Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Words on different pages
  1. Page 46 of 176

    03/31/2026 Docket No. 86-12-03 vii. Switchgear Replacement There are over 100 high voltage non-network services (greater than 600 volts) across UI’s service territory. The Company operates, maintains, and in many cases owns the switching demarcations. Through a specific inspection plan, UI will identify and prioritize the locations that have reached the end of their useful life, and/or present concerns ranging from safety, operational difficulties, code/access issues, and environmental. The Company will prepare engineering designed solutions for addressing these issues, up to and including replacement of service demarcations. Work plans will be executed alongside each customer as the program continues until all locations have been identified, and shortfalls have been addressed. Each plan will need customer involvement and acceptance, as the majority of UI equipment and construction will be on private property. There will also be locations that include UI owned transformers in customer owned vaults that are also in poor condition and may need to be relocated as part of the program, on a case by case review. This program will not only help maintain reliable service but also keep UI workers safe. In 2026, UI plans to replace L152 at Bella Vista on 339 Eastern St, New Haven. The 2026 budget for Switchgear Replacement is approximately $1,064,843 46
  2. Page 47 of 176

    03/31/2026 Docket No. 86-12-03 C. Capacity i. Distribution Transformers In 1976, the manufacturing of polychlorinated biphenlys (PCBs) was banned. In 1982, the Company put in place a specification for electrical insulating oil which required the transformer manufacturer to supply transformers with zero parts per million PCB content. At the time, the Company did not engage in a program of replacing all transformers prior to 1982. Therefore, pre-1982 transformers with unknown PCB content still exist on the system. The Company owns and maintains over 50,000 distribution transformers on the electric system. During 2010, the Company completed an engineering survey of all distribution transformers on the system. The survey determined the need to replace over 14,000 transformers due to unknown PCB content, condition and/or loading levels. As of the end of 2025, approximately 5,368 transformers (an increase of 85) have been replaced. The remaining transformers will be replaced on a scheduled programmatic basis. This is a 20-year program which concentrates on eliminating PCB and overload conditions during the first half of the program and replacements in the second period due to age and condition. The rate of replacement is evaluated each year and CAPEX requirements are based on program progress and balanced with resource and material availability. This program has been significantly reduced in funding over recent years (2020-2023) due to supply chain issues. And for 2024, the program was deferred entirely with no funding forecasted. However, as other work is performed in UI Distribution Operations, if a pole has been previously identified as a TARP location, that work is reviewed and may be required to be done in conjunction with the other distribution work. There is no projected budget for 2026. The program is currently expected to resume in 2027. ii. Energy Storage Resiliency This battery storage project consists of installing a 8.12 MW, 32.5 MWh Battery Energy Storage System (BESS) mid-circuit on Water St Circuit 1526. This circuit currently feeds around 1,600 New Haven customers. The battery will be used to provide circuit resiliency and capacity benefits. Specific use cases for this project include: 1. Resiliency and back up to a targeted section of a poor performing circuit 2. Provides back-up to LMI and environmental justice customers 3. Provides targeted relief during area capacity events 4. Provides load relief to an overloaded circuit 47
  3. Page 48 of 176

    03/31/2026 Docket No. 86-12-03 Energy storage will be required to meet the State’s clean energy goals enabling the integration of renewable intermittent resources like solar and wind. This project addresses an existing operational resiliency need and utilizes existing connected intermittent resources to optimize battery charging and discharging cycles. This project also helps Connecticut move towards its goal of 1 GW of energy storage by 2030. The 2026 budget for this Energy Storage Resiliency project is approximately $2,302,374. 48
  4. Page 49 of 176

    03/31/2026 Docket No. 86-12-03 D. Enhancement Programs UI enhances the existing distribution system as follows: i. URD Project Rebuilds/Rehabilitation Cable replacement and/or refurbishment, coupled with transformer replacements, in older underground residential projects where UI’s equipment may be approaching the end of its useful life. Reference Section 7a Residential Line for more information. ii. Highest CEMI-3 and CELID-9 Circuit Improvements Appendix 14a lists the Tier 1 Worst Performing Circuits by All-In CEMI-3 for the period of July 2024 to June 2025. Appendix 14b lists the Tier 1 Worst Performing Circuits by Non-Excluded CEMI-3 for the period of July 2024 to June 2025. Appendix 14c lists the Tier 1 Worst Performing Circuits by All-In CEMI-3 for the calendar year of 2025. Appendix 14d lists the Tier 1 Worst Performing Circuits by Non-Excluded CEMI-3 for the calendar year of 2025. Appendix 14e lists the Tier 1 Worst Performing Circuits by All-In CELID-9 for the period of July 2024 to June 2025. Appendix 14f lists the Tier 1 Worst Performing Circuits by Non-Excluded CELID-9 for the period of July 2024 to June 2025. Appendix 14g lists the Tier 1 Worst Performing Circuits by All-In CELID-9 for the calendar year of 2025. Appendix 14h lists the Tier 1 Worst Performing Circuits by Non-Excluded CELID-9 for the calendar year of 2025. Appendix 16a describes the proposed reliability corrective action plans UI designed to improve the reliability of the four percent of the circuits with the highest CEMI-7 and CELID-9 percentages as determined by July 2024 to June 2025 interruption data per Docket No. 17-1203RE08. 49
  5. Page 50 of 176

    03/31/2026 Docket No. 86-12-03 iii. Highest SAIDI/SAIFI Circuit Improvements Appendix 15a lists the Tier 2 Worst 100 Circuits by SAIDI ranking for the period of July 2024 to June 2025. A SAIDI threshold is determined by calculating 250% of the systemwide SAIDI value for the period of July 2024 to June 2025. Circuits where its July 2024 to June 2025 SAIDI values reach or exceed this threshold are flagged with Y. Appendix 15b lists the Tier 2 Worst 100 Circuits by SAIDI ranking for the calendar year of 2025. A SAIDI threshold is determined by calculating 250% of the systemwide SAIDI value for the calendar year of 2025. Circuits where its 2025 SAIDI values reach or exceed this threshold are flagged with Y. Appendix 15c lists the Tier 2 Worst 100 Circuits by SAIFI ranking for the period of July 2024 to June 2025. A SAIFI threshold is determined by calculating 250% of the systemwide SAIFI value for the period of July 2024 to June 2025. Circuits where its July 2024 to June 2025 SAIFI values reach or exceed this threshold are flagged with Y. Appendix 15d lists the Tier 2 Worst 100 Circuits by SAIFI ranking for the calendar year of 2025. A SAIFI threshold is determined by calculating 250% of the systemwide SAIFI value for the calendar year of 2025. Circuits where its 2025 SAIFI values reach or exceed this threshold are flagged with Y. Appendices 15e lists the worst 4% of all Circuits created by using the lists from Appendices 15a and 15c by alternating SAIDI and SAIFI circuit rankings. Circuits are flagged if the average SAIDI or SAIFI values reach or exceed 250% of the systemwide SAIDI or SAIFI values for the period of July 2024 to June 2025. Appendices 15f lists the worst 4% of all Circuits created by using the lists from Appendices 15b and 15d by alternating SAIDI and SAIFI circuit rankings. Circuits are flagged if the average SAIDI or SAIFI values reach or exceed 250% of the systemwide SAIDI or SAIFI values for the calendar year of 2025. Appendix 16b describes the proposed reliability corrective action plans UI designed to improve the reliability of the four percent of the circuits with the highest SAIDI and SAIFI values as determined by July 2024 to June 2025 interruption data per Docket No. 17-12-03RE08. iv. Status of Prior Corrective Actions The status of the previous year’s corrective action plans can be found in Appendix 17. 50
  6. Page 51 of 176

    03/31/2026 Docket No. 86-12-03 v. Substation Flood Protection Weather events experienced in the recent years, along with revisions to Federal Emergency Management Agency (FEMA) flood maps have necessitated UI to take action to evaluate the risk and potential impact of a single 100-year coastal flooding event on its coastal substations and evaluate mitigating solution alternatives. The Company commissioned a study, "Coastal Substation Flooding Asset Condition Review". That study revealed that five of the Company's coastal substations are at significant risk of being incapacitated and/or destroyed by a single FEMA 100-year flood event. Singer Substation is a 345kV transmission substation that provides electricity from Bridgeport to Norwalk. The Singer Flood Mitigation project aims to provide flood protection to the critical transmission assets during severe weather conditions. The project scope includes the installation of flood walls and gates around the substation perimeter, reinforcement of the Gas Insulated Switch Gear (GIS) building walls, as well as installation of a storm water management system. The 2026 budget for this project is approximately $25,354,809. The Grand Ave/Mill River Flood Mitigation project is very similar. The scope includes the installation of flood walls and gates around the substation perimeter, modifications to river bulkhead, as well as installation of a storm water management system. To mitigate the risk, UI is installing a perimeter flood wall system, which includes a driven steel sheet pile flood wall below and above grade along the current fence line. The flood gates will have concrete foundations and a stormwater system for runoff discharge. The 2026 budget for this project is approximately $6,364,354. The Milvon Substation has a history of flooding. Water has reached the MOD operators, blowing fuses, and disrupting normal operations which has caused unplanned outages. The 100-year flood elevation in the area is 39 ft above sea level (based on the NAVD 88). The scope of this project is to raise all critical yard equipment above the base design elevation of 41 ft above sea level (plus 2 ft of the NAVD 88 elevation). The site slopes to the north (towards the Metro North Railroad) which is the low point of surrounding buildings and roadways. The 2026 budget for this project is approximately $1,146,057. 51
  7. Page 52 of 176

    03/31/2026 Docket No. 86-12-03 E. Maintenance Programs UI's personnel follow specific procedures designed to reduce certain types of service outages. Among these procedures are the following: i. Tree Trimming UI follows the Vegetation Management Plan, (UPZ), performs hazard tree removals, and vine clearing in order to reduce the probability of tree related interruptions and damaging tree contacts to the electric infrastructure. For 2025 there were numerous instances where the Company was denied permission to trim. Refer to Appendix 13, “Vegetation Program Miles Trimmed & Tree Trimming Denials”, for additional details on both miles trimmed and trim denials. UI performs UPZ, in conjunction with hazard tree removals and the clearing of vines to reduce the probability of tree related outages. The budgets for the distribution and transmission line clearance programs along with the UPZ program for 2026 are as follows: Year ii. Company Distribution Line Clearance 2026 $1,477,599 2026 Enhanced Tree Trimming (Distribution) $13,893,779 Transmission ROW’s $1,788,801 Infrared Survey In order to detect potential failures, infrared inspections of three phase fused side-taps and three-phase mainline are performed annually. Bulk substations are inspected semi-annually and distribution substations annually. In 2019 the Company identified fused cutout failures related to a specific manufacturer and vintage. As a result, the Infrared survey was enhanced by identifying these locations and taking extra steps to thoroughly scan and replace defective fused cutouts. UI’s trained personnel inspect three phase main lines and three phase fused side taps annually. Bulk substations are inspected semi-annually and distribution substations annually. 52
  8. Page 53 of 176

    03/31/2026 Docket No. 86-12-03 The total cost for the infrared inspection survey in 2026 excluding material is estimated to be around $89,000. The total cost for the infrared repairs in 2026 is estimated to be around $414,000. iii. Preventative Maintenance – RCM UI employs a Reliability Centered Maintenance (RCM) program approach to system maintenance. In general, activities that apply time-based equipment testing, diagnostic testing, analysis of historical data and other techniques to support a Reliability Centered Maintenance program approach to system maintenance. The RCM program is a continually evolving process that strives to understand an asset’s potential for failure by focusing resources on preservation of system function, as opposed to traditional maintenance to preserve individual equipment operation. This approach improves cost effectiveness by reducing unwarranted corrective-reactive maintenance. Ground Level Inspection and maintenance program for all padmounted & below grade distribution equipment, vaults, transclosures, and switches. The inspections are performed on a 5-year cycle. There are approximately 13,500 locations throughout UI’s territory. Inspecting 2,800 locations per year will maintain a 5-year inspection cycle. The 2026 budget for Preventative Maintenance is approximately $827,690. iv. Distribution Network A vast majority of UI’s distribution network infrastructure was originally installed in the 1950s, 1960s and early 1970s, however, since the inception of a new distribution network inspection process in 2006, outlined below, the Company has readily rebuilt, replaced, and refitted its network infrastructure, and plans to continue civil and electrical remediation in 2026. UI has a large number of radial vaults with pole top transformers that are over 30 years old that are approaching their end of life due to exposure of wet conditions. These vaults are typically just large enough to fit the transformer. They lack proper working space and ventilation. The aim is to remediate existing transformers and replace them with new pad or pole-mounted transformers, H-frame structures, or equipment that meets NESC requirements. 53
  9. Page 54 of 176

    03/31/2026 Docket No. 86-12-03 In 2006, the Company improved its inspection process for distribution networks to include techniques for assessing and recording the condition of the infrastructure and prioritizing replacement and maintenance activities. The Company has been executing an annual inspection of all network vaults. Since 2007, 23 vaults have been rebuilt and approximately 125 network transformers have been replaced. The Company continues to identify and prioritize assets requiring remediation or replacement. There are 278 Customer Vault locations throughout the territory. This project incorporates follow up maintenance, vault structural condition assessment, repair and abandonment. Additionally, this project incorporates the cost for converting deteriorated vaults. When vaults are identified through the inspection process with structural deterioration or electrical deficiencies UI develops plans with the customer for a new electric service. Typically, the vault is converted to a Pad-mount Transformer or overhead construction. This helps guarantee the safety of UI workers, correct operational and environmental issues, and maintain reliable service. The 2026 budget for Distribution Networks is approximately $232,689. 54
  10. Page 55 of 176

    03/31/2026 Docket No. 86-12-03 VIII. Power Quality In Section II.B.3.d.iii Measurement – Power Quality, of the RE08 decision, the regulatory authority states: “Before requiring that the EDCs track and report this data, however, it is first necessary to understand what data can be collected, and at what granularity and frequency, as well as what such data will reveal about system power quality. Accordingly, the Authority directs the EDCs to describe what power quality metrics it can record, its recommended granularity and frequency for recording such data, and whether the following, or other, scenarios will provide helpful information regarding the evaluation of power quality: in blue-sky conditions (excluding Major Storms), for frequency, voltage, and power factor (1) over a calendar year; (2) during summer months; (3) during winter months; and (4) during shoulder months.” Upon evaluation of the Company’s capabilities for reporting power quality metrics as stated in the above reference, the following power quality values can be calculated using the data elements stored in the company’s operational data management platform: Steady State Voltage, Frequency, and Power Factor at the Substation level. The Company utilizes PI Historian, an operational data management platform, for near-real time data management and analytics to standardize operational and metering data sets. The SCADA data is stored in the PI Historian system for operational awareness and engineering analysis. Data elements stored include various monitored analog values (Watts, VARS, Volts, and Amps) that can be used to calculate the power quality values referenced above. While these values are available at the Substation level, there is currently less availability of this data at the feeder level. When evaluating the benefits of power quality monitoring, the Company quotes 1159-2019-IEEE Recommended Practice for Monitoring Electric Power Quality: “The primary reason underpinning all others is economic, particularly if critical process loads are being adversely affected by electromagnetic phenomena. Effects on equipment and process operations can include misoperation, damage, process disruption, and other such anomalies. Such disruptions are costly since a profit-based operation is interrupted unexpectedly and should be restored to continue production. In addition, equipment damage and subsequent repair cost both money and time. Product damage can also result from electromagnetic phenomena requiring that the damaged product be either recycled or discarded, both of which are economic issues.” The Company regards the monitoring of power quality and subsequent resolution of power quality issues as not dependent on weather or season, as though electromagnetic phenomena may be impacted by such external conditions, the Company monitors power quality continuously. The 55

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)