Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Words on different pages
  1. Page 53 of 176

    03/31/2026 Docket No. 86-12-03 The total cost for the infrared inspection survey in 2026 excluding material is estimated to be around $89,000. The total cost for the infrared repairs in 2026 is estimated to be around $414,000. iii. Preventative Maintenance – RCM UI employs a Reliability Centered Maintenance (RCM) program approach to system maintenance. In general, activities that apply time-based equipment testing, diagnostic testing, analysis of historical data and other techniques to support a Reliability Centered Maintenance program approach to system maintenance. The RCM program is a continually evolving process that strives to understand an asset’s potential for failure by focusing resources on preservation of system function, as opposed to traditional maintenance to preserve individual equipment operation. This approach improves cost effectiveness by reducing unwarranted corrective-reactive maintenance. Ground Level Inspection and maintenance program for all padmounted & below grade distribution equipment, vaults, transclosures, and switches. The inspections are performed on a 5-year cycle. There are approximately 13,500 locations throughout UI’s territory. Inspecting 2,800 locations per year will maintain a 5-year inspection cycle. The 2026 budget for Preventative Maintenance is approximately $827,690. iv. Distribution Network A vast majority of UI’s distribution network infrastructure was originally installed in the 1950s, 1960s and early 1970s, however, since the inception of a new distribution network inspection process in 2006, outlined below, the Company has readily rebuilt, replaced, and refitted its network infrastructure, and plans to continue civil and electrical remediation in 2026. UI has a large number of radial vaults with pole top transformers that are over 30 years old that are approaching their end of life due to exposure of wet conditions. These vaults are typically just large enough to fit the transformer. They lack proper working space and ventilation. The aim is to remediate existing transformers and replace them with new pad or pole-mounted transformers, H-frame structures, or equipment that meets NESC requirements. 53
  2. Page 54 of 176

    03/31/2026 Docket No. 86-12-03 In 2006, the Company improved its inspection process for distribution networks to include techniques for assessing and recording the condition of the infrastructure and prioritizing replacement and maintenance activities. The Company has been executing an annual inspection of all network vaults. Since 2007, 23 vaults have been rebuilt and approximately 125 network transformers have been replaced. The Company continues to identify and prioritize assets requiring remediation or replacement. There are 278 Customer Vault locations throughout the territory. This project incorporates follow up maintenance, vault structural condition assessment, repair and abandonment. Additionally, this project incorporates the cost for converting deteriorated vaults. When vaults are identified through the inspection process with structural deterioration or electrical deficiencies UI develops plans with the customer for a new electric service. Typically, the vault is converted to a Pad-mount Transformer or overhead construction. This helps guarantee the safety of UI workers, correct operational and environmental issues, and maintain reliable service. The 2026 budget for Distribution Networks is approximately $232,689. 54
  3. Page 55 of 176

    03/31/2026 Docket No. 86-12-03 VIII. Power Quality In Section II.B.3.d.iii Measurement – Power Quality, of the RE08 decision, the regulatory authority states: “Before requiring that the EDCs track and report this data, however, it is first necessary to understand what data can be collected, and at what granularity and frequency, as well as what such data will reveal about system power quality. Accordingly, the Authority directs the EDCs to describe what power quality metrics it can record, its recommended granularity and frequency for recording such data, and whether the following, or other, scenarios will provide helpful information regarding the evaluation of power quality: in blue-sky conditions (excluding Major Storms), for frequency, voltage, and power factor (1) over a calendar year; (2) during summer months; (3) during winter months; and (4) during shoulder months.” Upon evaluation of the Company’s capabilities for reporting power quality metrics as stated in the above reference, the following power quality values can be calculated using the data elements stored in the company’s operational data management platform: Steady State Voltage, Frequency, and Power Factor at the Substation level. The Company utilizes PI Historian, an operational data management platform, for near-real time data management and analytics to standardize operational and metering data sets. The SCADA data is stored in the PI Historian system for operational awareness and engineering analysis. Data elements stored include various monitored analog values (Watts, VARS, Volts, and Amps) that can be used to calculate the power quality values referenced above. While these values are available at the Substation level, there is currently less availability of this data at the feeder level. When evaluating the benefits of power quality monitoring, the Company quotes 1159-2019-IEEE Recommended Practice for Monitoring Electric Power Quality: “The primary reason underpinning all others is economic, particularly if critical process loads are being adversely affected by electromagnetic phenomena. Effects on equipment and process operations can include misoperation, damage, process disruption, and other such anomalies. Such disruptions are costly since a profit-based operation is interrupted unexpectedly and should be restored to continue production. In addition, equipment damage and subsequent repair cost both money and time. Product damage can also result from electromagnetic phenomena requiring that the damaged product be either recycled or discarded, both of which are economic issues.” The Company regards the monitoring of power quality and subsequent resolution of power quality issues as not dependent on weather or season, as though electromagnetic phenomena may be impacted by such external conditions, the Company monitors power quality continuously. The 55
  4. Page 56 of 176

    03/31/2026 Docket No. 86-12-03 needs and power usage patterns of customers can vary widely depending on several variables, including season and weather. Power Factor Summer Months Winter Months Shoulder Months Date PF Date PF Date PF 2025 6/24/2025 19h 1.0000 1/22/2025 19h -0.9999 10/7/2025 19h -0.9999 2024 7/16/2024 18h 0.9997 12/22/2024 18h -1.0000 11/14/2024 18h -0.9997 2023 9/7/2023 17h 0.9999 2/3/2023 19h -1.0000 11/28/2023 18h 1.0000 2022 8/9/2022 15h 0.9998 12/26/2022 20h -0.9999 5/31/2022 17h 0.9999 2021 6/30/2021 18h 0.9998 1/29/2021 19h -1.0000 11/30/2021 18h -0.9999 2020 7/28/2020 16h -1.0000 12/16/2020 19h -1.0000 11/18/2020 18h 1.0000 Table VIII.1 Summer Months: June – September Winter Months: December – March Shoulder Months: April, May, October, November Voltage and Frequency Fluctuation Table VIII.2 56
  5. Page 57 of 176

    03/31/2026 Docket No. 86-12-03 IX. Equitable Modern Grid Initiatives Data The Storage Decision implemented a nine-year Electric Storage Program to value electric storage for the net benefit of the electric distribution system. The Electric Storage program identifies as a key objective the provision of resilience benefits to the electric distribution system, particularly for customers on the grid edge, low- to moderate-income customers, and those customers who may reside in an environmental justice or economically distressed community. The goal is to develop and implement a program for battery energy storage systems (BESS) that would provide multiple types of benefits to the grid, including ancillary services, peak shaving, support for the deployment of other distributed energy resources, and customer, local, or community resilience. Energy Storage Solutions offers two types of incentives: • Upfront incentives help reduce the upfront cost of installing a battery system. In exchange, the customer’s battery is programmed to discharge on a set schedule each summer for 10 years. • Performance-based incentives are paid to customers twice annually based on their performance during individual discharge events that help reduce demand on the electric grid. There are approximately 50 events in the summer and 5 in the winter. Beginning April 1, 2026, newly approved customers will no longer be enrolled in Passive Dispatch. Energy Storage Solutions is designed to provide cost savings and emissions reduction benefits to all ratepayers – not just those who install batteries. This is accomplished by coordinating all enrolled batteries to send energy to the grid during the hottest summer days and coldest winter days. This also helps ensure that these limited ratepayer funds only to go the highest-performing batteries. The new Program design is similar to the old structure, but more heavily weighted on the ten-year performance incentive. This means less incentive value upfront, but potentially more value overall based on battery performance. 57
  6. Page 58 of 176

    03/31/2026 Docket No. 86-12-03 Program Totals Active and Passive Category # of Projects Total System Power (kW) Total System Energy Capacity (kWh) Total Battery Cost Up Front Incentive # of Projects Paired with Solar PV # of Grid Edge Projects # of Underserved Community Projects # of Forward Capacity Market Participation Projects # of Critical Facility Projects # of Small Business Projects # of Low to Moderate Income Projects # of On-Site Fossil Fuel Replacement Only Active Residential C&I Residential Total Submitted Approved Inspection Completed Approved Submitted Approved Completed 3 48.7 60.5 $65,030 $17,606 3 0 1 244 1,396.3 3,605.1 $4,291,579 $1,557,316 84 19 45 1 12.0 20.5 $24,920 $4,096 1 0 0 47 488.5 986.6 $1,522,136 $322,498 45 23 11 9 5,147.6 13,736.1 $14,737,487 $2,282,578 7 2 0 3 $0 0 0 0 4 42.1 58.5 $64,149 4 2 1 19 192.8 486.0 $18,975 1 0 0 330 7,327,9 18,953.2 $20,724,276 $4,184,094 145 46 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 16 0 Table IX.1 * Note that the values from Table IX.1 are reflective of the Energy Storage Solutions dashboard accessed on January 22, 2026 58
  7. Page 59 of 176

    03/31/2026 Docket No. 86-12-03 Avoided Emissions Emissions Metric Avoided CO2 (lb) Avoided NOX (lb) Avoided SOX (lb) AVERT -237,000 50 70 2021, 2024 AESC 81,880 N/A N/A Table IX.2 Note that: • This data was last updated on November 30, 2024 • Emission estimates may not exactly match values reported in the evaluation reports • 2021 AESC used for 2022 and 2023 activity, AESC values used for subsequent years • 2024 ASEC does not provide NOX or SOX emission rates • AVERT rates have not been updated since 2023 • 2023 AVERT emission rates applied to all years Program Costs Year 2025 2024 2023 2022 Total Cost $4,718,639 $3,991,181 $2,750,928 $1,900,214 $13,360,962 Table IX.3 * Note that 2025 costs are an estimate as of 11/30/2025 59
  8. Page 60 of 176

    03/31/2026 Docket No. 86-12-03 X. Summary UI continues to regard reliability as a culture; beyond the projects noted in this report, UI focuses on ways to prevent outages, minimize the size of an outage, and reduce service restoration time if an outage does occur. System operation, equipment selection, and modifications to installation practices where improvements in reliability can be achieved, are standard operational procedures, not special projects. UI is committed to provide highly reliable electric service and maintain its regional operational excellence status. The historic performance is proof of the Company’s commitment. Grid Modernization across the electric industry has led to a demand for visualization and control of field equipment. In order to advance United Illuminating’s Distribution automation, additional smart field devices will be installed and or replaced in order to establish new communications systems. 60
  9. Page 61 of 176

    03/31/2026 Docket No. 86-12-03 XI. Voltage Irregularity Claims Each year the TDRP report summarizes Voltage Irregularity Claims - irregularity events resulting in 10 or more damage claims. Event data is included as Appendix 18. 61
  10. Page 62 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 1: Service Territory Map 62

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /