Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Words on different pages
  1. Page 151 of 176

    03/31/2026 Docket No. 86-12-03 Percent Complete Rank Circuit 2615 13 550 1608 2624 Yr(s) Identified 2020 2023 2022 2021 Compl Date Refer to Comments Refer to Comments Refer to Comments Refer to Comments OH (%) NA NA NA NA UG NA NA NA NA Aerial NA NA NA NA Original SAIDI (MIN) 17 12.8 119.1 134 SAIFI 0.08 0.04 1.90 1.21 151 Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) 66 66 66 66 SAIFI 0.64 0.64 0.64 0.64 12.0 30.1 74.6 38.6 SAIFI Comments 0.08 Old Town Circuit 2615 was included in the 2021 TDRP Reliability Corrective Action Plan. It is a repeat from the 2020 TDRP and it first appeared where on the 4% list in 2018. Reliability improvement recommendations were identified, planned, and completed in 2018. An improvement in reliability for Circuit 2615, as measured by both SAIDI and SAIFI was seen for the year-ending 2020. No further comprehensive recommendations were required. 0.93 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. 0.68 June St Circuit 1608 was included in the 2023 TDRP Reliability Corrective Action Plan. There were three CELID9 outages in 2022 during blue sky days that were caused by tree contacts. Spot Tree Trimming from inspections were handled within the Vegetation Management program. Additional plans of replacing deteriorated overhead equipment were delayed until the arrival of Frontier Pole Set. 0.32 Old Town Circuit 2624 was included in the 2022 TDRP Reliability Corrective Action Plan changes, the completion of proposed reliability improvements will extend into calendar year 2023.
  2. Page 152 of 176

    03/31/2026 Docket No. 86-12-03 Percent Complete Rank Circuit 2543 14 1548 2687 3635 Yr(s) Identified 2020 2023 2022 2021 Compl Date Refer to Comments Refer to Comments Refer to Comments Refer to Comments OH (%) NA NA NA 25 UG NA NA NA NA Aerial NA NA NA NA Original SAIDI (MIN) 16 22.0 30.6 106 SAIFI 0.11 0.10 0.30 1.42 152 Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) 66 66 66 66 SAIFI 0.64 0.64 0.64 0.64 129.1 31.4 20.5 61.0 SAIFI Comments 1.72 New Congress Circuit 2543 was included in the 2021 TDRP Reliability Corrective Action Plan. It is a repeat from the 2020 TDRP and was included in the 2019 TDRP Reliability Corrective Action Plan as well. Reliability improvements were identified, planned, and completed in 2019. An improvement in reliability for Circuit 2543, as measured by both SAIDI and SAIFI was seen for the year-ending 2020. No further comprehensive recommendations were required. 0.21 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. One Trip Saver was installed in April of 2025. 0.19 Hawthorne Circuit 2687 was included in the 2023 TDRP Reliability Corrective Action Plan. There were three CELID9 outages in 2022 during blue sky days that were caused by tree contacts. Spot Tree Trimming from inspections were handled within the Vegetation Management program. Tree Trimmings at the recommended 1PH locations are still being carried out as part of the Utility Protection Zone program. 1.06 Milvon Circuit 3635 was included in the 2022 TDRP Reliability Corrective Action Plan. Reviews and changes, the completion of proposed reliability improvements will extend into calendar year 2023.
  3. Page 153 of 176

    03/31/2026 Docket No. 86-12-03 Percent Complete Rank 15 Circuit Yr(s) Identified Compl Date OH (%) UG Aerial Original SAIDI (MIN) SAIFI Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) SAIFI SAIFI Comments 1608 2020 Refer to Comments NA NA NA 133 1.57 66 0.64 74.6 0.68 June Street Circuit 1608 was included in the 2021 TDRP Reliability Corrective Action Plan. It is a repeat from both the 2020 and 2017 TDRP 4% list. Reliability improvement recommendations were identified, planned, and completed in 2017. An improvement in reliability as measured by SAIDI was seen for the yearending 2020, whereas a decline in reliability as measured by SAIFI was seen for the same time period. As part of the 2019 Comprehensive Circuit Review it was determined that Circuit 1608 load was above 90% of the normal rating and a project has been created to extend either the 1606 or 1608 riser and to shift load from 1608 to 1606 which would help circuit 1608 reliability if completed. As such, no further comprehensive recommendations were required. 1647 2023 Refer to Comments NA NA NA 45.4 0.20 66 0.64 24.5 0.19 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. 0.73 Water St Circuit 1532 was included in the 2023 TDRP Reliability Corrective Action Plan. Tree Trimming at the recommended 1PH location was completed. Cutout replacements at the three recommended locations were also completed. 0.03 Ansonia Circuit 3675 was included in the 2022 TDRP Reliability Corrective Action Plan. Reviews and changes, the completion of proposed reliability improvements will extend into calendar year 2023. 1532 3675 2022 2021 Nov - 23 Refer to Comments 100 90 NA NA NA NA 148.6 128 1.40 1.18 153 66 66 0.64 0.64 79.9 3.8
  4. Page 154 of 176

    03/31/2026 Docket No. 86-12-03 Percent Complete Rank 16 Circuit Compl Date OH (%) UG Aerial SAIDI (MIN) SAIFI Original Expected Improvement 2025 Current Values SAIDI (MIN) SAIDI (MIN) SAIFI SAIFI Comments 1688 2020 Dec-21 NA NA NA 112 1.31 66 0.64 33.2 1.02 Mix Avenue Circuit 1888 is included in the 2021 TDRP Reliability Corrective Action Plan. Approximately 25% of the 4-year interruptions were due to tree contacts. Two tree contact incidents in 2020 affected a total of 973 meters with a total duration time of approximately two hours. Recommendations for 2021 included specific tree trimming which was completed in 2021. 2801 2023 Refer to Comments NA NA NA 124.2 1.14 66 0.64 113.3 1.37 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. 0.18 East Shore Circuit 1709 is included in the 2020 TDRP Reliability Corrective Action Plan. The majority of outages on East Shore Circuit 1709 were conductor failures which occurred during the years 2017, 2018, and 2019. Low customer count on this circuit causes a decline in reliability more quickly than others. Refinements for 2021 included the installation of a SCADA switch/recloser. Due to supply -chain delays and proposed recloser location(s) reviews and changes, the completion of proposed reliability improvements will extend into calendar year 2022. 0.07 None of the 2024 TDRP Reliability Corrective Action Plans were executed in 2024 due to budget constraints resulting from PURA’s final decision in Docket No. 22-08-08. 1709 17 Yr(s) Identified Original 3659 2020 2023 Refer to Comments Refer to Comments 100 NA NA NA NA NA 120 36.7 1.06 0.35 154 66 66 0.64 0.64 53.2 12.2
  5. Page 155 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 18: 2025 Voltage Irregularity Claims 2025 Voltage Irregularity Events Resulting In 10 or More Damage Claims There were zero events in 2025 that resulted in 10 or more damage claims. 155
  6. Page 156 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 19: Power Restorations After Major Storms - 2025 The Authority maintains its recommendation to include the Power Restoration After Major Storms Metric in the PBR Performance Mechanism Portfolio, with one modification. Specifically, the Authority proposes allowing the EDCs to report the data using the distressed municipalities as defined by the DECD, rather than census block data. Using the distressed municipalities to report the data avoids the complexity of using census block data while still providing the necessary granularity to assess power restoration in vulnerable communities. However, as the PBR Performance Mechanism Portfolio evolves and the EDCs’ respective IT systems change, the Authority may explore the use of census data for additional granularity. Six sub-metrics: (1) Time between the first customer to lose power and the last customer to be reconnected; (2) Time between the first customer reconnected and the last customer reconnected; (3) Average per-capita income in the areas that lost power as a share of average per-capita income for all areas where the EDC has residential customers; (4) Percentages of racial and ethnic minorities in the areas that lost power as a share of the percentages of racial and ethnic minorities in all the areas where the EDC has residential customers; (5) Average household income in the areas where the first, second, third, fourth, and fifth quintiles of customers had their power restored; and, (6) Percentages of racial and ethnic minorities in the areas where the first, second, third, fourth, and fifth quintiles of customers had their power restored. UI experienced a total of six major storms during 2025. (Refer to Appendix 7, “Excluded Storm Summary”). 156
  7. Page 157 of 176

    03/31/2026 Docket No. 86-12-03 a. Major Storm Sub-Metrics 1 and 2 Town Ansonia Bridgeport Derby East Haven Easton Storm Number 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 First Outage Time First Restoration Time Last Restoration Time 2025-02-16 07:29:20 2025-06-24 11:52:59 2025-07-03 15:46:52 N/A 2025-10-30 15:46:03 2025-12-19 13:03:19 2025-02-16 07:34:01 2025-06-24 10:28:20 2025-07-03 17:48:57 2025-10-13 02:31:56 2025-10-30 14:28:12 2025-12-19 10:02:05 2025-02-16 07:22:01 N/A 2025-07-03 11:46:07 N/A N/A 2025-12-19 12:46:09 2025-02-16 22:20:00 2025-06-24 18:15:40 2025-07-03 18:10:11 N/A 2025-10-30 15:28:41 2025-12-19 08:11:57 2025-02-16 07:34:00 N/A 2025-02-16 12:05:00 2025-06-24 12:20:12 2025-07-03 19:44:48 N/A 2025-10-30 17:35:53 2025-12-19 18:31:02 2025-02-16 11:15:45 2025-06-24 11:28:30 2025-07-03 22:00:43 2025-10-13 03:46:11 2025-10-30 16:16:16 2025-12-19 13:16:34 2025-02-17 09:42:00 N/A 2025-07-03 12:14:27 N/A N/A 2025-12-19 15:07:47 2025-02-17 09:23:00 2025-06-24 18:42:48 2025-07-03 22:41:00 N/A 2025-10-30 17:16:12 2025-12-19 08:48:28 2025-02-16 18:34:55 N/A 2025-02-17 17:16:13 2025-06-24 12:20:12 2025-07-03 19:44:48 N/A 2025-10-30 17:35:53 2025-12-20 02:58:32 2025-02-17 18:57:21 2025-06-25 01:21:00 2025-07-05 00:13:18 2025-10-13 14:03:02 2025-10-30 16:51:05 2025-12-21 11:05:34 2025-02-17 21:37:50 N/A 2025-07-03 12:14:27 N/A N/A 2025-12-19 20:24:02 2025-02-17 09:23:00 2025-06-24 19:46:24 2025-07-04 05:51:42 N/A 2025-10-30 21:53:06 2025-12-19 21:19:00 2025-02-18 10:02:42 N/A 157 Time Between First Outage and Last Restoration Time (Hours) 33.78 0.45 3.97 N/A 1.83 13.92 35.39 14.88 30.41 11.52 2.38 49.06 38.26 N/A 0.47 N/A N/A 7.63 11.05 1.51 11.69 N/A 6.41 13.12 50.48 N/A Time Between First Restoration and Last Restoration Time (Hours) 29.19 0.00 0.00 N/A 0.00 8.46 31.69 13.88 26.21 10.28 0.58 45.82 11.93 N/A 0.00 N/A N/A 5.27 0.00 1.06 7.18 N/A 4.62 12.51 39.46 N/A
  8. Page 158 of 176

    03/31/2026 Docket No. 86-12-03 Town Easton Fairfield Hamden Milford New Haven North Branford Storm Number 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 First Outage Time First Restoration Time Last Restoration Time 2025-07-03 16:50:42 2025-10-13 03:48:34 2025-10-30 12:14:17 2025-12-19 10:16:56 2025-02-16 07:34:01 2025-06-24 08:06:35 2025-07-03 17:44:28 2025-10-13 01:47:45 2025-10-30 13:16:10 2025-12-19 10:29:29 2025-02-16 04:08:54 2025-06-24 18:39:31 2025-07-03 18:46:07 2025-10-13 08:10:31 N/A 2025-12-19 11:31:22 2025-02-16 08:51:45 2025-06-24 18:44:05 2025-07-03 05:13:14 2025-10-13 03:37:23 2025-10-30 12:43:12 2025-12-19 02:53:16 2025-02-16 06:35:47 2025-06-24 18:15:40 2025-07-03 18:02:42 2025-10-13 01:28:08 2025-10-30 10:14:23 2025-12-19 10:47:46 2025-02-17 10:14:06 2025-07-03 17:54:55 2025-10-13 09:29:30 2025-10-30 12:50:13 2025-12-19 15:00:08 2025-02-16 11:15:45 2025-06-24 08:53:23 2025-07-03 21:45:57 2025-10-13 07:14:17 2025-10-30 14:05:53 2025-12-19 12:54:00 2025-02-16 05:08:17 2025-06-24 22:47:57 2025-07-04 01:15:37 2025-10-13 10:53:12 N/A 2025-12-19 12:05:09 2025-02-17 08:37:01 2025-06-25 01:17:56 2025-07-03 05:40:41 2025-10-13 04:36:33 2025-10-30 15:47:45 2025-12-19 03:42:36 2025-02-16 08:37:33 2025-06-24 18:42:48 2025-07-03 19:51:45 2025-10-13 02:27:30 2025-10-30 11:27:26 2025-12-19 12:37:06 2025-02-17 23:23:33 2025-07-05 14:02:09 2025-10-13 21:30:37 2025-10-31 02:02:58 2025-12-20 01:43:25 2025-02-17 17:42:43 2025-06-25 10:57:48 2025-07-05 03:22:54 2025-10-13 21:30:37 2025-10-30 18:10:19 2025-12-20 15:50:26 2025-02-18 12:07:28 2025-06-24 22:47:57 2025-07-04 01:15:37 2025-10-13 15:10:03 N/A 2025-12-19 23:31:44 2025-02-17 21:15:26 2025-06-25 02:33:50 2025-07-04 23:11:57 2025-10-13 12:56:05 2025-10-30 19:13:45 2025-12-20 03:37:50 2025-02-18 14:55:13 2025-06-24 18:42:48 2025-07-03 19:51:45 2025-10-13 21:48:00 2025-10-30 23:04:11 2025-12-20 07:07:00 2025-02-17 23:23:33 158 Time Between First Outage and Last Restoration Time (Hours) 45.19 17.70 13.81 15.44 34.15 26.85 33.64 19.71 4.90 29.35 55.98 4.14 6.49 6.99 N/A 12.01 36.39 7.83 41.98 9.31 6.51 24.74 56.32 0.45 1.82 20.33 12.83 20.32 13.16 Time Between First Restoration and Last Restoration Time (Hours) 44.12 12.02 13.21 10.72 30.45 26.07 29.62 14.27 4.07 26.94 54.99 0.00 0.00 4.28 N/A 11.44 12.64 1.27 41.52 8.33 3.43 23.92 54.29 0.00 0.00 19.34 11.61 18.50 0.00
  9. Page 159 of 176

    03/31/2026 Docket No. 86-12-03 Town North Branford North Haven Orange Shelton Stratford Storm Number 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 First Outage Time First Restoration Time Last Restoration Time N/A 2025-07-03 19:04:27 2025-10-13 01:32:08 N/A 2025-12-19 10:35:26 2025-02-16 06:07:06 N/A N/A N/A N/A 2025-12-19 10:22:34 2025-02-16 03:42:21 2025-06-24 06:48:13 2025-07-03 09:34:10 2025-10-13 05:10:15 2025-10-30 13:23:42 2025-12-19 10:02:47 2025-02-16 05:50:41 2025-06-24 08:42:29 2025-07-03 07:22:11 2025-10-13 04:07:50 2025-10-30 14:36:27 2025-12-19 10:12:58 2025-02-16 07:12:47 2025-06-24 18:32:54 2025-07-03 15:20:05 2025-10-13 03:30:09 2025-10-30 07:11:52 2025-12-19 09:53:46 N/A 2025-07-04 04:07:00 2025-10-13 04:59:14 N/A 2025-12-19 14:13:52 2025-02-16 10:19:13 N/A N/A N/A N/A 2025-12-19 12:11:00 2025-02-16 05:12:00 2025-06-24 08:59:55 2025-07-03 10:33:00 2025-10-13 08:29:38 2025-10-30 15:59:47 2025-12-19 14:25:11 2025-02-16 14:39:41 2025-06-24 09:21:58 2025-07-03 09:10:03 2025-10-13 07:07:53 2025-10-30 15:46:45 2025-12-19 11:49:12 2025-02-16 18:42:52 2025-06-24 22:41:02 2025-07-03 16:10:00 2025-10-13 04:38:53 2025-10-30 08:36:52 2025-12-19 10:36:19 N/A 2025-07-04 04:07:00 2025-10-13 07:04:25 N/A 2025-12-19 14:13:52 2025-02-17 21:44:07 N/A N/A N/A N/A 2025-12-19 20:55:39 2025-02-18 01:14:30 2025-06-24 08:59:55 2025-07-04 04:14:30 2025-10-13 13:28:29 2025-10-30 15:59:47 2025-12-20 02:23:50 2025-02-18 00:21:03 2025-06-25 04:27:30 2025-07-04 05:24:46 2025-10-13 21:10:04 2025-10-30 22:09:11 2025-12-19 21:07:27 2025-02-17 22:30:07 2025-06-24 22:41:23 2025-07-05 08:41:53 2025-10-13 20:33:56 2025-10-31 00:38:25 2025-12-20 00:31:07 159 Time Between First Outage and Last Restoration Time (Hours) N/A 9.04 5.54 N/A 3.64 39.62 N/A N/A N/A N/A 10.55 45.54 2.20 18.67 8.30 2.60 16.35 42.51 19.75 22.04 17.04 7.55 10.91 39.29 4.14 41.36 17.06 17.44 14.62 Time Between First Restoration and Last Restoration Time (Hours) N/A 0.00 2.09 N/A 0.00 35.42 N/A N/A N/A N/A 8.74 44.04 0.00 17.69 4.98 0.00 11.98 33.69 19.09 20.25 14.04 6.37 9.30 27.79 0.01 40.53 15.92 16.03 13.91
  10. Page 160 of 176

    03/31/2026 Docket No. 86-12-03 Town Trumbull West Haven Woodbridge Storm Number 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 First Outage Time First Restoration Time Last Restoration Time 2025-02-16 04:43:17 2025-06-24 13:46:10 2025-07-03 17:38:20 2025-10-13 03:23:37 2025-10-30 13:56:21 2025-12-19 04:43:37 2025-02-16 04:56:46 2025-06-24 12:18:14 2025-07-03 17:56:00 2025-10-13 14:46:11 2025-10-30 21:03:45 2025-12-19 09:05:04 2025-02-16 06:06:15 2025-06-24 22:50:10 N/A 2025-10-13 04:19:18 2025-10-30 18:47:58 2025-12-19 09:49:12 2025-02-16 06:17:00 2025-06-24 17:50:03 2025-07-03 19:37:41 2025-10-13 07:39:38 2025-10-30 15:21:08 2025-12-19 05:59:57 2025-02-16 13:46:09 2025-06-24 14:05:10 2025-07-03 19:08:14 2025-10-13 14:59:39 2025-10-31 00:32:32 2025-12-19 09:54:08 2025-02-16 16:44:02 2025-06-25 00:18:00 N/A 2025-10-13 10:57:42 2025-10-30 20:35:29 2025-12-19 12:15:00 2025-02-18 00:00:54 2025-06-24 18:37:55 2025-07-05 19:06:00 2025-10-13 20:57:10 2025-10-30 22:09:11 2025-12-19 18:56:00 2025-02-17 18:44:38 2025-06-24 20:39:46 2025-07-04 12:54:22 2025-10-13 14:59:39 2025-10-31 00:32:32 2025-12-19 09:54:08 2025-02-18 10:58:48 2025-06-25 00:18:00 N/A 2025-10-13 11:00:02 2025-10-31 01:31:17 2025-12-20 17:12:47 Time Between First Outage and Last Restoration Time (Hours) 43.29 4.86 49.46 17.56 8.21 14.21 37.80 8.36 18.97 0.22 3.48 0.82 52.88 1.46 N/A 6.68 6.72 31.39 Time Between First Restoration and Last Restoration Time (Hours) 41.73 0.80 47.47 13.29 6.80 12.93 28.97 6.58 17.77 0.00 0.00 0.00 42.25 0.00 N/A 0.04 4.93 28.96 * “N/A” entries indicate customers from the respective town did not experience any outages during the respective storm 160

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)