126.39382239382238 | 29 SCITICO | 23 | 27H6 | 2466 | 31 | 0.23 | 133.20033955857383 SCITICO | 23 | 27H7 | 2202 | 38 | 0.85 | 44.60899470899471 | 355 SCITICO | 23 | 27H9 | 3167 | 124 | 1.25 | 99.3472222222222 | 62 SHAWS HILL | 13.8 | 24H2 | 127 | 29 | 0.07 | 418.11111111111114 SHAWS HILL | 13.8 | 24H3 | 1509 | 38 | 0.34 | 111.17274472168907 SHAWS HILL | 13.8 | 24H4 | 1129 | 2 | 0.02 | 87 SHAWS HILL | 13.8 | 24H5 | 234 | 69 | 1.32 | 52.472491909385106 | 13 SHAWS HILL | 13.8 | 24H6 | 2522 | 64 | 0.26 | 246.41238670694872 SHAWS HILL | 13.8 | 24H9 | 521 | 1 | 0.01 | 115 SHERWOOD | 13.8 | 18P1 | 886 | 37 | 0.59 | 62.476280834914604 SHERWOOD | 13.8 | 18P2 | 882 | 109 | 0.4 | 272.5056179775281 | 1 SHERWOOD | 13.8 | 18P4 | 1139 | 68 | 0.97 | 69.70323741007195 | 3 SHERWOOD | 13.8 | 18P8 | 1049 | 23 | 0.11 | 207.4333333333333 SHERWOOD | 13.8 | 18P9 | 1155 | 41 | 0.16 | 248.49740932642496 SHUNOCK | 13.8 | 32P1 | 987 | 113 | 0.77 | 146.72062663185378 | 56 SHUNOCK | 13.8 | 32P3 | 1680 | 68 | 1.19 | 57.33949076385422 | 426 SHUNOCK | 13.8 | 32P4 | 1976 | 131 | 1.95 | 67.07386363636363 | 779 SHUNOCK | 13.8 | 32P5 | 2779 | 14 | 0.44 | 33.09911361804995 | 7 SILVER | 13.8 | 30A2 | 1334 | 41 | 0.44 | 92.11872909698992 SIMSBURY ROAD | 4.8 | 4403 | 205 | 208 | 1.04 | 199.4392523364486 SIMSBURY ROAD | 4.8 | 4404 | 367 | 40 | 1.1 | 36.28255528255528 SIMSBURY ROAD | 4.8 | 4405 | 384 | 218 | 2 | 109 SKUNGAMAUG | 13.8 | 49S1 | 2759 | 155 | 2.28 | 67.96958656740061 | 1120 SKUNGAMAUG | 13.8 | 49S2 | 2500 | 116 | 1.19 | 97.91864747238031 | 238 SOUTH END | 13.2 | 1G16 | 909 | 135 | 0.46 | 288.94823529411764 SOUTH END | 13.2 | 1G20 | 727 | 0 | 0 | 76.00000000000001 SOUTH END | 13.2 | 1G21 | 1084 | 25 | 0.17 | 141.15624999999997 SOUTH END | 13.2 | 1G28 | 3504 | 208 | 1.69 | 123.09346581340519 | 1068 SOUTH MEADOW | 23 | 113 | 1953 | 81 | 0.4 | 203.162196679438 SOUTH MEADOW | 23 | 116 | 250 | 32 | 0.64 | 50.722222222222214 SOUTH MEADOW | 23 | 119 | 38 | 117 | 1.47 | 80 SOUTH MEADOW | 23 | 120 | 604 | 67 | 1.14 | 59.48621190130622 | 1 SOUTH MEADOW | 23 | 128 | 2132 | 27 | 0.27 | 101.19861830742659 SOUTH MEADOW | 23 | 130 | 194 | 41 | 0.27 | 148.25925925925927 SOUTH MEADOW | 23 | 300F2 | 939 | 261 | 1.22 | 214.26567944250874 SOUTH MEADOW | 23 | 300F4 | 872 | 4 | 0.03 | 119.99999999999999 SOUTH MEADOW | 23 | 301G3 | 498 | 70 | 0.73 | 95.4538043478261 SOUTH MEADOW | 23 | 301L3 | 515 | 18 | 0.01 | 1554 SOUTH MEADOW | 23 | 301L4 | 527 | 241 | 1.02 | 236.72118959107812 SOUTH MEADOW | 23 | 322G1 | 844 | 898 | 2.42 | 370.98237885462555 | 355 SOUTH MEADOW | 23 | 322G3 | 824 | 166 | 0.33 | 505.47794117647055 SOUTH MEADOW | 23 | 322G4 | 558 | 39 | 0.18 | 210.93333333333334 SOUTH MEADOW | 23 | 375C1 | 400 | 947 | 3.44 | 275.161220043573 | 399 SOUTH MEADOW | 23 | 386R2 | 652 | 12 | 0.02 | 504.99999999999994 SOUTH MEADOW | 23 | 386R3 | 1096 | 40 | 0.26 | 153.2405498281787 SOUTH MEADOW | 23 | 386R4 | 594 | 10 | 0.02 | 356 SOUTH MEADOW | 23 | N1 | 4872 | 3 | 0.01 | 206.11688311688312 SOUTH MEADOW | 23 | N200 | 4028 | 14 | 0.06 | 226.84251968503943 SOUTH WINDSOR | 13.8 | 14L1 | 479 | 5 | 0.06 | 79.71875 SOUTH WINDSOR | 13.8 | 14L2 | 1661 | 64 | 1.1 | 58.752323674138864 SOUTH WINDSOR | 13.8 | 14L3 | 2422 | 16 | 0.23 | 71.797513321492 SOUTH WINDSOR | 13.8 | 14L4 | 920 | 42 | 0.7 | 60.66976744186045 | 11 SOUTH WINDSOR | 13.8 | 14L5 | 758 | 27 | 0.34 | 79.50381679389314 SOUTH WINDSOR | 13.8 | 14L6 | 1168 | 11 | 0.19 | 62.78378378378377 SOUTH WOODSTOCK | 23 | 26E8 | 3431 | 381 | 2.09 | 182.3480078016158 | 1212 SOUTH WOODSTOCK | 23 | 26E9 | 1553 | 357 | 2.63 | 135.62008306865374 | 650 SOUTHINGTON | 13.8 | 4C11 | 1729 | 110 | 0.85 | 128.73333333333332 | 10 SOUTHINGTON | 13.8 | 4C12 | 1622 | 75 | 0.42 | 176.43290043290048 | 98 SOUTHINGTON | 13.8 | 4C13 | 1340 | 3 | 0.07 | 51.927083333333336 SOUTHINGTON | 13.8 | 4C14 | 1778 | 11 | 0.22 | 54.07633587786261 SOUTHINGTON | 13.8 | 4C15 | 2011 | 18 | 0.13 | 140.96981132075476 SOUTHINGTON | 13.8 | 4C16 | 1743 | 90 | 0.63 | 142.39259927797838 SOUTHINGTON | 13.8 | 4C17 | 2869 | 36 | 0.42 | 84.66014669926648 SOUTHINGTON | 13.8 | 4C18 | 1168 | 120 | 0.91 | 131.6160298229264 SOUTHINGTON | 13.8 | 4C19 | 1665 | 38 | 0.82 | 47.157703488372086 | 64 SOUTHWEST HARTFORD | 23 | 300Z2 | 379 | 4 | 0.07 | 64.99999999999999 SOUTHWEST HARTFORD | 23 | 300Z3 | 1182 | 14 | 0.17 | 82.7877358490566 SOUTHWEST HARTFORD | 23 | 301M3 | 264 | 391 | 2 | 194.84528301886792 SOUTHWEST HARTFORD | 23 | 301M4 | 523 | 315 | 2 | 157.38095238095238 SOUTHWEST HARTFORD | 23 | 303Q1 | 490 | 16 | 0.1 | 165 SOUTHWEST HARTFORD | 23 | 303Q3 | 670 | 168 | 0.99 | 169 SOUTHWEST HARTFORD | 23 | 304J2 | 488 | 1 | 0.01 | 127 SOUTHWEST HARTFORD | 23 | 47N14 | 100 | 54 | 1.12 | 47.982300884955755 SOUTHWEST HARTFORD | 23 | 47N2 | 1748 | 15 | 0.09 | 166.23636363636362 SOUTHWEST HARTFORD | 23 | 47N3 | 3582 | 44 | 0.7 | 63.59318001586044 SOUTHWEST HARTFORD | 23 | 47N8 | 3480 | 21 | 0.09 | 238.17515923566884 SOUTHWEST HARTFORD | 23 | 47N9 | 612 | 18 | 0.36 | 51 SOUTHWICK | 13.8 | 29A1 | 732 | 161 | 0.46 | 344.28779069767444 | 18 SOUTHWICK | 23 | 29A3 | 2789 | 127 | 1.13 | 112.84603224786599 | 469 STEPSTONE | 13.8 | 35L8 | 1575 | 167 | 2.39 | 69.65193223928006 | 472 STEPSTONE | 13.8 | 35L9 | 2306 | 97 | 0.88 | 110.41347099311706 | 184 STEPSTONE | 23 | 35L10 | 1665 | 31 | 0.83 | 37.79812545061284 STEPSTONE | 23 | 35L7 | 1765 | 176 | 0.79 | 221.55911680911683 | 129 STEVENSON | 8.32 | 14A1 | 765 | 251 | 2.56 | 97.99184089750135 | 89 STONINGTON | 4.16 | 21U1 | 233 | 9 | 0.15 | 60.55555555555555 STONINGTON | 4.16 | 21U2 | 708 | 6 | 0.02 | 270 STONY HILL | 13.8 | 48C10 | 2371 | 102 | 2.36 | 43.33774124374555 | 1000 STONY HILL | 13.8 | 48C4 | 902 | 295 | 0.83 | 355.51866666666666 STONY HILL | 13.8 | 48C5 | 1212 | 101 | 0.87 | 116.12146892655365 | 68 STONY HILL | 13.8 | 48C6 | 2032 | 124 | 0.91 | 136.26688276607246 | 80 STONY HILL | 13.8 | 48C7 | 2458 | 83 | 0.61 | 136.3160345974717 | 73 STONY HILL | 13.8 | 48C8 | 1570 | 51 | 0.49 | 104.35006435006434 | 108 STONY HILL | 13.8 | 48C9 | 1367 | 2 | 0.01 | 183.6842105263158 SUFFIELD | 23 | 36M1 | 1063 | 50 | 0.58 | 85.83333333333334 SUFFIELD | 23 | 36M2 | 2599 | 108 | 0.66 | 163.92486895748394 | 114 THOMASTON | 13.2 | 2B4 | 1690 | 30 | 0.21 | 144.60335195530726 THOMASTON | 13.2 | 2B5 | 2123 | 49 | 0.33 | 147.71107994389902 THOMASTON | 13.2 | 2B6 | 1264 | 95 | 0.88 | 107.62287756925822 THOMASTON | 13.2 | 2B7 | 787 | 93 | 1.04 | 89.92317073170727 | 18 THOMASTON | 13.2 | 2B8 | 328 | 95 | 0.71 | 133.64255319148936 | 28 THOMPSON | 23 | 23Q8 | 2403 | 272 | 1.33 | 203.8839675608235 | 298 THOMPSON | 23 | 23Q9 | 1921 | 232 | 2.9 | 79.96793264063058 | 1161 TODD RD | 13.8 | 30L23 | 1885 | 23 | 0.2 | 115.71164021164019 TODD RD | 13.8 | 30L24 | 2029 | 15 | 0.15 | 97.21269841269839 TODD RD | 13.8 | 30L25 | 1367 | 26 | 0.19 | 138.18867924528305 TODD RD | 13.8 | 30L26 | 3248 | 3 | 0.04 | 73.36296296296297 TODD RD | 13.8 | 30L27 | 606 | 0 | 0.01 | 41.800000000000004 TODD RD | 13.8 | 30L28 | 1170 | 22 | 0.12 | 183.52482269503545 TOMAC AVE | 13.2 | 12H16 | 650 | 5 | 0.04 | 121.2 TOMAC AVE | 13.2 | 12H19 | 540 | 16 | 0.07 | 231.5263157894737 TORRINGTON TERMINAL | 13.2 | 8A1 | 1945 | 9 | 0.05 | 164.33333333333334 TORRINGTON TERMINAL | 13.2 | 8A2 | 2715 | 90 | 0.86 | 104.88275566966199 | 6 TORRINGTON TERMINAL | 13.2 | 8A3 | 42 | 417 | 3.04 | 136.90625 | 42 TRACY | 23 | 14M22 | 664 | 285 | 2.6 | 109.95251881876085 | 305 TRACY | 23 | 14M24 | 582 | 31 | 0.07 | 414.9545454545453 TRACY | 23 | 14M29 | 2791 | 155 | 0.99 | 155.2825385442811 | 59 TRACY | 23 | 14M39 | 2804 | 100 | 0.62 | 159.53405221339392 | 51 TRACY | 23 | 14M7 | 1198 | 4 | 0.03 | 112.77272727272727 TRACY | 23 | 14M8 | 1591 | 92 | 0.91 | 100.99452429842572 | 120 TRACY | 23 | 14M9 | 1291 | 178 | 1.35 | 132.35415472779385 | 186 TRIANGLE | 13.8 | 11A50 | 432 | 50 | 0.88 | 57.70866141732283 TRIANGLE | 13.8 | 11A51 | 257 | 70 | 0.28 | 253.33333333333334 TRIANGLE | 13.8 | 11A53 | 1922 | 69 | 0.82 | 84.06510745891279 TRIANGLE | 13.8 | 11A54 | 1114 | 12 | 0.16 | 79.10555555555555 TRIANGLE | 13.8 | 11A55 | 611 | 77 | 0.79 | 97.17453798767966 | 25 TRIANGLE | 13.8 | 11A56 | 174 | 8 | 0.19 | 44.705882352941174 TRIANGLE | 13.8 | 11A57 | 18 | 239 | 0.94 | 253.47058823529412 TRIANGLE | 13.8 | 11A58 | 3079 | 41 | 0.2 | 200.09478672985782 TRIANGLE | 13.8 | 11A71 | 1381 | 25 | 0.51 | 48.413165266106446 TRIANGLE | 13.8 | 11A72 | 1843 | 26 | 0.35 | 73.53869499241273 TRIANGLE | 13.8 | 11A73 | 2899 | 32 | 0.24 | 133.46844319775596 TRIANGLE | 13.8 | 11A74 | 3064 | 60 | 0.65 | 92.02287419194428 | 653 TRIANGLE | 13.8 | 11A75 | 934 | 45 | 0.71 | 64.00899550224888 TRIANGLE | 13.8 | 11A76 | 2684 | 24 | 0.3 | 78.20192307692308 TRIANGLE | 13.8 | 11A77 | 2596 | 102 | 0.69 | 147.51825221238934 | 34 TUNNEL | 23 | 12S1 | 584 | 121 | 0.57 | 209.90504451038575 TUNNEL | 23 | 12S2 | 1887 | 84 | 0.96 | 86.98796498905905 | 529 TUNNEL | 23 | 12S3 | 336 | 100 | 1.31 | 76.44343891402717 | 36 TUNNEL | 23 | 12S4 | 2030 | 157 | 1.27 | 124.19844961240314 | 100 TUNNEL | 23 | 12S5 | 1572 | 265 | 2.87 | 92.35421740092984 | 626 UNCASVILLE | 13.2 | 1Q01 | 2756 | 108 | 0.97 | 111.19031657355679 | 515 UNCASVILLE | 13.2 | 1Q02 | 1044 | 67 | 0.86 | 77.97455752212387 | 27 UNCASVILLE | 13.2 | 1Q03 | 2327 | 46 | 0.69 | 67.2486016159105 | 7 UNCASVILLE | 13.2 | 1Q5 | 29 | 68 | 1 | 68 UNCASVILLE | 13.2 | 1Q6 | 2296 | 37 | 0.34 | 110.430749682338 | 166 UNCASVILLE | 27.6 | 1Q21 | 3 | 102 | 1 | 102 WATERFORD | 23 | 36F2 | 1219 | 12 | 0.1 | 119.00757575757574 WATERFORD | 23 | 36F5 | 796 | 170 | 1.27 | 133.76134122287968 | 195 WATERFORD | 23 | 36F6 | 4638 | 46 | 0.54 | 84.51023622047242 | 6 WATERSIDE | 13.2 | 117A1 | 4 | 23 | 1 | 23 WATERSIDE | 13.2 | 117A4 | 4 | 23 | 1 | 23 WATERSIDE | 13.2 | 22M1 | 1700 | 131 | 0.97 | 135.11319612590796 | 11 WATERSIDE | 13.2 | 22M10 | 1335 | 213 | 0.63 | 334.3770491803279 | 102 WATERSIDE | 13.2 | 22M12 | 659 | 87 | 1.01 | 86.62368815592205 WATERSIDE | 13.2 | 22M13 | 845 | 29 | 0.11 | 249.3535353535354 WATERSIDE | 13.2 | 22M14 | 1043 | 46 | 0.24 | 185.51351351351352 WATERSIDE | 13.2 | 22M15 | 1459 | 10 | 0.04 | 244.8870967741936 WATERSIDE | 13.2 | 22M16 | 1517 | 99 | 0.63 | 157.638164754953 | 41 WATERSIDE | 13.2 | 22M2 | 813 | 64 | 1.04 | 61.64512338425382 WATERSIDE | 13.2 | 22M3 | 1423 | 55 | 0.56 | 97.5716049382716 WATERSIDE | 13.2 | 22M4 | 1524 | 21 | 0.16 | 130.0197628458498 WATERSIDE | 13.2 | 22M6 | 1514 | 45 | 0.62 | 72.99265477439666 | 80 WATERSIDE | 13.2 | 22M8 | 300 | 25 | 0.14 | 173.70454545454544 WATERSIDE | 13.2 | 22M9 | 2751 | 43 | 0.55 | 78.96668843892881 | 20 WATERTOWN | 4.8 | 25R1 | 154 | 251 | 1.61 | 156.1612903225806 WATERTOWN | 4.8 | 25R2 | 163 | 219 | 1.43 | 152.8418803418803 WATERTOWN | 4.8 | 25R3 | 575 | 148 | 1.81 | 82.17466410748563 WELLS | 4.8 | 3803 | 578 | 160 | 1.15 | 138.98206278026908 WELLS | 4.8 | 3805 | 718 | 155 | 1.56 | 99.5307212822796 | 76 WEST BROOKFIELD | 13.8 | 14H1 | 2412 | 53 | 0.73 | 73.55988700564971 | 1 WEST BROOKFIELD | 13.8 | 14H2 | 1532 | 133 | 1.21 | 109.8245708154507 | 57 WEST BROOKFIELD | 13.8 | 14H3 | 2856 | 22 | 0.21 | 102.3928571428572 WEST BROOKFIELD | 13.8 | 14H4 | 1297 | 77 | 0.53 | 144.36743515850148 | 46 WEST BROOKFIELD | 13.8 | 14H5 | 662 | 47 | 2.18 | 21.985467128027683 | 105 WEST BROOKFIELD | 13.8 | 14H6 | 1782 | 195 | 0.84 | 231.53364423717528 | 35 WEST GOSHEN | 23 | 33M1 | 741 | 253 | 2.41 | 104.58895705521473 | 312 WEST GOSHEN | 23 | 33M2 | 283 | 57 | 1.16 | 49.57401812688822 WESTBROOK | 4.8 | 20S1 | 479 | 147 | 1.26 | 116.59933774834434 WESTBROOK | 4.8 | 20S2 | 576 | 197 | 1.94 | 101.66071428571432 | 76 WESTBROOK | 4.8 | 20S3 | 277 | 245 | 2.34 | 104.54923076923076 | 88 WESTON | 13.8 | 21M1 | 778 | 173 | 0.97 | 178.37730870712397 | 20 WESTON | 13.8 | 21M15 | 1178 | 332 | 2.43 | 136.51308900523563 | 490 WESTON | 13.8 | 21M2 | 1090 | 136 | 1.51 | 89.63867069486409 | 166 WESTON | 13.8 | 21M3 | 639 | 170 | 1.66 | 101.88566073102155 | 23 WESTPORT | 13.8 | 27F14 | 912 | 121 | 0.43 | 280.22588832487304 WESTSIDE | 13.2 | 7A71 | 665 | 1 | 0.02 | 64 WESTSIDE | 13.2 | 7A72 | 796 | 2 | 0.01 | 134 WESTSIDE | 13.2 | 7A73 | 2720 | 86 | 0.36 | 234.95318725099602 WESTSIDE | 13.2 | 7A74 | 700 | 14 | 0.58 | 25.634803921568626 WESTSIDE | 13.2 | 7A76 | 378 | 551 | 2.71 | 202.75583657587543 | 235 WESTSIDE | 13.2 | 7A77 | 1932 | 34 | 0.21 | 161.1050119331742 | 52 WESTSIDE | 13.2 | 7A78 | 1607 | 21 | 0.17 | 125.96028880866426 WESTSIDE | 13.2 | 7A79 | 2839 | 49 | 0.38 | 127.41048824593129 | 116 WESTSIDE | 13.2 | 7A80 | 847 | 29 | 0.06 | 468.99999999999994 WESTSIDE | 13.2 | 7A81 | 1381 | 2 | 0.01 | 180.47058823529412 WESTSIDE | 13.2 | 7A82 | 357 | 44 | 0.2 | 219.13698630136986 WILLIAMS ST | 13.2 | 9L01 | 1639 | 26 | 0.61 | 42.31876861966237 WILLIAMS ST | 13.2 | 9L02 | 210 | 27 | 0.86 | 31.318681318681318 WILLIAMS ST | 13.2 | 9L03 | 1201 | 15 | 0.13 | 113.39375 WILLIAMS ST | 13.2 | 9L04 | 2020 | 36 | 0.17 | 206.52691218130303 WILLIAMS ST | 13.2 | 9L05 | 3062 | 18 | 0.16 | 116.5755102040816 WILLIAMS ST | 13.2 | 9L06 | 2383 | 27 | 0.15 | 177.3736263736264 WILLIAMS ST | 13.2 | 9L07 | 1165 | 33 | 0.21 | 158.22857142857146 WILLIAMS ST | 13.2 | 9L08 | 2060 | 23 | 0.15 | 150.10703363914376 WILLIAMS ST | 13.2 | 9L09 | 1049 | 70 | 0.51 | 134.8954128440367 | 49 WILLIAMS ST | 13.2 | 9L10 | 639 | 32 | 0.27 | 118.68965517241382 WILLIMANTIC | 27.6 | 14S31 | 3 | 94 | 0.66 | 142.00000000000003 WILLIMANTIC | 4.8 | 14S3 | 522 | 6 | 0.05 | 116.55555555555556 WILTON | 13.8 | 35A1 | 686 | 14 | 0.15 | 90.24074074074075 | 7 WILTON | 13.8 | 35A10 | 728 | 147 | 0.57 | 258.17548076923083 WILTON | 13.8 | 35A11 | 1678 | 204 | 0.97 | 208.49269183922036 | 20 WILTON | 13.8 | 35A3 | 443 | 161 | 1.05 | 153.2226980728052 | 16 WILTON | 13.8 | 35A4 | 345 | 73 | 0.45 | 161.23417721518987 | 7 WILTON | 13.8 | 35A6 | 1001 | 32 | 0.18 | 174.27659574468086 WILTON | 13.8 | 35A7 | 956 | 188 | 1.56 | 120.19066666666676 | 206 WILTON | 13.8 | 35A8 | 1300 | 164 | 0.81 | 203.46533713200375 | 19 WINCHESTER | 4.8 | 29W1 | 946 | 228 | 2 | 113.67930489731437 | 319 WINDSOR LOCKS | 23 | 14K5 | 1777 | 6 | 0.16 | 36.33887043189369 WINDSOR LOCKS | 23 | 14K6 | 4073 | 60 | 0.88 | 68.16583054626533 | 460 WINDSOR LOCKS | 23 | 14K7 | 2608 | 42 | 0.32 | 128.607476635514 | 220 WINDSOR LOCKS | 23 | 14K9 | 2113 | 44 | 0.45 | 97.73917525773199 WINDSOR LOCKS | 27.6 | 14K44 | 4 | 1113 | 1.5 | 742.5 WINSTED | 23 | 33B7 | 1363 | 122 | 0.57 | 212.91730279898226 | 163 WOLCOTT | 4.8 | 24R1 | 688 | 52 | 0.5 | 104.51873198847262 WOLCOTT | 4.8 | 24R2 | 854 | 22 | 0.17 | 132 WOLCOTT | 4.8 | 24R3 | 498 | 5 | 0.05 | 92.85185185185185 YALE AVE | 4.8 | 25L1 | 603 | 69 | 1.06 | 64.85981308411213 YALE AVE | 4.8 | 25L2 | 208 | 44 | 0.24 | 183.28

Text of ES-Attachment 3.pdf

Extracted from the file · 7,205 characters
REGION_NAME Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut Connecticut BULK_SUBSTATION_NAMES BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BATES_ROCK_21K BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BEACON_FALLS_11N BOKUM_15L BOKUM_15L BOKUM_15L BOKUM_15L BOKUM_15L BRANFORD_11J BRANFORD_11J BRANFORD_11J BRANFORD_11J BRANFORD_11J BRANFORD_11J BRISTOL_11K BROOKLYN_30Y BROOKLYN_30Y BULLS_BRIDGE_11M CAMPVILLE_14R CAMPVILLE_14R CAMPVILLE_14R CAMPVILLE_14R CAMPVILLE_14R CANAL_ST_15Q CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CANTON_5R CARD_ST_11F CARD_ST_11F CARD_ST_11F CARD_ST_11F CARMEL_HILL_11S CARMEL_HILL_11S CARMEL_HILL_11S CEDAR_HEIGHTS_4R CEDAR_HEIGHTS_4R CEDAR_HEIGHTS_4R CEDAR_HEIGHTS_4R CEDAR_HEIGHTS_4R CHIPPEN_HILL_15U COMPO_23K COMPO_23K COS_COB_11R DARIEN_13S DOOLEY_30K DOOLEY_30K DOOLEY_30K DOOLEY_30K EAST_NEW_BRITAIN_7L FARMINGTON_1C FARMINGTON_1C FARMINGTON_1C FARMINGTON_1C FARMINGTON_1C FARMINGTON_1C FARMINGTON_1C FARMINGTON_1C FLANDERS_11Y FLANDERS_11Y FLANDERS_11Y FLANDERS_11Y FREIGHT_ST_11W FREIGHT_ST_11W FREIGHT_ST_11W FREIGHT_ST_11W FRYBROOK_13B FRYBROOK_13B FRYBROOK_13B GALES_FERRY_11B GALES_FERRY_11B GREEN_HILL_30R GREEN_HILL_30R GREEN_HILL_30R GREEN_HILL_30R GREEN_HILL_30R GREEN_HILL_30R HADDAM_11C HADDAM_11C HADDAM_11C HADDAM_11C HADDAM_11C HADDAM_11C HADDAM_11C HANOVER_ST_12F HANOVER_ST_12F HANOVER_ST_12F HANOVER_ST_12F HOPEWELL_22R HOPEWELL_22R HOPEWELL_22R HOPEWELL_22R MANCHESTER_3A MANCHESTER_3A MANCHESTER_3A MANCHESTER_3A MANCHESTER_3A MANCHESTER_3A MANSFIELD_12J MANSFIELD_12J MANSFIELD_12J MIDDLE_RIVER_28M MIDDLE_RIVER_28M MIDDLE_RIVER_28M MIDDLE_RIVER_28M MIDDLE_RIVER_28M MIDDLE_RIVER_28M NEWINGTON_4A NEWINGTON_4A NEWINGTON_4A NEWTOWN_12M NEWTOWN_12M NORTH_BLOOMFIELD_2A NORWALK_9S NORWALK_9S OXFORD_26N OXFORD_26N PEACEABLE_12N PEACEABLE_12N PEACEABLE_12N PEACEABLE_12N PLUMTREE_30G PORTLAND_21H PORTLAND_21H PORTLAND_21H PORTLAND_21H PORTLAND_21H PORTLAND_21H PORTLAND_21H RIDGEFIELD_22N RIDGEFIELD_22N RIDGEFIELD_22N RIDGEFIELD_22N RIDGEFIELD_22N ROCKY_HILL_3R ROCKY_HILL_3R ROCKY_HILL_3R ROCKY_HILL_3R ROCKY_RIVER_12Y ROCKY_RIVER_12Y ROCKY_RIVER_12Y ROOD_AVE_24J ROOD_AVE_24J ROOD_AVE_24J S_NAUGATUCK_21L S_NAUGATUCK_21L S_NAUGATUCK_21L S_NAUGATUCK_21L S_NAUGATUCK_21L S_NAUGATUCK_21L SALISBURY_21J SANDY_HOOK_37F SANDY_HOOK_37F SANDY_HOOK_37F SCITICO_27H SCITICO_27H SCITICO_27H SHEPAUG_13A SHERWOOD_18P SHERWOOD_18P SHERWOOD_18P SHUNOCK_32P SHUNOCK_32P SKUNGAMAUG_49S SKUNGAMAUG_49S STEPSTONE_35L STONY_HILL_48C STONY_HILL_48C STONY_HILL_48C STONY_HILL_48C STONY_HILL_48C TRACY_14M TRACY_14M TRACY_14M TRACY_14M TRACY_14M TRACY_14M TRIANGLE_11A TUNNEL_12S TUNNEL_12S TUNNEL_12S TUNNEL_12S UNCASVILLE_1Q WEST_BROOKFIELD_14H WEST_BROOKFIELD_14H WEST_BROOKFIELD_14H WEST_BROOKFIELD_14H WEST_BROOKFIELD_14H WESTON_21M WESTON_21M WESTON_21M WESTON_21M WESTON_21M WILLIMANTIC_14S WILLIMANTIC_14S WILLIMANTIC_14S WILTON_35A WILTON_35A WILTON_35A WILTON_35A WILTON_35A WINDSOR_LOCKS_14K WINDSOR_LOCKS_14K WINDSOR_LOCKS_14K BULK_CIRCUIT_NAMES 21K11 21K2 21K5 21K5 21K5 21K5 21K5 21K5 21K5 21K5 21K7 21K8 21K9 11N81 11N85 11N86 11N87 11N87 11N87 11N87 11N87 11N88 15L12 15L12 15L12 15L12 15L68 11J30 11J41 11J43 11J45 11J58 11J58 11K46 30Y10 30Y8 11M3 14R31 14R31 14R31 14R31 14R31 15Q6 5R1 5R2 5R3 5R4 5R5 5R7 5R80 5R80 5R80 5R80 5R80 11F12 11F13 11F14 11F9 11S13 11S14 11S15 4R07 4R08 4R09 4R11 4R13 15U2 23K11 23K14 11R2 13S7 30K11 30K12 30K14 30K16 7L82 1C02 1C03 1C06 1C06 1C06 1C06 1C06 1C20 11Y1 11Y3 11Y3 11Y3 11W76 11W76 11W76 11W76 13B10 13B25 13B9 11B62 11B63 30R10 30R13 30R14 30R7 30R8 30R9 11C10 11C12 11C12 11C12 11C12 11C13 11C14 12F45 12F45 12F47 12F48 22R1 22R2 22R2 22R4 3A04 3A04 3A04 3A04 3A09 3A12 12J17 12J4 12J5 28M1 28M11 28M12 28M2 28M3 28M6 4A9 4A9 4A9 12M4 12M5 2A14 9S25 9S26 26N2 26N7 12N14 12N16 12N17 12N19 30G3 21H13 21H14 21H8 21H8 21H8 21H8 21H9 22N1 22N4 22N5 22N6 22N7 3R03 3R03 3R03 3R03 12Y15 12Y8 12Y9 24J3 24J3 24J3 21L3 21L4 21L5 21L5 21L5 21L6 21J4 37F1 37F2 37F3 27H1 27H12 27H9 13A2 18P1 18P4 18P6 32P1 32P4 49S1 49S2 35L9 48C10 48C5 48C6 48C7 48C8 14M14 14M22 14M22 14M39 14M9 14M9 11A58 12S3 12S4 12S5 12S6 1Q03 14H1 14H2 14H3 14H4 14H6 21M1 21M1 21M15 21M2 21M3 14S31 14S31 14S31 35A10 35A3 35A4 35A7 35A8 14K44 14K44 14K5

Text of ES-Attachment 3.xlsx

Extracted from the file · 8,166 characters
[Sheet: CED.reportcircuitconnectivity] REGION_NAME | BULK_SUBSTATION_NAMES | BULK_CIRCUIT_NAMES Connecticut | BATES_ROCK_21K | 21K11 Connecticut | BATES_ROCK_21K | 21K2 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K5 Connecticut | BATES_ROCK_21K | 21K7 Connecticut | BATES_ROCK_21K | 21K8 Connecticut | BATES_ROCK_21K | 21K9 Connecticut | BEACON_FALLS_11N | 11N81 Connecticut | BEACON_FALLS_11N | 11N85 Connecticut | BEACON_FALLS_11N | 11N86 Connecticut | BEACON_FALLS_11N | 11N87 Connecticut | BEACON_FALLS_11N | 11N87 Connecticut | BEACON_FALLS_11N | 11N87 Connecticut | BEACON_FALLS_11N | 11N87 Connecticut | BEACON_FALLS_11N | 11N87 Connecticut | BEACON_FALLS_11N | 11N88 Connecticut | BOKUM_15L | 15L12 Connecticut | BOKUM_15L | 15L12 Connecticut | BOKUM_15L | 15L12 Connecticut | BOKUM_15L | 15L12 Connecticut | BOKUM_15L | 15L68 Connecticut | BRANFORD_11J | 11J30 Connecticut | BRANFORD_11J | 11J41 Connecticut | BRANFORD_11J | 11J43 Connecticut | BRANFORD_11J | 11J45 Connecticut | BRANFORD_11J | 11J58 Connecticut | BRANFORD_11J | 11J58 Connecticut | BRISTOL_11K | 11K46 Connecticut | BROOKLYN_30Y | 30Y10 Connecticut | BROOKLYN_30Y | 30Y8 Connecticut | BULLS_BRIDGE_11M | 11M3 Connecticut | CAMPVILLE_14R | 14R31 Connecticut | CAMPVILLE_14R | 14R31 Connecticut | CAMPVILLE_14R | 14R31 Connecticut | CAMPVILLE_14R | 14R31 Connecticut | CAMPVILLE_14R | 14R31 Connecticut | CANAL_ST_15Q | 15Q6 Connecticut | CANTON_5R | 5R1 Connecticut | CANTON_5R | 5R2 Connecticut | CANTON_5R | 5R3 Connecticut | CANTON_5R | 5R4 Connecticut | CANTON_5R | 5R5 Connecticut | CANTON_5R | 5R7 Connecticut | CANTON_5R | 5R80 Connecticut | CANTON_5R | 5R80 Connecticut | CANTON_5R | 5R80 Connecticut | CANTON_5R | 5R80 Connecticut | CANTON_5R | 5R80 Connecticut | CARD_ST_11F | 11F12 Connecticut | CARD_ST_11F | 11F13 Connecticut | CARD_ST_11F | 11F14 Connecticut | CARD_ST_11F | 11F9 Connecticut | CARMEL_HILL_11S | 11S13 Connecticut | CARMEL_HILL_11S | 11S14 Connecticut | CARMEL_HILL_11S | 11S15 Connecticut | CEDAR_HEIGHTS_4R | 4R07 Connecticut | CEDAR_HEIGHTS_4R | 4R08 Connecticut | CEDAR_HEIGHTS_4R | 4R09 Connecticut | CEDAR_HEIGHTS_4R | 4R11 Connecticut | CEDAR_HEIGHTS_4R | 4R13 Connecticut | CHIPPEN_HILL_15U | 15U2 Connecticut | COMPO_23K | 23K11 Connecticut | COMPO_23K | 23K14 Connecticut | COS_COB_11R | 11R2 Connecticut | DARIEN_13S | 13S7 Connecticut | DOOLEY_30K | 30K11 Connecticut | DOOLEY_30K | 30K12 Connecticut | DOOLEY_30K | 30K14 Connecticut | DOOLEY_30K | 30K16 Connecticut | EAST_NEW_BRITAIN_7L | 7L82 Connecticut | FARMINGTON_1C | 1C02 Connecticut | FARMINGTON_1C | 1C03 Connecticut | FARMINGTON_1C | 1C06 Connecticut | FARMINGTON_1C | 1C06 Connecticut | FARMINGTON_1C | 1C06 Connecticut | FARMINGTON_1C | 1C06 Connecticut | FARMINGTON_1C | 1C06 Connecticut | FARMINGTON_1C | 1C20 Connecticut | FLANDERS_11Y | 11Y1 Connecticut | FLANDERS_11Y | 11Y3 Connecticut | FLANDERS_11Y | 11Y3 Connecticut | FLANDERS_11Y | 11Y3 Connecticut | FREIGHT_ST_11W | 11W76 Connecticut | FREIGHT_ST_11W | 11W76 Connecticut | FREIGHT_ST_11W | 11W76 Connecticut | FREIGHT_ST_11W | 11W76 Connecticut | FRYBROOK_13B | 13B10 Connecticut | FRYBROOK_13B | 13B25 Connecticut | FRYBROOK_13B | 13B9 Connecticut | GALES_FERRY_11B | 11B62 Connecticut | GALES_FERRY_11B | 11B63 Connecticut | GREEN_HILL_30R | 30R10 Connecticut | GREEN_HILL_30R | 30R13 Connecticut | GREEN_HILL_30R | 30R14 Connecticut | GREEN_HILL_30R | 30R7 Connecticut | GREEN_HILL_30R | 30R8 Connecticut | GREEN_HILL_30R | 30R9 Connecticut | HADDAM_11C | 11C10 Connecticut | HADDAM_11C | 11C12 Connecticut | HADDAM_11C | 11C12 Connecticut | HADDAM_11C | 11C12 Connecticut | HADDAM_11C | 11C12 Connecticut | HADDAM_11C | 11C13 Connecticut | HADDAM_11C | 11C14 Connecticut | HANOVER_ST_12F | 12F45 Connecticut | HANOVER_ST_12F | 12F45 Connecticut | HANOVER_ST_12F | 12F47 Connecticut | HANOVER_ST_12F | 12F48 Connecticut | HOPEWELL_22R | 22R1 Connecticut | HOPEWELL_22R | 22R2 Connecticut | HOPEWELL_22R | 22R2 Connecticut | HOPEWELL_22R | 22R4 Connecticut | MANCHESTER_3A | 3A04 Connecticut | MANCHESTER_3A | 3A04 Connecticut | MANCHESTER_3A | 3A04 Connecticut | MANCHESTER_3A | 3A04 Connecticut | MANCHESTER_3A | 3A09 Connecticut | MANCHESTER_3A | 3A12 Connecticut | MANSFIELD_12J | 12J17 Connecticut | MANSFIELD_12J | 12J4 Connecticut | MANSFIELD_12J | 12J5 Connecticut | MIDDLE_RIVER_28M | 28M1 Connecticut | MIDDLE_RIVER_28M | 28M11 Connecticut | MIDDLE_RIVER_28M | 28M12 Connecticut | MIDDLE_RIVER_28M | 28M2 Connecticut | MIDDLE_RIVER_28M | 28M3 Connecticut | MIDDLE_RIVER_28M | 28M6 Connecticut | NEWINGTON_4A | 4A9 Connecticut | NEWINGTON_4A | 4A9 Connecticut | NEWINGTON_4A | 4A9 Connecticut | NEWTOWN_12M | 12M4 Connecticut | NEWTOWN_12M | 12M5 Connecticut | NORTH_BLOOMFIELD_2A | 2A14 Connecticut | NORWALK_9S | 9S25 Connecticut | NORWALK_9S | 9S26 Connecticut | OXFORD_26N | 26N2 Connecticut | OXFORD_26N | 26N7 Connecticut | PEACEABLE_12N | 12N14 Connecticut | PEACEABLE_12N | 12N16 Connecticut | PEACEABLE_12N | 12N17 Connecticut | PEACEABLE_12N | 12N19 Connecticut | PLUMTREE_30G | 30G3 Connecticut | PORTLAND_21H | 21H13 Connecticut | PORTLAND_21H | 21H14 Connecticut | PORTLAND_21H | 21H8 Connecticut | PORTLAND_21H | 21H8 Connecticut | PORTLAND_21H | 21H8 Connecticut | PORTLAND_21H | 21H8 Connecticut | PORTLAND_21H | 21H9 Connecticut | RIDGEFIELD_22N | 22N1 Connecticut | RIDGEFIELD_22N | 22N4 Connecticut | RIDGEFIELD_22N | 22N5 Connecticut | RIDGEFIELD_22N | 22N6 Connecticut | RIDGEFIELD_22N | 22N7 Connecticut | ROCKY_HILL_3R | 3R03 Connecticut | ROCKY_HILL_3R | 3R03 Connecticut | ROCKY_HILL_3R | 3R03 Connecticut | ROCKY_HILL_3R | 3R03 Connecticut | ROCKY_RIVER_12Y | 12Y15 Connecticut | ROCKY_RIVER_12Y | 12Y8 Connecticut | ROCKY_RIVER_12Y | 12Y9 Connecticut | ROOD_AVE_24J | 24J3 Connecticut | ROOD_AVE_24J | 24J3 Connecticut | ROOD_AVE_24J | 24J3 Connecticut | S_NAUGATUCK_21L | 21L3 Connecticut | S_NAUGATUCK_21L | 21L4 Connecticut | S_NAUGATUCK_21L | 21L5 Connecticut | S_NAUGATUCK_21L | 21L5 Connecticut | S_NAUGATUCK_21L | 21L5 Connecticut | S_NAUGATUCK_21L | 21L6 Connecticut | SALISBURY_21J | 21J4 Connecticut | SANDY_HOOK_37F | 37F1 Connecticut | SANDY_HOOK_37F | 37F2 Connecticut | SANDY_HOOK_37F | 37F3 Connecticut | SCITICO_27H | 27H1 Connecticut | SCITICO_27H | 27H12 Connecticut | SCITICO_27H | 27H9 Connecticut | SHEPAUG_13A | 13A2 Connecticut | SHERWOOD_18P | 18P1 Connecticut | SHERWOOD_18P | 18P4 Connecticut | SHERWOOD_18P | 18P6 Connecticut | SHUNOCK_32P | 32P1 Connecticut | SHUNOCK_32P | 32P4 Connecticut | SKUNGAMAUG_49S | 49S1 Connecticut | SKUNGAMAUG_49S | 49S2 Connecticut | STEPSTONE_35L | 35L9 Connecticut | STONY_HILL_48C | 48C10 Connecticut | STONY_HILL_48C | 48C5 Connecticut | STONY_HILL_48C | 48C6 Connecticut | STONY_HILL_48C | 48C7 Connecticut | STONY_HILL_48C | 48C8 Connecticut | TRACY_14M | 14M14 Connecticut | TRACY_14M | 14M22 Connecticut | TRACY_14M | 14M22 Connecticut | TRACY_14M | 14M39 Connecticut | TRACY_14M | 14M9 Connecticut | TRACY_14M | 14M9 Connecticut | TRIANGLE_11A | 11A58 Connecticut | TUNNEL_12S | 12S3 Connecticut | TUNNEL_12S | 12S4 Connecticut | TUNNEL_12S | 12S5 Connecticut | TUNNEL_12S | 12S6 Connecticut | UNCASVILLE_1Q | 1Q03 Connecticut | WEST_BROOKFIELD_14H | 14H1 Connecticut | WEST_BROOKFIELD_14H | 14H2 Connecticut | WEST_BROOKFIELD_14H | 14H3 Connecticut | WEST_BROOKFIELD_14H | 14H4 Connecticut | WEST_BROOKFIELD_14H | 14H6 Connecticut | WESTON_21M | 21M1 Connecticut | WESTON_21M | 21M1 Connecticut | WESTON_21M | 21M15 Connecticut | WESTON_21M | 21M2 Connecticut | WESTON_21M | 21M3 Connecticut | WILLIMANTIC_14S | 14S31 Connecticut | WILLIMANTIC_14S | 14S31 Connecticut | WILLIMANTIC_14S | 14S31 Connecticut | WILTON_35A | 35A10 Connecticut | WILTON_35A | 35A3 Connecticut | WILTON_35A | 35A4 Connecticut | WILTON_35A | 35A7 Connecticut | WILTON_35A | 35A8 Connecticut | WINDSOR_LOCKS_14K | 14K44 Connecticut | WINDSOR_LOCKS_14K | 14K44 Connecticut | WINDSOR_LOCKS_14K | 14K5

Text of ES-Attachment 4.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
YEAR CIRCUIT CELID_3 CELID_5 2025 113 312 2025 116 17 2025 11A53 80 2025 11A55 91 2025 11A56 1 CELID_7 CELID_9 SERVED 268 1953 250 1922 25 25 25 611 174 2025 11A57 15 2025 11A58 125 125 125 125 3079 18 2025 11A73 4 1 1 1 2899 2025 11A74 280 2025 11A75 55 55 31 3063 934 2025 11A76 43 22 16 2025 11A77 364 301 301 301 2596 2684 2025 11B1 232 144 64 19 2694 2025 11B2 329 218 75 8 1745 2025 11B61 642 349 9 6 2293 2025 11C10 818 621 280 208 1043 2025 11C12 1358 309 239 24 2489 2025 11C13 1150 372 297 42 4068 2025 11C14 911 895 574 530 3139 2025 11F10 407 129 129 129 3432 2025 11F12 509 299 124 63 2793 2025 11F13 315 161 34 13 2989 2025 11F14 530 319 231 219 5290 2025 11F9 322 144 61 30 3534 2025 11H62 2 3019 2025 11H64 80 1382 2025 11H65 134 1 1 1 1819 2025 11H77 58 58 58 58 2571 2025 11H79 136 121 49 4 2023 2025 11J30 88 26 2025 11J40 19 19 19 19 2025 11J41 25 3264 752 3385 2025 11J43 13 2025 11J45 181 157 109 101 3620 2025 11J58 171 152 147 4 1452 27 27 2025 11K41 27 2025 11K42 126 4314 1078 1557 2025 11K43 49 2025 11K46 3 49 26 1499 2146 2025 11K49 8 1379 2025 11M3 1365 1114 716 2025 11N81 34 32 9 525 2946 2025 11N83 82 82 2 2 1215 2025 11N84 478 458 458 458 1477 2025 11N85 4 4 1736 2025 11N86 19 9 2871 1946 2025 11N87 4 2025 11N88 344 190 185 185 2508 393 2025 11N89 20 9 8 8 1961 2025 11R1 170 111 111 2025 11R2 113 113 61 60 112 960 2025 11S13 359 266 220 183 1619 2025 11S14 206 163 116 89 2784 2025 11S15 542 422 131 19 3221 2025 11W46 155 155 155 155 868 2025 11W47 10 10 10 2025 11W48 44 1809 1487 2025 11Y1 467 326 131 130 3180 2025 11Y2 180 168 41 41 3009 2025 11Y3 149 132 22 2025 11Y6 18 8 2025 11Y7 225 21 2025 11Y8 59 3433 1725 8 8 2364 2153 2025 120 8 8 8 604 2025 127B3 5 5 5 5 2025 128 63 2025 12A12 335 2025 12A5 28 2132 300 2740 2752 2025 12A7 2 2025 12A8 54 28 28 28 1988 1209 2025 12A9 74 1 1 1 2902 1 2025 12B31 146 81 81 2025 12B32 1 1 1 794 1451 2025 12B33 142 33 30 11 1349 2025 12B34 48 36 27 27 858 2025 12B35 247 2 2 2 1541 105 87 87 3935 2025 12B37 119 2025 12C3 23 2025 12C4 869 869 784 4 4 333 5154 2025 12C47 4 2025 12C48 71 4 4 2025 12C5 234 234 159 142 2263 158 114 2393 3644 2025 12C7 160 160 2025 12F43 71 71 72 2025 12F44 1299 1299 181 1286 2025 12F46 66 37 36 3261 2025 12F47 16 15 15 10 2787 375 373 330 3633 2025 12F48 598 2025 12F51 33 993 2025 12F52 100 1406 2025 12J17 35 35 2025 12J32 375 285 196 196 3314 894 2025 12J33 866 161 5 5 2523 2025 12J37 432 271 63 5 1819 2025 12J38 141 64 64 18 1583 2025 12J4 350 234 209 15 2480 44 20 3236 2025 12J5 591 416 2025 12J6 484 37 2025 12M3 70 49 916 2 2 1219 2025 12M4 62 18 2025 12M5 500 387 336 96 2705 1824 2025 12M6 6 6 5 5 904 2025 12N14 768 657 511 114 1545 2025 12N15 58 4 700 2025 12N16 82 66 37 35 906 2025 12N17 442 340 136 102 1772 2025 12N19 518 202 147 107 1277 2025 12S1 215 2025 12S2 226 35 9 1887 2025 12S3 33 27 25 336 584 2025 12S4 363 274 129 2025 12S5 379 167 55 8 2030 1572 2025 12S6 1 1 2025 12Y12 273 137 2 1 2507 1 2025 12Y14 443 363 343 136 2205 2025 12Y15 1326 133 60 32 3141 2025 12Y8 305 225 41 34 1488 2025 12Y9 675 110 59 25 2812 530 518 465 3619 2025 130 7 2025 13B10 684 194 2025 13B21 56 48 31 29 1439 2025 13B25 866 544 406 180 4388 2025 13B27 350 26 26 15 1958 106 3323 2025 13B7 16 16 2025 13B9 1351 174 106 2025 13C2 25 9 9 44 44 2025 13C4 57 2025 13F62 42 2025 13F64 27 27 2025 13F65 9 1 2025 13F66 40 1 372 1856 44 1513 1723 2199 1816 1 1 2157 10 10 2546 2025 13F67 2 2 2025 13F71 50 25 1165 2025 13F72 14 2025 13H2 43 2025 13H3 15 15 2025 13H91 8 8 2025 13H97 114 3042 2025 13H98 225 1048 2025 13H99 14 1989 1048 14 1423 8 667 3180 2025 13K1 27 7 7 5 2283 2025 13K2 247 70 28 2 2541 2025 13K3 235 8 8 8 1562 41 13 2025 13K6 71 67 2025 13K8 193 193 2025 13Q1 18 12 3 41 5 2025 13Q2 41 2025 13Q4 60 2025 13S10 197 1389 1107 3 671 582 204 195 172 150 2173 2025 13S5 111 64 57 18 1095 2025 13S6 41 25 4 2 1077 220 107 92 2025 13S7 221 2025 13S8 1 2025 13S9 10 10 10 2025 13Y1 880 240 240 2025 13Y2 617 490 145 2025 146C3 94 2025 146C4 30 2025 14A1 113 758 1974 1105 880 36 2580 164 30 35 765 2025 14H1 229 66 5 5 2412 2025 14H2 288 141 5 5 1532 2025 14H3 13 10 10 9 2856 14 5 2025 14H4 74 2025 14H5 2 2025 14H6 826 242 2025 14K7 90 89 2025 14K9 97 61 1297 662 242 14 1782 4 4 2114 2608 2025 14L1 1 1 1 1 479 2025 14L2 69 15 5 5 1661 2025 14L3 11 11 11 2025 14L4 73 5 5 2025 14L5 16 16 16 2025 14L6 1 1 2422 5 920 758 1168 2025 14M22 263 263 71 22 664 2025 14M24 18 18 18 1 582 2025 14M28 61 61 54 54 846 2025 14M29 601 579 211 29 2791 2025 14M39 391 184 59 32 2804 2025 14M8 121 114 114 88 1591 2025 14M9 422 41 20 20 1291 2025 14N1 1 1 1 1 2025 14N2 584 584 584 2 584 2025 14N3 2113 1985 1957 1589 2830 2025 14R32 1 1 1 107 2025 14W10 107 107 2025 14W12 72 18 2025 14W34 290 86 1 107 2183 2773 39 39 3831 2025 14W4 30 7 2025 14W5 34 34 1 2025 14W6 244 63 31 2640 2025 14W8 31 1 2025 14W9 55 23 1 3879 2025 15C8 1293 171 73 34 2563 65 57 35 2105 2025 15L12 124 2025 15L5 92 2025 15L6 14 2203 1 2572 2561 1177 14 14 8 1008 2025 15L68 1206 706 553 285 3271 2025 15L69 172 107 66 17 2360 2025 15Q1 28 2025 15Q4 58 58 58 58 502 2025 15Q5 57 57 57 57 2209 2025 15Q6 23 2025 15U1 69 2 2 2025 15U2 45 4 1 2025 15U3 81 74 2025 15U4 6 2209 3126 2513 1 3239 2858 3676 2025 15Y2 207 2025 15Y3 18 120 110 9 2160 2025 16J 1 1 2025 16M2 29 29 2025 16M3 114 2025 16Q1 364 55 17 17 624 2025 16Q2 303 263 259 257 1044 2025 16Q8 22 1036 1 1 1 490 756 735 2025 16S1 1 2025 17R11 84 1 1 1 2025 17R12 180 36 23 11 509 1434 1594 2025 18J1 64 64 18 14 296 2025 18P1 44 7 7 5 886 2025 18P2 224 26 25 1 882 2025 18P4 13 8 2025 18P8 8 8 8 8 1049 2025 18P9 146 45 14 11 1155 1139 2025 19U1 780 518 138 83 1781 2025 19U2 406 340 96 34 1470 23 4 1388 2025 19Y1 25 23 2025 1B08 76 48 2025 1B10 69 37 7 178 2807 2419 2025 1B12 291 178 2025 1C01 33 1 177 1920 2025 1C02 275 28 2025 1C06 27 7 7 7 3257 2025 1C08 96 35 11 10 1469 2025 1C19 17 16 707 27 3293 1806 2025 1C20 126 67 36 36 3641 2025 1C21 115 11 3 3 2267 2025 1G16 368 93 93 93 909 551 551 3504 2025 1G21 16 2025 1G28 551 551 1084 2025 1K02 18 18 2025 1K04 321 199 2025 1K05 406 234 2025 1K06 24 985 199 2809 1787 2757 2025 1K07 33 33 685 2025 1K10 26 26 1702 2025 1K11 23 23 2025 1K12 192 190 190 190 1447 2379 2025 1K13 133 5 5 5 1147 2025 1K14 8 8 8 8 2318 2025 1K16 351 335 321 321 1477 2025 1Q01 518 16 16 2761 2 2327 2025 1Q03 16 11 2025 1Q6 46 44 2296 2025 20S3 67 2 2025 20Y1 366 275 2 277 2025 20Y2 448 77 2025 215C3 2 2025 21H12 2 2 2025 21H13 253 69 2025 21H14 126 63 63 63 1535 2025 21H15 38 29 17 17 1571 1378 71 71 1037 247 1408 13 12 3499 2025 21H8 243 29 12 10 3087 2025 21H9 615 249 230 45 3487 2025 21J3 940 390 221 193 1772 255 168 1629 2025 21J4 519 424 2025 21K1 26 13 556 2025 21K11 144 127 2106 2025 21K2 243 208 3 2025 21K3 251 246 4 3 2025 21K6 226 226 1 1 2 1362 951 1025 2025 21K7 134 92 87 2025 21K8 294 82 1 1565 2025 21L1 392 3545 2025 21L2 43 3601 2025 21L3 383 199 1946 199 3 10 2884 2025 21L6 211 121 10 2025 21L8 224 31 14 1885 2025 21M1 238 73 73 2025 21M15 785 337 165 81 1178 2025 21M2 191 78 22 12 1090 2025 21M3 153 29 6 6 639 1965 67 778 2025 21P1 327 1876 2025 21P2 8 2106 2025 21P3 8 8 8 8 22 1819 2025 21P4 239 239 22 2025 21P5 43 43 24 3767 2025 21U1 4 2025 21Y2 213 1 2025 22D4 76 76 56 2025 22E36 10 10 10 2025 22H14 165 1750 2025 22H18 32 1365 1861 233 2025 22M1 425 425 2025 22M10 72 72 2025 22M12 219 1236 2309 10 18 1700 72 72 1335 659 2025 22M13 14 14 12 2025 22M14 7 7 7 2025 22M15 38 32 12 846 1043 1459 2025 22M16 172 21 21 15 1517 2025 22M4 8 8 8 8 1524 2025 22M6 80 1514 2025 22M8 26 300 2025 22M9 20 2751 2025 22N1 353 221 14 14 2375 2025 22N2 89 79 62 26 1705 2025 22N3 248 219 167 2 2020 2025 22N4 482 432 124 17 2025 22N5 102 42 27 1914 1681 2025 22N6 215 193 90 90 1691 2025 22N7 688 667 150 150 1556 2025 22R1 723 385 170 170 2374 95 22 2672 2025 22R2 263 209 2025 22R3 89 29 2025 22R4 223 98 12 2233 1943 2025 22R5 386 316 316 4 3564 2025 22R6 62 42 42 16 2517 2025 23A1 133 7 7 7 446 2025 23A2 92 92 92 2025 23D3 94 715 615 2025 23J1 73 2025 23J2 28 1827 2025 23J31 49 701 2025 23J32 94 2025 23J33 12 2025 23J36 176 1 58 1 1 49 2680 2620 1731 96 83 62 2617 28 28 1303 2025 23K11 62 59 2025 23K14 605 90 2025 23K16 72 72 1536 72 68 887 2025 23Q8 752 602 569 205 2403 2025 23Q9 571 163 20 16 1921 2025 23R1 681 667 581 569 687 2025 246D1 168 168 168 167 2025 246D4 1 1 1 1 2025 24A10 210 2062 2025 24A11 278 278 21 21 948 2025 24A13 135 2 2 2 1686 2025 24A14 35 8 2025 24A15 1 2025 24A16 3 966 1251 3 3 1145 2025 24A17 161 36 36 36 1766 2025 24A19 155 152 152 152 1626 2025 24H2 7 7 2025 24H3 22 2025 24H6 350 2025 24J1 14 2025 24J2 26 2025 24J3 1 127 1509 83 49 44 2522 4695 26 1 1 118 121 2025 24J5 109 109 104 2025 24J6 92 37 21 4 779 2025 24N1 6 6 6 6 6 2600 208 2025 25L2 47 2025 26E8 1310 1142 651 638 3431 2025 26E9 546 423 292 195 1553 2025 26F1 340 278 275 10 1138 2025 26N1 9 9 9 6 327 2025 26N2 465 462 442 439 2504 2025 26N7 96 5 5 5 1802 2025 27F14 204 178 140 2 912 3 2025 27G1 111 101 35 2025 27H1 537 192 131 633 2025 27H11 20 1 1 1 1659 14 14 2813 3727 2025 27H12 239 14 2025 27H2 43 15 2025 27H4 221 172 6 1620 2025 27H6 279 22 21 2465 2025 27H7 2 2 1367 2201 2025 27H9 805 136 2025 27K1 238 50 42 42 3167 615 2025 27K3 153 145 145 116 549 42 2025 27K5 94 56 42 2025 27K7 75 51 50 2025 27K9 229 125 125 295 524 123 614 2025 28A1 24 14 2 2 1644 2025 28A3 80 25 20 7 1004 2025 28E1 45 30 30 735 2025 28F1 14 3 3 3 643 2025 28F10 109 109 95 95 379 2025 28F2 73 52 47 47 892 2025 28F3 119 117 111 3 1519 2025 28F6 502 465 465 425 765 2025 28F8 244 74 74 1836 2025 28M1 16 16 16 1 3528 2025 28M11 260 74 11 11 2742 2025 28M12 68 60 60 1724 2025 28M13 314 314 10 10 1096 2025 28M2 487 271 73 32 1944 2025 28M3 86 25 2025 28M5 19 2025 28M6 181 44 2000 21 38 4 1962 2025 28M8 344 344 914 2025 28P6 165 8 1667 2025 29A1 248 235 45 43 732 2025 29A3 614 266 57 55 2789 2025 29J1 1522 73 68 29 2009 2025 29J2 236 4 4 4 1516 2025 29W1 65 55 49 36 946 2025 2A1 172 530 2025 2A11 37 37 31 191 2025 2A15 138 105 21 2108 2025 2A17 6 6 916 2025 2A3 73 11 11 2025 2A4 390 383 258 2025 2B4 77 48 2025 2B5 188 2123 2025 2B6 1 1264 2025 2B7 82 82 2025 2B8 28 28 2025 2H04 31 31 1993 15 1220 1691 6 6 787 328 31 31 957 2025 2N05 14 14 6 6 160 2025 2N10 4 4 1 1 2333 2025 2N16 8 8 8 8 1153 2025 300F2 834 105 105 50 939 2025 300L2 2 2 2 2025 300L4 2 2 2025 300U3 99 99 99 2025 301B1 184 184 61 517 1 415 2025 301D4 95 95 2025 301G1 1 1 2025 301L2 1 2 70 632 582 438 2025 301L4 316 2025 301M3 266 2 1 527 265 2025 301M4 495 523 2025 308B2 77 6 141 2025 30A2 12 11 1334 2025 30G1 1 2102 2025 30G2 45 3 2025 30G3 124 20 18 943 2025 30K11 138 13 7 16 2193 2963 2025 30K12 774 771 6 6 1486 2025 30K13 288 186 70 48 1504 2025 30K14 282 95 9 9 1577 85 85 6 2025 30K15 85 2025 30K16 84 2586 2025 30L23 54 1885 2025 30L25 68 1367 2025 30L26 1 1 1 1 656 3248 2025 30L28 206 22 15 15 1170 2025 30R10 564 190 159 98 3026 2025 30R12 58 46 46 1595 2025 30R13 231 84 82 2 3223 2025 30R14 1484 886 689 309 3148 2025 30R15 318 217 123 49 1439 2025 30R7 526 346 334 282 2589 2025 30R8 1342 523 187 135 3827 2025 30R9 293 134 132 8 3605 2025 30Y10 494 377 87 47 2151 2025 30Y8 1534 619 328 54 2159 2025 312B2 2 2 2 2025 312B4 1 1 1 2025 315A1 1 2025 31A1 43 33 28 21 1165 1 2025 31A15 64 64 42 2 1472 2025 31A6 249 115 84 2025 31A8 45 12 8 7 1589 853 2025 31A9 68 41 30 23 1060 2025 31C1 1163 950 807 712 2518 2025 31C2 229 79 11 11 675 2025 31K1 296 296 22 2025 320P2 334 2025 320P3 316 316 163 163 332 430 410 844 561 570 2025 322G1 844 844 2025 322G3 1 1 824 2025 32G1 1 1 1462 2025 32G2 5 5 2025 32G3 45 45 2 3467 2025 32G8 53 8 3186 2025 32G9 248 26 24 2025 32P1 132 73 5 2025 32P3 111 37 25 1 19 3606 3345 987 6 1680 2025 32P4 458 65 7 2025 32P5 11 4 3 1 2025 32R1 924 462 248 106 3 1976 2779 5210 2025 32R2 1310 177 156 2025 32R3 181 4 4 2729 2025 33B7 164 164 53 1363 5 3207 2025 33M1 232 145 5 2025 35A1 6 6 6 685 741 2025 35A10 222 214 3 728 2025 35A11 479 354 280 100 1677 2025 35A4 18 15 15 3 345 2025 35A7 259 75 64 2 956 2025 35A8 545 140 20 17 1300 2025 35K4 78 78 19 813 2025 35L7 323 305 241 241 1765 2025 35L8 152 148 116 109 1575 2025 35L9 226 191 90 26 2306 2025 36A1 18 2025 36C9 48 48 48 48 335 187 2025 36F1 1 205 2025 36F5 241 796 2025 36F6 349 9 5 1 4638 2025 36M1 75 2025 36M2 450 210 120 120 2599 1063 2025 375C1 400 400 393 1 400 2025 37F1 926 195 153 139 3244 2025 37F2 217 170 166 13 2110 2025 37F3 224 184 5 5 1188 2025 37J1 339 238 178 87 988 2025 3803 1 1 1 1 578 35 2025 386R3 35 35 2025 388F2 527 111 2025 388F4 551 1096 810 551 2025 39M1 425 152 2025 3A01 290 18 2025 3A02 125 152 152 766 4209 3526 2025 3A03 311 116 14 14 3148 2025 3A04 581 351 177 105 2328 261 2025 3A05 359 2025 3A06 44 1508 2025 3A07 34 34 2025 3A08 40 1 2025 3A09 4 2025 3A10 21 10 2025 3A11 134 134 134 83 4489 2025 3A12 53 52 49 49 3100 2025 3B02 5 5 5 5 277 686 552 2754 2175 2731 2025 3B05 49 16 2025 3B07 480 66 56 2685 2025 3B08 173 125 21 20 2977 21 1418 2025 3B11 20 20 2025 3B12 10 8 1077 2025 3B13 183 87 10 10 2545 41 7 7 1357 1424 2025 3R01 184 2025 3R02 12 2025 3R03 54 2025 3R04 93 6 2025 3R05 40 16 6 2025 3R06 330 2025 3R11 75 73 22 22 3899 2025 42J1 174 110 106 8 1158 3121 1 1 1 3897 2617 2168 3181 2025 42P2 151 142 2025 43F2 760 666 644 488 3302 2025 43F3 358 273 88 59 3819 82 12 12 4282 2025 43F6 963 2025 4403 204 606 205 2025 44J3 61 42 42 40 1251 2025 4504 2 2 1 1 325 2025 47N3 154 3582 2025 47N7 1 1557 2025 485 1 11 2025 48C10 307 146 141 2025 48C4 280 280 280 2025 48C5 93 15 6 2371 280 902 1212 2025 48C6 142 65 29 20 2031 2025 48C7 211 145 57 10 2458 2025 48C8 109 1 1570 2025 48C9 7 7 2025 49S1 277 117 1367 2025 49S2 225 62 2025 4A1 18 2025 4A10 81 17 1 1 455 2025 4A11 528 528 528 528 1734 2025 4A12 4 4 4 4 3771 2025 4A2 185 117 99 2759 2500 1485 721 2025 4A3 37 2025 4A4 29 37 37 34 304 2025 4A5 34 1518 2025 4A6 72 2025 4A8 5 2025 4A9 189 28 1812 2301 3254 7 1 1 2643 2025 4C12 114 68 59 53 1622 2025 4C16 39 39 9 9 1743 2025 4C17 98 97 76 67 2868 2025 4C18 5 5 5 5 1168 2025 4L06 433 333 333 93 908 2025 4L08 322 318 318 315 626 2025 4L09 362 335 203 203 828 2025 4R07 286 147 12 10 1039 2025 4R08 162 130 32 28 1005 130 2025 4R09 247 212 130 2025 4R10 28 28 27 2025 4R11 208 172 112 105 1353 9 9 7 776 2025 4R12 189 2025 4R13 159 2025 4R14 76 2025 4R16 28 8 2025 4R17 125 74 957 812 504 690 1443 56 49 1067 2025 4R18 29 20 20 17 1040 2025 5L01 202 202 198 30 201 2025 5L02 260 54 52 33 1334 2025 5L03 6 6 2025 5L04 732 463 348 289 1062 6 2025 5R1 1350 1322 1322 1322 1780 2025 5R2 302 58 25 19 3457 2025 5R3 318 20 3105 2025 5R4 709 373 324 279 4365 2025 5R5 1613 1490 1110 277 2844 2025 5R6 98 1180 2025 5R7 669 488 236 2025 5R80 9 9 9 21 2025 6A10 22 2025 6A11 22 22 22 22 885 2025 6A25 75 66 54 37 2577 2025 6A3 302 3 2025 6A4 9 2025 6A5 192 192 13 9 690 1145 806 1275 2025 6A7 50 2025 6A9 29 2025 7A73 249 249 249 249 2025 7A76 338 305 247 61 2025 7A77 172 49 310 2025 7A80 53 53 45 45 8 2025 7L86 12 11 1030 2721 378 1932 2025 7A79 2025 7A82 11 1527 2025 7A78 2025 7L83 4077 49 1607 2839 53 847 357 1197 5 2025 7L88 1 2025 7L89 123 116 2025 8A1 1 1 829 5654 116 116 1937 1945 2025 8A2 84 2025 8A3 42 2025 9L04 83 58 50 2715 42 83 2020 2025 9L09 1 1044 2025 9S13 123 2086 2025 9S15 194 182 2025 9S16 13 13 2025 9S25 117 2025 9S27 52 45 7 1417 33 33 28 2009 39 39 16 1630 3 4028 2082 2025 N200 4 3 3 2025 N31 10 10 10 473 REPORT_RULES SYSDATE 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Excluding Planned-Primary Events 2026-09-21 12:46:30 05 RE08 - Excluding Storms, Exc

Text of ES-Attachment 4.xlsx

Extracted from the file · 60,000 characters (the first 60,000 are kept)
[Sheet: CEMI] YEAR | CIRCUIT | CEMI_3 | CEMI_5 | CEMI_7 | CEMI_9 | SERVED | REPORT_RULES | SYSDATE 2025 | 11A55 | 25 | 611 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11A74 | 653 | 3063 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11A77 | 35 | 2596 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11B1 | 323 | 2694 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11B2 | 105 | 1745 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11B61 | 494 | 1 | 2293 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11C10 | 244 | 47 | 1043 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11C12 | 1568 | 377 | 9 | 2489 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11C13 | 729 | 131 | 49 | 12 | 4068 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11C14 | 337 | 62 | 3139 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11F10 | 119 | 3432 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11F12 | 401 | 48 | 2793 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11F13 | 437 | 42 | 2989 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11F14 | 522 | 9 | 5290 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11F9 | 447 | 110 | 83 | 3534 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11H79 | 59 | 2023 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11J30 | 89 | 3264 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11J40 | 189 | 752 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11J41 | 413 | 3385 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11J58 | 11 | 1452 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11K41 | 27 | 1078 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11M3 | 1049 | 304 | 87 | 2946 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11N81 | 270 | 1946 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11N84 | 36 | 1477 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11N86 | 185 | 2871 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11N89 | 67 | 1961 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11R1 | 49 | 1 | 960 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11R2 | 41 | 112 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11S13 | 1145 | 168 | 32 | 1619 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11S14 | 47 | 2784 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11S15 | 780 | 52 | 7 | 6 | 3221 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11Y1 | 330 | 44 | 3180 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11Y2 | 711 | 3009 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11Y3 | 254 | 3433 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11Y7 | 31 | 2364 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 11Y8 | 117 | 2153 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 120 | 1 | 604 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12A8 | 35 | 1209 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12A9 | 39 | 2902 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12B31 | 27 | 794 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12B33 | 13 | 1349 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12B35 | 708 | 1541 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12B37 | 221 | 3935 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12C4 | 17 | 5154 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12C47 | 4 | 4 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12C5 | 1 | 2263 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12C7 | 26 | 2393 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12F43 | 72 | 72 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12F44 | 1299 | 1286 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12F47 | 305 | 68 | 6 | 2787 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12F48 | 995 | 131 | 3633 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12F51 | 84 | 993 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12F52 | 146 | 1406 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J32 | 284 | 15 | 3314 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J33 | 677 | 7 | 4 | 2523 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J37 | 602 | 64 | 1819 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J38 | 72 | 1583 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J4 | 672 | 46 | 2480 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J5 | 411 | 3236 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12J6 | 63 | 916 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12M4 | 26 | 1824 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12M5 | 159 | 2705 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12M6 | 11 | 904 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12N14 | 670 | 143 | 11 | 1545 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12N16 | 33 | 4 | 906 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12N17 | 255 | 1772 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12N19 | 416 | 232 | 1277 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12S2 | 283 | 1887 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12S3 | 37 | 336 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12S4 | 100 | 24 | 2030 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12S5 | 628 | 268 | 94 | 1 | 1572 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12Y12 | 21 | 2507 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12Y14 | 447 | 2205 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12Y15 | 272 | 91 | 1 | 3141 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12Y8 | 585 | 112 | 1488 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 12Y9 | 207 | 17 | 2812 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13B10 | 322 | 52 | 3619 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13B21 | 27 | 1 | 1439 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13B25 | 338 | 62 | 4 | 4 | 4388 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13B27 | 35 | 11 | 11 | 1958 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13B7 | 17 | 372 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13B9 | 954 | 554 | 55 | 3323 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13F65 | 53 | 1816 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13F71 | 42 | 2546 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13H3 | 109 | 38 | 1423 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13H93 | 164 | 878 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13H94 | 217 | 225 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13H96 | 33 | 1763 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13H98 | 225 | 1048 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13H99 | 66 | 3180 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13K2 | 133 | 2541 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13K3 | 137 | 1562 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13K6 | 76 | 1389 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13K8 | 288 | 1107 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13Q1 | 51 | 6 | 671 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13Q2 | 35 | 582 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13Q4 | 28 | 204 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13S10 | 183 | 2173 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13S5 | 6 | 1095 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13S6 | 15 | 1077 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13S7 | 347 | 9 | 758 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13S9 | 10 | 1105 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13Y1 | 849 | 430 | 231 | 880 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 13Y2 | 358 | 53 | 2580 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14A1 | 81 | 765 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14H1 | 1 | 2412 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14H2 | 58 | 1532 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14H4 | 46 | 1297 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14H5 | 2 | 662 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14H6 | 35 | 1782 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14K6 | 30 | 4073 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14K7 | 220 | 2608 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14L4 | 11 | 920 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14M22 | 305 | 664 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14M28 | 91 | 846 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14M29 | 57 | 2791 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14M39 | 35 | 2804 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14M8 | 121 | 85 | 1591 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14M9 | 160 | 32 | 1291 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14N2 | 161 | 1 | 584 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14N3 | 428 | 108 | 2830 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W10 | 138 | 2183 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W12 | 121 | 2773 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W34 | 98 | 57 | 49 | 3831 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W4 | 130 | 2203 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W6 | 72 | 2640 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W7 | 74 | 2459 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W8 | 18 | 2561 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 14W9 | 31 | 2 | 3879 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15C8 | 455 | 34 | 27 | 2563 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15L5 | 125 | 1177 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15L68 | 1950 | 291 | 12 | 3271 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15L69 | 54 | 2 | 2360 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15Q5 | 478 | 2209 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15U1 | 9 | 2513 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15U2 | 61 | 3239 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15U3 | 24 | 2858 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 15U4 | 139 | 1 | 3676 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 16Q2 | 25 | 1044 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 17R11 | 143 | 1434 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 18P2 | 1 | 882 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 18P4 | 3 | 1139 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 19U1 | 199 | 70 | 19 | 1781 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 19U2 | 248 | 43 | 1470 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 19Y1 | 5 | 1388 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 19Y2 | 695 | 70 | 718 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1B10 | 91 | 2419 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1B12 | 217 | 6 | 1920 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1C02 | 21 | 3293 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1C20 | 29 | 3641 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1C21 | 15 | 2267 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1G28 | 1068 | 3504 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1K12 | 2 | 1447 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1K16 | 13 | 1477 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1Q01 | 109 | 2761 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1Q03 | 7 | 2327 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 1Q6 | 30 | 2296 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 20S2 | 76 | 576 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 20S3 | 48 | 277 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 20Y1 | 1 | 1378 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 20Y2 | 124 | 1037 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21H13 | 64 | 3499 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21H14 | 32 | 1535 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21H8 | 62 | 3087 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21H9 | 353 | 15 | 3487 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21J3 | 1578 | 232 | 38 | 4 | 1772 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21J4 | 415 | 230 | 61 | 1629 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21K11 | 599 | 49 | 4 | 2106 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21K3 | 10 | 951 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21K6 | 47 | 1025 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21K7 | 46 | 1565 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21K8 | 181 | 1 | 1946 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21L1 | 2 | 3545 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21L3 | 82 | 2884 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21L6 | 456 | 1885 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21M1 | 20 | 778 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21M15 | 491 | 24 | 1178 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21M2 | 168 | 1090 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21M3 | 23 | 639 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21P5 | 395 | 1861 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 21Y2 | 1 | 1236 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22A2 | 16 | 661 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22D2 | 15 | 1521 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22M1 | 11 | 1700 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22M10 | 11 | 1335 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22M16 | 41 | 1517 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22M6 | 80 | 1514 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22M9 | 20 | 2751 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N1 | 230 | 46 | 2375 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N2 | 21 | 1705 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N3 | 5 | 2020 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N4 | 301 | 16 | 1914 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N5 | 14 | 1681 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N6 | 344 | 297 | 1691 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22N7 | 278 | 18 | 1556 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22R1 | 93 | 2374 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22R2 | 129 | 64 | 2672 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22R4 | 30 | 1943 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22R5 | 28 | 3564 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 22R6 | 16 | 2517 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23D3 | 168 | 615 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23J32 | 35 | 2620 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23J36 | 80 | 2617 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23K11 | 31 | 1303 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23K15 | 18 | 485 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23Q8 | 298 | 51 | 2403 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23Q9 | 1162 | 327 | 41 | 1921 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 23R1 | 671 | 321 | 93 | 3 | 687 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 24A11 | 17 | 8 | 948 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 24A17 | 142 | 1766 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 24A19 | 36 | 1626 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 24J5 | 9 | 779 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 24J6 | 21 | 2600 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 24N1 | 6 | 6 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 26E8 | 1081 | 115 | 44 | 32 | 3431 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 26E9 | 467 | 107 | 53 | 1 | 1553 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 26F1 | 504 | 61 | 1138 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 26N2 | 57 | 7 | 2504 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 26N7 | 1 | 1802 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27G1 | 29 | 633 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27H1 | 56 | 16 | 3727 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27H12 | 395 | 1 | 2813 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27H4 | 29 | 1620 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27H7 | 355 | 2201 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27H9 | 62 | 3167 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27K1 | 41 | 615 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27K3 | 78 | 549 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27K5 | 32 | 15 | 295 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27K7 | 12 | 524 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 27K9 | 305 | 14 | 614 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28A1 | 15 | 1644 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28A4 | 255 | 1046 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28E1 | 29 | 735 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28F10 | 12 | 379 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28F2 | 160 | 892 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28F6 | 14 | 765 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28M1 | 65 | 3528 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28M11 | 92 | 2742 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28M12 | 26 | 1724 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28M2 | 139 | 1944 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 28M6 | 213 | 36 | 34 | 1962 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 29A1 | 18 | 732 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 29A3 | 429 | 10 | 2789 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 29J1 | 715 | 194 | 86 | 2009 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 29W1 | 319 | 19 | 946 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2A1 | 34 | 33 | 530 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2A17 | 28 | 916 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2A3 | 6 | 1993 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2A4 | 241 | 1220 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2B5 | 1 | 2123 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2B7 | 18 | 787 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2B8 | 28 | 328 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 2N05 | 78 | 160 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30G1 | 1 | 2102 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30G2 | 44 | 943 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30G3 | 213 | 2193 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30K11 | 49 | 2963 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30K13 | 262 | 107 | 21 | 4 | 1504 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30K14 | 732 | 126 | 3 | 1577 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R10 | 320 | 157 | 117 | 21 | 3026 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R12 | 47 | 1595 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R13 | 150 | 3223 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R14 | 1166 | 360 | 11 | 3148 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R15 | 4 | 1439 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R7 | 467 | 2 | 2589 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R8 | 931 | 154 | 3827 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30R9 | 7 | 3605 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30Y10 | 300 | 61 | 18 | 7 | 2151 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 30Y8 | 953 | 341 | 168 | 124 | 2159 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31A1 | 24 | 1165 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31A6 | 131 | 37 | 1589 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31A8 | 12 | 853 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31A9 | 4 | 1060 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31C1 | 1059 | 171 | 12 | 2518 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31C2 | 118 | 675 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 31K1 | 274 | 33 | 561 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 322G1 | 356 | 844 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32G8 | 127 | 3186 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32P1 | 61 | 40 | 987 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32P3 | 41 | 1680 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32P4 | 780 | 109 | 1976 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32P5 | 8 | 2779 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32R1 | 401 | 65 | 33 | 5210 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 32R2 | 320 | 3207 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 33B7 | 163 | 1363 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 33M1 | 312 | 5 | 741 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35A11 | 20 | 1677 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35A3 | 16 | 443 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35A4 | 7 | 345 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35A7 | 206 | 58 | 956 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35A8 | 20 | 1300 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35L7 | 130 | 1765 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35L8 | 398 | 15 | 1575 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 35L9 | 114 | 1 | 2306 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 36A1 | 122 | 187 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 36F5 | 196 | 18 | 796 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 36F6 | 7 | 4638 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 36M2 | 114 | 2599 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 375C1 | 400 | 400 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 37F1 | 695 | 4 | 3244 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 37F2 | 70 | 6 | 2110 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 37F3 | 21 | 1188 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 37J1 | 182 | 36 | 988 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3805 | 33 | 718 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 39M1 | 17 | 3 | 3 | 766 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3A03 | 2 | 3148 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3A04 | 174 | 2328 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3A08 | 164 | 2754 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3A11 | 20 | 4489 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3A12 | 23 | 3100 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3B07 | 419 | 359 | 2977 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3B13 | 23 | 2545 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3R01 | 188 | 1357 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3R04 | 13 | 2617 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 3R06 | 19 | 3181 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 42J1 | 498 | 21 | 1158 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 42P2 | 53 | 606 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 43F2 | 170 | 28 | 3302 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 43F3 | 70 | 3819 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 43F6 | 106 | 4282 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 44J3 | 14 | 1251 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 48C10 | 885 | 90 | 2371 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 48C5 | 68 | 52 | 26 | 2 | 1212 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 48C6 | 51 | 2 | 2031 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 48C7 | 38 | 2458 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 48C8 | 108 | 1570 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 49S1 | 1121 | 254 | 14 | 2759 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 49S2 | 148 | 11 | 2500 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4A1 | 3 | 1485 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4A10 | 79 | 455 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4A11 | 32 | 1734 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4A5 | 27 | 1518 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4A9 | 65 | 2643 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4C11 | 11 | 1729 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4C12 | 99 | 1622 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4C19 | 65 | 1665 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4L06 | 245 | 55 | 908 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4L08 | 349 | 179 | 84 | 10 | 626 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4L09 | 529 | 147 | 78 | 52 | 828 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R07 | 136 | 125 | 1039 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R08 | 83 | 1005 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R09 | 86 | 957 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R11 | 124 | 1353 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R12 | 39 | 1 | 504 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R17 | 50 | 1067 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 4R18 | 13 | 1040 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5L01 | 200 | 95 | 201 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5L02 | 26 | 8 | 1334 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5L03 | 1 | 6 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5L04 | 960 | 720 | 358 | 105 | 1062 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R1 | 902 | 441 | 229 | 120 | 1780 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R2 | 36 | 3457 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R3 | 47 | 3105 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R4 | 93 | 4365 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R5 | 843 | 392 | 23 | 2844 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R6 | 54 | 1180 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R7 | 363 | 184 | 3 | 3 | 4077 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 5R80 | 1 | 9 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 7A76 | 153 | 378 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 7A77 | 52 | 1932 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 7A79 | 116 | 2839 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 7L85 | 34 | 2452 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 9L09 | 49 | 1044 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 9S15 | 12 | 1417 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 2025 | 9S25 | 234 | 3 | 2009 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:31:24 [Sheet: CELID] YEAR | CIRCUIT | CELID_3 | CELID_5 | CELID_7 | CELID_9 | SERVED | REPORT_RULES | SYSDATE 2025 | 113 | 312 | 268 | 1953 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 116 | 17 | 250 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A53 | 80 | 1922 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A55 | 91 | 25 | 25 | 25 | 611 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A56 | 1 | 174 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A57 | 15 | 18 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A58 | 125 | 125 | 125 | 125 | 3079 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A73 | 4 | 1 | 1 | 1 | 2899 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A74 | 280 | 3063 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A75 | 55 | 55 | 31 | 934 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A76 | 43 | 22 | 16 | 2684 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11A77 | 364 | 301 | 301 | 301 | 2596 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11B1 | 232 | 144 | 64 | 19 | 2694 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11B2 | 329 | 218 | 75 | 8 | 1745 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11B61 | 642 | 349 | 9 | 6 | 2293 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11C10 | 818 | 621 | 280 | 208 | 1043 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11C12 | 1358 | 309 | 239 | 24 | 2489 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11C13 | 1150 | 372 | 297 | 42 | 4068 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11C14 | 911 | 895 | 574 | 530 | 3139 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11F10 | 407 | 129 | 129 | 129 | 3432 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11F12 | 509 | 299 | 124 | 63 | 2793 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11F13 | 315 | 161 | 34 | 13 | 2989 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11F14 | 530 | 319 | 231 | 219 | 5290 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11F9 | 322 | 144 | 61 | 30 | 3534 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11H62 | 2 | 3019 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11H64 | 80 | 1382 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11H65 | 134 | 1 | 1 | 1 | 1819 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11H77 | 58 | 58 | 58 | 58 | 2571 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11H79 | 136 | 121 | 49 | 4 | 2023 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11J30 | 88 | 26 | 3264 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11J40 | 19 | 19 | 19 | 19 | 752 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11J41 | 25 | 3385 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11J43 | 13 | 4314 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11J45 | 181 | 157 | 109 | 101 | 3620 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11J58 | 171 | 152 | 147 | 4 | 1452 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11K41 | 27 | 27 | 27 | 1078 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11K42 | 126 | 1557 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11K43 | 49 | 49 | 26 | 1499 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11K46 | 3 | 2146 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11K49 | 8 | 1379 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11M3 | 1365 | 1114 | 716 | 525 | 2946 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N81 | 34 | 32 | 9 | 1946 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N83 | 82 | 82 | 2 | 2 | 1215 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N84 | 478 | 458 | 458 | 458 | 1477 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N85 | 4 | 4 | 1736 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N86 | 19 | 9 | 2871 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N87 | 4 | 393 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N88 | 344 | 190 | 185 | 185 | 2508 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11N89 | 20 | 9 | 8 | 8 | 1961 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11R1 | 170 | 111 | 111 | 960 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11R2 | 113 | 113 | 61 | 60 | 112 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11S13 | 359 | 266 | 220 | 183 | 1619 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11S14 | 206 | 163 | 116 | 89 | 2784 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11S15 | 542 | 422 | 131 | 19 | 3221 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11W46 | 155 | 155 | 155 | 155 | 868 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11W47 | 10 | 10 | 10 | 1809 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11W48 | 44 | 1487 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11Y1 | 467 | 326 | 131 | 130 | 3180 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11Y2 | 180 | 168 | 41 | 41 | 3009 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11Y3 | 149 | 132 | 22 | 3433 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11Y6 | 18 | 8 | 1725 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11Y7 | 225 | 21 | 8 | 8 | 2364 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 11Y8 | 59 | 2153 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 120 | 8 | 8 | 8 | 604 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 127B3 | 5 | 5 | 5 | 5 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 128 | 63 | 2132 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12A12 | 335 | 300 | 2740 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12A5 | 28 | 2752 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12A7 | 2 | 1988 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12A8 | 54 | 28 | 28 | 28 | 1209 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12A9 | 74 | 1 | 1 | 1 | 2902 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12B31 | 146 | 81 | 81 | 1 | 794 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12B32 | 1 | 1 | 1 | 1451 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12B33 | 142 | 33 | 30 | 11 | 1349 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12B34 | 48 | 36 | 27 | 27 | 858 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12B35 | 247 | 2 | 2 | 2 | 1541 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12B37 | 119 | 105 | 87 | 87 | 3935 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12C3 | 23 | 333 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12C4 | 869 | 869 | 784 | 5154 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12C47 | 4 | 4 | 4 | 4 | 4 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12C48 | 71 | 3644 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12C5 | 234 | 234 | 159 | 142 | 2263 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12C7 | 160 | 160 | 158 | 114 | 2393 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F43 | 71 | 71 | 72 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F44 | 1299 | 1299 | 181 | 1286 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F46 | 66 | 37 | 36 | 3261 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F47 | 16 | 15 | 15 | 10 | 2787 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F48 | 598 | 375 | 373 | 330 | 3633 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F51 | 33 | 993 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12F52 | 100 | 1406 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J17 | 35 | 35 | 894 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J32 | 375 | 285 | 196 | 196 | 3314 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J33 | 866 | 161 | 5 | 5 | 2523 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J37 | 432 | 271 | 63 | 5 | 1819 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J38 | 141 | 64 | 64 | 18 | 1583 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J4 | 350 | 234 | 209 | 15 | 2480 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J5 | 591 | 416 | 44 | 20 | 3236 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12J6 | 484 | 37 | 916 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12M3 | 70 | 49 | 2 | 2 | 1219 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12M4 | 62 | 18 | 1824 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12M5 | 500 | 387 | 336 | 96 | 2705 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12M6 | 6 | 6 | 5 | 5 | 904 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12N14 | 768 | 657 | 511 | 114 | 1545 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12N15 | 58 | 4 | 700 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12N16 | 82 | 66 | 37 | 35 | 906 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12N17 | 442 | 340 | 136 | 102 | 1772 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12N19 | 518 | 202 | 147 | 107 | 1277 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12S1 | 215 | 584 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12S2 | 226 | 35 | 9 | 1887 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12S3 | 33 | 27 | 25 | 336 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12S4 | 363 | 274 | 129 | 8 | 2030 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12S5 | 379 | 167 | 55 | 1572 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12S6 | 1 | 1 | 1 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12Y12 | 273 | 137 | 2 | 1 | 2507 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12Y14 | 443 | 363 | 343 | 136 | 2205 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12Y15 | 1326 | 133 | 60 | 32 | 3141 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12Y8 | 305 | 225 | 41 | 34 | 1488 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 12Y9 | 675 | 110 | 59 | 25 | 2812 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 130 | 7 | 194 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13B10 | 684 | 530 | 518 | 465 | 3619 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13B21 | 56 | 48 | 31 | 29 | 1439 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13B25 | 866 | 544 | 406 | 180 | 4388 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13B27 | 350 | 26 | 26 | 15 | 1958 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13B7 | 16 | 16 | 372 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13B9 | 1351 | 174 | 106 | 106 | 3323 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13C2 | 25 | 9 | 9 | 1856 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13C4 | 57 | 44 | 44 | 44 | 1513 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F62 | 42 | 1723 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F64 | 27 | 27 | 2199 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F65 | 9 | 1 | 1816 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F66 | 40 | 1 | 1 | 1 | 2157 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F67 | 2 | 2 | 1165 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F71 | 50 | 25 | 10 | 10 | 2546 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13F72 | 14 | 1989 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13H2 | 43 | 1048 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13H3 | 15 | 15 | 1423 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13H91 | 8 | 8 | 8 | 667 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13H97 | 114 | 3042 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13H98 | 225 | 1048 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13H99 | 14 | 14 | 3180 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13K1 | 27 | 7 | 7 | 5 | 2283 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13K2 | 247 | 70 | 28 | 2 | 2541 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13K3 | 235 | 8 | 8 | 8 | 1562 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13K6 | 71 | 67 | 41 | 13 | 1389 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13K8 | 193 | 193 | 1107 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13Q1 | 18 | 12 | 3 | 3 | 671 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13Q2 | 41 | 41 | 5 | 582 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13Q4 | 60 | 204 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13S10 | 197 | 195 | 172 | 150 | 2173 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13S5 | 111 | 64 | 57 | 18 | 1095 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13S6 | 41 | 25 | 4 | 2 | 1077 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13S7 | 221 | 220 | 107 | 92 | 758 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13S8 | 1 | 1974 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13S9 | 10 | 10 | 10 | 1105 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13Y1 | 880 | 240 | 240 | 880 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 13Y2 | 617 | 490 | 145 | 36 | 2580 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 146C3 | 94 | 164 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events | 2026-09-21 12:46:30 2025 | 146C4 | 30 | 30 | 05 RE08 - Excluding Storms, Excluding Planned-Primary Events |

Text of ES-Attachment 5.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
Eversource Energy Emergency Response Program PLAN Eversource Cyber Security Plan EP-ALL-PLN-1100 Revision 10 Approved Process Owner: Signature: Name: Christopher Leigh Title: Vice President & Chief Information Security Officer Date: Effective Date: August 15, 2025 Applicability: Eversource Ensure you are using the current revision by verifying it against the controlled electronic copy located in the Emergency Response Program Documentation Lotus Notes Database. August 15, 2025 Eversource Cyber Security Plan Intentionally Blank EP-ALL PLN-1100 2 of 30 Rev 10 Eversource Cyber Security Plan Table of Contents 1. CONCEPT OF OPERATIONS............................................................................................................ 5 1.1 1.2 2. Risk Management ........................................................................................................................ 6 2.1 3. Cybersecurity Threat Information Sharing .......................................................................................... 16 Information Protection Policy .............................................................................................................. 16 Data Protection .................................................................................................................................... 16 Event and Incident Response, Continuity of Operations .............................................................. 18 8.1 8.2 8.3 8.4 8.5 9. Logging ................................................................................................................................................. 15 Monitoring Electronic Access............................................................................................................... 15 Information Sharing and Communications .................................................................................. 16 7.1 7.2 7.3 8. Existing Systems ................................................................................................................................... 12 New Systems ........................................................................................................................................ 13 Outside Services ................................................................................................................................... 13 Security Patch Assessment .................................................................................................................. 13 Security Patch Management ................................................................................................................ 13 Vulnerability Assessment Process........................................................................................................ 13 Situational Awareness ................................................................................................................ 15 6.1 6.2 7. Establish and Maintain Cyber Access ................................................................................................... 10 Physical Access Controls for Employees and Vendors ......................................................................... 11 Threat and Vulnerability Management ....................................................................................... 12 5.1 5.2 5.3 5.4 5.5 5.6 6. Critical Asset Identification .................................................................................................................... 9 Identity and Access Management ............................................................................................... 10 4.1 4.2 5. Overall Enterprise Risk Management Program ..................................................................................... 6 Asset, Change, and Configuration Management ........................................................................... 9 3.1 4. Purpose .................................................................................................................................................. 5 Overview and Cyber Security Approach ................................................................................................ 5 Data Breach Program ........................................................................................................................... 18 Business Continuity Plans .................................................................................................................... 18 Disaster Recovery Plans ....................................................................................................................... 18 All Hazards Plan.................................................................................................................................... 18 Eversource All Hazards Emergency Response Plan ............................................................................. 19 Supply Chain and External Dependencies Management .............................................................. 20 9.1 9.2 9.3 9.4 9.5 9.6 Procurement Security Controls ............................................................................................................ 20 Compatibility with Existing Equipment within the Enterprise ............................................................. 20 Adherence to Architecture Standards ................................................................................................. 20 Adherence to Standard Procurement Processes ................................................................................. 20 Network Security Perimeter and Access Control ................................................................................. 20 Vendor Security Program Evaluation ................................................................................................... 21 10. Workforce Management ............................................................................................................ 23 10.1 10.2 10.3 EP-ALL PLN-1100 IT Security Organization ....................................................................................................................... 23 Personnel Risk Assessment .................................................................................................................. 23 Awareness Program and Training ........................................................................................................ 23 3 of 30 Rev 10 Eversource Cyber Security Plan 11. Cybersecurity Program Management ......................................................................................... 25 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 11.10 11.11 Standards Based Security Program ...................................................................................................... 25 Cyber Security Risks and Mitigation .................................................................................................... 25 CIS Governance .................................................................................................................................... 25 IT Security Organization ....................................................................................................................... 26 Architecture to Protect Critical Systems: Defense in Depth ................................................................ 26 Architecture to Protect Critical Systems: Boundary Defense/Electronic Security Perimeter ............. 26 Architecture to Protect Critical Systems: Malicious Software Prevention .......................................... 26 Account Management ......................................................................................................................... 26 Cyber Vulnerability Assessment .......................................................................................................... 27 Disposal or Redeployment ................................................................................................................... 27 Cybersecurity Plan Updates ................................................................................................................. 27 12. RECORD OF CHANGES ................................................................................................................ 27 Attachments Attachment 1 Acronyms and Abbreviations .............................................................................................................. 28 Attachment 2 Reference Documents ........................................................................................................................ 30 EP-ALL PLN-1100 4 of 30 Rev 10 Eversource Cyber Security Plan 1. CONCEPT OF OPERATIONS 1.1 Purpose The Eversource Cybersecurity Plan is a high-level overview of Eversource’s Cybersecurity Program. The program is structured using the ES-C2M2 model and covers all systems and assets at the Enterprise Level. The detail and rigor of cybersecurity controls get stronger based on the criticality of the system that Eversource is protecting. The specific details of the security program are confidential and can only be shared with third parties when appropriate controls are in place (for example, at an Eversource location with legal contracts in place). 1.2 Overview and Cyber Security Approach Eversource Energy’s overall approach to cybersecurity follows the National Institute of Standards and Technology (NIST) framework. Use of the NIST framework ensures that security measures and risk management efforts align appropriately with the priority of business processes for which Eversource is responsible. The framework also provides a common means of organizing Eversource’s diverse array of cybersecurity activities to prevent gaps in coverage. It also enables a rigorous and integrated process for managing a necessarily complex Information Technology (IT) environment and melding it with business needs, risk management processes, and all of the various resources that are applied to effective cybersecurity. The Corporate Information Security (CIS) services, policies, and standards apply to all business units and operating entities. Each operating entity also has specific security requirements in place to address specialized technology used within each service territory (such as different software and hardware used in control systems in the field). Eversource applies leading security principles and practices to protect the infrastructure and computer networks from cyber-attacks. This includes a defense-in-depth strategy where best of breed specialized security technology is used, such as host- and network-based firewalls, intrusion detection/prevention systems, virus and anti-malware protection, file encryption, content filters, network segmentation, and vulnerability scanners to further reduce risk of compromise. The Eversource control centers architecture is consistent with the recommendations from the Department of Homeland Security’s (DHS) Recommended Practice: Improving Industrial Control Systems Cyber Security with Defense-In-Depth Strategies (October 2009). In addition, Eversource includes the key recommendations to the enterprise network where appropriate. Various aspects of this cyber security program are periodically assessed using internal and external expertise to ensure effective operation. CIS enforces this security architecture with strict policies and procedures. Corporate policies regarding definition and use of sensitive information include: • Internal Controls and the Safeguard of Company Assets Policy • Code of Business Conduct • Critical Infrastructure Protection Policy • IT Vulnerability Management Policy • IT Access Administration Policy • Corporate Information Security Procedure • Eversource Privacy Policy Critical Infrastructure Protection (CIP) asset information is defined by the North American Electric Reliability Corporation (NERC) standards. CIP version 5 has been implemented effective July 1, 2016. CIP003-CIP Cyber Security Policy-POL-01 sets forth requirements for the Eversource CIP program. Approximately 60 underlying procedures exist for the CIP program. EP-ALL PLN-1100 5 of 30 Rev 10 Eversource Cyber Security Plan 2. Risk Management The objectives of the risk management processes are to establish, operate, and maintain an enterprise risk management program to identify, analyze, and mitigate risk to the organization, including its business units, subsidiaries, related interconnected infrastructure, and stakeholders. 2.1 Overall Enterprise Risk Management Program Within the overall risk management program, cybersecurity risk is considered as an enterprise corporate risk through the risk assessment process conducted by the Enterprise Risk Management Department (ERM). The ERM program involves the application of a well-defined, enterprise-wide methodology designed to allow the Risk Committee, comprised of the senior officers and directors, to oversee the identification, prioritization, mitigation, and reporting of principal business risks such as cybersecurity. The ERM program is integrated with other assurance functions throughout Eversource, including Compliance, Auditing, and Insurance to ensure appropriate coverage of risks that could impact the company. To support the ERM process, the Information Security team performs annually, a detailed Cybersecurity Risk Assessment based on the NIST 800-30. This assessment includes reviewing known threats and the Eversource Cybersecurity Risk register to assess areas requiring additional mitigation plans. The Information Security organization also identifies emerging risks to the company, through participation in industry groups, discussions with management and in consultation with outside advisers. Eversource management analyzes the risks to determine materiality and other attributes such as likelihood, impact, and mitigation strategies. Management broadly considers the Eversource business model, the utility industry, the global economy, and the current environment to identify risks. The findings of this process are periodically discussed with the Finance Committee of the Board of Trustees as well as with other Board Committees or the full Board of Trustees, as appropriate including reporting on how these issues are being measured and managed. 2.2 Cyber Security Risk Management Program As a subset of the ERM program, an Annual Risk Assessment has been developed based on the NIST 800-30 standard. This process evaluates threat actors and the likelihood that an attack will occur. In addition, an assessment of the impact is done. The various threat scenarios roll up into the Risk Register which summarizes the top company cyber risks and top threats. The model is updated for new threat scenarios and if necessary, the Risk Register. An example of the summary results follows: EP-ALL PLN-1100 6 of 30 Rev 10 Eversource Cyber Security Plan Example Only Example Only The results and new risks are discussed with Executive management based on the criticality of the event. Communications may be immediate email/phone calls through formal presentations to executive management, including the Board of Trustees EP-ALL PLN-1100 7 of 30 Rev 10 Eversource Cyber Security Plan For all new technologies, the procurement process includes an assessment process for vendors. This process begins with a questionnaire completed by vendors relating to their security policies, personnel security, environmental security, network management, end-point security, access control, compliance, business continuity and disaster recovery planning, and application security (External Vendor Due Diligence Questionnaire). Vendors are provided access to an IT Security Requirements portal to assist them in understanding what is required of them. All new initiatives for technology are evaluated based on the content of a formal questionnaire referred to as the Corporate Information Security Risk Assessment Questionnaire (CISRAQ). That evaluation holds the most knowledgeable person, usually the business owner or executive sponsor, responsible for gathering the necessary information used to assess the cybersecurity risk of the initiative. Prior to implementation, IT evaluates, tests, and approves all new technology requests, including proposed hardware, software, and/or configurations for consistency with established internal standards to ensure proper support, back-up and recovery infrastructure, and compatibility with other existing technology. In addition, if the initiative includes a 3rd party who will store, process, or transmit Eversource, non-public information, then a Due Diligence Questionnaire (DDQ) must be completed. This document describes the internal security controls used by the 3rd party to protect the data (Technical and Customer/Employee Personal data) being provided. If the controls are deemed not acceptable, then changes must be made or the data will not be authorized for release. In addition to shared best industry (cyber and utility) security practices, Eversource is in full compliance (through their audited programs) with NERC CIP standards, FTC Red Flag Rules, Federal Code of Fair Information Practices for Customer Privacy, HIPAA rules, HITECH rules, Sarbanes Oxley rules, SEC rules. Planning, design, and implementation of all cybersecurity infrastructure, practices, procedures, and so on are based upon the above-referenced standards and practices. In its deployment processes, Eversource applies leading cybersecurity principles, including a defense-in-depth strategy. The approach uses layers of different, but complementary best of breed security technology to augment Eversource’s protection programs. This approach is consistent with the security architecture proposed by DHS: Recommended Practice: Improving Industrial Control Systems Cyber Security with Defense-In-Depth Strategies (2009), and DHS Strategy for Security Control Systems (2009). Eversource’s programs include creating security risk zones that segregate risk. EP-ALL PLN-1100 8 of 30 Rev 10 Eversource Cyber Security Plan 3. Asset, Change, and Configuration Management Eversource manages the organization’s Operational Technology (OT) and IT assets, including both hardware and software, commensurate with the risk to critical infrastructure and organizational objectives. Eversource IT maintains an asset inventory of all computing systems (Servers, PC, Storage systems, etc) in the IT Connect Configuration Management Data Base (CMDB). IT also records the applications that utilize servers and other devices in this same data base. A discovery service scans the network daily to identify new assets on the network. The server request process also has steps for automatically updating the CMDB. The IT Connect Service Mapping utility determines what systems communicate with other systems. This process helps to determine impacted systems when there is an outage. The third primary asset category is Company Data. Legal manages the Exterro Records and Information Management Data Inventory system. This system survey’s the Eversource management team to identify what types of data (Business, Operational, Technical, and Customer/Employee) are used by which department. The system also records where the stored and ultimately what the record retention requirements are. This system is not yet integrated with the IT Connect system, however by using the location information, the servers and applications can be mapped to the CMDB. Industry best practices are used for asset, change, and configuration management. Distribution control center applications are governed by IT policies for change management (Change Management Policy). That policy is enforced by change management procedures and workflow included in the change management tool called IT Connect. Critical applications are captured in the configuration management database (CMDB). Tracking methods for modifications or changes to the inventory of distribution system assets, system configurations, vendor and equipment models, and firmware are accomplished using technology platforms and configuration and control processes. System drawings also reflect security devices when applicable. In addition, there are various IT processes and reviews to ensure protection, including event logs and operational monitoring. The Change Control & Configuration Management Procedure is used for all change and configuration management requests associated with key IT cyber assets. This procedure is used by all personnel within IT for all systems supported by IT. Changes to key cyber assets are documented with the change management process in ITSM. All changes to critical cyber assets follow best practices of testing any changes in non-production environments. Once the impact of those changes is fully understood, a formal change ticket is created with a description of changes, the window of implementation and approvals, as well as presenting the change at the weekly IT change meeting. 3.1 Critical Asset Identification As required by NERC CIP standards, formal CIP procedures and plans are maintained to methodically identify those assets deemed critical to the reliability of the bulk electric power system. Those plans and procedures dictate periodic reviews to assess, update, and validate the asset list. A similar assessment is required when substantial changes to the cybersecurity environment occur and/or when new equipment and/or configurations are implemented. Additionally, there are cyber assets within IT, OT, and distribution environments that do not currently fall under the scope of CIP standards but to which Eversource, at its discretion, applies similar criteria and processes to more appropriately protect those assets it deems similarly critical. EP-ALL PLN-1100 9 of 30 Rev 10 Eversource Cyber Security Plan 4. Identity and Access Management The objectives of the identity and access management processes are to create and manage identities for entities that can be granted logical or physical access to the organization’s assets and control access to the organization’s assets, commensurate with the risk to critical infrastructure and organizational objectives. 4.1 Establish and Maintain Cyber Access The IT Policy “08 Access Control” describes the requirements for administering computer resources. This policy establishes the process for granting and maintaining access privileges on Eversource’s network and all associated computer resources and defines the responsibility and authority for the performance of access activities. This policy is enforced by the Access Administration Procedure, which describes the access request process and requires use of the IT Service Request System. In addition, “08 Access Control” policy defines the security requirements for IDs and passwords, and in part requires: use of unique identifier technologies such as a unique logon ID for each system user that is driven by a centralized Person Information Database used to track employees and contingent workers; User logon ID’s must have strong complex passwords that are secured and not written down; Logon ID’s are locked from use after a defined number of failed login attempts; For system accounts, default passwords must be changed periodically; and a Privileged Account Management system is used to limit access. All system access is driven by the least privilege principle and an access request must be properly approved before access is granted. Access is authorized only on a need to know basis. For remote access and for selected high risk systems, two-factor authentication is required. In addition, a second set of authentication credentials are required where stronger password policies are enforced. Monitoring of user behavior is performed using various security technologies. Anomalies such as where users log into computing systems with tolerances, unusual login times or methods are monitored with alerting. The Corporate Information Security Team will also consider significant business events for developing new monitoring rules. Examples could include strikes, layoffs, or other possible restructuring events. Additional policies and enhanced Insider Threat monitoring will be discussed with the Governance Committee. Termination procedures ensure that network and CIP access for terminated employees and contractors is removed upon receipt of notification. Employees receive periodic reminders to record all terminations prior to the effective date. Monitoring is also in place to identify postdated terminations. Specific communications reminding the supervisor and their manager that terminations must be recorded in the HR system prior to the effective date. There is also a “for cause” emergency termination process that is used to remove system access immediately. Semi-annually, all logon credentials are reconciled to a Human Resources list of active employees and all contingent workers are confirmed with designated Eversource management. Quarterly or annual access certifications with system owners are conducted based on system type as designated by corporate requirements. In addition, there is a weekly review of terminations and transfers to ensure that access levels have been adjusted or removed on identified systems, as appropriate. Unauthorized access is monitored using special password lock-out procedures and, for selected systems, an alert is generated requiring a review and disposition by the IT Security Department. Internal testing of the access administration process is conducted and overseen by the IT Compliance Department. Also, audits of the access administration activities are conducted by the Internal Audit Department and external auditors, as well as NERC and ISO-NE (Independent System Operators of New England). EP-ALL PLN-1100 10 of 30 Rev 10 Eversource Cyber Security Plan 4.2 Physical Access Controls for Employees and Vendors Because the cybersecurity environment includes physical elements (technology, equipment, and so on), it is important to provide some overview of aspects of Eversource’s Physical Security Plan in the context of its relevance to cybersecurity. Eversource has extensive experience with physical security programs based on its work required to protect the bulk electric system. This experience includes ensuring that physical locations are protected with physical security perimeters. Access points and measures to control entry have been established. Procedures to monitor physical access have been implemented including the monitoring of card key access and other means. Security personnel are in place to control physical access on-site or at remote monitoring locations on 24 hours a day/7 days a week basis. Alarm systems, physical access logs, and human observation of access points are all methods used to monitor physical access to protect physical locations. Employees who lose their badge are required to report the event to Physical Security. All new employees undergo thorough background checks before being granted any level of computer system access. Once cleared for employment, individual work needs are evaluated and formally reviewed prior to the employee being given very granular access (that is, access to systems that are in any way sensitive is granted only on a need-to-access basis). Similarly, physical access to areas with cyber sensitive equipment is granted only to those with a specific need. All such areas are card-key controlled with formal procedures for granting and using such access, all of which is recorded and monitored. Areas and systems with higher levels of sensitivity such as CIP areas require additional background checks prior to such access being granted. Procedures for all of these processes cover authentication, verification, tracking, and so on CIP-related processes and procedures are reviewed annually and audited by regulators and third parties every 3 years. Termination procedures ensure that access for terminated employees and contractors is removed in a scheduled and timely manner. There is also a for cause emergency termination process that is used to remove system access immediately. Periodic checks and audits are conducted to validate that appropriate access is in place. EP-ALL PLN-1100 11 of 30 Rev 10 Eversource Cyber Security Plan 5. Threat and Vulnerability Management The objectives of the threat and vulnerability management processes are to establish and maintain plans, procedures, and technologies to detect, identify, analyze, manage, and respond to cybersecurity threats and vulnerabilities, commensurate with the risk to the organization’s infrastructure (for example, critical, IT, operational) and organizational objectives. The Threat Profile for Eversource Energy considers the various “Threat Actors” who may have intent to attack Eversource Systems and data. These Threat Actors include Cyber Terrorists, Organized Criminals, and Nation States. These Threat Actors may use various forms of malware including, but not limited to, ransomware, Remote Access Trojans, Root Kits, Worms, or Crypto-mining technologies. These Threat Actors intentions when using these tools is to either obtain persistence in the network for future use, disrupt business and operations systems, or compromise technical or customer/employee data. Eversource uses the following threat information sources to incorporate into all threat monitoring technologies (In Priority Order): 5.1 • Department of Homeland Security • Federal Bureau of Investigation • Electric Sector Information Sharing and Analysis Center • US- Center for Emergency Response • DOE • Others as necessary Existing Systems CIS applies leading security principles and practices to protect the infrastructure and computer networks from cyber-attacks including a defense-in-depth strategy. Eversource uses best of breed specialized security technology is used such as host and network-based firewalls, intrusion detection systems, virus and anti-malware protection, file encryption, content filters and vulnerability scanners to further reduce risk of compromise. This security architecture is consistent with recommendations from DHS’s Recommended Practice: Improving Industrial Control Systems Cyber Security with Defense-In-Depth Strategies. For deployed systems, periodic reviews and audits are conducted by internal and 3rd parties to ensure the security controls are functioning as designed. In addition, penetration tests and/or vulnerability assessments are conducted to validate the system security controls on a periodic basis. For control systems, no automatic assessments are performed on production environments due to potential operational impacts by assessment tools. Assessments of control systems are done using manual data collection and analysis. The assessments include gathering intelligence from multiple reliable sources (vendors, ES-ISAC, Edison Electric Institute (EEI), and so on) and implementing response/mitigation plans. All mobile devices including laptops, tablets, and smartphones must utilize encryption technologies to secure company data. EP-ALL PLN-1100 12 of 30 Rev 10 Eversource Cyber Security Plan 5.2 New Systems There are many controls and processes used to validate systems in pre-deployment. CIS begins the security assessment process in the system purchasing phase by including security requirements in the request for proposal (RFP) and scoring security levels in the proposal evaluations. A security risk assessment process known as CISRAQ is required by the Methodology for Project Management. In addition, security approval is required as part of the change management process for any new systems deployed in the IT-supported production environment. 5.3 Outside Services The IT Security team monitors multiple threat advisory services such as Industrial Control Systems CyberEmergency Response Team (ICS-CERT), ES-ISAC, InfraGard, and SANS Internet Storm Center. Eversource also subscribes to a paid advisory service. All alerts are reviewed for applicability and analyzed for impact to the company. When mitigation is not available or cannot be implemented, the compensating measures are reviewed for mitigation effectiveness and to ensure the risk level is low. In these situations, the mitigations are reviewed with system owners. In addition, Eversource has multiple 3rd party forensic service providers that can be utilized if needed for a security event. 5.4 Security Patch Assessment IT Security performs the assessment of security patches at the Enterprise Patch review meeting that is conducted monthly. Minutes and actions are captured as a result of the monthly patch assessment. As part of the assessment process, individuals across Eversource who are identified as Subject Matter Experts (SME) for software related to a patch or upgrade provide input into the evaluation, testing, and installation of that software. The assessment process uses the defined CVSS (Common Vulnerability Scoring System) to help quantify risk and potential impact. All applicable devices are required to be patched based on the approved schedule. Eversource follows the NERC CIP Security requirements where applicable to this area. Real-time systems, communications networks, and interfaces are secured on the host side with firewalls and other industry best practices described in 5.5 • NIST Standard 800-82 Guide to Industrial Control System Security • DHS Industrial Control System Standards Security Patch Management Along with a rigorous IT patch management program for infrastructure and applications, the Security Patch Management process follows standard Change Control and Configuration Management Procedures. This process is used to track, evaluate, test, and implement cybersecurity software patches. Security patches and upgrades are tested before being installed in production unless there is no development environment. In that case, documentation of the exception and the compensating measures applied to mitigate risk exposure are required. 5.6 Vulnerability Assessment Process Eversource performs 3rd party vulnerability assessments on an annual basis on selected systems based on risk and compliance requirements. Vulnerability assessments are required by the NERC CIP standards for systems classified as critical. An external third party is selected to conduct the assessment. Eversource has also engaged with the Department of Homeland Security CISA to perform external vulnerability scanning services. The Information security team also periodically scans the internal network for vulnerabilities and monitors remediation. EP-ALL PLN-1100 13 of 30 Rev 10 Eversource Cyber Security Plan Eversource performs application vulnerability scans as part of the System Development Life Cycle (SDLC). The scan is performed during final application testing to ensure that no critical security vulnerabilities exist prior to deployment of the application. These scans also occur on major system changes. Eversource will perform “Red Team/Blue Team” testing which will ensure the preventative cyber technologies are in place and to test the company’s resistance to Social Engineering and the Cyber teams Incident Response procedures. EP-ALL PLN-1100 14 of 30 Rev 10 Eversource Cyber Security Plan 6. Situational Awareness The objectives of the situational awareness processes are to establish and maintain activities and technologies to collect, analyze, alarm, present, and use operational and cybersecurity information, including status and summary information from the other model domains, to form a common operating picture (COP). As part of this COP, a Security Operations Center has been established for the monitoring of security events. This team is staffed 24X7, 365 days a year. They will perform the initial risk assessment and triage for the event and escalate to the level 2 support team when needed. U.S. DHS Daily Open Source Infrastructure Report Updates provide relevant information that is reviewed and forwarded as appropriate to Corporate Security. More urgent/time-sensitive and focused briefings come on an emergent basis from the Department of Energy (DOE), DHS, ES-ISAC (directly to control rooms) and state agencies such as the Connecticut Division of Emergency Management and Homeland Security (CT DEMHS), the Massachusetts Emergency Management Agency (MEMA), and the New Hampshire Division of Homeland Security and Emergency Management (NH HSEM). These updates include classified and unclassified information, depending on the sensitivity of the data. These agencies have alert and text systems for alerts on any type of creditable threat such as weather, earthquakes, amber alerts, or terrorist alerts. They send situational reports and briefings, including weather forecasts and related information. Additional information is included in the Physical Security Plan. The company’s bulk transmission operators in each state share NERC and ISO alerts or actions they receive. Formal operating procedures dictate actions based on those alerts. EEI sends reports or information through the Business Continuity (BC) and Mutual Aid work room accounts to which Emergency Preparedness leadership subscribes. Corporate Security forwards any relevant information from state fusion centers and the FBI to operations control rooms. IT receives updates of both urgent and less time-sensitive natures on security patches and vulnerabilities from vendors. Rigorous patch management/change management processes ensure that these alerts are triaged and acted upon appropriately. 6.1 Logging Enterprise security policy requires that logging be enabled where technically possible in order to capture cybersecurity related events of significance. Logs containing cybersecurity related events from key systems are collected in a central logging repository, which is monitored for unauthorized activity. These logs can be used to support the Incident Response process. 6.2 Monitoring Electronic Access Key network activity is monitored 24/7 by a contracted Managed Services Security Provider (MSSP) that alerts the IT Security team in the event of unexpected or unauthorized activity. In addition, daily reports are generated by the central logging repository for review by the IT Security team. These reports are based on specific conditions that can indicate a security issue or threat. Electronic access logs are retained for 12 months. Logs related to reportable incidents are retained for a minimum of three years. EP-ALL PLN-1100 15 of 30 Rev 10 Eversource Cyber Security Plan 7. Information Sharing and Communications The objectives of the information sharing, and communications processes are to establish and maintain relationships with internal and external entities to collect and provide cybersecurity information, including threats and vulnerabilities, to reduce risks, and to increase operational resilience, commensurate with the risk to critical infrastructure and organizational objectives. 7.1 Cybersecurity Threat Information Sharing Eversource participates in several information sharing communities and has defined processes for when to share threat information. The nature of the information largely determines the frequency with which it is shared. For example, emergent, urgent information with significant potential impact is shared immediately. However, CIS executive management (including the Board of Trustee) are periodically briefed on events and alerts during the year. That briefing includes examples of newsworthy cybersecurity items that were reviewed and either acted upon or documented as not needing action. It provides examples of risk assessment, reviews of any incidents, other current items of interest, and so on. IT Security monitors multiple external threat advisory services such as ICS-CERT, ES-ISAC, Infragard, and SANS Internet Storm Center. Eversource also subscribes to several paid advisory services. All alerts are reviewed for applicability and analyzed for impact to the company. In addition to the advisory services, IT Security regularly networks with security personnel from other utilities. Sharing security related information obtained in a security incident is a requirement of the All Hazards Emergency Response Plan and will be done by the Information Security organization. Eversource incident response procedures include steps to engage with the ES-ISAC to share the threat intelligence is part of this procedure. Depending on the situation, other organizations will be included, such as the FBI and DHS. Communication is a key role in the incident response process and IT Security also engages internal stakeholders as part of the process. 7.2 Information Protection Policy Information sharing activities are guided by documented policies. Any information that has not been publicly disclosed is protected against improper disclosure, both inside and outside Eversource. The Records and Information Management Policy governs how Confidential Information (CI) is defined. Types of such information include Confidential Business Information (CBI), Critical Infrastructure Information (CII), information related to Critical Infrastructure Protection (CIP), Critical Energy Infrastructure Information (CEII), Confidential Personal Information (CPI), and Protected Personal Information (PPI). The policy also defines protocols for the treatment of confidential information, Contractor and Third-Party Confidentiality Agreements, and Confidential Data Breach or Loss. 3rd Parties are required by contract to notify Eversource of a data breach. Additional guidance is provided in the Records Retention Schedule and in the Identification, Protection and Labeling of CEII Materials administrative procedure. Compliance to policies is audited periodically by the Internal Audit Department. 7.3 Data Protection The Cyber Security team utilizes various preventive and detective controls to ensure security of company sensitive information including technical engineering data, Customer and Employee personal data. Preventative tools monitor for sensitive information in motion (unencrypted) or at rest in an unapproved location. The Eversource Data Loss Prevention (DLP) tools monitor various, but not all data repositories across the Eversource network. If PII information is found by these DLP tools, they will block and alert the Security team of an issue. Eversource performs quarterly access reviews for SOX applications, NERC CIP systems, and in Microsoft Azure. These reviews are intended to ensure only authorized persons have access to sensitive data and systems. EP-ALL PLN-1100 16 of 30 Rev 10 Eversource Cyber Security Plan 7.4 Data Loss Prevention: Eversource’s IT Security DLP Strategy includes reference to policies, control standards and control procedures which include tools and processes that detect and prevent unauthorized access, misuse, destruction of critical or sensitive data. Policies in place that support this strategy are as follows: • • Data Classification Policy: includes classification categories and the process for associating data to each identified classification and how each shall be managed. The continued development and growth of the process includes identification of mandatory controls for each specific type of data classification, or individual controls for subsets based on the technology allowances as to where the data is maintained for business use or at rest. Records Retention Policy: Detailing retention periods by record type, for use by the business owners and users of records. Technical tools for the areas of focus as noted below, are managed within IT Security as our DLP strategy include, yet are not limited to: 1) Data Classification – Eversource has the capabilities to watermark and classify Microsoft Office files in accordance with the Company’s Data Classification Policy. All employees are responsible to apply these controls where appropriate. 2) Unstructured Data – Utilize Microsoft Rights Management to encrypt sensitive data and to apply controls around printing, copying, saving and granting additional access directly to a file. The technology also can scan and tag files within specific data folders based on policies established. Once files are tagged, they will be protected with default protections that encrypts the files. If files are transmitted in error, or inappropriately, the files will be unavailable to recipient unless proper access is granted via the Microsoft Rights Management rules/policies. 3) Email – Technologies include Proofpoint and Microsoft Rights Management (previously known as AIP). Configurable to identify specific filters and alerting capability to prevent data loss – example can reject email transmission with SSNs, bank account formats etc. 4) Databases – Technology utilized is Imperva Database Protection. This technology is an agent-based technology installed on databases (currently in place). Alerts on large file export and other databasefocused loss/leaks, etc. EP-ALL PLN-1100 17 of 30 Rev 10 Eversource Cyber Security Plan 8. Event and Incident Response, Continuity of Operations The objectives of the event and incident response and continuity of operations processes are to establish and maintain plans, procedures, and technologies to detect, analyze, and respond to cybersecurity events and to sustain operations throughout a cybersecurity event, commensurate with the risk to critical infrastructure and organizational objectives. 8.1 Data Breach Program The Data Breach Readiness Program is a corporate-wide program with representatives from Legal, Corporate Communications, IT Security, and Business Segments as needed. The program includes a dedicated Incident Response Team (IRT) that is assembled upon notification of an incident to the IT Security Team and where the potential of a breach exists. Notification to appropriate IRT members is based on an established IT Incident Response Process including paging and notification. Additionally, Eversource uses a Personal Information Data Breach Incident Response Manual, which is reviewed and updated as necessary. This manual includes a policy statement, response team assembly, overview of Cyber Incident structure and process, roles and responsibilities, high-level communications workflow, customer communications, media and investor relations, and legislator and regulator communications protocols. Data breach plan provides guidance for the management of a significant breach or loss of confidential personal information (Data Breach Incident) requiring notification to impacted persons (customers or employees), potential notification to and involvement of law enforcement and/or other governmental authorities, and communications with regulators and investors. That manual is focused primarily on communications and references other Data Breach Incident response procedures and materials, such as IT Incident Response Procedures, the All Hazards Incident Response Plan (AHP) and business unit activities, which are part of the comprehensive plan for timely management and response to a Data Breach Incident. Communications regarding a Data Breach Incident are managed to comply with laws and to mitigate the negative impact on the relationship between the information owner and the company entrusted with it. 8.2 Business Continuity Plans Business Continuity Plans are maintained to ensure the ability to continue crucial and critical business processes during and after a disaster (any challenge to the ability to conduct those processes). Business Continuity Plans provide for the loss of people, facilities, and systems related to each covered process. Each plan, integrated with the overall incident response processes, provides specific guidance for continuing a specific critical or crucial business process during and after a disaster. 8.3 Disaster Recovery Plans Similarly, Eversource maintains IT Disaster Recovery (DR) plans that ensure the ability to recover, in a predetermined and timely manner, technology and associated data after a disaster. DR Plans for all time-critical non-CIP systems are maintained in the IT DR Runbook and are exercised annually. DR plans for CIP-related systems are maintained in classified CIP plans which provide an integrated DR and incident management approach. 8.4 All Hazards Plan The very nature of a utility includes core business processes for which incident response is a nearly routine occurrence. Leveraging that experience is key to the integration of all types of incident responses in the AHP. EP-ALL PLN-1100 18 of 30 Rev 10 Eversource Cyber Security Plan The AHP is established as an overarching framework for the implementation of the comprehensive Emergency Management Program. The AHP provides guidance used to direct operations and staff assignments, procure and allocate resources, and take measures to restore normal services and operations. This overall Emergency Management Program is consistent with the criteria for emergency management and business continuity programs established by National Fire Protection Association (NFPA) 1600: Standard on Disaster/Emergency Management and Business Continuity Programs. The purpose of the AHP is to provide a framework for identifying, preparing for, and responding to emergency situations and other extraordinary events consistently and effectively. Although not inclusive of every possible emergency situation that might occur, it provides key information regarding emergency and business continuity practices to be utilized system wide. A clear effective response to events ensures the safety of employees and the public and the protection of assets. By providing a comprehensive emergency response plan, the effects from any disruption of service are minimized and the safety of employees and the general public is maintained. 8.5 Eversource All Hazards Emergency Response Plan Eversource maintains an All Hazards Emergency Response Plan. Supplemental plans that specifically address critical infrastructure are maintained as required by NERC CIP. Criteria to identify security events are listed in these Plans. IT maintains a separate IT Incident Management process that is used for IT-specific incidents that do not warrant the response level of the All Hazards Incident Management Plan or NERC CIP plans. This process follows similar methodology to the other response plans and is focused on specific IT technology. Incidents are identified through multiple means of detection including monitored security events. Security events that are detected are reported to the Information Security team. The events are reported through the Enterprise ITSM tool and the details are tracked in a Confidential Investigations Database. Information Security has established a forensic skillset for collecting data and performing initial analysis. Eversource is also establishing contracts for advanced forensics services with third parties. Forensics activities will be activated during a security incident where there is an unknown cause or the likelihood of engaging law enforcement. The All Hazards plan also includes a section on Data Incident Response. This plan describes the different types of data (Technical, Operational, Business, Customer/Employee, etc.) incidents, how the response team is to be organized and the responsibilities of the different members. The document also has templates for internal communications regarding the incident and external reporting. Eversource has implemented a program for managing Distributed Denial of Service (DDoS) attacks. Eversource has a third party that would be activated to filter network traffic related to the attack. Standard procedures describe how this process will be activated and return to normal operations. 8.6 Eversource Ransomware Response Plan Eversource has implemented a plan for responding to a ransomware attack. This plan addresses the engagement with the adversary, and the process for determining if a ransomware payment should be made. Technical response and remediation of a ransomware attack is included in other response and operational plans. EP-ALL PLN-1100 19 of 30 Rev 10 Eversource Cyber Security Plan 9. Supply Chain and External Dependencies Management The objectives of the supply chain and external dependencies management processes are to establish and maintain controls to manage the cybersecurity risks associated with services and assets that are dependent upon external entities, commensurate with the risk to critical infrastructure and organizational objectives. 9.1 Procurement Security Controls A comprehensive process is used for evaluating risks and helping ensure that vendors do not pose undue risk to the company and its customers. This risk assessment starts with obtaining a Security Score from an independent third-party rating service that is based on the vendor’s security controls information. Security scores will be obtained for new vendors providing critical parts or services, as part of the Vendor Certification process. Vendors must have acceptable scores or commit to remediating the identified risks to do business with Eversource. A standard RFP process is used when procuring technology-related solutions. This process requires vendors to respond to requirements related to security capabilities and functional security controls. The cybersecurity procurement language for energy delivery is included in the RFP where possible. Vendors must respond to questions about the technology and demonstrate recognition of NIST ICS security guidelines as well as adherence to NIST security checklist configurations. They must provide baseline security configurations for their products with the ability to enable more advanced security configurations as documented with certifications of appropriate assurance levels of Common Criteria Evaluation. See Section 2.1, Overall Enterprise Risk Management Program. Cybersecurity procurement language is included in all contracts, based on what was included in the RFP. Vendor selection criteria are implemented through four components. The application of these four components as a group for vendor/device selection supports the implementation of enterprise security compliance, policies, and standards as a base capability, and any relevant and specific cybersecurity standards and requirements. 9.2 Compatibility with Existing Equipment within the Enterprise Hardware, software, and software tools must comply with existing installations. Compatibility is a primary vendor/device selection criterion to ensure systems are fully functional, supported, and can be maintained. 9.3 Adherence to Architecture Standards Hardware, software, and software tools follow architecture standards. These standards are defined and documented within the IT department, working with internal business partners. The adherence to these standards leverages pre-selected infrastructure, software, and tools that have been selected as leading technologies for implementation. 9.4 Adherence to Standard Procurement Processes Hardware, software, and software tools are procured through standard procurement procedures that include cybersecurity standards and compliance as part of the vendor evaluation criteria. Additional industry security standards used to create these standards, processes, and procedures are listed at the end of this document. 9.5 Network Security Perimeter and Access Control Network security supports the “Defense in Depth” strategy by implementing an external security perimeter, multiple internet facing zones for isolating different traffic types, and internal network segmentation. Internal segmentation separates “High Value” zones from the standard corporate network which is used by Eversource employees. The network segmentation strategy will be flexible to allow for changes in risk and a need to segment different business areas. EP-ALL PLN-1100 20 of 30 Rev 10 Eversource Cyber Security Plan For vendor equipment or networks not directly under company control, vendors are required to maintain a supervised, secure, controlled, monitored network facility to ensure: 9.6 • There are various administrative, technical, and logical controls to ensure that data is secure while resident at the external vendor’s network or in transit. • Industry standard security solutions are deployed to secure data. • Encryption of data, when appropriate, while resident at vendor’s location or while in transit using industry standard encryption and cryptographic methodologies. • Technology infrastructure that guarantees the availability of information technology assets. • Access to information technology assets is allowed only by authorized individuals. • Integrity and privacy of information technology assets is maintained. • Misuse or loss of information technology assets is prevented. • Transit of data to/from customer premises is sufficiently secured to guarantee integrity of the data while in transit. Vendor Security Program Evaluation A vendor security review that includes information technology security policies, procedures, and other documents is maintained jointly by CIS and Corporate Security (physical) and is performed periodically. This program requires that vendors perform the following activities: • Review what is required of them at least annually and make appropriate updates after any significant changes to their business operations, computing, or telecommunications environment. • Conduct their own information technology security policy review and standards compliance audit at least once every year. That review/audit must be performed by a qualified party or parties, independent of the vendor’s information technology organization. The nature and scope of the audit is commensurate with the extent of the vendor’s dependence on secure information technology assets to accomplish its critical business functions or as such operations can impact the security of other federal or state organizations. • Upon completion of the audit, the vendor must enact the recommendations of the audit and the plan for correcting the deficiencies appropriately and provide documented results for review and evidence for final validation. These measures ensure that vendor selection is made with careful consideration to, and mitigation of, cyber security risks that could potentially be introduced as a result of the proposed vendor relationship and project implementation. Thus, this part of the vendor selection process serves as a key component of the overall approach to cybersecurity. Information Security will also consider all forms of intelligence information as part of the vendor selection process. In any contract where data is stored off-site, vendors are required to adhere to the IT Security Requirement document. That document is made part of the terms and conditions of any ensuing contract. The vendor is required to complete and return an IT Due Diligence Questionnaire. The information collected on that questionnaire is then processed through the CISRAQ process, with vendor submission evaluations used by IT, Security, the requesting department, and Purchasing to render decisions on the viability of proposals. EP-ALL PLN-1100 21 of 30 Rev 10 Eversource Cyber Security Plan Annually, a risk assessment will be performed to identify hardware and service providers that by nature of the products used and services performed, will have the greatest risk to Eversource Operations systems (Relays, transformers, Engineering services, etc.). For the vendors identified through this risk assessment, additional security evaluation will be perfor

Text of ES-Attachment 1.xlsx

Extracted from the file · 60,000 characters (the first 60,000 are kept)
[Sheet: CT DERs as of 09302026] CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDC's Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 ES-Attachment 1 October 1, 2026 Customer/Service Address Line 1 | Customer/Service Address City | Customer/Service Address Zip Code | KW Rating | PV System Inverter Nameplate Rating | Battery KW Rating | Fuel Type | Technology Type | Interconnection Date | Current Status 62 Robin Hill | Newtown | 6470 | 4 | Solar | PV | 2009-06-05 00:00:00 | Level 1 - Online 273 Thimble Islands Rd. | Branford | 6405 | 7 | Solar | PV | 2009-01-09 00:00:00 | Level 1 - Online 24 Laura Lane | Oxford | 6478 | 6 | Solar | PV | 2009-10-09 00:00:00 | Level 1 - Online 89 Sherwood Pl | Greenwich | 6830 | 4 | Solar | PV | 2009-08-20 00:00:00 | Level 1 - Online 65 Griswold Rd. | Wethersfield | 6109 | 9 | Solar | PV | 2009-02-06 00:00:00 | Level 1 - Online 87 Quaker Farms Rd. | Southbury | 6488 | 8 | Solar | PV | 2009-02-18 00:00:00 | Level 1 - Online 222 Round Hill Road | Middletown | 6457 | 3.3 | Solar | PV | 2007-04-19 00:00:00 | Level 1 - Online 10 Stewart Rd | Pawcatuck | 6379 | 5 | Solar | PV | 2008-11-05 00:00:00 | Level 1 - Online 18 Rockland Park | Branford | 6405 | 3 | Solar | PV | 2008-07-28 00:00:00 | Level 1 - Online 859 Beaumont Highway | Lebanon | 6249 | 10 | Solar | PV | 2009-08-19 00:00:00 | Level 1 - Online 24 Pumpkin Hill Rd | Ashford | 6278 | 7 | Solar | PV | 2009-02-11 00:00:00 | Level 1 - Online 71 Highridge Rd. | West Simsbury | 6092 | 6 | Solar | PV | 2009-01-29 00:00:00 | Level 1 - Online 5 Cartridge Trail | Ledyard | 6339 | 9.3 | Solar | PV | 2009-12-31 00:00:00 | Level 1 - Online 438 Mile Lane | Middletown | 6457 | 6 | Solar | PV | 2009-09-22 00:00:00 | Level 1 - Online 43 Crofut Rd. | Naugatuck | 6770 | 6 | Solar | PV | 2008-05-16 00:00:00 | Level 1 - Online 20 Utley Rd. | Hampton | 6247 | 7 | Solar | PV | 2009-01-07 00:00:00 | Level 1 - Online 20 Pine Hill Road | Sterling | 6373 | 4.95 | Solar | PV | 2007-10-10 00:00:00 | Level 1 - Online 14 Norma's Way | Bolton | 6043 | 3.2 | Solar | PV | 2007-12-05 00:00:00 | Level 1 - Online 77 Clubhouse Rd. | Lebanon | 6249 | 4 | Solar | PV | 2007-10-01 00:00:00 | Level 1 - Online 13 Hickory Lane | Waterford | 6385 | 9 | Solar | PV | 2009-11-18 00:00:00 | Level 1 - Online 85 Meadowood Drive | Middletown | 6457 | 3.3 | Solar | PV | 2007-09-18 00:00:00 | Level 1 - Online 379 Old New London Road | Salem | 6420 | 7 | Solar | PV | 2009-06-10 00:00:00 | Level 1 - Online 14 Adams Lane | New Canaan | 6897 | 4 | Solar | PV | 2008-07-01 00:00:00 | Level 1 - Online 339 West Street | Middletown | 6457 | 7 | Solar | PV | 2010-03-23 00:00:00 | Level 1 - Online 52 Somerset St | Wethersfield | 06109-3029 | 3 | Solar | PV | 2009-01-20 00:00:00 | Level 1 - Online 35 Stonehedge Dr | Greenwich | 6831 | 3 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 584 Gurelyville Rd. | Storrs | 6268 | 7 | Solar | PV | 2009-07-21 00:00:00 | Level 1 - Online 10 Brook Wood Ct | Broad Brook | 6016 | 7.38 | Solar | PV | 2007-11-21 00:00:00 | Level 1 - Online 26 Battle Swamp Road | Roxbury | 6783 | 4 | Solar | PV | 2008-09-19 00:00:00 | Level 1 - Online 56 Rees Dr | Oxford | 6478 | 5 | Solar | PV | 2010-01-06 00:00:00 | Level 1 - Online 327 Guilds Hollow Rd. | Bethlehem | 6751 | 3.4 | Solar | PV | 2007-07-03 00:00:00 | Level 1 - Online 1 Thistle Road | Norwalk | 6851 | 10 | Solar | PV | 2010-05-28 00:00:00 | Level 1 - Online 20 Soundview Road | Ridgefield | 6877 | 6 | Solar | PV | 2008-02-25 00:00:00 | Level 1 - Online 69 Killingly Rd. | Pomfret Ctr | 6259 | 9.1 | Solar | PV | 2008-07-23 00:00:00 | Level 1 - Online 521 Middle Turnpike | Storrs | 6268 | 6 | Solar | PV | 2010-01-07 00:00:00 | Level 1 - Online 40 Secor Road | Brookfield | 6804 | 10 | Solar | PV | 2009-07-31 00:00:00 | Level 1 - Online 987 Ceder Swamp Rd | Coventry | 6238 | 3.8 | Solar | PV | 2008-10-31 00:00:00 | Level 1 - Online 263 Wolf Den Road | Brooklyn | 6234 | 7 | Solar | PV | 2009-03-12 00:00:00 | Level 1 - Online 379 North Bigelow Road | Hampton | 6247 | 7 | Solar | PV | 2009-02-09 00:00:00 | Level 1 - Online 56 Clement Rd. | East Hartford | 6118 | 2.5 | Solar | PV | 2007-07-26 00:00:00 | Level 1 - Online 167 Zaccheus Mead Lane | Greenwich | 6831 | 6 | Solar | PV | 2009-01-23 00:00:00 | Level 1 - Online 2 Palmer Road | Waterford | 6385 | 7 | Solar | PV | 2009-11-09 00:00:00 | Level 1 - Online 58 Tourtellotte Road | Putnam | 6260 | 4 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 162 Skilton Rd | Watertown | 6795 | 9.6 | Solar | PV | 2010-02-24 00:00:00 | Level 1 - Online 23 Spring Rock Road | East Lyme | 6333 | 8 | Solar | PV | 2009-01-19 00:00:00 | Level 1 - Online 4 Juniper Rd. | Bloomfield | 6002 | 5 | Solar | PV | 2008-06-19 00:00:00 | Level 1 - Online 144 Hampton Rd. | Pomfret Ctr | 6259 | 5.1 | Solar | PV | 2007-06-20 00:00:00 | Level 1 - Online 21 Diane Dr. | Manchester | 6040 | 8 | Solar | PV | 2009-01-23 00:00:00 | Level 1 - Online 477 Providence-N.L. Tpke | North Stonington | 6359 | 5.2 | Solar | PV | 2007-10-01 00:00:00 | Level 1 - Online 138 Housatonic River Road | Salisbury | 6068 | 10 | Solar | PV | 2009-08-20 00:00:00 | Level 1 - Online 13 Mine Hill Road | Roxbury | 6783 | 4.9 | Solar | PV | 2010-09-03 00:00:00 | Level 1 - Online 44 Taylor Place | Branford | 6405 | 4 | Solar | PV | 2009-01-22 00:00:00 | Level 1 - Online 71 Ballahack Road | East Haddam | 6423 | 7 | Solar | PV | 2010-01-22 00:00:00 | Level 1 - Online 66 Indian Trail | Vernon | 6066 | 3.8 | Solar | PV | 2008-05-09 00:00:00 | Level 1 - Online 3 Mountain View Lane | North Canaan | 6018 | 9 | Solar | PV | 2009-08-17 00:00:00 | Level 1 - Online 138 Wolfneck Rd | Stonington | 6378 | 10 | Solar | PV | 2008-11-20 00:00:00 | Level 1 - Online 40 Greystone Way | Guilford | 6437 | 8 | Solar | PV | 2009-10-05 00:00:00 | Level 1 - Online 8 Owen Dr. | Stonington | 6378 | 6 | Solar | PV | 2008-10-14 00:00:00 | Level 1 - Online 9 Oak Rd | Cromwell | 6416 | 8.4 | Solar | PV | 2009-12-18 00:00:00 | Level 1 - Online 32 Cat Swamp Rd | Woodbury | 6798 | 6.7 | Solar | PV | 2007-12-26 00:00:00 | Level 1 - Online 37 Bennett Circle | Voluntown | 6384 | 1.26 | Solar | PV | 2009-05-04 00:00:00 | Level 1 - Online 54 Pembroke Road | Darien | 6820 | 3 | Solar | PV | 2009-11-30 00:00:00 | Level 1 - Online 24 Bindloss Rd. | Mystic | 6355 | 4.8 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 71 Porchuck Road | Greenwich | 6831 | 3.3 | Solar | PV | 2008-02-06 00:00:00 | Level 1 - Online 4 Lynch Brook Ln | Ridgefield | 6877 | 5 | Solar | PV | 2008-09-25 00:00:00 | Level 1 - Online 42 Middle River Road | Danbury | 6811 | 6 | Solar | PV | 2009-12-30 00:00:00 | Level 1 - Online 9 Riverview Rd | Rocky Hill | 6067 | 4 | Solar | PV | 2009-11-02 00:00:00 | Level 1 - Online 100 Preston City Road | Voluntown | 6384 | 7 | Solar | PV | 2008-12-11 00:00:00 | Level 1 - Online 1 Glenwood Ct. | Gales Ferry | 6335 | 10 | Solar | PV | 2009-03-12 00:00:00 | Level 1 - Online 336 Ridgebury Road | Ridgefield | 6877 | 6.6 | Solar | PV | 2007-06-22 00:00:00 | Level 1 - Online 10 Valerie Ln | Danbury | 6811 | 8 | Solar | PV | 2010-02-08 00:00:00 | Level 1 - Online 62 Hillcrest Heights | Lebanon | 6249 | 10 | Solar | PV | 2009-06-24 00:00:00 | Level 1 - Online 204 Old-Norwich Rd. | Quaker Hill | 6375 | 10.4 | Solar | PV | 2008-04-30 00:00:00 | Level 1 - Online 6 Hidden Hill Road | Westport | 6880 | 5 | Natural Gas | Internal Combustion Engine | 2009-07-20 00:00:00 | Level 1 - Online 27 B Lane | Waterford | 6385 | 7 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 101 Watchaug Rd. | Somers | 6071 | 4 | Solar | PV | 2009-06-10 00:00:00 | Level 1 - Online 33 Brill Avenue | Waterford | 6385 | 7 | Solar | PV | 2009-04-30 00:00:00 | Level 1 - Online 110 Rowley Dr. | Stonington | 6378 | 10 | Solar | PV | 2008-09-29 00:00:00 | Level 1 - Online 13 River Crest Drive | Pawcatuck | 6379 | 10 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 15 John Todd Way | Redding | 6896 | 4 | Solar | PV | 2009-02-19 00:00:00 | Level 1 - Online 34 Apollo Rd. | Bethel | 6801 | 8 | Solar | PV | 2008-06-05 00:00:00 | Level 1 - Online 170 Brandy Hill Rd | Vernon | 6066 | 10 | Solar | PV | 2010-11-03 00:00:00 | Level 1 - Online 21 Graystone Lane | Lakeville | 6039 | 4 | Solar | PV | 2009-01-14 00:00:00 | Level 1 - Online 365 Grindstone Hill Rd. | North Stonington | 6359 | 6.6 | Solar | PV | 2007-12-26 00:00:00 | Level 1 - Online 143 Geer Mountain Road | South Kent | 6785 | 5 | Solar | PV | 2008-08-12 00:00:00 | Level 1 - Online 371 Quaker Farms Road | Oxford | 6478 | 7 | Solar | PV | 2009-04-06 00:00:00 | Level 1 - Online 54 Cooper Hill Road | Ridgefield | 6877 | 3.3 | Solar | PV | 2008-02-13 00:00:00 | Level 1 - Online 65 Village Circle | Naugatuck | 6770 | 5 | Solar | PV | 2009-09-11 00:00:00 | Level 1 - Online 24 Carroll Street | Stamford | 6907 | 5 | Solar | PV | 2009-05-06 00:00:00 | Level 1 - Online 49 Middle River Rd | Danbury | 6810 | 8 | Solar | PV | 2009-01-08 00:00:00 | Level 1 - Online 14 Hinckley Road | New Preston | 6777 | 4 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 51 Fieldstone Dr. | Mansfield | 6250 | 2.7 | Solar | PV | 2007-12-17 00:00:00 | Level 1 - Online 139 Schroback Road | Plymouth | 6782 | 8 | Solar | PV | 2009-06-10 00:00:00 | Level 1 - Online 54 Chriswood Terrace | Ledyard | 6339 | 10 | Solar | PV | 2009-04-07 00:00:00 | Level 1 - Online 58 Carriage Hill Drive | Newington | 6111 | 8 | Solar | PV | 2009-12-14 00:00:00 | Level 1 - Online 185 Fitch Hill Road | Uncasville | 6382 | 7 | Solar | PV | 2009-10-08 00:00:00 | Level 1 - Online 149 Thunder Lake Road | Wilton | 6897 | 7 | Solar | PV | 2008-09-18 00:00:00 | Level 1 - Online 181 Long Ridge Road | Danbury | 6810 | 4 | Solar | PV | 2009-04-01 00:00:00 | Level 1 - Online 100 Plumtrees Road | Bethel | 6801 | 10 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 6 Pine Woods Road | North Stonington | 6359 | 4 | Solar | PV | 2008-08-11 00:00:00 | Level 1 - Online 13 Judd Road | Terryville | 6786 | 10 | Solar | PV | 2010-03-23 00:00:00 | Level 1 - Online 11 Pheasant Lane | Monroe | 6468 | 5.1 | Solar | PV | 2007-08-02 00:00:00 | Level 1 - Online 141 Boston Hill Rd. | Andover | 6232 | 6 | Solar | PV | 2007-03-29 00:00:00 | Level 1 - Online 301 Chaffinch Island Road | Guilford | 6437 | 5 | Solar | PV | 2008-06-16 00:00:00 | Level 1 - Online 765 Hartford Tpke | Vernon | 6066 | 6 | Solar | PV | 2009-05-22 00:00:00 | Level 1 - Online 13 Charlene Dr | Naugatuck | 6770 | 5 | Solar | PV | 2009-01-09 00:00:00 | Level 1 - Online 51 Malibu Road | Stamford | 6803 | 5.3 | Solar | PV | 2009-12-18 00:00:00 | Level 1 - Online 190 White Sail Drive | Southington | 6489 | 4 | Solar | PV | 2007-07-27 00:00:00 | Level 1 - Online 12 Meadowlark Lane | Stonington | 6378 | 4 | Solar | PV | 2009-01-14 00:00:00 | Level 1 - Online 93 Adella St | Naugatuck | 6770 | 6 | Solar | PV | 2010-11-09 00:00:00 | Level 1 - Online 9 Witherell Drive | Greenwich | 6831 | 3.3 | Solar | PV | 2007-11-29 00:00:00 | Level 1 - Online 122 Pepperidge Road | Portland | 6480 | 10 | Solar | PV | 2009-06-23 00:00:00 | Level 1 - Online 263 Jonathan Trumbull Hwy | Columbia | 6237 | 7 | Solar | PV | 2009-01-19 00:00:00 | Level 1 - Online 293 Milton Road | Litchfield | 6759 | 3 | Solar | PV | 2008-05-28 00:00:00 | Level 1 - Online 632 Pequot Avenue | New London | 6320 | 11 | Solar | PV | 2009-03-06 00:00:00 | Level 1 - Online 7 Sunset Road | Gales Ferry | 6335 | 3 | Solar | PV | 2009-03-17 00:00:00 | Level 1 - Online 27 Lake Street | Unionville | 6085 | 6 | Solar | PV | 2008-08-29 00:00:00 | Level 1 - Online 609 Sterling Road | Sterling | 06377-2127 | 3.7 | Wind | Wind Turbine | 2008-07-07 00:00:00 | Level 1 - Online 280 Durham Rd. | Guilford | 6437 | 7 | Solar | PV | 2008-02-07 00:00:00 | Level 1 - Online 48 Clifton Avenue | Waterbury | 6710 | 6 | Solar | PV | 2010-04-27 00:00:00 | Level 1 - Online 256 Bantom Lake Road | Morris | 6763 | 5 | Solar | PV | 2007-11-02 00:00:00 | Level 1 - Online 27 Mansfield Ave | Darien | 6820 | 10 | Solar | PV | 2009-12-30 00:00:00 | Level 1 - Online 16 Welwyn Road | Riverside | 6878 | 3 | Solar | PV | 2009-02-19 00:00:00 | Level 1 - Online 14 Wallace Rd | Branford | 6405 | 4 | Solar | PV | 2009-09-22 00:00:00 | Level 1 - Online 116 Woodmere Rd. | Stamford | 6905 | 2.7 | Solar | PV | 2009-04-28 00:00:00 | Level 1 - Online 190 Brimfield Road | Wethersfield | 6109 | 5.1 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 76 Congress Drive | Hebron | 6248 | 6.8 | Solar | PV | 2010-03-25 00:00:00 | Level 1 - Online 1 Ryan Drive | Ellington | 6029 | 10 | Solar | PV | 2010-02-12 00:00:00 | Level 1 - Online 107 Blair Road | Willington | 6279 | 7 | Solar | PV | 2009-05-19 00:00:00 | Level 1 - Online 7 Bishop Circle | Sandy Hook | 6482 | 5.3 | Solar | PV | 2009-07-02 00:00:00 | Level 1 - Online 58 Baldwin Hill Rd | Litchfield | 6759 | 9.6 | Solar | PV | 2009-10-14 00:00:00 | Level 1 - Online 36 Brook Dr. | Simsbury | 6070 | 5.2 | Solar | PV | 2007-07-25 00:00:00 | Level 1 - Online 150 Lake Road | Andover | 6232 | 3.6 | Solar | PV | 2008-02-26 00:00:00 | Level 1 - Online 334 Grindstone Hill Rd. | North Stonington | 6359 | 10 | Solar | PV | 2008-06-20 00:00:00 | Level 1 - Online 211 East Shore Road | Morris | 6763 | 8 | Solar | PV | 2009-10-26 00:00:00 | Level 1 - Online 39 Bonnie Vue Lane | New Milford | 6776 | 6 | Solar | PV | 2008-06-10 00:00:00 | Level 1 - Online 34 Ludwig Rd | Ellington | 6029 | 6 | Solar | PV | 2007-06-28 00:00:00 | Level 1 - Online 3 Jacob Lane | Killingworth | 6419 | 10 | Solar | PV | 2008-09-03 00:00:00 | Level 1 - Online 534 Rte 169 | Woodstock | 6281 | 10 | Solar | PV | 2009-04-03 00:00:00 | Level 1 - Online 36 Russet Dr. | Guilford | 6437 | 5.2 | Solar | PV | 2007-10-11 00:00:00 | Level 1 - Online 174 Mudge Pond Rd. | Sharon | 6069 | 10 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 9 Lake Rd | Woodbury | 6798 | 8 | Solar | PV | 2009-12-04 00:00:00 | Level 1 - Online 21 Newcomb Road | Litchfield | 6756 | 7 | Solar | PV | 2009-10-29 00:00:00 | Level 1 - Online 191 Popple Swamp Road | Washington Depot | 6794 | 7 | Solar | PV | 2009-12-24 00:00:00 | Level 1 - Online 71 Waterside Lane | West Hartford | 6105 | 9 | Solar | PV | 2009-02-06 00:00:00 | Level 1 - Online 102 Davenport Road | Roxbury | 6783 | 4 | Solar | PV | 2009-08-10 00:00:00 | Level 1 - Online 789 Hill Road | Harwinton | 6791 | 5 | Solar | PV | 2009-03-16 00:00:00 | Level 1 - Online 560 N. Main St. | Stonington | 6378 | 6 | Solar | PV | 2008-09-29 00:00:00 | Level 1 - Online 192 Wagher Rd. | North Grosvenordale | 6255 | 5 | Solar | PV | 2008-08-29 00:00:00 | Level 1 - Online 278 Stamford Avenue | Stamford | 6902 | 12 | Solar | PV | 2009-01-26 00:00:00 | Level 1 - Online 20 Gorham Avenue | Westport | 6880 | 5 | Solar | PV | 2009-02-10 00:00:00 | Level 1 - Online 12 Linda CT. | Preston | 6365 | 10 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 34 Spring Lake Road | Sherman | 6784 | 5 | Solar | PV | 2009-05-05 00:00:00 | Level 1 - Online 41 Day Street | Granby | 6035 | 6 | Solar | PV | 2009-11-03 00:00:00 | Level 1 - Online 212 Deans Mill Road | Stonington | 6378 | 10 | Solar | PV | 2009-10-01 00:00:00 | Level 1 - Online 21 Tower Hill Rd | Deep River | 6417 | 10 | Solar | PV | 2009-04-13 00:00:00 | Level 1 - Online 61 Walnut Hill Rd | East Lyme | 6333 | 6 | Solar | PV | 2007-11-06 00:00:00 | Level 1 - Online 114 Overbrook Drive | Vernon | 6066 | 2 | Solar | PV | 2009-01-26 00:00:00 | Level 1 - Online 55 Harmony Hill Rd | Harwinton | 6791 | 8 | Solar | PV | 2007-08-02 00:00:00 | Level 1 - Online 88 Palmer Neck Rd | Pawcatuck | 6379 | 5 | Solar | PV | 2009-05-08 00:00:00 | Level 1 - Online 36 Stephanie Lane | South Windsor | 6074 | 5.2 | Solar | PV | 2007-03-22 00:00:00 | Level 1 - Online 13 West Ridge Rd | New Fairfield | 6812 | 4 | Solar | PV | 2008-09-24 00:00:00 | Level 1 - Online 226 Middlesex Ave | Chester | 6412 | 12.4 | Solar | PV | 2007-12-06 00:00:00 | Level 1 - Online 65 Whisconier Road | Brookfield | 6804 | 7 | Solar | PV | 2009-11-11 00:00:00 | Level 1 - Online 10 Rachel Lane | Voluntown | 6384 | 7 | Solar | PV | 2009-08-10 00:00:00 | Level 1 - Online 871 Hopeville Road | Griswold | 6351 | 5 | Solar | PV | 2008-09-29 00:00:00 | Level 1 - Online 54 Scudder Road | Newtown | 6470 | 5 | Solar | PV | 2009-04-15 00:00:00 | Level 1 - Online 56 Perkins Road | Litchfield | 6759 | 5 | Solar | PV | 2008-08-12 00:00:00 | Level 1 - Online 370 Saw Mill Rd | Guilford | 6437 | 7 | Solar | PV | 2009-07-29 00:00:00 | Level 1 - Online 182 Thompson Hill Rd. | Thompson | 6255 | 9.45 | Solar | PV | 2007-09-11 00:00:00 | Level 1 - Online 28 Pellegrino Rd. | Stonington | 6378 | 5 | Solar | PV | 2008-01-10 00:00:00 | Level 1 - Online 10 Babcock Road | East Haddam | 6423 | 4 | Solar | PV | 2008-04-29 00:00:00 | Level 1 - Online 510 Parum Rd | Colchester | 6415 | 9.88 | Solar | PV | 2009-10-21 00:00:00 | Level 1 - Online 241 Clark Ave | Branford | 6405 | 7 | Solar | PV | 2009-06-17 00:00:00 | Level 1 - Online 725 Breakneck Hill Road | Middlebury | 6762 | 10 | Solar | PV | 2009-11-16 00:00:00 | Level 1 - Online 380 South St | Roxbury | 6783 | 8 | Solar | PV | 2009-10-01 00:00:00 | Level 1 - Online 125 Florida Road | Ridgefield | 6877 | 5 | Natural Gas | Internal Combustion Engine | 2008-03-18 00:00:00 | Level 1 - Online 294 Woodchuck Lane | Harwinton | 6791 | 3.3 | Solar | PV | 2007-11-06 00:00:00 | Level 1 - Online 25 Oconnell Rd Ext. | East Haddam | 6415 | 7 | Solar | PV | 2009-04-14 00:00:00 | Level 1 - Online 600 Beach Pond Road | Voluntown | 6384 | 8.1 | Solar | PV | 2009-02-27 00:00:00 | Level 1 - Online 139 Kent Lane | South Windsor | 6074 | 9.6 | Solar | PV | 2010-02-12 00:00:00 | Level 1 - Online 87 Hewitt Road | Mystic | 6356 | 7 | Solar | PV | 2009-07-28 00:00:00 | Level 1 - Online 189 Salmon Kill Road | Lakeville | 6039 | 9 | Solar | PV | 2010-01-28 00:00:00 | Level 1 - Online 82 Wildwood Rd | West Simsbury | 6092 | 6 | Solar | PV | 2007-10-17 00:00:00 | Level 1 - Online 122 Seabury Road | Lebanon | 6249 | 10 | Solar | PV | 2009-11-09 00:00:00 | Level 1 - Online 51 Angeli Court | Kensington | 6037 | 4.2 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 106 Rockwell Road | Bethel | 6801 | 10 | Solar | PV | 2009-03-27 00:00:00 | Level 1 - Online 166 North Maple St. | Enfield | 6082 | 5.3 | Solar | PV | 2009-12-14 00:00:00 | Level 1 - Online 347 Scantic Road | East Windsor | 6088 | 11.4 | Solar | PV | 2009-12-16 00:00:00 | Level 1 - Online 93a Tolland Avenue | Stafford Springs | 6076 | 4 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 41 North Bedlam Rd | Chaplin | 6235 | 6 | Solar | PV | 2008-12-12 00:00:00 | Level 1 - Online 311 Old Mill Road | Middletown | 6457 | 7 | Solar | PV | 2008-06-10 00:00:00 | Level 1 - Online 7 Reeds Gap Road | Middlefield | 6455 | 7 | Solar | PV | 2009-03-16 00:00:00 | Level 1 - Online 26 Lancaster Road | Cromwell | 6416 | 10 | Solar | PV | 2008-10-31 00:00:00 | Level 1 - Online 107 Porter St. | Manchester | 6040 | 3 | Solar | PV | 2009-07-15 00:00:00 | Level 1 - Online 281 Simsbury Road | West Granby | 6090 | 3 | Solar | PV | 2010-02-03 00:00:00 | Level 1 - Online 37 Sheffield Ln | Madison | 6443 | 8 | Solar | PV | 2008-09-12 00:00:00 | Level 1 - Online 122 Sterling City Road | Lyme | 6371 | 6.5 | Solar | PV | 2009-02-12 00:00:00 | Level 1 - Online 28 Oleary Road | Thompson | 6277 | 10 | Solar | PV | 2010-02-18 00:00:00 | Level 1 - Online 26 Scott Rd | Oxford | 6478 | 6 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 595 Mather St | Suffield | 6072 | 6.3 | Solar | PV | 2009-12-22 00:00:00 | Level 1 - Online 19 Laurel Glen Drive | East Hampton | 6424 | 6 | Solar | PV | 2008-05-02 00:00:00 | Level 1 - Online 179 Cooper Road | Bridgewater | 6752 | 8 | Solar | PV | 2007-10-24 00:00:00 | Level 1 - Online 118 Clark Hill Rd | East Hampton | 6424 | 10 | Solar | PV | 2009-11-09 00:00:00 | Level 1 - Online 500 Skilton Road | Watertown | 6795 | 3 | Solar | PV | 2008-05-05 00:00:00 | Level 1 - Online 26 Pleasant Point Rd. | Branford | 6405 | 6 | Solar | PV | 2008-05-01 00:00:00 | Level 1 - Online 173 Cole Lane | Kensington | 6037 | 3 | Solar | PV | 2010-01-20 00:00:00 | Level 1 - Online 795 Stafford Rd. | Storrs | 6268 | 5.1 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 6 Lantern Hill Rd. | Westport | 6880 | 5.2 | Solar | PV | 2007-05-11 00:00:00 | Level 1 - Online 30 Canton Springs Road | Canton | 6019 | 5 | Solar | PV | 2009-05-21 00:00:00 | Level 1 - Online 75 Wake Robin Lane | Harwinton | 6791 | 7 | Solar | PV | 2008-08-04 00:00:00 | Level 1 - Online 184R Ashford Center Road | Ashford | 6278 | 8.1 | Solar | PV | 2009-05-04 00:00:00 | Level 1 - Online 853 Prospect Ave | West Hartford | 6105 | 6 | Solar | PV | 2009-12-10 00:00:00 | Level 1 - Online 17 Chaffeeville Rd. | Mansfield Ctr | 6250 | 8 | Solar | PV | 2010-02-02 00:00:00 | Level 1 - Online 34 Old Bethel Road | Griswold | 6351 | 6 | Solar | PV | 2009-12-03 00:00:00 | Level 1 - Online 157 Roseville Rd | Westport | 6880 | 3 | Solar | PV | 2010-06-08 00:00:00 | Level 1 - Online 103 Currituck Road | Newtown | 6470 | 5.6 | Solar | PV | 2008-10-27 00:00:00 | Level 1 - Online 774 Old Colchester Road | Uncasville | 6382 | 8.4 | Solar | PV | 2007-11-02 00:00:00 | Level 1 - Online 10 Drummers Trail | Old Saybrook | 6475 | 4.8 | Wind | Wind Turbine | 2009-04-15 00:00:00 | Level 1 - Online 20 River Head Lane | East Lyme | 6333 | 6.7 | Solar | PV | 2008-06-12 00:00:00 | Level 1 - Online 18 Byfield Lane | Greenwich | 6880 | 5.5 | Solar | PV | 2008-10-15 00:00:00 | Level 1 - Online 1249 Hill St. | Suffield | 6078 | 10 | Solar | PV | 2009-10-30 00:00:00 | Level 1 - Online 38 Hayden St. | Willimantic | 6226 | 4 | Solar | PV | 2010-02-01 00:00:00 | Level 1 - Online 19 Remington Street | Suffield | 6078 | 5 | Solar | PV | 2009-11-04 00:00:00 | Level 1 - Online 69 Garret Road | Canton | 6019 | 9 | Solar | PV | 2009-02-27 00:00:00 | Level 1 - Online 6 Littlefield Drive | Old Lyme | 6371 | 2.3 | Solar | PV | 2007-12-18 00:00:00 | Level 1 - Online 15 Bellewood Avenue | Waterbury | 6705 | 2.1 | Solar | PV | 2007-09-21 00:00:00 | Level 1 - Online 3 Mel Road | Plainville | 6062 | 7 | Solar | PV | 2010-02-09 00:00:00 | Level 1 - Online 61 Eastgate Drive | Cheshire | 6410 | 3 | Solar | PV | 2008-08-15 00:00:00 | Level 1 - Online 187 West Side Road | Goshen | 6756 | 7 | Solar | PV | 2009-07-17 00:00:00 | Level 1 - Online 2 Centennial Drive | Danbury | 6811 | 6 | Solar | PV | 2010-04-19 00:00:00 | Level 1 - Online 188 Brushy Hill Road | Danbury | 6810 | 8 | Solar | PV | 2008-12-15 00:00:00 | Level 1 - Online 155 Lambtown Rd. | Ledyard | 6339 | 8 | Solar | PV | 2007-08-21 00:00:00 | Level 1 - Online 32 Oak Ridge Dr. | Brooklyn | 6234 | 5.1 | Solar | PV | 2007-12-31 00:00:00 | Level 1 - Online 186 Flat Rock Road | Cornwall Brg | 6754 | 10 | Solar | PV | 2009-01-15 00:00:00 | Level 1 - Online 59 South Ellsworth Road | Sharon | 6069 | 5 | Solar | PV | 2009-01-05 00:00:00 | Level 1 - Online 478 Cornwall Bridge Road | Sharon | 6069 | 5 | Solar | PV | 2009-05-14 00:00:00 | Level 1 - Online 47 Spencer Brook Road | New Hartford | 6057 | 6 | Solar | PV | 2010-03-03 00:00:00 | Level 1 - Online 8 Halls Rd. | Westbrook | 6498 | 7 | Solar | PV | 2009-01-08 00:00:00 | Level 1 - Online 1 Powderhorn Hill | Brookfield | 6804 | 8 | Solar | PV | 2009-04-17 00:00:00 | Level 1 - Online 7 Oak Glen Hill Rd | Oxford | 6478 | 10 | Solar | PV | 2009-07-16 00:00:00 | Level 1 - Online 314 Kate Downing Rd | Plainfield | 6374 | 5.2 | Solar | PV | 2007-08-22 00:00:00 | Level 1 - Online 39 Case Street | Canton | 6019 | 3 | Solar | PV | 2010-05-12 00:00:00 | Level 1 - Online 19 Shady Brook Road Ext | New Hartford | 6057 | 7 | Solar | PV | 2010-01-08 00:00:00 | Level 1 - Online 157 Santa Maria Dr | Torrington | 6790 | 3 | Solar | PV | 2009-02-24 00:00:00 | Level 1 - Online 4 Sears Road | Stafford Spgs | 6075 | 4 | Solar | PV | 2008-08-12 00:00:00 | Level 1 - Online 1397 South St. | Coventry | 6238 | 5 | Solar | PV | 2009-01-07 00:00:00 | Level 1 - Online 336 Walnut St. | Putnam | 6260 | 4 | Solar | PV | 2008-09-04 00:00:00 | Level 1 - Online 8 Ware Rd. | Ballouville | 6233 | 5 | Solar | PV | 2008-02-21 00:00:00 | Level 1 - Online 476 Gardner Street | Manchester | 6040 | 4 | Solar | PV | 2008-07-24 00:00:00 | Level 1 - Online 180 Walsh Avenue | Newington | 6111 | 4 | Solar | PV | 2007-06-22 00:00:00 | Level 1 - Online 53 McClimon Rd. | Preston | 6365 | 7 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 302 Bartholomew Hill Rd | Goshen | 6038 | 7 | Solar | PV | 2009-06-18 00:00:00 | Level 1 - Online 7 Sullivan Farms Road | Broad Brook | 6016 | 5 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 279 Rattlesnake Ledge Road | Salem | 6420 | 7 | Solar | PV | 2008-12-08 00:00:00 | Level 1 - Online 8 Reutemann Road | North Stonington | 6379 | 5.46 | Solar | PV | 2007-04-30 00:00:00 | Level 1 - Online 3 Stone Bridge Trail | Sandy Hook | 6482 | 8 | Solar | PV | 2009-12-22 00:00:00 | Level 1 - Online 48 Taylor Rd | Barkhamsted | 6063 | 6 | Solar | PV | 2009-09-02 00:00:00 | Level 1 - Online 204 Carter Lane | Southington | 6489 | 4 | Solar | PV | 2009-06-09 00:00:00 | Level 1 - Online 116 Prospect Hill Rd | Colchester | 6415 | 9.66 | Solar | PV | 2009-11-12 00:00:00 | Level 1 - Online 12 Avebury Berwick | Ledyard | 6339 | 7 | Solar | PV | 2009-09-03 00:00:00 | Level 1 - Online 387 Kenyon Road | Lakeside | 6758 | 10 | Solar | PV | 2010-04-06 00:00:00 | Level 1 - Online 41 Windmill Road | Ellington | 6029 | 10 | Solar | PV | 2009-08-05 00:00:00 | Level 1 - Online 134 North Madison Rd. | Guilford | 6437 | 4 | Solar | PV | 2008-09-15 00:00:00 | Level 1 - Online 122 E. HEBRON TPKE. | Lebanon | 6249 | 8.4 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 359 Maple Ave | Cheshire | 6410 | 4 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 100 Brewster Road | Griswold | 6351 | 11.5 | Solar | PV | 2010-03-16 00:00:00 | Level 1 - Online 6 Hamilton Way | Farmington | 6032 | 7.02 | Solar | PV | 2009-05-08 00:00:00 | Level 1 - Online 109 Mell Rd. | Lisbon | 6351 | 10 | Solar | PV | 2009-01-20 00:00:00 | Level 1 - Online 26 Honey Lane | Sandy Hook | 6482 | 8 | Solar | PV | 2010-04-16 00:00:00 | Level 1 - Online 10 Valley Road | Cornwall | 6796 | 10 | Solar | PV | 2008-10-15 00:00:00 | Level 1 - Online 78 South Brook Road | Hampton | 6247 | 7.5 | Solar | PV | 2009-11-18 00:00:00 | Level 1 - Online 93 Ivan Hill St | Willimantic | 6226 | 8 | Solar | PV | 2009-06-12 00:00:00 | Level 1 - Online 57 Griswold Road | Ellington | 6029 | 6.8 | Solar | PV | 2010-04-26 00:00:00 | Level 1 - Online 55 Shinar Mountain Rd | Washington | 6794 | 10 | Solar | PV | 2007-11-21 00:00:00 | Level 1 - Online 17 Woodstone Road | Ridgefield | 6877 | 8 | Solar | PV | 2010-02-25 00:00:00 | Level 1 - Online 15 Rhodes Road | Rocky Hill | 6067 | 10 | Solar | PV | 2008-08-28 00:00:00 | Level 1 - Online 228 Maple Avenue | Durham | 6422 | 7 | Solar | PV | 2007-11-09 00:00:00 | Level 1 - Online 401 Shewville Rd. | Ledyard | 6339 | 1.8 | Solar | PV | 2010-01-18 00:00:00 | Level 1 - Online 540 Burr Road | Southbury | 6488 | 3 | Solar | PV | 2008-06-23 00:00:00 | Level 1 - Online 101 Middle Road | Preston | 6363 | 10 | Solar | PV | 2008-12-16 00:00:00 | Level 1 - Online 2 Whittlemore Place | Westbrook | 6498 | 7 | Solar | PV | 2009-07-21 00:00:00 | Level 1 - Online 530 Skiff Mountain Road | Kent | 6757 | 4 | Solar | PV | 2009-09-30 00:00:00 | Level 1 - Online 30 White St. | Waterbury | 6710 | 4 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 421 Warrenville Rd. | Mansfield Ctr | 6250 | 3 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 85 Turkey Hill Road | Westport | 6880 | 6 | Solar | PV | 2008-02-26 00:00:00 | Level 1 - Online 5 Pondview Drive | Cromwell | 6416 | 7 | Solar | PV | 2009-12-23 00:00:00 | Level 1 - Online 173 Park St. | New Canaan | 6840 | 5 | Solar | PV | 2009-08-06 00:00:00 | Level 1 - Online 67 Coles Avenue | Newington | 6131 | 8 | Solar | PV | 2010-01-25 00:00:00 | Level 1 - Online 1143 Main Street | South Glastonbury | 6073 | 2.1 | Solar | PV | 2007-09-05 00:00:00 | Level 1 - Online 17 Stiles Rd | Broad Brook | 6016 | 3.8 | Solar | PV | 2007-12-31 00:00:00 | Level 1 - Online 596 Bethel Road | Griswold | 6351 | 7 | Solar | PV | 2010-04-30 00:00:00 | Level 1 - Online 200 Bulkley Hill Rd | Colchester | 6415 | 6 | Solar | PV | 2009-11-19 00:00:00 | Level 1 - Online 17 Stony Point Road | Westport | 6880 | 10 | Solar | PV | 2009-03-27 00:00:00 | Level 1 - Online 173 Shore Road | Waterford | 6385 | 13 | Solar | PV | 2009-10-16 00:00:00 | Level 1 - Online 28 Carriage Lane | Marlborough | 6447 | 10 | Solar | PV | 2009-07-17 00:00:00 | Level 1 - Online 22A Bigos Road | Litchfield | 6750 | 10 | Solar | PV | 2008-08-19 00:00:00 | Level 1 - Online 11 Overhill Road | Ellington | 6029 | 7 | Solar | PV | 2010-02-03 00:00:00 | Level 1 - Online 10 Ridge Rd. | Ellington | 6029 | 5 | Solar | PV | 2009-02-27 00:00:00 | Level 1 - Online 6 Morehouse Drive | Darien | 6820 | 5 | Solar | PV | 2007-10-09 00:00:00 | Level 1 - Online 12 East Street | Oxford | 06478-1917 | 4.9 | Solar | PV | 2010-07-09 00:00:00 | Level 1 - Online 22 Hopson Avenue | Branford | 6405 | 4 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 32 Bartholomew Hill Road | Goshen | 6756 | 6 | Solar | PV | 2010-04-27 00:00:00 | Level 1 - Online 64 Killingworth Tpke | Clinton | 6413 | 7 | Solar | PV | 2009-01-09 00:00:00 | Level 1 - Online 152 Cedar Mountain Rd. | Thomaston | 6787 | 3 | Solar | PV | 2009-12-22 00:00:00 | Level 1 - Online 197 Strawberry Hill Avenue | Stamford | 6902 | 3.3 | Solar | PV | 2007-04-11 00:00:00 | Level 1 - Online 70 Hidden Lake Road | Higganum | 6441 | 6 | Solar | PV | 2009-05-27 00:00:00 | Level 1 - Online 339 Mansfield City Rd. | Mansfield | 6250 | 6 | Solar | PV | 2010-05-06 00:00:00 | Level 1 - Online 36 Niantic River Road | Waterford | 6385 | 8 | Solar | PV | 2010-10-21 00:00:00 | Level 1 - Online 33 Summit Road | Storrs | 6268 | 2 | Solar | PV | 2008-12-08 00:00:00 | Level 1 - Online 497 Bebbington Road, | Ashford | 6278 | 7 | Solar | PV | 2010-04-28 00:00:00 | Level 1 - Online 93 Bushnell Road | Baltic | 6330 | 6 | Solar | PV | 2009-07-08 00:00:00 | Level 1 - Online 283 Babcock Hill Road | Lebanon | 6249 | 5.2 | Solar | PV | 2007-02-05 00:00:00 | Level 1 - Online 8 Kelly Drive | Enfield | 6082 | 7 | Solar | PV | 2010-08-13 00:00:00 | Level 1 - Online 49 Brigham Road | Coventry | 6238 | 8 | Solar | PV | 2010-03-25 00:00:00 | Level 1 - Online 32 Bainbridge Road | West Hartford | 6119 | 4.5 | Solar | PV | 2011-07-26 00:00:00 | Level 1 - Online 16 Valley Field Road South | Sandy Hook | 6482 | 7 | Solar | PV | 2010-01-14 00:00:00 | Level 1 - Online 16 B Valley Field Road South | Sandy Hook | 6482 | 4 | Solar | PV | 2010-02-01 00:00:00 | Level 1 - Online 51 Harvey Rd | Durham | 6422 | 6 | Solar | PV | 2010-05-19 00:00:00 | Level 1 - Online 6 Glen Pines Lane | Norwalk | 6850 | 5.3 | Solar | PV | 2010-05-28 00:00:00 | Level 1 - Online 231 Farm Meadow Ln | Cheshire | 6410 | 8 | Solar | PV | 2010-04-26 00:00:00 | Level 1 - Online 90 OAK FARM DRIVE | Colchester | 6415 | 7 | Solar | PV | 2010-02-11 00:00:00 | Level 1 - Online 62 Gorton Ave | Old Lyme | 6371 | 6 | Solar | PV | 2010-06-07 00:00:00 | Level 1 - Online 200 Babcock Road | Tolland | 06084-2703 | 7.68 | Solar | PV | 2010-06-25 00:00:00 | Level 1 - Online 12 Fransworth Street | New London | 6320 | 4 | Solar | PV | 2010-06-21 00:00:00 | Level 1 - Online 17 N. Cone Road | East Hampton | 6424 | 9.8 | Solar | PV | 2010-05-07 00:00:00 | Level 1 - Online 89 Pine Street | Columbia | 6237 | 5.3 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 11 Shailor Hill Road | Colchester | 06415-2510 | 10.58 | Solar | PV | 2010-09-10 00:00:00 | Level 1 - Online 109 OAK FARM DRIVE | Colchester | 6415 | 5.3 | Solar | PV | 2010-03-01 00:00:00 | Level 1 - Online 106 Newtown Turnpike | Weston | 6883 | 8.33 | Solar | PV | 2010-06-14 00:00:00 | Level 1 - Online 37 Elihu Drive | Durham | 06422-1024 | 7.68 | Solar | PV | 2010-10-25 00:00:00 | Level 1 - Online 33 Foxtrail | Ledyard | 6338 | 3.5 | Wind | Wind Turbine | 2010-10-06 00:00:00 | Level 1 - Online 66 WILLIAMSBURG ROAD | Marlborough | 6447 | 10 | Solar | PV | 2010-05-19 00:00:00 | Level 1 - Online 223 Litchfield Turnpike | New Preston | 6777 | 8 | Solar | PV | 2010-05-13 00:00:00 | Level 1 - Online 232 Kent Road South | Cornwall Brg | 6754 | 7 | Solar | PV | 2010-10-07 00:00:00 | Level 1 - Online 204 Old Kelsey Pt Rd | Westbrook | 06498-2132 | 3 | Solar | PV | 2010-06-08 00:00:00 | Level 1 - Online 959 Essex Rd | Westbrook | 06498-1596 | 10 | Solar | PV | 2010-06-04 00:00:00 | Level 1 - Online 40 Green Hill Road, Right Apt. | Bethlehem | 6751 | 5 | Solar | PV | 2010-08-11 00:00:00 | Level 1 - Online 13 Young St | East Hampton | 6424 | 4 | Solar | PV | 2010-07-12 00:00:00 | Level 1 - Online 145 Pullen Ave. | Oakville | 6779 | 6 | Solar | PV | 2010-06-23 00:00:00 | Level 1 - Online 31 Berkshire Dr | Farmington | 6032 | 6 | Solar | PV | 2010-04-23 00:00:00 | Level 1 - Online 6 Washington Ridge Road | East Granby | 6026 | 10 | Solar | PV | 2010-07-21 00:00:00 | Level 1 - Online 35 Concord Street | West Hartford | 6119 | 4 | Solar | PV | 2010-08-27 00:00:00 | Level 1 - Online 16 Broad Hill Rd | West Granby | 6090 | 8 | Solar | PV | 2010-05-14 00:00:00 | Level 1 - Online 161 New Sweden Rd. | Woodstock | 6281 | 5 | Solar | PV | 2010-06-08 00:00:00 | Level 1 - Online 7 Highland Oak Dr | Ellington | 6929 | 8.3 | Solar | PV | 2010-05-10 00:00:00 | Level 1 - Online 81 W District Rd | Unionville | 6085 | 7 | Solar | PV | 2010-05-14 00:00:00 | Level 1 - Online 23 Sandy Brook Road | Colebrook | 6021 | 10 | Solar | PV | 2010-05-14 00:00:00 | Level 1 - Online 1676 Guerdat Road | Torrington | 6790 | 7.5 | Solar | PV | 2010-06-04 00:00:00 | Level 1 - Online 468 Wrights Crossing Rd. | Pomfret | 6259 | 7 | Solar | PV | 2010-07-29 00:00:00 | Level 1 - Online 90 Maple Ave | East Haddam | 6423 | 10 | Solar | PV | 2010-05-28 00:00:00 | Level 1 - Online 84 Maple Ave S | Westport | 6880 | 2.5 | Solar | PV | 2010-06-04 00:00:00 | Level 1 - Online 3 Devonshire La | Columbia | 6237 | 9.6 | Solar | PV | 2010-05-27 00:00:00 | Level 1 - Online 300F Maple Ave | Uncasville | 6382 | 8 | Solar | PV | 2010-06-30 00:00:00 | Level 1 - Online 295 Mark Rd. | Coventry | 6238 | 4 | Solar | PV | 2010-06-16 00:00:00 | Level 1 - Online 6 Chapman Ave. | Quaker Hill | 6375 | 7.5 | Solar | PV | 2010-09-03 00:00:00 | Level 1 - Online 106 Black Rock Tpke. | West Redding | 6896 | 7 | Solar | PV | 2010-11-12 00:00:00 | Level 1 - Online 18 Old King Highway | Hampton | 6247 | 3 | Solar | PV | 2010-09-16 00:00:00 | Level 1 - Online 67A Washburn Road | Canton | 6019 | 4 | Solar | PV | 2000-01-01 00:00:00 | Level 1 - Online 329 Long Hill St. | East Hartford | 6108 | 8 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 53 Spring Hill Ave. | Norwalk | 6850 | 6 | Solar | PV | 2010-08-12 00:00:00 | Level 1 - Online 18 Sixth Ave. | Branford | 6405 | 9 | Solar | PV | 2010-09-23 00:00:00 | Level 1 - Online 135 S. Farms Dr. | Manchester | 6040 | 8 | Solar | PV | 2010-07-28 00:00:00 | Level 1 - Online 229 Ridge Hill Rd | Oakdale | 6370 | 10 | Solar | PV | 2010-07-12 00:00:00 | Level 1 - Online 76 Spooner Hill Road | South Kent | 6785 | 7.5 | Solar | PV | 2010-09-10 00:00:00 | Level 1 - Online 115 Haley Road | Mystic | 6355 | 9 | Solar | PV | 2010-09-24 00:00:00 | Level 1 - Online 23 Sawmill Road | Burlington | 6013 | 6 | Solar | PV | 2010-08-12 00:00:00 | Level 1 - Online 217 Artillery Road | Middlebury | 6762 | 10 | Solar | PV | 2010-09-28 00:00:00 | Level 1 - Online 18 Sugar Hill Road | Salisbury | 6031 | 4 | Solar | PV | 2010-06-21 00:00:00 | Level 1 - Online 150 Valley Road | Cornwall | 6753 | 5 | Solar | PV | 2010-07-29 00:00:00 | Level 1 - Online 42 Granby Farms Road | Granby | 6035 | 10 | Solar | PV | 2010-09-09 00:00:00 | Level 1 - Online 8 Lilac Lane | Higganum | 6441 | 10 | Solar | PV | 2010-06-29 00:00:00 | Level 1 - Online 80 Harbor Road | Colchester | 6415 | 10 | Solar | PV | 2010-06-24 00:00:00 | Level 1 - Online 100 Portland Ave | Wilton | 6897 | 7 | Solar | PV | 2010-11-04 00:00:00 | Level 1 - Online 25 Amanda Lane | Danielson | 6239 | 6 | Solar | PV | 2010-11-23 00:00:00 | Level 1 - Online 88 Kildeer Lane | Suffield | 6078 | 8 | Solar | PV | 2010-10-20 00:00:00 | Level 1 - Online 55 Running Brook Dr | Killingworth | 6419 | 7.41 | Solar | PV | 2010-08-05 00:00:00 | Level 1 - Online 24 Marcardon Ave | Ridgefield | 6877 | 2.5 | Solar | PV | 2010-10-07 00:00:00 | Level 1 - Online 16 Doubling Rd | Greenwich | 6830 | 5 | Solar | PV | 2010-11-15 00:00:00 | Level 1 - Online 14 Wyncairne Dr. | East Granby | 6026 | 4 | Solar | PV | 2010-08-09 00:00:00 | Level 1 - Online 413 Sanford Road | Southbury | 6488 | 4 | Solar | PV | 2010-10-20 00:00:00 | Level 1 - Online 217 Crane Hollow Road | Bethlehem | 6751 | 5 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 24 Hazel Woods Drive | Woodbury | 6798 | 8 | Solar | PV | 2010-10-26 00:00:00 | Level 1 - Online 20 Birch Rd | New Fairfield | 6812 | 10.08 | Solar | PV | 2010-10-13 00:00:00 | Level 1 - Online 18 Mallard Lane | Clinton | 6413 | 7 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 168 Clark Lane | Waterford | 6385 | 10 | Solar | PV | 2010-08-16 00:00:00 | Level 1 - Online 231 Gillette Road | New Hartford | 06057-2811 | 2.28 | Solar | PV | 2011-01-27 00:00:00 | Level 1 - Online 436 Oxoboxo Dam Rd | Oakdale | 6370 | 8 | Solar | PV | 2011-02-24 00:00:00 | Level 1 - Online 3 Dorset Dr | New Milford | 6776 | 5 | Solar | PV | 2010-11-30 00:00:00 | Level 1 - Online 306 Pine Hill Rd. | Sterling | 6377 | 3.5 | Solar | PV | 2010-10-01 00:00:00 | Level 1 - Online 100 Curtiss Rd | New Preston | 6777 | 7 | Solar | PV | 2010-09-17 00:00:00 | Level 1 - Online 147 Pleasant Street | Windsor | 6095 | 6 | Solar | PV | 2010-11-23 00:00:00 | Level 1 - Online 185 Hanover Road | Scotland | 6330 | 2.5 | Solar | PV | 2010-09-16 00:00:00 | Level 1 - Online 346 Merriman Road | Windsor | 6095 | 5.3 | Solar | PV | 2010-12-02 00:00:00 | Level 1 - Online 119 Wheeler Road | Litchfield | 6759 | 7 | Solar | PV | 2011-01-05 00:00:00 | Level 1 - Online 26 Seven Hills Crossing | East Hampton | 6424 | 8 | Solar | PV | 2010-10-22 00:00:00 | Level 1 - Online 106 Sleepy Hollow Rd. | North Stonington | 6359 | 6 | Solar | PV | 2010-11-19 00:00:00 | Level 1 - Online 42 Hunting Ridge Rd. | Wilton | 6897 | 10 | Solar | PV | 2010-12-07 00:00:00 | Level 1 - Online 489 Pucker St. | Coventry | 6238 | 7.5 | Solar | PV | 2010-11-17 00:00:00 | Level 1 - Online 7 Meadow Ave. | Stonington | 6378 | 10 | Solar | PV | 2011-01-13 00:00:00 | Level 1 - Online 73 Nutmeg Rd. | Bristol | 6010 | 5 | Solar | PV | 2010-09-16 00:00:00 | Level 1 - Online 370 Kickhill Rd. | Lebanon | 6249 | 8 | Solar | PV | 2010-10-20 00:00:00 | Level 1 - Online 333 Park Road Ext | Middlebury | 6762 | 4.94 | Solar | PV | 2010-11-18 00:00:00 | Level 1 - Online 133 Pachaug River Drive | Griswold | 6351 | 10 | Solar | PV | 2010-12-29 00:00:00 | Level 1 - Online 1167 North Broad Street | Meriden | 6450 | 5.3 | Solar | PV | 2010-10-07 00:00:00 | Level 1 - Online 17 Christopher Rd. | East Hampton | 6424 | 4 | Solar | PV | 2010-10-21 00:00:00 | Level 1 - Online 176 Windham Road | Hampton | 6247 | 10 | Solar | PV | 2010-11-23 00:00:00 | Level 1 - Online 46 Glen Hill Rd | Wilton | 6897 | 7 | Solar | PV | 2011-01-13 00:00:00 | Level 1 - Online 35 West Hills | Avon | 6001 | 5 | Solar | PV | 2011-10-26 00:00:00 | Level 1 - Online 19 Pembroke Rd | Darien | 6820 | 7 | Solar | PV | 2010-10-25 00:00:00 | Level 1 - Online 22 Linden Point Rd | Branford | 6405 | 8 | Solar | PV | 2010-12-03 00:00:00 | Level 1 - Online 5 Fountain Head Road | Plymouth | 6786 | 7 | Solar | PV | 2010-11-24 00:00:00 | Level 1 - Online 72 Carriage Dr | Durham | 6422 | 9.45 | Solar | PV | 2010-10-22 00:00:00 | Level 1 - Online 332 Kent Rd. S | Cornwall Brg | 6754 | 10 | Solar | PV | 2011-01-20 00:00:00 | Level 1 - Online 3 Michaels Way | Oakdale | 6370 | 7.5 | Solar | PV | 2011-02-09 00:00:00 | Level 1 - Online 21 Carrington Dr. | Greenwich | 6831 | 7.5 | Solar | PV | 2011-03-24 00:00:00 | Level 1 - Online 100 Mott Lane | Moodus | 6469 | 8 | Solar | PV | 2010-11-09 00:00:00 | Level 1 - Online 141 Oak Farm Dr | Colchester | 6415 | 6.74 | Solar | PV | 2010-11-08 00:00:00 | Level 1 - Online 38 Canterbury Dr | Durham | 6422 | 10 | Solar | PV | 2010-12-20 00:00:00 | Level 1 - Online 19 Hearthstone Dr | Barkhamsted | 6063 | 5 | Solar | PV | 2011-06-13 00:00:00 | Level 1 - Online 14 Noyes Rd | Old Lyme | 6371 | 6 | Solar | PV | 2011-01-04 00:00:00 | Level 1 - Online 24 Cedar Meadow Rd | East Haddam | 6469 | 7 | Solar | PV | 2010-11-29 00:00:00 | Level 1 - Online 423 Haddam Quarter Rd | Durham | 6422 | 9.88 | Solar | PV | 2011-01-06 00:00:00 | Level 1 - Online 380 Kick Hill Rd | Lebanon | 6249 | 2 | Solar | PV | 2011-01-20 00:00:00 | Level 1 - Online 300 D Maple Ave. | Uncasville | 6382 | 8 | Solar | PV | 2010-12-07 00:00:00 | Level 1 - Online 24 D Rosemary Ln | Middlefield | 6455 | 3.83 | Solar | PV | 2011-03-01 00:00:00 | Level 1 - Online 33 Hampton Dr | Manchester | 6040 | 10 | Solar | PV | 2011-01-26 00:00:00 | Level 1 - Online 14 Holmes Road | Ellington | 06029-2932 | 7 | Solar | PV | 2010-12-21 00:00:00 | Level 1 - Online 612 Old Main Street | Rocky Hill | 6067 | 6.27 | Solar | PV | 2011-03-03 00:00:00 | Level 1 - Online 25 Hilltop Drive | Portland | 6480 | 6 | Solar | PV | 2010-12-22 00:00:00 | Level 1 - Online 181 Bacon Road | Roxbury | 6783 | 7 | Solar | PV | 2011-01-03 00:00:00 | Level 1 - Online 33 Ashford Road | Eastford | 6278 | 6 | Solar | PV | 2011-04-05 00:00:00 | Level 1 - Online 99 Noble Ave | Groton | 6340 | 5.1 | Solar | PV | 2010-12-21 00:00:00 | Level 1 - Online 706 Farmington Ave | New Britain | 6051 | 8 | Solar | PV | 2011-03-29 00:00:00 | Level 1 - Online 138 Housatonic River Road | Salisbury | 6068 | 9.5 | Solar | PV | 2011-06-27 00:00:00 | Level 1 - Online 6 Sage Lane | East Granby | 6026 | 6 | Solar | PV | 2011-01-17 00:00:00 | Level 1 - Online 14 West Cove Road | East Haddam | 6465 | 8.36 | Solar | PV | 2011-02-24 00:00:00 | Level 1 - Online 95 Middle Beach Road | Madison | 6475 | 15 | Solar | PV | 2011-04-07 00:00:00 | Level 1 - Online 119 Boardman Rd | East Haddam | 6423 | 9.12 | Solar | PV | 2011-04-15 00:00:00 | Level 1 - Online 20 Reed Rd. | Manchester | 6040 | 5 | Solar | PV | 2011-04-04 00:00:00 | Level 1 - Online 10 Oxford Dr. | Enfield | 6082 | 7.5 | Solar | PV | 2011-04-13 00:00:00 | Level 1 - Online 260 Beach Pond Rd. | Voluntown | 6384 | 10 | Solar | PV | 2011-03-29 00:00:00 | Level 1 - Online 16 Jeremiah Rd | Sandy Hook | 6482 | 10 | Solar | PV | 2011-07-26 00:00:00 | Level 1 - Online 13 Rose Lane | East Lyme | 6333 | 2 | Solar | PV | 2011-02-11 00:00:00 | Level 1 - Online 70 Johnsonville Rd | Moodus | 6469 | 4 | Solar | PV | 2011-03-03 00:00:00 | Level 1 - Online Lot 21R, 180 Cranberry Ln | Middletown | 6457 | 8 | Solar | PV | 2011-04-28 00:00:00 | Level 1 - Online 16 Sanfords Bridge | East Haddam | 6423 | 9.12 | Solar | PV | 2011-03-17 00:00:00 | Level 1 - Online 24 Sugar Hill Rd | Salisbury | 6068 | 5 | Solar | PV | 2011-05-02 00:00:00 | Level 1 - Online 68 Middle Rd | Preston | 6365 | 8 | Solar | PV | 2011-04-05 00:00:00 | Level 1 - Online 54 New Preston Hill Road | New Preston | 6777 | 7.5 | Solar | PV | 2011-04-12 00:00:00 | Level 1 - Online 83 Taine Mountain Rd | Burlington | 6013 | 7 | Solar | PV | 2011-06-29 00:00:00 | Level 1 - Online 165 Union Street | Deep River | 6417 | 4.94 | Solar | PV | 2011-05-05 00:00:00 | Level 1 - Online 88 Cedar Cliff Road | Riverside | 6878 | 10 | Natural Gas | Internal Combustion Engine | 2011-07-20 00:00:00 | Level 1 - Online 4 Beckwith Rd | Killingworth | 6419 | 10 | Solar | PV | 2011-10-12 00:00:00 | Level 1 - Online 25 Cadwell Pl | Branford | 6405 | 6 | Solar | PV | 2011-10-21 00:00:00 | Level 1 - Online 25 Lawson Rd | Bristol | 6010 | 1.5 | Solar | PV | 2011-05-25 00:00:00 | Level 1 - Online 2 Moser Dr | Rocky Hill | 06067-3725 | 5 | Solar | PV | 2011-06-23 00:00:00 | Level 1 - Online 31 Oak Hill Dr. | Niantic | 6357 | 5 | Solar | PV | 2011-07-05 00:00:00 | Level 1 - Online 49 Kelseytown Road | Clinton | 6413 | 7.56 | Solar | PV | 2011-06-21 00:00:00 | Level 1 - Online 27 Poinsettia Street | Middletown | 6457 | 5.13 | Solar | PV | 2011-06-08 00:00:00 | Level 1 - Online 752 Lakeside Rd | Southbury | 6488 | 6 | Solar | PV | 2011-08-01 00:00:00 | Level 1 - Online 11 Birch Ln | Ridgefield | 6877 | 7 | Solar | PV | 2011-11-18 00:00:00 | Level 1 - Online 40 Deanna Dr. | Griswold | 6351 | 10 | Solar | PV | 2011-08-18 00:00:00 | Level 1 - Online 76 Sturges Ridge Road | Wilton | 6897 | 4.83 | Solar | PV | 2011-09-22 00:00:00 | Level 1 - Online 9 Cleary Lane | Windsor | 6095 | 8 | Solar | PV | 2011-07-01 00:00:00 | Level 1 - Online 66 Howland Rd | Kent | 6757 | 5 | Solar | PV | 2011-07-27 00:00:00 | Level 1 - Online 42 Jacobson Farm Rd. | East Hampton | 6424 | 7 | Solar | PV | 2011-07-07 00:00:00 | Level 1 - Online 102 Earle St. | Hartford | 6120 | 4 | Solar | PV | 2011-08-08 00:00:00 | Level 1 - Online 110 Earle St., Floor 2 | Hartford | 6120 | 4 | Solar | PV | 2011-08-08 00:00:00 | Level 1 - Online 24 Town Street | Hadlyme | 6423 | 10 | Solar | PV | 2011-09-28 00:00:00 | Level 1 - Online 163 Bear Swamp Rd. | East Hampton | 6424 | 4 | Solar | PV | 2011-08-19 00:00:00 | Level 1 - Online 152 Chestnut Hill road | Stafford Springs | 6076 | 8.3 | Solar | PV | 2011-09-14 00:00:00 | Level 1 - Online 319 Scotland Road | Windham | 6280 | 18.8 | Solar | PV | 2012-03-16 00:00:00 | Level 1 - Online 743 Redding Rd | Redding | 6896 | 9.46 | Solar | PV | 2011-08-22 00:00:00 | Level 1 - Online 50 Knibloe Hill Rd. | Sharon | 6069 | 10 | Solar | PV | 2011-09-09 00:00:00 | Level 1 - Online 23 Putnam Park Rd | Bethel | 6801 | 3.78 | Solar | PV | 2012-02-02 00:00:00 | Level 1 - Online 284 Flanders Road | Bethlehem | 6751 | 3.61 | Solar | PV | 2011-10-24 00:00:00 | Level 1 - Online 51 Schalk Rd | Lebanon | 06249-1416 | 10 | Solar | PV | 2011-09-26 00:00:00 | Level 1 - Online 518 Route169 | Woodstock | 6281 | 4 | Solar | PV | 2011-12-02 00:00:00 | Level 1 - Online 53 Hydeville Road | Stafford Spgs | 6076 | 7 | Solar | PV | 2011-09-09 00:00:00 | Level 1 - Online 31 New Canaan Road | Wilton | 6897 | 2.73 | Solar | PV | 2011-09-22 00:00:00 | Level 1 - Online 114 Middlesex Ave | Chester | 06412-1224 | 7 | Solar | PV | 2012-01-09 00:00:00 | Level 1 - Online 97 Cemetery Road | Mansfield Ctr | 6250 | 4 | Solar | PV | 2011-09-26 00:00:00 | Level 1 - Online 629 Hampton Road | Pomfret Ctr | 6259 | 3.5 | Wind | Wind Turbine | 2011-11-16 00:00:00 | Level 1 - Online 1804 Old Waterbury Road | Cheshire | 6410 | 5.45 | Solar | PV | 2011-09-19 00:00:00 | Level 1 - Online 6 Circle Dr East | Danbury | 6811 | 10 | Solar | PV | 2012-01-16 00:00:00 | Level 1 - Online 72 Park Rd | Colchester | 6415 | 3 | Solar | PV | 2011-12-29 00:00:00 | Level 1 - Online 70 Gardner Rd | Voluntown | 6384 | 5.7 | Solar | PV | 2011-11-15 00:00:00 | Level 1 - Online 47 oak leaf drive | Colchester | 6415 | 5.8 | Solar | PV | 2011-12-02 00:00:00 | Level 1 - Online 35 Driscoll Drive | Uncasville | 6382 | 9.87 | Solar | PV | 2011-12-07 00:00:00 | Level 1 - Online 146 Daly Road | Hebron | 6248 | 4 | Solar | PV | 2011-12-14 00:00:00 | Level 1 - Online 60 Wood Rd | West Redding | 6896 | 10 | Solar | PV | 2012-01-24 00:00:00 | Level 1 - Online 756 Brayman Hollow Rd | Pomfret Ctr | 6259 | 5.16 | Solar | PV | 2012-01-23 00:00:00 | Level 1 - Online 31 Pautipaug Hill Road | North Franklin | 6254 | 10 | Solar | PV | 2012-01-16 00:00:00 | Level 1 - Online 261 Old Mount Tom Road | Bantam | 6750 | 10 | Solar | PV | 2011-12-21 00:00:00 | Level 1 - Online 3 Webster Heights | Cromwell | 06416-2122 | 14.19 | Solar | PV | 2012-01-11 00:00:00 | Level 1 - Online 96 Fire Hill Rd | Redding | 6896 | 10 | Solar | PV | 2012-02-03 00:00:00 | Level 1 - Online 129 Grantville Road | Norfolk | 6058 | 8 | Solar | PV | 2012-04-26 00:00:00 | Level 1 - Online 226 West Road | New Canaan | 6840 | 9 | Solar | PV | 2012-07-20 00:00:00 | Level 1 - Online 139 Griffiths Rd | Danielson | 6239 | 8 | Solar | PV | 2012-05-11 00:00:00 | Level 1 - Online 74 Clark Hill Rd | South Glastonbury | 6073 | 10 | Solar | PV | 2012-04-27 00:00:00 | Level 1 - Online 36 Ball Pond Rd East | New Fairfield | 6812 | 4.73 | Solar | PV | 2012-04-27 00:00:00 | Level 1 - Online 111 Sabin St | Putnam | 6260 | 3.01 | Solar | PV | 2012-04-11 00:00:00 | Level 1 - Online 13 Chadwick Place | East Lyme | 6357 | 6.7 | Solar | PV | 2012-06-21 00:00:00 | Level 1 - Online 7 Old Sharon Road 3 | Sharon | 6069 | 1.9 | Solar | PV | 2012-04-27 00:00:00 | Level 1 - Online 7 Garnet Hill Lane | Avon | 6001 | 9.5 | Solar | PV | 2012-04-10 00:00:00 | Level 1 - Online 21 Lincoln Ave | Branford | 6405 | 7.74 | Solar | PV | 2012-07-24 00:00:00 | Level 1 - Online 34 Kelly Ln | Granby | 6035 | 6 | Solar | PV | 2012-06-05 00:00:00 | Level 1 - Online 35 Coe Road | Wolcott | 6716 | 3 | Solar | PV | 2012-05-14 00:00:00 | Level 1 - Online 109 Bradway Road | Stafford Spgs | 6076 | 6 | Solar | PV | 2012-07-11 00:00:00 | Level 1 - Online 75 Latici Street | Putnam | 6260 | 2.15 | Solar | PV | 2012-05-07 00:00:00 | Level 1 - Online 121 Nortontown Road | Madison | 6443 | 5.7 | Solar | PV | 2012-04-26 00:00:00 | Level 1 - Online 25 Brainard Road | Niantic | 6357 | 7.5 | Solar | PV | 2012-05-02 00:00:00 | Level 1 - Online 19 Church Road | Eastford | 6242 | 4 | Solar | PV | 2012-05-07 00:00:00 | Level 1 - Online 10 Town Hill Road | Warren | 6754 | 10 | Solar | PV | 2012-05-04 00:00:00 | Level 1 - Online 226 Long Swamp Rd | Wolcott | 6716 | 7 | Solar | PV | 2012-05-16 00:00:00 | Level 1 - Online 147 Westford Road | Eastford | 6242 | 7 | Solar | PV | 2012-06-26 00:00:00 | Level 1 - Online 165 Saw Mill Rd | Guilford | 6437 | 4 | Solar | PV | 2012-05-25 00:00:00 | Level 1 - Online 148 Pleasant Street | Windsor | 6905 | 3.44 | Solar | PV | 2012-05-04 00:00:00 | Level 1 - Online 33 Holly Dr | Storrs | 6268 | 10 | Solar | PV | 2012-07-13 00:00:00 | Level 1 - Online 72 Sunset Hill Rd | Bethel | 6801 | 5.375 | Solar | PV | 2012-08-03 00:00:00 | Level 1 - Online 16 Wild Rose Pl | Waterford | 6385 | 4.9 | Solar | PV | 2012-06-07 00:00:00 | Level 1 - Online 11 Sunset Road | Old Saybrook | 6475 | 7 | Solar | PV | 2012-05-07 00:00:00 | Level 1 - Online 225 Haywardville Road | East Haddam | 6415 | 3.87 | Solar | PV | 2012-06-07 00:00:00 | Level 1 - Online 965 Horse Hill Road | Westbrook | 6498 | 2.58 | Solar | PV | 2012-07-03 00:00:00 | Level 1 - Online 20 Pierce Rd | South Windsor | 6074 | 8 | Solar | PV | 2012-06-25 00:00:00 | Level 1 - Online 184 Hampden Rd | Stafford | 6076 | 6 | Solar | PV | 2012-07-09 00:00:00 | Level 1 - Online 86 Zoey Drive | Vernon | 6066 | 7.2 | Solar | PV | 2012-08-16 00:00:00 | Level 1 - Online 3 Standish Road | Windsor | 6095 | 8 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 111 Cone Pond Lane | Granby | 6090 | 7 | Solar | PV | 2012-08-09 00:00:00 | Level 1 - Online 234 Mile Creek Rd | Old Lyme | 6371 | 5 | Solar | PV | 2012-09-20 00:00:00 | Level 1 - Online 56 Parker Terrace Ext | Glastonbury | 6033 | 3.01 | Solar | PV | 2012-07-10 00:00:00 | Level 1 - Online 122 White Oak Shade Road | New Canaan | 6840 | 9.215 | Solar | PV | 2012-07-06 00:00:00 | Level 1 - Online 11 Granite Street | New London | 6320 | 4 | Solar | PV | 2012-07-06 00:00:00 | Level 1 - Online 26 River Road | Greenwich | 6807 | 6.09 | Solar | PV | 2012-09-26 00:00:00 | Level 1 - Online 1079 France St | Rocky Hill | 6067 | 9.89 | Solar | PV | 2012-07-11 00:00:00 | Level 1 - Online 96 Cream Pot Road | Durham | 6442 | 12 | Solar | PV | 2012-09-25 00:00:00 | Level 1 - Online 85 R Newgate Road | East Granby | 6026 | 6.23 | Solar | PV | 2012-07-19 00:00:00 | Level 1 - Online 200 Pole Bridge Rd | Woodstock | 6281 | 14 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 770 Long Cove Road | Gales Ferry | 6335 | 5.16 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 148 Old Woodbury Road | Southbury | 6488 | 10 | Solar | PV | 2012-07-30 00:00:00 | Level 1 - Online 84 West Mountain Rd | Canton | 6019 | 4.5 | Solar | PV | 2012-08-30 00:00:00 | Level 1 - Online 51 Woodmont Road | Avon | 6001 | 4.2 | Solar | PV | 2012-10-09 00:00:00 | Level 1 - Online 641 Plainfield Pike Rd | Plainfield | 6374 | 7.5 | Solar | PV | 2012-09-25 00:00:00 | Level 1 - Online 578 Foot Hills Road | Higganum | 6441 | 5 | Solar | PV | 2012-11-07 00:00:00 | Level 1 - Online 17 Pond View Dr | Woodstock | 6281 | 5 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 11 Sunny Slope Drive | West Hartford | 6117 | 6 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 88 England Rd | Chaplin | 6235 | 5 | Solar | PV | 2012-08-28 00:00:00 | Level 1 - Online 30 colonial drive | Deep River | 6417 | 8.4 | Solar | PV | 2012-07-03 00:00:00 | Level 1 - Online 40 A Almada Drive | Brooklyn | 6234 | 5 | Solar | PV | 2012-10-18 00:00:00 | Level 1 - Online 1 Lawncrest Road | Enfield | 6082 | 4.515 | Solar | PV | 2012-08-01 00:00:00 | Level 1 - Online 58 Maxfelix Drive | Mansfield | 6268 | 7.31 | Solar | PV | 2012-07-13 00:00:00 | Level 1 - Online 15 Coppermine Rd. | Farmington | 6032 | 9.89 | Solar | PV | 2012-07-27 00:00:00 | Level 1 - Online 224 Riverside Dr. | Baltic | 6330 | 7.1 | Solar | PV | 2012-08-06 00:00:00 | Level 1 - Online 38 Tracey Ann Court | Naugatuck | 6770 | 7.2 | Solar | PV | 2012-10-10 00:00:00 | Level 1 - Online 35 Maple Shade Road | Middletown | 6457 | 8.6 | Solar | PV | 2012-09-19 00:00:00 | Level 1 - Online 27 Stephanie Drive | New Milford | 6776 | 5 | Solar | PV | 2012-08-28 00:00:00 | Level 1 - Online 38 Terrace Ave, Flr 1 | New London | 6320 | 3 | Solar | PV | 2013-01-18 00:00:00 | Level 1 - Online 14 Hunt Lane | Weston | 6883 | 10 | Solar | PV | 2012-10-15 00:00:00 | Level 1 - Online 455 Norwich Westerly Rd | North Stonington | 6359 | 8 | Solar | PV | 2012-09-11 00:00:00 | Level 1 - Online 2 Split Rail Ct | Oxford | 6478 | 8.4 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 675 Heron Dr | Torrington | 6790 | 6 | Solar | PV | 2012-10-15 00:00:00 | Level 1 - Online 125 E. Chestnut Hill Rd | Litchfield | 6759 | 9.03 | Solar | PV | 2012-09-05 00:00:00 | Level 1 - Online 85 Atwood St. | Watertown | 6795 | 7.74 | Solar | PV | 2012-10-05 00:00:00 | Level 1 - Online 29 Berch Court | Wilton | 6897 | 6 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 98 Pond Place | Middletown | 6457 | 5.805 | Solar | PV | 2012-07-25 00:00:00 | Level 1 - Online 136 Fieldstone Dr | Windsor | 6095 | 4.515 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 27 Evans Dr | Simsbury | 6070 | 4.945 | Solar | PV | 2012-10-09 00:00:00 | Level 1 - Online 52 Catoonah St. | Ridgefield | 6877 | 5 | Solar | PV | 2012-10-18 00:00:00 | Level 1 - Online 307 Roast Meat Hill Road | Killingworth | 6419 | 9.675 | Solar | PV | 2012-08-24 00:00:00 | Level 1 - Online 3 Sea Spray Rd | Old Lyme | 6371 | 3 | Solar | PV | 2012-10-19 00:00:00 | Level 1 - Online 309 Lake Dr | Guilford | 6437 | 7.6 | Solar | PV | 2012-08-16 00:00:00 | Level 1 - Online 5 Hilltop Road | Ellington | 6029 | 4 | Solar | PV | 2012-09-28 00:00:00 | Level 1 - Online 73 E Weatogue St | Simsbury | 6070 | 10 | Solar | PV | 2012-10-17 00:00:00 | Level 1 - Online 578 Hill Road | Terryville | 6786 | 6.5 | Solar | PV | 2012-01-10 00:00:00 | Level 1 - Online 36 Occum Lane | Uncasville | 6382 | 11 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 169 Penn Drive | West Hartford | 6119 | 8.55 | Solar | PV | 2012-09-13 00:00:00 | Level 1 - Online 6 Romindon Court | Norwalk | 6851 | 4.2 | Solar | PV | 2012-10-16 00:00:00 | Level 1 - Online 25 Prospect St | Enfield | 6082 | 3 | Solar | PV | 2012-10-17 00:00:00 | Level 1 - Online 100 Westport Dr | Waterbury | 6706 | 7 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 23 Harbor Rd | Darien | 6820 | 10 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 555 Colchester Road | Hebron | 6231 | 8.17 | Solar | PV | 2012-09-05 00:00:00 | Level 1 - Online 13 Stevens St | Windsor Locks | 6096 | 2.58 | Solar | PV | 2012-08-31 00:00:00 | Level 1 - Online 203 Maple Street | Litchfield | 6759 | 6 | Solar | PV | 2012-11-09 00:00:00 | Level 1 - Online 32 Buxton Lane | Riverside | 6878 | 5 | Solar | PV | 2012-10-17 00:00:00 | Level 1 - Online 80 Ridgewood Ave | Madison | 6443 | 4.73 | Solar | PV | 2012-10-16 00:00:00 | Level 1 - Online 198 Mechanic St. | Bristol | 6010 | 7.5 | Solar | PV | 2012-12-03 00:00:00 | Level 1 - Online 56 Shipman Dr | Glastonbury | 6033 | 6 | Solar | PV | 2012-11-30 00:00:00 | Level 1 - Online 44 FOREST ROAD | Madison | 6443 | 6 | Solar | PV | 2012-09-17 00:00:00 | Level 1 - Online 60 N Cove Road | Old Saybrook | 6475 | 8.4 | Solar | PV | 2012-09-12 00:00:00 | Level 1 - Online 202 Mountain Rd | West Hartford | 6017 | 10 | Solar | PV | 2012-12-13 00:00:00 | Level 1 - Online 9 Beach Street West #2 | Waterford | 6385 | 8.4 | Solar | PV | 2012-11-08 00:00:00 | Level 1 - Online 650 Albany Turnpike | Canton | 6019 | 3.87 | Solar | PV | 2012-09-24 00:00:00 | Level 1 - Online 259 Russet Lane | Southington | 6489 | 7.5 | Solar | PV | 2012-10-09 00:00:00 | Level 1 - Online 61 Barry Lane | Simsbury | 06070-2018 | 8.6 | Solar | PV | 2013-01-02 00:00:00 | Level 1 - Online 72 Pump Hill Road | Hebron | 6248 | 5.16 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 87 Whittlesey Road | Washington | 6794 | 7.5 | Solar | PV | 2012-10-25 00:00:00 | Level 1 - Online 20 Carrington Lane | Farmington | 6032 | 6.66 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 153 Lake Ridge Road | Southbury | 6488 | 7.2 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 9 Hillcrest Ln | Greenwich | 6870 | 7.6 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 75 Popple Bridge Rd | Griswold | 6351 | 6 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 10 Aspetuck Hill Rd | Weston | 6883 | 7 | Solar | PV | 2013-01-03 00:00:00 | Level 1 - Online 33 Village Drive | Mystic | 6339 | 6 | Solar | PV | 2012-10-11 00:00:00 | Level 1 - Online 212 Gilead Rd | Andover | 6232 | 7 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 22 Lyme Street | Old Lyme | 6371 | 10 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 87 Alling Court | Kensington | 6037 | 5.641 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 60 Cutler Rd | Dayville | 6241 | 10 | Solar | PV | 2012-11-14 00:00:00 | Level 1 - Online 59 Maynard Road | Old Saybrook | 6475 | 5.8 | Solar | PV | 2012-10-18 00:00:00 | Level 1 - Online 96 Harwinton Ave | Terryville | 6786 | 6.02 | Solar | PV | 2012-12-26 00:00:00 | Level 1 - Online 15 Silver Falls | Oakdale | 06370-1824 | 8 | Solar | PV | 2013-01-04 00:00:00 | Level 1 - Online 6 Sprucedale Road, Apt C | Woodstock | 6281 | 4.5 | Solar | PV | 2013-07-12 00:00:00 | Level 1 - Online 6 Sprucedale Road, Apt D | Woodstock | 6281 | 4.73 | Solar | PV | 2013-07-12 00:00:00 | Level 1 - Online 6 Sprucedale Road, Apt A | Woodstock | 6281 | 4.515 | Solar | PV | 2013-07-12 00:00:00 | Level 1 - Online 2 Cannon Brook Lane | Norwalk | 6851 | 4.3 | Solar | PV | 2012-11-26 00:00:00 | Level 1 - Online 125 Diane Dr | South Windsor | 6074 | 10 | Solar | PV | 2012-12-20 00:00:00 | Level 1 - Online 27James Road East | Durham | 6422 | 6.45 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 195 Skeet Club Road | Durham | 6422 | 10 | Solar | PV | 2012-11-08 00:00:00 | Level 1 - Online 182R Parmelee HIll Road | Durham | 6422 | 6.45 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 271 Newtown Turnpike | Wilton | 6897 | 5.805 | Solar | PV | 2013-01-03 00:00:00 | Level 1 - Online 50 Castlewood Rd | West Hartford | 6107 | 5.16 | Solar | PV | 2012-10-24 00:00:00 | Level 1 - Online 27 Knollcrest Rd | New Fairfield | 6812 | 4.2 | Solar | PV | 2012-12-20 00:00:00 | Level 1 - Online 24 Linwold Drive | West Hartford | 6107 | 3 | Solar | PV | 2013-01-30 00:00:00

Text of ES-Attachment 1.xlsx

Extracted from the file · 60,000 characters (the first 60,000 are kept)
[Sheet: CT DERs as of 09302026] CL&P dba Eversource Energy Docket No. 26-08-07 Compliance Order No. 4 EDC's Innovation Pilots Framework Program Implementation Plan - IES Program Cycle 5 ES-Attachment 1 October 1, 2026 Customer/Service Address Line 1 | Customer/Service Address City | Customer/Service Address Zip Code | KW Rating | PV System Inverter Nameplate Rating | Battery KW Rating | Fuel Type | Technology Type | Interconnection Date | Current Status 62 Robin Hill | Newtown | 6470 | 4 | Solar | PV | 2009-06-05 00:00:00 | Level 1 - Online 273 Thimble Islands Rd. | Branford | 6405 | 7 | Solar | PV | 2009-01-09 00:00:00 | Level 1 - Online 24 Laura Lane | Oxford | 6478 | 6 | Solar | PV | 2009-10-09 00:00:00 | Level 1 - Online 89 Sherwood Pl | Greenwich | 6830 | 4 | Solar | PV | 2009-08-20 00:00:00 | Level 1 - Online 65 Griswold Rd. | Wethersfield | 6109 | 9 | Solar | PV | 2009-02-06 00:00:00 | Level 1 - Online 87 Quaker Farms Rd. | Southbury | 6488 | 8 | Solar | PV | 2009-02-18 00:00:00 | Level 1 - Online 222 Round Hill Road | Middletown | 6457 | 3.3 | Solar | PV | 2007-04-19 00:00:00 | Level 1 - Online 10 Stewart Rd | Pawcatuck | 6379 | 5 | Solar | PV | 2008-11-05 00:00:00 | Level 1 - Online 18 Rockland Park | Branford | 6405 | 3 | Solar | PV | 2008-07-28 00:00:00 | Level 1 - Online 859 Beaumont Highway | Lebanon | 6249 | 10 | Solar | PV | 2009-08-19 00:00:00 | Level 1 - Online 24 Pumpkin Hill Rd | Ashford | 6278 | 7 | Solar | PV | 2009-02-11 00:00:00 | Level 1 - Online 71 Highridge Rd. | West Simsbury | 6092 | 6 | Solar | PV | 2009-01-29 00:00:00 | Level 1 - Online 5 Cartridge Trail | Ledyard | 6339 | 9.3 | Solar | PV | 2009-12-31 00:00:00 | Level 1 - Online 438 Mile Lane | Middletown | 6457 | 6 | Solar | PV | 2009-09-22 00:00:00 | Level 1 - Online 43 Crofut Rd. | Naugatuck | 6770 | 6 | Solar | PV | 2008-05-16 00:00:00 | Level 1 - Online 20 Utley Rd. | Hampton | 6247 | 7 | Solar | PV | 2009-01-07 00:00:00 | Level 1 - Online 20 Pine Hill Road | Sterling | 6373 | 4.95 | Solar | PV | 2007-10-10 00:00:00 | Level 1 - Online 14 Norma's Way | Bolton | 6043 | 3.2 | Solar | PV | 2007-12-05 00:00:00 | Level 1 - Online 77 Clubhouse Rd. | Lebanon | 6249 | 4 | Solar | PV | 2007-10-01 00:00:00 | Level 1 - Online 13 Hickory Lane | Waterford | 6385 | 9 | Solar | PV | 2009-11-18 00:00:00 | Level 1 - Online 85 Meadowood Drive | Middletown | 6457 | 3.3 | Solar | PV | 2007-09-18 00:00:00 | Level 1 - Online 379 Old New London Road | Salem | 6420 | 7 | Solar | PV | 2009-06-10 00:00:00 | Level 1 - Online 14 Adams Lane | New Canaan | 6897 | 4 | Solar | PV | 2008-07-01 00:00:00 | Level 1 - Online 339 West Street | Middletown | 6457 | 7 | Solar | PV | 2010-03-23 00:00:00 | Level 1 - Online 52 Somerset St | Wethersfield | 06109-3029 | 3 | Solar | PV | 2009-01-20 00:00:00 | Level 1 - Online 35 Stonehedge Dr | Greenwich | 6831 | 3 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 584 Gurelyville Rd. | Storrs | 6268 | 7 | Solar | PV | 2009-07-21 00:00:00 | Level 1 - Online 10 Brook Wood Ct | Broad Brook | 6016 | 7.38 | Solar | PV | 2007-11-21 00:00:00 | Level 1 - Online 26 Battle Swamp Road | Roxbury | 6783 | 4 | Solar | PV | 2008-09-19 00:00:00 | Level 1 - Online 56 Rees Dr | Oxford | 6478 | 5 | Solar | PV | 2010-01-06 00:00:00 | Level 1 - Online 327 Guilds Hollow Rd. | Bethlehem | 6751 | 3.4 | Solar | PV | 2007-07-03 00:00:00 | Level 1 - Online 1 Thistle Road | Norwalk | 6851 | 10 | Solar | PV | 2010-05-28 00:00:00 | Level 1 - Online 20 Soundview Road | Ridgefield | 6877 | 6 | Solar | PV | 2008-02-25 00:00:00 | Level 1 - Online 69 Killingly Rd. | Pomfret Ctr | 6259 | 9.1 | Solar | PV | 2008-07-23 00:00:00 | Level 1 - Online 521 Middle Turnpike | Storrs | 6268 | 6 | Solar | PV | 2010-01-07 00:00:00 | Level 1 - Online 40 Secor Road | Brookfield | 6804 | 10 | Solar | PV | 2009-07-31 00:00:00 | Level 1 - Online 987 Ceder Swamp Rd | Coventry | 6238 | 3.8 | Solar | PV | 2008-10-31 00:00:00 | Level 1 - Online 263 Wolf Den Road | Brooklyn | 6234 | 7 | Solar | PV | 2009-03-12 00:00:00 | Level 1 - Online 379 North Bigelow Road | Hampton | 6247 | 7 | Solar | PV | 2009-02-09 00:00:00 | Level 1 - Online 56 Clement Rd. | East Hartford | 6118 | 2.5 | Solar | PV | 2007-07-26 00:00:00 | Level 1 - Online 167 Zaccheus Mead Lane | Greenwich | 6831 | 6 | Solar | PV | 2009-01-23 00:00:00 | Level 1 - Online 2 Palmer Road | Waterford | 6385 | 7 | Solar | PV | 2009-11-09 00:00:00 | Level 1 - Online 58 Tourtellotte Road | Putnam | 6260 | 4 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 162 Skilton Rd | Watertown | 6795 | 9.6 | Solar | PV | 2010-02-24 00:00:00 | Level 1 - Online 23 Spring Rock Road | East Lyme | 6333 | 8 | Solar | PV | 2009-01-19 00:00:00 | Level 1 - Online 4 Juniper Rd. | Bloomfield | 6002 | 5 | Solar | PV | 2008-06-19 00:00:00 | Level 1 - Online 144 Hampton Rd. | Pomfret Ctr | 6259 | 5.1 | Solar | PV | 2007-06-20 00:00:00 | Level 1 - Online 21 Diane Dr. | Manchester | 6040 | 8 | Solar | PV | 2009-01-23 00:00:00 | Level 1 - Online 477 Providence-N.L. Tpke | North Stonington | 6359 | 5.2 | Solar | PV | 2007-10-01 00:00:00 | Level 1 - Online 138 Housatonic River Road | Salisbury | 6068 | 10 | Solar | PV | 2009-08-20 00:00:00 | Level 1 - Online 13 Mine Hill Road | Roxbury | 6783 | 4.9 | Solar | PV | 2010-09-03 00:00:00 | Level 1 - Online 44 Taylor Place | Branford | 6405 | 4 | Solar | PV | 2009-01-22 00:00:00 | Level 1 - Online 71 Ballahack Road | East Haddam | 6423 | 7 | Solar | PV | 2010-01-22 00:00:00 | Level 1 - Online 66 Indian Trail | Vernon | 6066 | 3.8 | Solar | PV | 2008-05-09 00:00:00 | Level 1 - Online 3 Mountain View Lane | North Canaan | 6018 | 9 | Solar | PV | 2009-08-17 00:00:00 | Level 1 - Online 138 Wolfneck Rd | Stonington | 6378 | 10 | Solar | PV | 2008-11-20 00:00:00 | Level 1 - Online 40 Greystone Way | Guilford | 6437 | 8 | Solar | PV | 2009-10-05 00:00:00 | Level 1 - Online 8 Owen Dr. | Stonington | 6378 | 6 | Solar | PV | 2008-10-14 00:00:00 | Level 1 - Online 9 Oak Rd | Cromwell | 6416 | 8.4 | Solar | PV | 2009-12-18 00:00:00 | Level 1 - Online 32 Cat Swamp Rd | Woodbury | 6798 | 6.7 | Solar | PV | 2007-12-26 00:00:00 | Level 1 - Online 37 Bennett Circle | Voluntown | 6384 | 1.26 | Solar | PV | 2009-05-04 00:00:00 | Level 1 - Online 54 Pembroke Road | Darien | 6820 | 3 | Solar | PV | 2009-11-30 00:00:00 | Level 1 - Online 24 Bindloss Rd. | Mystic | 6355 | 4.8 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 71 Porchuck Road | Greenwich | 6831 | 3.3 | Solar | PV | 2008-02-06 00:00:00 | Level 1 - Online 4 Lynch Brook Ln | Ridgefield | 6877 | 5 | Solar | PV | 2008-09-25 00:00:00 | Level 1 - Online 42 Middle River Road | Danbury | 6811 | 6 | Solar | PV | 2009-12-30 00:00:00 | Level 1 - Online 9 Riverview Rd | Rocky Hill | 6067 | 4 | Solar | PV | 2009-11-02 00:00:00 | Level 1 - Online 100 Preston City Road | Voluntown | 6384 | 7 | Solar | PV | 2008-12-11 00:00:00 | Level 1 - Online 1 Glenwood Ct. | Gales Ferry | 6335 | 10 | Solar | PV | 2009-03-12 00:00:00 | Level 1 - Online 336 Ridgebury Road | Ridgefield | 6877 | 6.6 | Solar | PV | 2007-06-22 00:00:00 | Level 1 - Online 10 Valerie Ln | Danbury | 6811 | 8 | Solar | PV | 2010-02-08 00:00:00 | Level 1 - Online 62 Hillcrest Heights | Lebanon | 6249 | 10 | Solar | PV | 2009-06-24 00:00:00 | Level 1 - Online 204 Old-Norwich Rd. | Quaker Hill | 6375 | 10.4 | Solar | PV | 2008-04-30 00:00:00 | Level 1 - Online 6 Hidden Hill Road | Westport | 6880 | 5 | Natural Gas | Internal Combustion Engine | 2009-07-20 00:00:00 | Level 1 - Online 27 B Lane | Waterford | 6385 | 7 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 101 Watchaug Rd. | Somers | 6071 | 4 | Solar | PV | 2009-06-10 00:00:00 | Level 1 - Online 33 Brill Avenue | Waterford | 6385 | 7 | Solar | PV | 2009-04-30 00:00:00 | Level 1 - Online 110 Rowley Dr. | Stonington | 6378 | 10 | Solar | PV | 2008-09-29 00:00:00 | Level 1 - Online 13 River Crest Drive | Pawcatuck | 6379 | 10 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 15 John Todd Way | Redding | 6896 | 4 | Solar | PV | 2009-02-19 00:00:00 | Level 1 - Online 34 Apollo Rd. | Bethel | 6801 | 8 | Solar | PV | 2008-06-05 00:00:00 | Level 1 - Online 170 Brandy Hill Rd | Vernon | 6066 | 10 | Solar | PV | 2010-11-03 00:00:00 | Level 1 - Online 21 Graystone Lane | Lakeville | 6039 | 4 | Solar | PV | 2009-01-14 00:00:00 | Level 1 - Online 365 Grindstone Hill Rd. | North Stonington | 6359 | 6.6 | Solar | PV | 2007-12-26 00:00:00 | Level 1 - Online 143 Geer Mountain Road | South Kent | 6785 | 5 | Solar | PV | 2008-08-12 00:00:00 | Level 1 - Online 371 Quaker Farms Road | Oxford | 6478 | 7 | Solar | PV | 2009-04-06 00:00:00 | Level 1 - Online 54 Cooper Hill Road | Ridgefield | 6877 | 3.3 | Solar | PV | 2008-02-13 00:00:00 | Level 1 - Online 65 Village Circle | Naugatuck | 6770 | 5 | Solar | PV | 2009-09-11 00:00:00 | Level 1 - Online 24 Carroll Street | Stamford | 6907 | 5 | Solar | PV | 2009-05-06 00:00:00 | Level 1 - Online 49 Middle River Rd | Danbury | 6810 | 8 | Solar | PV | 2009-01-08 00:00:00 | Level 1 - Online 14 Hinckley Road | New Preston | 6777 | 4 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 51 Fieldstone Dr. | Mansfield | 6250 | 2.7 | Solar | PV | 2007-12-17 00:00:00 | Level 1 - Online 139 Schroback Road | Plymouth | 6782 | 8 | Solar | PV | 2009-06-10 00:00:00 | Level 1 - Online 54 Chriswood Terrace | Ledyard | 6339 | 10 | Solar | PV | 2009-04-07 00:00:00 | Level 1 - Online 58 Carriage Hill Drive | Newington | 6111 | 8 | Solar | PV | 2009-12-14 00:00:00 | Level 1 - Online 185 Fitch Hill Road | Uncasville | 6382 | 7 | Solar | PV | 2009-10-08 00:00:00 | Level 1 - Online 149 Thunder Lake Road | Wilton | 6897 | 7 | Solar | PV | 2008-09-18 00:00:00 | Level 1 - Online 181 Long Ridge Road | Danbury | 6810 | 4 | Solar | PV | 2009-04-01 00:00:00 | Level 1 - Online 100 Plumtrees Road | Bethel | 6801 | 10 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 6 Pine Woods Road | North Stonington | 6359 | 4 | Solar | PV | 2008-08-11 00:00:00 | Level 1 - Online 13 Judd Road | Terryville | 6786 | 10 | Solar | PV | 2010-03-23 00:00:00 | Level 1 - Online 11 Pheasant Lane | Monroe | 6468 | 5.1 | Solar | PV | 2007-08-02 00:00:00 | Level 1 - Online 141 Boston Hill Rd. | Andover | 6232 | 6 | Solar | PV | 2007-03-29 00:00:00 | Level 1 - Online 301 Chaffinch Island Road | Guilford | 6437 | 5 | Solar | PV | 2008-06-16 00:00:00 | Level 1 - Online 765 Hartford Tpke | Vernon | 6066 | 6 | Solar | PV | 2009-05-22 00:00:00 | Level 1 - Online 13 Charlene Dr | Naugatuck | 6770 | 5 | Solar | PV | 2009-01-09 00:00:00 | Level 1 - Online 51 Malibu Road | Stamford | 6803 | 5.3 | Solar | PV | 2009-12-18 00:00:00 | Level 1 - Online 190 White Sail Drive | Southington | 6489 | 4 | Solar | PV | 2007-07-27 00:00:00 | Level 1 - Online 12 Meadowlark Lane | Stonington | 6378 | 4 | Solar | PV | 2009-01-14 00:00:00 | Level 1 - Online 93 Adella St | Naugatuck | 6770 | 6 | Solar | PV | 2010-11-09 00:00:00 | Level 1 - Online 9 Witherell Drive | Greenwich | 6831 | 3.3 | Solar | PV | 2007-11-29 00:00:00 | Level 1 - Online 122 Pepperidge Road | Portland | 6480 | 10 | Solar | PV | 2009-06-23 00:00:00 | Level 1 - Online 263 Jonathan Trumbull Hwy | Columbia | 6237 | 7 | Solar | PV | 2009-01-19 00:00:00 | Level 1 - Online 293 Milton Road | Litchfield | 6759 | 3 | Solar | PV | 2008-05-28 00:00:00 | Level 1 - Online 632 Pequot Avenue | New London | 6320 | 11 | Solar | PV | 2009-03-06 00:00:00 | Level 1 - Online 7 Sunset Road | Gales Ferry | 6335 | 3 | Solar | PV | 2009-03-17 00:00:00 | Level 1 - Online 27 Lake Street | Unionville | 6085 | 6 | Solar | PV | 2008-08-29 00:00:00 | Level 1 - Online 609 Sterling Road | Sterling | 06377-2127 | 3.7 | Wind | Wind Turbine | 2008-07-07 00:00:00 | Level 1 - Online 280 Durham Rd. | Guilford | 6437 | 7 | Solar | PV | 2008-02-07 00:00:00 | Level 1 - Online 48 Clifton Avenue | Waterbury | 6710 | 6 | Solar | PV | 2010-04-27 00:00:00 | Level 1 - Online 256 Bantom Lake Road | Morris | 6763 | 5 | Solar | PV | 2007-11-02 00:00:00 | Level 1 - Online 27 Mansfield Ave | Darien | 6820 | 10 | Solar | PV | 2009-12-30 00:00:00 | Level 1 - Online 16 Welwyn Road | Riverside | 6878 | 3 | Solar | PV | 2009-02-19 00:00:00 | Level 1 - Online 14 Wallace Rd | Branford | 6405 | 4 | Solar | PV | 2009-09-22 00:00:00 | Level 1 - Online 116 Woodmere Rd. | Stamford | 6905 | 2.7 | Solar | PV | 2009-04-28 00:00:00 | Level 1 - Online 190 Brimfield Road | Wethersfield | 6109 | 5.1 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 76 Congress Drive | Hebron | 6248 | 6.8 | Solar | PV | 2010-03-25 00:00:00 | Level 1 - Online 1 Ryan Drive | Ellington | 6029 | 10 | Solar | PV | 2010-02-12 00:00:00 | Level 1 - Online 107 Blair Road | Willington | 6279 | 7 | Solar | PV | 2009-05-19 00:00:00 | Level 1 - Online 7 Bishop Circle | Sandy Hook | 6482 | 5.3 | Solar | PV | 2009-07-02 00:00:00 | Level 1 - Online 58 Baldwin Hill Rd | Litchfield | 6759 | 9.6 | Solar | PV | 2009-10-14 00:00:00 | Level 1 - Online 36 Brook Dr. | Simsbury | 6070 | 5.2 | Solar | PV | 2007-07-25 00:00:00 | Level 1 - Online 150 Lake Road | Andover | 6232 | 3.6 | Solar | PV | 2008-02-26 00:00:00 | Level 1 - Online 334 Grindstone Hill Rd. | North Stonington | 6359 | 10 | Solar | PV | 2008-06-20 00:00:00 | Level 1 - Online 211 East Shore Road | Morris | 6763 | 8 | Solar | PV | 2009-10-26 00:00:00 | Level 1 - Online 39 Bonnie Vue Lane | New Milford | 6776 | 6 | Solar | PV | 2008-06-10 00:00:00 | Level 1 - Online 34 Ludwig Rd | Ellington | 6029 | 6 | Solar | PV | 2007-06-28 00:00:00 | Level 1 - Online 3 Jacob Lane | Killingworth | 6419 | 10 | Solar | PV | 2008-09-03 00:00:00 | Level 1 - Online 534 Rte 169 | Woodstock | 6281 | 10 | Solar | PV | 2009-04-03 00:00:00 | Level 1 - Online 36 Russet Dr. | Guilford | 6437 | 5.2 | Solar | PV | 2007-10-11 00:00:00 | Level 1 - Online 174 Mudge Pond Rd. | Sharon | 6069 | 10 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 9 Lake Rd | Woodbury | 6798 | 8 | Solar | PV | 2009-12-04 00:00:00 | Level 1 - Online 21 Newcomb Road | Litchfield | 6756 | 7 | Solar | PV | 2009-10-29 00:00:00 | Level 1 - Online 191 Popple Swamp Road | Washington Depot | 6794 | 7 | Solar | PV | 2009-12-24 00:00:00 | Level 1 - Online 71 Waterside Lane | West Hartford | 6105 | 9 | Solar | PV | 2009-02-06 00:00:00 | Level 1 - Online 102 Davenport Road | Roxbury | 6783 | 4 | Solar | PV | 2009-08-10 00:00:00 | Level 1 - Online 789 Hill Road | Harwinton | 6791 | 5 | Solar | PV | 2009-03-16 00:00:00 | Level 1 - Online 560 N. Main St. | Stonington | 6378 | 6 | Solar | PV | 2008-09-29 00:00:00 | Level 1 - Online 192 Wagher Rd. | North Grosvenordale | 6255 | 5 | Solar | PV | 2008-08-29 00:00:00 | Level 1 - Online 278 Stamford Avenue | Stamford | 6902 | 12 | Solar | PV | 2009-01-26 00:00:00 | Level 1 - Online 20 Gorham Avenue | Westport | 6880 | 5 | Solar | PV | 2009-02-10 00:00:00 | Level 1 - Online 12 Linda CT. | Preston | 6365 | 10 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 34 Spring Lake Road | Sherman | 6784 | 5 | Solar | PV | 2009-05-05 00:00:00 | Level 1 - Online 41 Day Street | Granby | 6035 | 6 | Solar | PV | 2009-11-03 00:00:00 | Level 1 - Online 212 Deans Mill Road | Stonington | 6378 | 10 | Solar | PV | 2009-10-01 00:00:00 | Level 1 - Online 21 Tower Hill Rd | Deep River | 6417 | 10 | Solar | PV | 2009-04-13 00:00:00 | Level 1 - Online 61 Walnut Hill Rd | East Lyme | 6333 | 6 | Solar | PV | 2007-11-06 00:00:00 | Level 1 - Online 114 Overbrook Drive | Vernon | 6066 | 2 | Solar | PV | 2009-01-26 00:00:00 | Level 1 - Online 55 Harmony Hill Rd | Harwinton | 6791 | 8 | Solar | PV | 2007-08-02 00:00:00 | Level 1 - Online 88 Palmer Neck Rd | Pawcatuck | 6379 | 5 | Solar | PV | 2009-05-08 00:00:00 | Level 1 - Online 36 Stephanie Lane | South Windsor | 6074 | 5.2 | Solar | PV | 2007-03-22 00:00:00 | Level 1 - Online 13 West Ridge Rd | New Fairfield | 6812 | 4 | Solar | PV | 2008-09-24 00:00:00 | Level 1 - Online 226 Middlesex Ave | Chester | 6412 | 12.4 | Solar | PV | 2007-12-06 00:00:00 | Level 1 - Online 65 Whisconier Road | Brookfield | 6804 | 7 | Solar | PV | 2009-11-11 00:00:00 | Level 1 - Online 10 Rachel Lane | Voluntown | 6384 | 7 | Solar | PV | 2009-08-10 00:00:00 | Level 1 - Online 871 Hopeville Road | Griswold | 6351 | 5 | Solar | PV | 2008-09-29 00:00:00 | Level 1 - Online 54 Scudder Road | Newtown | 6470 | 5 | Solar | PV | 2009-04-15 00:00:00 | Level 1 - Online 56 Perkins Road | Litchfield | 6759 | 5 | Solar | PV | 2008-08-12 00:00:00 | Level 1 - Online 370 Saw Mill Rd | Guilford | 6437 | 7 | Solar | PV | 2009-07-29 00:00:00 | Level 1 - Online 182 Thompson Hill Rd. | Thompson | 6255 | 9.45 | Solar | PV | 2007-09-11 00:00:00 | Level 1 - Online 28 Pellegrino Rd. | Stonington | 6378 | 5 | Solar | PV | 2008-01-10 00:00:00 | Level 1 - Online 10 Babcock Road | East Haddam | 6423 | 4 | Solar | PV | 2008-04-29 00:00:00 | Level 1 - Online 510 Parum Rd | Colchester | 6415 | 9.88 | Solar | PV | 2009-10-21 00:00:00 | Level 1 - Online 241 Clark Ave | Branford | 6405 | 7 | Solar | PV | 2009-06-17 00:00:00 | Level 1 - Online 725 Breakneck Hill Road | Middlebury | 6762 | 10 | Solar | PV | 2009-11-16 00:00:00 | Level 1 - Online 380 South St | Roxbury | 6783 | 8 | Solar | PV | 2009-10-01 00:00:00 | Level 1 - Online 125 Florida Road | Ridgefield | 6877 | 5 | Natural Gas | Internal Combustion Engine | 2008-03-18 00:00:00 | Level 1 - Online 294 Woodchuck Lane | Harwinton | 6791 | 3.3 | Solar | PV | 2007-11-06 00:00:00 | Level 1 - Online 25 Oconnell Rd Ext. | East Haddam | 6415 | 7 | Solar | PV | 2009-04-14 00:00:00 | Level 1 - Online 600 Beach Pond Road | Voluntown | 6384 | 8.1 | Solar | PV | 2009-02-27 00:00:00 | Level 1 - Online 139 Kent Lane | South Windsor | 6074 | 9.6 | Solar | PV | 2010-02-12 00:00:00 | Level 1 - Online 87 Hewitt Road | Mystic | 6356 | 7 | Solar | PV | 2009-07-28 00:00:00 | Level 1 - Online 189 Salmon Kill Road | Lakeville | 6039 | 9 | Solar | PV | 2010-01-28 00:00:00 | Level 1 - Online 82 Wildwood Rd | West Simsbury | 6092 | 6 | Solar | PV | 2007-10-17 00:00:00 | Level 1 - Online 122 Seabury Road | Lebanon | 6249 | 10 | Solar | PV | 2009-11-09 00:00:00 | Level 1 - Online 51 Angeli Court | Kensington | 6037 | 4.2 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 106 Rockwell Road | Bethel | 6801 | 10 | Solar | PV | 2009-03-27 00:00:00 | Level 1 - Online 166 North Maple St. | Enfield | 6082 | 5.3 | Solar | PV | 2009-12-14 00:00:00 | Level 1 - Online 347 Scantic Road | East Windsor | 6088 | 11.4 | Solar | PV | 2009-12-16 00:00:00 | Level 1 - Online 93a Tolland Avenue | Stafford Springs | 6076 | 4 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 41 North Bedlam Rd | Chaplin | 6235 | 6 | Solar | PV | 2008-12-12 00:00:00 | Level 1 - Online 311 Old Mill Road | Middletown | 6457 | 7 | Solar | PV | 2008-06-10 00:00:00 | Level 1 - Online 7 Reeds Gap Road | Middlefield | 6455 | 7 | Solar | PV | 2009-03-16 00:00:00 | Level 1 - Online 26 Lancaster Road | Cromwell | 6416 | 10 | Solar | PV | 2008-10-31 00:00:00 | Level 1 - Online 107 Porter St. | Manchester | 6040 | 3 | Solar | PV | 2009-07-15 00:00:00 | Level 1 - Online 281 Simsbury Road | West Granby | 6090 | 3 | Solar | PV | 2010-02-03 00:00:00 | Level 1 - Online 37 Sheffield Ln | Madison | 6443 | 8 | Solar | PV | 2008-09-12 00:00:00 | Level 1 - Online 122 Sterling City Road | Lyme | 6371 | 6.5 | Solar | PV | 2009-02-12 00:00:00 | Level 1 - Online 28 Oleary Road | Thompson | 6277 | 10 | Solar | PV | 2010-02-18 00:00:00 | Level 1 - Online 26 Scott Rd | Oxford | 6478 | 6 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 595 Mather St | Suffield | 6072 | 6.3 | Solar | PV | 2009-12-22 00:00:00 | Level 1 - Online 19 Laurel Glen Drive | East Hampton | 6424 | 6 | Solar | PV | 2008-05-02 00:00:00 | Level 1 - Online 179 Cooper Road | Bridgewater | 6752 | 8 | Solar | PV | 2007-10-24 00:00:00 | Level 1 - Online 118 Clark Hill Rd | East Hampton | 6424 | 10 | Solar | PV | 2009-11-09 00:00:00 | Level 1 - Online 500 Skilton Road | Watertown | 6795 | 3 | Solar | PV | 2008-05-05 00:00:00 | Level 1 - Online 26 Pleasant Point Rd. | Branford | 6405 | 6 | Solar | PV | 2008-05-01 00:00:00 | Level 1 - Online 173 Cole Lane | Kensington | 6037 | 3 | Solar | PV | 2010-01-20 00:00:00 | Level 1 - Online 795 Stafford Rd. | Storrs | 6268 | 5.1 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 6 Lantern Hill Rd. | Westport | 6880 | 5.2 | Solar | PV | 2007-05-11 00:00:00 | Level 1 - Online 30 Canton Springs Road | Canton | 6019 | 5 | Solar | PV | 2009-05-21 00:00:00 | Level 1 - Online 75 Wake Robin Lane | Harwinton | 6791 | 7 | Solar | PV | 2008-08-04 00:00:00 | Level 1 - Online 184R Ashford Center Road | Ashford | 6278 | 8.1 | Solar | PV | 2009-05-04 00:00:00 | Level 1 - Online 853 Prospect Ave | West Hartford | 6105 | 6 | Solar | PV | 2009-12-10 00:00:00 | Level 1 - Online 17 Chaffeeville Rd. | Mansfield Ctr | 6250 | 8 | Solar | PV | 2010-02-02 00:00:00 | Level 1 - Online 34 Old Bethel Road | Griswold | 6351 | 6 | Solar | PV | 2009-12-03 00:00:00 | Level 1 - Online 157 Roseville Rd | Westport | 6880 | 3 | Solar | PV | 2010-06-08 00:00:00 | Level 1 - Online 103 Currituck Road | Newtown | 6470 | 5.6 | Solar | PV | 2008-10-27 00:00:00 | Level 1 - Online 774 Old Colchester Road | Uncasville | 6382 | 8.4 | Solar | PV | 2007-11-02 00:00:00 | Level 1 - Online 10 Drummers Trail | Old Saybrook | 6475 | 4.8 | Wind | Wind Turbine | 2009-04-15 00:00:00 | Level 1 - Online 20 River Head Lane | East Lyme | 6333 | 6.7 | Solar | PV | 2008-06-12 00:00:00 | Level 1 - Online 18 Byfield Lane | Greenwich | 6880 | 5.5 | Solar | PV | 2008-10-15 00:00:00 | Level 1 - Online 1249 Hill St. | Suffield | 6078 | 10 | Solar | PV | 2009-10-30 00:00:00 | Level 1 - Online 38 Hayden St. | Willimantic | 6226 | 4 | Solar | PV | 2010-02-01 00:00:00 | Level 1 - Online 19 Remington Street | Suffield | 6078 | 5 | Solar | PV | 2009-11-04 00:00:00 | Level 1 - Online 69 Garret Road | Canton | 6019 | 9 | Solar | PV | 2009-02-27 00:00:00 | Level 1 - Online 6 Littlefield Drive | Old Lyme | 6371 | 2.3 | Solar | PV | 2007-12-18 00:00:00 | Level 1 - Online 15 Bellewood Avenue | Waterbury | 6705 | 2.1 | Solar | PV | 2007-09-21 00:00:00 | Level 1 - Online 3 Mel Road | Plainville | 6062 | 7 | Solar | PV | 2010-02-09 00:00:00 | Level 1 - Online 61 Eastgate Drive | Cheshire | 6410 | 3 | Solar | PV | 2008-08-15 00:00:00 | Level 1 - Online 187 West Side Road | Goshen | 6756 | 7 | Solar | PV | 2009-07-17 00:00:00 | Level 1 - Online 2 Centennial Drive | Danbury | 6811 | 6 | Solar | PV | 2010-04-19 00:00:00 | Level 1 - Online 188 Brushy Hill Road | Danbury | 6810 | 8 | Solar | PV | 2008-12-15 00:00:00 | Level 1 - Online 155 Lambtown Rd. | Ledyard | 6339 | 8 | Solar | PV | 2007-08-21 00:00:00 | Level 1 - Online 32 Oak Ridge Dr. | Brooklyn | 6234 | 5.1 | Solar | PV | 2007-12-31 00:00:00 | Level 1 - Online 186 Flat Rock Road | Cornwall Brg | 6754 | 10 | Solar | PV | 2009-01-15 00:00:00 | Level 1 - Online 59 South Ellsworth Road | Sharon | 6069 | 5 | Solar | PV | 2009-01-05 00:00:00 | Level 1 - Online 478 Cornwall Bridge Road | Sharon | 6069 | 5 | Solar | PV | 2009-05-14 00:00:00 | Level 1 - Online 47 Spencer Brook Road | New Hartford | 6057 | 6 | Solar | PV | 2010-03-03 00:00:00 | Level 1 - Online 8 Halls Rd. | Westbrook | 6498 | 7 | Solar | PV | 2009-01-08 00:00:00 | Level 1 - Online 1 Powderhorn Hill | Brookfield | 6804 | 8 | Solar | PV | 2009-04-17 00:00:00 | Level 1 - Online 7 Oak Glen Hill Rd | Oxford | 6478 | 10 | Solar | PV | 2009-07-16 00:00:00 | Level 1 - Online 314 Kate Downing Rd | Plainfield | 6374 | 5.2 | Solar | PV | 2007-08-22 00:00:00 | Level 1 - Online 39 Case Street | Canton | 6019 | 3 | Solar | PV | 2010-05-12 00:00:00 | Level 1 - Online 19 Shady Brook Road Ext | New Hartford | 6057 | 7 | Solar | PV | 2010-01-08 00:00:00 | Level 1 - Online 157 Santa Maria Dr | Torrington | 6790 | 3 | Solar | PV | 2009-02-24 00:00:00 | Level 1 - Online 4 Sears Road | Stafford Spgs | 6075 | 4 | Solar | PV | 2008-08-12 00:00:00 | Level 1 - Online 1397 South St. | Coventry | 6238 | 5 | Solar | PV | 2009-01-07 00:00:00 | Level 1 - Online 336 Walnut St. | Putnam | 6260 | 4 | Solar | PV | 2008-09-04 00:00:00 | Level 1 - Online 8 Ware Rd. | Ballouville | 6233 | 5 | Solar | PV | 2008-02-21 00:00:00 | Level 1 - Online 476 Gardner Street | Manchester | 6040 | 4 | Solar | PV | 2008-07-24 00:00:00 | Level 1 - Online 180 Walsh Avenue | Newington | 6111 | 4 | Solar | PV | 2007-06-22 00:00:00 | Level 1 - Online 53 McClimon Rd. | Preston | 6365 | 7 | Solar | PV | 2008-07-07 00:00:00 | Level 1 - Online 302 Bartholomew Hill Rd | Goshen | 6038 | 7 | Solar | PV | 2009-06-18 00:00:00 | Level 1 - Online 7 Sullivan Farms Road | Broad Brook | 6016 | 5 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 279 Rattlesnake Ledge Road | Salem | 6420 | 7 | Solar | PV | 2008-12-08 00:00:00 | Level 1 - Online 8 Reutemann Road | North Stonington | 6379 | 5.46 | Solar | PV | 2007-04-30 00:00:00 | Level 1 - Online 3 Stone Bridge Trail | Sandy Hook | 6482 | 8 | Solar | PV | 2009-12-22 00:00:00 | Level 1 - Online 48 Taylor Rd | Barkhamsted | 6063 | 6 | Solar | PV | 2009-09-02 00:00:00 | Level 1 - Online 204 Carter Lane | Southington | 6489 | 4 | Solar | PV | 2009-06-09 00:00:00 | Level 1 - Online 116 Prospect Hill Rd | Colchester | 6415 | 9.66 | Solar | PV | 2009-11-12 00:00:00 | Level 1 - Online 12 Avebury Berwick | Ledyard | 6339 | 7 | Solar | PV | 2009-09-03 00:00:00 | Level 1 - Online 387 Kenyon Road | Lakeside | 6758 | 10 | Solar | PV | 2010-04-06 00:00:00 | Level 1 - Online 41 Windmill Road | Ellington | 6029 | 10 | Solar | PV | 2009-08-05 00:00:00 | Level 1 - Online 134 North Madison Rd. | Guilford | 6437 | 4 | Solar | PV | 2008-09-15 00:00:00 | Level 1 - Online 122 E. HEBRON TPKE. | Lebanon | 6249 | 8.4 | Solar | PV | 2009-12-08 00:00:00 | Level 1 - Online 359 Maple Ave | Cheshire | 6410 | 4 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 100 Brewster Road | Griswold | 6351 | 11.5 | Solar | PV | 2010-03-16 00:00:00 | Level 1 - Online 6 Hamilton Way | Farmington | 6032 | 7.02 | Solar | PV | 2009-05-08 00:00:00 | Level 1 - Online 109 Mell Rd. | Lisbon | 6351 | 10 | Solar | PV | 2009-01-20 00:00:00 | Level 1 - Online 26 Honey Lane | Sandy Hook | 6482 | 8 | Solar | PV | 2010-04-16 00:00:00 | Level 1 - Online 10 Valley Road | Cornwall | 6796 | 10 | Solar | PV | 2008-10-15 00:00:00 | Level 1 - Online 78 South Brook Road | Hampton | 6247 | 7.5 | Solar | PV | 2009-11-18 00:00:00 | Level 1 - Online 93 Ivan Hill St | Willimantic | 6226 | 8 | Solar | PV | 2009-06-12 00:00:00 | Level 1 - Online 57 Griswold Road | Ellington | 6029 | 6.8 | Solar | PV | 2010-04-26 00:00:00 | Level 1 - Online 55 Shinar Mountain Rd | Washington | 6794 | 10 | Solar | PV | 2007-11-21 00:00:00 | Level 1 - Online 17 Woodstone Road | Ridgefield | 6877 | 8 | Solar | PV | 2010-02-25 00:00:00 | Level 1 - Online 15 Rhodes Road | Rocky Hill | 6067 | 10 | Solar | PV | 2008-08-28 00:00:00 | Level 1 - Online 228 Maple Avenue | Durham | 6422 | 7 | Solar | PV | 2007-11-09 00:00:00 | Level 1 - Online 401 Shewville Rd. | Ledyard | 6339 | 1.8 | Solar | PV | 2010-01-18 00:00:00 | Level 1 - Online 540 Burr Road | Southbury | 6488 | 3 | Solar | PV | 2008-06-23 00:00:00 | Level 1 - Online 101 Middle Road | Preston | 6363 | 10 | Solar | PV | 2008-12-16 00:00:00 | Level 1 - Online 2 Whittlemore Place | Westbrook | 6498 | 7 | Solar | PV | 2009-07-21 00:00:00 | Level 1 - Online 530 Skiff Mountain Road | Kent | 6757 | 4 | Solar | PV | 2009-09-30 00:00:00 | Level 1 - Online 30 White St. | Waterbury | 6710 | 4 | Solar | PV | 2008-09-22 00:00:00 | Level 1 - Online 421 Warrenville Rd. | Mansfield Ctr | 6250 | 3 | Solar | PV | 2009-10-07 00:00:00 | Level 1 - Online 85 Turkey Hill Road | Westport | 6880 | 6 | Solar | PV | 2008-02-26 00:00:00 | Level 1 - Online 5 Pondview Drive | Cromwell | 6416 | 7 | Solar | PV | 2009-12-23 00:00:00 | Level 1 - Online 173 Park St. | New Canaan | 6840 | 5 | Solar | PV | 2009-08-06 00:00:00 | Level 1 - Online 67 Coles Avenue | Newington | 6131 | 8 | Solar | PV | 2010-01-25 00:00:00 | Level 1 - Online 1143 Main Street | South Glastonbury | 6073 | 2.1 | Solar | PV | 2007-09-05 00:00:00 | Level 1 - Online 17 Stiles Rd | Broad Brook | 6016 | 3.8 | Solar | PV | 2007-12-31 00:00:00 | Level 1 - Online 596 Bethel Road | Griswold | 6351 | 7 | Solar | PV | 2010-04-30 00:00:00 | Level 1 - Online 200 Bulkley Hill Rd | Colchester | 6415 | 6 | Solar | PV | 2009-11-19 00:00:00 | Level 1 - Online 17 Stony Point Road | Westport | 6880 | 10 | Solar | PV | 2009-03-27 00:00:00 | Level 1 - Online 173 Shore Road | Waterford | 6385 | 13 | Solar | PV | 2009-10-16 00:00:00 | Level 1 - Online 28 Carriage Lane | Marlborough | 6447 | 10 | Solar | PV | 2009-07-17 00:00:00 | Level 1 - Online 22A Bigos Road | Litchfield | 6750 | 10 | Solar | PV | 2008-08-19 00:00:00 | Level 1 - Online 11 Overhill Road | Ellington | 6029 | 7 | Solar | PV | 2010-02-03 00:00:00 | Level 1 - Online 10 Ridge Rd. | Ellington | 6029 | 5 | Solar | PV | 2009-02-27 00:00:00 | Level 1 - Online 6 Morehouse Drive | Darien | 6820 | 5 | Solar | PV | 2007-10-09 00:00:00 | Level 1 - Online 12 East Street | Oxford | 06478-1917 | 4.9 | Solar | PV | 2010-07-09 00:00:00 | Level 1 - Online 22 Hopson Avenue | Branford | 6405 | 4 | Solar | PV | 2009-12-17 00:00:00 | Level 1 - Online 32 Bartholomew Hill Road | Goshen | 6756 | 6 | Solar | PV | 2010-04-27 00:00:00 | Level 1 - Online 64 Killingworth Tpke | Clinton | 6413 | 7 | Solar | PV | 2009-01-09 00:00:00 | Level 1 - Online 152 Cedar Mountain Rd. | Thomaston | 6787 | 3 | Solar | PV | 2009-12-22 00:00:00 | Level 1 - Online 197 Strawberry Hill Avenue | Stamford | 6902 | 3.3 | Solar | PV | 2007-04-11 00:00:00 | Level 1 - Online 70 Hidden Lake Road | Higganum | 6441 | 6 | Solar | PV | 2009-05-27 00:00:00 | Level 1 - Online 339 Mansfield City Rd. | Mansfield | 6250 | 6 | Solar | PV | 2010-05-06 00:00:00 | Level 1 - Online 36 Niantic River Road | Waterford | 6385 | 8 | Solar | PV | 2010-10-21 00:00:00 | Level 1 - Online 33 Summit Road | Storrs | 6268 | 2 | Solar | PV | 2008-12-08 00:00:00 | Level 1 - Online 497 Bebbington Road, | Ashford | 6278 | 7 | Solar | PV | 2010-04-28 00:00:00 | Level 1 - Online 93 Bushnell Road | Baltic | 6330 | 6 | Solar | PV | 2009-07-08 00:00:00 | Level 1 - Online 283 Babcock Hill Road | Lebanon | 6249 | 5.2 | Solar | PV | 2007-02-05 00:00:00 | Level 1 - Online 8 Kelly Drive | Enfield | 6082 | 7 | Solar | PV | 2010-08-13 00:00:00 | Level 1 - Online 49 Brigham Road | Coventry | 6238 | 8 | Solar | PV | 2010-03-25 00:00:00 | Level 1 - Online 32 Bainbridge Road | West Hartford | 6119 | 4.5 | Solar | PV | 2011-07-26 00:00:00 | Level 1 - Online 16 Valley Field Road South | Sandy Hook | 6482 | 7 | Solar | PV | 2010-01-14 00:00:00 | Level 1 - Online 16 B Valley Field Road South | Sandy Hook | 6482 | 4 | Solar | PV | 2010-02-01 00:00:00 | Level 1 - Online 51 Harvey Rd | Durham | 6422 | 6 | Solar | PV | 2010-05-19 00:00:00 | Level 1 - Online 6 Glen Pines Lane | Norwalk | 6850 | 5.3 | Solar | PV | 2010-05-28 00:00:00 | Level 1 - Online 231 Farm Meadow Ln | Cheshire | 6410 | 8 | Solar | PV | 2010-04-26 00:00:00 | Level 1 - Online 90 OAK FARM DRIVE | Colchester | 6415 | 7 | Solar | PV | 2010-02-11 00:00:00 | Level 1 - Online 62 Gorton Ave | Old Lyme | 6371 | 6 | Solar | PV | 2010-06-07 00:00:00 | Level 1 - Online 200 Babcock Road | Tolland | 06084-2703 | 7.68 | Solar | PV | 2010-06-25 00:00:00 | Level 1 - Online 12 Fransworth Street | New London | 6320 | 4 | Solar | PV | 2010-06-21 00:00:00 | Level 1 - Online 17 N. Cone Road | East Hampton | 6424 | 9.8 | Solar | PV | 2010-05-07 00:00:00 | Level 1 - Online 89 Pine Street | Columbia | 6237 | 5.3 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 11 Shailor Hill Road | Colchester | 06415-2510 | 10.58 | Solar | PV | 2010-09-10 00:00:00 | Level 1 - Online 109 OAK FARM DRIVE | Colchester | 6415 | 5.3 | Solar | PV | 2010-03-01 00:00:00 | Level 1 - Online 106 Newtown Turnpike | Weston | 6883 | 8.33 | Solar | PV | 2010-06-14 00:00:00 | Level 1 - Online 37 Elihu Drive | Durham | 06422-1024 | 7.68 | Solar | PV | 2010-10-25 00:00:00 | Level 1 - Online 33 Foxtrail | Ledyard | 6338 | 3.5 | Wind | Wind Turbine | 2010-10-06 00:00:00 | Level 1 - Online 66 WILLIAMSBURG ROAD | Marlborough | 6447 | 10 | Solar | PV | 2010-05-19 00:00:00 | Level 1 - Online 223 Litchfield Turnpike | New Preston | 6777 | 8 | Solar | PV | 2010-05-13 00:00:00 | Level 1 - Online 232 Kent Road South | Cornwall Brg | 6754 | 7 | Solar | PV | 2010-10-07 00:00:00 | Level 1 - Online 204 Old Kelsey Pt Rd | Westbrook | 06498-2132 | 3 | Solar | PV | 2010-06-08 00:00:00 | Level 1 - Online 959 Essex Rd | Westbrook | 06498-1596 | 10 | Solar | PV | 2010-06-04 00:00:00 | Level 1 - Online 40 Green Hill Road, Right Apt. | Bethlehem | 6751 | 5 | Solar | PV | 2010-08-11 00:00:00 | Level 1 - Online 13 Young St | East Hampton | 6424 | 4 | Solar | PV | 2010-07-12 00:00:00 | Level 1 - Online 145 Pullen Ave. | Oakville | 6779 | 6 | Solar | PV | 2010-06-23 00:00:00 | Level 1 - Online 31 Berkshire Dr | Farmington | 6032 | 6 | Solar | PV | 2010-04-23 00:00:00 | Level 1 - Online 6 Washington Ridge Road | East Granby | 6026 | 10 | Solar | PV | 2010-07-21 00:00:00 | Level 1 - Online 35 Concord Street | West Hartford | 6119 | 4 | Solar | PV | 2010-08-27 00:00:00 | Level 1 - Online 16 Broad Hill Rd | West Granby | 6090 | 8 | Solar | PV | 2010-05-14 00:00:00 | Level 1 - Online 161 New Sweden Rd. | Woodstock | 6281 | 5 | Solar | PV | 2010-06-08 00:00:00 | Level 1 - Online 7 Highland Oak Dr | Ellington | 6929 | 8.3 | Solar | PV | 2010-05-10 00:00:00 | Level 1 - Online 81 W District Rd | Unionville | 6085 | 7 | Solar | PV | 2010-05-14 00:00:00 | Level 1 - Online 23 Sandy Brook Road | Colebrook | 6021 | 10 | Solar | PV | 2010-05-14 00:00:00 | Level 1 - Online 1676 Guerdat Road | Torrington | 6790 | 7.5 | Solar | PV | 2010-06-04 00:00:00 | Level 1 - Online 468 Wrights Crossing Rd. | Pomfret | 6259 | 7 | Solar | PV | 2010-07-29 00:00:00 | Level 1 - Online 90 Maple Ave | East Haddam | 6423 | 10 | Solar | PV | 2010-05-28 00:00:00 | Level 1 - Online 84 Maple Ave S | Westport | 6880 | 2.5 | Solar | PV | 2010-06-04 00:00:00 | Level 1 - Online 3 Devonshire La | Columbia | 6237 | 9.6 | Solar | PV | 2010-05-27 00:00:00 | Level 1 - Online 300F Maple Ave | Uncasville | 6382 | 8 | Solar | PV | 2010-06-30 00:00:00 | Level 1 - Online 295 Mark Rd. | Coventry | 6238 | 4 | Solar | PV | 2010-06-16 00:00:00 | Level 1 - Online 6 Chapman Ave. | Quaker Hill | 6375 | 7.5 | Solar | PV | 2010-09-03 00:00:00 | Level 1 - Online 106 Black Rock Tpke. | West Redding | 6896 | 7 | Solar | PV | 2010-11-12 00:00:00 | Level 1 - Online 18 Old King Highway | Hampton | 6247 | 3 | Solar | PV | 2010-09-16 00:00:00 | Level 1 - Online 67A Washburn Road | Canton | 6019 | 4 | Solar | PV | 2000-01-01 00:00:00 | Level 1 - Online 329 Long Hill St. | East Hartford | 6108 | 8 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 53 Spring Hill Ave. | Norwalk | 6850 | 6 | Solar | PV | 2010-08-12 00:00:00 | Level 1 - Online 18 Sixth Ave. | Branford | 6405 | 9 | Solar | PV | 2010-09-23 00:00:00 | Level 1 - Online 135 S. Farms Dr. | Manchester | 6040 | 8 | Solar | PV | 2010-07-28 00:00:00 | Level 1 - Online 229 Ridge Hill Rd | Oakdale | 6370 | 10 | Solar | PV | 2010-07-12 00:00:00 | Level 1 - Online 76 Spooner Hill Road | South Kent | 6785 | 7.5 | Solar | PV | 2010-09-10 00:00:00 | Level 1 - Online 115 Haley Road | Mystic | 6355 | 9 | Solar | PV | 2010-09-24 00:00:00 | Level 1 - Online 23 Sawmill Road | Burlington | 6013 | 6 | Solar | PV | 2010-08-12 00:00:00 | Level 1 - Online 217 Artillery Road | Middlebury | 6762 | 10 | Solar | PV | 2010-09-28 00:00:00 | Level 1 - Online 18 Sugar Hill Road | Salisbury | 6031 | 4 | Solar | PV | 2010-06-21 00:00:00 | Level 1 - Online 150 Valley Road | Cornwall | 6753 | 5 | Solar | PV | 2010-07-29 00:00:00 | Level 1 - Online 42 Granby Farms Road | Granby | 6035 | 10 | Solar | PV | 2010-09-09 00:00:00 | Level 1 - Online 8 Lilac Lane | Higganum | 6441 | 10 | Solar | PV | 2010-06-29 00:00:00 | Level 1 - Online 80 Harbor Road | Colchester | 6415 | 10 | Solar | PV | 2010-06-24 00:00:00 | Level 1 - Online 100 Portland Ave | Wilton | 6897 | 7 | Solar | PV | 2010-11-04 00:00:00 | Level 1 - Online 25 Amanda Lane | Danielson | 6239 | 6 | Solar | PV | 2010-11-23 00:00:00 | Level 1 - Online 88 Kildeer Lane | Suffield | 6078 | 8 | Solar | PV | 2010-10-20 00:00:00 | Level 1 - Online 55 Running Brook Dr | Killingworth | 6419 | 7.41 | Solar | PV | 2010-08-05 00:00:00 | Level 1 - Online 24 Marcardon Ave | Ridgefield | 6877 | 2.5 | Solar | PV | 2010-10-07 00:00:00 | Level 1 - Online 16 Doubling Rd | Greenwich | 6830 | 5 | Solar | PV | 2010-11-15 00:00:00 | Level 1 - Online 14 Wyncairne Dr. | East Granby | 6026 | 4 | Solar | PV | 2010-08-09 00:00:00 | Level 1 - Online 413 Sanford Road | Southbury | 6488 | 4 | Solar | PV | 2010-10-20 00:00:00 | Level 1 - Online 217 Crane Hollow Road | Bethlehem | 6751 | 5 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 24 Hazel Woods Drive | Woodbury | 6798 | 8 | Solar | PV | 2010-10-26 00:00:00 | Level 1 - Online 20 Birch Rd | New Fairfield | 6812 | 10.08 | Solar | PV | 2010-10-13 00:00:00 | Level 1 - Online 18 Mallard Lane | Clinton | 6413 | 7 | Solar | PV | 2010-09-27 00:00:00 | Level 1 - Online 168 Clark Lane | Waterford | 6385 | 10 | Solar | PV | 2010-08-16 00:00:00 | Level 1 - Online 231 Gillette Road | New Hartford | 06057-2811 | 2.28 | Solar | PV | 2011-01-27 00:00:00 | Level 1 - Online 436 Oxoboxo Dam Rd | Oakdale | 6370 | 8 | Solar | PV | 2011-02-24 00:00:00 | Level 1 - Online 3 Dorset Dr | New Milford | 6776 | 5 | Solar | PV | 2010-11-30 00:00:00 | Level 1 - Online 306 Pine Hill Rd. | Sterling | 6377 | 3.5 | Solar | PV | 2010-10-01 00:00:00 | Level 1 - Online 100 Curtiss Rd | New Preston | 6777 | 7 | Solar | PV | 2010-09-17 00:00:00 | Level 1 - Online 147 Pleasant Street | Windsor | 6095 | 6 | Solar | PV | 2010-11-23 00:00:00 | Level 1 - Online 185 Hanover Road | Scotland | 6330 | 2.5 | Solar | PV | 2010-09-16 00:00:00 | Level 1 - Online 346 Merriman Road | Windsor | 6095 | 5.3 | Solar | PV | 2010-12-02 00:00:00 | Level 1 - Online 119 Wheeler Road | Litchfield | 6759 | 7 | Solar | PV | 2011-01-05 00:00:00 | Level 1 - Online 26 Seven Hills Crossing | East Hampton | 6424 | 8 | Solar | PV | 2010-10-22 00:00:00 | Level 1 - Online 106 Sleepy Hollow Rd. | North Stonington | 6359 | 6 | Solar | PV | 2010-11-19 00:00:00 | Level 1 - Online 42 Hunting Ridge Rd. | Wilton | 6897 | 10 | Solar | PV | 2010-12-07 00:00:00 | Level 1 - Online 489 Pucker St. | Coventry | 6238 | 7.5 | Solar | PV | 2010-11-17 00:00:00 | Level 1 - Online 7 Meadow Ave. | Stonington | 6378 | 10 | Solar | PV | 2011-01-13 00:00:00 | Level 1 - Online 73 Nutmeg Rd. | Bristol | 6010 | 5 | Solar | PV | 2010-09-16 00:00:00 | Level 1 - Online 370 Kickhill Rd. | Lebanon | 6249 | 8 | Solar | PV | 2010-10-20 00:00:00 | Level 1 - Online 333 Park Road Ext | Middlebury | 6762 | 4.94 | Solar | PV | 2010-11-18 00:00:00 | Level 1 - Online 133 Pachaug River Drive | Griswold | 6351 | 10 | Solar | PV | 2010-12-29 00:00:00 | Level 1 - Online 1167 North Broad Street | Meriden | 6450 | 5.3 | Solar | PV | 2010-10-07 00:00:00 | Level 1 - Online 17 Christopher Rd. | East Hampton | 6424 | 4 | Solar | PV | 2010-10-21 00:00:00 | Level 1 - Online 176 Windham Road | Hampton | 6247 | 10 | Solar | PV | 2010-11-23 00:00:00 | Level 1 - Online 46 Glen Hill Rd | Wilton | 6897 | 7 | Solar | PV | 2011-01-13 00:00:00 | Level 1 - Online 35 West Hills | Avon | 6001 | 5 | Solar | PV | 2011-10-26 00:00:00 | Level 1 - Online 19 Pembroke Rd | Darien | 6820 | 7 | Solar | PV | 2010-10-25 00:00:00 | Level 1 - Online 22 Linden Point Rd | Branford | 6405 | 8 | Solar | PV | 2010-12-03 00:00:00 | Level 1 - Online 5 Fountain Head Road | Plymouth | 6786 | 7 | Solar | PV | 2010-11-24 00:00:00 | Level 1 - Online 72 Carriage Dr | Durham | 6422 | 9.45 | Solar | PV | 2010-10-22 00:00:00 | Level 1 - Online 332 Kent Rd. S | Cornwall Brg | 6754 | 10 | Solar | PV | 2011-01-20 00:00:00 | Level 1 - Online 3 Michaels Way | Oakdale | 6370 | 7.5 | Solar | PV | 2011-02-09 00:00:00 | Level 1 - Online 21 Carrington Dr. | Greenwich | 6831 | 7.5 | Solar | PV | 2011-03-24 00:00:00 | Level 1 - Online 100 Mott Lane | Moodus | 6469 | 8 | Solar | PV | 2010-11-09 00:00:00 | Level 1 - Online 141 Oak Farm Dr | Colchester | 6415 | 6.74 | Solar | PV | 2010-11-08 00:00:00 | Level 1 - Online 38 Canterbury Dr | Durham | 6422 | 10 | Solar | PV | 2010-12-20 00:00:00 | Level 1 - Online 19 Hearthstone Dr | Barkhamsted | 6063 | 5 | Solar | PV | 2011-06-13 00:00:00 | Level 1 - Online 14 Noyes Rd | Old Lyme | 6371 | 6 | Solar | PV | 2011-01-04 00:00:00 | Level 1 - Online 24 Cedar Meadow Rd | East Haddam | 6469 | 7 | Solar | PV | 2010-11-29 00:00:00 | Level 1 - Online 423 Haddam Quarter Rd | Durham | 6422 | 9.88 | Solar | PV | 2011-01-06 00:00:00 | Level 1 - Online 380 Kick Hill Rd | Lebanon | 6249 | 2 | Solar | PV | 2011-01-20 00:00:00 | Level 1 - Online 300 D Maple Ave. | Uncasville | 6382 | 8 | Solar | PV | 2010-12-07 00:00:00 | Level 1 - Online 24 D Rosemary Ln | Middlefield | 6455 | 3.83 | Solar | PV | 2011-03-01 00:00:00 | Level 1 - Online 33 Hampton Dr | Manchester | 6040 | 10 | Solar | PV | 2011-01-26 00:00:00 | Level 1 - Online 14 Holmes Road | Ellington | 06029-2932 | 7 | Solar | PV | 2010-12-21 00:00:00 | Level 1 - Online 612 Old Main Street | Rocky Hill | 6067 | 6.27 | Solar | PV | 2011-03-03 00:00:00 | Level 1 - Online 25 Hilltop Drive | Portland | 6480 | 6 | Solar | PV | 2010-12-22 00:00:00 | Level 1 - Online 181 Bacon Road | Roxbury | 6783 | 7 | Solar | PV | 2011-01-03 00:00:00 | Level 1 - Online 33 Ashford Road | Eastford | 6278 | 6 | Solar | PV | 2011-04-05 00:00:00 | Level 1 - Online 99 Noble Ave | Groton | 6340 | 5.1 | Solar | PV | 2010-12-21 00:00:00 | Level 1 - Online 706 Farmington Ave | New Britain | 6051 | 8 | Solar | PV | 2011-03-29 00:00:00 | Level 1 - Online 138 Housatonic River Road | Salisbury | 6068 | 9.5 | Solar | PV | 2011-06-27 00:00:00 | Level 1 - Online 6 Sage Lane | East Granby | 6026 | 6 | Solar | PV | 2011-01-17 00:00:00 | Level 1 - Online 14 West Cove Road | East Haddam | 6465 | 8.36 | Solar | PV | 2011-02-24 00:00:00 | Level 1 - Online 95 Middle Beach Road | Madison | 6475 | 15 | Solar | PV | 2011-04-07 00:00:00 | Level 1 - Online 119 Boardman Rd | East Haddam | 6423 | 9.12 | Solar | PV | 2011-04-15 00:00:00 | Level 1 - Online 20 Reed Rd. | Manchester | 6040 | 5 | Solar | PV | 2011-04-04 00:00:00 | Level 1 - Online 10 Oxford Dr. | Enfield | 6082 | 7.5 | Solar | PV | 2011-04-13 00:00:00 | Level 1 - Online 260 Beach Pond Rd. | Voluntown | 6384 | 10 | Solar | PV | 2011-03-29 00:00:00 | Level 1 - Online 16 Jeremiah Rd | Sandy Hook | 6482 | 10 | Solar | PV | 2011-07-26 00:00:00 | Level 1 - Online 13 Rose Lane | East Lyme | 6333 | 2 | Solar | PV | 2011-02-11 00:00:00 | Level 1 - Online 70 Johnsonville Rd | Moodus | 6469 | 4 | Solar | PV | 2011-03-03 00:00:00 | Level 1 - Online Lot 21R, 180 Cranberry Ln | Middletown | 6457 | 8 | Solar | PV | 2011-04-28 00:00:00 | Level 1 - Online 16 Sanfords Bridge | East Haddam | 6423 | 9.12 | Solar | PV | 2011-03-17 00:00:00 | Level 1 - Online 24 Sugar Hill Rd | Salisbury | 6068 | 5 | Solar | PV | 2011-05-02 00:00:00 | Level 1 - Online 68 Middle Rd | Preston | 6365 | 8 | Solar | PV | 2011-04-05 00:00:00 | Level 1 - Online 54 New Preston Hill Road | New Preston | 6777 | 7.5 | Solar | PV | 2011-04-12 00:00:00 | Level 1 - Online 83 Taine Mountain Rd | Burlington | 6013 | 7 | Solar | PV | 2011-06-29 00:00:00 | Level 1 - Online 165 Union Street | Deep River | 6417 | 4.94 | Solar | PV | 2011-05-05 00:00:00 | Level 1 - Online 88 Cedar Cliff Road | Riverside | 6878 | 10 | Natural Gas | Internal Combustion Engine | 2011-07-20 00:00:00 | Level 1 - Online 4 Beckwith Rd | Killingworth | 6419 | 10 | Solar | PV | 2011-10-12 00:00:00 | Level 1 - Online 25 Cadwell Pl | Branford | 6405 | 6 | Solar | PV | 2011-10-21 00:00:00 | Level 1 - Online 25 Lawson Rd | Bristol | 6010 | 1.5 | Solar | PV | 2011-05-25 00:00:00 | Level 1 - Online 2 Moser Dr | Rocky Hill | 06067-3725 | 5 | Solar | PV | 2011-06-23 00:00:00 | Level 1 - Online 31 Oak Hill Dr. | Niantic | 6357 | 5 | Solar | PV | 2011-07-05 00:00:00 | Level 1 - Online 49 Kelseytown Road | Clinton | 6413 | 7.56 | Solar | PV | 2011-06-21 00:00:00 | Level 1 - Online 27 Poinsettia Street | Middletown | 6457 | 5.13 | Solar | PV | 2011-06-08 00:00:00 | Level 1 - Online 752 Lakeside Rd | Southbury | 6488 | 6 | Solar | PV | 2011-08-01 00:00:00 | Level 1 - Online 11 Birch Ln | Ridgefield | 6877 | 7 | Solar | PV | 2011-11-18 00:00:00 | Level 1 - Online 40 Deanna Dr. | Griswold | 6351 | 10 | Solar | PV | 2011-08-18 00:00:00 | Level 1 - Online 76 Sturges Ridge Road | Wilton | 6897 | 4.83 | Solar | PV | 2011-09-22 00:00:00 | Level 1 - Online 9 Cleary Lane | Windsor | 6095 | 8 | Solar | PV | 2011-07-01 00:00:00 | Level 1 - Online 66 Howland Rd | Kent | 6757 | 5 | Solar | PV | 2011-07-27 00:00:00 | Level 1 - Online 42 Jacobson Farm Rd. | East Hampton | 6424 | 7 | Solar | PV | 2011-07-07 00:00:00 | Level 1 - Online 102 Earle St. | Hartford | 6120 | 4 | Solar | PV | 2011-08-08 00:00:00 | Level 1 - Online 110 Earle St., Floor 2 | Hartford | 6120 | 4 | Solar | PV | 2011-08-08 00:00:00 | Level 1 - Online 24 Town Street | Hadlyme | 6423 | 10 | Solar | PV | 2011-09-28 00:00:00 | Level 1 - Online 163 Bear Swamp Rd. | East Hampton | 6424 | 4 | Solar | PV | 2011-08-19 00:00:00 | Level 1 - Online 152 Chestnut Hill road | Stafford Springs | 6076 | 8.3 | Solar | PV | 2011-09-14 00:00:00 | Level 1 - Online 319 Scotland Road | Windham | 6280 | 18.8 | Solar | PV | 2012-03-16 00:00:00 | Level 1 - Online 743 Redding Rd | Redding | 6896 | 9.46 | Solar | PV | 2011-08-22 00:00:00 | Level 1 - Online 50 Knibloe Hill Rd. | Sharon | 6069 | 10 | Solar | PV | 2011-09-09 00:00:00 | Level 1 - Online 23 Putnam Park Rd | Bethel | 6801 | 3.78 | Solar | PV | 2012-02-02 00:00:00 | Level 1 - Online 284 Flanders Road | Bethlehem | 6751 | 3.61 | Solar | PV | 2011-10-24 00:00:00 | Level 1 - Online 51 Schalk Rd | Lebanon | 06249-1416 | 10 | Solar | PV | 2011-09-26 00:00:00 | Level 1 - Online 518 Route169 | Woodstock | 6281 | 4 | Solar | PV | 2011-12-02 00:00:00 | Level 1 - Online 53 Hydeville Road | Stafford Spgs | 6076 | 7 | Solar | PV | 2011-09-09 00:00:00 | Level 1 - Online 31 New Canaan Road | Wilton | 6897 | 2.73 | Solar | PV | 2011-09-22 00:00:00 | Level 1 - Online 114 Middlesex Ave | Chester | 06412-1224 | 7 | Solar | PV | 2012-01-09 00:00:00 | Level 1 - Online 97 Cemetery Road | Mansfield Ctr | 6250 | 4 | Solar | PV | 2011-09-26 00:00:00 | Level 1 - Online 629 Hampton Road | Pomfret Ctr | 6259 | 3.5 | Wind | Wind Turbine | 2011-11-16 00:00:00 | Level 1 - Online 1804 Old Waterbury Road | Cheshire | 6410 | 5.45 | Solar | PV | 2011-09-19 00:00:00 | Level 1 - Online 6 Circle Dr East | Danbury | 6811 | 10 | Solar | PV | 2012-01-16 00:00:00 | Level 1 - Online 72 Park Rd | Colchester | 6415 | 3 | Solar | PV | 2011-12-29 00:00:00 | Level 1 - Online 70 Gardner Rd | Voluntown | 6384 | 5.7 | Solar | PV | 2011-11-15 00:00:00 | Level 1 - Online 47 oak leaf drive | Colchester | 6415 | 5.8 | Solar | PV | 2011-12-02 00:00:00 | Level 1 - Online 35 Driscoll Drive | Uncasville | 6382 | 9.87 | Solar | PV | 2011-12-07 00:00:00 | Level 1 - Online 146 Daly Road | Hebron | 6248 | 4 | Solar | PV | 2011-12-14 00:00:00 | Level 1 - Online 60 Wood Rd | West Redding | 6896 | 10 | Solar | PV | 2012-01-24 00:00:00 | Level 1 - Online 756 Brayman Hollow Rd | Pomfret Ctr | 6259 | 5.16 | Solar | PV | 2012-01-23 00:00:00 | Level 1 - Online 31 Pautipaug Hill Road | North Franklin | 6254 | 10 | Solar | PV | 2012-01-16 00:00:00 | Level 1 - Online 261 Old Mount Tom Road | Bantam | 6750 | 10 | Solar | PV | 2011-12-21 00:00:00 | Level 1 - Online 3 Webster Heights | Cromwell | 06416-2122 | 14.19 | Solar | PV | 2012-01-11 00:00:00 | Level 1 - Online 96 Fire Hill Rd | Redding | 6896 | 10 | Solar | PV | 2012-02-03 00:00:00 | Level 1 - Online 129 Grantville Road | Norfolk | 6058 | 8 | Solar | PV | 2012-04-26 00:00:00 | Level 1 - Online 226 West Road | New Canaan | 6840 | 9 | Solar | PV | 2012-07-20 00:00:00 | Level 1 - Online 139 Griffiths Rd | Danielson | 6239 | 8 | Solar | PV | 2012-05-11 00:00:00 | Level 1 - Online 74 Clark Hill Rd | South Glastonbury | 6073 | 10 | Solar | PV | 2012-04-27 00:00:00 | Level 1 - Online 36 Ball Pond Rd East | New Fairfield | 6812 | 4.73 | Solar | PV | 2012-04-27 00:00:00 | Level 1 - Online 111 Sabin St | Putnam | 6260 | 3.01 | Solar | PV | 2012-04-11 00:00:00 | Level 1 - Online 13 Chadwick Place | East Lyme | 6357 | 6.7 | Solar | PV | 2012-06-21 00:00:00 | Level 1 - Online 7 Old Sharon Road 3 | Sharon | 6069 | 1.9 | Solar | PV | 2012-04-27 00:00:00 | Level 1 - Online 7 Garnet Hill Lane | Avon | 6001 | 9.5 | Solar | PV | 2012-04-10 00:00:00 | Level 1 - Online 21 Lincoln Ave | Branford | 6405 | 7.74 | Solar | PV | 2012-07-24 00:00:00 | Level 1 - Online 34 Kelly Ln | Granby | 6035 | 6 | Solar | PV | 2012-06-05 00:00:00 | Level 1 - Online 35 Coe Road | Wolcott | 6716 | 3 | Solar | PV | 2012-05-14 00:00:00 | Level 1 - Online 109 Bradway Road | Stafford Spgs | 6076 | 6 | Solar | PV | 2012-07-11 00:00:00 | Level 1 - Online 75 Latici Street | Putnam | 6260 | 2.15 | Solar | PV | 2012-05-07 00:00:00 | Level 1 - Online 121 Nortontown Road | Madison | 6443 | 5.7 | Solar | PV | 2012-04-26 00:00:00 | Level 1 - Online 25 Brainard Road | Niantic | 6357 | 7.5 | Solar | PV | 2012-05-02 00:00:00 | Level 1 - Online 19 Church Road | Eastford | 6242 | 4 | Solar | PV | 2012-05-07 00:00:00 | Level 1 - Online 10 Town Hill Road | Warren | 6754 | 10 | Solar | PV | 2012-05-04 00:00:00 | Level 1 - Online 226 Long Swamp Rd | Wolcott | 6716 | 7 | Solar | PV | 2012-05-16 00:00:00 | Level 1 - Online 147 Westford Road | Eastford | 6242 | 7 | Solar | PV | 2012-06-26 00:00:00 | Level 1 - Online 165 Saw Mill Rd | Guilford | 6437 | 4 | Solar | PV | 2012-05-25 00:00:00 | Level 1 - Online 148 Pleasant Street | Windsor | 6905 | 3.44 | Solar | PV | 2012-05-04 00:00:00 | Level 1 - Online 33 Holly Dr | Storrs | 6268 | 10 | Solar | PV | 2012-07-13 00:00:00 | Level 1 - Online 72 Sunset Hill Rd | Bethel | 6801 | 5.375 | Solar | PV | 2012-08-03 00:00:00 | Level 1 - Online 16 Wild Rose Pl | Waterford | 6385 | 4.9 | Solar | PV | 2012-06-07 00:00:00 | Level 1 - Online 11 Sunset Road | Old Saybrook | 6475 | 7 | Solar | PV | 2012-05-07 00:00:00 | Level 1 - Online 225 Haywardville Road | East Haddam | 6415 | 3.87 | Solar | PV | 2012-06-07 00:00:00 | Level 1 - Online 965 Horse Hill Road | Westbrook | 6498 | 2.58 | Solar | PV | 2012-07-03 00:00:00 | Level 1 - Online 20 Pierce Rd | South Windsor | 6074 | 8 | Solar | PV | 2012-06-25 00:00:00 | Level 1 - Online 184 Hampden Rd | Stafford | 6076 | 6 | Solar | PV | 2012-07-09 00:00:00 | Level 1 - Online 86 Zoey Drive | Vernon | 6066 | 7.2 | Solar | PV | 2012-08-16 00:00:00 | Level 1 - Online 3 Standish Road | Windsor | 6095 | 8 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 111 Cone Pond Lane | Granby | 6090 | 7 | Solar | PV | 2012-08-09 00:00:00 | Level 1 - Online 234 Mile Creek Rd | Old Lyme | 6371 | 5 | Solar | PV | 2012-09-20 00:00:00 | Level 1 - Online 56 Parker Terrace Ext | Glastonbury | 6033 | 3.01 | Solar | PV | 2012-07-10 00:00:00 | Level 1 - Online 122 White Oak Shade Road | New Canaan | 6840 | 9.215 | Solar | PV | 2012-07-06 00:00:00 | Level 1 - Online 11 Granite Street | New London | 6320 | 4 | Solar | PV | 2012-07-06 00:00:00 | Level 1 - Online 26 River Road | Greenwich | 6807 | 6.09 | Solar | PV | 2012-09-26 00:00:00 | Level 1 - Online 1079 France St | Rocky Hill | 6067 | 9.89 | Solar | PV | 2012-07-11 00:00:00 | Level 1 - Online 96 Cream Pot Road | Durham | 6442 | 12 | Solar | PV | 2012-09-25 00:00:00 | Level 1 - Online 85 R Newgate Road | East Granby | 6026 | 6.23 | Solar | PV | 2012-07-19 00:00:00 | Level 1 - Online 200 Pole Bridge Rd | Woodstock | 6281 | 14 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 770 Long Cove Road | Gales Ferry | 6335 | 5.16 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 148 Old Woodbury Road | Southbury | 6488 | 10 | Solar | PV | 2012-07-30 00:00:00 | Level 1 - Online 84 West Mountain Rd | Canton | 6019 | 4.5 | Solar | PV | 2012-08-30 00:00:00 | Level 1 - Online 51 Woodmont Road | Avon | 6001 | 4.2 | Solar | PV | 2012-10-09 00:00:00 | Level 1 - Online 641 Plainfield Pike Rd | Plainfield | 6374 | 7.5 | Solar | PV | 2012-09-25 00:00:00 | Level 1 - Online 578 Foot Hills Road | Higganum | 6441 | 5 | Solar | PV | 2012-11-07 00:00:00 | Level 1 - Online 17 Pond View Dr | Woodstock | 6281 | 5 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 11 Sunny Slope Drive | West Hartford | 6117 | 6 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 88 England Rd | Chaplin | 6235 | 5 | Solar | PV | 2012-08-28 00:00:00 | Level 1 - Online 30 colonial drive | Deep River | 6417 | 8.4 | Solar | PV | 2012-07-03 00:00:00 | Level 1 - Online 40 A Almada Drive | Brooklyn | 6234 | 5 | Solar | PV | 2012-10-18 00:00:00 | Level 1 - Online 1 Lawncrest Road | Enfield | 6082 | 4.515 | Solar | PV | 2012-08-01 00:00:00 | Level 1 - Online 58 Maxfelix Drive | Mansfield | 6268 | 7.31 | Solar | PV | 2012-07-13 00:00:00 | Level 1 - Online 15 Coppermine Rd. | Farmington | 6032 | 9.89 | Solar | PV | 2012-07-27 00:00:00 | Level 1 - Online 224 Riverside Dr. | Baltic | 6330 | 7.1 | Solar | PV | 2012-08-06 00:00:00 | Level 1 - Online 38 Tracey Ann Court | Naugatuck | 6770 | 7.2 | Solar | PV | 2012-10-10 00:00:00 | Level 1 - Online 35 Maple Shade Road | Middletown | 6457 | 8.6 | Solar | PV | 2012-09-19 00:00:00 | Level 1 - Online 27 Stephanie Drive | New Milford | 6776 | 5 | Solar | PV | 2012-08-28 00:00:00 | Level 1 - Online 38 Terrace Ave, Flr 1 | New London | 6320 | 3 | Solar | PV | 2013-01-18 00:00:00 | Level 1 - Online 14 Hunt Lane | Weston | 6883 | 10 | Solar | PV | 2012-10-15 00:00:00 | Level 1 - Online 455 Norwich Westerly Rd | North Stonington | 6359 | 8 | Solar | PV | 2012-09-11 00:00:00 | Level 1 - Online 2 Split Rail Ct | Oxford | 6478 | 8.4 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 675 Heron Dr | Torrington | 6790 | 6 | Solar | PV | 2012-10-15 00:00:00 | Level 1 - Online 125 E. Chestnut Hill Rd | Litchfield | 6759 | 9.03 | Solar | PV | 2012-09-05 00:00:00 | Level 1 - Online 85 Atwood St. | Watertown | 6795 | 7.74 | Solar | PV | 2012-10-05 00:00:00 | Level 1 - Online 29 Berch Court | Wilton | 6897 | 6 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 98 Pond Place | Middletown | 6457 | 5.805 | Solar | PV | 2012-07-25 00:00:00 | Level 1 - Online 136 Fieldstone Dr | Windsor | 6095 | 4.515 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 27 Evans Dr | Simsbury | 6070 | 4.945 | Solar | PV | 2012-10-09 00:00:00 | Level 1 - Online 52 Catoonah St. | Ridgefield | 6877 | 5 | Solar | PV | 2012-10-18 00:00:00 | Level 1 - Online 307 Roast Meat Hill Road | Killingworth | 6419 | 9.675 | Solar | PV | 2012-08-24 00:00:00 | Level 1 - Online 3 Sea Spray Rd | Old Lyme | 6371 | 3 | Solar | PV | 2012-10-19 00:00:00 | Level 1 - Online 309 Lake Dr | Guilford | 6437 | 7.6 | Solar | PV | 2012-08-16 00:00:00 | Level 1 - Online 5 Hilltop Road | Ellington | 6029 | 4 | Solar | PV | 2012-09-28 00:00:00 | Level 1 - Online 73 E Weatogue St | Simsbury | 6070 | 10 | Solar | PV | 2012-10-17 00:00:00 | Level 1 - Online 578 Hill Road | Terryville | 6786 | 6.5 | Solar | PV | 2012-01-10 00:00:00 | Level 1 - Online 36 Occum Lane | Uncasville | 6382 | 11 | Solar | PV | 2012-09-07 00:00:00 | Level 1 - Online 169 Penn Drive | West Hartford | 6119 | 8.55 | Solar | PV | 2012-09-13 00:00:00 | Level 1 - Online 6 Romindon Court | Norwalk | 6851 | 4.2 | Solar | PV | 2012-10-16 00:00:00 | Level 1 - Online 25 Prospect St | Enfield | 6082 | 3 | Solar | PV | 2012-10-17 00:00:00 | Level 1 - Online 100 Westport Dr | Waterbury | 6706 | 7 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 23 Harbor Rd | Darien | 6820 | 10 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 555 Colchester Road | Hebron | 6231 | 8.17 | Solar | PV | 2012-09-05 00:00:00 | Level 1 - Online 13 Stevens St | Windsor Locks | 6096 | 2.58 | Solar | PV | 2012-08-31 00:00:00 | Level 1 - Online 203 Maple Street | Litchfield | 6759 | 6 | Solar | PV | 2012-11-09 00:00:00 | Level 1 - Online 32 Buxton Lane | Riverside | 6878 | 5 | Solar | PV | 2012-10-17 00:00:00 | Level 1 - Online 80 Ridgewood Ave | Madison | 6443 | 4.73 | Solar | PV | 2012-10-16 00:00:00 | Level 1 - Online 198 Mechanic St. | Bristol | 6010 | 7.5 | Solar | PV | 2012-12-03 00:00:00 | Level 1 - Online 56 Shipman Dr | Glastonbury | 6033 | 6 | Solar | PV | 2012-11-30 00:00:00 | Level 1 - Online 44 FOREST ROAD | Madison | 6443 | 6 | Solar | PV | 2012-09-17 00:00:00 | Level 1 - Online 60 N Cove Road | Old Saybrook | 6475 | 8.4 | Solar | PV | 2012-09-12 00:00:00 | Level 1 - Online 202 Mountain Rd | West Hartford | 6017 | 10 | Solar | PV | 2012-12-13 00:00:00 | Level 1 - Online 9 Beach Street West #2 | Waterford | 6385 | 8.4 | Solar | PV | 2012-11-08 00:00:00 | Level 1 - Online 650 Albany Turnpike | Canton | 6019 | 3.87 | Solar | PV | 2012-09-24 00:00:00 | Level 1 - Online 259 Russet Lane | Southington | 6489 | 7.5 | Solar | PV | 2012-10-09 00:00:00 | Level 1 - Online 61 Barry Lane | Simsbury | 06070-2018 | 8.6 | Solar | PV | 2013-01-02 00:00:00 | Level 1 - Online 72 Pump Hill Road | Hebron | 6248 | 5.16 | Solar | PV | 2012-10-22 00:00:00 | Level 1 - Online 87 Whittlesey Road | Washington | 6794 | 7.5 | Solar | PV | 2012-10-25 00:00:00 | Level 1 - Online 20 Carrington Lane | Farmington | 6032 | 6.66 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 153 Lake Ridge Road | Southbury | 6488 | 7.2 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 9 Hillcrest Ln | Greenwich | 6870 | 7.6 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 75 Popple Bridge Rd | Griswold | 6351 | 6 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 10 Aspetuck Hill Rd | Weston | 6883 | 7 | Solar | PV | 2013-01-03 00:00:00 | Level 1 - Online 33 Village Drive | Mystic | 6339 | 6 | Solar | PV | 2012-10-11 00:00:00 | Level 1 - Online 212 Gilead Rd | Andover | 6232 | 7 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 22 Lyme Street | Old Lyme | 6371 | 10 | Solar | PV | 2012-10-12 00:00:00 | Level 1 - Online 87 Alling Court | Kensington | 6037 | 5.641 | Solar | PV | 2012-11-16 00:00:00 | Level 1 - Online 60 Cutler Rd | Dayville | 6241 | 10 | Solar | PV | 2012-11-14 00:00:00 | Level 1 - Online 59 Maynard Road | Old Saybrook | 6475 | 5.8 | Solar | PV | 2012-10-18 00:00:00 | Level 1 - Online 96 Harwinton Ave | Terryville | 6786 | 6.02 | Solar | PV | 2012-12-26 00:00:00 | Level 1 - Online 15 Silver Falls | Oakdale | 06370-1824 | 8 | Solar | PV | 2013-01-04 00:00:00 | Level 1 - Online 6 Sprucedale Road, Apt C | Woodstock | 6281 | 4.5 | Solar | PV | 2013-07-12 00:00:00 | Level 1 - Online 6 Sprucedale Road, Apt D | Woodstock | 6281 | 4.73 | Solar | PV | 2013-07-12 00:00:00 | Level 1 - Online 6 Sprucedale Road, Apt A | Woodstock | 6281 | 4.515 | Solar | PV | 2013-07-12 00:00:00 | Level 1 - Online 2 Cannon Brook Lane | Norwalk | 6851 | 4.3 | Solar | PV | 2012-11-26 00:00:00 | Level 1 - Online 125 Diane Dr | South Windsor | 6074 | 10 | Solar | PV | 2012-12-20 00:00:00 | Level 1 - Online 27James Road East | Durham | 6422 | 6.45 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 195 Skeet Club Road | Durham | 6422 | 10 | Solar | PV | 2012-11-08 00:00:00 | Level 1 - Online 182R Parmelee HIll Road | Durham | 6422 | 6.45 | Solar | PV | 2012-11-13 00:00:00 | Level 1 - Online 271 Newtown Turnpike | Wilton | 6897 | 5.805 | Solar | PV | 2013-01-03 00:00:00 | Level 1 - Online 50 Castlewood Rd | West Hartford | 6107 | 5.16 | Solar | PV | 2012-10-24 00:00:00 | Level 1 - Online 27 Knollcrest Rd | New Fairfield | 6812 | 4.2 | Solar | PV | 2012-12-20 00:00:00 | Level 1 - Online 24 Linwold Drive | West Hartford | 6107 | 3 | Solar | PV | 2013-01-30 00:00:00

Text of UI-Attachment 1.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
The United Illuminating Company’s Transmission and Distribution System for 2025 Annual Report 2026 FINAL REPORT Submitted by: The United Illuminating Company 100 Marsh Hill Road Orange, CT 06477-3629 March 31, 2026 03/31/2026 Docket No. 86-12-03 CONTENTS I. II. III. IV. V. VI. VII. Executive Summary ................................................................................................................................... 5 Introduction ................................................................................................................................................. 7 Description of UI’s Geographic Area ........................................................................................................ 8 Reliability Performance in 2025 ................................................................................................................ 10 Chart IV-1.1 System Average Interruption Duration Index (2021 – 2025) ................................................. 13 Chart IV-1.2 System Average Interruption Frequency Index (2021 – 2025) ............................................. 14 Chart IV-1.3 Customer Average Interruption Duration Index (2021 – 2025) ............................................. 15 Chart IV-1.4 Customers Experiencing Multiple Interruptions (2025) ......................................................... 16 Chart IV-1.5 Customers Experiencing Long Interruption Duration (2025) ................................................. 17 Chart IV-2 Total Meter Hours Affected + Storm Days per Year ................................................................ 22 Blue-Sky, Gray-Sky, Blue-Sky + Gray-Sky, and Dark Sky (All-In) Performance .................................. 23 Causes of Outages ..................................................................................................................................... 25 Chart V-1.1 Causes of Outages by Interruptions (2025) .......................................................................... 27 Chart V-1.2 Causes of Outages by Interruptions (2021 - 2024) ............................................................... 28 Chart V-2.1 Causes of Outages by Meter Outages (2025) ...................................................................... 29 Chart V-2.2 Causes of Outages by Meter Outages (2021 - 2024) ........................................................... 30 Chart V-3.1 Causes of Outages by Meter Time Lost (2025) .................................................................... 31 Chart V-3.2 Causes of Outages by Meter Time Lost (2021 - 2024) ......................................................... 32 Reliability Improvement Programs Impact and Budget ......................................................................... 36 A. New Customer Additions ....................................................................................................................... 38 i. Residential Line............................................................................................................................. 38 ii. Street Lights ................................................................................................................................. 39 B. Infrastructure Replacement ................................................................................................................... 40 i. Bulk Substation Replacement ....................................................................................................... 40 ii. Low Voltage Distribution Substation Removal ............................................................................. 41 iii. Splicing Chambers ...................................................................................................................... 42 iv. Utility Poles .................................................................................................................................. 43 v. Circuit Performance Correction .................................................................................................... 44 vi. Network Infrastructure ................................................................................................................. 44 vii. Switchgear Replacement ........................................................................................................... 46 C. Capacity ................................................................................................................................................ 47 i. Distribution Transformers .............................................................................................................. 47 ii. Energy Storage Resiliency ........................................................................................................... 47 D. Enhancement Programs........................................................................................................................ 49 i. URD Project Rebuilds/Rehabilitation ............................................................................................ 49 ii. Highest CEMI-3 and CELID-9 Circuit Improvements ................................................................... 49 iii. Highest SAIDI/SAIFI Circuit Improvements ................................................................................. 50 iv. Status of Prior Corrective Actions ............................................................................................... 50 2 03/31/2026 Docket No. 86-12-03 v. Substation Flood Protection ......................................................................................................... 51 E. Maintenance Programs ......................................................................................................................... 52 i. Tree Trimming ............................................................................................................................... 52 ii. Infrared Survey ............................................................................................................................. 52 iii. Preventative Maintenance - RCM ............................................................................................... 53 iv. Distribution Network .................................................................................................................... 53 VIII. Power Quality .............................................................................................................................................. 55 IX. Equitable Modern Grid Initiatives Data ..................................................................................................... 57 X. Summary ...................................................................................................................................................... 60 XI. Voltage Irregularity Claims ......................................................................................................................... 61 Appendix 1: Service Territory Map .................................................................................................................... 62 Appendix 2: Definition of Terms ........................................................................................................................ 63 Appendix 3: Customers Served ......................................................................................................................... 68 Appendix 4: Transmission and Distribution System Miles per Construction Type and Voltage Level ..... 69 Appendix 5: Reliability Performance Against Goals ........................................................................................ 70 Appendix 6: UI Event Level Matrix ..................................................................................................................... 72 Appendix 7: Excluded Storm Summary ............................................................................................................ 73 Appendix 8: Reporting Metrics for Major Storms Event Level 3 – Event Level 1 ......................................... 74 Appendix 9: Major Storms Data – January 1, 2002 to Present ....................................................................... 75 Appendix 10: Excel File of Substation/Circuit Reliability Data - 2025............................................................ 76 Appendix 11: Five-Year Outage by Cause Summary ....................................................................................... 77 Appendix 12: Common Categories for Causes of Outages ............................................................................ 79 Appendix 13: Vegetation Program Miles Trimmed & Tree Trimming Denials ............................................... 81 Appendix 14: Tier 1 WPC .................................................................................................................................... 82 a. Worst Performing Circuits by CEMI-3 (July 2024 – June 2025 / All-In) ................................................. 82 b. Worst Performing Circuits by CEMI-3 (July 2024 – June 2025 / Non-Excluded) .................................. 85 c. Worst Performing Circuits by CEMI-3 (2025 Calendar Year / All-In) ..................................................... 87 d. Worst Performing Circuits by CEMI-3 (2025 Calendar Year / Non-Excluded) ...................................... 90 e. Worst Performing Circuits by CELID-9 (July 2024 – June 2025 / All-In) ............................................... 92 f. Worst Performing Circuits by CELID-9 (July 2024 – June 2025 / Non-Excluded).................................. 96 g. Worst Performing Circuits by CELID-9 (2025 Calendar Year / All-In) ................................................... 98 h. Worst Performing Circuits by CELID-9 (2025 Calendar Year / Non-Excluded) ..................................... 102 Appendix 15: Tier 2 WPC .................................................................................................................................... 104 a. 100 Worst Performing Circuits by SAIDI (July 2024 – June 2025) ........................................................ 104 b. 100 Worst Performing Circuits by SAIDI (2025 Calendar Year) ............................................................ 107 c. 100 Worst Performing Circuits by SAIFI (July 2024 – June 2025) ........................................................ 110 d. 100 Worst Performing Circuits by SAIFI (2025 Calendar Year) ............................................................ 113 e. SAIDI/SAIFI Worst 4% of All Circuits (July 2024 – June 2025) ............................................................. 116 f. SAIDI/SAIFI Worst 4% of All Circuits (2025 Calendar Year) .................................................................. 118 Appendix 16: Corrective Action Plans .............................................................................................................. 120 a. Reliability Corrective Action Plans for Tier 1 Circuits ............................................................................ 120 3 03/31/2026 Docket No. 86-12-03 b. Reliability Corrective Action Plans for Tier 2 Circuits (Worst 4%) ......................................................... 136 c. Reliability Corrective Action Plans for Optional and Alternative Circuits .............................................. 137 Appendix 17: Status of Previous Corrective Actions ...................................................................................... 138 Appendix 18: 2025 Voltage Irregularity Claims ................................................................................................ 155 Appendix 19: Power Restorations After Major Storms - 2025 ........................................................................ 156 a. Major Storm Sub-Metrics 1 and 2 .......................................................................................................... 157 b. Major Storm Sub-Metric 3 ...................................................................................................................... 161 c. Major Storm Sub-Metric 4 ...................................................................................................................... 165 d. Major Storm Sub-Metric 5 ...................................................................................................................... 173 e. Major Storm Sub-Metric 6 ...................................................................................................................... 175 4 03/31/2026 Docket No. 86-12-03 I. Executive Summary This is the thirty-ninth annual submission of the Transmission and Distribution Reliability Performance (TDRP) report filed by The United Illuminating Company (UI) to the Connecticut Public Utilities Regulatory Authority (”PURA” or “Authority”) as required by the Authority’s Docket No. 86-12-03, Order No. 1. This report provides an assessment of the service reliability provided to UI’s customers during the calendar year of 2025, as measured by the frequency and duration of service outages. During the one-year period from January 1, 2025 to December 31, 2025, UI’s achieved system average interruption frequency index (SAIFI) was 0.46. UI’s achieved system average interruption duration index (SAIDI) was 35 minutes. The achieved customer average interruption duration index (CAIDI) was 76 minutes. The achieved All-in momentary average interruption frequency index (MAIFI) was 1.22. The availability of service index (ASAI) achieved for UI was 99.993%. The reliability statistics are shown in Table I.1 below. Per Docket 15-07-38, “Joint Application of Iberdrola, S.A., Iberdrola USA, Inc., Iberdrola USA Networks, Inc., Green Merger Sub, Inc., and UIL Holdings Corporation for Approval of a Change of Control”, Order 17, UI met with the Authority on April 11, 2016 to establish a methodology for determining SAIDI and SAIFI reliability commitments. As a result of that meeting, the performance commitments are based on the average of the four years preceding the merger, 2011 – 2014. The commitments are as follows: 66 minutes for SAIDI and 0.64 for SAIFI. As shown in Table I.1 below, the SAIFI and SAIDI reliability statistics for 2025 indicate an increase in reliability performance when compared to the average of the previous four years, and all indices are better than the merger commitments. 2021 2022 2023 2024 Four-Year Average (’21 – ’24) 2025 SAIFI 0.46 0.44 0.58 0.61 0.52 0.46 Table I.1 5 SAIDI 40 39 43 49 43 35 CAIDI 86 88 74 79 82 76 MAIFI 0.88 ASAI 99.993 99.993 99.992 99.991 99.992 99.993 03/31/2026 Docket No. 86-12-03 2021 2022 2023 2024 Four-Year Average (’21 – ’24) 2025 SAIFI IEEE-1366 0.51 0.49 0.62 0.62 0.56 0.51 SAIDI IEEE-1366 44 46 50 49 47 39 CAIDI IEEE-1366 86 95 80 80 85 77 MAIFI IEEE-1366 0.94 Table IV.2 There were six major storms during 2025. (Refer to Appendix 7, “Excluded Storm Summary”). Aging infrastructure and tree related outages continue to be major concerns with regard to system performance. UI continuously reviews its standards and specifications to ensure the most costeffective technologies and tree-trimming practices are being utilized to maintain a high level of reliability. As a result, the Company takes proactive measures to manage this concern and potential risks. These measures include executing the scope of aging infrastructure replacement programs, continued implementation of Enhanced Tree Trimming (ETT) practices using a Utility Protection Zone (UPZ) and expanding inspection and analysis capabilities to provide the decision-making framework for future investment. 6 03/31/2026 Docket No. 86-12-03 II. Introduction This is the thirty-ninth annual submission of the Transmission and Distribution Reliability Performance (TDRP) report filed by The United Illuminating Company (“UI” or “Company”) to the Connecticut Public Utilities Regulatory Authority (“PURA” or “Authority”) as required by the Authority’s Docket No. 86-12-03, Order No. 1. This report provides an assessment of the service reliability provided to UI’s customers during calendar year 2025, as measured by the frequency and duration of service outages. There are changes the Authority will note in this filing to years’ prior as this TDRP filing has been restructured to both meet the requirements of the 17-12-03RE08 Final Order from August 2021 as well as make more comprehensive sense for the reader. There are changes to the submitted appendices as well; historically blank appendices have been eliminated and new appendices added to provide required data and Authority requested tables. Finally, the appendices have been reordered for categorical clarity. Changes can be seen starting at Section IV with the addition of new reliability metrics. Following the new Section IV, UI has added additional tables for CEMI, CELID, CEMM, and CEMSMI metrics. This section includes CEMI and CELID calculations based on primary vs. secondary breakdowns, repeat CEMI-5 and CELID-6 customers, as well as All-In SAIDI. The previous Sections VI and VII have been consolidated into a comprehensive Reliability Improvement Programs Impact & Budget section, which includes the programs sorted based on the reliability driver category. Power Quality and Equitable Modern Grid Initiatives Sections have been added to the TDRP report prior to the Summary (now Section X.). A new Appendix 19 was added for the Power Restoration After Major Storms Metric sub-metrics. 7 03/31/2026 Docket No. 86-12-03 III. Description of UI’s Geographic Area The United Illuminating Company is located in the southwest region of Connecticut along the Long Island Sound. UI serves approximately 349,000 customers in the seventeen towns surrounding the principal cities of New Haven and Bridgeport. (Refer to Appendix 3, “Customers Served”). The service territory is approximately 335 square miles, equal to approximately 7% of the state's total geographical area. The 2025 peak load was 1,282 MW, established on July 29, 2025. Appendix 1 contains a map illustrating UI’s territory as it is situated in the state and the municipalities that UI serves. To serve its customers in 2025, the Company maintained a total of 31 substations. This list includes both customer and generator interconnects. It does not include taps, transmission line equipment, or private stations. The last remaining 13.8/4.16 kV distribution substation, Whitney Ave, was decommissioned in 2025 and is not included in this count. The breakdown is as follows: • 24 - 115/13.8 kV bulk distribution substations with a capacity of 1,948 MVA • 1 - 345/115/13.8 kV substation with a capacity of 1,172 MVA • 3 - 115 kV transmission switching stations • 1 - 345/115 kV transmission substation • 1 - 115 kV generator interconnection station • 1 - 115 kV interconnection station to railroad owned 115/26.4 kV The Company has approximately 3,281 pole-line miles of overhead distribution lines (single phase, three phase, and secondary), 226 miles of underground conduit banks and 766 miles of underground primary cables, (single phase and three phase), consisting of direct-buried as well as underground duct and splicing chamber construction. The majority of the distribution system load is fed at 13,800 volts. (A list of circuits is contained in Appendix 10: “Excel File of Substation/Circuit Reliability Data for the Year 2025”). The downtown areas of New Haven and Bridgeport are supplied by underground network systems with interconnected secondary cables (208Y/120 volt) designed primarily for high density urban areas. Some of the larger downtown loads are supplied by 480Y/277-volt systems that are not interconnected and are called "spot networks." The UI transmission system consists of approximately 110 circuit miles of overhead lines and approximately 29 circuit miles of underground lines, all operated at 345 kV or 115 kV and substantially located within or immediately adjacent to the territory served by UI. A summary of the conductor types used in the UI system is found in Appendix 4. This table contains mileage of conductor types categorized by voltage level. Complete definitions of each conductor type can be found in the Glossary, Appendix 2. 8 03/31/2026 Docket No. 86-12-03 The Company's service area is composed of urban, suburban, and, to a lesser extent, rural areas. The urban areas are located in the downtown centers of Bridgeport and New Haven, as well as in the smaller downtown areas of Fairfield, Shelton, Derby, Ansonia, Stratford, Milford, West Haven, Hamden, and East Haven. The remaining service area is almost entirely suburban and is in the towns of Easton, North Branford, North Haven, Orange, Trumbull, and Woodbridge. Most of UI's commercial customers occupy land adjoining the major intercity highways, such as US #1 from Fairfield to East Haven, Route #8 from Bridgeport to Ansonia, US #5 from New Haven to North Haven and Route #10 from New Haven to Hamden. Most of the large industrial customers are situated along the Metro North right-of-way on the shoreline, and into the Housatonic and Quinnipiac River Valleys. Almost all of the non-commercial areas are suburban residential tracts. Except for scattered farms in North Haven, North Branford, and Orange, and state and local park lands, the only true rural area left in the service territory is in Easton. Much of the rural, suburban, and residential areas just outside the urban centers are heavily treed. Service reliability is of utmost importance for all our customers. Industrial and commercial customers need high reliability for their processes and operations. Service reliability, without question, is of vital importance to the viability of our customers, the Company, and the local economy. In particular, the very existence of our commercial and industrial customers, which comprise approximately 55% of our sales base, depends on UI’s ability to provide reliable service. UI’s MWh sales mix for the period 2023 – 2026 is shown below in Table III.1. 2023 2024 2025 2026 Actuals Actuals Actuals Forecast (%) (%) (%) (%) Residential 43.21 43.41 44.15 45.47 Industrial 7.97 7.78 7.36 7.53 Commercial 48.36 48.37 48.05 46.60 Street Lighting 0.46 0.44 0.43 0.40 Total 100.00 100.00 100.00 100.00 Customer Class Table III.1 9 03/31/2026 Docket No. 86-12-03 IV. Reliability Performance in 2025 UI’s achieved system average interruption frequency index (SAIFI) was 0.46, an indication of an improvement in reliability performance as compared to the average of the previous four years. UI’s achieved system average interruption duration index (SAIDI) was 35 minutes, representing an eight-minute improvement relative to the average of the previous four years. The achieved customer average interruption duration index (CAIDI) was 76 minutes, representing a six-minute improvement relative to the average of the previous four years. UI achieved an All-in momentary average interruption frequency index (MAIFI) of 1.22. The availability of service index (ASAI) achieved for UI was 99.993%. The reliability statistics shown in Table IV.1 below indicate that the 2025 SAIFI and SAIDI were better than the reliability performance goals set-forth within the merger commitments based on current calculation structures. Table IV.2 reflects, as Table IV.1, that the 2025 SAIFI and SAIDI were better than the reliability performance goals set-forth within the merger commitments based on the IEEE-1366 Major Storm Classification methodology. This impact is outlined in Chart IV-1.2 System Average Interruption Frequency Index (2021–2025). Per Docket 15-07-38, “Joint Application of Iberdrola, S.A., Iberdrola USA, Inc., Iberdrola USA Networks, Inc., Green Merger Sub, Inc., and UIL Holdings Corporation for Approval of a Change of Control”, Order 17, UI met with the Authority on April 11, 2016 to establish a methodology for determining SAIDI and SAIFI reliability commitments. As a result of that meeting, the performance commitments are based on the average of the four years preceding the merger, 2011 – 2014. The commitments are as follows: 66 minutes SAIDI, 0.64 SAIFI. 2021 2022 2023 2024 Four-Year Average (’21 – ’24) 2025 SAIFI 0.46 0.44 0.58 0.61 0.52 0.46 SAIDI 40 39 43 49 43 35 CAIDI 86 88 74 79 82 76 MAIFI 0.88 ASAI 99.993 99.993 99.992 99.991 99.992 99.993 Table IV.1 As can be seen from Table IV.1, UI’s reliability performance for 2025 based upon SAIDI and SAIFI indices meet and exceed the merger commitment goals. 10 03/31/2026 Docket No. 86-12-03 2021 2022 2023 2024 Four-Year Average (’21 – ’24) 2025 SAIFI IEEE-1366 0.51 0.49 0.62 0.62 0.56 0.51 SAIDI IEEE-1366 44 46 50 49 47 39 CAIDI IEEE-1366 86 95 80 80 85 77 MAIFI IEEE-1366 0.94 Table IV.2 As shown on Table IV.1, the CAIDI performance in 2025 was 76 minutes. The CAIDI goal as derived from the SAIDI and SAIFI merger performance commitment goals is 103 minutes. One driver for the CAIDI performance in 2025 is due to the continued proactive reliability–focused Company practices. These practices include: troubleshooter staffing and schedule modification, as warranted, the deployment of additional isolating devices in order to improve partial restoration capabilities, and system dispatcher training in the utilization of fault data analytics in order to assist in the determination of fault location. Table IV.3 below presents CAIDI year-by-year targets for the next four years. These targets are calculated based on the Company’s performance commitments for SAIDI and SAIFI. CAIDI Target (Minutes) 2026 103 2027 103 2028 103 2029 103 Table IV.3 As can be seen in Appendix 5, “Reliability Performance against Goals,” UI continues to provide its customers with highly reliable electric service. All indices indicate that UI's customers are generally receiving adequate service, which meets or exceeds the levels set by the Company's Reliability Criteria. Per the Department’s definition of “major storms”, there were six “major storms” during 2025 as defined by Docket 86-12-03 (see Appendix 7: Excluded Storm Summary). In compliance with PURA’s Final Decision dated May 15, 2019 on Docket Number 18-05-13: PURA 2018 Reliability Report to the General Assembly on Electric Distribution Company System 11 03/31/2026 Docket No. 86-12-03 Reliability, Order 1 states: “Each year, the EDC shall update the Table on its Response to Interrogatory EL-4 and file it with its annual TDRP Report”. The updated major storm information noted in Order 1 is provided in Appendix 9. Charts IV-1.1: System Average Interruption Duration Index (2021-2025) and IV-1.2: System Average Interruption Frequency Index (2021-2025) are shown on the next two pages. These charts illustrate calendar year 2025 and previous years' SAIDI and SAIFI indices categorized by outage type. Coupled with Appendix 5, “Reliability Performance against Goals,” 2025 reliability performance can be "benchmarked" against past performance. 12 03/31/2026 Docket No. 86-12-03 Chart IV-1.1 System Average Interruption Duration Index (2021–2025) 13 03/31/2026 Docket No. 86-12-03 Chart IV-1.2 System Average Interruption Frequency Index (2021–2025) 14 03/31/2026 Docket No. 86-12-03 Chart IV-1.3 Customer Average Interruption Duration Index (2021–2025) 15 03/31/2026 Docket No. 86-12-03 Chart IV-1.4 Customers Experiencing Multiple Interruptions (2025) 16 03/31/2026 Docket No. 86-12-03 Chart IV-1.5 Customers Experiencing Long Interruption Duration (2025) 17 03/31/2026 Docket No. 86-12-03 Per Docket No. 17-12-03RE08, UI is to include reliability metrics calculated with and without the inclusion of major storms and planned outages in its annual report. Table IV.4 below provides the SAIDI, SAIFI, CAIDI, MAIFI, CEMI, CELID, CEMM, and CEMSMI values for 2025. The four customer-centric metrics are further segmented into tranches of three or more, five or more, seven or more, and nine or more. SAIDI SAIFI CAIDI MAIFI CEMI-3 CEMI-5 CEMI-7 CEMI-9 CELID-3 CELID-5 CELID-7 CELID-9 CEMM-3 CEMM-5 CEMM-7 CEMM-9 CEMSMI-3 CEMSMI-5 CEMSMI-7 CEMSMI-9 Excluding Major Storm & Planned 35 0.46 76 0.88 0.0239 0.0005 0.0000 0.0000 0.0304 0.0100 0.0051 0.0022 0.0957 0.0184 0.0061 0.0037 0.1680 0.0417 0.0103 0.0050 Excluding Major Storm 36 0.48 76 0.89 0.0268 0.0007 0.0000 0.0000 0.0318 0.0107 0.0056 0.0023 0.0961 0.0186 0.0061 0.0037 0.1736 0.0435 0.0109 0.0051 Including Major Storm 72 0.64 113 1.22 0.0465 0.0027 0.0003 0.0000 0.0875 0.0409 0.0249 0.0146 0.1605 0.0352 0.0112 0.0057 0.2668 0.0843 0.0241 0.0103 All Outages 73 0.66 111 1.22 0.0507 0.0030 0.0004 0.0000 0.0889 0.0416 0.0254 0.0147 0.1609 0.0355 0.0113 0.0057 0.2723 0.0866 0.0253 0.0105 Table IV.4 Per Docket No. 24-08-09, UI is to report on the number of CEMI-3, CEMI-5, CEMI-7, CELID-3, CELID-6, CELID-9, and CELID-12 customers as a ratio of total customers served consistent with the IEEE-1366 standard. The CEMI and CELID data are to both include and exclude major storms. Both the IEEE-1366 (Major Event Day) and General Statutes § 16-245y(a) (major storms, scheduled interruptions, power supply outages, and customer-caused) methodologies are to be utilized. Additionally, the CEMI and CELID data is to be broken out by outages on the secondary and primary distribution system, both separately and as a whole. A four-year rolling average of CEMI and CELID interruptions from the four years preceding the year in question is also to be included. Table IV.5 below lists a breakdown of primary vs. secondary classification based on outage voltage descriptions. 18 03/31/2026 Docket No. 86-12-03 Voltage Description Secondary Service Net 120/208V Net 277/480V 2.4kV 4.16kV 13.8kV 115kV 345kV Sub 2.4/4kV Sub 13.8kV Primary / Secondary Secondary Secondary Secondary Secondary Primary Primary Primary Primary Primary Primary Primary Table IV.5 Table IV.6 below gives the CEMI and CELID breakdown for 2025 and four-year rolling average per Docket No. 24-08-09. All-In Primary / Secondary Primary Secondary Both KPI 2025 CEMI-3 CEMI-5 CEMI-7 CELID-3 CELID-6 CELID-9 CELID-12 CEMI-3 CEMI-5 CEMI-7 CELID-3 CELID-6 CELID-9 CELID-12 CEMI-3 CEMI-5 CEMI-7 CELID-3 CELID-6 CELID-9 CELID-12 0.0480 0.0027 0.0004 0.0866 0.0299 0.0139 0.0087 0.0001 0.0000 0.0000 0.0026 0.0011 0.0008 0.0004 0.0507 0.0030 0.0004 0.0889 0.0310 0.0147 0.0091 IEEE-1366 Average (’21 – ‘24) 0.0513 0.0083 0.0005 0.0756 0.0271 0.0136 0.0096 0.0001 0.0000 0.0000 0.0021 0.0007 0.0004 0.0002 0.0539 0.0086 0.0006 0.0773 0.0278 0.0140 0.0098 2025 0.0239 0.0014 0.0002 0.0338 0.0086 0.0021 0.0009 0.0000 0.0000 0.0000 0.0014 0.0005 0.0003 0.0001 0.0255 0.0015 0.0003 0.0352 0.0090 0.0024 0.0010 Table IV.6 IEEE-1366 removes the following: • Scheduled Outages • Major Event Days 19 Average (’21 – ‘24) 0.0366 0.0035 0.0004 0.0523 0.0132 0.0048 0.0018 0.0000 0.0000 0.0000 0.0015 0.0006 0.0003 0.0001 0.0378 0.0036 0.0004 0.0536 0.0138 0.0051 0.0019 Non-Excluded 2025 0.0228 0.0004 0.0000 0.0291 0.0072 0.0020 0.0008 0.0000 0.0000 0.0000 0.0012 0.0003 0.0002 0.0001 0.0238 0.0005 0.0000 0.0303 0.0075 0.0022 0.0009 Average (’21 – ‘24) 0.0322 0.0029 0.0004 0.0444 0.0109 0.0033 0.0010 0.0000 0.0000 0.0000 0.0013 0.0005 0.0003 0.0001 0.0331 0.0030 0.0004 0.0456 0.0114 0.0036 0.0012 03/31/2026 Docket No. 86-12-03 Non-Excluded removes the following: • Outages caused by Power Supply or Transmission Problems external to UI • Scheduled Outages • Outages caused by Customer equipment connected to UI lines • Major Storms Per Docket No. 21-05-15RE02, the revised proposal for the Equitable Reliability PIM is comprised of the following four sub-metrics: (1) CEMI 5; (2) Percent of repeat CEMI 5 customers; (3) CELID 6; (4) Percent of repeat CELID 6 customers. The CEMI 5 and CELID 6 sub-metrics shall be calculated as directed in Order Nos. 1 and 2, respectively, of the 2024 Reliability and Resilience Decision. The percent of repeat CEMI 5 customers shall be calculated as the number of CEMI 5 customers who appear on the CEMI 5 lists for both the current year and the prior year divided by the total number of CEMI 5 customers in the current year. The percent of repeat CELID 6 customers shall be calculated as the number of CELID 6 customers who appear on the CELID 6 lists for both the current year and the prior year divided by the total number of CELID 6 customers in the current year. Table IV.7 below lists the CEMI-5 and CELID-6 breakdown of current and repeating customers. Method All-In IEEE-1366 NonExcluded Year CEMI-5 Repeat CEMI-5 CELID-6 Repeat CELID-6 Average 2025 2024 2023 2022 2021 2020 2025 2024 2023 2022 2021 2020 2025 2024 2023 2022 2021 2020 0.0030 0.0122 0.0150 0.0044 0.0027 0.0229 0.0015 0.0038 0.0059 0.0031 0.0014 0.0064 0.0005 0.0037 0.0058 0.0013 0.0012 0.0055 0.3365 0.3873 0.0245 0.1039 0.1665 0.0667 0.6277 0.2681 0.0534 0.1382 0.0000 0.0042 0.6000 0.2719 0.0305 0.0131 0.0000 0.0005 0.0310 0.0605 0.0163 0.0171 0.0173 0.3550 0.0090 0.0092 0.0153 0.0164 0.0141 0.0127 0.0075 0.0090 0.0109 0.0141 0.0118 0.0087 0.2323 0.0564 0.0666 0.0374 0.4848 0.1095 0.0500 0.0628 0.0709 0.0348 0.0629 0.0237 0.0588 0.0615 0.0456 0.0243 0.0372 0.0071 0.1507 0.1291 0.0306 0.0407 0.1678 0.1385 0.1720 0.0860 0.0364 0.0481 0.0196 0.0118 0.1667 0.0865 0.0232 0.0132 0.0125 0.0055 Table IV.7 IEEE-1366 removes the following: • Scheduled Outages • Major Event Days 20 03/31/2026 Docket No. 86-12-03 Non-Excluded removes the following: • Outages caused by Power Supply or Transmission Problems external to UI • Scheduled Outages • Outages caused by Customer equipment connected to UI lines • Major Storms Per Docket No. 21-05-15RE02, the Authority maintains its Original Straw Proposal recommendation to include an All-in SAIDI Scorecard in the PBR Performance Mechanism portfolio. This additional scorecard provides a high-level view of each of the EDC’s resilience performance by showing the duration of service interruptions across all weather conditions. The Authority suggests that the All-in SAIDI calculation should follow the IEEE methodology, including all weather events but excluding loss of supply and customer-side events. The Authority also proposes two benchmarks for the All-in SAIDI scorecard, both a 10-year historical rolling average and a five-year historical rolling. Table IV.8 below lists the historical All-in SAIDI following the IEEE methodology. Year SAIDI (Minutes) 5-Year Average SAIDI (Minutes) 10-Year Average SAIDI (Minutes) 2025 2024 2023 2022 2021 2020 71 125 58 50 57 1293 317 333 375 381 385 136 226 220 222 494 676 581 Table IV.8 UI’s All-in SAIDI values are heavily skewed by major storms. The calculated values from Table IV.8 include major storms that date back all the way to 2010. Chart IV.6 below gives more insight into this. While 2018 had the greatest number of storm days in a single year at 22, the total customer hours impacted was negligible compared to other years. The most notable storms in this range include Tropical Storm Isaias in 2020 (7-day UI storm totaling around 6,435,808-meter hours affected), Hurricane Sandy in 2012 (9-day UI storm totaling around 14,215,106-meter hours affected), and Tropical Storm Irene in 2011 (6-day UI storm totaling around 8,579,929-meter hours affected). The 10-Year averages start seeing significant drops once some of these respective years start falling off. 21 03/31/2026 Docket No. 86-12-03 Chart IV-2 – Total Meter Hours Affected + Storm Days per Year 22 03/31/2026 Docket No. 86-12-03 V. 2021 2022 2023 2024 2025 Blue-Sky, Gray-Sky, Blue-Sky + Gray-Sky, and Dark-Sky (All-In) Performance Blue-Sky Planned Gray-Sky Blue + Gray-Sky Dark-Sky All-In SAIDI 0.66 0.06 0.24 0.90 0.00 0.96 SAIFI 0.46 0.05 0.11 0.57 0.00 0.62 CAIDI 1.44 1.16 2.17 1.58 0.00 1.55 SAIDI 0.64 0.07 0.12 0.76 0.00 0.83 SAIFI 0.44 0.04 0.04 0.48 0.00 0.53 CAIDI 1.47 1.75 2.65 1.58 0.00 1.59 SAIDI 0.71 0.06 0.22 0.93 0.00 0.98 SAIFI 0.58 0.03 0.17 0.75 0.00 0.78 CAIDI 1.23 1.89 1.28 1.24 0.00 1.27 SAIDI 0.81 0.05 1.22 2.03 0.00 2.08 SAIFI 0.61 0.03 0.18 0.79 0.00 0.82 CAIDI 1.32 1.90 6.87 2.57 0.00 2.54 SAIDI 0.58 0.02 0.62 1.20 0.00 1.22 SAIFI 0.46 0.02 0.18 0.64 0.00 0.66 CAIDI 1.26 1.20 3.41 1.88 0.00 1.86 Table V.1 23 03/31/2026 Docket No. 86-12-03 IEEE-1366 Blue-Sky, Gray-Sky, Blue-Sky + Gray-Sky, and Dark-Sky* 2021 2022 2023 2024 2025 Blue-Sky Gray-Sky Blue + Gray-Sky Dark-Sky SAIDI 0.66 0.07 0.73 0.17 SAIFI 0.46 0.05 0.51 0.06 CAIDI 1.44 1.33 1.43 2.91 SAIDI 0.65 0.12 0.77 0.00 SAIFI 0.44 0.04 0.49 0.00 CAIDI 1.47 2.65 1.57 0.00 SAIDI 0.71 0.12 0.83 0.10 SAIFI 0.58 0.05 0.62 0.12 CAIDI 1.23 2.64 1.34 0.77 SAIDI 0.81 0.01 0.82 1.21 SAIFI 0.61 0.00 0.62 0.17 CAIDI 1.32 2.40 1.33 6.96 SAIDI 0.58 0.08 0.65 0.54 SAIFI 0.46 0.05 0.51 0.13 CAIDI 1.26 1.51 1.29 4.15 Table V.2 *IEEE-1366 calculation excludes planned outages 24 03/31/2026 Docket No. 86-12-03 VI. Causes of Outages The causes of service interruptions have been classified into five categories in accordance with Docket 86-12-03, Order 1.b. These categories are as follows: 1. Forced Transmission & Power Supply Related Outages 2. Scheduled or Prearranged Outages for Maintenance & Construction 3. Major Storm Related Outages 4. Customer Caused Outages 5. Distribution System The components of the "Distribution System", (“All Others”) category is as follows: • Animal/Bird Contact • Lightning • Tree Contact • Accident a. Vehicle b. Foreign Objects c. Employee Error • Equipment Failure a. Overhead System b. Underground Cable c. Direct-Buried Cable d. Transformer e. Substation f. Transmission g. Other Equipment • Miscellaneous a. Overload b. Other c. Unknown Detailed definitions of the categories are in Appendix 12: “Common Categories for Causes of Outages” Percentage of outages caused by each category can be seen below on Charts V-1.1 and 1.2, V-2.1 and 2.2, and V-3.1 and 3.2. As is evident from these charts, excluding major storms, the category "All Others," which corresponds to "Distribution System," contains the majority of customer interruptions and lost meters. Lost meter-time can be greatly affected by major storms; barring a 25 03/31/2026 Docket No. 86-12-03 major storm, lost meter-time is also affected to the greatest degree by the "Distribution System" category. 26 03/31/2026 Docket No. 86-12-03 Cause of Outages 2025 By Interruptions Chart VI-1.1 - Causes of Outages by Interruptions (2025) 27 03/31/2026 Docket No. 86-12-03 Cause of Outages 2021 - 2024 By Interruptions Chart VI-1.2 - Causes of Outages by Interruptions (2021 - 2024) 28 03/31/2026 Docket No. 86-12-03 Cause of Outages 2025 By Meter Outages Chart VI-2.1 - Causes of Outages by Meter Outages (2025) 29 03/31/2026 Docket No. 86-12-03 Cause of Outages 2021 - 2024 By Meter Outages Chart VI-2.2 - Causes of Outages by Meter Outages (2021 - 2024) 30 03/31/2026 Docket No. 86-12-03 Cause of Outages 2025 By Meter Time Lost Chart V-3.1 - Causes of Outages by Meter Time Lost (2025) 31 03/31/2026 Docket No. 86-12-03 Cause of Outages 2021 - 2024 By Meter Time Lost Chart V-3.2 - Causes of Outages by Meter Time Lost (2021 - 2024) 32 03/31/2026 Docket No. 86-12-03 The outage category in which the Company can exercise significant influence is the "Distribution System" category. Although the actual number of interruptions, meter outages, and lost meter-time vary from year to year, UI believes that through continued efforts, outages in this category can be managed, with a balanced concern for economics. The percentages cited in the following paragraphs relate to the “Distribution System” subcategory, (“All Others” on the Pie Charts), and exclude outages related to major storms, forced transmission and power supply, planned outages and customer caused outages. In 2025, the number of wildlife contact incidents, as a percentage of the Distribution System (“All Others”) subcategory, 9.3%, (Chart V-1.1), as in previous years, 7%, (Chart V-1.2), has maintained a relatively level impact since completion of the project. The post-program impact of wildlife contacts has remained a reduction to the pre-program wildlife contact contribution to customer impact (SAIFI); this maintained status is a direct result of the three-year program (20152017) to replace wildlife guards. UI will continue to install wildlife guards on new transformer installations as well as coat the tops of critical overhead equipment, such as regulators and specific types of reclosers, with an insulating coating designed to minimize the potential for phase-toground squirrel or bird contacts. In response to Docket No. 13-01-19, “Application of The United Illuminating Company to Increase Rates and Charges”, PURA approved $100 million for an 8-year plan for vegetation management during 2014-2021. In response to Docket No. 16-06-04, “Application of The United Illuminating Company to Increase Rates and Charges”, PURA approved $162 million for a 12year plan for vegetation management extending the program to 2025. In Docket No. 22-08-08, “Application of The United Illuminating Company to Increase Rates and Charges”, the Authority approved a one-year rate plan, directed the Company to maintain the current annual funding levels for the UPZ program, and stipulated changes in the way the UPZ Program is being prioritized and executed, via Order 21, that: “UI shall develop and submit for Authority review and approval in Docket No. 23-08-09, Annual Electric Distribution Company Reliability and Resilience Framework Review a four-year work plan to implement the UPZ priorities for years 2024 to 2027 and to transition to a four-year trimming cycle by 2027.” Order 21 further stipulates that this work plan shall also demonstrate compliance with the following priorities (as outlined in section VI.A.15 of its Ruling). • Start the transition to four-year cycle trimming • Address first pass of remining single-phase system • Perform a second pass of full UPZ clearance of three-phase systems The Company has modified the priorities, annual scope, schedule, and the annual cost of the program to align with the Authority’s directives. The modifications are underway and being effectuated without any increase to the approved annual expenditure levels. The vegetation management work plan for 2024 through 2027 emphasizes transitioning to a 4-year trimming 33 03/31/2026 Docket No. 86-12-03 cycle; preserving the clearances where the UPZ Spec has already been applied; completing approximately 60% of the remining single phase circuit miles; and maintaining a total annual cost that is consistent with the approved expenditure levels. In Docket No. 24-10-04 the Authority subsequently determined the Company’s UPZ plan complied with direction given in the 22-08-08 Decision. Motion No.5 Ruling, Oct. 27, 2023, Docket No. 23-08-09, Annual Electric Distribution Company and Reliability and Resiliency Framework Review. The major components of UI’s proposed program are: 1. Utility Protection Zone Specification, (UPZ), is UI’s storm resiliency tree work specification, creating an eight-foot side clearance ground to sky, retaining desirable low height or ornamental trees within the zone or those that are planted under the Right Tree – Right Place program. Additionally, the Company identifies and removes whole or parts of hazardous trees from outside of the zone that could fall causing damage to utility infrastructure, facilities, or equipment. 2. Utility Protection Zone Maintenance (UPZM) maintains the previously established UPZ, or clearance within the rectangular area extending horizontally for a distance of eight feet from any outermost primary electrical conductor. Additionally, removal in whole or in part of hazardous trees that could fall from inside or outside of the zone causing damage to utility infrastructure, facilities or equipment. 3. UI documents and tracks all objections, requests for modification and decisions made by municipal tree wardens and the State Department of Transportation through the full execution of Public Act 14-151 that cause nonconformities, or areas where UI is not able to meet these specifications within and outside of the Utility Protection Zone (UPZ). Instances of outages caused by nonconforming trees will be documented and considered a reportable performance attribute. In 2025, tree contact incidents continue as a significant cause of customer outages in terms of the number of customers impacted. For 2025, tree contact incidents accounted for 17.2% of the outages within the Distribution System subcategory. The average of tree contact incidents as a percentage of the Distribution System subcategory during previous years, (2021-2024) totals 23.7%. Excluding transformer failures which are not a major source of customer minutes interrupted, equipment failures on the overhead system for 2025, as a percentage of the Distribution System subcategory, (28.5%), as in previous years, (24%), continue as a significant contributor to customer minutes interrupted. UI recognizes this situation, and is cautious in its selection of new equipment, so that it selects durable equipment and material to construct and maintain its overhead 34 03/31/2026 Docket No. 86-12-03 and underground distribution system. UI has taken steps to analyze assets throughout their life cycle. One such analysis is the periodic in-service inspection of equipment to determine where the assets reside on their life cycle curves. This aids in making prudent asset replacement and/or rehabilitation decisions before customer reliability is impacted. Also, UI analyzes certain equipment failures to determine what type of equipment has a significant failure rate and is negatively impacting customer reliability. Referring to Appendix 11, “Five-Year Outage by Cause Summary (excluding major storms),” a comparison of 2025 data with previous years’ data (2021 - 2024) reveals the following: • Distribution system outages, defined as all outages other than Transmission/Power Supply, Customer Caused, Scheduled/Prearranged, or Major Storm, historically account for the majority of customer interruptions and customer minutes of interruption. • Within the distribution system subset, tree-related incidents, wildlife contacts, and failure of overhead equipment continue to comprise the majority of outage events. 35 03/31/2026 Docket No. 86-12-03 VII. Reliability Improvement Programs and Budget Reliability programs are deterministic / reactive or probabilistic / proactive in nature, or a combination of both. Deterministic or reactive programs are designed to address circuit reliability or customer reliability outlier performance. Probabilistic or proactive programs are designed to prevent circuit or customer reliability performance from becoming an outlier. UI's policy is to design all distribution systems to meet the Company's Reliability Criteria (DEG 80). Each project is analyzed to determine what features (for example, tree-wire, buried cable, line reclosers, sectionalizing switches, lightning arresters, additional fusing, wildlife protection, etc.) are necessary to produce the desired level of reliability. Repair time and circuit backup requirements are analyzed such that rapid service restoration is possible through switching and sectionalizing to minimize the extent of an actual outage. Construction design standards provide additional details of how reliability is incorporated as a part of every project. This principal element is probabilistic in nature. Enhancements to the existing distribution system are based on both deterministic and probabilistic performance. In addition to the design of reliability into the systems themselves, UI reliability programs consist of five principal elements. Some programs significantly overlap the principal element types, such as: Installation of advanced two-way meters is exceeding current budgets for meter purchases. Meter exchanges are utilized for aging meters (meters greater than 20 years old and fully depreciated), power outage applications (Two-Meters per Transformer), Disconnect for Non-Payment (DNP), Get Customer Name (GCN) and Move in/Move Out orders (performs remote connect/disconnect activities without rolling a vehicle), estimates/consecutive estimate meter replacements (current population of one-way meters 14 years old and beginning to show signs of failure) and general exchanges to enhance the operation of the two-way network and customer service expectations. This is a customer facing activity which provides service to customers where accurately functioning meters is critical. L&G will stop supporting AMR meters by the end of 2026. Based on historical data and projected deployment strategy the 2026 scope for this project is as follows: • New Customers: This is a reactive program that has been consistently deploying ~3,500 units yearly and a similar figure is expected for 2026. • Defective Equipment: Reactive program anticipating ~4,500 failures per year based on forecast. • AMR/AMI Program: Plan to replace ~13,050 AMR meters in this category in 2026. • Solar/DG: UI saw ~3,000 solar requests in 2025, but due to the increasing volume of DG requests, the estimates have increased to around ~3,500 requests for 2026. 36 03/31/2026 Docket No. 86-12-03 Scope New Customer Defective Equipment AMR/AMI Solar/DG Load Ctrl Adaptor 2026 Units 3,500 4,500 13,050 3,500 0 Unit Price $287.37 $325.22 $325.22 $287.37 $447.72 Total $1M $1.5M $4.2M $1M - The 2026 CAPEX budget for installing advanced two-way meters is approximately $7,719,173. Distribution line repairs ensure a safe and reliable electric distribution system by maintaining the infrastructure and performing maintenance and restoration activities. This is an on-going program which includes all overhead and underground distribution system work for customer connections, emergency repairs, corrective/reactive work, customer restoration resulting from failures, compliance work to meet company standards of construction, reliability improvements for red circuits and work related to replacing items found during infrared inspections, and all minor storm work. Types of work include, pole replacements, NESC adjustments, cable faults, equipment failure, and damage to electric system plant. The source of this work comes from customer requests, trouble calls, outages, emergency response, damage to electric infrastructure, preventive maintenance inspections and field inspections to meet standards and compliance. The 2026 CAPEX budget for distribution line repairs is approximately $15,029,646. The programs that can be clearly categorized within the five principal elements are as follows: 37 03/31/2026 Docket No. 86-12-03 A. New Customers Added UI is obligated to connect all customers within its franchise area to the electric distribution system in accordance with specific Terms & Conditions, Construction Standards, the National Electrical Safety Code (NESC), UI’s Guidebook of Requirements for Electric Service, policies, and procedures, etc. as approved by the Connecticut Public Utilities Regulatory Authority (PURA). This is an annual blanket program covering hundreds of individual customer related service requests for a given year. Construction work for services to commercial & industrial customers supplied by either overhead or underground powerlines for new, increase, replacement, removal, or demolition electric services. Each individual customer request is a unique project which has its own design scope of work, schedule, and cost. The scope of the job can include distribution primary system upgrades to serve the new customer by installing, new poles, transformers, primary wires, and other system equipment. The average cost from the last three years for this program has been used to determine the high-level cost estimate. The COVID years showed a decline in industrial and commercial development activity between 2020 and 2023. However, starting in 2024, the Company has seen a rebound in such development, especially in the downtown Bridgeport and New Haven areas (averaging ~$7m per year after CIAC). The Company’s current forecast reflects the planned project cost for known projects and provides a level of funding for future ones. The 2026 budget for New Customer installations is approximately $6,770,000. The planned P26 budget amount is actually around $9.52M. This amount is being reduced by about $2.755M, as offsets are being provided to four specific projects under this category. These customer projects were originally planned to be completed by the end of 2025 but are now rolling into 2026. The following projects are: • 19 Elm St - New Network Vault ($855k) • 300 State St - New Customer Service ($1.03M) • 855 Main St Bridgeport - Office to Condo ($219k) • Steelpointe Harbor - New Residential/Retail ($651k) i. Residential Line UI has an obligation to serve all customers within its franchise area. This project is required for new customer connections. This includes service work for temporary and permanent construction (new, increases, replacements, removals, and demolitions). The work is required to satisfy customer needs to purchase new or additional power for their consumption. 38 03/31/2026 Docket No. 86-12-03 This is an on-going program for residential overhead and underground new services, underground residential cable repairs, rebuilds, secondary line extension, initial installation of equipment for every subdivision on-going program for commercial and residential overhead and underground new services, underground residential cable repairs, rebuilds, secondary line extension, initial installation of equipment for every subdivision (single phase or multiple phases). The scope, designs, estimates and construction is based on customer requests that come in throughout the year. This includes new residential service for 3-phase primary overhead or underground, single premise which would be for a multi-unit apartment building with separate metering, requiring a 3-phase transformer. This would include distribution primary system upgrades to serve this new customer. The scope of the construction may include installing new poles, transformers, and primary/secondary/service wires. Additionally, the scope would include interconnecting with a neighboring Utility. The 2026 budget for Residential Line is approximately $4,507,719. ii. Street Lights This is an on-going program to install/replace/relocate/remove existing customer private area lighting. The scope includes lights that are fed from overhead and underground, secondary and service wire work, poles and light heads and civil work for bases and conduit and miscellaneous hardware. The sources of the work come from customer requests to install new lighting, repair damaged lighting and from routine inspections. The 2026 scope will include any new requests or notifications of damaged lights that come in throughout the year. The Company ensures that equipment is installed to meet customer commitment and ensuring it is maintained to provide the service the customer is paying for. Customer satisfaction. State Statutes require utilities to repair 'Light Out' calls within 3 business days. UI receives notifications for Light-Out and schedules the next day through mobility. The 2026 budget for Street Light CAP is approximately $1,954,265. 39 03/31/2026 Docket No. 86-12-03 B. Infrastructure Replacement i. Bulk Substation Replacement UI currently operates 25 – 115/13.8 kV substations to deliver electricity to its customers. These substations transform power from the 115-kV transmission system down to the 13.8 kV level to be distributed on utility poles. The performance of a single substation can impact up to 10,000 to 20,000 customers. Many of the substations are nearing the end of their useful life. In 2025, a large number of UI’s 115/13.8 kV substations were forty years old or older. This concentration of assets in the fourth quartile of their useful life represents a significant risk to the Company and its customers. It takes four years or longer to bring a new 115/13.8 kV substation project from planning to design, siting approval and construction and requires many engineering, project management, and construction resources to complete. As a result, the Company’s ability to site and build 115/13.8 kV substations is finite. The Company continues a proactive replacement program to address this situation, through component replacement programs or entire substation rebuilds if warranted. The Pequonnock Substation was placed into service in 1956 and is located in Bridgeport, CT immediately adjacent to the Long Island Sound. The substation serves approximately 8,240 customers. The site experienced flooding one to two feet above the yard elevation during Tropical Storm Irene and approximately 10 feet NAVD 88 (North American Vertical Datum of 1988) during Superstorm Sandy or within inches of the control room floor. Along with the flooding concerns, there were several known asset condition deficiencies at this site. The Pequonnock project called for the rebuilding of the existing substation further inland. The project is expected to be completed this year. A set of comprehensive evaluations were performed to determine the future viability of the Old Town Substation. The substation serves approximately 18,000 customers. The Full Replacement solution was selected based on a review of all of the factors associated with maintaining adequate, safe and reliable service to the Old Town distribution area. This solution is superior in the key areas of construction outage requirements, minimization of construction hazards, future expansion capabilities, overall project cost as well as in the area of life of equipment. The life of equipment concerns for Old Town Substation stemmed from the age of the station. The work for this project is still ongoing. The 2026 budget for the Old Town Substation Rebuild is approximately $11,608,131 ($10,384,472 Transmission + $1,223,659 Distribution). 40 03/31/2026 Docket No. 86-12-03 ii. Low Voltage Distribution Substation Removal Low Voltage Distribution substations originated at the dawn of the utility industry in the early 1900’s. These substations transform the voltage down from 13.8 kV to the 4.16 kV or 2.4 kV voltages that were predominantly the distribution voltages during the 1920s, 1930s and 1940s. The program objective is to complete the removal of service and retirement of assets associated with all 4.16 kV and 2.4 kV substations on the distribution system due to the age of the equipment and the inability to maintain this obsolete equipment. The age range of these substations is 50-70 years old. Removal of low voltage (4.16kV) substations is accomplished through either total conversion of the distribution infrastructure supported by the low substation to 13.8kV or through partial conversion to 13.8kV and the utilization of Step Down Banks where there is significant remaining life in the distribution infrastructure. The Low Voltage Substation Removal program was developed as a result of a formal condition assessment of all low voltage substations in 2006. The main concerns resulting from this assessment were: • Potential safety hazards associated with the risk of failure of equipment that has exceeded its useful life • The risk of long duration power outages related to obsolete or end of useful life substation equipment • Continued maintenance required to keep obsolete substation equipment operational This

Text of UI-Attachment 2.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
2025 CLEAN & RENEWABLE ENERGY REPORT April 22, 2026 Connecticut Public Utilities Regulatory Authority I. ABOUT THIS REPORT .....................................................................................................................................1 II. GENERATION AND EMISSIONS .....................................................................................................................2 A. B. STATUTORY RENEWABLE ENERGY AND EMISSIONS GOALS .......................................................................................................... 2 CONNECTICUT GREENHOUSE GAS EMISSIONS – ELECTRICITY SECTOR............................................................................................ 4 III. EQUITABLE MODERN GRID (EMG) ...............................................................................................................9 IV. COMBINED PROGRAM DATA...................................................................................................................... 11 V. EXISTING PROGRAMS ................................................................................................................................. 17 A. B. C. D. E. F. G. H. I. J. K. VI. A. B. C. D. RESIDENTIAL RENEWABLE ENERGY SOLUTIONS (RRES) PROGRAM ............................................................................................. 17 COMBINED RESIDENTIAL SOLAR PROGRAM METRICS ............................................................................................................... 21 NON-RESIDENTIAL RENEWABLE ENERGY SOLUTIONS (NRES) PROGRAM..................................................................................... 26 SHARED CLEAN ENERGY (SCEF) PROGRAM AND SCEF PILOT PROGRAM ..................................................................................... 34 COMBINED SOLAR DEPLOYMENT METRICS ............................................................................................................................ 40 ENERGY STORAGE SOLUTIONS (ESS) PROGRAM ..................................................................................................................... 43 LIGHT-DUTY ELECTRIC VEHICLE CHARGING PROGRAM ............................................................................................................. 54 MEDIUM-HEAVY DUTY ELECTRIC VEHICLE CHARGING PROGRAM ............................................................................................... 62 DEEP PROCUREMENTS (I.E., PUBLIC POLICY CONTRACTS/PPAS) .............................................................................................. 65 CONSERVATION & LOAD MANAGEMENT PLAN ....................................................................................................................... 69 VOLUNTARY RENEWABLE OPTIONS (VRO) PROGRAM AND CLEAN ENERGY OPTIONS PROGRAM (CEOP) .......................................... 72 RENEWABLE PORTFOLIO STANDARD (RPS)........................................................................................... 75 RPS SUMMARY ................................................................................................................................................................ 75 DEMONSTRATING RPS COMPLIANCE .................................................................................................................................... 78 BANKING REQUIREMENTS FOR EXCESS RECS ......................................................................................................................... 78 ACP FOR SHORTAGE OF RECS ............................................................................................................................................ 79 VII. LEGACY PROGRAMS ................................................................................................................................... 80 A. B. C. RESIDENTIAL SOLAR INVESTMENT PROGRAM (RSIP) ............................................................................................................... 80 LOW EMISSION RENEWABLE ENERGY CREDIT (LREC) AND ZERO EMISSION RENEWABLE ENERGY CREDIT (ZREC) PROGRAM ................ 83 VIRTUAL NET METERING (VNM) PROGRAM ......................................................................................................................... 87 VIII. CLEAN ENERGY EMPLOYMENT ................................................................................................................. 91 IX. REPORT AND PROGRAM NOTES ............................................................................................................... 93 X. APPENDIX 1: A DD ITIO N AL R E SO U RC E S & D O CU M EN T S ........................................................... 94 XI. APPENDIX 2: P RO G RA M O B J ECT I V E S ............................................................................................. 100 XI I. APPENDIX 3: G LO S SA R Y O F AC RO NY M S ....................................................................................... 103 1 I. About This Report The following report details the status of the current clean and renewable energy programs and contracts administered by the electric distribution companies (EDCs), The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) and The United Illuminating Company (UI), and overseen by the Connecticut Public Utilities Regulatory Authority (the Authority or PURA). The clean and renewable energy programs and relevant market segments include, but are not limited to: • • • • • • • • Residential solar photovoltaic (PV) systems; Non-residential clean energy systems, including solar PV and fuel cell energy systems; The Shared Clean Energy Facility (SCEF) Program; The Energy Storage Solutions (ESS) Program; Light-Duty and Medium-Heavy Duty Electric Vehicle Charging Programs; Public policy contracts and Power Purchase Agreements (PPAs) selected through Department of Energy and Environmental Protection (DEEP) procurements; Voluntary renewable offers, including the Clean Energy Options Program (CEOP) and Voluntary Renewable Options (VRO) Program; and Compliance with Connecticut’s Renewable Portfolio Standard (RPS). This report is intended to act as a centralized document for key performance metrics associated with these programs and contracts. The publicly available data used to generate this Report can be accessed via Docket No. 25-08-01, 2025 Clean and Renewable Energy Program Data and Report. Any publicly available data used to generate future reports will be made available through the corresponding proceeding using the same numbering convention, Docket No. XX08-01, where XX is the last two digits of the year (e.g., “25” for 2025). Information on the program eligibility requirements, additional documents and resources, and an acronym glossary can be found in the appendices. 2 II. Generation and Emissions A. Statutory Renewable Energy and Emissions Goals In recent years, Public Act No. 22-5, § 1 and Public Act No. 25-125, § 2 amended General Statutes § 22a-200a(a), which requires the state to reduce the level of emissions from greenhouse gases (GHGs) to at least 45% below 2001 levels by 2030 and to an economy-wide net zero level by 2050, provided that direct and indirect emissions of GHGs are at least eighty percent below the emissions level in 2001. Additionally, all electricity supplied to customers in Connecticut must come from zero-carbon sources by January 1, 2040. General Statutes § 22a200a(a)(3). Electricity supplied to electric customers can be thought of as the electricity consumed in the state, otherwise known as the electric load, typically measured in megawatt-hours (MWh) or gigawatt-hours (GWh). The below graph displays Connecticut’s net electricity load over time (“net”, in this context, indicates the inclusion of WHAT IS A MEGAWATT-HOUR? reductions in load attributable to behind-the-meter distributed A megawatt-hour (MWh) is the amount of energy generation). As can be seen in the produced if a 1 megawatt (MW) electric chart below, Connecticut’s electricity generation unit ran for 1 hour. As an example, if load requirement has been generally a 3 MW capacity solar panel installation ran at full decreasing over time (by about 12% capacity (3 MW) due to optimal operating between 2015 and 2024), in part due to conditions (perfect weather) for 2 hours, it would increased proliferation of energy generate 6 MWh of energy (i.e., 3 MW x 2 hours efficiency and distributed generation. = 6 MWh). Conversely, a MWh is the amount of However, increasing electrification of energy consumed if a 1 MW appliance ran for 1 transportation and space heating, as hour. Per EIA estimates, the average well as potential energy demand from Connecticut household uses 7.8 MWh per year, data centers, will likely lead to a or 650 kWh per month (vs. national average of reversal in this trend, with electricity 10.6 MWh per year). consumption growing as consumption of other fuels decreases. 3 Figure 1: Connecticut Net Energy for Load Over Time1 40,000 Net Energy for Load (GWh) 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 Year CT Net Energy for Load Linear Trend 1 ISO New England, “Net Energy and Peak Load,” available at https://www.iso-ne.com/isoexpress/web/reports/load- and-demand/-/tree/net-ener-peak-load (Annual Generation and Load Data for ISO NE and the Six New England States link) (last visited January 9, 2026). 4 B. Connecticut Greenhouse Gas Emissions – Electricity Sector Electricity sector emissions can be measured by (1) emissions associated with electricity usage or consumption within the state (load); and (2) emissions from power generation within the state. Connecticut uses the first methodology. DEEP tracks the state’s progress in meeting its climate goals, including electric sector emissions, and regularly issues Greenhouse Gas Emissions Inventory Reports.2 In 2023, consumption-based electric sector GHG emissions were about 3.6 million metric tons of carbon dioxide equivalent (MMTCO2e), accounting for 10.3% of the state’s total GHG emissions.3 Consumption-based electric sector emissions in Connecticut have been generally decreasing over time, due to increases in energy efficiency, a reduction in emissions intensity from regional fossil-based generators (reduced petroleum and coal use in favor of natural gas), and an increase in renewable energy generation. However, consumption-based electric sector emissions rose by 1.1 MMTCO2e (44%) compared to 2022. DEEP reports that this increase appears to be largely due to more frequent and prolonged outages at the Millstone nuclear plant in 2023 than 2022, resulting in a lower energy production in 2023 and greater reliance on fossil fuels for power generation.4 Significantly, the steep decline in emissions after 2019, as shown in Figure 2, is a result of the power purchase agreement with the Millstone nuclear plant, which granted Connecticut ownership of all RECs generated by the facility from 2019 to 2029.5 2 See CT DEEP, “Connecticut Greenhouse Gas Reduction Progress Reports,” available at https://portal.ct.gov/deep/climate-change/ct-greenhouse-gas-inventory-reports (last visited January 9, 2026). 3 CT DEEP, “1990–2023 Greenhouse Gas Emissions Inventory,” updated September 2025, p. 6, available at https://portal.ct.gov/-/media/deep/climatechange/1990-2023-ghg-inventory/deep_ghg_report_1990-2023final.pdf?rev=c4562f29c0cd4dc4a43c7d67cfa83593&hash=B7E9F86289DCEFFCE0AAE1AA08637750 (last visited January 9, 2025). Beginning with its 1990–2021 Greenhouse Gas Emissions Inventory, DEEP included a new methodology for calculating the consumption-based electric power sector emissions that better accounts for the exchange and retirement of Renewable Energy Certificates. In general, this new methodology reduced calculated emissions. 4 CT DEEP, “1990–2023 Greenhouse Gas Emissions Inventory,” updated September 2025, pp. 5, 12, available at https://portal.ct.gov/-/media/deep/climatechange/1990-2023-ghg-inventory/deep_ghg_report_1990-2023final.pdf?rev=c4562f29c0cd4dc4a43c7d67cfa83593&hash=B7E9F86289DCEFFCE0AAE1AA08637750 (last visited January 9, 2025), 5 Id., p. 12; see also Connecticut DEEP and PURA Corresp., Feb. 1, 2018, Docket No. 17-07-32, DEEP and PURA Joint Proceeding to Implement the Governor’s Executive Order Number 59, Resource Assessment of Millstone Pursuant to Executive Order No. 59 and Public Act 17-3, available at: https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/3e4880375be426ff85258 752007981d6?OpenDocument. 5 Generation of zero-carbon electricity from Millstone was equal to approximately 57% of the state’s electric load in 2023 and 2024.6 However, power sector emissions associated with generation within Connecticut are significantly higher than consumption-based power-sector emissions, as Connecticut generates more power than it consumes. In 2023, emissions from electricity generation totaled about 10.6 MMTCO2e.7 Generation-based power sector emissions have held relatively steady, with a 12.4% decrease from 1990 to 2023. Increased in-state emissions associated with the operation of new natural gas generators have offset reductions in coal and petroleum-based power generation.8 Figure 2: CT GHG Emissions - Power Sector9 16.0 Emissions (MMT CO2e) 14.0 12.0 10.0 8.0 6.0 4.0 2.0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 0.0 Electric Power (Consumption) Electric Power (Generation) 6 U.S. Energy Information Administration (EIA), “Millstone, annual,” available at https://www.eia.gov/electricity/data/browser/#/plant/566?freq=A&ctype=linechart&ltype=pin&pin=&maptype=0&li nechart=ELEC.PLANT.GEN.566-ALL-ALL.A&columnchart=ELEC.PLANT.GEN.566-ALL-ALL.A; ISO New England, “Net Energy and Peak Load,” available at https://www.iso-ne.com/isoexpress/web/reports/load-anddemand/-/tree/net-ener-peak-load (Annual Generation and Load Data for ISO NE and the Six New England States link) (last visited January 9, 2026). 7 CT DEEP, “1990–2023 Greenhouse Gas Emissions Inventory,” Supporting Data, Emissions Totals sheet, available at https://portal.ct.gov/-/media/deep/climatechange/1990-2023-ghg-inventory/ghgemissions-19902023.xlsx?rev=62d11950305745bea819ccfddceb677c&hash=29D063FFD1EBDB54033C4C65CF5EB274 (Updated September 2025) (last visited January 9, 2026). 8 See U.S. Energy Information Administration (EIA), “Connecticut Electricity Profile 2024,” Full data tables 1–19 (Table 7: Emissions), available at https://www.eia.gov/electricity/state/connecticut/. 9 CT DEEP, “1990–2023 Greenhouse Gas Emissions Inventory,” Supporting Data, Emissions Totals sheet, available at https://portal.ct.gov/-/media/deep/climatechange/1990-2023-ghg-inventory/ghgemissions-19902023.xlsx?rev=62d11950305745bea819ccfddceb677c&hash=29D063FFD1EBDB54033C4C65CF5EB274 (Updated September 2025) (last visited January 9, 2026). 6 Figure 3 reveals why Connecticut is a net exporter of electricity. In 2024, Connecticut generated approximately 60% more electricity than it consumed.10 New England’s electricity grid is organized as a restructured regional market system, where generation, transmission, and distribution are subject to different regulatory regimes; decisions about the siting and construction of power generation facilities are complex and driven by a variety of factors.11 Figure 3: CT Electricity Load vs. Generation12 50,000 45,000 Net Energy (GWh) 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 Year Net Energy for Load In-State Generation Connecticut’s role in powering New England is further demonstrated in Figure 4 below. Connecticut produces approximately 41% of the electricity generated within New England (excluding exports from neighboring regions).13 Connecticut generates more electricity from both zero-carbon and carbon-emitting resources than any other New England state.14 As shown 10 ISO New England, “Net Energy and Peak Load,” available at https://www.iso- ne.com/isoexpress/web/reports/load-and-demand/-/tree/net-ener-peak-load (Annual Generation and Load Data for ISO NE and the Six New England States link) (last visited January 9, 2026). 11 See CT DEEP, “CT GHG Emissions Inventory 1990-2021,” Apr. 2023, p. 17, available at: https://portal.ct.gov//media/deep/climatechange/1990-2021-ghg-inventory/deep_ghg_report_9021_final.pdf?rev=735951aaaba54081be0e7cbba73d9b2d&hash=82C52012E23A7239005665069720C855. 12 ISO New England, “Net Energy and Peak Load,” available at https://www.isone.com/isoexpress/web/reports/load-and-demand/-/tree/net-ener-peak-load (Annual Generation and Load Data for ISO NE and the Six New England States link) (last visited January 9, 2026). 13 EIA, “Electricity Data Browser,” available at https://www.eia.gov/electricity/data/browser/#/topic/0?agg=2,0,1&fuel=vvg2&geo=00fo&sec=g&freq=A&start=20 23&end=2024&ctype=linechart&ltype=pin&rtype=s&maptype=0&rse=0&pin= (last visited January 13, 2026). 14 Id. 7 in the graph below, nuclear made up 38% of Connecticut’s utility-scale electricity generation in 2024, representing 92% of the state’s utility-scale zero-carbon electricity generation.15 Figure 5 displays the shift in the fuel mix used for electricity generation in Connecticut over time, while Figure 6 indicates the associated CO2 emissions from each fuel type. Figure 4: 2024 New England States Electricity Generation by Fuel16 50000 45000 40000 35000 Small-scale solar Other Other Renewables Hydropower Nuclear Gas Oil Coal GWh 30000 25000 20000 15000 10000 5000 0 Connecticut 15 Id. 16 Id. Maine Massachusetts New Hampshire Rhode Island Vermont 8 Figure 5: Electricity Generation in Connecticut Over Time17 50,000,000 45,000,000 40,000,000 35,000,000 MWh 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 Coal Hydroelectric Natural gas Nuclear Other Other biomass Other gas Petroleum Pumped storage Solar Wind Wood 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 0 Figure 6: CO2 Emissions from Connecticut In-State Power Generation18 14,000 Thousand Metric Tons 12,000 10,000 8,000 6,000 4,000 2,000 0 Coal Natural gas Other Petroleum 17 EIA, “Connecticut Electricity Profile 2024,” available at https://www.eia.gov/electricity/state/connecticut/ (Table 5: Generation) (last visited January 13, 2026). 18 EIA, “Connecticut Electricity Profile 2024,” available at https://www.eia.gov/electricity/state/connecticut/ (Table 7: Emissions) (last visited January 13, 2026). 9 III. Equitable Modern Grid (EMG) On October 2, 2019, PURA issued an Interim Decision in Docket No. 17-12-03, PURA Investigation into Distribution System Planning of the Electric Distribution Companies. The Interim Decision outlines the Authority’s framework for realizing an equitable modern electric grid in Connecticut (EMG Framework), as well as for near-term and long-term plans for continuous improvement to Connecticut’s electric grid. While the EMG Framework is not the subject of this report, the Authority strives to achieve the objectives of the EMG Framework in its oversight of the programs outlined in this report and the clean energy programs established effective January 1, 2022 (e.g., the Residential Renewable Energy Solutions (RRES) and the Energy Storage Solutions (ESS) programs, among others). The EMG Framework objectives are: 1. To support (or remove barriers to) the growth of Connecticut’s green economy; 2. To enable a cost-effective, economy-wide transition to a decarbonized future; 3. To enhance customers’ access to a more resilient, reliable, and secure commodity; and 4. To advance the ongoing energy affordability dialogue in the state, particularly in underserved communities. Based on the foundational record established during Phase I of Docket No. 17-12-03, the Interim Decision also identified and outlined the 11 dockets, illustrated in Figure 7, that will realize the EMG Framework objectives. Figure 7: Grid Modernization Dockets 10 The Authority has reached a final determination in all eleven EMG Framework dockets, resulting in numerous new programs, processes, and frameworks established to better achieve the objectives outlined above. Major milestones in each of the dockets are shown in Figure 8 below. More information on the EMG Framework and the resulting programs, processes, and frameworks can be found on the Authority’s dedicated website. Figure 8: Status of Grid Modernization Dockets 11 IV. Combined Program Data Table 1 provides a summary of the clean energy programs currently and previously in effect in Connecticut: Table 1: Overview of Clean Energy Programs Current Programs Legacy Programs Program Name Customer Segment Technology Time Period Residential Renewable Energy Solutions (RRES) Non-Residential Renewable Energy Solutions (NRES) Shared Clean Energy Facilities (SCEF) Energy Storage Solutions (ESS) Electric Vehicle (EV) Charging Medium- and Heavyduty (MHD) EV Charging Public Policy Contracts Conservation and Load Management Plan19 Voluntary Renewable Options (VRO) Residential Solar Investment Program (RSIP) Low- and ZeroEmission Residential Zero-Emission Class I Renewable Zero-emission Class I Renewable Zero-Emission Class I Renewable Energy Storage 2022–2027 EV Chargers 2022–2030 EV Chargers 2026–2030 Utility-Scale Varies Varies Residential and Non-residential Energy Efficiency Standard service utility customers RECs 2021–Present Residential Solar 2012–2021 Residential and Non-residential Solar, Fuel Cell, and Other Class 2012–2021 Non-residential Residential and Non-residential Residential and Non-residential Residential and Non-residential Commercial and Industrial 19 The Conservation and Load Management Plan is overseen by DEEP. 2022–2027 2020–2027 2022–2030 12 Program Name Customer Segment Technology Renewable Energy Credit (LREC/ZREC) Virtual Net Metering (VNM) (primarily nonresidential) Non-residential (State, Agricultural, and Municipal) Standard service utility customers I, II, and III renewable Solar, Fuel Cell, and Other Class I, II, and III renewable RECs Clean Energy Options Program (CEOP) Time Period 2014–2021 2005–2020 13 Figure 9 graphs the cumulative deployment of fuel cell, wind, battery storage, and electric vehicle charging systems via all relevant state programs, including projects where the physical deployment is out of state (e.g., in New York or in federal waters).20 It also shows the cumulative deployment of solar resources via all relevant state programs. For solar, one MW of installed capacity produces enough electricity annually to power approximately 146 Connecticut homes.21 The data for 2025 are through September 30. The figure reports the combined data for both EDCs, but does not show deployment through programs or procurements conducted by the state’s municipal electric utilities. For more information on deployment over time for individual programs, see the relevant sections below. 20 Excludes the Conservation and Load Management (C&LM) Plan. The C&LM plan was excluded to improve graph scale, as the deployed MW are significantly higher than that of other programs. 21 See Solar Energy Industries Association, “What’s in a Megawatt?,” available at https://seia.org/whats-in-a- megawatt/ (last visited Jan. 14, 2026) (Average Number of Homes Powered by a MW of Solar PV chart). 14 Figure 9: Cumulative Resource Deployment - All Programs22 900 800 700 MW 600 500 400 300 200 100 0 As of 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Residential Solar Photovoltaic (AC) Non-Residential Solar Photovoltaic (AC) Utility Solar Photovoltaic (AC) Wind Fuel Cells Battery Storage 2025 Other Class I, II, or III Resources Table 2 highlights deployment data by energy type, separated by year, for both EDCs. The table reflects only deployment in the state of Connecticut via relevant state programs, compared to Table 3, which includes projects physically located outside of Connecticut. 22 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (Overview by Tech sheet, Interrogatories CRE-01, CRE-02, and CRE-03); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 2025-11-17 UI Attachment 2 #25-08-01.xlsx, (Overview by Tech sheet, Interrogatories CRE-01, CRE-02, and CRE-03). Table 2: Program Deployment by Year by Technology Type23 In State Incremental MW of Deployment by Year by Technology Type (UI & Eversource) As of 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Residential 1.12 2.96 6.40 11.82 52.54 53.59 33.56 36.61 55.81 52.22 45.52 79.73 141.76 106.52 95.15 NonResidential 0.20 1.31 17.68 19.86 22.43 33.41 36.27 48.88 45.48 47.96 49.85 62.04 49.36 56.90 28.56 Utility 0.00 0.00 5.00 4.00 0.00 0.00 20.00 20.00 26.40 24.58 43.70 15.00 15.95 29.79 0.00 Wind 0.00 0.00 0.00 0.02 4.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 Fuel Cells 0.00 0.44 3.60 22.04 4.01 8.53 3.51 7.56 3.06 7.55 13.31 16.35 30.27 24.87 6.39 Battery Storage 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.09 0.16 0.25 0.73 5.01 6.92 6.51 3.22 893.39 131.72 129.32 130.69 176.79 94.79 105.30 93.29 68.52 110.48 129.05 132.12 139.12 137.42 107.50 3.00 2.00 39.61 4.50 2.11 5.88 4.32 2.00 0.00 3.00 4.55 1.33 0.60 1.00 2.00 Solar PV (AC) Energy Efficiency/Demand Response Other Class I, II, or III Resources 23 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (Overview by Tech sheet, Interrog. CRE-01); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 2025-11-17 UI Attachment 2 #25-08-01.xlsx, (Overview by Tech sheet, Interrog. CRE-01). 15 Table 3: Overview of Programs, Including Deployment MW and Count24 Overview of Programs - Including Total Deployment (In and Out of State) Statutory Authority Residential Solar (RSIP + RRES) Renewable Energy Source(s) Duration of Tariff or Contract Total No. of Annual Solicitations (or Program Length) Initial Project Award Year 0 (~10 years) 2011 (RSIP) Solar PV 15-year REC contract for RSIP 20-year tariff 0 (6 years) 2022 (RRES) 16-245ff, 16-244u 16-244z, P.A. 19-35 NRES Program 16-244z, P.A. 19-35 Solar PV 20-year tariff 0 (6 years) 2022 LREC/ZREC Program 16-244r, 16-244s, 16-244t Class I RECs 15-year tariff 10 (10-yr procurement term) 2012 VNM Program 16-244u(5) Project life N/A 2014 SCEF Pilot Program 16-244x SCEF Program 16-244z(a)(1)(c) DEEP Procurements Class I & Class III Energy Class I Energy + RECs Class I Energy + RECs 20-year tariff Pilot 20-year tariff 1 RFP (2year Pilot program) 6 (6-year procurement term) Varies - See DEEP Procurements section for details 2017 2020 Total Deployment Levels Total Deployment Levels through Sept. 2025 Deployment in MWs (AC) 330 Number of Projects In-Service 46,319 Deployment in MWs (AC) 396 Number of Projects In-Service 50,273 Deployment in MWs (AC) 32.7 Number of Projects In-Service 165 Deployment in MWs (AC) 451.6 Number of Projects In-Service 2630 Deployment in MWs (AC) 87.5 Number of Projects In-Service 90 Deployment in MWs (AC) 1.62 Number of Projects In-Service 1 Deployment in MWs (AC) 29.1 Number of Projects In-Service 11 Deployment in MWs (AC) Number of Projects In-Service Annual Number of RECs Delivered (Average) 1719.6 57 2029584 24 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (Overview by Program sheet, Interrog. CRE-05); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 2025-11-17 UI Attachment 2 #25-08-01.xlsx, (Overview by Program sheet, Interrog. CRE-05). 16 CEOP/VRO Program 16-244c / 16245p(a) Voluntary Class I RECs only ESS Program P.A. 21-53, 16-11, 16-19, 16-19e, 16244i Energy Storage 16-11, 16-244i EV Charging Infrastructure EV Charging Program Enroll 1-year customer contract N/A, through 2030 for the Performance Incentive N/A, through 2030 for Managed Charging 0 (9 years) 0 (9 years) 17 2005 / January 2021 Number of Enrolled Customers (Average) 2022 Deployment in MWs (AC) Number of Projects In-Service 2022 224683 7.98 577 Residential Ports In-Service 9,972 Commercial Ports In-Service 8,740 18 V. Existing Programs A. Residential Renewable Energy Solutions (RRES) Program 1. Program Description and History Authorized by General Statutes § 16244z(b)(2), the six-year Residential Renewable Energy Solutions (RRES) Program replaced the Residential Solar Incentive Program (RSIP, discussed below in Section VII.A). The program began on January 1, 2022, and will run through 2027. The following five objectives guide the development of the RRES Program: (1) To foster the sustained and orderly development of the state’s solar industry, and maintain Connecticut’s annual historical deployment of residential solar; (2) To achieve a 100% zero carbon electric grid by 2040, including through additional residential solar deployment; (3) To balance participant, non-participant, and electric system costs and benefits; (4) To ensure program accessibility for customers; and (5) To promote inclusivity and program participation by low- and moderate-income (LMI) customers and those in environmental justice communities (EJCs).25 the program has a target of 40% deployment among low-income populations or in distressed municipalities.26 25 See Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, PURA Implementation of Section 3 of Public Act 19-35, Renewable Energy Tariffs and Procurement Plans, pp. 5–7. 26 The current distressed municipality list and criteria are defined by the CT Department of Economic and Community Development (DECD). CT.gov, “Distressed Municipality List 2025,” available at https://portal.ct.gov/DECD/Content/About_DECD/Research-andPublications/02_Review_Publications/Distressed-Municipalities (last visited Jan. 14, 2026). 19 The RRES program design was established in the February 10, 2021 Interim Decision in Docket No. 20-07-01, PURA Implementation of Section 3 of P.A. 19-35, Renewable Energy Tariffs and Procurement Plans. While open to all forms of Class I renewables, RRES deployments have been exclusively solar projects to date. This program is administered by the EDCs in their respective service territories. The RRES Program allows residential solar customers to sell energy and RECs for a 20year term under one of two tariff rate structures: (1) Buy-All; or (2) Netting. Under the Buy-All tariff, the residential project is provided fixed compensation for all energy and RECs produced over a 20-year term. Compensation can either be provided directly to customers in the form of monetary on-bill credits, or as direct payments to thirdparty beneficiaries, such as a solar developer. Customers can cash out credits in excess of their utility bill once per year. Alternatively, under the Netting tariff, qualified projects are compensated for the net energy produced (i.e., all renewable energy production not consumed within the monthly netting interval) at the retail electric rate at the time of generation. A customer’s energy consumption, and therefore monthly energy bill, are reduced by the energy produced and used on site. Netting compensation for new customers is adjusted annually through the addition of either REC incentives (compensated at a fixed rate, payable to either the customer of record or a third-party beneficiary on a quarterly basis) or non-bypassable customer charges assessed per kWh of solar generation. Non-bypassable charges were implemented for new RRES customers beginning in 2025. The Authority annually reviews the RRES Program in Docket No. XX-08-02, where XX is the last two digits of the year (e.g., “25” for 2025). PURA reviewed 2025 (Program Year 4) RRES deployment data and program documents for use in 2026 (Program Year 5) in Docket No. 25-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 5. PURA issued a Decision on December 17, 2025 (Year 5 RRES Decision), which implemented several changes to better align the RRES Program with its objectives. The Year 5 RRES Decision updated the Buy-All and Netting tariff rates for 2026 using a tariff model developed through a stakeholder process to reflect recent economic and project data. Accordingly, the Authority authorized a Buy-All tariff rate for 2026 of 32.89 cents per kWh and a non-bypassable charge of 4.02 cents per kWh for customers enrolling under the Netting tariff. These changes were made to achieve a reasonable rate of return for participating customers while balancing participant costs and benefits with costs and benefits to non-participating ratepayers. Additionally, the Decision authorized a new Contractor Compliance Working Group, led by the PURA Office of Education, Outreach, and Enforcement, to develop recommendations for the standardization of information provided in Customer Disclosure Forms, as 20 well as program rules to ensure that customers receive complete financial information before signing a solar contract. More information and resources are available at the PURA RRES Program webpage and on each of the EDC’s dedicated RRES Program webpages (Eversource Residential; United Illuminating Residential). 2. Rates & Deployment Following the objectives cited above, RRES tariff rates are structured to provide a reasonable rate of return for project owners, as required under General Statutes § 16244z(b) while protecting Connecticut ratepayers from overcompensating projects, with the goal of providing a sustained and orderly growth of the residential solar market in Connecticut. The RRES Residential Tariff Model attached to the Year 5 RRES Decision as Appendix B is used to aid the development of these rates. The 2026 RRES tariff rates approved in the Year 5 RRES Decision are shown in Table 4: Table 4: 2026 RRES Residential Tariff Rates27 2026 RRES Residential Tariff Rates Buy-All Rate ($/kWh) Eversource UI Low-Income Adder Distressed Municipality Adder 0.3289 0.3289 0.0550 0.0275 Netting REC Rate / NonBypassable Charge ($/kWh) -0.0402 -0.0402 0.0350 0.0175 The EDCs also make quarterly and annual reports on RRES system deployment. RRES total and approved applications as of September 2025 are shown below in 27 Year 5 RRES Decision, p. 13 (Table 5). 21 Table 5. Roughly 96% of applications submitted over this period were approved. 22 Table 5: RRES Application Data: January 2022–September 202528 RRES Application Data: January 2022 - September 2025 Eversource UI Total Total Applications 52,402 11,719 64,121 Total Application kW 427,408 86,249 513,657 Approved Applications 50,512 10,756 61,268 Approved kW 410,027 77,315 487,342 Out of the 61,268 approved applications, about 77% have been completed and deployed across both EDCs, as seen in Table 6. Table 6: RRES Deployment: January 2022–September 202529 RRES Deployment: January 2022–September 2025 Eversource UI Total Total # Projects Deployed 39,667 7,343 47,010 Total kW Deployed 318,692 52,802 371,494 Figure 10. RRES Systems Installed by Month30 16 MW Installed 14 12 10 8 6 4 2 0 Month Low Income Adder 28 Distressed Municipality Adder No Adder Year 5 RRES Decision, p. 5 (Table 2). 29 Year 5 RRES Decision, p. 6 (Table 3). 30 Eversource Order No. 12 Compliance, Oct. 15, 2025, Docket No. 25-08-02, Att.1; UI Order No. 12 Compliance, Oct. 16, 2025, Docket No. 25-08-02, Att. 1. 23 B. Combined Residential Solar Program Metrics Figure 11 graphs the cumulative deployment of residential solar in Connecticut through state residential solar programs, including the legacy Residential Solar Investment Program (RSIP), discussed below in Section VII.A, Residential Solar Investment Program (RSIP), and the RRES Program, through October 2023. 2022 was the first year of deployment via the RRES Program. Cumulative residential solar deployment reached about 877 MW by September 2025. In addition, some residential solar projects have been deployed outside of the state-authorized programs (e.g., enrolled in legacy net metering, which was available prior to the start of the RRES program, but did not receive an RSIP incentive), which are also shown in Figure 11. According to the Solar Energy Industries Association, 11.87% of Connecticut homes have solar power equipment.31 31 SEIA, CT Solar State Spotlight, last visited Jan. 30, 2026, available at: https://seia.org/wp- content/uploads/2025/03/Connecticut.pdf. 24 Figure 11: Cumulative MW of Residential Solar Deployed in CT by Program32 1000 900 800 700 600 500 400 RSIP RRES LREC/ZREC No Program 300 200 100 0 Figure 12 summarizes annual residential solar deployment by program, including deployment outside of the state-authorized programs. Note that 2025 data only include deployment through September. 32 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet and LREC ZREC sheet, Interrogatory CRE-01; Capacity by Town sheet, Interrogatory CRE-15); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 2025-11-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet and LREC ZREC sheet, Interrogatory CRE-01); UI Compliance, Nov. 15, 2023, Docket No. 23-08-01, “2023-11-15 Section B.1.a UI Cover Letter Interrogatories - 2023 Clean and Renewable Energy Program #23-08-01,” UI CAE-033 Attachment 1. 25 Figure 12: Annual MW Deployment of Residential Solar in CT33 160 140 120 RSIP 100 80 60 RRES LREC/ZREC No Program 40 20 0 The “No Program” data shown in Figure 11 and Figure 12 reflect residential solar projects that enrolled only in the legacy net metering tariff and did not receive an incentive through the RSIP. However, the “No program” data are approximate and were calculated using total residential solar deployment by town and subtracting the RSIP, RRES, and LREC/ZREC deployment data.34 If data from the different sources is attributed to different years, the “No Program” value may be slightly higher or lower than what is represented. Out-of-program deployment is not available for 2023–2025 but is expected to be minimal, as net metering is no longer being offered separately from the RRES Program. Figure 13 displays total cumulative residential solar deployment by town. This includes solar deployed through RSIP, net metering, and the RRES Program. 33 Id. 34 See Decision, Feb. 22, 2023, Docket No. 22-08-01, 2022 Clean and Renewable Energy Program Data and Report, p. 3. 26 Figure 13: MW of Total Installed Residential Solar Capacity by Town35 In general, higher deployment is evident areas with higher population density. Bridgeport has the highest total installed residential solar, with 26.9 MW, followed by Hamden (21.8 MW) and Waterbury (21.5 MW). The map also displays Connecticut’s environmental justice communities, as defined by General Statutes § 22a-20a.36 Additionally, some towns have municipal utilities and may have additional residential solar installations not captured in this plot.37 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (Capacity by Town sheet, Interrogatory CRE-15); UI Compliance, March 18, 2026, Order No. 1, Att. 202603-18 UI Attachment 2 REVISED #25-08-01.xlsx ((Capacity by Town sheet, Interrogatory CRE-15). 36 EJ communities include: (a) Distressed municipalities as defined by the CT Department of Economic and Community Development (DECD); and (b) Census block groups that are not in distressed municipalities but in which 30% or more of the population lives below 200% of the federal poverty level (FPL). 37 Bozrah, Groton, Norwich, Norwalk, and Wallingford have municipal electric utilities. While some municipal utility solar may be captured in cases where CGB has agreements with municipal utilities to participate in RSIP, the data reflected here is likely not complete for towns with municipal utilities. 35 27 Figure 14 displays total residential solar deployment per capita, in kW per 100 persons. Middlefield has the highest residential solar installed per capita, with about 96.6 kW per hundred residents, followed by New Fairfield (83.8 kW per hundred residents) and Sprague (80.8 kW per hundred residents). Figure 14: kW of Total Installed Residential Solar Capacity by Town, Per 100 Residents38 38 Id. 28 C. Non-Residential Renewable Energy Solutions (NRES) Program 1. Program Description and History The Non-Residential Renewable Energy Solutions (NRES) Program is a statewide, six-year, non-residential program for Class I renewable energy projects under five MW administered by the EDCs in their respective service territories. The NRES Program is a combined successor program to the state’s Low and Zero Emissions Renewable Energy Credit (LREC/ZREC) and Virtual Net Metering (VNM) programs for non-residential customers and was established pursuant to General Statutes § 16-244z in the June 30, 2021 Decision in Docket No. 20-07-01, PURA Implementation of Section 3 of Public Act 19-35, Renewable Energy Tariffs and Procurement Plans (Non-Residential Tariff Decision). Five objectives guide the development of the NRES Program: (1) To foster the sustained, orderly development of the state’s Class I renewable energy industry; (2) To deploy the full MW capacity allowable under statute; (3) To ensure least-cost outcomes through the solicitation process; (4) To enable program accessibility for customers; and (5) To encourage inclusivity and program participation by customers in underserved communities and EJCs.39 The program has a target of 40% deployment in distressed municipalities. Zero-emission NRES projects less than or equal to 200 kilowatts (kW) are awarded incentive agreements on a non-competitive basis with an administratively set compensation rate. Zero-emission NRES projects between 200 kW and 5,000 kW, or five MW, are awarded incentive agreements through a competitive solicitation process 39 See Non-Residential Tariff Decision, pp. 7–8. 29 subject to price caps. The NRES competitive solicitation process is split into two categories: (1) medium zero-emission projects and (2) large zero-emission projects. Prior to October 2025, the NRES Program also included a 10 MW per year allocation for lowemission energy resources.40 In addition, beginning in Year 4 (2025), the NRES Program includes an additional carveout for solar projects at public schools, with a maximum total capacity 25 MW per year, as directed in Public Act No. 24-151, § 173(a). A summary of the NRES project categories is found in Table 7. The annual MW capacity allocation is split 80%/20% between Eversource and UI.41 Table 7: NRES Project Size Categories42 NRES Project Size Categories Category Project Size (AC) ≤ 200 kW Small Zero-Emission Medium Zero-Emission Large Zero-Emission School Solar >200 kW < 1,000 kW ≥ 1,000 kW ≤ 5,000 kW ≤ 5,000 kW Selection Method Lottery/First-come, first-served43 Competitive solicitation Competitive solicitation First-ready44 MW/Year (Year 5) 30 33 37 25 Approved NRES projects are eligible to sell energy and RECs to the EDCs for a 20-year term under one of two tariff rate structures, consistent with the RRES payment structures: 40 Public Act 25-173, § 9(a)(2) removed the annual 10 MW allocation for low emission projects from the NRES Program, specifying that NRES projects must use a Class I renewable energy source that emits no pollutants. 41 Program capacity allocation is split 80%/20% based on the EDCs’ respective shares of Connecticut electric customers. See Non-Residential Tariff Decision, p. 19. 42 Decision, Nov. 8, 2023, Docket No. 23-08-03, Annual Non-Residential Renewable Energy Solutions Program Review – Year 3 (Year 3 NRES Decision), p. 22 (Table 4); Decision, Nov. 6, 2024, Docket No. 24-08-03, Annual Non-Residential Renewable Energy Solutions Program Review – Year 4 (Year 4 NRES Decision), pp. 13–14; Decision, Dec. 17, 2025, Docket No. 25-08-03, Annual Non-Residential Renewable Energy Solutions Program Review - Year 5, p. 4. 43 Small Zero Emission NRES Projects are selected by lottery if the MW of submitted small projects exceed available capacity after the conclusion of a two-week window. Year 3 NRES Decision, pp. 16–17. If the MW of submitted projects does not exceed available capacity, then all projects are accepted, and the remaining MW are available on a first-come, first-serve basis. Id. 44 School category projects will be awarded on a “first-ready” basis, where the applicant must complete steps on a pre-application checklist before submitting a project. Year 4 NRES Decision, p. 14. Projects that meet this requirement will be reviewed and awarded as they are submitted, until the 25 annual MW capacity is reached. Id. 30 (1) Buy-All; or (2) Netting. Under the Buy-All tariff, the project is provided with fixed compensation for all energy and RECs produced over the 20-year term. Compensation is provided in the form of either monetary on-bill credits or quarterly direct payments. Customers can assign a portion or all of the tariff compensation to a third party. Alternatively, under the Netting tariff, the qualified NRES project is compensated (1) for all energy produced at the retail electric rate at the time of generation (i.e., all renewable energy production not consumed within the established netting interval) and (2) for the RECs created at a fixed rate over a 20-year term. A customer’s energy consumption and monthly energy bill are reduced by the energy produced and used onsite. REC payments are made to either the customer of record or a third-party beneficiary on a quarterly basis. The Authority annually reviews the NRES Program in Docket No. XX-08-03, where XX is the last two digits of the year (e.g., “24” for 2024). PURA reviewed the 2025 (Year 4) NRES deployment data and 2026 program documents in Docket No. 25-08-03, Annual Non-Residential Renewable Energy Solutions Program Review – Year 5. PURA issued a Decision on December 17, 2025 (Year 5 NRES Decision), which implemented several changes to better align the NRES Program with its program objectives. The Year 5 NRES Decision increased the price caps for the small, medium, and large project categories in 2026, to reflect changed circumstances resulting from the impending loss of the federal Investment Tax Credit (which will no longer be available for projects that fail to “commence construction” by July 4, 2026, or achieve full commercial operation by December 31, 2027, or do not meet new foreign entity of concern requirements). Adjusting price caps was intended to ensure continued project viability and support achievement of statutory clean energy goals. The Year 5 NRES Decision also introduced an annual budgetary cap, recognizing the ratepayer cost implications of a higher price cap, to limit total NRES Program costs to the level reached in 2024. The Authority determined that this approach was consistent with General Statutes § 16-244z, which permits the selection of projects above the NRES Program's MW cap subject to a cost-based constraint based on 2024 expenditure levels. More information and resources are available at the PURA NRES Program webpage and on each of the EDCs’ dedicated NRES Program webpages (Eversource Non-residential; United Illuminating Non-Residential). 2. Procurement Results NRES price caps, which represent the extent of the state’s willingness to pay for a given resource block, while allowing competitive forces to set the actual bid prices paid to 31 winning bidders, are shown in Table 8 for NRES Years 2, 3, and 4 (i.e., 2023, 2024, and 2025). Table 8: NRES Buy-All Bid Price Caps45 NRES Buy-All Bid Price Caps Category Small Zero-Emission Medium Zero-Emission Large Zero-Emission Low-Emission School Solar46 Year 2 Price Cap ($/MWh) Year 3 Price Cap ($/MWh) $200.97 $190 $159 $159 N/A $199.82 $188.9 $145.97 $159 N/A Year 4 Price Cap ($/MWh) $199.82 $188.9 $145.97 $159 $188.9 Year 5 Price Cap ($/MWh) $250.42 $236.74 $182.94 N/A $236.74 Table 9 represents the combined outcomes of the first four NRES program solicitations, occurring in February 2022 (Year 1), February and August 2023 (Year 2), February and August 2024 (Year 3), and February 2025 (Year 4). The August 2025 (Year 4) solicitation data was not yet available at the time of this report. Table 9: NRES Solicitation Data from February 2022–February 202547 NRES Solicitation Data from February 2022 – February 2025 (Table includes Year 1, Year 2, Year 3, and Year 4 February Solicitation) Eversource UI Size Category Total # of Executed Agreements MW Executed Agreements Small Zero-Emission 541 66.0 Medium Zero-Emission 112 79.1 Large Zero-Emission 33 104.7 Low-Emission 15 27.7 Small Zero-Emission 124 16.7 45 Year 5 NRES Decision, p. 12; Year 4 NRES Decision, p. 6; Year 3 NRES Decision, p. 7. 46 School solar compensation rates are administratively set, and are equal to the medium zero emission price cap. See Decision, Nov. 6, 2024, Docket No. 24-08-03 – Annual Non-Residential Renewable Energy Solutions Program Review – Year 4, p. 14. 47 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-25); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 202511-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-25). 32 Medium Zero-Emission 46 24.4 Large Zero-Emission 7 10.8 Low-Emission 3 3.0 881 332.6 Total In total, across the first four program years, the zero-emission categories executed contracts for 301.8 MW out of the 350 MW available (86%).48 Note that the available MW allocations are based on the full annual capacity allocation, but selected projects do not include those selected in the August 2025 solicitation. Additionally, selected projects may reflect reallocation of unused MW between the competitively selected project categories. Table 10: NRES Capacity Selected Size Category Small Zero-Emission Medium Zero-Emission Large Zero-Emission Capacity Selected (MW) Capacity Available (MW) Percent Selected 82.7 103.5 115.6 97.5 114 138.5 85% 91% 83% The low emission category executed 30.8 MW out of the 40 MW available (77%), before the low emission category was removed in Public Act No. 25-173, § 9, effective October 1, 2025. Solar projects represented 85% of the MW capacity selected, or 11 out of the 18 projects selected, in the low emission NRES category between the 2022 and February 2025 solicitations. Figure 15 indicates the total capacity of eligible NRES bids received and selected in each year across both EDCs. The chart does not include disqualified, declined, terminated, or withdrawn bids. 48 Id. 33 Figure 15. NRES MW Received and Selected49 60 50 MW 40 30 20 10 2022 2023 Feb 2023 Aug Selected 2024 Feb 2024 Aug Low Large Zero Medium Zero Small Zero Large Zero Medium Zero Small Zero Low Large Zero Medium Zero Small Zero Low Large Zero Medium Zero Small Zero Large Zero Medium Zero Small Zero Low Large Zero Medium Zero Small Zero 0 2025 Feb Not Selected Figure 16 summarizes the bid preferences of selected NRES projects. Out of 216 total bids selected in the competitive project categories through the February 2025 solicitation, 107 received a distressed municipality bid preference, two received a brownfield bid preference, 20 received a landfill bid preference, and 20 received a solar canopy or carport bid preference. Note that small zero-emission projects do not receive bid preferences, as they are not competitively selected. 49 Id. 34 Figure 16. Bid Preferences of Selected NRES Projects50 140 120 MW Selected 100 80 60 40 20 0 Small Zero Medium Zero Large Zero Low Emission Size Category None Distressed Municipality Brownfield Landfill Solar Carport/Canopy Table 11, below, provides the average pricing for the projects selected through the Years 1–4 NRES solicitations. Table 11: Average Bid Price for Selected Projects in NRES Years 1–4 Solicitations51 (Year 4 includes only February solicitation) Small Zero-Emission Medium Zero-Emission Large Zero-Emission Low-Emission Year 1 Average ($/MWh) Year 2 Average ($/MWh) Year 3 Average ($/MWh) Year 4 Feb Average ($/MWh) $200.97 $163.8 $143.1 $137.9 $200.97 $160.1 $134.5 $151.2 $199.82 $161.1 $126.5 $142.3 $199.82 $170.6 $130.9 $149.1 50 Id. 51 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-25); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 202511-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-25). 35 Figure 17 below provides the cumulative MW deployed by the NRES Program. As of September 2025, a total of 29.76 MW of selected projects under the NRES Program have reached deployment, of which 25.44 MW is solar PV. 52 Figure 17. Cumulative MW Deployed via the NRES Program53 35.00 30.00 MW Deployed 25.00 20.00 15.00 10.00 5.00 0.00 2022 2023 2024 Solar PV 2025 Fuel Cell 52 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-01); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 202511-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-01). 53 Id. 36 D. Shared Clean Energy (SCEF) Program and SCEF Pilot Program 1. Program Description and History Pursuant to General Statutes § 16-244z(a)(1)(C), the SCEF Program was established as a competitive procurement effort to provide benefits of clean energy to customers who meet income requirements or are unable to install clean energy projects at their home or business. SCEF is Connecticut’s version of a community clean energy program. The goal of the SCEF Program is to provide savings to specific categories of customers, particularly customers with low- to moderate-incomes, low-income service organizations, and customers who reside in EJCs. Typically, residents or businesses can choose to invest in, or lease, a renewable energy system on the rooftops of their homes or businesses. However, some Connecticut residents and businesses, especially LMI customers, may face substantial barriers to investing in or leasing an individual installation, such as high installation costs, unsuitable rooftop orientation, shaded property, or renting a property instead of owning one. In addition to the goal of providing savings to these specific categories of customers, the SCEF Program objectives are to cost-effectively allocate up to 50 MWs to SCEFs annually, and to lower or eliminate barriers to entry for subscriber organizations. A SCEF project enables multiple customers to benefit directly from a facility's energy production. Participating SCEF customers, or subscribers, receive clean energy savings in the form of a fixed monthly credit of $0.025/kWh on their utility bill. The EDCs administer the SCEF Program in coordination with DEEP. The EDCs are responsible for subscription management, identification, and enrollment of customers/subscribers, as well as project selection through an annual, competitive solicitation. The Authority reviews the program requirements, price caps, and bid preferences each year to ensure the program’s effectiveness. The SCEF owner is responsible for the financing and construction of the project, which delivers energy and RECs to the EDCs. In turn, the SCEF owner receives direct payment for the energy production of the project on a quarterly basis over a 20-year term. The Program allocated 25 MW of new clean power generation per year for the first three program years (2020– 2022) and 50 MW per year for subsequent program years. In 2024, Public Act No. 2431, § 6(c)(1)(C)(ii) extended the SCEF program from six to eight years, with the final procurement in 2027, for a total of 325 MW available over eight years. The MW allocation is split 80%/20% between Eversource and UI, respectively. 37 The SCEF project requirements and tariff design, including the program timeline, project eligibility requirements, and the EDCs’ solicitation and bid selection process were approved by PURA in the December 18, 2019 Decision in Docket No. 19-07-01, Review of Statewide Shared Clean Energy Facility Program Requirements. The Authority conducts an annual review proceeding each year to determine whether any adjustments to next year’s procurement are necessary.54 This year, the 2026 Program documents and manual were reviewed and approved by PURA in the December 17, 2025 Decision in Docket No. 25-08-04, Annual Review of Statewide Shared Clean Energy Facility Program Requirements – Year 7 (Year 7 SCEF Decision). The Year 7 SCEF Decision implemented several program changes in addition to the annual revision and approval of the SCEF Program Manual and related program documents. First, the decision increased the SCEF price cap from $133/MWh to $182.94/MWh to reflect changed circumstances, including recent modifications to the federal investment tax credit (ITC) enacted through the One Big Beautiful Bill Act. This change also aligned the SCEF price cap with that of the NRES Program and reduced artificial pricing disparities between programs serving similar project types and developer markets, thereby improving market efficiency and predictability. At the same time, the decision recognized the ratepayer cost implications of a higher price cap. To balance these considerations, it established an annual budgetary cap to ensure that total SCEF Program costs do not exceed those reached in 2024, the fifth SCEF Program year, consistent with the intent of General Statutes § 16-244z(c)(1)(B). The Year 7 SCEF Decision also maintained the Program’s bid preference amounts to provide stability and avoid introducing uncertainty for developers. Finally, the decision removed the SCEF Program’s slope-based site restrictions. These restrictions, which limited projects to no more than 10% of land with slopes greater than 15% and prohibited grading to meet this threshold, were determined to be duplicative of the review conducted under DEEP’s General Permit and to increase administrative burden, development costs, and review timelines. Accordingly, the slope requirements were eliminated through the Year 7 SCEF Decision. 2. SCEF Pilot Program The current SCEF Program design is largely based off lessons learned from a pilot program administered under General Statutes § 16-244x and approved by PURA in Docket No. 17-06-28, Application to Approve the Selected Projects Under the Shared 54 Annual reviews are conducted in Docket No. XX-08-04, where XX is the last two digits of the year (e.g., “25” for 2025). 38 Clean Energy Facility Pilot Program. In the November 8, 2017 Decision in Docket No. 17-06-28, PURA approved DEEP’s selection of three solar projects for a two-year SCEF Pilot Program with the EDCs. The selected projects consist of a 2.0 MW facility by CHIP Fund 5 and a 1.62 MW facility by Clean Energy Collective located in Eversource territory, and a 1.6 MW facility by US Solar Corporation located in UI territory. Currently, only the 1.62 MW facility in Eversource territory is in service under the SCEF Pilot Program.55 The RFP issued by DEEP to select pilot projects was conducted pursuant to General Statutes § 16-244x. The statute directed DEEP to: (1) establish a billing credit for subscribers of a SCEF; (2) establish consumer protections for subscribers and potential subscribers of such facility; and (3) select, pursuant to a competitive RFP process, SCEF projects with an aggregate total nameplate capacit

Text of UI-Attachment 3.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
2018 EDITION Guidebook of Requirements for Electric Service TABLE OF CONTENTS 1. General Information. ......................................................................................................1 1.1 Introduction. ..............................................................................................1 1.2 Policies & Procedures. ................................................................................1 1.3 Safety..........................................................................................................1 1.4 Electrical Codes. .........................................................................................2 1.5 Effective Date & Revisions..........................................................................3 1.6 Consultation...............................................................................................3 2. General Requirements for Service...............................................................................4 3. Types of Service Available.............................................................................................6 3.1 Scope..........................................................................................................6 3.2 Single- and Three-Phase Service from Pole-Mounted Transformers.........8 3.3 Services from Padmount Transformers. ....................................................9 3.4 Services from Transformer Vaults..............................................................9 3.5 Temporary Service. ..................................................................................11 3.6 Primary Voltage Services..........................................................................11 4. Request for Electric Service. .......................................................................................11 4.1 General Service Information.....................................................................12 4.2 Residential Overhead Service Drops. .......................................................12 4.3 All Other Service Drops & Laterals. ...........................................................13 4.4 Residential Developments. ......................................................................14 4.5 Commercial & Industrial Developments. .................................................15 4.6 Service Request Dos and Don’ts...............................................................16 5. Design Criteria & Construction Practices................................................................16 5.1 Overhead and Underground Services. .....................................................16 5.2 Road Crossing Poles. ................................................................................19 5.3 Private Line Poles (PLP).............................................................................20 5.4 Cut & Reconnect Policy. ...........................................................................20 5.5 Buildings Vacant for Periods Greater Than Six Months.............................23 5.6 Demolition................................................................................................23 5.7 Service to PCS Towers...............................................................................24 6. Motors . ..........................................................................................................................25 6.1 General Requirements..............................................................................25 6.2 Protective Devices....................................................................................25 6.3 Single-Phase Motors.................................................................................26 6.4 Three-Phase Motors. ................................................................................26 7. Emergency Interruption of Service & Emergency Generators...........................26 7.1 Interruption of Service. ............................................................................26 7.2 Emergency Generators.............................................................................27 8. Alternate Energy Source. ............................................................................................27 8.1 Parallel Generation....................................................................................27 8.2 Uninterruptible Power Supply (UPS).........................................................27 9. Quality of Service..........................................................................................................28 9.1 Voltage Regulation. ..................................................................................28 9.2 Non-Linear Loads......................................................................................29 10. Metering. .......................................................................................................................29 10.1 General Requirements..............................................................................29 10.2 Metering Installation Requirements.........................................................30 10.3 Metering Equipment. ...............................................................................38 11. Energy Diversion/Theft of Service. .........................................................................42 11.1 General Requirements..............................................................................42 11.2 Refusal or Discontinuance of Service.......................................................42 11.3 Jumpered Metering..................................................................................44 12. Service Materials Available at Town Halls. ............................................................44 13. Guidebook Standards. ...............................................................................................45 Appendix A – DEFINITIONS...............................................................................................72 1. GENERAL INFORMATION 1.1 Introduction This Guidebook provides a cursory view of the policies and procedures of UI and is intended for use by our customers, electrical contractors, consulting engineers, architects and electrical inspectors. We present this Guidebook in an effort to acquaint you with the various types of electric services that are offered by UI and to help you determine which is best suited for your individual needs. This booklet mainly deals with low voltage services (480 volts and below). Primary service voltages above 480 volts are supplied by special contract, and additional information is available on request. We at UI look forward to working with you to meet all your electrical energy and service requirements. NOTE: Section 10.3 contains a list of attributes, characteristics and specifications for approved metering equipment. UI no longer specifies catalog numbers. 1.2 Policies & Procedures UI supplies electricity subject to our Terms and Conditions and our Rate Schedules on file with the Connecticut Public Utilities Regulatory Authority (PURA). While our policies and procedures follow accepted industry practices and standards, they are not necessarily the same as the requirements adopted by the other electric utilities that adjoin our territory. UI policies and procedures are available upon written request and online. Where UI and other specified agencies are named in this book, all policies and requirements are to remain valid for future names of the same entity. 1.3 Safety A. The safety of UI personnel and others who work on and/or around our equipment, as well as the safety of the general public, is our most important concern. Do not approach any downed or exposed wire, cable or other equipment as any contact may cause injury or death. Please report any problems immediately to UI at [phone removed]. B. UI designs, builds and operates its electric system in accordance with the applicable Connecticut General Statutes, Occupational Safety & Health Administration (OSHA) regulations, the National Electrical Safety Code (NESC) and to UI’s own safety rules. Only authorized personnel are allowed to work on utility poles and equipment. 1 C.  UI reserves the right to refuse to energize a new service or to de-energize an existing service that violates UI safety rules regardless of whether it meets electrical or building codes. D. People working with equipment such as ladders, scaffolding, backhoes, dump trucks, cranes, etc. should use extreme caution when working near UI power lines. Contact with these lines may result in the electrification of you and/or your equipment and may cause injury or death. Please maintain a minimum of 10 feet from UI power lines. For additional information, please refer to OSHA regulations and contact UI at [phone removed]. E. People doing any excavation near buried power cables should use extreme caution. State law requires that you contact CALL BEFORE YOU DIG at 811 or [phone removed] a minimum of two full business days before starting any excavation. 1.4 Electrical Codes A. UI designs, builds and operates its electric system in accordance with the latest revision of the National Electrical Safety Code (NESC). The requirements of this code are incorporated in our Company Standards. For new construction and renovations, certain customer-owned facilities fall under the jurisdiction of the NESC and must also comply with this code. B. Customer-owned facilities are built in accordance with the latest approved version of the National Electrical Code (NEC) and the latest versions of the Building and Fire Safety Codes that have been adopted by the State of Connecticut Department of Public Safety. Approval by the authority having jurisdiction must be received by UI and posted in our system before any new or renovated or substantially repaired electric service can be energized. C. Where there is a conflict with the requirements of UI, the NESC and the NEC, the more stringent requirements shall prevail. If necessary, UI and the authority having jurisdiction will jointly confer. UI reserves the right to make all final determinations. 2 1.5 Effective Date & Revisions The effective date of this booklet is Dec. 1, 2018, and supersedes all previous issues. All construction started on or after this date must comply with these requirements. Allowance will be made for projects currently in construction or service requests previously submitted to UI. UI reserves the right to change the requirements of the booklet without notification based on changes to our policies and procedures, terms and conditions, industry standards and codes, etc. When planning a project, it is your responsibility to verify the latest requirements of UI. NOTE: Do not start any project without first consulting with UI and the Building Department of your municipality. 1.6 Consultation It is impractical for a booklet of this type to contain all the information necessary to cover all variations and possibilities of service installation. Our Customer Care Center Representatives are available to assist you in determining the appropriate method of service for your needs. Our Customer Care Center acts as a clearinghouse for all customer requests and will direct your questions to the appropriate department. We urge you to contact them at your earliest convenience. We are confident that doing so will result in greater satisfaction and will avoid unnecessary delays. Our Standard Field Department is responsible for coordinating all 200 A and below, single-phase, overhead services for residential customers where UI facilities are already in place. This includes temporary services to construction trailers that meet the above criteria. In addition, Standard Field is responsible for coordinating all service removals for building demolitions. Our Engineering Department is responsible for coordinating all services where additional poles and wires are needed, all residential overhead services over 200 A, all underground residential services and all commercial/industrial services. Our Distributed Energy Resources Department facilitates the safe, reliable interconnections of parallel generation on the distribution system. Our Economic Development Department is available to assist you with the attraction, retention and/or expansion of your business in our service territory. This includes coordinating contact with state and municipal representatives, real estate developers and financial institutions. 3 Our Energy Conservation Department offers technical assistance, consulting services and incentives at every phase of your construction or retrofit project encouraging the design, construction and operation of energy-efficient buildings and equipment. This assistance covers the major energy-consuming systems such as lighting, heating ventilation and air conditioning equipment (HVAC), refrigeration equipment, motors, air compressors, process equipment and building envelopes. Below are the phone and fax numbers for the listed departments: DEPARTMENT Customer Care Center PHONE # FAX # [phone removed] [phone removed] Email: [email removed] Standard Field [phone removed] [phone removed] Engineering [phone removed] [phone removed] Economic Development [phone removed] [phone removed] Distributed Energy Resources [phone removed] Email: [email removed] Energy Conservation [phone removed] [phone removed] Refer to Section 4, Request for Electric Service for detailed information about applying for service, or visit us on our website at uinet.com. 2. GENERAL REQUIREMENTS FOR SERVICE A. All requests for new service and changes to existing services must be ordered through our Customer Care Center either by phone, fax or the Internet. Call [phone removed] from 7 a.m. to 7 p.m. Monday through Friday and 7 a.m. to 4 p.m. on Saturday. You can fax your Electric Service Information Form to 888.442.-6070 or apply on the Internet at uinet.com at any time. A UI job number will be assigned; this number is required to obtain a release from the authority having jurisdiction. NOTE: Any request for new service or changes to existing service jobs which have no action for 180 days will be canceled, and the request process, if needed, will have to be repeated. B. All service requests must include the name and address of the party who will be responsible for paying the electric bill. The customer may be required to sign a Service Contract and, in some cases, make a deposit. 4 C. All service requests are subject to UI approval. This includes the service location, voltage and phase characteristics, outdoor meter location and configuration, and other associated requirements. NOTE: ALL new and renovated meter provisions MUST be located outdoors unless approved in writing. Do not purchase any equipment or proceed with any construction until you have obtained these requirements from UI in writing. To avoid problems and delays, this should be done early in the project planning stages. D. In general, service to a customer’s premises will be delivered at a single point. If the capacity requirements to a single building or multiple buildings on a single parcel of land warrant additional service, both UI and the authority having jurisdiction must jointly grant approval. UI reserves the right to restrict the service to a single point of delivery or require additional payment for the cost to provide the additional service. E. When requested by UI: customers consultants or contractors shall complete a UI Load Information Form. This form provides greater details about the project (including the total connected load in kilowatts) and should be submitted to the Engineering Department. It augments and does not replace the service order placed through our Customer Care Center (see Paragraph A above). F. The characteristics of certain electrical equipment such as motors, inverter-based generators and non-linear loads may adversely affect your service and the operation of UI’s electrical system. All adverse effects on UI’s electrical system caused by customer equipment must be corrected by the customer at the customer’s expense. For additional information, please reference Section 6 – Motors and Section 9 – Quality of Service. This incorporates solar, standby generators or any other alternative power generation methods. G. The company requires clear access to its facilities at all times and reserves the right to enter the customer’s property to inspect, maintain and/or upgrade our equipment without notice. If access into a building is required, UI will make every attempt to do this during normal working hours or will make specific arrangements with the property owner. UI reserves the right to disconnect services as allowed by law. 5 H. When the estimated expenditures of the company to provide service to a customer’s premises exceed the estimated income to be derived from that service, additional payments by the customer may be required. The company may require the customer to pay, in advance, the estimated cost difference to provide such service or to guarantee a minimum annual payment for a term of years as stated in UI’s Terms and Conditions (CPUCA No. 647, Item 4). I. Customers shall consult the company when contemplating changes in the size or electrical characteristics of their equipment. UI normally sizes its equipment to serve the actual electrical load of the customer and not the full potential load of the customer’s service entrance equipment. UI must be notified of customer load increases in advance and be provided the opportunity to replace its equipment, if necessary, prior to the load increase. Damages to company equipment resulting from unauthorized changes shall be the responsibility of the customer. J. All wiring must comply with the latest approved version of the National Electrical Code and the latest versions of the Building and Fire Safety Codes that have been adopted by the State of Connecticut Department of Public Safety. NOTE: UI will not schedule or energize any new or renovated service unless the release from the authority having jurisdiction is posted in our system. The contractor should make arrangements with the proper authority in advance to avoid delays. 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service territory of UI. All services are either single-phase, three wire or three-phase, four wire and the neutral conductor must be grounded in accordance with the National Electrical Code. Please contact our Engineering Department to verify that the requested service can be provided by UI prior to making any commitments or ordering any equipment. A. Single-phase, three-wire, 120/240 volt service is generally supplied to all residential customers and is typically available for all customers. B. Single-phase, three-wire, 120/208 volt service is only supplied when singlephase metered service is required and a three-phase 120/208Y volt source is available. Typically, this involves large apartment buildings, a condominium or an office complex, or service in the underground network area. 6 C. Three-phase, four-wire delta (120/240/240 volt) service may be supplied for commercial and industrial customers provided that the minimum connected three-phase load is 5 KW and the minimum total demand is 10 KW. For pole mounted transformers, the minimum service size is 100 A and the maximum service size is 600 A. This voltage is not available from padmount transformers. D. Three-phase, four-wire wye (120/208Y volt) service may be supplied for large residential projects and for commercial and industrial customers. For polemounted transformers, the minimum service size is 400 A with a minimum demand of 30 KW. For padmount transformers, the minimum service size is 600 A with a minimum demand of 65 KW. E. Three-phase, four-wire wye (277/480Y volt) service may be supplied for large commercial and industrial customers. For pole-mounted and padmount transformers, the minimum service size is 400 A with a minimum demand of 100 KW. F. Three-phase, three-wire delta (240 volt and 480 volt) service is no longer provided. For existing services with either of these voltages, please contact Engineering before planning any changes. Conversion to a three-phase, four-wire service may be required. G. Primary service voltages above 480 volts are supplied by special contract. Contact Engineering for additional information. NOTES: When three-phase service is supplied, every effort should be made to balance the load among all three phases. Three-phase service is not generally supplied for residential use but may be furnished if loads warrant and facilities are available. UI’s Engineering Department shall be consulted prior to making commitments for any such service. 7 3.2 Single- and Three-Phase Service from Pole-Mounted Transformers Maximum Service Size from Transformers Mounted on Poles Main Switch Size and Equivalent KVA Ratings Maximum Size Main Allowed from Street Pole Off-Street Pole Transformer Capacity Allowed on U.G. by U.G. by Poles Cust. Cust. (Note 1) O.H. (Note 2) O.H. (Note 2) VOLTS 400A 600A 800A 120/240 1φ 3 Wire 96 KVA N/A N/A 100 KVA 400 A 400 A 400 A 400 A 120/240/240 3 φ 4 Wire 166 KVA 250 KVA N/A 300 KVA 400 A 400 A 400 A 400A (10 KW Min. Demand) 600 A No longer available for new services. Contact UI’s Engineering Department 240 3φ 3 Wire before making any additions or changes. 120/208Y/ 3 φ 4 Wire 144 KVA 216 KVA 288 KVA 300 KVA 400 A 400 A 400 A 400 A (30 KW Min. Demand) 600 A 800 A 277/480Y 3 φ 4 Wire (100 KW Min. Demand) 332 KVA N/A N/A 300 KVA (Note 3) (Note 3) 400 A 400 A NOTES: 1. 3 φ 3 wire underground services (240V or 480V) are no longer available. Contact UI’s Engineering Department before making any additions or changes to existing service. 2. Conduit shall be no smaller than 1¼ inch nor larger than 4 inch in diameter. Location on the riser pole shall be designated by UI and is typically on the field side of the pole away from traffic. Do not trench to any pole without first obtaining approval from UI. A maximum of two conduits per pole is allowed for electric service and a maximum of three wires for single-phase and four wires for threephase can be installed in each conduit. While allowed by NEC, UI does not allow doubled conductors in a single riser conduit. All riser pole conduits and sweeps to be rigid galvanized steel conduit and supported 3 inches clear of the pole. Install only the first vertical 10-foot length and provide the remaining conduit, brackets, weatherhead and grounding clamp for installation by UI. Service entrance conductors are supplied by the customer and must extend a minimum of three feet beyond the weatherhead to allow for a drip loop. Do not install conductors without UI assistance. 3. 277/480Y services are not available from street poles (private property poles are required). 8 3.3 Services from Padmount Transformers A. The design, location, voltages and materials for underground services must be approved by UI prior to making any commitments. Please contact UI’s Engineering Department for more information. B. The company has a residential policy (OP-D36) which states that the developer must provide all trenching required for the electrical system. Also, the developer must supply and install foundations and conduit to UI specifications. UI will then install the primary and secondary electric system. UI requires a permanent easement for this equipment. The customer for each individual lot will supply, install, own and maintain the service entrance cables and conduit. Voltages available are 120/240 volt single-phase and 120/208Y volt three-phase for large multi-unit housing. Contact UI’s Engineering Department for more information. C. The company has a commercial/industrial policy (OP-D32) governing service to office or industrial parks. The developer must provide all trenching required for the electrical system. Also, the developer must supply and install foundations and conduit to UI specifications. UI will then install the electric system necessary to supply the individual lots. UI requires a permanent easement for this equipment. The services to the individual lots are installed under separate contracts. See Paragraph D below. Contact UI’s Engineering Department for more information. D. For service to an individual commercial/industrial lot, the customer must supply, install, own and maintain all primary conduit, transformer foundations and the service entrance conduit and cables. The primary conduit shall be installed from the high voltage supply designated by UI to the transformer foundation per UI specifications. UI will install the primary cable and transformer and make all connections to company-owned equipment. Voltages available are single-phase, three-wire 120/240 volt (800 A max.) and three-phase, four-wire 120/208Y (3,000 A max.) or 277/480Y (2,500 A max.). Contact UI’s Engineering Department for more information. 3.4 Services from Transformer Vaults A. The design, location, voltages and materials for these underground services must be approved by the company prior to making any commitments. Contact UI’s Engineering Department for more information. 9 B. For downtown New Haven or Bridgeport, the company has a policy (OP-D10N) for service from the network grid. Services up to 800 A at 120/208Y volts will be connected to the grid. The customer must pay for that portion of the service between the main switch or junction box and the curb. Services exceeding 800 A in total capacity at 120/208Y and all services rated 277/480Y cannot be connected directly to the network grid. In this case, the customer is required to install, own and maintain a vault to UI specifications. Voltages available are three-phase, four wire 120/208Y or 277/480Y, and are limited to 3000 A. (Refer to Guidebook Standards #8 and #9 in Section 13.) NOTE: Other municipalities have underground systems in portions of their downtown areas (e.g., East Haven and Derby). Contact UI’s Engineering Department for specific requirements for service in these areas. C. With the exception of single meter installations, the underground service conduit shall terminate in a junction or pull box supplied and installed by the customer. The junction or pull box shall meet both UI and National Electrical Code requirements and is subject to the approval of the authority having jurisdiction. The junction box will connect to the customer’s main switch or switches. The minimum size of the box shall be based on the service size, and the conduit shall enter from the back or the end of the box. The service conductors shall not be spliced but may be tapped where multiple main switches are used. The junction or pull box shall have provisions for company locks and seals. Contact UI’s Engineering Department for drawings of approved junction boxes. D. In each of the above cases, the service entrance disconnect must be either a switch with current limiting fuses or a circuit breaker of equivalent interrupting capacity. The short circuit capacity of these devices shall be not less than 200,000 A symmetrical for downtown network areas, and the service must be configured in cold sequence (i.e., switch-fuse-meter). For all other areas, contact UI’s Engineering Department. E. Customers in non-network areas may be required to install, own and maintain a transformer vault to UI specifications. This occurs when the service entrance capacity requires the installation of transformers on the customer’s property and there is not sufficient area for a padmount transformer. Voltages available are three-phase, four-wire 120/208Y (3,000 A max.) or 277/480Y (2500 A max.). The short circuit capacity of these devices shall be calculated by UI, and the service must be configured in cold sequence (i.e., switch-fuse-meter). Contact UI’s Engineering Department for more information. 10 3.5 Temporary Service A. Temporary service is available upon request provided that the cost to install and remove the necessary facilities is paid in full and in advance by the customer. Contact United Illuminating, 100 Marsh Hill Rd., Orange, CT 06478. B. Where UI facilities are already in place- a single-phase temporary service can be supplied by a simple service drop or underground service lateral. A standard flat rate fee applies. C. For more complex temporary services, the Engineering Department will provide the customer with a written estimate of the cost associated with providing such service. D. Services that utilize temporary conductors connected to the load side of the meter provision must be applied for as a temporary service even if the permanent conductors are installed on the line side of the meter. This is billable at the current rate. 3.6 Primary Voltage Services Primary voltage services are generally supplied by high voltage switchgear (either fused interrupters or circuit breakers) and are primary metered. Contact UI’s Engineering Department for additional information. 4. REQUEST FOR ELECTRIC SERVICE To establish electric service, temporary or permanent, contact UI’s Customer Care Center by calling [phone removed] from 7 a.m. to 7 p.m., Monday through Friday, and 7 a.m. to 4 p.m. on Saturday. You may fax a completed Electric Service Information Form to [phone removed] (available 24 hours a day/7 days per week). You may also apply by completing an application on our website at uinet.com. Please request a service order and a meter application. NOTE: Before UI can schedule or energize any new or renovated service, the authority having jurisdiction must approve the construction, and the acceptance of such construction must be posted in UI’s system. 11 4.1 General Service Information The following general service information is required on all applications: A. Project/Owner Name B. Number & Street Address, Town and Zip Code C. Lot # (if applicable) and nearest intersecting street D. Complete billing information including: – Owner’s billing address and telephone number – Total number of meters requested E. Connecticut electrical contractor’s license number (E-1/E-9) F. Electrical Contractor’s cell phone number and email address G. Service information including: – Residential or Commercial/Industrial – Overhead or Underground – Service size in amperes – Requested service voltage – Single-phase (three-wire) or three-phase (four-wire) – Temporary or permanent H. Type of construction (new, replacement, increase, removal, demolition, cut tap or repair) I. Dates temporary and permanent service is required 4.2 Residential Overhead Service Drops For single-phase residential overhead service drops rated 200 A and below, the following additional information is required by UI: A. Pole number of requested service pole B. Confirmation if the requested service pole has UI secondaries (yes/no) C. Number of pole spans from transformer to service pole D. Span distance (in feet) from service pole to service location 12 Where UI facilities are already in place, residential overhead service drops are typically designed and located by the customer’s licensed electrical contractor. This includes temporary services to construction trailers that meet the above criteria (the standard flat rate fee for temporary service applies). Upon receiving complete information, UI will provide a job number immediately from our Customer Care Representative or by the next business day if you faxed in your request. Customer Electricians or trained field technicians are expected to determine the proper location for the service based on guidebook standards #1, 2, 3, 4, 10 and 12. If you have requested UI to “spot the service,” then typically you will be contacted within five business days by the Standard Field Department. Midspan service taps are nonstandard construction and generally not acceptable. Contact UI Engineering for other options. 4.3 All Other Service Drops & Laterals The following are requirements for all other overhead service drops and underground service laterals, services where additional poles and wires are needed, all residential overhead services over 200 A, all underground services and all commercial/ industrial services: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. A completed UI electrical load information form. C. Construction start and completion dates. You will not receive the UI job number until your request has been reviewed and the job requirements determined by the UI Engineering Department. Typically, you will be contacted by our engineer to discuss the job and/or arrange for a job site meeting within five business days of placing the order. The job requirements will be written by our engineer and sent to you with a copy of the service order by US mail or email. Refer to Guidebook Standards #5, 6, 7, 8, 9, 11 and 13 in Section 13. 13 4.4 Residential Developments Overhead line extensions and Underground Residential Distribution (URD) projects require more information, drawings and advance planning. Therefore, it is important that our Engineering Department obtain the following information: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. Name of real property owner and the approximate date property was purchased (obtain volume number, page number and date recorded, if available). C. Sizes (sq. ft.) and number of buildings, including the number of units per building and any house meters, if applicable. If this represents only a portion or section of the total development, indicate the total number of future buildings and units planned for the development. D. A completed UI electrical load information form for a typical unit or building. E. Construction start and completion dates. UI needs six to eight weeks after receipt of complete information to prepare the necessary project documents and cannot install or energize any facilities until the necessary contracts are signed and all applicable easements have been recorded on the land records. These documents include: A. As-Planned Engineering Drawing with proposed UI facilities. B. As-Planned Easement Drawing with proposed easement strip. C. Responsibility Agreement/URD Contract. 14 4.5 Commercial & Industrial Developments Commercial and industrial developments supplied by overhead power lines or underground cable systems require additional information, drawings and advance planning. Therefore, it is important that our Engineering Department obtain the following information: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. One complete set of the electrical series drawings, including the power riser or one-line diagram for the service(s), and any other drawings that detail trenching and conduit placement, transformer foundations, or other items relating to the service from UI’s facilities to the customer’s service entrance equipment. C. Name of real property owner and the approximate date property was purchased (obtain volume number, page number and date recorded, if available). D. Sizes (sq. ft.) and number of buildings, including the number of units per building and any house meters, if applicable. If this represents only a portion or section of the total development, indicate the total number of future buildings and units planned for the development. E. A completed UI electrical load information form for each service. F. Construction start and completion dates. UI needs six to eight weeks after receipt of complete information to prepare the necessary project documents and cannot install or energize any facilities until the necessary contracts are signed and all applicable easements have been recorded on the land records. These documents include: A. As-Planned Engineering Drawing with proposed UI facilities. B. As-Planned Easement Drawing with proposed easement strip. C. Responsibility Agreement /OP-D32 Contract. 15 4.6 Service Request Dos and Don’ts REMEMBER: Do: Contact UI’s Customer Care Center to apply for electric service and provide complete and accurate information. Please allow sufficient time for UI to review your request, order necessary materials and schedule the required work. Label meter provisions and main switches with the same identifying mark as the unit the meter serves. Have the authority having jurisdiction inspect and release the service (new or renovated) and notify UI of such release. Install meter provisions outside. Don’t: Install electric service without first applying for service and obtaining the job requirements and a job number from UI. Excavate underground facilities before contacting Call Before You Dig at 811 or [phone removed]. Install meter provisions indoors.  Install service conduits to poles until such poles have been approved by UI and the location of the conduit has been clearly marked on the pole. Install more than one 10-foot vertical section of conduit or any service entrance conductors in conduits to poles, padmount transformers or hand holes without coordinating the installation with UI. 5. DESIGN CRITERIA & CONSTRUCTION PRACTICES 5.1 Overhead and Underground Services A. Overhead Service Drops 1. Overhead service drops are installed, owned and maintained by the company. A clear path, devoid of vegetation, is required. Customer is responsible to maintain this clear path. 2. Overhead service drops must not exceed 150 feet in length. 16 3. The point of attachment on the customer’s premises will be approved by the company and shall be the shortest practical distance from the company’s pole. Service bolts will be supplied by the company (see Section 12 to find the locations where service bolts are available) and installed by the customer. The bolt shall be adequately anchored at the point of attachment to safely withstand the strain imposed by the service drop. The service bolt must be installed in such a manner that it can withstand at least 650 pounds. of tension. The contractor should install the bolt into brick, concrete block or masonry construction when available. 4. The point of attachment shall be safely accessible by UI crews from a ladder on level ground, and the height above finished grade shall not be less than 12 feet nor more than 26 feet. The point of attachment shall also be such that the minimum conductor clearances conform to NEC 230.24. Attachment height must allow for 12 inches of separation between any communication cable and the service conductor along the length of the cable run. NOTE: If the height of a structure is not adequate to maintain these clearances, a service mast may be necessary. Refer to Guidebook Standards #1, 2, 3 and 4 in Section 13. 5. The point of attachment shall be designated such that UI’s service drop is not readily accessible as defined by the National Electrical Code and the National Electrical Safety Code and adequate horizontal and vertical clearance can be maintained. In no case shall UI provide, own or maintain a service drop that runs horizontally along the surface of a building. 6. Service entrance conductors provided by the customer shall conform to the National Electrical Code and the local authority having jurisdiction and shall be properly identified. 7. If allowed by the local authority having jurisdiction, a maximum of two service masts with a total of six-wires for single-phase or eight-wires for three-phase can be connected to a single service drop. B. Underground Service Laterals 1. Underground service laterals (both the conduit and the service entrance conductors) are supplied, owned and maintained by the customer from the service entrance equipment to the designated point of attachment to UI facilities. 17 2. Trenching for underground laterals from wood poles shall not start until the service location is approved and the conduit location is marked at the pole by UI. A maximum of two risers for the electric service can be installed on the pole, and a maximum of three wires for single-phase and four wires for three-phase can be installed in each conduit. While allowed by NEC, UI does not allow multiple sets of conductors in a single conduit. The contractor installs only the first ten-foot vertical length of conduit and one stand-off bracket (a minimum of eight feet above final grade). The conduit must be installed per Guidebook Standard #24 with the conduit being installed away from the flow of traffic and three inches from the pole. The additional conduit, stand-off brackets, weatherhead and UL listed conduit grounding clamp or ground lug kit on the weatherhead are provided by the customer and installed by UI. The riser conduit and elbow at the pole must be rigid galvanized steel. To facilitate the installation of the wires, UI recommends that the elbow at the pole be larger than the minimum allowable radius for the trade diameter conduit being installed. 3. Conduit from the service entrance equipment back to the property line can be either rigid galvanized steel or PVC, subject to the requirements of the NEC and the authority having jurisdiction. Conduit in the street right-of-way (curb to property line) must be rigid galvanized steel. 4. For underground services from single-phase padmount transformers or secondary hand holes, the contractor must locate and extend the PVC conduit stub at the UI point of service connection. If no stub is available, contact UI’s Engineering Department for assistance. Do not attempt to install any conduit or cable into the transformer or hand hole without contacting UI. 5. Direct buried services must extend in rigid galvanized steel conduit from the pole onto private property or extend five feet in Schedule 40 PVC conduit from the single-phase padmount transformer or hand hole. The conduit at the service entrance must extend perpendicularly away from the building foundation wall a minimum of five feet. NOTE: UI does not recommend the installation of direct buried services. 6. Service entrance conductors from poles, padmount transformers or hand holes must be continuous to the meter location. Pull boxes or tap boxes are prohibited except when located next to and installed as part of the service entrance equipment. 18 7. Protection from ground movement for underground service entrance conductors shall be provided by the installation of a UL listed slip fitting at all meter provisions. The slip joint shall be the appropriate match to the trade diameter of the service conduit and be securely fastened to the building with a minimum of two clamps. Refer to Guidebook Standard #13 in Section 13. Upon pre-approval in writing from the company, specific applications may be authorized to use flexible metal conduit in place of a slip joint. 8. Our Standard Field Department will schedule the installation and connection of your underground service entrance conductors. You will be contacted after the authority having jurisdiction has inspected the service and the release is posted in our system. 5.2 Road Crossing Poles The company will make every effort to treat all customers equally, no matter which side of the street they reside on. UI will therefore install road crossing poles as follows: A. The company will install overhead secondary service from a pole on the street provided the span does not exceed 150 feet. (100 feet for 400 A services). If the pole is on the opposite side of the street and the service would be within the 150 feet limitation if the pole was on the other side of the street, then a road crossing pole will be set at no cost. If additional poles beyond the road crossing pole are required to reach the building, they will be installed by the company on a billable basis and are covered under UI’s Private Line Pole Policy. Refer to Section 5.3 below and to Guidebook Standard #5 in Section 13. B. If the customer elects to install underground service, UI will install a road crossing pole at no charge to save the customer the cost of trenching across the street. If the customer elects not to have the pole installed, no credit for said pole would be granted by UI. Refer to Guidebook Standard #6 in Section 13. C. The company will install one section of wire, at no charge, from a street pole on the customer’s side of the street. If the street pole line is located on the opposite side of the street, the company will install a pole on the customer’s side of the street, if necessary, and the previously mentioned section of wire will be installed from that pole at no charge. Refer to Guidebook Standard #7 in Section 13. 19 5.3 Private Line Poles (PLP) A. Where off-street overhead facilities for a single customer are required, all facilities beyond the standard 150-foot span of overhead wire are billable to the customer. The company will install, own and maintain the overhead facilities. The property owner must sign a Private Property Permit or permanent easement. Future changes to or relocations of these facilities requested by the customer are also billable. B. Where off-street overhead facilities for multiple customers are required, the company will install, own and maintain the overhead facilities. These facilities will be installed at no cost to the customers. A permanent easement must be granted to UI by the property owner(s). Future changes to or relocations of these facilities requested by the customer are billable. C. When company-owned poles are installed on private property, permanent truck access to all poles must be provided and maintained by the property owner. 5.4 Cut & Reconnect Policy POLICY DESCRIPTION: The United Illuminating Company will permit electrical contractors and electricians (herein jointly called “electricians”), licensed by the State of Connecticut, to cut and reconnect residential services at the weatherhead in order to expedite work requested by customers. Failure to follow the steps contained within the procedure of this policy may result in additional corrective work and expense for the electrician. The electrician will be billed for any corrective work performed by the company. Unauthorized connections to the company’s service conductors will be treated as tampering and may result in criminal prosecution. The electrician shall be responsible for obtaining the appropriate permits from the local municipal authority. Homeowners are not authorized to cut and reconnect electric services. Homeowners can only install de-energized or dead services. To participate in the program, an electrician must hold an E-1or E-9 license issued by the Connecticut Electrical Work Examining Board or work in the capacity of an E-2 Journeyman or electrical apprentice under the employment of an E-1 licensee. Under this condition, physical work may be performed; however, the permit must be obtained by the licensee who is responsible for the work at the location. 20 The electrician, its employees and those under its control shall perform all work as independent contractors and shall not be deemed to be employees or agents of United Illuminating for any purpose whatsoever. UI shall not be liable for direct, indirect or consequential damages of any kind, whether resulting from injuries to persons or property or otherwise arising out of the electrician’s work. SCOPE OF WORK: Services to be cut and reconnected must meet the following criteria: – Single-phase, overhead service drop, 200 A class (maximum) with voltages of 120V line to ground. – UI requires permanent connections, which will be inspected by UI in order to reduce customer damage due to poor connections. PROCEDURE: The electrician shall perform the following: 1.  The electrician shall contact the company at [phone removed] prior to starting work to avoid possible code violations or non-compliance with company requirements. A service location request can also be submitted online at uinet.com. NOTE: In the remarks section, This Work Involves Cut and Reconnect, the work must be completed within 15 days from the required service date. 2.  The electrician shall cut the drip loop at the house, on the line side, immediately adjacent to the company’s existing connectors. 3.  The electrician shall replace/repair the service entrance/meter box up to the first disconnecting device. 4.  The electrician shall connect the replaced or repaired service entrance/meter box to the live ends of the company’s service drop using properly sized connector types as outlined below: – Phase/hot leg: Insulation Piercing Connectors – Neutral: Parallel Groove Connectors – Connectors must be approved for use with the type (copper/aluminum) of conductors being installed. NOTE: Split bolt and taped connectors are not acceptable for permanent connections. 5. The electrician shall install approved rated jumpers and optically clear meter socket cover(s) to avoid damage to the meter socket, ensure public safety and provide access for visual inspection. Covers and service bolts are available through the local building official’s office or from UI. Jumpers may be obtained at UI’s Operations Center located at 100 Marsh Hill Rd., Orange, CT. 21 6.  The electrician shall leave the old meter in close proximity to the new meter socket. In no case shall the electric meter be reinstalled. 7.  The electrician shall be responsible for obtaining municipal inspection/ approval and shall advise the company within one business day of completing Steps 1-6 above. 8.  The company shall ensure that the installation meets company requirements and install the necessary meters. 9. Service requests older than six months that have not been completed may be canceled. Contractors may be required to request service again and be issued a new job number. It is the responsibility of the contractor to inform local jurisdiction of this change. VIOLATIONS: In any instance of deviation from the above procedure: 1.  The company will bill the electrician for de-energizing meters without an active service request. Any time a meter is de-energized without authorization, our automated systems may dispatch company personnel to the outage. 2.  The company will send written notification to the electrician and the municipal authority, describing the specific violation of this policy. This notification will serve as a warning. 3.  The company will bill the electrician for costs incurred by the company due to the violation. 4.  The company will notify the appropriate municipal and state authorities after multiple warning letters have been issued. This constitutes a violation letter. 5.  The company will suspend the electrician’s privilege to participate in the Residential Overhead Service Policy, which includes the Cut and Reconnect Policy. 6. The Trade Practice Division of the Department of Consumer Protection of the State of Connecticut will review complaints to determine if Connecticut General Statute Section 20-334 has been violated and take appropriate action, up to and including penalties, as described in the Connecticut General Statute Section 20-341. 22 5.5 Buildings Vacant for Periods Greater Than Six Months Reference: State of CT House Bill 6292 (Session 2003) If the owner of a building or portion of a building that has been unoccupied and disconnected from the electric distribution system for a period of six months or longer wishes to resume the delivery of electricity, the owner shall contact United Illuminating to request a service reconnection form to be signed and notarized by the building owner’s contracted electrician, stating that an inspection of all customer-owned facilities on private property used to supply electric power to such building is electrically safe and does not constitute a public safety hazard. Services disconnected due to fire, flood or similar circumstances will not be reconnected without the proper notification and/or permit by an appropriate public official. Please contact UI for any additional guidance in determining the inspection requirements. 5.6 Demolition A. To terminate UI service to any building or structure designated for demolition, a notarized letter from the property owner must be received by UI. For condemnations, eminent domain proceedings, etc., a letter from the municipality is acceptable. Please send the letter to: United Illuminating Standard Field Department 100 Marsh Hill Road (MS OP-GB) Orange, CT 06477-3628 B. The letter must list the legal address of the property as determined by the tax records, and the front of the building must be clearly marked with this number in orange paint. C. UI personnel must have access to the premises for verification of the service disconnect and for removal of UI equipment. If the building structure is unsafe for entry or UI cannot gain access to the premises, then the building owner is responsible for verifying that the service to the building has been disconnected before proceeding with the demolition. D. When completed, UI will prepare a letter stating that all of its facilities have been removed from said property. The letter will be sent to the originator of the request and to the appropriate municipal authority. Contact UI’s Standard Field Department. 23 5.7 Service to PCS Towers A. Where personal communication system (PCS) towers, antennas or other similar systems are installed on leased property, a PCS Agreement must be signed by both the tower owner and the land owner. Before planning any service, please contact UI’s Engineering Department. B. For stand-alone towers, new electric service will be administered according to the applicable UI policies and procedures. The initial service installed must have sufficient electrical capacity (including meter provisions) to supply the maximum number of carriers for which the tower is designed. C. Where the construction of the proposed service will not comply with UI standards and/or access to the electric facilities is restricted, UI may require a primary voltage service with a single primary meter. All facilities beyond the primary meter are to be installed, owned and maintained by the customer. D. For service additions to stand-alone towers, UI prefers one service entrance with one meter location. Where it is impractical to combine the new service with the existing service, UI will allow a second meter location provided both services originate from the same UI source, a placard of the service locations is posted at each entry gate, and it is approved by the authority having jurisdiction. E. For towers or antennas attached to existing buildings or other structures, the preferred method of service is to utilize the existing service. This may involve a service increase and/or a reconfiguration of the existing metering. A separate service to the building (including line side taps in the service entrance equipment) is not permitted unless granted in writing by UI and approved by the authority having jurisdiction. Refer to UI Guidebook Section 2, Paragraph D. When submitting application for service, the following is required: 1. A copy of the Lease Property Agreement between the land owner and the tower owner 2. An A2 survey plot showing the property lines 3. A completed UI Load Information Form 4. Documentation stating the maximum number of carriers that the tower can accommodate, stamped by a professional engineer licensed in the State of Connecticut. 24 6. MOTORS 6.1 General Requirements If a motor is connected to a secondary system that also supplies other UI customers, the following conditions must be met in order to minimize voltage flicker and other disturbances caused by the starting currents. The starting current of a motor is assumed to be the locked rotor current stated on the nameplate or obtained from the manufacturer’s coding or test data. A. When two or more motors start simultaneously, the sum of all their horsepower ratings shall be totaled. The maximum allowable total starting current shall not exceed the value listed in Section 6.3 or 6.4, as applicable, for the total of the horsepower rating of all motors that are started simultaneously. B. If the locked rotor current of any motor exceeds the allowable starting current listed in Section 6.3 or 6.4, then the motor shall not be started across the line. The customer must furnish, install, own and maintain a reduced voltage starter or other device to bring the starting current within the allowable value. C. Motors should be rated for use at the service voltage provided by UI, and you should verify your service voltage prior to buying any equipment. The nominal service voltages available are 120, 208 and 240 volts single-phase and 208, 240 and 480 volts three-phase. Motors rated at 220, 230, 440 or 460 volts may not operate satisfactorily. 6.2 Protective Devices A. UI strongly recommends that all motors be controlled and protected from damage that can occur by operation under abnormal conditions. These conditions include single phasing, under voltage, phase reversals, voltage transients and other operating hazards. The company is not responsible for equipment and/or collateral damage due to abnormal conditions. Customers are advised to install adequate protection on all motors. Protective equipment must conform to the requirements of the National Electrical Code. B. There are advantages to incorporating timed under-voltage relays for motors on certain applications. Due to the normal, rapid reclosure of our supply circuit breakers, many manual restarts can be avoided by delaying motor contactor opening. 25 6.3 Single-Phase Motors A. Single-phase motors not exceeding 50 A of starting current (typically up to 1 horsepower, 12,000 BTUs or 1 ton) may be connected for 120 volt operation. B. Single-phase motors not exceeding 150 A of starting current (typically up to 5 horsepower, 60,000 BTUs or 5 tons) should be connected for 240 volt operation. 6.4 Three-Phase Motors A. Three-phase Design Code B, C and D motors, up to 50 horsepower inclusive, may be started across the line if they do not have locked rotor currents per phase conductor in excess of the following: Maximum Allowable Motor Starting Current for Across the Line Starting HP 208V 240V 480V Up to 10 179 155 78 11 -20 321 278 139 21 -30 481 417 208 31 -40 641 556 278 41 -50 802 695 347 B. For motors larger than 50 HP or for motors served at primary voltage (above 480 volts), contact UI’s Engineering Department for motor starting requirements. 7. EMERGENCY INTERRUPTION OF SERVICE & EMERGENCY GENERATORS 7.1 Interruption of Service The company makes every effort to maintain its system to the highest possible standards but cannot assume liability as a result of any failure of its service or equipment. The company reserves the right to interrupt service t

Text of UI-Attachment 4a.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
Eversource Energy The United Illuminating Company Docket No. 17-12-03 RE06 EVERSOURCE ENERGY THE UNITED ILLUMINATING COMPANY Guidelines for Generator Interconnection Fast Track and Study Processes April 11, 2025 Excluding Residential Inverter Based Projects Level 1 50kW or Less Table of Contents 1 Introduction and Executive Summary ............................................................................................... 4 1.1 Introduction .................................................................................................................................... 4 1.2 Executive Summary ....................................................................................................................... 5 Interconnection Process for Generators smaller than 20 MW: ....................................................... 5 State Jurisdictional Interconnections: ................................................................................................. 5 Additional Process Steps for compliance with ISO-NE Planning Procedure ................................ 6 Interconnection Process for Generators greater than 20 MW: ....................................................... 7 2 Application Requirements and Interconnection Request................................................................ 8 2.1 Interconnection Request ............................................................................................................... 8 2.2 Insurance Requirements ................................................................................................................ 9 General Liability: .................................................................................................................................... 9 Insurer Requirements and Endorsements ........................................................................................10 Evidence of Insurance ........................................................................................................................10 2.3 Facility Security, Access and Contact Information .................................................................10 Infrastructure Security ........................................................................................................................10 Emergency Reporting .........................................................................................................................10 Access to EDC Equipment and Facilities .......................................................................................11 Access to Isolation Device .................................................................................................................11 3 2.4 Modification and Non-Material changes ..................................................................................11 2.5 Site Control ...................................................................................................................................11 2.6 Queue Position .............................................................................................................................11 2.7 Withdrawal ....................................................................................................................................12 Fast Track Process ............................................................................................................................... 13 3.1 Applicability ..................................................................................................................................13 3.2 Initial Review ................................................................................................................................13 DER Rating and Export Capabilities ...............................................................................................13 Screen Criteria ......................................................................................................................................13 3.3 Customer Options Meeting ........................................................................................................16 3.4 Supplemental Review ..................................................................................................................16 Supplemental Review requirements ..................................................................................................17 4 Study Process ....................................................................................................................................... 18 4.1 Applicability ..................................................................................................................................18 4.2 Scoping Meeting ...........................................................................................................................18 2 Requirements........................................................................................................................................18 5 4.3 Feasibility Study ............................................................................................................................19 4.4 System Impact Studies .................................................................................................................19 4.5 Facility Study .................................................................................................................................21 Provisions that Apply to all Interconnections and Associated Applications .............................. 23 5.1 Reasonable Efforts .......................................................................................................................23 5.2 Dispute Resolution Process ........................................................................................................23 5.3 Interconnection Metering ...........................................................................................................24 5.4 Monitoring and Control ..............................................................................................................24 5.5 Commissioning.............................................................................................................................24 5.6 Periodic Interconnection Tests...................................................................................................25 5.7 Safe Operation and Maintenance ..............................................................................................25 5.8 Confidentiality ..............................................................................................................................25 5.9 Record Retention .........................................................................................................................25 5.10 Interconnection Agreement ........................................................................................................26 5.11 Performance Assurance...............................................................................................................26 5.12 Coordination with Affected Systems...........................................................................................26 5.13 Generating Facility Capacity .......................................................................................................26 Attachment I…………..……………………………………………………………I-1 Attachment II………..……………………………………………………………II-1 Attachment III…………..…………………………………………………….…III-1 Attachment IV……..………………………………………………………….…IV-1 Attachment V…………..………………………………………………………….V-1 Attachment VI………..……………………………………………………….…VI-1 Exhibit A Interconnection Agreement (Separate Document) Exhibit B Technical Requirements (Separate Document) 3 1 Introduction and Executive Summary 1.1 Introduction Welcome! These Guidelines have been prepared by the Electric Distribution Companies, The Connecticut Light & Power Company (“CL&P”) and The United Illuminating Company (“UI”) (collectively, the “EDCs”), to assist power-generating customers wishing to interconnect with the Electric Power System (the “EPS”). Capitalized terms used herein shall have the meanings specified in Attachment XI or the body of these Guidelines. The EDCs are responsible for the distribution of electric power throughout most of the State of Connecticut. In order to carry out their responsibilities to all customers, each EDC must assure that all Interconnections are made according to certain protocols and procedures, which are described in more detail in these Guidelines. These revised Guidelines have been simplified as follows: (i) the application process has been streamlined; and (ii) these Guidelines are harmonized with ISO-NE requirements based on FERC’s Small Generator Order-2006. These Guidelines do not apply to residential inverter-based Generating Facilities of 50 kW and less. Separate guidelines, entitled “Guidelines for the Interconnection of Residential Single Phase Certified Inverter- Based Generating Facilities, 50 kW (ac) or Less,” were created for such Generating Facilities. These Guidelines contemplate that a Generator and an EDC will work together toward the common goal of a successful Interconnection, and the EDCs may consider case specific exemptions to the Guidelines (e.g., advances in technology). These Guidelines are technology agnostic to allow for future technologies to be implemented, provided this can be done safely and reliability consistent the intent of these guidelines and technical requirements. In the unlikely event that a Generator and an EDC cannot reach agreement on a specific Interconnection matter, such dispute will be resolved via formal dispute resolution procedures set forth in these Guidelines. Generators intending to make an Interconnection are advised to (i) refer to the Technical Requirements, attached hereto as Exhibit B, for guidance in the design of the Generating Facility and the Interconnection Facility; (ii) consult with the appropriate EDC prior to purchase of equipment in connection with the proposed Interconnection; and (iii) contact the appropriate EDC Facilitator to determine where and how to apply. 4 The Connecticut Light & Power Company and The United Illuminating Company look forward to working with Generators to facilitate a safe, reliable and successful Interconnection in accordance with these Guidelines. 1.2 Executive Summary Interconnection Process for Generators smaller than 20 MW: These Interconnection Guidelines provide general guidance for interconnections of Generating Facilities, also known as Distributed Energy Resources (DERs), that are smaller than 20 MW. DER interconnections vary significantly in complexity depending on the generator size, location, and customer requirements; consequently, it is not practical to expect that these Guidelines should always be rigidly observed for all interconnections. The Electric Distribution Company’s (EDC’s) Facilitator will work closely with the Generator to help achieve a successful interconnection. This Executive Summary provides a quick overview of the Interconnection process and is not meant to replace the more detailed description of requirements contained in the remainder of these Interconnection Guidelines. These Guidelines only apply to Generating Facilities intending to interconnect onto the EDC distribution system. Any Generator project intending to interconnect onto the transmission system will be required to follow the most recent Federal Energy Regulatory Commission (FERC) guidelines and processes, which are administered by the Independent System Operator – New England, Inc. (ISO-NE). State Jurisdictional Interconnections: DERs that intend to interconnect directly to the distribution level of the EPS will fall under the State of Connecticut Public Utility Regulatory Authority (PURA) jurisdiction, and are administered by the EDC. The state-jurisdictional Interconnection process begins when a Generator submits an application to the EDC, which includes supporting documentation such as electrical line drawings, site plans, wiring schematics, planned operational schedules and procedures, etc. The EDC will review the application and submittals and work with the customer to resolve any discrepancy and obtain any missing information. The EDC will then conclude the initial application review within fifteen (15) Business Days and submit the results to the Generator. Upon completion of the application review, which could include multiple design revisions based on feedback, if an Interconnection Study (Feasibility, Impact and/or Facility) is required, the EDC will provide a Study Agreement and an estimate of the costs to complete the Study. The EDC will request that the Generator execute the Agreement within thirty (30) Business Days and pay the estimated cost of the Study. Some or all of the Studies may be required, and the EDC will work with the Generator to identify the required Studies. Each Study will require its own Study Agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. Distribution Studies usually require approximately thirty to sixty (30 to 60) Business Days for completion of each Study and may include a Feasibility Study, an Impact Study and a 5 Facility Study. Upon completion of each respective Distribution Study, the EDC will share the applicable results with the Generator. Transmission studies may be required for some Interconnections even if the Generator Interconnection falls under state rules. Transmission studies are more complex and must be conducted in accordance with applicable ISO-NE rules and procedures. These Guidelines do not address the transmission studies process required by ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedule 22 and 23 and Section I.3.9. However, during the Interconnection process, the EDC will provide guidance including information concerning the scope, duration and cost of the transmission studies. At the conclusion of the studies including any Transmission studies or additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with payment milestones included within the Agreement. In order to move forward with the execution of the project, the Generator will be required to sign the IA within thirty (30) Business Days and comply with payment milestones specified within the Agreement. At the conclusion of the project, the EDC will reconcile actual vs. estimated cost and reimburse or bill the Generator accordingly. It is important to note that these Guidelines do not consider Transmission upgrades or delays due to such upgrades. Once the upgrades are implemented, the following steps will be required to allow the Generator to interconnect to the EDC. • Provide Proof of Municipal approval for the Generating Facility. • Request the EDC to witness the commissioning test. Within ten (10) Business Days of the receipt of the Municipal approval, the EDC will aim to schedule and perform any required meter work and witness the commissioning test. If the EDC is unable to schedule and complete the required work within the ten (10) Business Day timeframe, the EDC will communicate the reason for such delay promptly and provide an expected schedule and plan of action to complete the work. Following successful completion of that test, the EDC will send a final approval authorizing the interconnection to the Generator. Additional Process Steps for compliance with ISO-NE Planning Procedure Regardless of the Interconnection jurisdiction, each Generator wishing to interconnect a Generating Facility must comply with the ISO-NE Planning Procedure 5 (PP5), which is the procedure for a Proposed Plan Application (PPA) under Section I.3.9 of the ISO-NE Tariff. This process must be completed before the Generator may Interconnect such Generating Facility. It is important to note that the PPA process is an ISO-NE requirement, even if the Interconnection of such facility falls under state jurisdiction. From timeto-time ISO-NE has made changes to the ISO-NE Planning Procedure which are out of EDC control and the details of which are not included in this document. The EDCs will post the most recent ISO-NE requirements on their respective web pages as they become available. 6 While the Generator is ultimately responsible for the PPA application and the associated data to be submitted to ISO-NE, the EDC will provide support to the Generator if the Generator is not a “Governance Participant” (as such term is defined in the Participants Agreement; among ISO-NE and the New England Power Pool) at the time the PPA is submitted to the EDC. Typically, the EDC will file the PPA on behalf of such non- Governance Participant Generator. Additionally, the EDC will represent such Generator in ISO-NE proceedings in accordance with the current ISO-NE rules; provided, however, that such Generator shall remain solely responsible for, among other things: (a) the completion of the PPA and the accuracy of the information contained therein, (b) the advance payment based on a non-binding good faith estimate of all costs in connection with any required Transmission System Impact Study, and (c) the payment of all costs associated with transmission upgrades identified through the ISO-NE approval process. Each non-Governance Participant Generator wishing to Interconnect a Generating Facility must read and be familiar with PP5, Section I.3.9 of the ISO- NE Tariff and other relevant ISO-NE guidance on the PPA process. Further, such non- Governance Participant Generator can communicate directly with ISO-NE to seek assistance concerning the applicable PPA requirements and associated issues. For non-Governance Participant Generators, the EDC notifies ISO-NE of receipt of the Interconnection Application, under current ISO-NE practice. Further, the EDC submits a complete copy of the PPA application to ISO-NE in order to secure an ISO-NE queue position. An ISO-NE queue position will not be established by ISO-NE until all the data required by ISONE is complete. Governance Participants are responsible for filing their own PPA with the ISO-NE and representing themselves in connection with all ISO-NE proceedings. Interconnection Process for Generators greater than 20 MW: The time frames and processes described in these guidelines are applicable to Generating Facilities smaller than 20 MW and represent the majority of Distribution interconnections. Generating Facilities larger than 20 MW are only rarely interconnect to the EPS. However, from time to time the EDC will receive requests for Interconnecting Generating Facilities greater than 20 MW seeking an interconnection to the EPS. When this situation occurs and provided that an interconnection to the EPS is feasible and appropriate, the EDC will use these Guidelines; however, the time frames to conduct the Application Review and Studies will be adjusted in accordance with the ISO-NE Tariff, Schedule 22. 7 2 Application Requirements and Interconnection Request 2.1 Interconnection Request Prior to submitting an Interconnection Application, customers should refer to the hosting capacity maps located on the respective EDC websites to review project viability. An Interconnection Request must be submitted through the respective EDC’s online application portal. A processing fee is required with each Interconnection Request. The applicable fee is as follows: Process Generator Applicability Fast Track (1) 0-2 MW, unless Generating Facility does not qualify for the Fast Track process, or (2) Is 25 kW or less, certified but did not pass the 25 kW or Less screen(s). (1) is larger than 2 MW, (2) is 2 MW or less and is not certified, or (3) is 2 MW or less and is certified but did not pass the Fast Track Process. Study Application Study Fee Fee $500 Actual Cost $1000 Actual Cost Table 1 Application Fees a) The Interconnecting EDC shall date- and timestamp the Interconnection Request upon receipt. Such date and timestamp shall be used for the purposes of the timetables set forth in these Guidelines. b) Within three (3) Business Days of the receipt of the Interconnection Request, the Interconnecting EDC shall confirm receipt of such Interconnection Request using the form attached hereto as Attachment II. c) Within ten (10) Business Days of the receipt of the Interconnection Request, the Interconnecting EDC shall notify the Generator if such Interconnection Request is incomplete using the form attached hereto as Attachment III. The Generator will have fifteen (15) Business Days from the date of such notice to submit the listed information or to request an extension of time to provide such information. If the Generator does not provide the listed information or a request for an extension of time within such fifteen (15) day period, then the Interconnection Request will be deemed withdrawn, and such deemed 8 withdrawal shall be subject to Section 3.8. An Interconnection Request will be deemed complete upon receipt of the listed information by the Interconnecting EDC. 2.2 Insurance Requirements Generators interconnecting a Generating Facility to the EPS of an EDC shall maintain general liability insurance in the amounts set forth in the following table, per Interconnection at all times during the Interconnection. Nameplate Rating* Less than 100 kW Minimum Liability Insurance Required $300,000 Greater than 100 kW to 1 MW $1,000,000 Greater than 1 MW to 5 MW $2,000,000 Greater than 5 MW $5,000,000 All Nameplate Ratings are based on aggregate generation at the site. Table 2 Liability Insurance General Liability: In connection with Generator’s performance of its duties and obligations under the Interconnection Agreement, Generator shall maintain, at all times during the Interconnection, general liability insurance with a combined single limit of not less than: Three hundred thousand dollars ($300,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the Gross Nameplate Rating of the Generators Facility is less than or equal to 100 kW. One million dollars ($1,000,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the gross nameplate rating of the Generators Facility is greater than 100 kW and less than or equal to 1 MW. Two million dollars ($2,000,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the gross nameplate rating of the Generators Facility is greater than 1 MW and less than or equal to 5 MW. Five million dollars ($5,000,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the gross nameplate rating of the Generators Facility is greater than 5 MW and less than or equal to 20 MW. 9 Insurer Requirements and Endorsements All required insurance shall be carried by reputable insurers qualified to underwrite insurance in Connecticut. In addition, all insurance shall: (a) include the EDC as an additional insured for all Generating facilities greater than 1 MW; (b) contain a severability of interest clause or cross-liability clause; (c) provide that the EDC shall not incur liability to the insurance carrier for payment of premium for such insurance; and (c) provide for thirty (30) Calendar Days’ written notice to the EDC prior to cancellation, termination, or material change of such insurance. Evidence of Insurance Evidence of the insurance required shall state that coverage provided is primary and is not in excess of or contributing with any insurance or self-insurance maintained by the EDC. The Generator is responsible for providing the EDC with evidence of insurance in compliance with this Guideline on an annual basis. Prior to the EDC commencing work on system modifications, the Generator shall have its insurer furnish to the EDC certificates of insurance evidencing the insurance coverage required above. The Generator shall notify and send to the EDC a certificate of insurance for any policy written on a "claims-made" basis. The EDC may at its discretion require the Generator to maintain tail coverage for three years on all policies written on a "claimsmade" basis. All insurance certificates, statements of self insurance, endorsements, cancellations, terminations, alterations, and material changes of such insurance shall be issued and submitted to the appropriate EDC Facilitator. 2.3 Facility Security, Access and Contact Information Infrastructure Security The security of the electric system infrastructure is essential. FERC requires the EDCs, market participants, and Generating Facilities interconnected with an EDC’s EPS to comply with the recommendations offered by the National Infrastructure Advisory Council and best practice recommendations from NERC. All public utilities must meet basic standards for electric system infrastructure and operational security, including physical, operational, and cyber-security practices where required. Interconnection Requests will be reviewed in light of infrastructure security concerns. Emergency Reporting In accordance with Section 6.4.1 of the Interconnection Agreement, the EDC and the Generator shall each provide to the other (and shall update as necessary) a telephone number that can be used at all times to allow the other to report an emergency. 10 Access to EDC Equipment and Facilities In accordance with Section 6.4.2 of the Interconnection Agreement, the Generator shall allow the EDC access to the EDC’s equipment and the EDC’s facilities located on the Generating Facility’s premises. Access to Isolation Device In accordance with Section 6.4.3 of the Interconnection Agreement, the EDC shall have access to the Isolation Device of the Generating Facility at all times. 2.4 Modification and Non-Material changes Any modification to machine data, equipment configuration or the Interconnection site not agreed to in writing by the Interconnecting EDC may be deemed a withdrawal of the Interconnection Request. In the event of a deemed withdrawal, the provisions of Section 2.7 shall apply. In cases when a reduction in size may avoid significant upgrades, and is proposed by the developer prior to the project application receiving Contingent Approval to Install (CATI), such modifications will not be considered Material modifications and will not impact the current project queue position. However, all project documentations including one lines, layout, and application in Power Clerk must be updated by the developer in order for the revised modification take effect, and may require additional technical analysis to be performed by the EDC. 2.5 Site Control Documentation evidencing site control must be submitted with the Interconnection Request. Site control may be demonstrated through: a) Ownership of, a leasehold interest in, or a right to develop a site for the purpose of constructing the Generating Facility. b) An irrevocable option to acquire any of the property rights set forth in Section 3.6.1; or c) An exclusivity or other business relationship between the Generator and an entity having the right to sell, lease, or grant the Generator the right to possess or occupy a site for such purpose; or d) Filed applications for required permits with respect to a site on Federal or State property. 2.6 Queue Position The Interconnecting EDC shall assign to each Interconnection Request a queue position based upon date of the date-stamp described in Section 2.1.a The queue position of each Interconnection Request will be used to determine the cost responsibility for any upgrades necessary to accommodate the Interconnection. The EDC shall maintain a single Distribution 11 queue. 2.7 Withdrawal a) The Generator may withdraw its Interconnection Request at any time by written notice of such withdrawal to the Interconnecting EDC. b) In addition, if the Generator fails to adhere to all requirements of these Guidelines, subject to Section 2.7.c, the Interconnecting EDC shall deem the Interconnection Request to be withdrawn and shall provide written notice to the Generator of the deemed withdrawal and an explanation of the reasons for such deemed withdrawal. c) Upon receipt of such written notice, if the Generator wishes to dispute the withdrawal notice, the Generator shall have fifteen (15) Business Days in which to either respond with information or actions that cure the deficiency or to notify the Interconnecting EDC of its intent to pursue dispute resolution in accordance with Section 5.2. d) Withdrawal of an Interconnection Request shall result in the loss of queue position assigned to such Interconnection Request. e) If a Generator disputes such withdrawal and loss of queue position, then the Generator’s Interconnection Request shall be removed from the queue until such time that the outcome of the dispute restores its queue position. f) Within thirty (30) days following a withdrawal, a Generator that withdraws or is deemed to have withdrawn its Interconnection Request shall pay to the Interconnecting EDC and any Affected Parties all costs prudently incurred with respect to such Interconnection Request prior to the receipt of notices described Section 2.7.a or 2.7.b, as the case may be. g) A Generator who fails to pay all monies due pursuant to Section 2.7.f shall not be eligible to obtain any Interconnection Study reports or submit subsequent Interconnection Requests. 12 3 Fast Track Process 3.1 Applicability The Fast Track Process is available to any Generator proposing to interconnect its Generating Facility with the Distribution System if (a) the proposed Generating Facility is 50 kW or less, certified, but did not pass the 50 kW or less screen(s) (b) the proposed Generating Facility is no larger than 2 MW and passes the technical screens associated with the Fast Track process, and (c) the proposed Generating Facility (i) meets the Codes and Standards and other certification requirements of these Guidelines or (ii) is determined to be safe to operate by the Interconnecting EDC, in its sole discretion. 3.2 Initial Review Within fifteen (15) Business Days after the Interconnecting EDC notifies the Generator it has received a complete Interconnection Request, the Interconnecting EDC shall perform an initial review using the screens set forth below, shall notify the Generator of the results, and include with the notification copies of the analysis and data underlying the determinations under the screens. DER Rating and Export Capabilities The technical evaluation will be conducted based on the name plate rating or the Maximum Export Capacity or Derated Name plate rating of the DER. Refer to section 4.2.8 in the Exhibit B Technical Requirements document for further guidance on and acceptable methods for export limitation. Consult with the applicable EDC on the specific acceptable options for formal equipment derating. These may include a recertification letter or memo from the equipment manufacturer, updating the physical nameplate affixed to the equipment, and/or other approved means. Screen Criteria The EDC will use the following criteria for performing screening evaluations of all proposed Generating Facilities greater than 50 kW and less than or equal to 2 MW: a) For Interconnection of a proposed Generating Facility, the aggregated nameplate generation capacity shall not exceed the nameplate rating of the service transformer for those Generating Facilities directly connected to the distribution transformer. b) For Interconnection of a proposed Generating Facility based to a radial distribution circuit, the aggregated generation including the proposed Generating Facility, on the circuit shall not exceed fifteen percent (15%) of the Line Section annual peak load as most recently measured at the substation. A line section is that portion of an Interconnecting EDC’s electric system connected to a customer bounded by automatic sectionalizing devices or the end of the distribution line. Alternatively, the EDC may use internal data and modeling tools for any proposed Generating Facility to determine if the screen passes. NOTE: EDC-approved methods of export limitation and equipment derating may 13 be considered as acceptable means to pass this screen. Refer to section 4.2.8 in the Exhibit B Technical Requirements document for further guidance. c) For Interconnection of a proposed Generating Facility to the load side of Spot Network protectors, the proposed Generating Facility must utilize an inverter-based equipment package and, together with the aggregated other inverter-based generation, shall not exceed the lesser of five percent (5%) of a Spot Network's maximum load or 50 kW. d) For Interconnection of a proposed Generating Facility to the load side of an area network, the following screen will be conducted: a. The unit is a Certified Inverter-based generator or inverter based using a utility grade relay package exclusively in its design. b. The network primary feeders supplying the network to which the generation is attached are from the same electrical bus or normally tied buses. c. The maximum DG size will be limited to 50 kW at any location. A location is defined as any manhole or service box where the DG is connected to the network secondary system. This will ensure that no more than 50 kW of DG is located between the same set(s) of cable limiters. d. Total aggregate DG interconnected to an area network will be limited to 3% of the maximum network transformer connected kVA with the feeder supplying the largest number of network units out of service, or a maximum of 500 kW, whichever is less. e) The proposed Generating Facility, in aggregation with other generation on the distribution circuit, shall not contribute more than ten percent (10%) to the distribution circuit's maximum fault current at the point on the high voltage (primary) level nearest the proposed point of change of ownership. f) The proposed Generating Facility, in aggregation with other generation on the distribution circuit, shall not cause any distribution protective devices and equipment (including, but not limited to, substation breakers, fuse cutouts, load-break elbows, and line reclosers), or Generating Facility equipment on the EPS to exceed eighty-seven and one-half percent (87.5%) of the short circuit interrupting capability; nor shall the Interconnection be permitted for a circuit that already exceeds eighty-seven and one-half percent (87.5%) of the short circuit interrupting capability. g) The table below sets forth the type of Interconnection applicable to each type of primary distribution line. This screen criterion includes a review of the type of electrical service provided to the Generator, including line configuration and the transformer connection to limit the potential for creating over-voltages on the Interconnecting EDC’s EPS due to a loss of ground during the operating time of any anti-islanding function. 14 Primary Distribution Line Type of Interconnection to Result/Criteria Type Primary Distribution Line Three-phase, three wire 3-phase or single phase, Pass screen phase-to-phase Three-phase, four wire Effectively grounded 3 phase Pass screen or Single-phase, line-to- neutral h) If the proposed Generating Facility is to be interconnected on single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the proposed Generating Facility, shall not exceed the line ampacity rating. i) If the proposed Generating Facility is single-phase and is to be interconnected on a center tap neutral of a 240-volt service, its addition shall not create an imbalance between the two sides of the 240-volt service of more than twenty percent (20%) of the nameplate rating of the affected service transformer. j) The Generating Facility (in aggregation with other generation interconnected to the side of a substation transformer feeding the circuit where the Generating Facility is proposed to be interconnected) shall not exceed 10 MW in an area where there are known, or posted, transient stability limitations to DER units located in the general electrical vicinity (e.g., three or four busses from the Point of Interconnection). k) No construction of facilities by the Interconnecting EDC on its EPS shall be required to accommodate the Generating Facility. At the discretion of the EDC, hosting capacity map data may be used in lieu of the Fast Track screens above. If the Interconnecting EDC determines that the proposed Interconnection passes the screen criteria set forth in Section 3.2.1, the Interconnection Request shall be approved, and the Interconnecting EDC will provide the Generator an executable Interconnection Agreement within five (5) Business Days after such determination. If the proposed Interconnection fails the screens, but the Interconnecting EDC determines that the Generating Facility may nevertheless be interconnected consistent with safety, reliability, and power quality standards, the Interconnecting EDC shall provide the Generator an executable Interconnection Agreement within five (5) Business Days after such determination. If there are additional requirements set forth by ISO-NE for any proposed Generating Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement. If the proposed Interconnection fails the screens, but the Interconnecting EDC is unable to determine from the initial review that the Generating Facility may nevertheless be interconnected consistent with safety, reliability, and power quality standards (unless the Generator is willing to consider minor modifications or further study), the Interconnecting EDC shall provide the 15 Generator with the opportunity to attend a customer options meeting described in Section 3.3. 3.3 Customer Options Meeting If the Interconnecting EDC determines that the Interconnection Request cannot be approved without (a) minor modifications at minimal cost, (b) a supplemental study or other additional studies or actions, or (c) modifications at significant cost to address safety, reliability, or power quality problems, then the EDC shall notify the Generator and provide copies of all analyses underlying its conclusion within the five (5) Business Day period after such determination. At the request of the Generator, the Interconnecting EDC shall offer to convene a customer options meeting with the Generator to review possible Generating Facility modifications or the screen analysis and related results in order to determine what further steps are needed to permit the Generating Facility to be connected safely and reliably and to allow DER system modifications to avoid upgrades to the distribution system.. At the time of notification of the determination, or at the customer options meeting: a) The Interconnecting EDC shall offer to perform, at the Generator’s expense, modifications to the EDC’s Interconnection Facilities or minor modifications to the Interconnecting EDC’s EPS (e.g., changing meters, fuses, relay settings) and provide a non-binding good faith estimate of the limited cost to make such modifications to the Interconnecting EDC’s EPS; b) The Interconnecting EDC shall offer to perform, at the Generator’s expense, a supplemental review in accordance with Section 4.4 if the EDC concludes in its sole discretion that the supplemental review might reasonably determine that the Generating Facility could continue to qualify for Interconnection pursuant to the Fast Track Process, and provide a non-binding good faith estimate of the costs of such supplemental review; or c) The Interconnecting EDC and the Generator shall agree to continue evaluating the Interconnection Request under Section 4 (Study Process). 3.4 Supplemental Review In order to accept the Interconnecting EDC’s offer to conduct a supplemental review, the Generator must accept such offer in writing within fifteen (15) Business Days of such offer and submit a payment to the Interconnecting EDC for the estimated costs set forth in such offer. The Generator shall be responsible for the Interconnecting EDC’s actual costs of conducting the supplemental review. The Generator must pay any review costs that exceed the estimated cost payment within twenty (20) Business Days of the later or (a) receipt of an invoice from the Interconnecting EDC or (b) resolution of any dispute concerning such invoice. If the estimated cost payment exceeds the actual costs, the Interconnecting EDC will refund such excess without interest within twenty (20) Business Days of the calculation of the actual costs. 16 Supplemental Review requirements a) Within ten (10) Business Days following receipt of the payment for a supplemental review, the Interconnecting EDC shall conduct a supplemental review to determine whether the Generating Facility can be interconnected safely and reliably. b) If so, and no modifications to the Generating Facility are required by the Interconnecting EDC, the Interconnecting EDC shall forward an Interconnection Agreement to the Generator for execution within five (5) Business Days of such determination. c) If so, and modifications to the Generating Facility are required by the Interconnecting EDC, the Interconnecting EDC will provide a written summary of estimated costs of such modifications, and the Generator shall provide written notice to the Interconnecting EDC of whether the Generator agrees to make the required Generating Facility modifications at the Generator’s cost within thirty (30) Business Days of receiving such written summary from the Interconnecting EDC. Within five (5) Business Days after confirmation that the Generator has agreed in writing to make the required changes at the Generator’s cost, the Interconnecting EDC shall forward an Interconnection Agreement (Exhibit A) to the Generator for execution. d) If so, and minor modifications to the Interconnecting EDC’s EPS are required by the Interconnecting EDC, the Generator shall pay the costs of such EPS modifications prior to Interconnection. The Interconnecting EDC shall forward an executable Interconnection Agreement to the Generator within ten (10) Business Days of such a determination. e) If not, the Interconnection Request shall be evaluated under Section 5 (Study Process). Technical Requirements for certified inverter-based Generating Facilities are provided in the Exhibit B. 17 4 Study Process 4.1 Applicability The Study Process shall be used by a Generator proposing to interconnect its Generating Facility with the Distribution System if the Generating Facility (a) is larger than 2 MW, (b) is 2 MW or less and is not certified, or (c) is 2 MW or less and is certified but did not pass the Fast Track Process. 4.2 Scoping Meeting Requirements A Scoping Meeting can be held at the request of either the EDC or the Generator, but should not occur until the EDC is satisfied with the proposed design details provided and the project is ready to proceed into the Study phase. The Interconnecting EDC, the Generator and any Affected Party(ies) will bring to the meeting personnel, including system engineers, and other resources as may be reasonably necessary in order to accomplish the purpose of the meeting. The purpose of the Scoping Meeting is to discuss the Interconnection Request, review the appropriate jurisdiction for application submittal, and review whether the proposed project will require a corresponding ISO-NE System Impact Study to be performed and also to review existing studies relevant to the Interconnection Request. At the Scoping Meeting, the Parties shall further discuss whether the Interconnecting EDC should perform a Feasibility Study or proceed directly to either or both of the System Impact Studies, a Facility Study, or an Interconnection Agreement. If the Parties agree that a Feasibility Study should be performed, the Interconnecting EDC shall provide the Generator, as soon as practicable, but not later than five (5) Business Days after the Scoping Meeting, a Feasibility Study Agreement in the form of Attachment IV, including an outline of the scope of the Feasibility Study and a non-binding good faith estimate of the cost to perform the Feasibility Study. The Parties may mutually agree to forgo the Scoping Meeting if (a) the Generator requests a Feasibility Study or (b) the Interconnecting EDC determines that a Feasibility Study is not required, and the Parties agree to proceed to either or both of the System Impact Studies. a) A Generator who has requested a Feasibility Study must return the executed Feasibility Study Agreement within fifteen (15) Business Days after the Generator’s Interconnection Request is deemed complete. b) If the Interconnecting EDC determines that a Feasibility Study is not required and the Parties agree to proceed to either or both System Impact Studies, then the Interconnecting EDC shall provide the Generator, no later than five (5) Business Days after the scoping meeting, the appropriate System Impact Study agreement(s) including an outline of the scope of such System Impact Study and a non-binding good faith estimate of the cost to perform such System Impact Study. The form of Distribution System Impact Study Agreement is attached hereto as Attachment V. Transmission System Impact Study process and documents can be found on the ISO-NE website. (www.iso-newengland.com). 18 4.3 Feasibility Study The Feasibility Study may be used to review multiple interconnection options and locations with the goal of identifying the most feasible point of interconnection for the Generating Facility, any potential adverse system impacts that would result from the Interconnection of the Generating Facility, or for the EDC to provide specific circuit and/or substation data to the developer for further refinement of their proposal (i.e. to develop a proposed dispatch limiting schedule for ESS projects). The Generator must pay the good faith cost estimate set forth in the Feasibility Study Agreement prior to the Interconnecting EDC’s initiation of the Feasibility Study. The scope of and cost responsibilities for the Feasibility Study are more fully described in the Feasibility Study Agreement (Attachment V). In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed Feasibility Study Agreement with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the Feasibility Study Agreement with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. If the Feasibility Study shows no potential for adverse system impacts, the EDC shall send the Generator a Facility Study Agreement in the form of Attachment VI, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If the Feasibility Study shows that no additional facilities are necessary, an Interconnection Agreement shall be tendered to the Generator for execution within five (5) Business Days after the completion of the Feasibility Study. If the Feasibility Study shows the potential for adverse system impacts, the review process shall proceed to the System Impact Study(ies). In the case where either the Feasibility Study or the System Impact Study(ies) are determined to be unnecessary, the Interconnecting EDC shall notify the Generator within five (5) Business Days that such study(ies) are not required. 4.4 System Impact Studies 19 The System Impact Studies shall (a) identify and detail the EPS impacts that would result if the proposed Generating Facility were interconnected without project modifications or electric system modifications, focusing on the adverse system impacts identified in the Feasibility Study, and/or (b) study potential impacts, including but not limited to those identified in the Scoping Meeting. If potential adverse distribution system impacts are identified at the Scoping Meeting or in the Feasibility Study, then a Distribution System Impact Study shall be required. If a Distribution System Impact Study is required, then the Interconnecting EDC shall send the Generator a Distribution System Impact Study Agreement within fifteen (15) Business Days of (a) transmittal of the results of the Feasibility Study (if performed) or (b) the Scoping Meeting (if no Feasibility Study is performed), including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If potential adverse transmission system impacts are identified, the Interconnecting EDC shall send the Generator a Transmission System Impact Study Agreement within five (5) Business Days following transmittal of the Study results of the Feasibility Study or the Distribution System Impact Study, as the case may be, including an outline of the scope of the Transmission System Impact Study and a non-binding good faith estimate of the cost to perform the Transmission System Impact Study. If a Transmission System Impact Study is not required, but EPS adverse system impacts are shown by the Feasibility Study to be possible and no Distribution System Impact Study has been conducted, the EDC shall send the Generator a Distribution System Impact Study Agreement. If the System Impact Study(ies) shows no potential for adverse impacts to the transmission system or the distribution system, then the EDC shall send to the Generator for execution either (a) a Facility Study Agreement, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study, or (b) an Interconnection Agreement, as applicable. In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed System Impact Study Agreements with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the System Impact Study Agreements with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. A payment of the good faith estimated System Impact Study costs shall be required in full of the Generator prior to initiation of the System Impact Studies. The scope of and cost responsibilities for a System Impact Studies are set forth in the applicable System Impact Study agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study 20 agreement. Any Affected Parties shall be invited to participate in the System Impact Studies and provide information necessary or helpful to complete the System Impact Studies. 4.5 Facility Study Once the required System Impact Studies, if any, are completed, the Interconnecting EDC shall prepare a System Impact Studies report and provide a copy of such report to the Generator along with a Facility Study Agreement within five (5) Business Days of completion of the System Impact Studies, including an outline of the scope of the Facility Study and a non-binding good faith estimate of the cost to perform the Facility Study. Within five (5) Business Days following receipt of the report described in Section 4.5, the Generator shall notify the Interconnecting EDC in writing as to whether it will either pursue the Facility Study or waive the Facility Study and elect an expedited Interconnection. a) If the Generator waives the Facility Study, it shall commit to the following milestones in the Interconnection Agreement: (a) siting approval by the appropriate regulatory authorities for the Generating Facility and Interconnection Facilities; (b) engineering of Interconnection Facilities shall be subject to prior approval by the Interconnecting EDC; (c) the ordering of long lead time material by the EDC for Interconnection Facilities and system upgrades; (iv) an In-Service Date; and (v) Commercial Operation Date. b) If the Generator does not waive the Facility Study, in order to remain under consideration for Interconnection and in the EDC’s Interconnection queue, then the Generator must return the executed Facility Study Agreement or a request for an extension of time within thirty (30) Business Days following receipt of the Facility Study from the Interconnecting EDC. Any such extension shall not exceed sixty (60) Business Days. The Facility Study shall specify and estimate the cost of the equipment, engineering, procurement and construction work (including overheads) needed to safely and reliably interconnect the Generating Facility. This includes service connection details and implementation of the System Impact Study(ies) conclusions. Design for any required Interconnection Facilities and/or Generating Facility upgrades shall be provided for under the Facility Study Agreement. The Interconnecting EDC may contract with outside consultants to provide such design(s). The Generator, the Interconnecting EDC and any Affected Party(ies), may agree to allow the Generator to separately arrange for such design(s). In such cases, facilities design shall be subject to review and prior by the Interconnecting EDC, in accordance with the Facility Study Agreement. If the Parties agree to separately arrange for design and construction, and provided security and confidentiality requirements can be met, the Interconnecting EDC shall make sufficient information available to the Generator in accordance with confidentiality and critical infrastructure requirements to permit the Generator to obtain an independent design and cost estimate for any necessary facilities. In order to remain under consideration for Interconnection and in the Interconnecting EDC’s 21 Interconnection queue, the Generator must return executed Facility Study Agreement with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the Facility Study Agreement with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. A payment of the good faith estimated Facility Study costs shall be required in full from the Generator prior to execution of the Facility Study. The scope of and cost responsibilities for the Facility Study are described in the attached Facility Study Agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. Within thirty (30) Business Days of receipt of the Facility Study results, the Generator shall provide written notice whether it agrees to pay for the Interconnection Facilities and upgrades identified in the Facility Study. An executable Interconnection Agreement shall be tendered by the Interconnecting EDC to the Generator within five (5) Business Days of receipt of such written notice. 22 5 Provisions that Apply to all Interconnections and Associated Applications 5.1 Reasonable Efforts The Interconnecting EDC shall make reasonable efforts to meet all time frames provided in these Guidelines; provided, however, that the Interconnecting EDC and the Generator may agree to different time frames. If the Interconnecting EDC fails to meet a deadline provided herein, it shall (a) notify the Generator, (b) explain the reason for the failure to meet the deadline, and (c) provide an estimated date by which it will complete the applicable Interconnection procedure in the process. 5.2 Dispute Resolution Process The Parties shall agree to attempt to resolve all disputes promptly, equitably and in a good faith manner. If Parties are unable to informally resolve their dispute, the following dispute resolution process must be followed: a) In the event of a dispute, the disputing Party shall provide the other Party a written Notice of Dispute containing the relevant known facts pertaining to the dispute, the specific dispute and the relief sought, and express notice by the disputing Party that it is invoking the procedures under this Section. The notice shall be sent to the non-disputing Party’s email address and physical address set forth in the Interconnection Agreement or Application, if there is no Interconnection Agreement. A copy of the notice shall also be sent to Interconnection Ombudsperson. The non-disputing Party shall acknowledge the notice within three (3) Business Days of its receipt and identify a representative with the authority to make decisions for the non-disputing Party with respect to the dispute. b) The Interconnection Ombudsperson is to be appointed by the PURA chairperson or the chairperson’s designee, and should be a member of PURA’s Office of Education, Outreach, and Enforcement. c) If the dispute is principally related to one or both Parties’ compliance with timelines specified in these Interconnection Procedures or associated agreements, the Parties shall seek assistance from Interconnection Ombudsperson if the Parties cannot mutually resolve the dispute within eight (8) Business Days. d) If the dispute is not principally related to one or both Parties’ compliance with a timeline, then the non-disputing Party shall provide the disputing Party with all relevant regulatory and/or technical details and analysis regarding any Utility interconnection requirements under dispute within ten (10) Business Days of the date of the notice of dispute. Within twenty (20) Business Days of the date of the notice of dispute, the Parties’ authorized representatives shall meet and confer to try to resolve the dispute. Parties shall operate in good faith and use best efforts to resolve the dispute. e) If a resolution is not reached in thirty (30) Business Days from the date of the notice of dispute, either (1) a Party may request to continue negotiations for an additional twenty (20) Business Days, or (2) the Parties may by mutual agreement make a written request for mediation to the Interconnection Ombudsperson. Alternatively, both Parties by mutual agreement may request mediation from an outside third-party mediator with costs to be shared equally between the Parties. f) For the third party mediation process, the Parties shall agree to a mutually agreeable mediation process and mediator. Each party will select a mediator within five (5) Business Days of the end of the negotiation period and the two selected mediators will attempt to, within five (5) Business Days, select a third, mutually agreeable, mediator. The Partie

Text of UI-Attachment 4b.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
Eversource Energy And The United Illuminating Company Exhibit B Generator Interconnection Technical Requirements October 1, 2025 Table of Contents SCOPE ..........................................................................................................................................................................3 GENERAL CONSIDERATION ..........................................................................................................................................3 1.1 1.2 1.3 1.4 1.5 1.6 GENERAL REQUIREMENTS .................................................................................................................................. 3 DISTRIBUTION IMPACT STUDY PHILOSOPHY ............................................................................................................ 3 ADVERSE IMPACT OF GENERATING FACILITY ............................................................................................................ 4 SAFE OPERATION AND MAINTENANCE ................................................................................................................... 4 FUTURE SYSTEM CHANGES AND RESPONSIBILITIES .................................................................................................... 4 DEFINITIONS ................................................................................................................................................... 5 GENERAL DESIGN REQUIREMENTS ..............................................................................................................................5 1.7 1.8 1.9 1.10 1.11 1.12 INTERCONNECTION TRANSFORMER WINDING AND GROUNDING CONSIDERATIONS (CONFIGURATION, FERRO-RESONANCE, ETC.) . 5 POWER QUALITY REQUIREMENTS ......................................................................................................................... 5 VOLTAGE REGULATION ...................................................................................................................................... 6 INSULATION COORDINATION ............................................................................................................................... 7 GROUNDING AND BONDING ............................................................................................................................... 7 ISOLATION DEVISES........................................................................................................................................... 8 PROTECTION AND CONTROL REQUIREMENTS .............................................................................................................9 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 GENERATOR PROTECTION PHILOSOPHY.................................................................................................................. 9 GENERAL REQUIREMENTS .................................................................................................................................. 9 ADDITIONAL REQUIREMENTS FOR INVERTER-BASED INSTALLATIONS ............................................................................ 14 ADDITIONAL REQUIREMENTS FOR ENERGY STORAGE SYSTEMS ................................................................................... 16 ADDITIONAL REQUIREMENTS FOR INDUCTION GENERATORS ...................................................................................... 17 ADDITIONAL REQUIREMENTS FOR SYNCHRONOUS GENERATORS ................................................................................. 17 CLOSED TRANSITION GENERATORS ..................................................................................................................... 19 OPEN TRANSITION GENERATING FACILITIES .......................................................................................................... 21 SPECIAL PROTECTION SYSTEMS .......................................................................................................................... 21 PROTECTION SYSTEM CHANGES ......................................................................................................................... 22 INTERCONNECTING GENERATORS WITH NETWORK SYSTEMS ................................................................................... 22 1.23 1.24 AREA NETWORKS ........................................................................................................................................... 23 SPOT NETWORKS ........................................................................................................................................... 23 METERING, MONITORING AND COMMUNICATION ................................................................................................... 24 1.25 1.26 1.27 METERING ................................................................................................................................................... 24 MONITORING AND COMMUNICATION ................................................................................................................. 24 COMMUNICATIONS CHANNELS AND SCADA ......................................................................................................... 25 TESTING AND MAINTENANCE REQUIREMENTS.......................................................................................................... 25 1.28 1.29 1.30 WITNESSING OF COMMISSIONING TEST ............................................................................................................... 26 PERIODIC TESTING .......................................................................................................................................... 27 SAFE OPERATIONS AND MAINTENANCE ............................................................................................................... 27 STANDARDS AND APPLICABLE GUIDELINES (IEEE, UL, ANSI, ETC.) ............................................................................. 27 1.31 1.32 1.33 1.34 PRE-CERTIFIED FACILITIES ................................................................................................................................. 28 NON PRE-CERTIFIED FACILITIES .......................................................................................................................... 28 CERTIFICATION OF GENERATOR EQUIPMENT PACKAGES ........................................................................................... 28 CODES AND STANDARDS .................................................................................................................................. 28 APPENDIX A............................................................................................................................................................... 29 APPENDIX B ............................................................................................................................................................... 32 Scope These Generator Interconnection Technical Requirements (“Technical Requirements”) apply to the Interconnection of a Generating Facility to the EPS, regardless of federal or state jurisdiction. These Technical Requirements provide requirements relevant to the safety, performance, reliability, operation, design, protection, testing, metering, monitoring, control, and maintenance of the Interconnected Generating Facility. Among other things, these Technical Requirements are particularly focused on the safety of the general public and the employees and equipment of the EDC. All capitalized terms shall have the meanings specified in the glossary set forth in Attachment XI to the Guidelines for Generator Interconnection: Fast Track and Study Processes. General Consideration 1.1 General Requirements Any Generator desiring Interconnection with the EPS or modification of an existing Interconnection must meet the specifications set forth in this section and any other requirements which may be imposed by the EDC, including without limitation: a. Latest approved version of the IEEE 1547 (Standard for Interconnecting Distributed Resources with Electric Power Systems) and associated 1547 standard and family of guidelines or recommended practices. b. Latest approved version of UL (Underwriters Laboratories) 1741 (Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources). c. 1.2 Latest approved version of UL 1741 supplemental version. Distribution Impact Study Philosophy Generating Facilities will be studied based on the expected operational requirements provided by developers, including, but not limited to, export limitation, charge/discharge schedules, smart inverter functionality, and intentional islanding capabilities. Protective functions will be required to ensure compliance with such operational requirements. If the developer does not provide sufficient details regarding the intended operation of the generator, the EDC will use maximum power export as the study parameter. Refer to section 4.2.8 for examples of acceptable means of export limitations. 1.3 Adverse Impact of Generating Facility Unintentional Islanding by the Generating Facility of all or part of the EPS (meaning a part of the EPS is kept energized by the Generating Facility after the EPS has de-energized the area) is prohibited as it may result in unsafe conditions on the EPS. The Generator shall comply at all times with Section 6 of the Interconnection Agreement. 1.4 Safe Operation and Maintenance The Generator shall operate and maintain the Generating Facility in accordance with Good Utility Practice and comply with all aspects of the Interconnection Agreement and applicable Guidelines and tariffs, terms and conditions. Moreover, the Generator shall comply, at all times, with all applicable laws, regulations and other legal requirements. In the event that the Generating Facility may pose an unreasonable risk to the EPS, the Interconnection Agreement provides that (a) the EDC may install equipment to monitor the Generating Facility and (b) the EDC may disconnect the Generating Facility as set forth in the Guidelines. Arc Flash: The interconnection of a Generating Facility to the EPC system shall not increase available fault current and associated arc flash energy to a level where EPC workers would have to use the next level of enhanced Personal Protective Equipment (PPE) and/or restrictive work methods above and beyond what the workers would normally use for work at the same location without the Generating Facility present. 1.5 Future System Changes and Responsibilities The EPS is dynamic and must be able to accommodate future load growth and system changes. Therefore, the EDC may, at its discretion and cost, make upgrades to the EPS. Such upgrades may have an impact on existing Generator Facilities and/or Interconnection Facilities. To ensure continued safe operations in compliance with the Interconnection Agreement, the Generator Facilities and/or Interconnection Facilities may need to be upgraded in accordance with the upgraded EPS. The Generator and the EDC will work together and cooperatively to implement the appropriate changes, upgrades, etc. to attain the common goal of continued safe and reliable operation of the interconnection of the Generator to the EPS. 1.6 Definitions a. UL1741 Throughout this document, UL1741 refers to the latest approved revision including supplements A and B of UL 1741 Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources. This term may be used interchangeable to describe the main standard or supplemental revisions, including future revisions to be adopted by the EDC after the publishing of this document. b. Power Control System (PCS) Embedded or stand-alone equipment designed to manage and optimize power within a complex electrical system. This equipment may be embedded within an inverter or energy storage device and includes the capability of limiting export power. For clarity within this document, an Energy Management System (EMS) may also provide the same capabilities of a PCS. General Design Requirements 1.7 Interconnection Transformer Winding and Grounding Considerations (Configuration, Ferro-resonance, etc.) In order to provide maximum operating flexibility for the Generator and to minimize possible adverse effects on the facilities of other EDC customers, the Generator shall provide, at its sole cost and expense, an interconnection transformer between the Generating Facility and the EDC-owned equipment, unless this requirement is waived in writing by the EDC in its sole discretion. The Generator shall propose to the EDC an interconnection transformer and grounding configuration, which shall be subject to the approval of the EDC at its sole discretion. The final winding connection and grounding configuration is subject to the approval of the EDC at its sole discretion. 1.8 Power Quality Requirements 1.8.1 The Generating Facility and its Interconnection system shall not inject DC current greater than 0.5% of the full rated output current at the POI. 1.8.2 The Generating Facility shall not create objectionable flicker to other EDC customers. 1.8.3 Harmonics. When the Generating Facility is serving linear loads, harmonic current injection into the EPS at the PCC shall not exceed the limits listed in the latest version of IEEE 1547 under the following test conditions: 1.8.4 a. Serving balanced linear loads b. No voltage distortion present. The Interconnection of the Generating Facility shall not increase the potential for ferro-resonance in the EPS. 1.8.5 The Interconnection of the Generator Facility shall not cause temporary under voltages or over voltages. 1.8.6 An Induction Generator may be connected and brought up to speed as an induction motor if it can be demonstrated that the initial voltage drop (visible flicker) is acceptable and within limits as defined by IEEE 519. When flicker occurs, outside of the IEEE 519 limits, soft starting will be required, such as speed matching to within 1% of synchronous speed or other techniques. 1.9 Voltage Regulation The Generating Facility shall not: (i) actively regulate the voltage of the EPS unless specifically agreed by the EDC; (ii) cause the voltage at any point along the EPS to deviate from the levels prescribed by the exemption to the upper voltage variation established by the Public Utilities Regulatory Authority by way of Decision, dated March 6, 2019, in Docket No. 03-01-15RE04 or the voltage limits established in Conn. Agencies Regs. § 16-11-115(a), whichever limits are greater (currently +5/-5% for residential and commercial customers ; or (iii) cause any voltage deviations, which are objectionable to other customers of the EDC. The EDC may regulate the voltage on the EPS by employing load tap changing transformers or line voltage regulators. These devices are typically designed for one-way (forward) power flow to properly regulate the voltage. Therefore, unless specifically waived in writing by the EDC, the Generating Facility shall be required to limit its output so that reverse power flow cannot occur when the proposed Interconnection would be expected to result in reversed power flow through a load tap changing transformer absent such limitation. When the proposed Interconnection is expected to result in reverse power flow through line voltage regulators, control modifications necessary to mitigate the effects of the reverse power flow may be made, if practical, at the sole cost and expense of the Generator. Otherwise, the Generating Facility will be required to limit its output so that adverse levels of reverse power flow cannot occur. 1.9.1 VAR (Power Factor) a. All Generators other than Induction Generators shall be capable of operating within a power factor range of 0.9 leading to 0.9 lagging. Unless specifically determined through studies performed by the EDC and as may be specified in the Interconnection Agreement, the power factor as measured at the PCC shall be within such range. If the power factor is outside of this range the method and compensation for power factor correction shall be determined by the EDC. b. The VAR requirements for Induction Generators shall be determined by the EPS. For aggregate generation of up to and including 100 kW, there will be no charge to the Generator. For aggregate generation greater than 100 kW, the EDC shall charge the Generator a one-time “capacitor charge” to cover the cost of supplying the reactive current to the Generating Facility. This “capacitor charge” shall be based on 0.5 kVAR of capacitors per kW of generator nameplate capacity and will be based on the prevailing rate of installed cost per KVAR by utility grade equipment. 1.10 Insulation Coordination The Generating Facility and all other equipment connected to the EPS (even in closed transition mode) must be able to withstand the normal and abnormal voltages that can be experienced on the EPS (i.e., normal and abnormal voltages shall not cause damage to or reduce the reliability of any connected equipment). The Generator shall be responsible for procuring equipment with a level of insulation and fault withstands capability compatible with the grounding method specified below. 1.11 Grounding and Bonding 1.11.1 The grounding scheme of the Generating Facility Interconnection shall not cause overvoltages that exceed the rating of the EDC’s equipment connected to the EPS and shall not disrupt the coordination of the ground fault protection on the EPS. 1.11.2 Generating Facility shall be effectively grounded. To achieve effective grounding, the DER owner shall design and install an interconnection system where the ratio of the DER’s reactance parameters meets the following criteria: a. 1<X0 / X1<3 b. R0/X1<1 Where, X0 is the zero-sequence reactance at the PCC R0 is the zero-sequence resistance at the PCC X1 is the positive sequence reactance at the PCC 1.12 Isolation Devises 1.12.1 Low Voltage Applications (<= 600 volts): For voltages equal to or less than 600 volts on the EPS, the Generator shall own, install, operate and maintain an external Isolation Device (or comparable device mutually agreed upon by the parties) for the Generating Facility that can be opened for isolation. The Isolation Device shall be operated by the Generator’s personnel and shall be in a location easily accessible by EDC personnel at all times. The Isolation Device shall: (i) be gang operated; (ii) have a visible break when open; (iii) be rated to interrupt the maximum Generator Facility output; and (iv) be capable of being locked open. Although EDC personnel will normally not operate the Isolation Device, the EDC reserves the right to have its personnel open the Isolation Device in an emergency. If an existing Isolation Device at the Generating Facility meets the requirements of this section, then this requirement of an additional Isolation Device may be waived by the EDC. The Generator shall maintain the Isolation Device in good working condition. The EDC shall not be responsible for any damage to the disconnect switch or the Isolation Device. 1.12.2 High Voltage Applications (> 600 volts): The EDC shall own, install, operate and maintain the Isolation Device when the Isolation Device is required to be installed at voltages greater than 600 volts on the EPS. The EDC will determine the size, type and rating of such Isolation Device. An existing Isolation Device, if deemed adequate for the application by the EDC, may be sufficient. If a new Isolation Device is required, then the cost of such device, including the installation thereof, will be borne by the Generator. Protection and Control Requirements 1.13 Generator Protection Philosophy One of the core objectives of these Technical Requirements is to protect the public, EDC personnel and the EPS from unsafe or unstable operating conditions. Therefore, much of the focus of these Technical Requirements is on the use of protective functions designed to prevent the Generating Facility from causing a system failure or propagating disturbances onto the EPS during normal operations. Such requirements are designed solely to protect the public (and EDC employees) and the EPS and are not designed to protect the Generating Facility or the Generator’s other facilities and equipment. The Interconnection of the Generating Facility to the EPS will not be allowed to degrade the reliability of the EPS either as a result of its operation or as a result of changes to the EPS to accommodate the Interconnection. From time to time, protective relays and microprocessors used in protective relays and inverters must be removed from service for maintenance, testing, and revision upgrades. During such times, the Generating Facility shall not operate in parallel with the EPS without adequate protection in service and functioning as approved. Additionally, for firmware upgrades, the EDC may require witness testing by the EDC to determine the success of any such upgrade. The Generating Facility is required to review any such upgrade with the EDC before any such upgrade is attempted. 1.14 General Requirements 1.14.1 Section 2.1 of these Technical Requirements is generally applicable to all of these Technical Requirements and should be reviewed in concert with Section 4. 1.14.2 The specifications and requirements listed herein are intended solely to mitigate possible adverse impacts caused by the Generating Facility to the EDC’s equipment and to the reliability of its EPS as well as to protect the safety of the EDC’s personnel, the public, and other customers of the EDC. They are not intended to address protection of the Generating Facility itself or internal load on the Generating Facility side of the PCC. It is the responsibility of the Generator to comply with the requirements of all appropriate standards, codes, statutes, and authorities to protect itself and its loads. The Generator must be aware of the risk of single phasing and of voltage transients (and other normal system disturbances as described herein) that accompany Interconnection with the EPS. In accordance with the Interconnection Agreement, it is the Generator’s responsibility to protect the Generating Facility from these risks. 1.14.3 The EDC shall make available to, upon request, system protection information directly related to the Point of Interconnection, which information may be used by the Generator solely to evaluate protection of its Generating Facility during parallel operation and for no other purpose. 1.14.4 The design of the Generating Facility’s protection and control scheme shall take into account the EDC’s practice of automatically reclosing portion(s) of its EPS without synchronism check after one or more portion(s) of the EPS have been tripped. The de-energized portion of the EPS may be reenergized at any time after de-energization. If the EDC’s reclosing practices are found to be incompatible with the Interconnection of the Generating Facility, the EDC may choose to modify the EPS to accommodate that Interconnection, which modification shall be at the Generator’s sole cost and expense. 1.14.4.1 Unless otherwise agreed by the EDC, if the Generating Facility has been tripped off-line, then the Generating Facility’s control system shall not permit the Generating Facility to be reconnected to the EPS for at least five (5) minutes after normal system conditions are reestablished. 1.14.4.2 The Generating Facility shall be designed to accommodate reclosing of the EPS even if no reclosing exists at the time of Interconnection. If the Generating Facility’s protection cannot be designed to be compatible with the EDC’s reclosing practices, other anti-Islanding measures will be required at the Generator’s sole cost and expense (e.g., a dedicated circuit supply or direct transfer trip protective relaying from all EDC sources and isolation points). 1.14.5 Protective relays required by these Technical Requirements shall either be Utility Grade or certified to UL 1741 and IEEE C62.41 and IEEE C62.45, as amended from time to time. Equipment tested to UL 1741 needs only prove compliance with latest revision and supplements. The time characteristics of these relays must be reviewed and approved by the EDC prior to purchase by the Generator in order to achieve coordinated timing with the EDC’s protective devices. 1.14.6 The Generating Facility shall not operate in parallel with the EPS without properly functioning protective equipment required by these Technical Requirements. 1.14.6.1 Generating Facilities (of less than or equal to 1 MW in size) are not required to provide redundancy in protective functions. However, if such a Generating Facility desires to operate in parallel with the EPS with its required protective equipment out of service, the design of that facility shall include redundant protection functionality installed in parallel to facilitate the removal of that protective relaying from service for any reason. 1.14.6.2 Generating Facilities (above 1MW in size) shall be designed in a manner such that the Generating Facility protection shall provide sufficient redundancy in protective function(s) so that no single protective equipment failure can remove any protective function required by the EDC. 1.14.7 The EDC has adopted UL 1741 (including IEEE C62.41) for certifying the electrical protective functionality of independent power systems, including Generating Facilities. UL 1741 compliance may be established by UL or other Accredited, Nationally Recognized Testing Laboratories (NRTL). The EDC also accepts inverter-based Generating Facilities that are installed in multiple packs and that have been certified to UL 1741 in this configuration. 1.14.8 Generating Facilities that are not intended to export power to the EPS but which are capable must use an EDC approved method of limiting export. Similarly, generating facilities which do intend to export power to the EPS may be required by the EDC to limit export below an identified threshold. 1.14.8.1 Generating facilities greater than or equal to 200kW and are capable of exporting power to the EPS must include either: a. a reverse power (32R) or b. a under-power (32U) relay or c. a corresponding function in a multifunction microprocessor. A reverse power element (32R) operates whenever power is exported from a Generating Facility onto the EPS for periods beyond those expected during normal system transient conditions. An underpower element (32U) ensures the Generating Facility is always importing some preset level of power. If the import level drops below the “under-power” threshold, then the element will operate to trip the Generating Facility. The under-power element (32U) must be used in cases where a reliable (32R) (export trip) cannot be guaranteed. (See Appendix A for recommended settings). 1.14.8.2 Generating facilities which are less than 200kW may utilize a PCS, EMS, or other agreed upon means to limit export of the facility to the EPS. The EDC may allow the use of new technologies as they become available to the public. Any PCS, EMS, or other device will require review and approval by the EDC. 1.14.8.3 It is recognized that for business model reasons, for technical reasons such as limitations in an existing facility, or for process reasons such as the acceleration of the application approval or reduction in studies required, the Generator may choose to operate the facility exclusively in a non-export mode. 1.14.9 The Generator shall submit to the EDC for review and acceptance the settings for all devices with protection functions that could affect the Interconnection. These devices include all relays, adjustable inverters and controllers that provide protective functions used for EDC-required protection. These settings shall be provided to the EDC no later than twenty (20) Business Days prior to the scheduled date for setting those relays/inverters/controllers. The Generator shall provide both a paper and an electronic copy of the setting file for all settings within any electronic multifunction relay. The Generator must also provide the most recent revisions to the schematics and wiring diagrams listed in Attachment I to the applicable Guidelines (“Interconnection Request”). The Generator shall also submit to the EDC a written description of the operation as programmed for each of the protective relay schemes that could affect the Interconnection. Each such protective relay scheme description shall list all inputs to the protective relay, the function(s) performed on these inputs, and a list of all outputs driven by the relay. The vendor instruction manual will not be acceptable for this purpose. 1.14.10 Over-and under-voltage and over-and under-frequency protective relay functions are required for all Generating Facilities interconnected to the EPS. This requirement also applies to closed transition transfer schemes that result in the Generating Facility operating in parallel to the EPS for 100 milliseconds or longer. Voltage sensing on all three phases shall be used for the required voltage relaying for maximum sensitivity for phase disturbances. 1.14.11 All protection functions required by the EDC for protection of its EPS shall be designed in such a way that a loss of AC power will not compromise that protection. Acceptable methods include but are not limited to: undervoltage trip, DC battery systems, and UPS systems. 1.14.12 An Interconnection interrupting device such as a circuit breaker or contactor shall be installed to isolate the Generating Facility from the EPS. All such Interconnection interrupting devices must be capable of interrupting the maximum available short circuit current and the current produced when the Generating Facility is connected out of phase. For the avoidance of doubt, if the Generating Facility has multiple interrupting devices, this requirement applies to each such device. 1.14.13 An interconnection circuit breaker equipped with all appropriate protective devices defined in this document shall be located at the PCC in addition to any required interrupting device(s) and protection devices required at the generator. However, if a Generator meets certain requirements, the EDC may elect to waive the separate protection devices at the PCC. In order for the EDC to consider waiving the separate protection devices at the PCC all of the following conditions must be met (unless waived by the EDC): a. Total Generation Facility Capacity is less than 1MW. b. Generation Facility Capacity is less than 1/3 of its total minimum load. c. Generating Facility is designed as a net-import facility at all times (no power exported to EPS). d. Generator has interrupting and protection devices meeting all other requirements in this document. 1.14.14 Voltage relays that can be connected directly to the Generating Facility’s line voltage without a voltage transformer (VT) are acceptable to the EDC 1.14.15 Unless otherwise agreed by the EDC in writing, protective relay schemes shall be hardwired to the device they are tripping. Test switches are required in the current, voltage and trip circuits. 1.14.16 Current Transformer (CT) ratios and accuracy classes for CTs as used in the Generating Facility protection shall be consistent with ANSI and IEEE standards. 1.14.17 Voltage Transformers The Generating Facility shall be equipped with a direct voltage connection or a VT, which shall be connected to the EDC’s side of the interrupting device. For three-phase applications, a VT for each phase is required. If the interconnecting voltage transformer is ungrounded at the EDC voltage, this VT shall be a single three-phase device or three single-phase devices connected from each phase to ground on the EDC’s side of the Generating Facility’s interconnecting transformer, rated for phaseto phase voltage. The secondary winding shall be connected in open delta, have a loading resistor to prevent ferroresonance, and supply a zero-sequence over-voltage relay. On one side of the relay/resistor, the connection shall be grounded. Relays that (i) are capable of calculating zero-sequence voltages, and (ii) can be directly connected at the utilization voltage, may be utilized in lieu of grounded-wye to open delta VTs. 1.14.18 Data Requests for Fault Current, Impedance, and Transformer Specs A common need for third-party developers when designing details of an interconnection proposal is certain EDC distribution system data specific to the proposed location. This information includes available fault current, impedance data, and transformer sizing information. The EDC will gather this information at a billable cost to the developer based on the following process parameters: - If an interconnection project is required to undergo a Distribution System Impact Study, this information will be provided as part of the Impact Study analysis, typically as part of the report or within 15 business days from commencement of an Impact Study. The estimate costs to gather this information will be built into the Impact Study Agreement. Please see Section 4 within the Fast Track & Study Guidelines for more information regarding the Impact Study process. - If an interconnection project does not need to undergo a Distribution System Impact Study, this information will be provided upon request within 15 business days during the Contingent Approval phase of the interconnection process, with the applicable data request fee charged to and paid for by the developer. 1.15 Additional Requirements for Inverter-Based Installations Current inverter systems are capable of performing many of the required protective functions internally, without the need for additional protective equipment. Therefore, additional standards are applicable to inverter-based technologies. Two external standards shall apply to inverter-based Interconnections: (1) IEEE Standard 1547, (Standard for Interconnecting Distributed Resources with Electric Power Systems): and (2) UL Standard 1741 and UL Standard 1741 SA, “Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources.” These standards set forth the nominal voltage and frequency parameters that must be met and the limits allowed for anomalies such as flicker and interference, as well as the time allowed for disconnection when the required parameters are no longer being met or for reconnection following a system failure or automatic disconnection. The EDC recognizes the concept of “Type Certification” (sometimes called pre-certification) which requires that the inverter-based units undergo standardized testing, usually by an Accredited Nationally Recognized Testing Laboratory (e.g., Underwriter’s Laboratory), and that the results of those tests be made publicly available. Type certified units typically must also be “listed” by the laboratory and the equipment labeled as such. Advanced inverters also provide grid support functionality and can assist with resource availability in the event of a bulk power system or other disturbance. As such and unless agreed upon by the EDC, inverters must also be set as per the guidance provided in Appendix C. 1.15.1 The technical requirements for certified inverter based Generating Facilities, 25kW and less, are found in a separate document, the Eversource Energy/UI “Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 25 kW (ac) or Less.” 1.15.2 The requirements of UL 1741may be applied to inverters with photovoltaic and other electric energy sources. An inverter is considered approved if it is certified to the UL 1741 testing procedure and it has passed the required tests without failure to comply with IEEE C62.41 and C62.45. Proof of certification under UL1741 and compliance with IEEE C62.41, and C62.45 shall be required. As of May 7, 2007, UL 1741 includes the requirements within it of IEEE C62.41, and C62.45. Therefore, equipment tested to UL 1741 after that date need only prove compliance with UL 1741. 1.15.3 It is the Generator’s responsibility to submit written evidence that the proposed Generating Facility has been UL 1741 certified. Generators should contact the Generating Facility’s supplier to determine if it has been listed. 1.15.4 Non-certified inverters must have either non-islanding or anti-islanding protection as defined by IEEE 1547 and conform to the maximum harmonic limits prescribed in IEEE 519. Non-certified inverters must be protected by certified or Utility-Grade Relays, using settings approved by the EDC. 1.15.5 Self-commutated inverters with external frequency sensing may be used to synchronize the Generating Facility with the EPS. The following requirements apply to such inverters: 1.15.5.1 The Generator shall use one or more synchronizing devices such as motorized breakers, contactor/ breaker combinations, or a fused contactor (if mutually agreeable) to connect the Generating Facility to the EPS. This synchronizing device shall not be the Interconnection interrupting device. This synchronizing device shall be capable of interrupting the current produced when the Generating Facility is connected out of phase with the EPS consistent with IEEE 1547, Section 4.1.8.3. 1.15.5.2 All synchronizing shall be done by the Generator at the Generating Facility. The Generating Facility shall not be used to energize a de-energized EDC circuit. 1.15.5.3 In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. 1.15.5.4 All synchronizing schemes used for interconnecting a Generating Facility with the EPS must conform to the synchronizing requirements of the latest version of IEEE 1547. Automatic synchronizing schemes are preferred. 1.16 Additional Requirements for Energy Storage Systems 1.16.1 Impact Study Requirements: 1.16.1.1 In order to conduct a distribution impact study for a Storage System, a proposed dispatch limiting schedule (DLS) shall be provided to the EDC by the developer. The DLS will include the maximum dispatch schedule for both charging and discharging activity of the system as shown in the sample tables below. The time shown in the table row is for reference only and can be changed by the developer to fit their intended operational schedule. See Table 4-1 and Table 4-2 below. 1.16.1.2 Prior to developing a DLS, the EDC must provide minimum load or peak load data for the substation and circuit. The minimum load data for charging and discharging will be provided for all four seasons, Spring (March, April and May), summer (June, July and August), Fall (September, October and November) and Winter (December, January and February). The following data will be developed during a distribution Feasibility study as described in the Guidelines for Generator Interconnection Fast Track and Study Process. Alternatively, such data may be provided in the EDC hosting capacity maps in which case, no study will be required. 1.16.1.3 The EDC’s will conduct a Distribution Impact Study based on submitted DSL within the schedule windows proposed for the peak load and minimum load/peak generation day. Based on results of the study analysis, the EDC may communicate the need for adjustments to the DSL in order to avoid distribution system upgrades. 1.16.1.4 Compliance with the approved DSL for each project will be treated as a required operational restriction and detailed in the Interconnection Agreement. Enforcement of this required compliance, such as a Real Time Automatic Controller or a DER management system, will be determined by the EDC. Refer to section 6 for Monitoring and control requirements. Maximum Discharge (MW) Discharge Limiting Schedule 8:00 – 10:00 10:00 – 16:00 16:00 – 18:00 18:00 – 8:00 Spring (March, April, May) Summer (June, July, August) Fall (Sep, Oct, Nov) Winter (Dec, Jan, Feb) Table 0-1 Maximum Charge (MW) Charge Limiting Schedule 8:00 – 10:00 10:00 – 16:00 16:00 – 18:00 18:00 – 8:00 Spring (March, April, May) Summer (June, July, August) Fall (Sep, Oct, Nov) Winter (Dec, Jan, Feb) Table 0-2 1.17 Additional Requirements for Induction Generators Unless the EDC shall determine otherwise, there are no additional protection requirements applicable only to Induction Generators. 1.18 Additional Requirements for Synchronous Generators The following additional relay functions are required for Synchronous Generators. Settings for these relays shall be submitted to the EDC for review. See Appendix 4.2.8A for setting guidance. 1.18.1 Relays for Synchronous Generators a. 51V Over-Current (Voltage Control or Restrained). This element provides backup phase overcurrent protection for system faults under a collapsed voltage condition. b. 59G Over-Voltage (Ground). This element detects ground faults in the event that a ground N over-current source is lost. When studies show it can operate reliably, an alternative to the 59G is a 51N over-current (Ground). This element provides ground over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. c. 25 Synchronizing or Synch-Check. This element supervises the operation of the Generator automatic or manual synchronizing system by ensuring proper voltage phase angle matching and, where appropriate, slip frequency between the EPS and the Generating Facility before the breaker is allowed to close. 1.18.2 Relays settings for Synchronous Generators Any or all of the following additional relay functions may be required by the EDC. Settings for these relays shall be submitted to the EDC for review. See Appendix A for setting guidance. 1.18.2.1 32R Reverse Power. This element is used on systems designed as import only systems to ensure no power is exported onto the EPS. 1.18.2.2 32U Under-Power. This element performs a similar function to the 32R element, except it ensures the Generating Facility is always importing some level of power. 1.18.2.3 46 Negative Sequence Current. This element serves to protect both the EPS and the Generator system from system unbalances including single phasing. 1.18.2.4 51 Phase Over-Current. This element provides over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. 1.18.2.5 51N Ground Over-Current. This element provides ground over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. 1.18.2.6 67 Directional Phase Over-Current. This element provides directional phase over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. 1.18.2.7 67N Directional Ground Over-Current. This element provides directional ground over-current protection and operates with an inverse time-current characteristic when its current exceeds a predetermined value in a specified direction. 1.18.2.8 86 Lockout Relay. This auxiliary relay is electrically tripped by the Generating Facility protection and in turn trips the isolating circuit breaker(s). It can only be reset manually after all protective trips have been cleared. 1.18.3 Synchronizing Devices 1.18.3.1 The Generator shall designate one or more synchronizing device(s) such as motorized breakers, contactor/breaker combinations, or a fused contactor (if mutually agreeable) to be used to connect the Generating Facility to the EPS. This synchronizing device may be a device other than the Interconnection interrupting device. The synchronizing device must be capable of interrupting the current produced when the Generating Facility is connected out of phase with the EPS consistent with IEEE 1547, Section 4.1.8.3 as amended from time to time. 1.18.3.2 All synchronizing will be done by the Generator at the Generating Facility. The Generating Facility shall not be used to energize a de-energized EDC circuit. 1.18.3.3 In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. 1.18.3.4 All synchronizing schemes used for interconnecting a Generating Facility with the EPS must conform to the synchronizing requirements within the current version of IEEE 1547. Automatic synchronizing schemes are preferred. 1.18.3.5 The Generator shall provide relaying functions to clear both phase and ground short circuit faults on the EDC’s distribution circuit. The operating characteristics thereof shall be subject to review and approval by the EDC. 1.19 Closed Transition Generators 1.19.1 A closed transition, “make-before-break” Generating Facility must be synchronized with the EPS prior to transfer occurring. The transfer scheme will then parallel the Generating Facility with the EPS for less than 100 milliseconds. During this brief period, the load will be either transferred to the Generating Facility from the EPS or to the EPS from the Generating Facility. The design of the transfer scheme shall prevent the possibility of sustained parallel operation of the Generating Facility with the EPS. 1.19.2 The closed transition scheme and transition equipment used by the Generator must be reviewed and approved by the EDC prior to operation of the Generating Facility. The closed transition scheme must provide voltage, frequency and phase angle matching as appropriate to provide a smooth transition. It must also provide maximum paralleling time protection. This protection is described below in Section 4.6.3. 1.19.3 Protective relays isolating the Generating Facility from faults in the EPS shall not be required if the paralleling operation is automatic and takes place for less than 100 milliseconds. Maximum paralleling time protection must be provided by a separate device from the equipment used for control and paralleling of the generator and operation of the transfer switch. (See Appendix B for details on the required logic for this protection.) This protection shall (i) use a discrete solid-state timer (pneumatic timers are unacceptable for this purpose), (ii) be powered by the generator battery and (iii) trip an interrupting device (which may be the generator breaker) that ceases parallel operation of the generator. This requirement shall prevent sustained operation should the control equipment malfunction. 1.19.4 The parallel operation of a closed transition Generating Facility lasting 100 milliseconds or more requires the same protective relay functions as would a Generating Facility operating in sustained parallel operation with the EPS as described in these Technical Requirements. 1.19.5 The Generator, at a minimum, must perform the following functional tests after its transfer equipment has been energized, but before the closed-transition transfer is allowed on the EPS as a normal operation: a. Voltage, frequency, and phase rotation. b. Transfer test (maximum paralleling time must be less than 100 milliseconds); and c. Excessive parallel time test (when the EDC source switch fails to open), the protection must trip an interrupting device (which may be the Generating Facility’s breaker) that ceases parallel operation of the generator. The EDC must be notified ten (10) Business Days in advance of such testing so that it may, at its option, have its personnel observe the testing, and/or inspect the installation. 1.19.6 Before the approval of closed-transition transfer is granted by the EDC, the Generator must provide to the EDC a report attesting to the successful completion of the above testing. Upon receipt by the EDC of the approved test and inspection reports, along with a verification of the local Electrical Inspector’s approval, the EDC will issue a written notice of approval of closed-transition transfer to the Generator. 1.20 Open Transition Generating Facilities Connection of a Generating Facility with open transition transfer does not require an Interconnection Application and is permissible on the condition that such Generating Facility’s manual or automatic transfer switch will not allow any parallel operation of the Generating Facility with the EPS. This electrical state (i.e., open transition transfer) is typically referred to as “breakbefore-make,” which means that the Generating Facility’s transfer switch must be designed and operated to prevent the EPS-provided power and the Generating Facility-provided power from powering the Generator’s facility circuits (i.e., load) at the same time. Consequently, this mode of operation will also prevent the Generating Facility from potentially energizing the EPS. 1.21 Special Protection Systems 1.21.1 The EDC May Require additional anti islanding protection Whenever: 1.21.1.1 The minimum load to generation on a circuit creates the possibility that an unacceptable abnormal operating condition could occur. 1.21.1.2 It is determined that the Generating Facility’s protective relaying may not operate during certain conditions or faults; or 1.21.1.3 The installation could increase the length of outages on a distribution circuit or jeopardize the reliability of the circuit. The Generator shall be responsible for all costs and expenses incurred by the EDC to install additional anti-islanding protection. EDC may require a Dynamic Risk of Islanding Study in order to evaluate the risk of unintentional islanding. 1.21.2 High Speed Protection If the EDC determines that relaying used traditionally on the distribution system cannot operate quickly enough to avoid adverse system impacts, the EDC may require that the Generating Facility use either direct transfer tripping techniques or more sophisticated techniques that rely on protective relay communication to increase operating speed. 1.21.3 Recloser Schemes Any Generating Facility proposed for Interconnection at a point on the EPS that is supplied by an existing recloser scheme shall require special studies to determine the feasibility of that Interconnection as proposed. The Interconnection of the Generating Facility to the EPS shall not degrade the reliability of the EPS as a result of either its operation or changes to the EPS to accommodate the Interconnection. If the Generating Facility’s protection cannot be designed to meet these requirements, other anti-Islanding measures will be required (such as a dedicated circuit supply or DTT protective relaying from all EDC isolation points). Any changes to the EPS’s protective schemes or settings, or to the Generating Facility necessary to accommodate the Interconnection shall be at the Generator’s sole cost and expense. 1.22 Protection System Changes 1.22.1 The Generator shall provide the EDC with reasonable advance notice of any proposed modifications to the Generating Facility’s protective relay system, relay settings, operating procedures or other equipment affecting the Interconnection. The EDC will determine if such proposed modifications require re-acceptance of the Interconnection per the requirements of this Section 4. 1.22.2 The EDC shall provide the Generator with reasonable advance notice of any proposed changes to be made to its protective relay system, relay settings, operating procedures or other equipment that affects the Interconnection. Interconnecting Generators with Network Systems Other sections of these Technical Requirements are applicable to Generating Facilities interconnected with radial primary or secondary distribution circuits, the most common distribution configuration. In large cities, however, a number of electric utility companies use lowvoltage network systems. These low-voltage networks are of two subtypes: (1) the secondary grid network (also referred to as an area network, grid network, or street network) that serve; numerous sites, usually several city blocks, from a highly interconnected grid at 120/208 V, threephase; and (2) the Spot Network that serve independent, large buildings usually at 277/480 V, three-phase. When completed, the IEEE standard development project P1547.6, “Draft Recommended Practice for Interconnecting Distributed Resources with Electric Power Systems Distribution Secondary Networks”, will cover both secondary grid networks and Spot Networks. 1.23 Area Networks A Generating Facility proposed to be interconnected to the load side of an Area Network protector must utilize an inverter-based equipment package and, when aggregated with other inverter-based generation, shall not exceed 50 kW at any location. A location is defined as any manhole or service box. This criteria is designed to ensure that no more than 50 kW of DG is located between the same set (s) of cable limiters. In addition, the aggregate DG interconnected to an area network will be limited to 3% of the maximum network transformer connected kVA with the feeder supplying the largest number of network units out of service, or a maximum of 500 kW, whichever is less. 1.24 Spot Networks A Generating Facility proposed to be interconnected to the load side of Spot Network protectors must utilize an inverter-based equipment package and, when aggregated with other inverter-based generation, shall not exceed the lesser of five percent (5%) of a Spot Network’s maximum load or 50 kW. The inverter must be certified to stop conducting prior to the three (3) cycle response of the network protector relays. In addition, all the following requirements of IEEE 1547 must be met as amended from time to time: 1.24.1 Network protectors shall not be used to separate, switch, serve as breaker failure backup, or in any manner isolate a Generating Facility’s network or network primary feeder from the remainder of the EPS, unless such protectors are rated and tested per applicable standards for such an application. 1.24.2 Each Generating Facility connected to a Spot Network shall be coordinated with the EPS such that it will not affect the operation or prevent closing of any network protectors installed on the Spot Network. Such coordination shall be accomplished without any changes to prevailing network protector clearing time practices of the EPS. 1.24.3 Connection of the Generating Facility to the EPS shall be permitted only if the EPS network bus is already energized by more than 50% of the installed network protectors are in operation. 1.24.4 The Generating Facility’s output shall not cause any cycling of network protectors. The Interconnection of the Generating Facility shall not cause the network equipment loading and fault interrupting capacity to be exceeded. 1.24.5 Any Generating Facility installation on a Spot Network that utilizes an automatic transfer scheme in which load is transferred between the Generating Facility and the EPS in a momentary “makebefore-break” operation shall meet all the requirements of Section 5.2 regardless of the duration of paralleling. 1.24.6 The Generating Facility shall not utilize a stand alone inverter capable of operation independent of the EPS. Metering, Monitoring and Communication 1.25 Metering Metering requirements varies depending on the applicable Tariff. EDC to post metering requirement by Tariff on Company web page. a. For Eversource: Please refer to Information & Requirements for Electric Supply Below 600 Volts b. For UI: Please refer to Guidebook of Requirements for Electric Service and the UI Distributed Generation Webpage for additional DER Specific Requirements, and Metering Diagrams. 1.26 Monitoring and Communication All DER, regardless of technology, certified and non−cer fied DER equal or greater than 500 kW require SCADA visibility for standalone facilities and behind−the−meter facili es. However, on a case−by−case basis, the EDC reserves the right to require DSCADA visibility as required. Specific technical requirement will be published by EDC on each individual web page. The Generator shall be responsible for costs and expenses incurred by the EDC in connection with the purchase, installation, operation, maintenance, testing, repair or replacement of its metering and SCADA (supervisory control and data acquisition) equipment. Facility metering (and data acquisition, as required) equipment shall conform to EDC rules and applicable operating requirements. All metering devices shall conform to applicable American National Standard Institute (ANSI) C-12 standards, as amended from time to time. Metering of watt-hour, reactive volt-ampere-hour and the associated demand components should conform to ANSI standard C-12. Instrument transformers should conform to ANSI standard C57.13. This document only addresses SCADA required by the EDC and does not consider additional ISO-NE requirements. 1.27 Communications Channels and SCADA The EDC may require communications channels between the EDC and the Generating Facility. If so required, the Generator shall be responsible for procuring such communications channels and for providing protection from transients and over-voltages at both ends of such communication channels. The Generator shall be responsible for all costs and expenses incurred in connection with such communication channels. 1.27.1 SCADA Requirements 1.27.1.1 In order to facilitate safe, efficient and reliable operation of the EPS, any Generating Facility with a size of 500 kW or greater shall have telemetry equipment compatible with the EDC’s SCADA. The Generator shall be responsible for all costs and expenses incurred in connection with this telemetry equipment. The quantities to be telemetered are: (i) Phase Voltage; (ii) Line Current; (iii) Real Power (kW); (iv) Reactive power (kVAR); (v) and breaker disconnect status (open/closed) both at the generator and at the Point of Interconnection. The EDC may require the Generating Facility to have additional equipment, such as protective devices, supervisory control and alarms, and a dedicated communication channel(s). The EDC shall advise the applicant of its communications requirements after a preliminary review of the Generator’s Interconnection Request. 1.27.1.2 Monitoring, control, and information exchange requirements can be found at the EDC web pages. 1.27.1.3 For Eversource please refer to the DER Information and Technical Requirements. 1.27.1.4 For UI, further requirement details will be provided upon request. Testing and Maintenance Requirements All testing must be completed in accordance with the latest approved version(s) of IEEE 1547 section 5.0 and IEEE 1547.1. 1.28 Witnessing of Commissioning Test 1.28.1 The EDC shall have the right to witness the commissioning testing (pre-parallel testing) as defined in the IEEE 1547.1. The Generator shall notify the EDC ten (10) Business Days in advance of the testing so that the EDC may, at its option, have EDC personnel observe the testing, or inspect the installation. Prior to notifying the EDC of the testing, the Generator shall provide a copy of the test procedure, the as-built one-line and three-line metering and relaying diagram(s), and applicable relay control diagrams for EDC approval. An individual qualified and experienced in testing protective equipment must perform commissioning testing in accordance with the manufacturer’s recommended test procedure to prove the settings and requirements of these Technical Requirements. At the completion of the test, the Generator shall provide the EDC with a copy of the test report data. All witness testing will be conducted at the expense of the interconnecting generator. Testing typically includes, but is not limited to: a. CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests. b. VT and VT circuit polarity, ratio, insulation and continuity tests. c. Relay pick-up and

Text of UI-Attachment 5.pdf

Extracted from the file · 12,181 characters
Assessment details ID 8818 Name HAYLEY NELSON_New Engagement_06/10/2026 Organization Avangrid Management Company (CORPORATE) Description Approver Respondent HAYLEY NELSON Template New Engagement Workflow Third Party Risk Evaluation (CURRENT) Creator HAYLEY NELSON Date created 06/10/2026 01:33 PM Deadline Completed date 06/10/2026 01:35 PM Date submitted 06/10/2026 01:35 PM Last updated 06/10/2026 01:35 PM Stage Completed Approval stage Status Active Very high risks 0 High risks 0 Medium risks 0 Low risks 0 Total risks 0 Residual risk level None Residual risk score 0.0 Result Approved Result comments Third Party Review NERC CIP Review Primary record id 1524 Primary record name (Google) TEST Cybersecurity Objective Template version 54 Open risk count 0 Open info request 0 Tags 1 / 10 Submission Progress (%) 87 Assessment questions 1 Scope of Work 1.1 To begin, if this engagement involves multiple vendors, please select 'Multiple Vendor Engagement' in 1.2 1.2 Vendor Name (manufacturer or provider name) If the vendor you are using is not in this list, please request it here:OneTrust |Vendor Request Form Provide the name of the vendor that manufactures or directly delivers the product or service being evaluated. If you are soliciting bids from multiple resellers, list only the manufacturer or provider, not the resellers. If the engagement involves more than one manufacturer or provider, select “!Multiple Vendor Engagement!”. Response Google | Avangrid Management Company (CORPORATE) | Unknown Justification None 1.3 Engagement Name Type in your current engagement name and then click on the dropdown below that says "Add: [Engagement Name]" This is similar to your project name. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective 1.4 Has this engagement been awarded to a third party by Avangrid Purchasing? If you are soliciting bids from multiple resellers, but there is only one manufacturer/provider, select 'No (Single Third Party)'. If the engagement involves more than one manufacturer/provider, select 'No (Multiple Bidders, RFP/RFI, etc.) and ensure your choice to Question 1.2 states 'Multiple Vendor Engagement'. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No (Single Third Party) Justification None Vendor Website Address 2 / 10 1.6 Vendor Website Address Response Google | Avangrid Management Company (CORPORATE) | Unknown Response google.com Justification None 1.7 Who is the primary point of contact for this project or purchase? Avangrid Employee or Avangrid Contractor information only, not for external use* Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response HAYLEY NELSON Justification None 1.8 Who is the secondary point of contact for this project or purchase? Avangrid Employee or Avangrid Contractor information only, not for external use* Response Not answered Justification None 1.9 Business Area Managing this Relationship Please type your specific Business area, for example: Business Area: Third Party Risk Management Line of Business = Corporate Security Response CSRO 1.10 Line of Business Select ALL that apply Response Corporate Security & Resilience | Avangrid Management Company (CORPORATE) | United States Justification None 1.11 Which Avangrid companies does this engagement apply to? Select ALL that apply Response Avangrid Management Company (Corporate) | Avangrid Management Company (CORPORATE) | United States Justification None 3 / 10 1.12 Please provide a short description of the Scope of Work (SOW) for this engagement, including the data, connection, or services in this engagement. Provide enough information so the evaluators understand the purchase or engagement. Attach the SOW or additional documentation to this question using the paperclip icon below or at the end of this evaluation. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response TEST Justification None 1.13 Framework Agreement Number Optional Response Not answered Justification None 1.14 Is this a part of a global (Iberdrola) purchase or being purchased off of a global (Iberdrola) framework agreement? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 1.17 Does the scope of work relate to a regulatory project? DER/DG Interconnections, Aggregators, or Customer Energy Consultants, ESE, Rate Cases, etc. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 1.19 Is this engagement a continuation of existing work with this vendor (e.g., renewal, extension, rebid, or new SOW for similar services)? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 4 / 10 2 Qualification Questions 2.1 Is the Scope of Work (SOW) related only to a materials purchase or a non-technical service? Non-technical examples: General upkeep of facilities or equipment; lawn mowing, snow plowing, paving, landscaping, tree trimming, catering, etc. Material examples: cables, work gloves, pens, fuses, ladders, food, etc. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response Yes (only materials purchase or non-technical service) Justification None 2.2 Will the engagement require a vendor to view, access, transmit, store, or process PERSONAL DATA belonging to Avangrid employees, customers, or contractors? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 2.3 Will the vendor have access to any Avangrid-owned or Avangrid-managed information or data as part of this engagement? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 2.4 Will the engagement require the vendor to acquire, develop, use, or access any websites, portals, applications, software licenses, systems, or IT/OT infrastructure (including industrial equipment with processing capabilities)? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None Does the equipment, system, or service involved in this engagement require or enable routable connectivity between Avangrid systems and ERCOT (Electric 5 / 10 2.5 Does the equipment, system, or service involved in this engagement require or enable routable connectivity between Avangrid systems and ERCOT (Electric Reliability Council of Texas) systems? This question determines whether the engagement falls within the scope of LSIPA reporting, which applies only to equipment purchases that have been identified as having routable connectivity between Avangrid systems and ERCOT systems. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 2.7 Is this a procurement of goods or services from suppliers owned, controlled, or otherwise connected to the Peoples Republic of China, Russia, North Korea, Iran, Cuba, Venezuela, or Belarus? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 2.9 Will this engagement involve the purchase of a drone, aerial photography utilizing drones, or any equipment or services related to drones? Avangrid prohibits the purchase and operation of DJI and Autel drones. ​Please Review the Avangrid UAS Grid Protection Rule Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 2.12 Will the scope of work relate to or impact the Bulk Electric System (BES) or any NERC CIP asset or site? The BES includes all transmission elements operated at 75 MW or higher and interconnected at 100 kV or higher, as well as real and reactive power resources interconnected at 100 kV or higher. It does not include facilities used solely for local electric energy distribution. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None Will the scope of work require physical access to any Avangrid controlled space? 6 / 10 2.13 Will the scope of work require physical access to any Avangrid controlled space? To include installation or maintenance within the scope of work. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 2.16 Will the scope of work relate to a critical business process or asset? Please review the Critical Process Definition linked below ​Critical Process Definition Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 6 Document Submission & Attestation 6.1 Please Submit all Supporting Documentation Here Attach all applicable materials, including prior contracts, SOWs, technical documentation, RFP information, and bid specifications. Ensure all previously completed requirements are included (Annex 1 Data Security Rider, Annex 2 Questionnaire, Annex 11 CIP-013 Controls, and any prior Third‑Party Risk Exceptions).* Using the following paperclip icon below the text box Response TEST 6.2 Are you currently working with an Avangrid Attorney on this engagement? Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None I attest all information provided is true and accurate to the best of my knowledge. 7 / 10 6.4 I attest all information provided is true and accurate to the best of my knowledge. Response Yes Justification None 6.5 THE FOLLOWING SECTIONS ARE FOR THIRD PARTY REVIEW ONLY. PLEASE CLICK SUBMIT IN THE BOTTOM RIGHT AS SHOWN HERE. ​ If the submit button is greyed out, please check the left side for a red *. This asterisk * means a required field was skipped. 6.6 THIRD PARTY TEAM ONLY - I have reviewed this Third Party Risk Evaluation Response Yes Justification None 6.7 TPRM Passcode - THIRD PARTY TEAM ONLY This Question is for the TPRM Team ONLY - Do not answer this if you are not on the Corporate Security & Resilience Third Party Risk Management Team. Response 3 OneTrust 2 Justification None 7 Third Party Review [FOR THIRD PARTY TEAM REVIEW ONLY] 7.1 Third Party Notes (Internal Only) Notes for Third Party Team Review Only Response Not answered Justification None 7.2 Third Party Review Date Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response 06/10/2026 Justification None Security Scorecard Score 8 / 10 7.3 Security Scorecard Score Response Google | Avangrid Management Company (CORPORATE) | Unknown Response 87 Justification None 7.4 Recorded Future - Risk Score Response Google | Avangrid Management Company (CORPORATE) | Unknown Response Not answered Justification None 7.5 Risk Level Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response Medium Justification None 7.6 Third Party Recommendation Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response NDA Justification None 7.7 Does this engagement involve the use of AI? Additional requirement of the AI Annex will be sent to the business area. Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None Comments to Business Area 9 / 10 7.8 Comments to Business Area Any comments put in this box will be sent to the business area. Response Not answered Justification None 7.11 Send to NERC Team Response Google | Avangrid Management Company (CORPORATE) | Unknown TEST Cybersecurity Objective Response No Justification None 7.13 Reminder to Third Party Team Hit the COMPLETED button ---------------> Assessment notes 10 / 10

Text of UI-Attachment 6.pdf

Extracted from the file · 55,805 characters
Avangrid Third-Party Risk Management Rule Corporate Security & Resilience / Policy & Governance Third-Party Risk Management Rule October 2025 Document Name: Third-Party Risk Management Rule (“Rule”) Company: Applicable to Avangrid Inc. (“AVANGRID”), and its subsidiary companies (collectively the “AVANGRID Group”) Date: October 2025 Purpose: AVANGRID depends on Third Parties for the provision of services and the execution of operations. These dependencies have the potential to create risks to the company, including Cybersecurity and Data Protection, which must be properly understood and mitigated. This Rule establishes common criteria and guidelines across the AVANGRID Group for the management of the Cybersecurity and Data Protection risks derived from the Group’s relationship with Third Parties. Owner: Chief Security Officer – AVANGRID Updating Document: The Owner shall review and update this Rule as necessary. The initial document and any material changes to the document must be reviewed and acknowledged by the AVANGRID Chief Security Officer. The acknowledged date and approval date are noted in the table below. Update to 2021 Approved Rule - complete revisions to rule identifying process and methodology. _________________________________ Brian Harrell, VP & Chief Security Officer October 1, 2025 ___________________________________ 2 Internal Use Third-Party Risk Management Rule October 2025 Table of Contents 1. Purpose & Scope ........................................................................................................................... 5 2. Third-Party Risk Management Basic Principles................................................................... 5 3. Definitions .........................................................................................................................................6 4. Methodology ................................................................................................................................... 8 5. 4.1 Data Sensitivity and Classification .......................................................................................9 4.2 Timeline for the Evaluation Process ................................................................................... 10 4.3 How to locate the Third-Party Risk Evaluation Form:..................................................... 10 4.4 Submission and Review Process ........................................................................................ 10 4.5 Further Assessments and Documentation ........................................................................ 11 4.6 Special Evaluation Circumstances ..................................................................................... 12 4.6.1 Framework Agreements .................................................................................................. 12 4.6.2 RFP/RFI’s ............................................................................................................................ 13 4.6.3 Energy Service Entities (ESEs) ....................................................................................... 14 4.6.4 Interconnections: .............................................................................................................. 15 4.6.5 Payment Authorization Order Invoices: ....................................................................... 15 4.7 Continuous Risk Monitoring and Contract Termination ................................................. 16 4.8 Additional Reviews and Documentation ........................................................................... 18 4.9 SOP-66 Response TPRM Vendor Breach Process & Responsibilities ....................... 19 4.10 Third-Party Contractual Risk Acceptance (Previously Risk Exception) .................... 20 4.11 General Provision .................................................................................................................. 22 Roles & Responsibilities............................................................................................................ 22 5.1.1 Requestor (Project Manager, Business Area, etc.) ......................................................... 22 5.1.2 Corporate Security & Resilience ........................................................................................ 22 5.1.3 Corporate IT ............................................................................................................................ 25 5.1.4 Procurement and Vendor Management ........................................................................... 26 5.1.5 Legal Services ........................................................................................................................ 26 5.1.6 Corporate Risk........................................................................................................................ 26 5.1.7 NERC Reliability & Assurance............................................................................................. 26 5.1.8 CEII Team................................................................................................................................. 27 3 Internal Use Third-Party Risk Management Rule October 2025 5.1.9 Other Relevant Teams.......................................................................................................... 27 6.1. Prohibited Countries ............................................................................................................. 28 7. Related and Dependent Policy Compliance. .................................................................. 28 4 Internal Use Third-Party Risk Management Rule October 2025 1. Purpose & Scope Purpose: The protection of Avangrid cyber, physical and information assets is driven by business, legal, regulatory, financial and operational requirements. Avangrid depends on Third Parties for the provision of services and the execution of operations. These dependencies have the potential to create Cybersecurity, Physical Security, and Data Protection risks to the company which must be properly understood and mitigated. Scope: The purpose of this Third-Party Risk Management Rule (hereinafter, the “Rule”) is to establish common criteria and guidelines across Avangrid for the management of Cybersecurity, Physical Security, and Data Protection risks derived from Avangrid’s relationships with Third Parties. The Rule is intended to supplement the Global Third-Party Cyber Risk Management Rule and align with Iberdrola policies and rules. Application: The Rule is the set of process controls which Avangrid employees will follow when considering procuring goods and services from a Third-Party. This Rule applies to Avangrid, its subsidiaries, and all its employees in connection with all their activities, regardless of location. Capitalized terms shall have the meaning set forth in Section 3 of this Rule. 2. Third-Party Risk Management Basic Principles Responsibility: Identification and mitigation of Cybersecurity, Physical Security, and Data Protection risks stemming from a relationship with a Third-Party, is the responsibility of the business or corporate area contracting the service, with the support, tools and procedures provided by Corporate Security. Risk Determination: The potential to introduce Cybersecurity, Physical Security, and Data Protection risks to the Company shall be determined based on the nature of the ThirdParty relationship. This includes, but is not limited to: • • • • • • Access to Avangrid information/data and the type (classification) of information/data involved. Access to the Group IT or OT Network infrastructure and type of connectivity. Provision of applications, websites, or information systems. Cloud services, development or maintenance of information systems; and Compliance risk with applicable regulations (Data Protection, Cybersecurity, Critical infrastructure, etc.). Any international connections which could affect supply chain or security. 5 Internal Use Third-Party Risk Management Rule October 2025 Lifecycle Management: In line with industry best practices, Cybersecurity, Physical Security, and Data Protection risks shall be managed and controlled throughout the entire lifecycle of the relationship with the Third-Party, from the start of the procurement process to the termination of provisioning, based on risk. Integration: Third-Party services and associated processes, infrastructure, users, resources, etc. shall be integrated into existing internal Cybersecurity management and oversight mechanisms to the extent possible. 3. Definitions Bid Evaluation Technical Report (ITEO): Report prepared by Avangrid requesting Business containing a summary of the offers received in a specific tender, objectively evaluating the technical, Cybersecurity, Physical Security, and Data Protection, environmental and quality aspects thereof, and objectively concluding on which are the valid vendors. Evaluation: Third-Party Risk Management tool used to engage Corporate Security in the procurement of Third-Party products and services. Services/Materials Agreement: Contractual relationship with a Supplier, including the terms and conditions agreed upon, which identifies the equipment, materials, works and services to be acquired. Framework Agreement: An internal, system mechanism, under which Call-Off Purchase Orders can be made throughout the duration of the Contract or Agreement. Requesting Organization can directly release Purchase Orders against the Framework Agreement for their specific requirements. Call-off Orders may be released up to the approved value of the Framework Agreement. Information/ Data Owner: An information/data owner is a manager or above (or his/her designees), who is responsible for ensuring the classification and identification of security requirements applicable to the information he/she owns is done properly and in accordance with internal rules and external regulations. It will be identified whenever the information he/she owns is being stored, processed or transmitted by a System / Asset Owner belonging to a different organizational area. 6 Internal Use Third-Party Risk Management Rule October 2025 Owner/Manager: A member of the requesting business or corporate area which manages the relationship with the vendor and for which the Third-Party provides products or services. Personal Data: Any information relating to an identified or identifiable natural person (“data subject”); an identifiable natural person is one who can be identified, directly or indirectly, in particular by reference to an identifier such as a name, an identification number, location data, an online identifier or to one or more factors specific to the physical, physiological, genetic, mental, economic, cultural or social identity of which natural person. Requesting /Organization: Business or corporate area which initiates a purchasing process. Requestor: A member of the requesting business or corporate area responsible to manage the purchasing process on behalf of the requesting business. The service requestor might be the same as the service owner. Request for Proposal (RFP): The process within the Procurement organization requesting a product or service, including detailed technical specifications and any other documents needed to ensure that the proposal is clear and unbiased; to encourage competition and equal opportunities. Technical Specification (TS): Document(s) prepared by the Requesting Organization describing business and technical requirements for the tender. Third-Party: Any natural or legal person which, not being an employee or member of the administrative bodies of the Iberdrola Group (the Group), which manages information assets owned by the Group, either in its own infrastructure or within the Group’s infrastructure, or who has access to the latter, and particularly those who meet any of the following conditions: • • • • • Provide cloud services in any of its modes. Have access to sensitive, critical or confidential customers or employees, business, strategic or financial information or information related to the Group's critical infrastructure and systems protection mechanisms. Are involved in the processes or development, integration, maintenance and/or operations of the Group’s systems and components or, Have physical access to the Group's facilities and to critical infrastructure. Third parties include among others, vendors, consultants, partners, regulators and government agencies. 7 Internal Use Third-Party Risk Management Rule October 2025 Cybersecurity Risk: The potential for loss or harm resulting from threats to digital assets, information, or technology. Cybersecurity risks relate to the loss of confidentiality, integrity, or availability of information, data, or information (or control) systems and reflect the potential adverse impacts to organizational operations (i.e., mission, functions, image, or reputation) and assets, individuals, other organizations, and the Nation. Data Protection Risk: The potential for loss of, or damage to sensitive or confidential information from threats to Avangrid information security, including Personal Data resulting in Privacy concerns. Artificial Intelligence (AI): Technology that enables computers and machines to simulate human learning, comprehension, problem solving, decision making, creativity and autonomy. 4. Methodology All Products and/or Services procured for Avangrid shall be subject to a Third-Party Risk Evaluation. TPRM must review any purchase of a product or service which may affect IT/OT infrastructure, company data, BES cyber asset, critical business processes, or similar like purchases to evaluate Cybersecurity, Physical Security, or Data Protection risks to the company, regardless of the type of purchase it is (i.e. Centralized, Agile, Direct, etc.). The purpose of the Evaluation is: • • • • • • Determine if the product or service has the potential to create a Cybersecurity, Physical Security, or Data Protection risk to the company. Identify Cybersecurity, Physical Security, and Data Protection requirements in the technical specifications to mitigate risks. Determine the need to perform a comprehensive Cybersecurity risk assessment of potential vendor(s). Identify advisable monitoring and assurance controls throughout the lifecycle of the vendor engagement. Ensure compliance with relevant NIST, ISO, and NERC CIP standards as well as other applicable regulatory requirements and industry best practices. Integrate Cybersecurity Supply Chain Risk Management (C-SCRM) practices to evaluate and mitigate risks associated with suppliers and their supply chains. 8 Internal Use Third-Party Risk Management Rule October 2025 • • • • 4.1 Evaluate Non-Financial Information (including ESG Objectives) factors to ensure suppliers adhere to ethical practices. Implement continuous monitoring to detect and respond to new risks throughout the vendor engagement’s lifecycle. Identify the use of AI to protect company data. Assess additional risk factors beyond Cybersecurity, Physical Security, and Data Protection Risk, including financial stability, operational resilience, regulatory compliance, and other supply chain risk factors. Data Sensitivity and Classification Data classification is a critical and foundational component of the Third-Party Risk Management process, and the Requestor must adhere to the Avangrid Data Classification and Treatment Rule. It is the responsibility of the Subject Matter Expert (SME), manager, or director overseeing the engagement to accurately classify the data involved and communicate this classification to the Third-Party Risk Management Team during the evaluation process. 4.1.1 Data Classification Responsibilities: SMEs, managers, and directors must assess the sensitivity of the data involved in the Third-Party engagement. Data should be classified according to Avangrid's data classification standards (e.g., public, internal use, confidential, restricted secret). The classification must be documented and communicated to the Third-Party Risk Management Team. All data classification and handling must comply with the Avangrid Data Classification and Treatment Rule, ensuring appropriate security measures are applied to reduce the risk of unauthorized access, disclosure, alteration, and destruction of Avangrid information/data. 4.1.2 4.1.3 Evaluation Process: The Third-Party Risk Management Team will use the data classification information to determine the appropriate level of risk evaluation and monitoring. Confidential and Restricted classified data will require more stringent security controls and assessments. Ongoing Responsibility: 9 Internal Use Third-Party Risk Management Rule October 2025 SMEs, managers, and directors must ensure any changes in data sensitivity are promptly communicated to the Third-Party Risk Management Team. Regular reviews of data classification should be conducted to ensure accuracy and compliance with Avangrid's policies. 4.2 Timeline for the Evaluation Process The Third-Party Risk Evaluation process shall follow the timeline below: • • • Initial Screening: The TPRM Team has a 5-business day Service Level Agreement (SLA) to review the initial Third-Party Risk Evaluation. Reliability Assurance Assessment: If the purchase may be in scope for CIP-013, additional time may be needed for the NERC CIP team to review the Third-Party Risk Evaluation. Contractual or Supplemental Security Assessments: The TPRM Team has a 10-business day SLA to review any additionally required contractual or supplemental Security Assessments. 4.3 How to locate the Third-Party Risk Evaluation Form: The Third-Party Risk evaluation form is located on the Corporate Security & Resilience Office SharePoint site, within the Third-Party Page. Additional contractual documents which may be required are located in the Contractual Documentation page on the Third-Party SharePoint site. 4.4 Submission and Review Process The Requester shall notify the Third-Party Risk Management Team by submitting the Third-Party’s name and active website via the Risk Evaluation. Review of the Risk Evaluations by Corporate Security and Resilience Office will determine Risk Security Assessment requirements. The Third-Party Risk Evaluation may include a request for an overview of the proposed and/or existing Third-Party relationship with the Third-Party. 10 Internal Use Third-Party Risk Management Rule October 2025 It is the responsibility of the Requestor to communicate the determined Cybersecurity, Physical Security, & Data Protection Security Assessment requirements to the Third-Party. The Requestor is responsible for obtaining completed Risk Security Assessments from the Third-Party and submitting them to the Third-Party Risk Management Team for review. The Requestor is responsible for identifying the classification level of data shared, stored or processed by the Third-Party. 4.5 Further Assessments and Documentation Based on the review of the initial Evaluation, the Corporate Security and Resilience Office may determine the need to perform further Third-Party assessments of Cybersecurity and/or Data Protection controls. • An email notification will be sent to relevant teams including but not limited to Cybersecurity, OT Cybersecurity, Threat Management Intel, Data Protection, and others as necessary, informing them of the need for further assessments and documentation. This ensures all relevant stakeholders are aware and can provide input as needed to fully mitigate the risk to Avangrid. Once Corporate Security has received and reviewed the initial Evaluation and any additional requested documentation, the need for the following information and/or documentation will be determined and communicated to the Requestor via email: • • • • Need for a Data Security Rider (DSR) or other contract security Annexes. Cyber Insurance recommendation. o Questions regarding cyber insurance amounts should be directed to the Avangrid Insurance team at: [email removed]. Other relevant materials, e.g. data flow diagrams, design specifications, System & Organizational Controls 2 (SOC 2), CIP-013 documentation, or the use of AI, etc. Requests for Corporate Security, Subject Matter Expert (SME) participation in Data Security Rider (DSR), and other materials review with the business 11 Internal Use Third-Party Risk Management Rule October 2025 • and/or the Third-Party, shall be coordinated by the Project Manager/Business Requester. Corporate Security shall require 10 business days to schedule a materials review. 4.6 Special Evaluation Circumstances Conducting a thorough Third-Party Risk Evaluation is essential to identify and mitigate Cybersecurity, Physical Security, and Data Protection risks. This section outlines specific unique situations requiring a possible variation to the Third-Party Risk Evaluation process. 4.6.1 Framework Agreements Recognizing the need to maintain an auditable record of all purchases to ensure compliance with NERC and the Third-Party Risk Management Rule, while also balancing the Business Area’s administrative workload and need to remain flexible in multi-PO Framework Agreements, the following approach is designed to avoid multiple redundant evaluations: • • • The Business Area (except in the case of those engagements already deemed in NERC-CIP scope) can use the original completion/approval email from the TPRM tool as evidence the Third-Party Framework Agreement was evaluated and all relevant Cybersecurity Risk paperwork (or risk exceptions) were completed, received, approved, and filed with the Third-Party Risk Management Team. In lieu of the need for multiple evaluations within the Framework term, the Business Area can submit a quarterly Third-Party Risk evaluation via the ThirdParty Risk Evaluation Form located on the Corporate Security & Resilience SharePoint Site. o It is incumbent on the Business Area to track and submit its quarterly reporting and communicate about the reporting with the TPRM program. The Business Area must ensure the evaluation accurately and clearly reflects: o The relevant purchase number for identification o The SAP Vendor Number 12 Internal Use Third-Party Risk Management Rule October 2025 • • • • o Identifies within the free text “scope of engagement box,” which submission is the quarterly filing under the Framework Agreement and provide the original Third-Party ID number (5- or 6-digit number). o Attach a document which details, at minimum, all PO reference numbers, date, payment amounts, and payee (either by number or name reference) for the reporting quarter. The Business Area will ensure purchases are within the scope of the original Framework. This evaluation will allow Third-Party to perform any due diligence necessary to mitigate ongoing risk and will serve to satisfy the audit needs. This methodology will not supersede requirements to require High Risk and Very High-Risk Third-Party engagements to provide updated documentation when required. This process will continue to be adjusted to meet both Third-Party Risk Management and Business Area needs while maintaining compliance with policy and regulatory requirements. 4.6.2 RFP/RFI’s 1. To ensure comprehensive risk management and compliance with Avangrid’s security standards, all Requests for Proposals (RFPs) and Requests for Information (RFIs) must undergo the Third-Party Risk Management (TPRM) process. • During RFP/RFI creation, the Requestor should anticipate submitting two (2) Third-Party Evaluations. The initial evaluation will risk rank the Scope of Work (SOW) within the RFP/RFI. A follow-up evaluation will include the assessment of any required cybersecurity materials and the review of a DSR if necessary. This evaluation needs to be completed by the TPRM Team before a contract is signed with the Third-Party. • The TPRM Team strongly suggests a requirement of all bidders on High Risk/Very High-Risk RFPs/RFIs to submit the anticipated cybersecurity documents without the DSR (which can be completed by the selected bidder at the time of negotiating the final contract.) With the cybersecurity documents submitted at this point in the Procurement Process, the Requestor can utilize the TPRM Team’s review of the bidders’ cybersecurity profile and history as part of the technical review in the bid process. 13 Internal Use Third-Party Risk Management Rule October 2025 2. Below outlines the necessary steps and responsibilities for the requesting organization and the TPRM Team to effectively evaluate and manage Third-Party risks during the RFP/RFI stage and before awarding a bid to a Third-Party. • The Requestor must identify the engagement as being in the RFP/RFI stage within the TPRM Risk Evaluation. • The TPRM Team will provide an initial recommendation regarding the anticipated Cybersecurity documentation required to mitigate the risk or indicate if no further Cybersecurity documentation will be needed. • This initial evaluation is based only on the SOW and does not factor in all risk or supply chain concerns. Therefore, it is not a final risk ranking approving the engagement with a Third-Party. • The Requestor is responsible to ensure any Third-Party contracted to complete the SOW of an RFP has been evaluated by TPRM. • TPRM suggests within the ITEO process, a Third-Party evaluation is conducted for all submitted bidders as part of the technical evaluation within this part of the Procurement Process. • Upon submitting the new evaluation for the Third-Party intended to contract to complete the SOW, ensure the original Third-Party Evaluation ID Number is referenced in the appropriate section of the new evaluation form. • The TPRM Team will conduct a final review of the Third-Party(s) intended to contract to complete the SOW. • Define the specific requirements needed to complete the process, ensuring all necessary steps are followed as outlined in the Methodology section 4.6.3 Energy Service Entities (ESEs) ESE are Third-Parties which provide energy or perform an energy related service. When considering the risk to the Company of an ESE, Customer data is usually the primary focus. Therefore, best practice dictates any data is shared via a customer consent mechanism. The data shared should be documented by an evaluation to Third-Party in order to monitor the ESE in the event they are affected by a data security incident. Ultimately, the standard of review will be dictated by the data requested to be shared and a historical Cybersecurity analysis of the Third-Party. 14 Internal Use Third-Party Risk Management Rule October 2025 4.6.4 Interconnections: Interconnections are Third-Parties which connect directly or indirectly to the electrical grid. These types of Third-Parties include DERs/DG energy entities, Aggregators of meter energy generation, or Aggregators which facilitate connection to DERs/DGs. While these entities often are registered and evaluated by utility commissions and regional ISOs, TPRM will conduct its own evaluation for risk and inventory concerns. When interconnecting Third-Party systems with Avangrid’s infrastructure, it is crucial to ensure comprehensive security and regulatory measures are in place to protect sensitive information and maintain operational integrity. The following shall be considered: • Data Security Agreement (DSA): Use a Data Security Agreement (DSA) instead of a Data Security Rider (DSR) for managing interconnections between Avangrid and Third-Party systems, as a DSA is specifically focused for this type of engagement. • Security Controls Evaluation: Evaluate the security controls of Third-Party systems which will interconnect with Avangrid’s infrastructure. • Risk Mitigation: Identify and mitigate potential risks associated with data exchange and system integration. • Compliance Assurance: Ensure compliance with Avangrid’s Cybersecurity policies and standards, as well as relevant regulatory mandates. • DSA Documentation: Ensure that the DSA includes detailed security requirements, data handling procedures, and compliance obligations. 4.6.5 Payment Authorization Order Invoices: A PAO is an internal purchasing document which is required for enabling and documenting the payment of certain contracting categories which do not require purchasing activity. PAOs are used for payment obligations where there is no possibility to negotiate with a vendor and all PAO concepts must be previously approved by the Purchasing Department. (Accounts Payable Policy, Section 5.2. & Appendix A) 15 Internal Use Third-Party Risk Management Rule October 2025 TPRM recommends before the Purchasing Department approve a PAO, the vendor is submitted to TPRM for evaluation of risk and to maintain a complete inventory of Third-Parties. The Purchasing Procedure provides guidance to comply with the Avangrid Purchasing Risk Policy for the Avangrid Group which establishes a global framework for monitoring and managing the risk resulting from the purchasing activities undertaken for the procurement or contracting of equipment, materials, works and services throughout the Group. The procedure detailed in this document, does not apply to any fuel, energy, raw material purchases, real estate, contracts with municipalities, government agencies, legal services, financial services and other Payment Authorization Orders (PAO), where there is no possibility for negotiation and this concept has been previously approved by the Purchasing Department. (Avangrid Purchasing Procedure, Section 1) 4.7 Continuous Risk Monitoring and Contract Termination Corporate Security and Resilience Office will continuously monitor specific third parties identified in the Third-Party Risk Evaluation process. This includes, for example, defining alert rules to notify the Third-Party Risk Management Team of new incidents, data breaches, merger/acquisitions, and/or decrease in security scoring tool score. TPRM will notify procurement and the business requestor of a significant change or risk. Additionally, Corporate Security and Resilience Office will provide Project Managers/Business Requesters with an annual Third-Party status report. All Third Parties ranked High and Very High Risk will be subject to a Continuous Risk Monitoring (CRM) Process after the initial risk evaluation is completed. Third Parties ranked Medium Risk will be reviewed on an ad hoc basis within the CRM Process. The CRM Process will consist of: • Continuous monitoring within Vendor Risk Management Solutions1 by defining alert rules to notify TPRM of new data security incidents, mergers/acquisitions, decrease in Cybersecurity score, and other risk areas as applicable to the scope of work in the initial engagement. Currently Avangrid Corporate Security and Resilience employs the use of Security Score Card and Recorded Futures as its Vendor Risk Management Tools. 1 16 Internal Use Third-Party Risk Management Rule October 2025 • Regular Audit and Risk Review of High Risk and Very High Risk Third Parties during the contract lifecycle. The Audit and Review of Very High Risk Third Parties may consist of: • • • • Annual evaluation (proactive) of the Third-Party within the Vendor Risk Management Solutions as defined above. A request (not to extend beyond 18 months) to the Third-Party to re-submit an updated Annex 2 NATF Questionnaire for review by TPRM. Upon analysis of the above, if there is any significant change or issues of concern TPRM will conduct a more thorough review. This review should include, as appropriate, the re-submission and review of Business Continuity Plans, Incident Response Plans, Communication Plans, Cybersecurity Policies and Procedures, Training & Awareness activities as well as an onsite inspection. The analysis will be a new review considering the initial scope of work and information provided by the Third-Party and regarding current threat intelligence. The Audit and Review of High Risk Third Parties may consist of: • • • • Continuous monitoring (reactive) within Vendor Risk Management Solutions as defined above. A semi-annual request (not to extend past 24 months) to the Third-Party to resubmit an updated Annex 2 NATF Questionnaire for review by TPRM. Upon analysis of the above, if there is any significant change or issues of concern TPRM will conduct a more thorough review. This review may include, as appropriate, the re-submission and review of Business Continuity Plans, Incident Response Plans, Communication Plans, Cybersecurity Policies and Procedures, and Training & Awareness activities. Any analysis will consider the initial scope of work compared to the information provided by the Third-Party. The Audit and Review of Medium Risk Third Parties may consist of: • Review of Medium Risk Vendors may be conducted only in special risk circumstances, including but not limited to: 17 Internal Use Third-Party Risk Management Rule October 2025 • • a. Consultants with access to confidential or restricted data as a scope of work, b. Medium Level NERC-CIP assets, c. An ad hoc review of the Third-Party’s Cybersecurity profile within Vendor Risk Management Solutions as defined above. If there is any significant change or issues of concern arising from above, TPRM may request an Annex 2 NATF Questionnaire for review by TPRM. Annual Reviews and Audits: For engagements involving confidential or restricted data, the Corporate Security and Resilience Office shall require annual reviews and audits to ensure ongoing compliance with security and Data Protection requirements. This includes reassessing risks and updating security controls as necessary. Additionally, the Corporate Security and Resilience Office reserves the right to audit low-risk engagements or those which fall under the internal classification, as well as request any additional reviews, documentation, or actions deemed necessary to address emerging risks or compliance requirements not explicitly covered in this policy. Upon contract termination, the Requester shall ensure, as applicable: • The termination of all digital identities and access rights to include those of contractors. • The return of equipment and devices provided by Avangrid. • The destruction, or return by secure storage, of Avangrid information/ data. • Secure disconnections from Avangrid’s cyberinfrastructure. • Closure/ deregistering of IP addresses, domains, applications and web sites. • Closure / decommission of any platform or mechanism used for information exchange. • Verification of supplier access to organizational resources is deactivated. 4.8 Additional Reviews and Documentation If a risk with a vendor is identified at any point during the engagement, the TPRM Team reserves the right to require additional reviews and documentation. This may include, but is not limited to: • • Comprehensive Risk Assessments: Conducting further risk assessments to evaluate the identified risk and its potential impact on the company. Updated Security Documentation: Requesting updated security policies, procedures, and controls from the vendor. 18 Internal Use Third-Party Risk Management Rule October 2025 • • • • Incident Reports: Requiring detailed reports on any incidents, breaches, or security concerns which have arisen. Mitigation Plans: Requesting a detailed plan from the vendor outlining steps to mitigate the identified risk. Regular Audits: Scheduling regular audits and reviews to ensure ongoing compliance with security and Data Protection requirements. Enhanced Monitoring: Implementing enhanced monitoring measures to detect and respond to new risks promptly. 4.9 SOP-66 Response TPRM Vendor Breach Process & Responsibilities If Corporate Security & Resilience receives information about a possible security event/breach of a Third-Party vendor, the Third-Party Risk Management (TPRM) team is responsible for managing its internal process to determine if, or to what extent, Avangrid is affected. The TPRM Team will conduct their investigation consistent to SOP 66. 1. FOLLOW-UP ACTIVITY a. TPRM will continue to collaborate with our business partners to ensure the vendor is contacted, Avangrid receives regular updates from the vendor including the extent of the overall impact if any and what mitigation steps the vendor has taken to prevent reoccurrence. b. TPRM will continue to update the Kaseware Third-Party Breach Investigation Form of relevant updates received. c. In a confirmed, direct cyber event, the C-SIRT team is responsible for collecting information and managing technical issues. d. The Incident Response Team (IRT) will work with C-SIRT and other Corporate Security and business areas to set a regular update schedule, via email or calls depending on the situation, so departments can provide updates, and key stakeholders can be provided regular updates on the situation and investigation status. e. If the cyber breach is determined to be an incident, the UIRP will take the lead on managing communications. 19 Internal Use Third-Party Risk Management Rule October 2025 4.10 Third-Party Contractual Risk Acceptance (Previously Risk Exception) In rare circumstances, the Requestor may need to continue to contract with the Third-Party although the required Cybersecurity documentation has not been completed. In those cases, the Requestor can submit a Third-Party Contractual Risk Acceptance the Requestor will need to submit a Third-Party Contractual Risk Exception if a Third-Party will not comply with the required contractual documents or the residual risk remaining to Avangrid remains extremely high and use of the ThirdParty cannot be recommended. Before the Requestor seeks a risk exception, the TPRM Team should be engaged to work with the vendor to narrow the outstanding risks. Additionally, the Requestor and TPRM should work together to identify the risk mitigation strategy which will be documented in the Risk Acceptance Agreement and presented to Corporate Security’s Risk Review Board. To obtain an approved Risk Acceptance, the Requestor opens a Third-Party Contractual Risk Exception Form and completes the following steps: 1. 2. 3. 4. 5. 6. 7. 8. 9. The Risk Exception Form includes the following sections to be completed by the Requestor: Third-Party ID Number (this is the original Third-Party Risk Evaluation ID Number) Third-Party Name Requester’s Information and Business Area Whether the Third-Party will require access to NERC CIP Restricted information Applicable section of the Third-Party Management Rule, the Third-Party cannot comply with. Requestor Reasoning and Justification for Requested Exception The Reason Section should not just be a recitation of the SOW but must detail how this Third-party is the only choice to complete the required work. The Justification Section must detail the risk to Avangrid if the work is not completed by the Third-Party. If these sections are not completed to the satisfaction of the Risk Board, the exception will be returned to the Requestor to be resubmitted with those changes noted. The Requestor must Identify the Compensating Controls or risk mitigation strategy to be employed to address the associated risks. 20 Internal Use Third-Party Risk Management Rule October 2025 10. This can include the Third-Party’s contractual documentation in lieu of Avangrid’s. 11. Any relevant documents should be attached. 12. Once the Risk Exception Form has been submitted, the Requestor will receive an email from the TPRM Tool stating it has been successfully received by Corporate Security & Resilience Office and will be reviewed. 13. The Risk Exception Review Board meets biweekly. The Board consists of the SME Directors and/or their delegates to discuss the circumstances of the exception and ensure all due diligence was conducted and that the greatest effort of remediation of risk will be employed. If any questions or concerns arise, the TPRM Team will communicate back to the Requestor. 14. If the Risk Acceptance is approved by the Risk Board, the Requestor is responsible for obtaining a signature from the VP (or higher,) of the business area, accepting the risks defined in the exception form. 15. Approval by the Risk Board should not be construed that Corporate Security & Resilience recommends the Third-Party, but that the Risk Acceptance Agreement clearly defines the necessary information and contains a mitigation strategy which will allow the business area VP to conduct a valid risk assessment before accepting the risk on behalf of Avangrid. 16. Once signed, the Requestor must submit the Signed Risk Acceptance Agreement to the TPRM team for final approval. • The Risk Exception is active for 1 year from the date of signature, unless otherwise specified. Upon date of expiration of the Risk Acceptance Agreement, the Project Requestor will receive an automated email stating the Risk Acceptance is up for renewal. The Requestor may choose to renew the Acceptance or inactivate the exception within 60-business days. 17. An expired Risk Acceptance will be treated as that the Third-Party is no longer conducting the scope of work or contracted to do work and the TPRM Team will notify the Requestor to begin the procedure necessary to inactivate connections or reclaim data under the contract termination terms of the contract. 18. Renewals of a Risk Acceptance Agreement will trigger a review of the ThirdParty by the TPRM Team and may require the resubmission of outdated or expired Cybersecurity documentation. 21 Internal Use Third-Party Risk Management Rule October 2025 4.11 General Provision The Corporate Security and Resilience Office may request additional reviews, documentation, or actions deemed necessary to address emerging risks or compliance requirements such as emerging Cybersecurity threats, changes in regulatory requirements, and any other factors which may impact the security and integrity of Avangrid's information/data assets. 5. Roles & Responsibilities 5.1.1 Requestor (Project Manager, Business Area, etc.) • • • • • Complete Evaluations: Complete the Avangrid Third-Party Risk Evaluation for all new/renewal Third-Party engagements by submitting a request for evaluation from the Corporate Security & Resilience SharePoint site.. Technical Evaluation: Complete the Cybersecurity/Data Protection technical evaluation of the received bids and identify any Cybersecurity/Data Protection non-compliances. Coordinate Action Plans: Coordinate the Third-Party action plan to mitigate the risks, when required. Ensure which the contract meets the requirements established in this Rule. Ensure service provisioning complies with any applicable Cybersecurity and Data Protection rules & procedures. Manage Risks: Ensure Cybersecurity & Data Protection risks are properly managed throughout the life of the contract. Business Continuity: Integrate Critical Services into relevant Business Continuity plans and procedures and conduct periodic testing of these plans. 5.1.2 Corporate Security & Resilience Cybersecurity • Risk Assessment: Assess Third-Party vendors’ security risks and their potential impact on the organization’s systems, data, and operations. Provide risk-based recommendations to mitigate threats and ensure compliance with corporate security standards. • Review Exceptions: Review all Cybersecurity-related risk exceptions for ThirdParty risk management evaluations, ensuring deviations from security requirements are documented, justified, and appropriately mitigated. 22 Internal Use Third-Party Risk Management Rule October 2025 • • Investigate Breaches: Investigate Third-Party data breaches upon notification from the vendor or team within Corporate Security. Analyze root cause, assess the impact on the company, and recommend corrective actions to prevent future incidents. Risk Board: Participate in the Risk Review Board as an SME. Drone Program • Compliance: Ensure all drone acquisitions and operations comply with federal and state regulations prohibiting the use of drones from certain foreign manufacturers. • Policy Adherence: Ensure compliance with UAS Grid Protection Rule. • Review Exceptions: Ensure all Third-Party Risk Exceptions regarding drones are reviewed and documented. Governance, Risk & Assurance • Implementation: Ensure the TPRM rule is effectively implemented, updated, and aligned with regulatory requirements, industry best practices, and corporate risk tolerance. • Review Risk Acceptance Agreements: Review Third-Party Risk Exceptions to ensure all deviations from security and operational standards are properly documented, justified, and mitigated. • Risk Board: Participate in the Risk Review Board as an SME. Operational Technology • Compliance: Confirm which all products and services comply with regulatory requirements and internal safety protocols. • Network Segmentation: Maintain appropriate network segmentation and implement robust controls, when necessary, to securely integrate OT solutions into Avangrid’s environment. • Risk Board: Participate in the Risk Review Board as an SME. Physical Security • Protocol Review: Review Third-Party’s physical security protocols, including but not limited to access controls, surveillance systems, facility security, and emergency response capabilities. 23 Internal Use Third-Party Risk Management Rule October 2025 Data Protection • Contract Review: Review all contractual documents from Third-Party’s related to the Third-Party Risk Management Process to ensure they align with Avangrid’s security standards, regulatory requirements, and internal policies. • Data Protection: Evaluate Third-Party’s Data Protection practices, identifying potential Data Protection risks and ensuring which Third-Party’s implement robust controls to safeguard sensitive information. • Risk Board: Participate in the Risk Review Board as an SME. Resilience / Business Continuity • Impact Assessment: When notified that a critical process or system involves a Third-Party engagement, assess the potential operational impact. • Risk Evaluation: Evaluate the Third-Party’s role within the critical process, identify risks, and determine how disruptions could affect overall business continuity. • Recovery Strategies: Outline recovery strategies, identify alternative vendors or backup procedures, and establish recovery time objectives for critical systems reliant on these Third-Parties. • Risk Board: Participate in the Risk Review Board as an SME. Third-Party Risk Management • Oversight: Oversight and maintenance of the Third-Party Security Risk Evaluation process, database and reporting to support the requesting business. • Support: Support the Requesting Business in identifying & managing Third-Party Cybersecurity & Data Protection risks. • Communication Protocol: Develop a protocol for the communication and coordination of vulnerabilities, threats and incidents with relevant vendors. • Key Risk Indicators: Establish Key Risk Indicators and reporting mechanisms to track the effectiveness of the TPRM Program. Provide regular updates to senior leadership highlighting key risks, trends, and necessary improvements in ThirdParty risk management. • Risk Board: Participate in the Risk Review Board as an SME. Third-Party Intelligence • Independent Review: When notified of an Avangrid high or very high-risk ThirdParty engagement, conduct an independent review to assess the potential 24 Internal Use Third-Party Risk Management Rule October 2025 • • • threats—including the Third-Party’s exposure to Cybersecurity risks, geopolitical risks, and industry-specific vulnerabilities. Gap Analysis: Identify any gaps or emerging risks by comparing internal evaluations with real-time threat intelligence. Recommendations: Develop actionable recommendations, where possible, to mitigate identified risks including additional monitoring requirements, enhanced security controls, and/or alternative Third-Party strategies. Risk Board: Participate in the Risk Review Board as an SME. Training & Awareness • Training Materials: Support the creation of training materials which educate employees on Third-Party risk management fundamentals, best practices, and the potential impacts of Third-Party related risks. Internal Campaigns: Support the TPRM team in leading internal campaigns and communications to promote the TPRM program across Avangrid. 5.1.3 Corporate IT • • • • • Database Maintenance: Maintain updated databases with the information related to Iberdrola Group users and assets related to Third-Party contracts. Technical Monitoring: Perform technical monitoring of the users & assets related to Third-Party contracts. Incident Management: Collaborate in the management of vendor incidents. Risk Review Board: Participate in the Risk Review Board as an SME. AI CoC: IT will work with CSRO to ensure all Third-Party evaluations containing the use of AI are evaluated through TPRM before the use of AI is presented to the AI COC as the use of AI by that specific vendor may be a relevant dimension of the risk to be weighed by the AI COC members. o IT will also work with CSRO to ensure all Third-Party evaluations involving AI systems—defined as machine-based systems that make predictions, recommendations, or decisions—are reviewed through the AI Code of Conduct (AI COC) process. This includes: ▪ Identifying AI use cases during the initial risk evaluation ▪ Applying AI-specific risk criteria (e.g., model transparency, data provenance, bias mitigation) 25 Internal Use Third-Party Risk Management Rule October 2025 Coordinating with Legal and Data Protection teams for compliance with emerging AI regulations ▪ Documenting the AI risk assessment outcome in the TPRM record (Insert finalized link to AI COC and any related SOPs) Offboarding: Manage Third-Party offboarding initiatives when the vendor engagement is complete. ▪ • 5.1.4 Procurement and Vendor Management • • • • • • Platform and Process: Provide the platform and the process (I-buy). Compliance: Procurement will assist TPRM with the goal of ensuring ThirdParties, within their scope, are evaluated pursuant to this rule and effective audit and control measures are in place within the systems and processes. Risk Assessment: To ensure the entirety of the Cybersecurity risk assessment process within the TPRM Rule has been completed. RFP Requirements: Ensure that the RFP includes a specific section on Cybersecurity & Data Protection requirements before it is published. ITEO Completion: To verify that the Cybersecurity section of the ITEO has been completed. Risk Review Board: Participate in the Risk Review Board as an SME. 5.1.5 Legal Services • • • Contract Clauses: To prepare standard and ad hoc Cybersecurity & Data Protection clauses to be included in the contracts. Support: To support the Requestor throughout contract negotiation. Risk Board: Participate in the Risk Review Board as an SME. 5.1.6 Corporate Risk • Risk Board: Participate in the Risk Review Board as an SME. 5.1.7 NERC Reliability & Assurance • Evaluation Review: Review and oversee Third-Party Risk Management Evaluations to ensure which Third parties in scope for CIP-013 meet all NERC reliability assurance requirements for Corporate, Networks and Renewables. 26 Internal Use Third-Party Risk Management Rule October 2025 • • Record Maintenance: Support the TPRM team in maintaining detailed records of compliance findings, risk assessments, and any exceptions identified during the review process. Reporting: Support the TPRM team in preparing comprehensive reports and documentation to demonstrate adherence to CIP-013 requirements for internal and NERC regulatory reviews. 5.1.8 CEII Team CEII Team • Evaluation Oversight: Assess and oversee Third-Party Risk Management Evaluations which involve the access, storing and/or processing of CEII data for Corporate, Networks, and Renewables. • Ongoing Monitoring: Oversee the ongoing monitoring for Third-Party’s handling CEII data, ensuring continuous compliance and alignment with evolving regulations. 5.1.9 Other Relevant Teams • 6. Any other teams not explicitly mentioned in this section which are, or may become involved in Third-Party Risk Management, Cybersecurity, Physical Security, Data Protection or related activities, are expected to collaborate and fulfill their roles and responsibilities necessary to ensure compliance with this policy. This includes providing input, support and documentation as required to manage and mitigate risk effectively. Supply Chain Risk Management Concerns The purpose of this section is to provide Avangrid personnel with guidance regarding how the sourcing of goods and services from Third-Parties can create risk to the company beyond Cybersecurity considerations. This guidance should be consulted in conjunction with the Avangrid Third-Party Risk evaluation process and factors herein may be considered aggravating concerns increasing the initial ThirdParty risk rank. This guidance also applies to the sourcing and/or procuring of goods or services from suppliers owned or controlled by, or otherwise connected to, the Peoples 27 Internal Use Third-Party Risk Management Rule October 2025 Republic of China, Russia, North Korea, and Iran (each, a “Prohibited Country”, and collectively, the “Prohibited Countries” which would affect from countries which present known security threats to the United States.) 6.1. Prohibited Countries Corporate Security & Resilience does not support the procurement of goods and services, which could have a negative security implication, from Prohibited Countries. When situations arise in which the procurement of goods or services, which could be sensitive items, are required and known to be sourced from a Prohibited Country, the Avangrid (Networks, Renewables, Corporate) Business Area Lead (BAL) VP or higher, should be informed and confirm acceptance, prior to accepting a bid. The Third-Party Risk Acceptance process should be used to acknowledge this confirmation. Where situations arise in which a joint project/procurement with Iberdrola includes the sourcing of goods or services which could be sensitive items from a Prohibited Country, the Avangrid project/relationship manager should inform and receive confirmed acceptance from the Avangrid (Networks, Renewables, Corporate) Business Area Lead (BAL) VP or higher. The Third-Party Risk Acceptance process should be used to acknowledge this confirmation. Confirmed acceptance from an Avangrid Operating Company C-level executive does not supersede the requirements for an RFP (Request for Proposal), a ThirdParty Risk Management evaluation, an ITEO, (Bid Evaluation Technical Report), as well as the compliance processes associated with the Protocol for the Management of Third-Party Fraud, Corruption Risk and OFAC Compliance Risk. 7. Related and Dependent Policy Compliance. This rule is not intended to read as the sole standalone guidance but the baseline process to evaluate and mitigate risk to Avangrid posed by Third-Parties. Internal 28 Internal Use Third-Party Risk Management Rule October 2025 related and inter-dependent policies, rules, guidelines and SOPs must be consulted for compliance in order to weave the greatest level of protection for Avangrid’s people, assets, and information. Ultimately, the TPRM process is in search of the best decision for Avangrid. It is incumbent of the Requestor to be familiar with, and ensure the provisions of this guidance, are followed. 29 Internal Use

Text of UI-Attachment 7.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider For the purposes of this Privacy and Data Security Rider (the “Rider”) [_____________________________________]1 and any of its affiliates procuring or receiving services, works, equipment or materials under the Agreement (as defined below) shall be hereinafter referred to as the “CUSTOMER”. [_____________________________________]2 shall be hereinafter referred to as the “VENDOR” (a) Among other, the purpose of this Rider is to enable the VENDOR to Process on behalf of the CUSTOMER the Personal Data and Company Data necessary to comply with the purpose of the Agreement (as defined below), define the conditions under which the VENDOR will Process the Personal Data and Company Data to which it has access during the performance of the Agreement, and establish the obligations and responsibilities of the VENDOR derived from such Processing. Personal Data disclosed by CUSTOMER to VENDOR is provided only for limited and specified purposes as set forth in the Agreement and this Rider. (b) The following definitions are relevant to this Rider: (i) “Personal Data” means any information about an individual, including an employee, vendor, customer, or potential customer of CUSTOMER or its affiliates, including, without limitation: (A) any information that can be used to distinguish or trace an individual‘s identity, such as name, social security number, date and place of birth, mother‘s maiden name, biometric records, personal electronic mail address, internet identification name, network password or internet password; (B) information that identifies, relates to, describes, is capable of being associated with, or could reasonably be linked, directly or indirectly, with a particular individual or household, or (C) any other information that is linked or linkable to an individual, such as medical, educational, financial, and employment information, as well as cookie information and usage and traffic data or profiles, that is combined with any of the foregoing. (ii) “Company Data” means any and all information concerning CUSTOMER and its affiliates and their respective business in any form, or to which the CUSTOMER or its affiliates have access, that requires reinforced protection measures, including but not limited to CUSTOMER sensitive information (confidential or restricted), internal use information, Personal Data, Cardholder Data, commercially sensitive information, Critical Infrastructure Information, other information that relates to critical infrastructure, information that relates to the operation or functionality of facilities, networks, or grids, commercially sensitive information, strategic business information, credentials, encryption data, system and application access logs, or any other information that may be subject to legal or regulatory requirements. (iii) “Critical Infrastructure Information” means engineering, vulnerability, or detailed design information about proposed or existing critical infrastructure (physical or virtual) that (A) relates details about the production, generation, transmission, or distribution of energy; (B) could be useful to a person planning 1 2 Insert the name of the Avangrid entity that is the signatory of the Agreement. Insert the name of the Vendor that is the signatory of the Agreement. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 1 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider an attack on critical infrastructure; (C) is exempt from mandatory disclosure under the Freedom of Information Act; and (D) gives strategic information beyond the location of the critical infrastructure. (iv) “Processing” (including its cognate, “process”) means any operation, action, error, omission, negligent act, or set of operations, actions, errors, omissions, or negligent acts that is performed upon Personal Data or Company Data, whether or not by automatic means, including, without limitation, collection, recording, organization, storage, access, adaptation, alteration, retrieval, consultation, retention, use, disclosure, dissemination, exfiltration, taking, removing, copying, making available, alignment, combination, blocking, deletion, erasure, or destruction. (v) “Data Security Incident” means: (A) the loss or misuse (by any means) of Personal Data or Company Data; (B) the inadvertent, unauthorized and/or unlawful Processing, corruption, modification, transfer, sale or rental of Personal Data or Company Data; (C) any other act, omission or circumstance that compromises or may reasonably compromise the security, confidentiality, or integrity of Personal Data or Company Data, including but not limited to incidents where Personal Data or Company Data has been damaged, lost, corrupted, destroyed, or accessed, acquired, modified, used, or disclosed by any unauthorized person, by any person in an unauthorized manner, or for an unauthorized purpose; (D) any act, omission or circumstance that compromises or may reasonably compromise the cybersecurity of the products and services provided to CUSTOMER by VENDOR or the physical, technical, administrative, or organizational safeguards protecting VENDOR’s systems or, if VENDOR knows or reasonably believes, CUSTOMER’s systems storing or hosting Personal Data or Company Data, or (F) VENDOR receives any complaint, notice, or communication which relates directly or indirectly to (x) VENDOR’s Processing of Personal Data or Company Data or VENDOR’s compliance with Technical and Organizational Measures or applicable law in connection with Personal Data or Company Data or (y) the cybersecurity of products and services provided to CUSTOMER by VENDOR. (vi) “Technical and Organizational Measures” means security measures, consistent with the type of Personal Data or Company Data being Processed and the services being provided by VENDOR, to protect Personal Data or Company Data, which measures shall implement industry accepted protections which may include physical, electronic and procedural safeguards to protect the Personal Data or Company Data supplied to VENDOR against any Data Security Incident, and any security requirements, obligations, specifications or event reporting procedures set forth in this Rider or in any Schedule to this Rider. As part of such security measures, VENDOR shall provide a reasonably secure environment for all Personal Data and Company Data and any hardware and software (including servers, network, and data components) to be provided or used by VENDOR as part of its performance under the Agreement. (vii) “Losses” shall mean all losses, liabilities, damages, and claims and all related or resulting costs and expenses (including, without limitation, reasonable attorneys’ fees and disbursements and costs of investigation, litigation, settlement, judgment, interest and penalties). (viii) “Agreement” shall mean the [____________________________________]3 dated as 3 Insert the name of the agreement. For example, Master Service Procurement Agreement. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 2 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider of [___________]4 and any purchase orders, statements of work, notice to proceed and related documents issued in connection therewith. (c) Personal Data and Company Data shall at all times remain the sole property of CUSTOMER, and nothing in this Rider or the Agreement will be interpreted or construed as granting VENDOR any license or other right under any patent, copyright, trademark, trade secret, or other proprietary right to Personal Data or Company Data. VENDOR shall not create or maintain data which are derivative of Personal Data or Company Data except for the purpose of performing its obligations under the Agreement and this Rider and as authorized by CUSTOMER. (d) Regarding the Processing of Personal Data and Company Data, the parties agree that: (i) VENDOR shall Process Personal Data and Company Data only on behalf of CUSTOMER, on the instruction of CUSTOMER and in accordance with the Agreement, this Rider and privacy and security laws applicable to VENDOR’s services or VENDOR’s possession or Processing of Personal Data and Company Data. CUSTOMER hereby instructs VENDOR, and VENDOR hereby agrees, to Process Personal Data and Company Data only as necessary to perform VENDOR’s obligations under the Agreement and as further described below and for no other purpose. For the avoidance of doubt and without limitation, (i) VENDOR shall not Process Personal Data or Company Data for any purpose other than providing the services specified in the Agreement nor for any purpose outside the scope of the Agreement; and (ii) VENDOR is prohibited from (w) selling, renting, releasing, disclosing, disseminating, making available, transferring, or otherwise communicating orally, in writing, or by electronic or other means, Personal Data and Company Data to any business or third party (x) retaining, using, or disclosing Personal Data or Company Data for any purpose other than for the purposes specified in the Agreement and this Rider, (y) retaining, using or disclosing Personal Data and Company Data outside of the direct business relationship between CUSTOMER and VENDOR pursuant to the Agreement, and (z) combining Personal Data or Company Data received from CUSTOMER with Personal Data or Company Data received from or on behalf of another person or persons or collected by VENDOR. (ii) The parties agree that: - The Processing activities that will be carried out by VENDOR are: [_________________________].5 - The categories of Personal Data or Company Data that will be Processed by VENDOR are: [______________________].6 4 Insert date of the agreement. 5 Insert Processing activities to be carried out by Vendor. How will the third party access the data? What type of actions will the third party perform with the data? 6 Insert categories of Personal Data. Please review Data Classification Rule. With respect to Personal Data, include a listing of personal data elements or categories that will be processed. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 3 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider - The categories of Personal Data subjects whose information will be processed by VENDOR are: [_____________________].7 - The instructions for the Processing of Personal Data or Company Data are: [___________________________].8 - The duration of the Processing shall be: [_____________________].9 (iii) VENDOR shall immediately inform the CUSTOMER if in VENDOR’s opinion a Processing instruction given by CUSTOMER may infringe the privacy and security laws applicable to VENDOR’s services or VENDOR’s possession or Processing of Personal Data or Company Data. (iv) In the event that the activities to be carried out by VENDOR under the Agreement do not require access to Personal Data, VENDOR, its employees and representatives shall be prohibited from accessing and Processing Personal Data. If they gain access to Personal Data, VENDOR shall immediately inform CUSTOMER. Notwithstanding the foregoing, any Processing of Personal Data by VENDOR shall be subject to the terms and conditions set forth in this Rider. (e) As a condition to starting work, VENDOR’s employees and other persons authorized, pursuant to the terms of this Rider, to Process Personal Data or Company Data shall acknowledge in writing their agreement to [(i) comply with the terms of CUSTOMER’s Acceptable Use Requirements set forth in Schedule C hereto, as such Acceptable Use Requirements may be modified or supplemented from timeto-time upon notice from the CUSTOMER,]10 (ii) maintain the confidentiality of Personal Data and Company Data, and (iii) comply with any applicable Technical and Organizational Measures. In addition, VENDOR’s employees and other authorized persons that access CUSTOMER’s premises shall abide by CUSTOMER’s physical security policies, rules and procedures. (f) At any and all times during which VENDOR is Processing Personal Data or Company Data, VENDOR shall: (i) Comply with all applicable privacy and security laws to which it is subject, or that are applicable to VENDOR’s services or VENDOR’s possession or Processing of Personal Data and\or Company Data, and not, by act or omission, place CUSTOMER or its affiliates in violation of any privacy or security law known by VENDOR to be applicable to them; (ii) With regards to the Processing of Personal Data, maintain a record of Personal Data Processing activities carried out on behalf of CUSTOMER, which shall include at least: 7 Insert categories of data subjects. 8 Insert instructions. 9 Insert duration. 10 The Acceptable Use Requirements only need to be included if the VENDOR will be using Avangrid information resources or will have access the Avangrid information technology environment. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 4 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider (A) The name and contact details of the VENDOR, any subcontractor, where applicable and as previously authorized by CUSTOMER, the CUSTOMER on whose behalf the VENDOR is Processing Personal Data, their respective representatives and, where applicable, the data protection officer; (B) The categories of Processing activities carried out on behalf of CUSTOMER; (C) Where applicable, international transfers of Personal Data to a third country or international organization, identifying the third country or international organization, and identification of appropriate safeguards; (D) A general description of the appropriate Technical and Organizational Measures that VENDOR is implementing relating to: - The ability to ensure the continued confidentiality, integrity, availability and resilience of Personal Data Processing systems and services; - The ability to quickly restore availability and access to Personal Data in the event of a physical or technical incident; and - A process of regular verification, evaluation and assessment of the effectiveness of Technical and Organizational Measures to ensure the security of the Personal Data Processing; - Pseudonymization and encryption of Personal Data; (iii) Have in place appropriate and reasonable Technical and Organizational Measures to protect the security of Personal Data and Company Data and prevent a Data Security Incident, including, without limitation, a Data Security Incident resulting from or arising out of VENDOR’s internal use, Processing or other transmission of Personal Data and Company Data, whether between or among VENDOR’s subsidiaries and affiliates or any other person or entity acting on behalf of VENDOR. Taking into account the state-of-the-art, the costs of implementation, and the nature, scope, context and purposes of the Processing as well as the risks of varying likelihood and severity for, among other, the rights and freedoms of the data subjects, VENDOR shall implement Technical and Organizational Measures to ensure a level of security appropriate to the risk. Without limiting the generality of the foregoing, the VENDOR will implement measures to: (A) Ensure the continued confidentiality, integrity, availability and resilience of Processing systems and services; (B) Quickly restore availability and access to Personal Data and Company Data in the event of a physical or technical incident; AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 5 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider (C) Verify and evaluate, on a regular basis, the effectiveness of the Technical and Organizational Measures implemented; (D) Pseudonymize and encrypt Personal Data, where applicable; and (E) Safely secure or encrypt all Personal Data and Company Data, during storage or transmission; (iv) Except as may be necessary in connection with providing services to CUSTOMER (and provided that immediately upon the need for such Personal Data and Company Data ceasing, such Personal Data or Company Data is immediately destroyed or erased), not use or maintain any Personal Data or Company Data on a laptop, hard drive, USB key, flash drive, removable memory card, smartphone, or other portable device or unit; and ensure that any such portable device or unit is encrypted. (v) Notify CUSTOMER at [email removed] or (855)548-727611 no later than one (1) day from the date of obtaining actual knowledge of any Data Security Incident, or from the date the VENDOR reasonable believes that a Data Security Incident has taken place, whatever is earlier, and at VENDOR’s cost and expense, assist and cooperate with CUSTOMER concerning any disclosures to affected parties and other remedial measures as requested by CUSTOMER or required under applicable law. If the Data Security Incident involves Personal Data, the following information shall be provided as a minimum: (A) Description of the nature of the Data Security Incident, including, where possible, the categories and approximate number of data subjects affected, and the categories and approximate number of Personal Data records affected; (B) Contact details of the data protection officer of the VENDOR, where applicable, or other contact person for further information; (C) Description of the possible consequences of the Data Security Incident or violations; and (D) Description of the measures taken or proposed to remedy the Data Security Incident, including, where appropriate, the measures taken to mitigate possible negative effects; (vi) VENDOR designates the following contacts for the purposes of communications related to a Data Security Incident: [__ Insert name and phone number _].12 (vii) Assist and cooperate with CUSTOMER to enable CUSTOMER to comply with its 11 Include Avangrid e-mail addresses and phone numbers for the purposes of notifications of a Data Security Incident. 12 Include contact details. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 6 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider obligations under any applicable privacy or security law, including but not limited to maintaining Personal Data and Company Data secured, responding to Data Security Incidents, and, where applicable, ensuring the rights of data subjects and carrying out Personal Data impact assessments; (viii) Inform the CUSTOMER, if, where applicable, data subjects exercise their rights of access, rectification, erasure or objection, restriction of processing, data portability and not to be the subject to automated decisions by the VENDOR. The communication must be made immediately and in no case later than one (1) business day following the receipt of the request by VENDOR. VENDOR shall assist CUSTOMER, taking into account the nature of the Personal Data Processing, through appropriate Technical and Organizational Measures, and with any information that may be relevant to the resolution of the request; (ix) Not use independent contractors or provide Personal Data or Company Data to independent contractors or other personnel that are not full-time employees of VENDOR without CUSTOMER’s prior written approval; (x) Not disclose Personal Data or Company Data to any third party (including, without limitation, VENDOR’s subsidiaries and affiliates and any person or entity acting on behalf of VENDOR) unless with respect to each such disclosure: (A) the disclosure is necessary in order to carry out VENDOR’s obligations under the Agreement and this Rider; (B) VENDOR executes a written agreement with such third party whereby such third party expressly assumes the same obligations set forth in this Rider; (C) VENDOR has received CUSTOMER’s prior written consent; (D) the Processing is carried out in accordance with the instructions of CUSTOMER, and (D) VENDOR shall remain responsible for any breach of the obligations set forth in this Rider to the same extent as if VENDOR caused such breach; (xi) Not permit any officer, director, employee, agent, other representative, subsidiary, affiliate, independent contractor, or any other person or entity acting on behalf of VENDOR to Process Personal Data or Company Data unless such Processing is in compliance with this Rider and is necessary to carry out VENDOR’s obligations under the Agreement and this Rider. Personal Data and Company Data shall only be accessed by persons who need access to carry out VENDOR’s obligations under the Agreement and this Rider and in accordance with the instructions of CUSTOMER; VENDOR shall provide appropriate privacy and security training to its employees and those persons authorized to Process Personal Data or Company Data. (xii) Establish policies and procedures to provide all reasonable and prompt assistance to CUSTOMER in responding to any and all requests, complaints, or other communications received from any individual who is or may be the subject of any Personal Data Processed by VENDOR to the extent such request, complaint or other communication relates to VENDOR’s Processing of such Personal Data; (xiii) Establish policies and procedures to provide all reasonable and prompt assistance to CUSTOMER in responding to any and all requests, complaints, or other communications received from any individual, government, government agency, regulatory authority, or other entity that is or may have an interest in the Personal Data or Company Data, exfiltration of Personal Data or Company Data, disclosure of Personal Data or Company Data, or misuse of Personal Data or Company Data to the extent such AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 7 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider request, complaint or other communication relates to VENDOR’s Processing of such Personal Data or Company Data; (xiv) Not transfer any Personal Data or Company Data across a country border, unless directed to do so in writing by CUSTOMER, and VENDOR agrees that CUSTOMER is solely responsible for determining that any transfer of Personal Data or Company Data across a country border complies with the applicable laws and this Rider; (xv) Keep Personal Data and Company Data in strict confidence; (g) At the time of the execution of this Rider, and at any time, upon CUSTOMER’s request, VENDOR shall provide evidence that it has established and maintains Technical and Organizational Measures governing the Processing of Personal Data and Company Data appropriate to the Processing and to the nature of the Personal Data and Company Data; (h) To the extent VENDOR maintains Personal Data and Company Data at its location, CUSTOMER shall have the right to conduct onsite inspections and/or audits (with no advance notice to VENDOR) of VENDOR’s information security protocols, and VENDOR agrees to cooperate with CUSTOMER regarding such inspections or audits; provided, any such inspections or audits shall be conducted during normal business hours and in a manner so as to minimize any disruptions to VENDOR’s operations. VENDOR will promptly correct any deficiencies in the Technical and Organizational Measures identified by CUSTOMER to VENDOR; (i) VENDOR shall keep and make accessible to CUSTOMER, at any time, upon CUSTOMER’s request, documentation that evidences compliance with the terms of this Rider. CUSTOMER may conduct audits and inspections, either directly or through a third party, and VENDOR agrees to cooperate with CUSTOMER regarding such audits; (j) VENDOR shall cease Processing Personal Data and Company Data and [return, or securely delete or destroy],13 or cause or arrange for the [return, or secure deletion or destruction] of, all Personal Data and Company Data subject to the Agreement and this Rider, including all originals and copies of such Personal Data and Company Data in any medium and any materials derived from or incorporating such Personal Data and Company Data, upon the expiration or earlier termination of the Agreement, or when there is no longer any legitimate business need (as determined by CUSTOMER) to retain such Personal Data and Company Data, or otherwise on the instruction of CUSTOMER, but in no event later than ten (10) days from the date of such expiration, earlier termination, expiration of the legitimate business need, or instruction. If applicable law prevents or precludes the return or destruction of any Personal Data or Company Data, VENDOR shall notify CUSTOMER of such reason for not returning or destroying such Personal Data and Company Data and shall not Process such Personal Data and 13 Personal Data and Company Data in the VENDOR’s possession has to be returned or destroyed upon termination or expiration of the agreement or in any of the other scenarios contemplated herein. The business should determine in each case whether the VENDOR will be required to either return the information or destroy the information if what they have are copies. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 8 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider Company Data thereafter without CUSTOMER’s express prior written consent. VENDOR’s obligations under this Rider to protect the security of Personal Data and Company Data shall survive termination of the Agreement. (k) [To the extent that VENDOR is afforded regular access in any way to “Cardholder Data” as defined below and for so long as it has such access, the following requirements shall apply with respect to the Cardholder Data; provided, that the parties do anticipate that VENDOR will have access to any Cardholder Data: (i) VENDOR represents that it is presently in compliance and will remain in compliance with the Payment Card Industry Data Security Standard (“PCI Standard”), and all updates to PCI Standard, developed and published jointly by American Express, Discover, MasterCard and Visa (“Payment Card Brands”) for protecting individual credit and debit card account numbers (“Cardholder Data”). (ii) VENDOR acknowledges that Cardholder Data is owned exclusively by CUSTOMER, credit card issuers, the relevant Payment Card Brand, and entities licensed to process credit and debit card transactions on behalf of CUSTOMER, and further acknowledges that such Cardholder Data may be used solely to assist the foregoing parties in completing a transaction, supporting a loyalty program, providing fraud control services, or for other uses specifically required by law, the operating regulations of the Payment Card Brands, or this Agreement. (iii) To the extent Cardholder Data is regularly maintained on the premises or property of VENDOR, VENDOR shall maintain a business continuity plan addressing the possibility of a potential disruption of service, disaster, failure or interruption of its ordinary business process, which business continuity plan provides for appropriate back-up facilities to ensure VENDOR can continue to fulfill its obligations under the Agreement. (iv) VENDOR agrees that, in the event of a Data Security Incident arising out of or relating to VENDOR’s premises or equipment contained thereon, VENDOR shall afford full cooperation and access to VENDOR’s premises, books, logs and records by a designee of the Payment Card Brands to the extent necessary to perform a thorough security review and to validate VENDOR’s compliance with the PCI Standards; provided, that such access that be provided during regular business hours and in such a manner so as to minimize the disruption of VENDOR’s operations.]14 (l) [To the extent that the VENDOR processes personal information of California residents as such terms are defined in the California Consumer Privacy Act of 2018, as amended (Cal. Civ. Code §§ 1798.100 to 1798.199.95), the terms and conditions set forth in Schedule D of this Rider shall apply.]15 14 This section only has to be included if the VENDOR will be afforded access to Cardholder Data. If the VENDOR will not have access to Cardholder Data, this section can be deleted prior to providing the Rider to the counterparty for review. 15 Only for Avangrid wide or Avangrid Renewables related engagements where the VENDOR will process personal information of California residents. Not applicable to Avangrid Networks only engagements. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 9 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider (m) [To the extent that VENDOR processes personal data of Connecticut consumers as such terms are defined in An Act Concerning Personal Data Privacy and Online Monitoring (Public Act No. 2215), the terms and conditions of Schedule E shall apply.]16 (n) VENDOR represents that the security measures it takes in performance of its obligations under the Agreement and this Rider are, and will at all times remain, at the highest of the following: (a) Privacy & IT Security Best Practices ( including, but not limited to, National Institute of Standards and Technology (“NIST”) SP 800-53, International Organization for Standardization (“ISO”) 27001/27002, Control Objectives for (“COBIT”) framework, Center for Internet Security (“CIS”) Security Benchmarks, and Top 20 Critical Controls) and (b) any security requirements, obligations, specifications, or event reporting procedures set forth in Schedule A. (o) In addition to any other insurance required to be provided by VENDOR hereunder, VENDOR shall also provide the Cyber-Insurance coverage meeting the requirements specified in Schedule B, attached hereto and made part hereof. VENDOR shall also comply with the terms and conditions in Schedule B as they relate to any insurance required to be provided by VENDOR pursuant to this Agreement. (p) Notwithstanding anything in the Agreement or this Rider to the contrary, VENDOR shall indemnify, defend and hold CUSTOMER, its affiliates, and their respective employees, officers, representatives and contractors, harmless from and against all Losses caused by, resulting from, or attributable to VENDOR’s breach or violation of applicable laws, regulations or any of the terms and conditions of this Rider. VENDOR’s obligation to indemnify, defend, and hold harmless shall survive termination or expiration of the Agreement and this Rider. (q) Failure by VENDOR to comply with any requirement of this Rider shall constitute a material breach of the Agreement and a VENDOR default thereunder. CUSTOMER shall be allowed to terminate the Agreement, and CUSTOMER shall have all rights and remedies provided by law or equity under the Agreement and this Rider. *** [Signature page follows] 16 Only for agreements that involve (i) The United Illuminating Company, Connecticut Natural Gas, Southern Connecticut Gas or UIL Holdings Corporation, or (ii) Avangrid Service Company or Avangrid Management Company if services will be provided to the companies listed in (i). AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 10 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider IN WITNESS WHEREOF, CUSTOMER and VENDOR have caused their representatives to execute and deliver this Privacy and Data Security Rider. CUSTOMER VENDOR By: _____________________ Name: Title: Date: By: _____________________ Name: Title: Date: By: _____________________ Name: Title: Date: [Signature page to Privacy and Data Security Rider] AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 11 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider Schedule A General Security Requirements (a) The following definitions are relevant to this General Security Requirements Schedule: (i) “Cyber-infrastructure" means electronic information and communication systems and services, as well as the information contained therein. These systems, both those housed within facilities as well as those that are cloud-based, be they proprietary or third-party, in any manner, are comprised of hardware and software for processing (creating, accessing, modifying and destroying), storing (on magnetic, electronic or other formats) and sending (shared use and distribution) information, or any combination of said elements that include any type of electronic device such as, without limitation, standard computers (desktop/laptop) with internet connections, digital storage methods used on computers (e.g. hard drives), mobiles, smartphones, personal digital assistants, data storage media, digital and video cameras (including CCTV), GPS systems, etc. (ii) "Protected Information" means Personal Data and Company Data as defined in the (iii) forth in the Rider. Capitalized terms not otherwise defined in this Schedule shall have the meaning set Rider. (b) VENDOR must, always, know the level of information protection that should be afforded to the Protected Information as well as the corresponding standards and applicable laws and regulations, and it shall adopt the Technical and Organizational Measures adequate thereto. VENDOR shall, at least, maintain Technical and Organizational Measures consistent with the type of Protected Information being processed and the services being provided by VENDOR, to secure Protected Information, which measures shall implement industry accepted protections which include physical, electronic and procedural safeguards to protect the Protected Information supplied to VENDOR against any Data Security Incident or other security incident, and any security requirements, obligations, specifications or event reporting procedures set forth in the Agreement, the Rider or this Schedule. As part of such security measures, VENDOR shall provide a secure environment for all Protected Information and any hardware and software (including servers, network, and data components) to be provided or used by VENDOR as part of its performance under the Agreement on which Protected Information is contained. (c) When the scope of the Agreement implies the use or connection of VENDOR's Cyberinfrastructure to that of CUSTOMER, the VENDOR shall have reasonable Technical and Organizational Measures for its protection and for the prevention of any Data Security Incident. (i) The connection between the CUSTOMER’s and the VENDOR’s network is not permitted, unless expressly agreed to in writing, in which case it must be done by establishing encrypted and authenticated virtual private networks, and the number of interconnection points between the two AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 12 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider networks must be the minimum that is compatible with the required level of availability. The connection to the VENDOR's network shall be removed as soon as there is no need for it. (ii) Direct user connections from the VENDOR to CUSTOMER's network are not permitted, unless authorized in writing by CUSTOMER and only for a limited period of time. (iii) If the Agreement is fully or partially performed at the VENDOR's premises or property, the VENDOR must establish mechanisms and procedures for physical access to said premises or property to prevent unauthorised persons from accessing Cyber-infrastructure or Protected Information. (d) VENDOR shall establish mechanisms and procedures for identifying, authenticating and controlling logical access necessary to prevent unauthorised persons from accessing its Cyberinfrastructure elements and CUSTOMER’s Protected Information, and, in particular: (i) VENDOR will have procedures based on the principle of least privilege when granting, assigning and withdrawing authorized access and permissions to its personnel or the personnel of its subcontractors, where applicable, including privileged users or administration taking into account the need for the use, the confidentiality of the Protected Information and the resources for the performance of their tasks; (ii) VENDOR will maintain an updated inventory of the access granted and will withdraw access from personnel who cease working in connection with the Agreement within a period of less than twenty-four (24) hours. Credentials must always be encrypted when stored and transmitted; and (iii) VENDOR shall have policies and procedures that ensure the strength of the passwords and that they are updated regularly. Passwords shall be changed during the installation processes of new hardware or software. VENDOR’s default passwords shall be changed. (e) VENDOR shall implement Technical and Organisational Measures necessary to ensure operational continuity under applicable service level agreements (including but not limited to contingency plans, backup and recovery procedures). In particular: (i) VENDOR shall make backup copies of the Protected Information as frequently as is required for the services being provided by VENDOR and according to the nature of the data, establishing the appropriate procedures and mechanisms to ensure that the data can be retrieved, that only authorised VENDOR personnel can access it and that they are transferred and stored in such a way as to prevent access or manipulation by unauthorised persons; and (ii) The same security measures shall apply to backups as to the original Protected Information. (f) In the event that CUSTOMER has expressly authorized VENDOR to use its own IT equipment for accessing CUSTOMER’s Cyber-infrastructure, the VENDOR shall guarantee and undertake AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 13 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider that there are adequate security measures to protect the stationary or portable IT equipment and mobile devices used to access such Cyber-infrastructure or for storing, processing or transmitting the Protected Information, including but not limited to: (i) Automatic locking if the device is left unattended for a certain period of time. User authentication will be required for unlocking. (ii) Protection against malicious software and known vulnerabilities. (iii) Updating the operating system as often as the vendor requires. The VENDOR shall maintain an action procedure should the equipment or device be lost or stolen, ensuring, to the maximum extent possible that the event be communicated promptly, Protected Information be deleted safely in accordance with recognised standards, and access to CUSTOMER’s systems or systems containing CUSTOMER’s Protected Information be suspended. Before equipment is reused or replaced, the VENDOR must protect, or if applicable remove, all the Protected Information stored on it, ensuring that unauthorised personnel or third parties cannot access or recover it. (g) The VENDOR shall establish adequate procedures to guarantee protection against loss or unauthorised processing of files, computer media and paper documents containing Protected Information and guarantee that they are destroyed when the reasons for their creation no longer apply. Extracting data from a file and downloading it to a server or delivering it electronically is considered equivalent to computer media for the purposes of complying with these measures. AVANGRID may request information concerning any Processing of Protected Information by the VENDOR. (h) The VENDOR shall include security measures appropriate to the nature of the Protected Information Processed in developing, maintaining and testing the equipment that will be used to perform the services being provided by VENDOR. The VENDOR will adopt secure code development standards and ensure that no real data is used in test environments. If necessary, CUSTOMER's express written authorisation will be required, and the same security measures required for the work environment will be applied to these test environments. (i) When the scope of the Agreement includes the supply of equipment and/or materials, the VENDOR shall prove that best security practices and standards have been applied for the design, fabrication, maintenance, and, where applicable, installation of the supplied equipment and/or materials, including its components. For any such equipment and/or materials with information processing capacity or network connectivity options: AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 14 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider (i) The VENDOR shall provide evidence or certificates that guarantee design security, firmware/software updates and malware protection. (ii) The VENDOR shall conduct periodic analyses of vulnerabilities and inform CUSTOMER about any necessary updates, especially those that affect security. (iii) All internet connected devices shall be protected with adequately complex passwords that can be changed by CUSTOMER. (iv) The configuration of devices, equipment and materials shall be adjustable exclusively according to AVANGRID's needs, and any unnecessary functionality deactivated. Should the VENDOR conduct any configuration, documentation to that effect shall be provided. (j) VENDOR should fully implement the mitigation actions available on the APTs Targeting IT Service Provider CUSTOMERS site page to protect against this malicious activity. VENDOR should implement the following specific actions: (i) Apply the principle of least privilege to their environment, which means customer data sets are separated logically, and access to client networks is not shared; (ii) Implement robust network and host-based monitoring solutions that looks for known malicious activity and anomalous behaviour on the infrastructure and systems providing client services; (iii) Ensure that log information is aggregated and correlated to enable maximum detection capabilities, with a focus on monitoring for account misuse; and (iv) Work with CUSTOMER to ensure hosted infrastructure is monitored and maintained, either by the service provider or the client. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 15 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider Schedule B Cyber-Insurance Requirements (a) coverage: VENDOR shall during the term of the Agreement have and maintain the following insurance (i) Cyber Errors and Omissions Policy providing coverage, on a per occurrence basis, for acts, errors, omissions, and negligence of employees and contractors giving rise to potential liability, financial and other losses relating to data security and privacy, including cost of defense and settlement, in an amount of at least $10 million dollars, which policy shall include coverage for all costs or risks associated with: 1) violations of data privacy or data security laws and regulations; and 2) cyber risks, including denial-of-service attacks, risks associated with malware and malicious code, whether designed to interrupt a network or provide access to private or confidential information; and 3) other risks specific to the work performed by VENDOR as shall be identified by CUSTOMER. (ii) Such coverage shall be furnished by an insurance company with an A.M. Best Financial Strength Rating of A- or better, and which is otherwise reasonably acceptable to CUSTOMER. (b) VENDOR warrants that the scope of all coverage evidenced to the CUSTOMER pursuant to this Agreement shall be the sole responsibility of the VENDOR to maintain at committed to levels required by this document and VENDOR, in any event of a loss, will take full responsibility for the payment of any policy deductible, self-insured retention, premium or retrospective premium obligation necessary to maintain coverage, and shall include coverage for any indemnification and hold harmless agreements made by the VENDOR pursuant to the Data Security Rider. VENDOR’s failure to pay the applicable deductible, self-insured retention, or retrospective premium shall constitute a material breach of this Agreement, with damages equal to at least the amount of insurance lost or not provided due to such breach. (c) All insurance coverage(s) provided by VENDOR pursuant to this Agreement shall be primary and non-contributing with respect to any other insurance or self-insurance which may be maintained by the CUSTOMER. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 16 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider [Schedule C]17 Acceptable Use Requirements The intent of this Schedule is to document requirements as they pertain to the Acceptable Use of the Electronic Devices and Cyber-infrastructure of Avangrid, Inc. and any of its subsidiaries (hereinafter “Avangrid”) by contractors, consultants or other third parties. Employees and other persons acting on behalf of Avangrid vendors shall be required to read, acknowledge their understanding of, and commit to comply with these Avangrid Acceptable Use Requirements. Definitions • A User is defined as any contractor, consultant or other third parties, including any employee of an Avangrid vendor, with access to or using Avangrid Electronic Devices or Cyber-infrastructure. • Cyber-infrastructure Includes electronic information and communications systems and services, and the information contained in these systems and services. Those systems and services are composed of all hardware and software that process (creation, access, modification, and destruction), store (paper, magnetic, electronic, and all other media types), and communicate (sharing and distribution) information, or any combination of these elements. • Electronic Devices include standard computer (workstation desktop/ laptop) with network connections, digital storage media used in standard computers (e.g. hard drives), telephone and voicemail systems, mobile phones, smartphones, tablets, Personal Digital Assistants (PDA), End Point Storage Devices (EPSD), digital and video cameras (including CCTV), mobile navigation systems, printers, photocopiers and scanners, fax machines, and all other similar of associated devices, etc. o Avangrid Electronic Devices are Electronic Devices owned and managed by Avangrid. o Personally Owned Devices (POD) are Electronic Devices (e.g. smart phones, tablets, laptops) privately owned and managed by Users. o End Point Storage Devices (EPSD) applies to the storage of data on devices that can be connected either by a USB drive, data cable or by wireless connection direct to any computing equipment within Avangrid, e.g. USB sticks, drives, thumb nails, pen drives, flash drives, memory cards, etc. 17 Schedule C (Acceptable Use Requirements) only needs to be included if the VENDOR will have access to Avangrid information technology resources or if the VENDOR will have access to the Avangrid information technology environment. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 17 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider 1. Requirements and Practices 1.1 Electronic Devices Avangrid Electronic Devices and resources are property of Avangrid and may be provided to Users for the pursuit of their professional activity. 1.1.1 The determining authority and responsibility for issuance of an Electronic Device shall rest with the Avangrid Business Area Leader (BAL) or department hiring manager. 1.1.2 Avangrid Electronic Devices shall be provided to Users configured with the required security hardware and software protections. a. Compromising or interfering with the Electronic Devices’ operating system, hardware, software or protection mechanisms is prohibited. 1.1.3 Users shall be responsible for the appropriate use of authorized Electronic Devices in accordance with their duties and responsibilities, including, but not limited to: a. Protecting Electronic Devices from misuse. b. Logging off or protecting Electronic Devices with a screen and/or keyboard locking mechanism, when unattended and when not in use. i. Desktop and laptop computers shall be switched off or hibernating when unattended for a period more than one hour and always at the end of the workday. ii. Desktop and laptop computer screens shall be locked by Users always when unattended. c. Taking the following preventative measures to ensure that any Electronic Devices used to connect to Avangrid’s Cyber-infrastructure are physically secured by: i. Protecting Avangrid assets from unauthorized access and use by others, ii. Leaving Electronic Devices in secured locations (e.g. locked cabinet or drawer, locked rooms in locked buildings as applicable), iii. Not leaving Electronic Devices in plain view in unattended vehicles, iv. Not leaving Electronic Devices in vehicles overnight, v. Carrying laptops as hand luggage when traveling, AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 18 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider 1.1.4 vi. Positioning Electronic Devices so that they (and the information displayed) are not visible from outside a ground floor window, and vii. Positioning the display screen of Electronic Devices such that it cannot be viewed by others in public places (e.g. train, aircraft, restaurants, etc.). Users shall follow Avangrid procedures for immediately reporting lost, compromised, or stolen Electronic Devices. a. The User shall notify the Service (Help) Desk and their Avangrid contact. 1.1.5 User shall follow Avangrid procedures for the return of Avangrid owned Electronic Devices when the use of those devices is deemed no longer necessary. a. Users shall return all Avangrid Electronic Devices to their Avangrid contact immediately upon separation/ termination, which shall be responsible for collecting all Avangrid Electronic Devices. 1.1.6 The use of hot desks/ shared network access equipment shall be reserved for Users who do not regularly require the use of a portable Electronic Device (e.g. laptop) for their professional activities. a. Users of hot desks/shared network access shall have a current network login. 1.2 Connection to Avangrid Cyber-infrastructure 1.2.1 All Electronic Devices which connect to the Avangrid Cyber-infrastructure network shall be Avangrid approved assets which have been configured in accordance with Avangrid standard configurations. a. Non-Avangrid approved Electronic Devices shall not connect directly to the Avangrid Cyberinfrastructure (e.g. through Ethernet connection). b. Wireless connections from an Avangrid office shall only be accomplished through Avangrid Electronic Devices and the Avangrid supported wireless infrastructure. c. Guest wireless network accounts shall only be supplied on ‘as-need-be-basis’ following Avangrid approval processes. d. Remote desk connections shall only be supplied on ‘as-need-be-basis’ following Avangrid approval processes. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 19 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider 1.3 Use of Mobile Devices (for Remote Access) 1.3.1 The determining authority and responsibility for issuance of a mobile electronic device to perform Avangrid professional activities; access the Avangrid Cyber-infrastructure or store/transmit Avangrid information/data remotely shall rest with the Avangrid Business Area Leader (BAL) or department hiring manager. a. Users shall remotely access Avangrid’s Cyber-infrastructure utilizing only authorized hardware, software and access control standards (e.g. Avangrid approved VPN technology for Avangrid Electronic Devices or Citrix client). b. At no time shall a remote User initiate two simultaneous connections to different networks (e.g., no split tunneling and no multi-homed connection). c. Avangrid issued SIM cards shall not be swapped or used in non-Avangrid issued Electronic Devices. d. Configuring a non-Avangrid issued Electronic Device for connection to the Avangrid corporate email system is strictly prohibited. e. Users should be aware that Avangrid may monitor emails sent from and to non-Avangrid issued devices. 1.4 Personally Owned Devices 1.4.1 The use of Personally Owned Devices for access to and/or handling of Avangrid information/data and Avangrid Cyber-infrastructure is prohibited. 1.5 Treatment of Software and Applications 1.5.1 The acquisition and installation of software on Avangrid Electronic Devices shall be made using approved methods. a. All access to company software and/or applications shall be subject to formal request and approval processes. 1.5.2 Users shall be prohibited from introducing or installing any unauthorized software, content or material. 1.5.3 The installation of any type of network access program peer (P2P) or similar (e.g., BitTorrent, Emule), as well as any other application for file sharing that could saturate Internet bandwidth, prevent access to other Users or slow down connections to technology and information resources is prohibited. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 20 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider 1.5.4 Intellectual property, licensing and regulatory requirements shall be observed always. Downloading, obtaining, copying or redistributing materials protected by copyright, trademark, trade secret or other intellectual property rights (including software, music, video, images) is prohibited, even where such material is to be used for the pursuit of the professional activity. a. Where materials protected by copyright, trademark, trade secret or other intellectual property rights are required for the pursuit of an Avangrid professional activity the appropriate license/permission shall be obtained prior to use. 1.6 Treatment of Information/Data 1.6.1 Information/data assets obtained or created during the engagement with Avangrid are the property of Avangrid and shall be treated in accordance with the applicable Agreement and Data Security Rider. 1.6.2 The storage of Avangrid information/data on Personally Owned Devices or non-Avangrid controlled or authorized environments, including non-authorized Electronic Devices is prohibited. Users shall not store AVANGRID owned information/data on devices that are not issued by AVANGRID unless explicitly and contractually agreed by both parties. 1.6.3 Where access to Personal Data is part of a Users’ professional role and responsibilities, access shall be treated in accordance with all applicable data protection and/or privacy law(s) and regulation(s) and under strict access and usage guidelines. 1.6.4 Corporate storage spaces and network resources shall be used for file storage and/or exchange of professional information. 1.6.5 Users shall store and share information/data in accordance with the terms and conditions with Avangrid and any applicable Data Security Rider. 1.6.6 Use of an End Point Storage Device (EPSD) (e.g., USB) shall be limited to those devices acquired through the Information Technology (IT) request process (e.g. ITSM/ServiceNow). 1.6.7 Printed information/data (hard copy) shall be: a. Stored based on critically, e.g., hardcopy containing confidential and/or sensitive information/data shall be locked away when not required (or not in use). b. Discarded, when no longer needed, based on criticality, e.g. confidential and/or sensitive hardcopy shall be shredded. c. To be removed from printers, fax machines, copier rooms, and conference/ meeting rooms immediately. AVANGRID / CORPORATE SECURITY & RESILIENCE / 180 Marsh Hill Road, Orange, CT 06577 - USA Take care of the environment. Printed in black and white and only if necessary. Page 21 Avangrid Privacy and Data Security Rider (November 8th, 2024) AVANGRID Privacy and Data Security Rider 1.7 User Access Credentials and Passwords 1.7.1 Requests for access shall be made following access provisioning procedures. 1.7.2 Applications and network resources access shall be activated\deactivated in accordance with Avangrid activation\ deactivation procedures. 1.7.3 Users requiring duly justified privileged access rights will be assigned a specific “Privileged User ID” a. Privileged User IDs shall be reviewed and confirmed at least semi-annually. b. Regular professional activities shall not be performed from a privileged ID. 1.7.4 Users shall use strong, complex passwords and securely maintain secret authentication information (e.g. passwords, cryptographic keys, smart cards that produce authorization codes), including: a. Not sharing or disclosing their Avangrid credentials (log on IDs-user names and/or passwords) with others inside or outside the company. b. Keeping secret authentication information confidential, ensuring that it is not divulged to any other parties, including senior management and technical support. c. Not recording (e.g. on paper, software file or hand-held device) secret authentication information, unless this can be stored securely, and the method of storing has been approved (e.g. password vault) by Corporate Security. d. Changing secret authentication information when there is any indication of a possible co

Text of UI-Attachment 9.pdf

Extracted from the file · 33,882 characters
CORPORATE SECURITY / CYBERSECURITY 17 June 2019 Avangrid Data Classification and Treatment Rule CONFIDENTIAL 17 / June / 2019 Avangrid Data Classification and Treatment Rule Document: Data Classification and Treatment Rule Date: 17 June 2019 Purpose: Protection of Avangrid’s information and data assets throughout lifecycle. Owners: Avangrid Corporate Security Office Review & Update: Periodically, the Owner shall review and update this document. The date of review and approval shall be noted in the table below. Avangrid Corporate Security: --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 1 17 / June / 2019 Avangrid Data Classification and Treatment Rule Table of Contents 1. Purpose .......................................................................................................................... 3 2. Scope ............................................................................................................................. 3 3. Definitions ....................................................................................................................... 3 4. Rule Requirements and Controls .................................................................................... 6 4.1. Information/data Asset Classification .......................................................................... 6 4.2. Information/data Marking/Labeling .............................................................................. 6 4.3. Data Protection Measures........................................................................................... 7 5. Roles & Responsibilities ................................................................................................. 8 5.1. 5.2. 5.3. 5.4. 5.5. 5.6. 5.7. 5.8. 5.9. All Employees ............................................................................................................. 8 Information Asset Owner ............................................................................................ 8 Information Asset Custodian ....................................................................................... 8 Managers and Business Area Leads (BALs) ............................................................... 8 Vendors and Contractors ............................................................................................ 9 Legal Services ............................................................................................................ 9 Business/Corporate Functions .................................................................................... 9 Corporate Security ...................................................................................................... 9 Exceptions ................................................................................................................ 10 Appendix A – Avangrid Data Classification Matrix ................................................................ 11 Classifying Avangrid Information/Data throughout its Life Cycle: ....................................... 11 --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 2 17 / June / 2019 Avangrid Data Classification and Treatment Rule 1. Purpose Protection of Avangrid’s cyber, physical and information assets is driven by business, legal, regulatory, financial and operational requirements. The purpose of this Avangrid Data Classification and Treatment Rule (the “Rule”) is to assist users in classifying business information/data assets and identifying the applicable security measures recommended to reduce the risk of unauthorized access, disclosure, alteration and destruction of Avangrid information/data assets. This Rule identifies a set of controls to be used to classify information/data assets based on their level of sensitivity, value and criticality to Avangrid. This Rule shall be used in collaboration with the Avangrid Cyber Asset Management Rule and in conjunction with related policy and rules and appropriate processes, procedures and reviewed periodically to ensure that it remains current with Avangrid’s legal, regulatory and compliance obligations. This Rule and associated guidance was developed based on current industry best practice, guidance and standards. 2. Scope This Rule applies to Avangrid, Inc. and all its subsidiaries (collectively “Avangrid”).This Rule applies to information/data that is generated, accessed, modified, transmitted, stored or used, irrespective of the medium on which the information/data resides and regardless of its format (e.g. electronic, paper, audio, and video). For purposes of this Rule, the words “information” or “data” can be used interchangeably. 3. Definitions The purpose of the following definitions is to facilitate a common understanding of the relevant concepts included in this document.  Bulk Electric System (BES) means transmission elements operated at 100 kV or higher and real power and reactive power resources connected at 100 kV or higher. This does not include facilities used in the local distribution of electric energy.  Bulk Power System (BPS) means the facilities and control systems necessary for operating an interconnected network (and any portion thereof) and electric energy from generation facilities needed to maintain transmission system reliability. The term excludes facilities used in local electric distribution.  Business Area Lead (BAL) is an internal Vice President or higher that is authorized to approve the sharing of confidential or restricted information.  Critical Energy/Electric Infrastructure means a system or asset of the Bulk Power System, whether physical or virtual, the incapacity or destruction of which would negatively affect --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 3 17 / June / 2019 Avangrid Data Classification and Treatment Rule national security, economic security, public health or safety, or any combination of such matters  Critical Energy/Electric Infrastructure Information (CEII) means information related to critical electric infrastructure, or proposed critical electric infrastructure, generated by or provided to the Federal Energy Regulatory Commission (FERC) or another Federal agency other than classified national security information, that is designated as critical electric infrastructure information. CEII is (a) specific engineering, vulnerability, or detailed design information about a proposed or existing critical infrastructure that: (i) relates details about the production, generation, transportation, transmission, or distribution of energy, (ii) could be useful to a person in planning an attack on critical infrastructure, (iii) is exempt from mandatory disclosure under the Freedom of Information Act, and (iv) does not simply give the general location of the critical infrastructure.  Critical infrastructure: means existing and proposed systems and assets, whether physical or virtual, the incapacity or destruction of which would negatively affect security, economic security, public health or safety, or any combination of those matters.  Cyber-infrastructure: includes electronic information and communications systems and services and the information contained in these systems and services. Those systems and services are composed of all hardware and software that process (creation, access, modification, and destruction), store (paper, magnetic, electronic, and all other media types), and communicate (sharing and distribution) information, or any combination of all of these elements.  Employee is defined as all permanent staff, which is employed by Avangrid or on behalf of Avangrid. This includes on-assignment (temporary) fixed term staff.  Information/data Assets are information and information systems that process, manage and organize the information in such a way that provides meaning or has value to business, such as customers systems/ databases, contracts and agreements, system documentation, research information, management systems, operational or support procedures, business continuity plans, fallback arrangements, audit trails, and archived information.  Information Custodian is responsible for providing a secure infrastructure in support of the information/data asset, including, but not limited to, providing physical security, backup and recovery processes, granting access privileges to users as authorized by the Information Asset Owner.  Information Asset Owner is a manager or above (or their designees) who are responsible for determining the sensitivity level of information/data asset(s) and classifying those assets according to their sensitivity and value to Avangrid. Information Asset Owners are also responsible for changing the classification level of these assets when warranted.  NERC Confidential means: 1) information that by itself will not provide a high probability for a malicious actor to plan or cause a disturbance on the Bulk Electric System (BES), 2) information which may be obtained by any employee but should not be released to the public, and 3) information which may contribute to understanding or identifying an essential system. Information classified as NERC Confidential does not contain enough detail to be able to compromise assets, but may contribute to an attacker’s knowledge of the essential system. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 4 17 / June / 2019 Avangrid Data Classification and Treatment Rule  NERC Restricted means information that by itself significantly increases the probability that a malicious actor can successfully compromise an essential system or plan, or execute an action that causes a disturbance on the Bulk Electric System (BES).  Personal Risk Assessment (PRA) as defined in the North American Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) Reliability Standard 004-1, ensures that a background check has been performed on those individuals electronically accessing or physically touching critical cyber assets.  User is defined as any Employee, Contractor, Consultant or other Third Party with access to or use of Avangrid Electronic Devices or Cyber-infrastructure, regardless of their employment status. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 5 17 / June / 2019 Avangrid Data Classification and Treatment Rule 4. Rule Requirements and Controls 4.1. Information/data Asset Classification 4.1.1. Information/data assets produced, owned or managed by Avangrid to provide services and achieve professional (business) objectives shall be classified and prioritized, throughout their lifecycle, based on the potential impact to the business in the event of a 1 compromise or loss . a. Classifying information/data assets shall be used to determine the appropriate protection measures required to reduce the risk of compromise or loss. 4.1.2. Classification levels shall be determined based on information/data asset type (e.g. Critical Electric/Energy Infrastructure Information - CEII, Personally Identifiable Information - PII) and criticality/value to Avangrid. 4.1.3. Information/data assets shall be assigned a classification level at inception and reviewed and adjusted as necessary throughout the assets’ lifecycle. 4.1.4. Avangrid information/data assets shall be assigned one (1) of four (4) classification levels, as defined in the Avangrid Data Classification Matrix (Appendix A). a. The four (4) categories that shall be used to classify Information/data assets produced, owned or managed by Avangrid are:  Public – Information or data lawfully, properly and regularly disclosed generally or broadly to the public. Information that is neither sensitive nor controlled.  Internal Use – Information or data that is needed to perform job responsibilities. Data is not approved for public disclosure; however, access is unrestricted within the company.  Confidential (including, without limitation, NERC Confidential) – Information or data whose unauthorized disclosure, particularly outside Avangrid, could cause damage to our company, customers, employees or environments or be in violation of federal and/or state requirements.  Restricted (including, without limitation, NERC Restricted and CEII) – Information or data considered secret and highly sensitive, whose unauthorized disclosure could result in grave damage, significant loss of customer or regulatory confidence, damage to Avangrid’s reputation or put our employees at risk. 4.2. Information/data Marking/Labeling 4.2.1. Information/data assets produced, owned or managed by Avangrid to provide services and achieve professional (business) objectives shall be marked and/or labeled based on their classification; as per the Avangrid Data Classification Matrix (Appendix A). 1 Compromise or loss such that the information/data becomes inaccessible, corrupted, destroyed, or made available to those who should not have access to it. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 6 17 / June / 2019 Avangrid Data Classification and Treatment Rule 4.2.2. Where a set of information/data includes elements with varying assigned classification levels, the highest level in the set shall be used for marking/labeling. a. The associated classification protections shall be applied to the set as a whole. 4.2.3. Specific marking and/or labeling shall be applied as follows: a. Document: in the document footer (as per templates) on all pages, and in the 2 metadata . b. Emails: in the mail subject. In this case, the owner shall be the sender. c. Multimedia files: In the metadata. d. Removable media (e.g. CD, DVD, thumb drives, etc.) shall be marked with the highest level of classification based on the elements stored on the removable media and handled in accordance with the Data Classification Matrix. e. Conversations: all parties shall be informed upfront if the information that is going to be discussed is Confidential or Restricted. 4.2.4 Unlabeled/unmarked Avangrid information/data assets shall be treated as information/data assets carrying the classification level of Internal Use. 4.3. Data Protection Measures 4.3.1. Controls to protect Avangrid information/data assets shall be applied throughout the assets’ lifecycle, and shall be based on the assigned classification level. a. Copies of Avangrid information/data assets shall be subject to the same protection controls as the original asset. 4.3.2. Information/data protection measures for electronic files shall also be applied and include: a. Not storing Avangrid owned information/data on personal or non-Avangrid controlled or authorized environments. b. Not sending Avangrid owned information/data through email to personal email accounts. c. Using corporate storage spaces and network resources for file storage and/or exchange of Avangrid owned information/data. i. Critical business information/data or information/data subject to legal or regulatory retention requirements shall not be stored on users’ local hard drives. d. Where an End Point Storage Device (EPSD) is required, only Avangrid supported and distributed devices, with the appropriate security measures shall be used. e. Protection measures shall be adhered too for information/data assets as specified by regulations like Sarbanes-Oxley (SOX), NERC-CIP, the Payment Card Industry-Data Security Standard (PCI-DSS), etc. 2 Metadata – includes data associated with either an information system or an information object for purposes of description, administration, legal requirements, technical functionality use and usage and preservation. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 7 17 / June / 2019 Avangrid Data Classification and Treatment Rule 5. Roles & Responsibilities 5.1. All Employees 5.1.1 All employees shall handle Avangrid information/data assets in accordance with the classification level assigned. 5.1.2 All employees shall report the loss or misuse of marked/labeled information/data to their manager, the Information Asset Owner and Corporate Security at [email removed]. 5.1.3 Any employee who believes that an Avangrid information/data asset is improperly marked or labeled should immediately notify the Information Asset Owner. 5.2. Information Asset Owner 5.2.1 An Information Asset Owner shall be assigned to each information/data asset or group of information assets. 5.2.2 The Information Asset Owner shall determine the information/data assets’ classification level and ensure the level accuracy throughout the assets’ lifecycle. 5.2.3 The Information Asset Owner shall ensure that the information asset is clearly marked/labeled and that the marking/labeling remains accurate throughout the assets’ lifecycle. 5.2.4 The Information Asset Owner shall ensure compliance with use and disclosure restrictions applicable to the information/data assets (e.g. as a result of confidentiality agreements with third parties, legal or regulatory requirements). 5.2.5 The Information Asset Owner shall ensure that the information/data asset is adequately deleted or destroyed at the end of its lifecycle. 5.3. Information Asset Custodian 5.3.1 An Information Asset Custodian shall be assigned to each information/data asset or group of information assets. 5.2.2 The Information Asset Custodian shall ensure that the technical security requirements are implemented to protect the asset, based on the assigned classification level and the Information Asset Owners’ specific requirements. 5.4. Managers and Business Area Leads (BALs) 5.4.1 Managers and BALs shall be responsible for: a. Promoting local implementation and compliance to this Rule. b. Ensuring the integration of the Rule in Business processes and procedures. c. Taking appropriate action when a breach or non-conformance with the rule is suspected or confirmed, including notifying Corporate Security. d. Making the resources needed for compliance to the rule available. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 8 17 / June / 2019 Avangrid Data Classification and Treatment Rule e. Approving, for business reasons, exceptions to information/data sharing controls as required by this Rule. f. Ensuring the submission of a security Third Party Risk evaluation for each new (or renewal) vendor/contractor engagement. (Determines the type and level of access to Avangrid owned information/data assets) 5.5. Vendors and Contractors 5.5.1 The security Third Party Risk management process shall be used to determine the type information/data asset and level of access required by a third party. 5.5.2 Execution of a non-disclosure agreement (NDA), confidentiality agreement or other agreement that includes appropriate non-disclosure and confidentiality provisions approved by the Avangrid’s Legal Services shall be required before granting access to Avangrid Information/data assets classified as Confidential or Restricted. 5.5.3 Vendors/contractors requiring access to Avangrid information/data assets shall be required to complete a Third Party Risk Assessment. 5.5.4 Results of the assessment shall demonstrate established process and controls to protect Avangrid information/data assets. 5.5.5 Contractors requiring access to information/data assets subject to NERC-CIP Standards shall be required to complete NERC-CIP training. 5.5.6 Contractors requiring access to information/data assets subject to NERC-CIP Standards shall be required to have a Personal Risk Assessment (PRA) Check performed. 5.6. Legal Services 5.6.1 As needed and in accordance with Avangrid Records and Information Management Rule, shall provide legal advice to the Business/Corporate Areas in the identification of retention periods derived from legal or regulatory requirements or related to the need to address potential claims. 5.7. Business/Corporate Functions 5.7.1 Business Areas/Corporate Functions shall be responsible for: 5.8. a. Identifying the required technical tools and technologies needed to meet the defined controls. b. Provisioning and implementing the necessary organization and technical controls (as defined) to support the Rule. c. Defining the retention schedules in accordance with Avangrid Records and Information Management Rule. d. Technical security monitoring and measurement to ensure that technical controls are working as expected. d. Ensuring compliance to the Rule. Corporate Security --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 9 17 / June / 2019 Avangrid Data Classification and Treatment Rule 5.8.1 Corporate Security shall be responsible for: a. Governance, oversight and maintenance of the rule. b. Providing guidance, recommendations, and clarifications to users in regards to the Rules’ content. c. Providing training and awareness related to the Rule. 5.9. Exceptions Any relevant exception to this Rule that could entail a significant risk to Avangrid shall be approved using the Avangrid Exception Management Procedure. As required by procedure, any request for exception must be made in writing accompanied by supporting business documentation justifying the exception. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 10 17 / June / 2019 Avangrid Data Classification and Treatment Rule Appendix A – Avangrid Data Classification Matrix The Avangrid Data Classification Matrix can be found in its entirety at: http://iusaintranet/mycompany/iberdrolausa/security/Cyber%20Security%20Policies/Forms/AllItems.as px Classifying Avangrid Information/Data throughout its Life Cycle: 1. Prior to information/data creation consider information/data classification requirements: AVANGRID Data Classification Matrix Type Non-Sensitive Sensitive Restricted - Secret NERC Restricted CEII Avangrid Data Classification Public Internal Use Confidential NERC Confidential Global Data Classification Public Internal Use Confidential Restricted-Secret Risk Low Risk Medium risk High risk Very high risk Information or data lawfully, properly and regularly disclosed generally or broadly to the public. Routine office correspondence available to the general public. Typically regarded as information in the public domain. Information or data employees have access to that is needed to perform their job responsibilities. Information or data is not approved for public disclosure. Information or data that is valuable to AVANGRID, unauthorized disclosure/destruction could cause damage to AVANGRID. Information or data which can be made available to anyone without exception. It is neither sensitive or nor controlled. Information or data which must be available Information or data that has limitations in order for AVANGRID to effectively perform placed upon its internal access and that may Information or data which AVANGRID its mission and meet legally, assigned be disclosed only in accordance with public management believes requires limitations on responsibilities. If lost or damaged could law, federal statute, and supporting internal access on a "need-to-know" basis, cause significant financial loss, inconvience AVANGRID policies, rules, guidelines, but which does not fall under the definition or delay in performance of services and procedures and processes. Would create risk of 'sensitive information'. Not covered result in loss of public trust. May create risk for the Bulk Electric System, Bulk Power under any federal or state legislation. for the Bulk Electric System, Bulk Power System, critical energy/electric System, critical energy/electric infrastructure, or critical infrastructure. infrastructure, or critical infrastructure. Marketing Materials authorized for public release such as advertisements, brochures, web pages, catalogues, external hiring notices, information found in the AVANGRID Annual Report. Information or data that falls under privacy related statutes, nonpublic personal customer, consumer or employee information, incident response plans, operating plans, operating procedures, transaction data, productivity reports, disciplinary reports, contracts, Service level Agreements, floor plans of NERC computing centers that show BES Cyber Systems, network topology or similar diagrams for NERC CIP ESP related networks, etc. Description Criteria Information/Data Examples Business plans, marketing strategies, internal memos, directives, training materials, organizational charts, generic maps/diagrams. Authorized access lists for BES Cyber Systems, training materials. Information or data whose unauthorized Highly sensitive or valuable information or disclosure, particularly outside AVANGRID, data, whose exposure, unauthorized would cause damage to AVANGRID, loss of disclosure/destruction would result in grave customers, embarrassment to the company, damage, significant loss of customer or would be in violation of federal and/or confidence, loss of market share and damage state regulatory requirements resulting in to AVANGRID's reputation. Could put staff fines or litigation against AVANGRID. and/or customers at risk. Business strategies, product development, merger and acquisition information, notes restricted to senior executives and most accounting data. Passwords, passphrases, password databases, and PIN codes, VPN tokens, credit and debit card numbers. , Personally identifiable information (e.g. PII, social security numbers). Security configuration (e.g. BES Cyber Systems, and ESP or PSP equipment). IP addresses, hostnames in context of CIP assets where it can be used to obtain IP addresses, ESP Firewall Rules, etc. 2. Information/data Creation: Life-Cycle: Creating Marking/Labeling Documents (paper and electronic, including No special requirements web pages) Mark each page on hard copy as 'Internal Use'. Identify electronic information as 'Internal Use'. Reproduction Unlimited copies may be made by AVANGRID employees. Must include 'Internal Use' marking. Unlimited Mark each page on hard copy as Mark each page on hard copy as 'Restricted' 'Confidential' or 'NERC Confidential'. Identify or 'NERC Restricted'. Identify electronic electronic information as 'Confidential' or information as 'Restricted' or 'NERC 'NERC Confidential'. Include a legend stating Restricted'. Include delivery instructions. restrictions. Limited copies may be made internally or Limited copies may be made internally or externally with approval (permission) by externally with approval (permission) by information and/or data owner; consistent information and/or data owner; consistent with the need to carry out job with the need to carry out job responsabilities. Proof of approval responsabilities. If digital copies are used, (permission) must be available upon request. cache must be erased. If digital copies are used, cache must be erased. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 11 17 / June / 2019 Avangrid Data Classification and Treatment Rule 3. Information/data Transmission (Distribution) Life-Cycle: Transmission (Distribution) of information or data Internal mail within AVANGRID No special requirements Extended AVANGRID subsidiaries & other offices No special requirements Internal routing envelope/container with no Sealed internal mail envelope, marked and special markings. labeled. Sealed envelope/container marked Sealed envelope/container marked 'Internal 'Confidential' or 'NERC Confidential', To Use'. opened by addressee only'. Requires Fax cover sheet. Fax machine should be located in an area not assessable to the general public. Requires notification and verification of receipt. Sender and receiver must be at fax machines until transmission is complete. Routing envelope sealed, hand delivered where feasible. Sealed envelope/container marked 'Restricted' and restricted to a specified individual. Trackable delivery required. Should not be used. If need to use, Requires Fax cover sheet. Fax machine should be located in a secured area. Telephone notification prior to transmission and subsequent telephone confirmation of receipt required. Immediately confirm receipt. Sender and receiver must be at fax machines until transmission is complete. Facsimile within AVANGRID Requires Fax cover sheet. Fax machine should be located in an area not assessable to the general public. Requires Fax cover sheet. Fax machine should be located in an area not assessable to the general public. Facsimile overseas Requires Fax cover sheet. Fax machine should be located in an area not assessable to the general public. Requires Fax cover sheet. Fax machine should be located in an area not assessable to the general public. Email within AVANGRID No special requirements Email outside AVANGRID No special requirements Transmission by Spoken Word No special requirements None Encryption required for transmission to external email addresses Reasonable precautions to prevent inadvertent disclosure. Requires Fax cover sheet. Fax machine should be located in an area not assessable to the general public and unauthorized employees. Requires notification and Must not be used. verification of receipt. Sender and receiver must be at fax machines until transmission is complete. Encryption required for transmission. Use of email discouraged unless encrypted. Encryption required for transmission to Use of email discouraged. external email addresses. Active measures and close control to limit Active measures and close control to limit information to as few persons as possible. information to as few persons as possible. Can leave in closed desk or unattended cabinet. Reasonable precautions to prevent access by non-employees. Information must be in control of individual entrusted with the information. Requires reasonable care. Storage in lockable enclosure, e.g. desk or storage cabinet. Information must be in control of individual entrusted with the information. Storage on secure drives only. Password protection of document preferred. 4. Information/data Storage Life-Cycle: Storage Hardcopy Storage within AVANGRID No special requirements Hardcopy Storage off site No special requirements Electronic documents Stored on owner's drive Stored on owner's drive E-mail No special requirements Reasonable precautions to prevent access by Encrypted storage and backup in a secure unauthorized personnel. location or container. Requires extreme care. Locked in desk, safe or storage cabinet when unattended. Access should be highly restricted. Information must be in control of individual entrusted with the information. Storage on secure drives only. Password protection/encryption of document required. Encrypted storage and backup in a secure location or container. 5. Information/data Destruction and Disposal Life-Cycle: Destruction & Disposal Hardcopy within AVANGRID Regular Trash, recycle Follow department record retention Follow department record retention Follow department record retention guidelines for shredding (cross cut) or secure guidelines for shredding (cross cut) or secure guidelines for shredding (cross cut) or secure shreding receptables. shreding receptables. shreding receptables. Hardcopy off site Regular Trash Shred or return to AVANGRID. Shred or return to AVANGRID. None Erase or degauss magnetic media. Send CDs, Erase or degauss magnetic media. Send CDs, DVDs, dead hard drives, laptops to IT for DVDs, dead hard drives, laptops to IT for appropriate disposal. appropriate disposal. Intended for use only within AVANGRID. May be shared with Third Party Vendors only if there is a legitimate business need to know and appropriate documentation has been obtained, e.g. data security rider, nondisclosure or confidentiality agreement, cyber insurance, back ground checks, etc. Intended for use only within AVANGRID. May be shared with Third Party Vendors only if there is a legitimate business need to know and appropriate documentation has been obtained, e.g. data security rider, nondisclosure or confidentiality agreement, cyber insurance, back ground checks, etc. Electronic data None Return to AVANGRID. 6. Release to Third Party Vendors Available to the general public and for Release to Third Party Vendors distribution outside of AVANGRID. Access limited to as few persons as possible on a need to know basis. Release only permitted if appropriate documentation has been obtained, e.g. data security rider, nondisclosure or confidentiality agreement, cyber insurance, back ground checks, etc., and approved by information/data owner (or custodian) and Corporate Security. --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 12 17 / June / 2019 Avangrid Data Classification and Treatment Rule --- CONFIDENTIAL --CORPORATE SECURITY / CYBERSECURITY Take care of the environment. Printed in black and white and only if necessary. 13

Text of UI-Attachment 11.pdf

Extracted from the file · 13,899 characters
Personal Data Privacy Policy October 15, 2025 The Board of Directors of Avangrid, Inc. (“Avangrid”) oversees the management of Avangrid and its business with a view to enhance the long-term value of Avangrid. Avangrid is a wholly owned subsidiary of Iberdrola, S.A. and a member of the group of companies controlled by Iberdrola, S.A. (the “Iberdrola Group”). The Board of Directors of Avangrid (the “Board of Directors”) has approved this Personal Data Privacy Policy (this “Policy”) to assist in exercising its responsibilities to Avangrid and its Stakeholders (as defined in Avangrid’s Stakeholder Engagement Policy). This Policy is subject to periodic review and modification by the Board of Directors from time to time. This Policy and Avangrid’s certificate of incorporation, by-laws, corporate governance guidelines and other policies pertaining to corporate governance and regulatory compliance, risk, sustainable development, and social responsibility (collectively, the “Governance and Sustainability System”) form the framework of governance of Avangrid and its subsidiaries (collectively, the “Avangrid Group”). Avangrid’s Governance and Sustainability System is inspired by and based on a commitment to ethical principles, transparency and leadership in the application of best practices in good governance and is designed to be a working structure for principled actions, effective decisionmaking and appropriate monitoring of both compliance and performance. This Policy aligns with and further develops the principles contained in the Personal Data Protection Policy, the Purpose and Values of the Iberdrola Group, and the Ethical and Basic Principles of Governance and Sustainability of the Iberdrola Group approved by the Board of Directors of Iberdrola, S.A. from time to time. 1. Scope of Application This Policy applies to the Avangrid Group and reflects the basic principles established at the Iberdrola Group level and that, in the area of personal data protection, complement those contained in the Ethical and Basic Principles of Governance and Sustainability of the Iberdrola Group and informs the conduct and standards-setting implemented by the other companies of the Avangrid Group in this area in the exercise of their powers and in accordance with their autonomy. For companies that do not form part of the Avangrid Group but in which Avangrid holds an interest, as well as for joint ventures, temporary joint ventures, and other entities in which it assumes management, Avangrid shall also promote the alignment of its regulations with the basic principles regarding personal data protection contained in this Policy. 2. Purpose In the context of the Avangrid Group’s business activities, the Avangrid Group processes personally identifiable information (“PII”) from different groups of Stakeholders such as customers, employees and suppliers. Avangrid recognizes the importance of proper use and handling of the PII acquired, used, stored, destroyed or disclosed in the course of the Avangrid Group’s business activities. This Policy sets forth the general principles that will guide the processing of PII by the Avangrid Group and the basic framework for the distribution of privacy compliance related responsibilities within the different Avangrid Group divisions. This Policy does not, and is not intended to, describe the specific privacy practices of the Avangrid Group, but sets forth the general principles that guide the Avangrid Group’s approach towards privacy compliance. This Policy is not, and should not be construed as, a privacy notice, statement or disclosure. Governance and Sustainability System Personal Data Privacy Policy / 2 3. Main Principles of Conduct Avangrid Group companies shall comply with all applicable privacy laws and regulations in relation to the processing of PII. In addition, the Avangrid Group shall consider the following general principles when processing PII: a) Legal and Lawful. The processing of personal data shall be legitimate, lawful, and fair, in accordance with applicable laws and regulations. In this sense, personal data will be collected for one or more specific and legitimate purposes in accordance with applicable laws and regulations. b) Management. Define, document, communicate and assign accountability for privacy practices. c) Notice and Purpose Specification. When required by applicable law or otherwise considered appropriate by the Avangrid Group, provide notice about privacy practices, including identifying the purposes for which PII is collected, used, retained and disclosed. d) Choice and Consent. When required by applicable law or otherwise considered appropriate by the Avangrid Group, describe the choices available to Stakeholders and obtain implicit or explicit consent with respect to the collection, use and disclosure of PII. e) Minimization. When required by applicable law or otherwise considered appropriate by the Avangrid Group, limit the collection of PII to information needed for legitimate business needs and purposes and any other purposes that may be specified in a privacy notice. If Stakeholders have been provided with a privacy notice identifying the purposes for which specific PII is collected, the Avangrid Group shall only collect the specified PII for purposes that are consistent with the privacy notice. f) Transparency. The Avangrid Group shall be transparent about its practices with respect to the processing of PII. g) Use, Retention and Disposal. When required by applicable law or otherwise considered appropriate by the Avangrid Group, limit the use of PII to legitimate business needs and purposes and any other purposes identified in any applicable privacy notice. When appropriate, the Avangrid Group shall retain PII for only as long as necessary to fulfil legitimate business needs or stated purposes or as required by law or regulations, and thereafter securely dispose of such information. h) Rights of Data Subjects. When required by applicable law or otherwise indicated in any applicable privacy notice, allow Stakeholders to exercise the rights of access, correction, deletion, restriction of processing, portability and appeal that are applicable in each jurisdiction with respect to their PII, establishing for such purpose such internal procedures as may be necessary to satisfy the legal requirements applicable in each case. i) User Limitation and Disclosure to Third Parties. Avangrid Group employees’ right to access PII shall appropriately account for whether the employee “needs to know” and/or “needs to have” access to the PII to fulfil job responsibilities. The Avangrid Group may disclose PII to third parties, including, without limitation, to (i) affiliates, (ii) contractors, service providers, and other third parties used to support the Avangrid Group’s business, (iii) any successor or assignee, or (iv) as required by applicable law or mandate. When required by applicable law or otherwise considered appropriate by the Avangrid Group, privacy notices provided by the Avangrid Group shall describe the type of third parties that could be given access to specific PII and the circumstances thereof. Governance and Sustainability System Personal Data Privacy Policy / 3 When contracting with third parties that may access PII, the Avangrid Group shall take appropriate measures to assess, monitor and control the risks associated with the processing of PII by such third party. j) Security for Privacy. The Avangrid Group shall have in place appropriate technical and organizational security measures that aim to protect PII against unauthorized access or acquisition. In the event of a data security breach, the Avangrid Group shall take appropriate steps to comply with applicable breach notification and reporting requirements. k) Data Quality. Take reasonable steps to maintain accurate and relevant and, where necessary, up-to-date PII. l) Monitoring and Enforcement. Regularly monitor compliance with privacy procedures and practices. m) Data Inventory and Mapping. The Avangrid Group shall maintain a current inventory of systems and processes that collect, store, process, or transmit PII. This inventory shall include data flow mapping to understand how PII moves across internal systems and third-party environments. The inventory shall be reviewed periodically and updated as necessary to reflect changes in business operations or technology. n) Privacy Risk Assessment. The Avangrid Group shall conduct Privacy Impact Assessments (PIAs) or similar evaluations when implementing new systems, processes, or technologies that involve processing of PII. These assessments shall identify potential privacy risks and recommend mitigation strategies. The Corporate Security and Resilience Division shall oversee the execution and documentation of such assessments. o) Training and Awareness. The Avangrid Group shall implement a privacy training and awareness program for employees, contractors, and relevant third parties. Training shall be tailored to roles and responsibilities and shall be conducted at onboarding and at regular intervals thereafter. The program shall include education on privacy principles, data handling procedures, and incident reporting protocols. p) Incident Response and Breach Management. The Avangrid Group shall maintain a documented incident response plan that includes procedures for identifying, reporting, investigating, and remediating data breaches involving PII. The plan shall define roles and responsibilities, escalation paths, and timelines for notification to affected individuals and regulators, as required by applicable law. q) Third Party Risk Management. The Avangrid Group shall assess and manage privacy risks associated with thirdparty vendors that process PII. This includes conducting due diligence prior to engagement, executing appropriate contractual safeguards (e.g. data processing agreements), and performing ongoing monitoring and audits. Vendors shall be required to implement security and privacy controls consistent with Avangrid’s standards. r) Data Classification. The Avangrid Group shall classify PII based on sensitivity and business impact. The general principles set forth in this Policy shall also be considered when developing and implementing internal procedures and rules and when designing and implementing systems containing PII. 4. Iberdrola Group Level Coordination The Corporate Security and Resilience Division of Avangrid, through the Security, Resilience and Digital Technology Committee of Avangrid (or such committee or division as assumes the powers thereof at any time), shall ensure appropriate coordination of the practices and management of risks in the areas of personal data protection within the Avangrid Group, and shall establish appropriate coordination procedures with the Security Governance and Sustainability System Personal Data Privacy Policy / 4 and Resilience Division of Iberdrola, S.A. through the Security, Resilience and Digital Technology Committee of Iberdrola, S.A. (or such committee or division as assumes the powers thereof at any time). 4. Implementation and Monitoring For the implementation and monitoring of the provisions of this Policy, the Board of Directors is assisted by the Corporate Security and Resilience Division (or such division as assumes the powers thereof at any time), which, through the Security, Resilience and Digital Technology Committee (or such committee as assumes the powers thereof at any time), shall develop and keep updated, in accordance with the provisions of this Policy, the internal regulations for the management of personal data protection, which shall be implemented by the Corporate Security and Resilience Division of Avangrid and which shall be mandatory for the members of the management team and the professionals of Avangrid (particularly, it shall establish a procedure for regular monitoring and reporting to the corresponding governance bodies). Avangrid’s Corporate Security and Resilience Division shall be responsible for (i) supervising the implementation of this Policy by the Avangrid Group, (ii) developing and maintaining, with the support of Avangrid’s Legal Services Division, appropriate privacy procedures, rules and practices, and (ii) monitoring compliance by the Avangrid Group of this Policy and any applicable privacy procedures, rules and practices. Avangrid’s Legal Services Division shall be responsible for monitoring material developments concerning privacy laws and regulations, as well as informing Avangrid’s Corporate Security and Resilience Division of such material developments. Avangrid’s technology divisions shall be responsible for implementing appropriate technology controls and developments. As appropriate, the business and corporate function divisions of the Avangrid Group shall identify data owners and shall process PII in accordance with the principles set forth in this Policy and any applicable privacy procedures, rules and practices. Members of Avangrid’s Corporate Security and Resilience Division participate in Iberdrola cybersecurity committees, which assist with coordination across the Group and the implementation of best practices in personal data protection and risk management. This basic framework for the distribution of privacy compliance related responsibilities within the different Avangrid Group divisions may be further developed or supplemented by other internal frameworks, procedures, or rules. The Corporate Security and Resilience Division (or such division as assumes the powers thereof at any time) shall review this Policy at least once per year to ensure that the content thereof conforms to the ongoing progress, innovations, risks and regulatory changes that are occurring in the area. Governance and Sustainability System

Text of UI-Attachment 12.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
Iberdrola´s Group Binding corporate rules September 2025 Content INTRODUCTION 2 1. DEFINITIONS 2 2. SCOPE OF APPLICATION 4 2.1. Material scope of application of the BCRs 4 2.2. Geographical scope of application of the BCRs 5 3. PRINCIPLES 6 3.1. Compliance with local laws and GDPR 6 3.2. Lawfulness, faireness and transparency 6 3.3. Purpose limitation 8 3.4. Data minimization 8 3.5. Accuracy 8 3.6. Storage limitation 8 3.7. Processing of special categories of personal data 9 3.8. Integrity and confidentiality 9 3.9. Personal data security breaches 10 3.10. Processing carried out by data processors 10 3.11. International processing of personal data 11 3.12. Record of processing activities 12 3.13. Objective privacy risk assessment and data protection impact assessment (DPIA) 13 3.14. Data protection by design and by default 14 4. DATA SUBJECTS RIGHTS 14 5. THIRD PARTY BENEFICIARIES’ RIGHTS 15 6. Training programme 15 7. Internal complaints handling procedure 16 8. Audit and supervision programme 16 9. COMPLIANCE 17 10. MUTUAL ASSISTANCE AND COOPERATION DUTY WITH DATA PROTECTION AUTHORITIES 17 11. RELATIONSHIP BETWEEN BCRs AND LOCAL LEGAL REGULATIONS 18 12. LIABILITY 19 13. UPDATE AND MODIFICATIONS OF THE BCRs 21 14. TERMINATION OF THE BCRs 21 15. CONTACT 21 Iberdrola´s Group Binding corporate rules September 2025 ANNEX I – List of the companies included in the scope of the binding corporate rules 23 ANNEX II - Training in personal data protection 23 Annual training programme in personal data protection 23 ANNEX III – Complaints handling procedure 24 ANNEX IV – BCRs audit procedure 26 ANNEX V- Iberdrola´s group privacy team 27 ANNEX VI - Procedure for cooperation with supervisory authorities and other public authorities 30 ANNEX VII – Procedure for updating iberdrola’s binding corporate rules 31 NOTICE: This document is a translation of a duly approved Spanishlanguage document, and is provided for informational purposes only. In the event of any discrepancy between the text of this translation and the text of the original Spanish-language document that this translation is intended to reflect, the text of the original Spanish-language document shall prevail. www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 INTRODUCTION The Binding Corporate Rules (hereinafter “BCRs”) demonstrate the global commitment of all the companies that comprise the Iberdrola Group and are bound by these BCRs (Iberdrola, S.A., the company that exercises control, and all its controlled companies that are also bound by these BCRs, hereinafter referred to as the “Iberdrola Group” and each of its affiliated companies, the “Group Companies”) to privacy and data protection, and establish the framework of appropriate safeguards for the transfer and processing of personal data among them. These BCRs are adopted in accordance with the provisions of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (hereinafter, the “GDPR”). These BCRs apply to all personal data processed within the European Economic Area (hereinafter, the “E.E.A.”), by Group Companies acting as data controllers or processors on behalf of a Group data controller, and transferred, directly or indirectly, from Group Companies located in the E.E.A to Group Companies located outside the E.E.A, to the processing of personal data falling within the scope of these BCRs. The obligations set out in these BCRs apply to all Group Companies acting as Controllers, as well as to Group Companies acting as internal Data processors. By adhering to these BCRs, the Group Companies commit to respecting and complying with their provisions relating to the collection and processing of personal data for the fulfilment of their own purposes, and to ensure compliance by all their employees. The Global Corporate Security Data Protection Coordinator will ensure that the Group Companies comply with these BCRs in a coordinated manner, following common interpretative criteria. These BCRs and the Group Companies are published on the website www.iberdrola.com, and on Iberdrola´s Group Intranet. 1. DEFINITIONS a. “Personal Data” means any information relating to an identified or identifiable natural person (“Data Subject”); an identifiable natural person is one who can be identified, directly or indirectly, in particular by reference to an identifier, such as a name, an identification number, location data, an online identifier or to one or more factors specific to the physical, physiological, genetic, mental, economic, cultural or social identity of that person. b. “Special categories of personal data”: Special categories of personal data include data revealing racial or ethnic origin, political opinions, religious or philosophical beliefs, trade union membership, genetic data, biometric data for the purpose of uniquely identifying a natural person, data concerning health or data concerning a natural person´s life or sexual orientation. c. “Processing” means any operation or set of operations which is performed on personal data or sets of personal data, whether or not by automated means, such as collection, recording, organisation, structuring, storage, adaptation or alteration, retrieval, consultation, use, disclosure by transmission, dissemination or otherwise making available, alignment or combination, restriction, suppression or destruction. d. “Data controller” means the natural or legal person, public authority, service or other body which, alone or jointly with others, determines the purposes and means of the processing of personal data. 2 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 In these BCRs, the Data controller will be the Group Company transferring the personal data and the Group Company receiving the data when it is processed by the Company for its own purposes. e. “Data processor” means a natural or legal person, public authority, service or other body that processes personal data on behalf of the controller. For the purposes of these BCRs, the Group Company providing the services will be considered as a processor in accordance with the corresponding service agreement. f. “Recipient” means a natural or legal person, public authority, agency or other body to which the personal data are disclosed, whether a third party or not. g. “Third party”: means a natural or legal person, public authority, service or other body other than the Data Subject, controller, processor and persons who, under the direct authority of the controller or processor, are authorised to process the personal data. h. “Iberdrola Group or Group”: a group consisting of Iberdrola, S. A., the company exercising control, and all its controlled companies. i. “Group Company/Companies”: each of the companies within Iberdrola´s Group that have adhered to the BCRs by signing the Intragroup Agreement on the BCRs. j. “Parent Company”: in accordance with the Spanish Commercial Code, within Iberdrola´s Group the parent company is the Group Company that meets any of the requirements in relation to the other subsidiary companies: 1. Holds the majority of the voting rights. 2. Has the authority to appoint or remove the majority of the members of the administrative body. 3. Can exercise, by virtue of agreements made with third parties, the majority of the voting rights. 4. Has appointed with its votes the majority of the members of the administrative body who are in office at the time the consolidated accounts are to be drawn up and during the two immediately preceding financial years. k. “Subholding company”: a company that groups together in Spain, the United Kingdom, the United States, Mexico and Brazil the companies of Iberdrola´s Group that are domiciled in such countries and that do not directly depend on Iberdrola, S.A. Exceptionally, Iberdrola Energía Internacional, S.A. groups together the Companies of the Iberdrola Group that do not depend on any of the abovementioned subholding companies and that do not directly depend on Iberdrola, S.A. The subholding company directly depends on Iberdrola, S.A. and, therefore, its subsidiaries are part of the Iberdrola Group. l. “Binding Corporate Rules”: personal data protection policies adhered to by a Group Member established in the territory of a Member State for the transfer or for the set of transfers of personal data to a Data controller or a Data processor based in one or more third countries, within a business group or a union of companies engaged in a joint economic activity. m. “Supervisory Authority” means the independent public authority established by a Member State to monitor and coordinate the implementation of the GDPR. n. “Public Authority” means the public authority established in the Importing country which, in compliance with the laws of that country, requests access to the Exporter’s Personal Data of the Data transferred under the BCRs. Take care of the environment. Printed in black and white and only if necessary. 3 Iberdrola´s Group Binding corporate rules September 2025 o. “Spanish Data Protection Agency”: refers to the Supervisory Authority responsible for overseeing and coordinating the procedure for authorising BCRs, approving them, and informing the relevant Supervisory Authorities of any updates to the BCRs or the list of BCR members. p. “Data Subject”: the identified or identifiable natural person to whom the personal data being transferred from the E.E.A to third countries belongs. q. “Data Exporter” means a Group Company established in an E.E.A country, which directly or indirectly transfers personal data to another Group Company not established in an E.E.A country. r. “Data Importer” means a Group Company which, not being in a country of the E.E.A., receives personal data from a data exporter. s. “Security measures” means appropriate technical and organisational measures taken to ensure a level of security appropriate to the risk. t. “Consent” means any freely given, specific, informed and unambiguous statement by which the Data Subject agrees, either by a statement or a clear affirmative action, to the processing of personal data concerning him/her. u. “Third country” means a country that is established outside the E.E.A. v. “Member State law” refers to the national law of an EU member state, and the law of the E.E.A countries. To the extent not provided for in this paragraph, the Group Companies shall interpret these BCRs in accordance with the GDPR. 2. SCOPE OF APPLICATION 2.1. Material scope of application of the BCRs The BCRs cover the following processing of personal data: • Candidates for a job within the Iberdrola Group: Identification and curriculum data of candidates applying for jobs and study internships who register on Iberdrola´s Group employment portal, in order to allow their participation in possible employment selection processes or student internships. Your personal data may be transferred to any Group Company, even outside the E.E.A, which has an interest in your profile. • Employees: Personal data of employees that are obtained as a result of the employment relationship, in the process of formalizing the relationship and during the period in which it is maintained. Such data may be communicated to the Group Companies, including those outside the E.E.A, for the internal filling of vacancies, for managing the employment relationship, including the management of powers of attorney, guaranteeing compliance with the Code of Ethics, service contracts, and for the team management and organisation. All these international transfers are necessary for the management and fulfilment of the employment relationship with the employee. . • Participants in scholarship programs: Identification, academic and professional data of applicants and beneficiaries of scholarship programs, for the purposes of managing and awarding scholarships. The data provided by the applicant will be included in a database accessible to the Group companies involved in the program’s management, including those located outside the E.E.A. • Volunteers: Identification data of volunteers, for the purpose of managing Iberdrola’s corporate volunteering program and related activities. These data may be communicated to the Iberdrola Group companies coordinating volunteer actions, including those located outside the E.E.A. 4 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 • Suppliers: Personal identification data, personal and professional characteristics, commercial information, economic and transactional data of suppliers, for the purpose of comprehensive supplier management. These data may be communicated to the Group companies involved in supplier management, including those located outside the E.E.A. • Legal representatives: Identification data and personal and professional characteristics for the purpose of managing powers of attorney. These data may be transferred to Group companies, including those located outside the E.E.A, for the management of representation procedures, powers of attorney, and other appointments within the Iberdrola Group companies. • Event attendees and site visitors: Identification data, including images, of attendees at events and visitors to Iberdrola Group facilities, for the purpose of managing corporate events and visits and ensuring their security. These data maybe communicated to other Iberdrola Group companies, including those located outside the E.E.A, for internal administrative purposes. • Individuals affected by security incidents and/or threats: Identification data of individuals affected by security incidents, as well as any other data related to detected security incidents and/ or threats (e.g., IP addresses, usernames, passwords, etc.). These data may be communicated to Group companies, including those located outside the E.E.A, for the purpose of managing such incidents and/or threats. • Individuals contacting Iberdrola through mailboxes and other channels: Identification data of individuals who contact Iberdrola through dedicated mailboxes or other channels to submit queries, requests, complaints, reports, or similar communications regarding various matters (e.g., privacy, ethics and compliance), as well as any other personal data provided through these channels and data relating to third parties involved in the communication. These data may be transferred to Group companies, including those located outside the E.E.A, to manage such communications. • Third parties in compliance matters: Identification data, personal and professional characteristics, commercial and employment-related information of natural and legal persons who interact or may interact with Iberdrola, such as suppliers, their attorneys-in-fact, representatives, directors, managers, and shareholders. The purpose is to ensure coordination, implementation, and standardization of compliance practices within the Group, monitor indicators related to business ethics, and prepare the non-financial reporting statement. 2.2. Geographical scope of application of the BCRs These BCRs apply to the transfers of personal data specified referred to in section 2.1 above, regulating the material scope of these BCRs, carried out by Group Companies in their capacity as Data controllers or processors. Therefore, these BCRs apply to the Group Company located in an E.E.A. country that exports personal data, directly or indirectly, and to the Group Company located outside an E.E.A. country that imports the personal data. The BCRs apply to the initial transfers of personal data as well as to onward transfers. These BCRs are binding on the Group Companies that have signed the Intragroup Agreement on the BCRs (hereinafter, the “IA”) in which they express their acceptance, and which is included as an annex to such IA. Likewise, Annex I of these BCRs includes a list of the Group Companies bound by these BCRs, grouped by the Group Companies that directly or indirectly have control over the former. If you have any questions relating to the Group Companies bound by these BCRs, please contact the Global Corporate Security Data Protection Coordinator whose contact details are: [email removed]. In accordance with the GDPR and applicable labour legislation, these BCRs are binding and enforceable for Iberdrola´s Group employees in all Group Companies. Employees have been informed of their existence, indicating that they are mandatory regulations and establishing that, in accordance with the applicable legislation and the employment contracts with each of the Group Companies, Take care of the environment. Printed in black and white and only if necessary. 5 Iberdrola´s Group Binding corporate rules September 2025 these companies may apply the corresponding disciplinary regime in the event of non-compliance with them. The processing activities and categories of personal data covered by the BCRs are those defined in their scope of application and apply to both manual and automated processing. The transfers of personal data take place between Group Companies in the normal course of their activities, and such data may be stored in centralized databases accessible by Group Companies from anywhere in the world where Iberdrola Group operates. Although all personal data falling within the scope of these BCRs could potentially be transferred to any third country where a Group Company is located, actual transfers only take place when necessary for a specific processing activity and in compliance with applicable data protection regulations. 3. PRINCIPLES Any processing of personal data carried out by the Group Company, whether as Data controllers or Data processors, must comply with the following principles, which are implemented through the rules, procedures, methodologies and corporate tools of Iberdrola´s Group. 3.1. Compliance with local laws and GDPR In addition to complying with these BCRs, each of the Group Company must comply with the applicable local laws related to personal data, understood as the regulations of the country where it is established and shall ensure that the collection and use of personal data are carried out in accordance with those laws. 3.2. Lawfulness, faireness and transparency Personal data must be processed lawfully, fairly and transparently in relation to the Data Subject. The processing of data is lawful if it is based on any of the following conditions provided for in the GDPR: a. Consent: the Data Subject has consented to the processing of his/her personal data for one or more specific purposes. For example, the processing of employee images by the Group Companies for social and corporate communication purposes is carried out if the owner has provided his or her consent. In the event that consent is the legitimate basis for the processing, the Data controller must ensure that the consent has been obtained in the following manner: 1. Freely given: consent is considered freely given if the Data Subject has a real option not to give it. 2. Specific: the purposes of the processing must be specific and cannot be vague or expanded once the Data Subject has consented to the collection of data. 3. Informed: it is necessary for the Data controller to inform the Data Subject of the purposes of the processing, and when necessary, provide additional information to ensure that the Data Subject fully understands the processing activities. 4. Unambiguous: consent must expressly refer to each particular processing activity of personal data. Consent must be obtained independently from the acceptance of any terms and conditions related to the legal relationship and must use clear and simple language. A record will be kept of when and how the Data Subject’s consent was obtained, as well as for what specific purpose, along with the supporting documentation. 6 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 In addition, the Data controller must ensure that the Data Subject can withdraw its consent at any time as easily as it was given. b. Contractual relationship: the processing is necessary for the performance of a contractual relationship between the Group Company and the Data Subject or for the implementation of pre-contractual measures requested by the Data Subject. c. Legal obligation: the processing is necessary for compliance with a legal obligation to which the controller is subject to. d. Vital interest: the processing is necessary in order to protect the vital interests of the Data Subject or of another natural person. e. Public interest: the processing is necessary to ensure that the Data controller fulfils a task carried out in the public interest. f. Legitimate interest: the processing is necessary for the purposes of the legitimate interests pursued by the Data controller or by a third party, except where such interests are overridden by the interests or fundamental rights and freedoms of the Data Subject which require protection of personal data, in particular where the Data Subject is a child. Data Subjects must be informed about the processing activities involving their personal data. Specifically, the following information should be provided: a. The identity and contact details of the Data controller and, where applicable, of its representative. b. The contact details of the Data Protection Officer. c. The purposes of the processing. d. The legal basis or legitimacy for the processing. In the event that the legal basis is the legitimate interest pursued by the Data controller or a third party, provided that this interest is not overridden by the interests or fundamental rights and freedoms of the Data Subject that require the protection of personal data, information will be provided on said interest. e. Categories of personal data processed. f. The data retention period or the criteria used to determine such period. g. The existence of automated decision-making or profiling. h. If there are data transfers to third parties, the recipients or categories of recipients must be indicated. i. Whether the provision of personal data is a statutory or contractual requirement, or a requirement necessary to enter into a contract, as well as whether the Data Subject is obliged to provide the personal data and of the possible consequences of failure to provide such data. j. If the Data controller intends or not to carry out international transfers of data to third countries, and, if carried out, the safeguards that will apply to them. k. The rights that correspond to you in terms of data protection. These are: the right of access, right to rectification, erasure, restriction of the processing, the right to receive notification regarding rectification or erasure of personal data or restriction of processing, the right to object to processing, the right to data portability, and the right to not to be subject to decisions based solely on automated processing, including profiling. If the processing is based on (i) the consent of the Data Subject for one or more purposes or (ii) explicit consent to the processing of data revealing racial or ethnic origin, political opinions, religious or philosophical beliefs, or trade Take care of the environment. Printed in black and white and only if necessary. 7 Iberdrola´s Group Binding corporate rules September 2025 union membership, and the processing of genetic data, biometric data intended to uniquely identify a natural person, data relating to the sexual life or sexual orientation of a natural person, the Data Subject will be informed of the right to withdraw its consent at any time. l. The right to lodge a complaint with a Supervisory Authority in the event that the Data Subject considers that its personal data protection rights recognized in the applicable regulations or in these BCRs have not been respected. m. The existence of automated decisions, including profiling and meaningful information on the logic applied, as well as the significance and consequences of such processing for the Data Subject. n. Where the controller intends to further process the personal data for a purpose other than the purpose other than that for which the personal data were collected, it shall provide the Data Subject prior to that further processing with information on that other purpose and with any relevant further information in accordance with the previous sections. o. If the data is not obtained from the Data Subject, in addition to the information indicated in the previous sections, the controller shall provide the Data Subject with information on the source of the personal data and, if applicable, whether it comes from publicly accessible sources. 3.3. Purpose limitation Personal data are collected for specific, explicit and legitimate purposes and will not be processed for purposes incompatible with those for which they were originally collected. For example, the registration of a supplier only requires the information necessary to maintain and manage the business relationship (general identification and contact data, bank and transactional data such as invoices and contracts) and is only processed for that purpose and will not be processed for purposes for which it is not intended to be used. 3.4. Data minimization Personal data must be adequate, relevant and limited to what is necessary in relation to the purposes of the processing. Only information that is strictly necessary for the purposes of the processing should be collected. Specifically, each Group Company has access to the complete details of its suppliers, while access to other Group Companies suppliers’ information is restricted to the general details of such suppliers (identification, contact and bank details). 3.5. Accuracy Personal data must be accurate and kept up to date. In particular: a. All information repositories, including applications, databases, spreadsheets, etc., should include, as far as possible, a data validation mechanism to ensure that the information is accurate and complete. b. Processes of periodic review and continuous improvement of the information will be established to ensure that the data are accurate and up to date. 3.6. Storage limitation Personal data must be kept in a form which permits the identification of the Data Subjects for no longer than is necessary for the purposes of the processing. In particular: a. All processings of personal data are linked to retention periods implemented through a manual or automatic process which is in the Record of Processing Activities. 8 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 b. Personal data is not retained for a period longer than that implemented through manual or automatic processes. c. Mandatory retention periods for the data, without prejudice to their blocking once the processing for which the data was collected has been completed, are those resulting from the legislation, standards and other applicable regulations, both state and sectoral, in each case. 3.7. Processing of special categories of personal data Group Companies are prohibited from processing special categories of personal data, unless there is a legitimate basis for processing as provided for in Article 6.1 of the GDPR, and one of the circumstances set forth in Article 9.2 of the GDPR applies, which exempts the general prohibition on the processing of special categories of data. These circumstances are: a. The Data Subject has given explicit consent to the processing of such special categories of personal data for one or more of the specified purposes, and such consent is considered valid in accordance with applicable law and regulations; b. The processing is necessary for the fulfilment of obligations and the exercise of specific rights of the controller or the Data Subject in the field of labour law, social security and social protection, to the extent permitted by the applicable law that establishes adequate safeguards for respecting fundamental rights and interests of the Data Subject; c. The processing is necessary to protect the vital interests of the Data Subject or another natural person, in the event that the Data Subject is not physically or legally capable of giving consent; d. The processing relates to personal data that the Data Subject has manifestly made public; e. The processing is necessary for the establishment, exercise or defence of claims or when the courts act in the exercise of their judicial function. 3.8. Integrity and confidentiality Personal data is processed in a manner that guarantees its security, applying appropriate technical and organizational measures. To guarantee this principle, the personal data in relation to which a Group Company is the Data controller or Data processor must be processed: a. Safely and with adequate protection against unauthorised or unlawful processing and against accidental or unlawful loss, destruction or alteration. To this end, the security measures considered necessary will be implemented in each case depending on the level of risk of the processing activity in question. b. Under conditions that guarantee the permanent confidentiality, integrity, availability and resilience of the systems and processing services. c. Under conditions that ensure the ability to quickly restore availability and access to personal data in the event of a physical or technical incident. The technical and organisational measures developed and implemented to guarantee the security of personal data, and their processing must be subject to processes of verification, evaluation and periodic assessment of effectiveness. Group Companies must comply with Iberdrola´s Group Cybersecurity Framework, which defines the programme, policies, standards and processes necessary to manage cybersecurity risks in Iberdrola’s operating environment. Take care of the environment. Printed in black and white and only if necessary. 9 Iberdrola´s Group Binding corporate rules September 2025 3.9. Personal data security breaches In the event of a security breach that results in the destruction, loss, accidental or unlawful alteration of personal data, as well as any unauthorised communication or access to personal data transmitted, stored or otherwise processed, the Group Company acting as Data controller or Data processor of the processing must proceed in accordance with the provisions of Iberdrola´s Group internal procedure: Procedure for Responding to Incidents Related to Personal Data, which establishes the organization and action criteria for the detection, containment, risk assessment, communication and notification of security incidents in which personal data are involved. This procedure establishes the obligation of the Group Companies that have been affected by a Personal Data Security Breach related to personal data transferred from the E.E.A, to notify, without undue delay, the Group Companies that they accept liability for any breach of the BCRs occasioned by any of the Group Companies established outside the E.E.A, as well as to the Global Corporate Security Data Protection Coordinator. In the event that the Personal Data Security Breach is likely to constitute a risk to the rights and freedoms of Data Subjects, the Local Corporate Security Data Protection Coordinator, or where applicable, the Global Corporate Security Data Protection Coordinator shall notify the competent Supervisory Authority, no later than 72 hours after becoming aware of the breach. Where the Personal Data Security Breach is likely to constitute a high risk to the rights and freedoms of Data Subjects, the Group Companies concerned shall notify the Data Subjects directly without undue delay. Notifications of a Security Breach must be documented and include at a minimum: a. The description of the nature of the Security Breach: number of affected Data Subjects, category of affected Data Subjects, approximate number of personal data records affected, etc. b. Name and contact details of the Data Protection Officer or other point of contact where more information can be obtained. c. Effects and possible consequences of the Security Breach. d. Description of the measures taken or proposed to remedy the Security Breach, including, if applicable, the measures taken to mitigate the possible negative effects. This documentation must be made available to the Spanish Data Protection Agency and any other Supervisory Authority when requested. 3.10. Processing carried out by data processors Group Companies may not contract the services of a service provider that has access to the personal data for which the Company is the Data controller without first ensuring that the Data processor will apply appropriate technical and organisational measures to ensure the protection of the rights and freedoms of the Data Subjects. A contract or other similar legal act must be signed, binding the Data processor to the Data controller and establishing the subject matter, duration, nature and purpose of the processing, the type of personal data and the categories of Data Subjects to which they refer, the rights and obligations of the Data controller and the Data processor. The obligations of the Data processor shall be, as a minimum and expressly provided for in the contract or similar legal act, the following: a. Process the personal data only on documented instructions from the Data controller, including with regard to transfers of personal data to a third country or an international organization, unless required to do so by Union or Member State law to which the processor is subject. In such a case, the processor shall inform the controller of that legal requirement before processing, unless that law prohibits such information on important grounds of public interest 10 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 b. Ensure that persons authorised to process the personal data have committed themselves to confidentiality or are under an appropriate statutory obligation of confidentiality. c. Take all necessary measures to ensure the safety of the treatments. d. Not to allow access to personal data to another Data processor without the prior written authorisation, specific or general, of the Data controller. In any case, the processing of personal data carried out by the new subprocessor must comply with the instructions of the controller, and the processor must enter into a contract with the new subprocessor in accordance with the provisions of Article 28 of the GDPR. e. Assist the Data controller, taking into account the nature of the processing, through appropriate technical and organisational measures, whenever possible, so that the latter can comply with its obligation to respond to requests aimed at exercising the rights of Data Subjects. f. To assist the controller in ensuring compliance with the obligations set out in the GDPR, taking into account the nature of the processing and the information available to the Data processor: • Taking into account the state of the art, the costs of implementation, and the nature, scope, context and purposes of the processing, as well as the risks of varying likelihood and severity to the rights and freedoms of natural persons, the processor shall implement appropriate technical and organisational measures to ensure a level of security appropriate to the risk. • The Data processor shall notify the Data controller of breaches of the security of personal data without undue delay from the date of becoming aware of such delay • The Data processor shall provide reasonable support to the Data controller when conducting any Data Protection Impact Assessment, and in prior consultations with Supervisory Authorities or other competent data protection authorities, where appropriate. g. At the choice of the Data controller, delete or return all personal data to the Data controller after the end of the provision of processing services, and delete existing copies unless Union or Member State law requires storage of the personal data. h. Make available to the Data controller all information necessary to demonstrate compliance with the obligations applicable to the Data processor, as well as to enable and contribute to the performance of audits, including inspections, by the Data controller or another auditor authorised by the Data controller. i. Immediately inform the Data controller in the event of a breach of its obligations as a Data processor. 3.11. International processing of personal data The processing of personal involving a transfer of data to Data controllers and Data processors that are not part of Iberdrola´s Group and are located in countries outside the E.E.A must be subject to additional guarantees that ensure that the level of protection is adequate. Therefore, the transfer of personal data from a Group Company to non-adherent Group Companies or to third parties may only take place: 1. When the countries in which the recipient companies (Group Companies or third parties) are located offer an adequate level of protection, in accordance with an adequacy decision of the European Commission. 2. When the countries in which the recipient companies are located are not those referred to in paragraph 1), the Data controller or processor shall take appropriate measures to compensate for the lack of data protection in the destination country. By way of example: Take care of the environment. Printed in black and white and only if necessary. 11 Iberdrola´s Group Binding corporate rules September 2025 • Standard data protection clauses adopted by the European Commission or by a Supervisory Authority; • Binding corporate rules for Data processors; • Binding codes of conduct setting out the obligations of member companies in relation to the international transfer of data in accordance with the GDPR; along with binding and enforceable commitments on the controller or processor of the third country to apply appropriate safeguards, including those relating to the rights of Data Subjects. • Certification that demonstrates that the certified companies comply with the GDPR in relation to international transfers; along with binding and enforceable commitments on the controller or processor of the third country to apply appropriate safeguards, including those relating to the rights of Data Subjects. • Legally binding and enforceable instruments between public authorities or bodies. Apart from the cases provided for in the two previous sections, international data transfers may only be carried out by Group Companies to non-member Group Companies or to third parties if: • The Data Subject has given his or her explicit and informed consent. • The international transfer is necessary for (i) the conclusion or performance of a contract between the Data Subject and the controller or for the execution of pre-contractual measures adopted at the request of the Data Subject; (ii) the conclusion or performance of a contract, in the interest of the Data Subject, between the controller and another natural or legal person; (iii) the protection of the vital interests of the Data Subject or other persons, where the Data Subject is physically or legally incapable of giving consent; or (iv) the assertion, exercise or defense of claims. • The international transfer has been authorised by the Supervisory Authority prior to its execution and on the basis of contractual clauses agreed between the controller or the Data processor and the controller, processor or recipient of the personal data in the third country. • The international transfer is based on a legitimate interest of the Data controller over which the interests or fundamental rights and freedoms of the Data Subject do not prevail, and also that it is (i) non-repetitive, and (ii) affects a limited number of people, and (iii) specific and appropriate data protection guarantees are adopted. It will also be necessary to inform the Supervisory Authority and the Data Subject. This case is only admissible in exceptional circumstances and when none of the three previous reasons for the transfer are applicable. The international transfer of data as a result of the provision of services shall not exempt the obligation to enter into a contract with the Data processor in accordance with the provisions of the GDPR The internal procedure of Iberdrola´s Group called the Procedure on international transfers of personal data establishes the guidelines to be followed in accordance with the GDPR when a Group Company located in the E.E.A must carry out international transfers of personal data to recipients outside the E.E.A. 3.12. Record of processing activities Each Data controller and Data processor keeps a Record of Processing Activities, which will be documented in writing, including in electronic format, and will include all personal data processing activities they carry out. The Record of Processing Activities will be made available to the supervisory authority upon request. The Record of Processing Activities must include: a. The name and contact details of the controller and, where applicable, the joint controller, the controller´s representative, and the data protection officer. b. The purposes of the processing. 12 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 c. A description of the categories of Data Subjects and categories of personal data. d. The categories of recipients to whom the personal data is disclosed, including recipients in third countries. e. Where applicable, transfers of personal data to a third country, including the identification of such third country or international organisation and in the case of transfers referred to in section 3.11. f. The envisaged time limits for erasure of the different categories of data. g. A general description of the technical and organisational measures implemented to protect personal data. h. The identification of the data processors, both internal and external. The Record of Processing Activities of the Data processor includes all categories of processing activities carried out on behalf of the Data controller, containing: a. The name and contact details of the processor(s) and of each controller on behalf of which the processor is acting and, where applicable, of the controller’s or the processor’s representative, and the data protection officer b. The categories of processing carried out on behalf of each controller. c. International transfers of personal data to a third country or international organisation, including the identification of such third country or international organisation, and in the case of transfers referred to in section 3.11, the documentation of appropriate safeguards. d. A general description of the technical and organizational security measures you are implementing. The Record of Processing Activities must be reviewed at least annually and, in any case, whenever there is any significant change in any of the processing activities. No processing activities that may compromise the rights and freedoms of Data Subjects will be carried out. To this end, and in accordance with the GDPR, an objective analysis of the risks of each processing will be carried out, as described in the following clause. 3.13. Objective privacy risk assessment and data protection impact assessment (DPIA) Processing activities falling within the scope of these BCRs must be subject to an objective privacy risk assessment. In cases where it is found that there is a high risk to the rights and freedoms of Data Subjects, a Data Protection Impact Assessment (hereinafter, “DPIA”) will be carried out. In the event that the DPIA shows that the processing entails a high risk and the controller does not take measures to mitigate it, the Supervisory Authority will be consulted before proceeding with the processing. The DPIA consists of a more exhaustive analysis of the risks associated with a processing activity, which allows the identification of the mitigating measures of the same, through: a. The assessment of threats and vulnerabilities, both legal and technological, including their likelihood and potential impact; b. Obtaining the inherent risk; c. The assessment of the degree of maturity of safeguards; d. Obtaining residual risk; e. Implementation of the Action Plan. Take care of the environment. Printed in black and white and only if necessary. 13 Iberdrola´s Group Binding corporate rules September 2025 3.14. Data protection by design and by default The Data Controller, both at the time of determining the means of processing and at the time of the processing itself, implements appropriate technical and organisational measures, in order to meet the requirements of the GDPR and the BCRs, and protect the rights and freedoms of Data Subjects. The Data controller shall implement appropriate technical and organisational measures for ensuring that, by default, only personal data which are necessary for the specific purposes of the processing are processed. Before starting a new processing, activity or modifying an existing one, the legal and technical requirements that are required and necessary must be analysed in order to determine whether the processing by Iberdrola´s Group is viable in accordance with the GDPR, following Iberdrola´s Group internal procedure, known as the Procedure to guarantee data protection by design and by default. 4. DATA SUBJECTS RIGHTS With regard to the processing of personal data, the Group Companies guarantee the following inalienable rights to the Data Subjects: a. Right of Access, which involves providing information about the personal data held concerning a Data Subject. b. Right to Rectification, by virtue of which the Data Subject may request the rectification of inaccurate or incomplete personal data concerning him or her. c. Right to Erasure or “right to be forgotten”, by which the Data Subject may request the deletion of its personal when the circumstances provided for in the GDPR apply. d. Right to Restriction of the Processing, by virtue of which the Data Subject may request the restriction of processing when the circumstances provided for in the GDPR apply. e. The right to Data Portability, whereby the Data Subject may receive the personal data concerning him or her, which he or she has provided to a Data controller, in a structured format, and to transmit them to another Data controller. f. Right to Object, by which the Data Subject may object to the processing of its personal data for a specific purpose. g. Right not to be subject to a decision based solely on automated processing, including profiling, which produces legal effects on Data Subjects or similarly significantly affects them. h. Right to receive notification regarding rectification or erasure of personal data or restriction of processing. The Group Companies will only make decisions based solely on automated processing, including profiling, that produces legal effects on the Data Subject or significantly affects him/her, if any of the following conditions are met: • It is necessary for entering into, or performance of, a contract between the Data Subject and a Group Company Data controller. • It is authorised by the regulations applicable to the Data controller which also lay down suitable measures to safeguard rights and freedoms and legitimate interests. • It is based on the Data Subject´s explicit consent. In the first and third case, the Data Subject will be facilitated, at least, with the right to obtain human intervention on the part of the Data controller, to express his or her point of view and to contest the decision. 14 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 The exercise of the above rights must be carried out in accordance with the provisions of the applicable data protection regulations and, in any case, in accordance with the provisions of the GDPR. 5. THIRD PARTY BENEFICIARIES’ RIGHTS The Group Companies shall guarantee that Data Subjects can exercise their rights as third-party beneficiaries under these BCRs. Data Subjects may invoke the rights set out in sections 3, 4, 7, 10, 11, 12 and 13 of these BCRs, which correspond to them as third-party beneficiaries in relation to the processing of their data, under the terms provided in this section. Data Subjects also have the right to easily access these BCRs. Data Subjects whose personal data is collected and/or processed in the E.E.A by a Group Company (Exporter) and transferred to a Group Company outside the E.E.A (Importer) shall have the right to enforce these BCRs as third-party beneficiaries. For this purpose: • They may lodge a complaint with the competent Supervisory Authority (at their choice, the E.E.A Supervisory Authority corresponding to their country of residence, place of work or place of alleged infringement) and before the competent court of the E.E.A. (at your choice, those of the country of the E.E.A in which the Group Company has an establishment, or those of the country in which the Data Subject has its residence). Likewise, Data Subjects may be represented by a nonprofit body, organisation or association under the conditions established in article 80.1 of the GDPR. • If the Group Company that has allegedly breach the BCRs is established outside the E.E.A, the Data Subject may, under the terms provided for in the previous section, exercise its rights and lodge a claim, in accordance with the liability scheme defined in section 12 of these BCRs, against the Group Company that assumes liability in the event of a breach of the BCRs on the side of the Group Company domiciled outside the E.E.A., which shall be considered liable for the infringement. For this purpose, the breach will be deemed to have occurred at the registered office of the Group Company that assumes responsibility. • Likewise, the Group Company which, in accordance with the liability scheme defined in section 12 of these BCRs, assumes liability in case of a breach of the BCRs on the side of the Group Company domiciled outside the E.E.A, will be liable for assume any damages suffered by any Data Subject as a result of a breach of these BCRs by the Group Company or another data importing company, provided that such liability has been declared by a court or other competent authority. In order to identify the company to which the Data Subject should address his/her claim and which is responsible for a breach of the BCRs, the Data Subject should contact the Global Corporate Security Data Protection Coordinator, whose contact details are: [email removed], who will provide the information about the Responsible Company. For the abovementioned purposes, these BCRs are constantly available and easily accessible by interested parties through their publication on the website www.iberdrola. 6. Training programme The Group Companies will promote, update, and provide specific training programs to all their employees on the principles of personal data protection, with a particular focus on these BCRs and the consequences of non-compliance. All Group Companies employees must complete training activities annually and pass an assessment test. Take care of the environment. Printed in black and white and only if necessary. 15 Iberdrola´s Group Binding corporate rules September 2025 Specific training should be provided to employees who have permanent or regular access to personal data or who are involved in the collection of such data or in the development of tools used for its processing. Annex II of the BCRs includes the training requirements for the Group employees regarding personal data protection with a particular emphasis on the BCRs as a transfer mechanism between the Group Companies. 7. Internal complaints handling procedure Data Subjects may contact the Global Corporate Security Data Protection Coordinator at any time, who is responsible for handling and processing complaints regarding the breach of the BCRs by a Group Company and exercises its functions independently. The Group Companies must comply with the complaints handling procedure included as Annex III of the BCRs. Upon submission of a claim, an acknowledgment of receipt will be issued. The claim will be resolved within one month of its receipt. This period may be extended by up to two months, depending on the complexity and number of requests received. In the event that a claim leads to an investigation by the competent Supervisory Authority, the affected Group Company will abide by the decision issued. 8. Audit and supervision programme The privacy audit programme of the Group Companies expressly includes the verification of compliance with these BCRs, being the verification mechanisms defined in Iberdrola´s Group internal procedure called GDPR Compliance Assessment Model. The BCRs Audit Procedure is described in Annex IV. The Global Corporate Security Data Protection Coordinator determines the scope of the BCRs audit, which includes all aspects of the BCRs, as well as the designation of the internal staff responsible for conducting it and the methods and action plans to ensure that corrective actions are carried out. The BCRs audit may be conducted internally or through an external audit. The audit report must be communicated to the Board of Directors of the Group Companies responsible in case of BCRs noncompliance, their Local Corporate Security Data Protection Coordinator, and the Global Corporate Security Data Protection Coordinator, specifying the corrective measures, recommendations and a deadline for their implementation. The BCRs audit is conducted annually. The Board of Directors of the Group Companies in the event of non-compliance with the BCRs may also request the performance of an audit of the BCRs. In addition to the audits carried out on an annual basis, specific audits (ad hoc audits) may be requested by the Global Corporate Security Data Protection Coordinator. Iberdrola will provide, through the Global Corporate Security Data Protection Coordinator, access to the results of the BCR audit to the competent European Data Protection Authority upon its request. The competent European Data Protection Authorities may carry out a data protection audit of any member of the BCRs if deemed appropriate. The Group Companies must comply with the recommendations on the scope and compliance with these BCRs that may be issued by the data protection authorities. 16 www.iberdrola.com Iberdrola´s Group Binding corporate rules September 2025 9. COMPLIANCE The Global Corporate Security Data Protection Coordinator is responsible for supervising and ensuring that the Group Companies comply with the BCRs in a coordinated manner and following common interpretative criteria, with the assistance of the professionals who make up the Iberdrola Group’s Privacy team. The Group Companies undertake the following: • Not to carry out any transfer of data to another Group Company, unless said company is adhered the BCRs and has mechanisms in place to ensure compliance. • When acting as a Data Importer, to inform the Data Exporter as soon as possible in the event that, for any reason, including the situations described in paragraph 11, it is unable to comply with the BCRs. • When acting as a Data Exporter, to suspend the data transfer in the event that the Data Importer fails or is unable to comply with the BCRs. • When acting as a Data Importer, at the Data Exporter’s choice, to delete or return the transferred personal data or any copy thereof when: – the Data Exporter has suspended the transfer and compliance with the BCRs cannot be restored within a reasonable time and in any event within one month from the suspension; – the Data Importer materially or repeatedly fails to comply with the BCRs; or – the Data Importer fails to comply with a binding decision of a court or Supervisory Authority regarding the obligations contemplated in the BCRs. The Data Importer shall certify the deletion of the personal data to the Data Exporter. Until this action is carried out, the Data Importer shall continue to ensure compliance with the BCRs. If local laws applicable to the Data Importer prohibit the return or deletion of the received personal data, the Data Importer shall continue to comply with the BCRs and will process the data only within the limits permitted by local laws. Annex V provides information on the operating structure, coordination mechanisms and responsibilities of the Iberdrola´s Group Privacy team, which guarantees compliance with the protection of personal data throughout the Group and the absence of conflicts of interest in the performance of duties. 10. MUTUAL ASSISTANCE AND COOPERATION DUTY WITH DATA PROTECTION AUTHORITIES The Group Companies commit to cooperate and assist each other in the event of complaints from a Data Subject or investigations and requests made by the Supervisory Authorities concerning breaches of the BCRs. The Group Companies also commit to cooperate with the competent Data Protection Authorities within the scope of application of the BCRs and will respond to requests made by such Authorities in relation to the BCRs in the corresponding manner and time frame, and they will abide by the decisions and recommendations issued by these Authorities. To this end, they will follow the Procedure for cooperation with the Supervisory Authorities detailed in Annex VI. The Group Companies agree to submit to the data protection audits carried out by the Data Protection Authorities. Any conflict relating to the exercise of the Supervisory Authorities powers in relation to the supervision and enforcement of the BCRs shall be settled by the courts of the Member State to which the Supervisory Authority concerned belongs, in accordance with the procedural laws of that Member State. The Group Companies agree to submit to the jurisdiction of such courts. Take care of the environment. Printed in black and white and only if necessary. 17 Iberdrola´s Group Binding corporate rules September 2025 11. RELATIONSHIP BETWEEN BCRs AND LOCAL LEGAL REGULATIONS The Group Companies must comply with the applicable local data protection regulations, without prejudice to compliance with these BCRs, provided that the BCRs offer a higher level of protection than that established in local regulations. In all aspects covered by these BCRs where the applicable local legislation establishes a higher level of protection, the local legislation shall. • Transfer Impact Assessment: Third Country Regulations and Practices The Group Companies will use the BCRs as a tool for international data transfers only after assessing that the local regulations and practices of the destination country applicable to the processing of the data, including data disclosure requirements or any authorisation of access to the data by public authorities, do not impede compliance with the Data Importer’s obligations under the BCRs. In particular, the Group Companies will assess whether the local regulations and practices of the destination country essentially respect fundamental rights and freedoms, and whether the legislative measures contemplated therein are necessary and proportionate in a democratic society to safeguard the legal rights of Article 23.1 of the GDPR. When assessing local regulations and practices in the third country, which may have implications for compliance with the obligations and commitments set out in the BCRs, the Group Companies shall take into account: – The specific circumstances of the transfer or set of transfers and subsequent transfers envisaged within the third country or