Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Words on different pages
  1. Page 131 of 176

    03/31/2026 Docket No. 86-12-03 Trumbull 2803 – City of Shelton and Town of Trumbull – continued e) Work with Operations to identify potential solutions to help limit customer exposure to CELID9 events during blue sky days. 131
  2. Page 132 of 176

    03/31/2026 Docket No. 86-12-03 Indian Well 514 – Town of Shelton 4 – Year Outage Cause Summary Number of Outages 1 1 3 2 26 4 Outage Type Animal Contact Conductor Failure Cutout Meter Tree Contact Vehicle Accident Number of Outages 6 13 1 7 1 Outage Type Cable Fault Connector Failure Lightning Transformer Unknown Number of Outages 1 Outage Type Conductor Failure 4 – Year CELID-9 Outage Cause Summary Number of Outages 2 1 2 1 Outage Type Cable Fault Connector Failure Transformer Unknown 1 18 Cutout Tree Contact Reliability Improvement – 2026 Recommendations Indian Well Circuit 514 was included in the 2025 TDRP Reliability Corrective Action Plan. Recommendations for 2026 are listed below: 1. Include circuit 514 in the Vegetation Management program. 2. Spot Tree Trimming from pole 2628 to pole 2637 (Saw Mill City Rd). 3. Add missing current limiting fuses on the following 8 poles: 3641, 8065, 7231, 9586, 2746, 8053, 6314, and 1345. 4. Replace the four skirt cutouts on the following 25 poles: 834, 3564, 1725, 4430, 1333, 1727, 3046, 1684, 5071, 1498, 2637, 1516, 1512, 1513, 952, 5989, 9748, 4903, 2785, 3263, 1312, 2760, 831, 832, and 9827. 5. Install a cutout fuse at the following locations: a) Pole 4780 (Button Rd) and pole 4787 (Treeland Rd) to help sectionalize the area during outages and reduce the total number of customers affected. 132
  3. Page 133 of 176

    03/31/2026 Docket No. 86-12-03 Indian Well 514 – Town of Shelton - continued 6. 2025 CELID9 events: a) One CELID9 outage caused by an underground cable fault affecting 19 customers. b) One CELID9 outage caused by tree contact affecting 64 customers. c) One CELID9 outage caused by an unknown reason affecting 1 customer. d) Work with Operations to identify potential solutions to help limit customer exposure to CELID9 events during blue sky days. 133
  4. Page 134 of 176

    03/31/2026 Docket No. 86-12-03 Old Town 2615 – City of Bridgeport and Towns of Easton, Fairfield & Trumbull 4– Year Outage Cause Summary Number of Outages 1 1 3 4 1 1 21 1 Outage Type Cable Fault Conductor Off Pin Cutout Fuse Loose Connection Power Supply Tree Contact X-Arm/Brace Number of Outages 1 7 1 1 3 3 1 Outage Type Circuit Breaker Connector Failure Foreign Objects Lightning Meter Transformer Vehicle Accident Number of Outages 1 3 Outage Type Recloser Tree Contact 4 – Year CELID-9 Outage Cause Summary Number of Outages 1 1 Outage Type Fuse Transformer Reliability Improvement – 2026 Recommendations Old Town Circuit 2615 was included in the 2025 TDRP Reliability Corrective Action Plan. Recommendations for 2026 are listed below: 1. Include circuit 2615 in the Vegetation Management program. 2. Install missing current limiting fuses at the following 11 poles: 2293, 2294, 2713, 3916, 845, 1251, 1309, 1296, 2652, 2711, and 1299. 3. Replace the four skirt cutouts at the following 8 poles: 5488, 1436, 5064, 917, 4500, 1656, 2250, and 2373. 4. 2025 CELID9 events: a) One CELID9 outage caused by a fuse affecting 27 customers. b) One CELID9 outage caused by tree contact affecting 13 customers. c) Work with Operations to identify potential solutions to help limit customer exposure to CELID9 events during blue sky days. 134
  5. Page 135 of 176

    03/31/2026 Docket No. 86-12-03 Trumbull 2801 – Towns of Shelton & Trumbull 4– Year Outage Cause Summary Number of Outages 2 1 7 3 1 2 2 1 27 6 Outage Type Animal Contact Circuit Breaker Connector Failure Elbow Failure Hot Line Clamp Lightning Meter Terminator Failure Tree Contact Vehicle Accident Number of Outages 1 2 5 2 1 1 2 8 2 Outage Type Cable Fault Conductor Failure Cutout Fuse Insulator Loose Connection Pad Mounted Switch Transformer Unknown Number of Outages 1 2 1 Outage Type Cutout Transformer Vehicle Accident 4 – Year CELID-9 Outage Cause Summary Number of Outages 1 1 13 Outage Type Connector Failure Pole Tree Contact Reliability Improvement – 2026 Recommendation Trumbull Circuit 2801 was included in the 2025 TDRP Reliability Corrective Action Plan. Recommendations for 2026 are listed below: 1. Include circuit 2801 in the Vegetation Management. 2. 2025 CELID9 events: a) One CELID9 outage caused by a cutout affecting 28 customers. b) One CELID9 outage caused by a transformer affecting 4 customers. c) Seven CELID9 outages caused by tree contact affecting 34 customers. d) Work with Operations to identify potential solutions to help limit customer exposure to CELID9 events during blue sky days. 135
  6. Page 136 of 176

    03/31/2026 Docket No. 86-12-03 b. Reliability Corrective Action Plans for Tier 2 Circuits (Worst 4%) No Tier 2 corrective actions in 2025 Plan. Appendix 16b is not applicable. 136
  7. Page 137 of 176

    03/31/2026 Docket No. 86-12-03 c. Reliability Corrective Action Plans for Optional and Alternative Circuits No optional circuits in 2025 Plan. Appendix 16c is not applicable. 137
  8. Page 138 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 17: Status of Previous Corrective Action Percent Complete Rank 1 Circuit Yr(s) Identified Compl Date OH (%) UG Aerial Original SAIDI (MIN) SAIFI Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) SAIFI SAIFI Comments 512 2024 Refer to Comments NA NA NA 281.5 4.46 66 0.64 87.0 0.49 Indian Well Circuit 512 was included in the 2025 TDRP Reliability Corrective Action Plan. None of the Reliability Corrective Action Plans were executed in 2025 due to budget constraints. 2683 2023 Refer to Comments NA NA NA 275.5 2.71 66 0.64 46.2 0.26 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. 0.21 Quinnipiac Circuit 1548 was included in the 2023 TDRP Reliability Corrective Action Plan. There were three CELID9 outages in 2022 during blue sky days that were caused by tree contacts. Spot Tree Trimming from inspections were handled within the Vegetation Management program. Planned trip saver installations were delayed due to long lead/supply chain availability issues. Field workforce training is scheduled for Q2 of 2024. 0.00 Old Town Circuit 2617 was included in the 2022 TDRP Reliability Corrective Action Plan. It was originally included in the worst 4% list due to deteriorated cross arms, animal guard and switch. Will be evaluated to be included in the 2022 corrective action plan. 1548 2617 2022 2021 Refer to Comments Refer to Comments NA NA NA NA NA NA 112.6 199 0.7 0.72 138 66 66 0.64 0.64 31.4 0.0
  9. Page 139 of 176

    03/31/2026 Docket No. 86-12-03 Percent Complete Rank Circuit 2519 2 2688 2684 2616 Yr(s) Identified 2020 2024 2023 2022 Compl Date Refer to Comments Refer to Comments Refer to Comments Jan - 24 OH (%) NA NA NA 100 UG NA NA NA NA Aerial NA NA NA NA Original SAIDI (MIN) 6669* 371.0 180.3 28.8 SAIFI 89.33* 3.83 1.24 0.10 139 Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) 66 66 66 66 SAIFI 0.64 0.64 0.64 0.64 8.4 390.8 85.5 1.1 SAIFI Comments 0.06 Pequonnock Circuit 2519 was included in the 2021 TDRP Reliability Corrective Action Plan. It is a repeat from the 2020 TDRP. It was originally included in the worst 4% list due to a cable fault at the riser. Reliability improvement recommendations were identified, planned, and completed in 2020. The configuration of Circuit 2519 is set to change as a result of the Pequonnock Substation relocation. No further comprehensive recommendations were required. *Circuit 2519 SAIDI/SAIFI values were reviewed. Updates did not affect the final system reliability indices. 3.16 Hawthorne Circuit 2688 was included in the 2025 TDRP Reliability Corrective Action Plan. None of the Reliability Corrective Action Plans were executed in 2025 due to budget constraints. 1.17 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. One Trip Saver was installed in May of 2025. 0.02 Old Town Circuit 2616 was included in the 2023 TDRP Reliability Corrective Action Plan. Spot Tree Trimming from inspections were handled within the Vegetation Management program. Both the recommended deteriorated crossarm brace replacement and fault indicator installations were completed. Additional fusing were added based on evaluations of backbone unprotected side taps.
  10. Page 140 of 176

    03/31/2026 Docket No. 86-12-03 Percent Complete Rank Circuit 1695 2504 3 Yr(s) Identified 2021 2020 Compl Date Refer to Comments Refer to Comments OH (%) 50 NA UG NA NA Aerial NA NA Original SAIDI (MIN) 140 0 SAIFI 2.16 0 Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) 66 66 SAIFI 0.64 0.64 0.0 0.0 SAIFI Comments 0.00 Mix Circuit 1695 was included in the 2022 TDRP Reliability Corrective Action Plan. Requirement of an outage is needed to complete. Will be evaluated to be included in the 2022 corrective action plan. 0.00 Pequonnock Circuit 2504 was included in the 2021 TDRP Reliability Corrective Action Plan. It is a repeat from the 2020 Corrective Action Plan listing due to a one-time outage in 2019 due to a cable fault. The outage seen for 2020 was required to properly identify and fix a cable fault given the unique service configuration at the customer site. 2673 2024 Refer to Comments NA NA NA 301.8 3.55 66 0.64 103.3 0.63 Ash Creek Circuit 2673 was included in the 2025 TDRP Reliability Corrective Action Plan. None of the Reliability Corrective Action Plans were executed in 2025 due to budget constraints. 2685 2023 Refer to Comments NA NA NA 110.5 1.38 66 0.64 20.4 0.14 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. 0.15 Hawthorne Circuit 2690 was included in the 2023 TDRP Reliability Corrective Action Plan. Spot Tree Trimming from inspections were handled within the Vegetation Management program. The recommended new recloser installation was delayed due to long lead/supply chain availability issues. 2690 2022 Refer to Comments NA NA NA 56.8 0.30 140 66 0.64 23.4

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)