Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Words on different pages
  1. Page 24 of 176

    03/31/2026 Docket No. 86-12-03 IEEE-1366 Blue-Sky, Gray-Sky, Blue-Sky + Gray-Sky, and Dark-Sky* 2021 2022 2023 2024 2025 Blue-Sky Gray-Sky Blue + Gray-Sky Dark-Sky SAIDI 0.66 0.07 0.73 0.17 SAIFI 0.46 0.05 0.51 0.06 CAIDI 1.44 1.33 1.43 2.91 SAIDI 0.65 0.12 0.77 0.00 SAIFI 0.44 0.04 0.49 0.00 CAIDI 1.47 2.65 1.57 0.00 SAIDI 0.71 0.12 0.83 0.10 SAIFI 0.58 0.05 0.62 0.12 CAIDI 1.23 2.64 1.34 0.77 SAIDI 0.81 0.01 0.82 1.21 SAIFI 0.61 0.00 0.62 0.17 CAIDI 1.32 2.40 1.33 6.96 SAIDI 0.58 0.08 0.65 0.54 SAIFI 0.46 0.05 0.51 0.13 CAIDI 1.26 1.51 1.29 4.15 Table V.2 *IEEE-1366 calculation excludes planned outages 24
  2. Page 25 of 176

    03/31/2026 Docket No. 86-12-03 VI. Causes of Outages The causes of service interruptions have been classified into five categories in accordance with Docket 86-12-03, Order 1.b. These categories are as follows: 1. Forced Transmission & Power Supply Related Outages 2. Scheduled or Prearranged Outages for Maintenance & Construction 3. Major Storm Related Outages 4. Customer Caused Outages 5. Distribution System The components of the "Distribution System", (“All Others”) category is as follows: • Animal/Bird Contact • Lightning • Tree Contact • Accident a. Vehicle b. Foreign Objects c. Employee Error • Equipment Failure a. Overhead System b. Underground Cable c. Direct-Buried Cable d. Transformer e. Substation f. Transmission g. Other Equipment • Miscellaneous a. Overload b. Other c. Unknown Detailed definitions of the categories are in Appendix 12: “Common Categories for Causes of Outages” Percentage of outages caused by each category can be seen below on Charts V-1.1 and 1.2, V-2.1 and 2.2, and V-3.1 and 3.2. As is evident from these charts, excluding major storms, the category "All Others," which corresponds to "Distribution System," contains the majority of customer interruptions and lost meters. Lost meter-time can be greatly affected by major storms; barring a 25
  3. Page 26 of 176

    03/31/2026 Docket No. 86-12-03 major storm, lost meter-time is also affected to the greatest degree by the "Distribution System" category. 26
  4. Page 27 of 176

    03/31/2026 Docket No. 86-12-03 Cause of Outages 2025 By Interruptions Chart VI-1.1 - Causes of Outages by Interruptions (2025) 27
  5. Page 28 of 176

    03/31/2026 Docket No. 86-12-03 Cause of Outages 2021 - 2024 By Interruptions Chart VI-1.2 - Causes of Outages by Interruptions (2021 - 2024) 28
  6. Page 29 of 176

    03/31/2026 Docket No. 86-12-03 Cause of Outages 2025 By Meter Outages Chart VI-2.1 - Causes of Outages by Meter Outages (2025) 29
  7. Page 30 of 176

    03/31/2026 Docket No. 86-12-03 Cause of Outages 2021 - 2024 By Meter Outages Chart VI-2.2 - Causes of Outages by Meter Outages (2021 - 2024) 30
  8. Page 31 of 176

    03/31/2026 Docket No. 86-12-03 Cause of Outages 2025 By Meter Time Lost Chart V-3.1 - Causes of Outages by Meter Time Lost (2025) 31
  9. Page 32 of 176

    03/31/2026 Docket No. 86-12-03 Cause of Outages 2021 - 2024 By Meter Time Lost Chart V-3.2 - Causes of Outages by Meter Time Lost (2021 - 2024) 32
  10. Page 33 of 176

    03/31/2026 Docket No. 86-12-03 The outage category in which the Company can exercise significant influence is the "Distribution System" category. Although the actual number of interruptions, meter outages, and lost meter-time vary from year to year, UI believes that through continued efforts, outages in this category can be managed, with a balanced concern for economics. The percentages cited in the following paragraphs relate to the “Distribution System” subcategory, (“All Others” on the Pie Charts), and exclude outages related to major storms, forced transmission and power supply, planned outages and customer caused outages. In 2025, the number of wildlife contact incidents, as a percentage of the Distribution System (“All Others”) subcategory, 9.3%, (Chart V-1.1), as in previous years, 7%, (Chart V-1.2), has maintained a relatively level impact since completion of the project. The post-program impact of wildlife contacts has remained a reduction to the pre-program wildlife contact contribution to customer impact (SAIFI); this maintained status is a direct result of the three-year program (20152017) to replace wildlife guards. UI will continue to install wildlife guards on new transformer installations as well as coat the tops of critical overhead equipment, such as regulators and specific types of reclosers, with an insulating coating designed to minimize the potential for phase-toground squirrel or bird contacts. In response to Docket No. 13-01-19, “Application of The United Illuminating Company to Increase Rates and Charges”, PURA approved $100 million for an 8-year plan for vegetation management during 2014-2021. In response to Docket No. 16-06-04, “Application of The United Illuminating Company to Increase Rates and Charges”, PURA approved $162 million for a 12year plan for vegetation management extending the program to 2025. In Docket No. 22-08-08, “Application of The United Illuminating Company to Increase Rates and Charges”, the Authority approved a one-year rate plan, directed the Company to maintain the current annual funding levels for the UPZ program, and stipulated changes in the way the UPZ Program is being prioritized and executed, via Order 21, that: “UI shall develop and submit for Authority review and approval in Docket No. 23-08-09, Annual Electric Distribution Company Reliability and Resilience Framework Review a four-year work plan to implement the UPZ priorities for years 2024 to 2027 and to transition to a four-year trimming cycle by 2027.” Order 21 further stipulates that this work plan shall also demonstrate compliance with the following priorities (as outlined in section VI.A.15 of its Ruling). • Start the transition to four-year cycle trimming • Address first pass of remining single-phase system • Perform a second pass of full UPZ clearance of three-phase systems The Company has modified the priorities, annual scope, schedule, and the annual cost of the program to align with the Authority’s directives. The modifications are underway and being effectuated without any increase to the approved annual expenditure levels. The vegetation management work plan for 2024 through 2027 emphasizes transitioning to a 4-year trimming 33

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)