Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Words on different pages
  1. Page 59 of 176

    03/31/2026 Docket No. 86-12-03 Avoided Emissions Emissions Metric Avoided CO2 (lb) Avoided NOX (lb) Avoided SOX (lb) AVERT -237,000 50 70 2021, 2024 AESC 81,880 N/A N/A Table IX.2 Note that: • This data was last updated on November 30, 2024 • Emission estimates may not exactly match values reported in the evaluation reports • 2021 AESC used for 2022 and 2023 activity, AESC values used for subsequent years • 2024 ASEC does not provide NOX or SOX emission rates • AVERT rates have not been updated since 2023 • 2023 AVERT emission rates applied to all years Program Costs Year 2025 2024 2023 2022 Total Cost $4,718,639 $3,991,181 $2,750,928 $1,900,214 $13,360,962 Table IX.3 * Note that 2025 costs are an estimate as of 11/30/2025 59
  2. Page 60 of 176

    03/31/2026 Docket No. 86-12-03 X. Summary UI continues to regard reliability as a culture; beyond the projects noted in this report, UI focuses on ways to prevent outages, minimize the size of an outage, and reduce service restoration time if an outage does occur. System operation, equipment selection, and modifications to installation practices where improvements in reliability can be achieved, are standard operational procedures, not special projects. UI is committed to provide highly reliable electric service and maintain its regional operational excellence status. The historic performance is proof of the Company’s commitment. Grid Modernization across the electric industry has led to a demand for visualization and control of field equipment. In order to advance United Illuminating’s Distribution automation, additional smart field devices will be installed and or replaced in order to establish new communications systems. 60
  3. Page 61 of 176

    03/31/2026 Docket No. 86-12-03 XI. Voltage Irregularity Claims Each year the TDRP report summarizes Voltage Irregularity Claims - irregularity events resulting in 10 or more damage claims. Event data is included as Appendix 18. 61
  4. Page 62 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 1: Service Territory Map 62
  5. Page 63 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 2: Definition of Terms Term Definition Aerial Cable A conductor system in which each conductor is covered with a fully insulated covering. The cables are supported from a wire suspended on poles. Aerial cable is often installed in areas of heavy trees where other systems such as tree-wire would not be adequate. AESC Avoided Energy Supply Component/Cost provides estimates of avoided costs associated with energy efficiency measures for programs. ASAI (Average Service Availability Index) The ratio of the total number of customer hours that service was available during a year to the total customer hours demanded. Customer hours demanded are determined as the twelve-month average number of customers served multiplied by 8760 hours (8784 for leap years). ASAI = customer hours of available service/customer hours demanded Autoloop A scheme where two or more distribution circuits are tied together with a normally-open tie recloser capable of automatically restoring service to portions of a feeder that were de-energized due to an outage. AVERT The AVoided Emissions and geneRation Tool evaluates how energy policies and programs lead to changes in emissions from electric power plants at a county, state, or regional level. Backbone Feeder The portion of the three-phase distribution circuit beginning at the substation and ending at transitions to single- or multi-phase circuitry protected by singlephase devices. CAIDI (Customer Average Interruption Duration Index) The average service restoration time or the average interruption duration for those customers interrupted during a year. It is determined by dividing the sum of all customer interruption durations by the total number of customers interrupted in a year. CAIDI = sum of customer interruption durations/total number of customer interruptions CAIFI (Customer Average Interruption Frequency Index) The average number of interruptions per customer interrupted per year. It is determined by dividing the number of customer interruptions observed in a year by the number of customers affected. The customers affected are counted only once, regardless of the number of interruptions that each may have experienced during the year. This index is generally difficult to compile due to problems associated with gathering data on the number of customers affected. CAIFI = total number of customer interruptions/total number of customers affected 63
  6. Page 64 of 176

    03/31/2026 Docket No. 86-12-03 Term Definition CELID-n (Customers Experiencing Long Interruption Duration) The ratio of individual customers experiencing one or more interruptions of n or more hours during a year. It is determined by dividing the total number of unique customers interrupted for n or more hours in a year by the total number of customers served. CELID-n = total number of unique customers interrupted for n or more hours/total number of customers served CEMI-n (Customers Experiencing Multiple Interruptions) The ratio of individual customers experiencing n or more interruptions during a year. It is determined by dividing the total number of unique customers experiencing n or more interruptions in a year by the total number of customers served. CEMI-n = total number of unique customers with n or more interruptions/total number of customers served CEMM-n (Customers Experiencing Multiple Momentaries) The ratio of individual customers experiencing n or more interruptions during a year. It is determined by dividing the total number of unique customers experiencing n or more momentary interruptions in a year by the total number of customers served. CEMM-n = total number of unique customers with n or more momentary interruptions/total number of customers served CEMSMI-n (Customers Experiencing Multiple Sustained and Momentary Interruptions) The ratio of individual customers experiencing n or more interruptions during a year. It is determined by dividing the total number of unique customers experiencing n or more interruptions and momentary interruptions in a year by the total number of customers served. CEMSMI-n = total number of unique customers with n or more interruptions and momentary interruptions/total number of customers served Circuit Breaker A device which is utilized to interrupt the flow of current under normal or abnormal conditions. Circuit breakers are normally intended to operate infrequently and are operated by an external set of controls. CO2 Carbon dioxide (CO2) emissions are the release of CO2 gas into the atmosphere, primarily resulting from human activities like burning fossil fuels (coal, oil, gas) for energy, industrial processes (cement manufacturing), and land-use changes. Covered Conductor A conductor covered with a dielectric having no rated insulating strength or having a rated insulating strength less than the voltage of the circuit in which the conductor is used. Distribution Circuit An electric line which operates at voltage levels below 35,000 volts and from which the customer's ultimate utilization voltage (for example, 120V, 240V, and 480V) is directly provided through a distribution transformer. 64
  7. Page 65 of 176

    03/31/2026 Docket No. 86-12-03 Term Definition Fault A short circuit which occurs on an electric system. A fault is an abnormal occurrence which may be a result of a failed piece of equipment, a foreign object such as a tree limb contacting wires, or wires slapping together due to weather conditions such as high winds, snow, or ice. Feedback The return to a point of origin of evaluative or corrective information about an action or process. Fuse A device which opens when overheated by the passage of abnormally high current such as a short circuit. Interruption Loss of electric service to one or more customers for a period of time. See "Outage". KVA Kilo-Volt-Amperes. A measure of electrical capacity equal to the product of the voltage multiplied by the current divided by 1,000. Electrical equipment capacities are sometimes stated in KVA. Loop Feed A number of power lines forming a closed loop or ring. There are two or more routes by which any point on a loop fed circuit can receive energy. MAIFI (Momentary Average Interruption Frequency Index) The average number of times that a system customer is momentarily interrupted (less than 5 minutes) during a year. It is computed by dividing the total number of customers momentarily interrupted in a year by the average number of customers served during the year. A customer interruption is considered to be one interruption to one customer. MAIFI = ((sum of number of customers momentarily interrupted/customers served) times 12) divided by the number of months. Major Event Day (MED) A major event day is a day in which the daily SAIDI exceeds the threshold value, TMED. In calculating the daily SAIDI, interruption durations that extend into subsequent days accrue to the day on which the interruption is initiated. MEDs are removed from metric calculations as part of the IEEE-1366 methodology. Major Storm In March 1995, the DPUC approved a new major storm definition, which is based on a statistical analysis of the most recent four calendar years of reliability data. Under the new definition, a major storm will be declared when the number of restoration steps exceeds the 98.5 percentile of all days in the most recent four years. All reliability data associated with interruptions beginning on that qualifying day would be excluded, even if the interruptions extend into subsequent days. Momentary Interruption An interruption which results in a loss of electric service for a brief period of time (less than 5 minutes). Service is usually restored by devices which operate automatically, often in less than one second. Network Primary System An electrical system in which the high voltage (that is, 15,000 volt) primaries of transformers are loop fed by two or more circuits. 65
  8. Page 66 of 176

    03/31/2026 Docket No. 86-12-03 Term Definition Network Secondary System An electrical system in which the low voltage (that is, 120/208, 277/480 volt) secondaries of transformers are connected to a common network of wires for supplying light and power directly to consumers. (See also loop feed.) Non-Tree Wire Bare wire or any other wire not intended to withstand abrasion to tree contact. NOX Nitrogen Oxides (NOx) emissions are harmful gases, primarily nitric oxide (NO) and nitrogen dioxide (NO2), produced from burning fossil fuels in vehicles, power plants, and industries, as well as natural processes like lightning, contributing to smog, acid rain, and respiratory problems. Outage An extended interruption (greater than or equal to 5 minutes) of service to one or more customers which usually requires human intervention to restore electric service. See Appendix 16 for descriptions of the causes of outages used in this report. Phase Spacing The distance between the current carrying conductors in a power delivery system. Primary (Distribution) Feeder A primary voltage distribution circuit usually considered to be between a substation or point of supply and the distribution transformers, which supply lower voltage distribution circuits or consumer service circuits. Radial System An electrical distribution or transmission system which provides only one path for power to flow. It is generally considered to be the least reliable system but is also the least costly as compared to a network system. Recloser A device which isolates a short-circuited component from its voltage source. A recloser, unlike a fuse, may restore voltage one or more times to determine if the short circuit has cleared. Reclosing A technique used with circuit breakers and reclosers where voltage is interrupted to allow a short circuit to clear (that is, a tree branch to fall to the ground) and then voltage is restored to determine if the short circuit has cleared. Reliability The degree to which electric service is supplied continuously. Rights-of-way The land over which a utility line, railroad, or roadway passes. Utility facilities may also be buried in a right-of-way. SAIDI (System Average Interruption Duration Index) The average interruption duration in minutes per customer served. It is determined by dividing the sum of all customer interruption durations during a year by the number of customers served. SAIDI = sum of customer interruption durations/total number of customers. 66
  9. Page 67 of 176

    03/31/2026 Docket No. 86-12-03 Term Definition SAIFI (System Average Interruption Frequency Index) The average number of times that a system customer is interrupted during a year. It is computed by dividing the total number of customers interrupted in a year by the average number of customers served during the year. A customer interruption is considered to be one interruption to one customer. SAIFI = ((sum of number of customers interrupted/customers served) times 12) divided by the number of months. SCADA An acronym for Supervisory Control and Data Acquisition, which is a system for controlling and gathering data on a utility system. Sectionalizer Similar to a switch, this device does not have the capability to isolate electric devices under short circuit conditions and must rely on some other device such as a recloser or breaker to interrupt the short circuit before opening itself to isolate the short circuit. Service Drop The overhead conductors between the electric supply, such as the nearest pole, and the building or structure being served. Side Tap A single or multi-phase portion of a distribution circuit that is supplied by the backbone feeder and protected by single-phase devices. SOX Sulfur Oxides emissions (SOx) are poisonous, pungent gases—primarily sulfur dioxide (SO2) and sulfur trioxide (SO3)—released into the atmosphere, largely by burning sulfur-containing fossil fuels like coal and oil. Spacer Cable A type of electric supply line construction consisting of an assembly of one or more covered conductors, separated from each other and supported from a messenger by insulating spacers. Storm Refer to the definition of Major Storm. Subtransmission A functional classification relating to that portion of utility plant used for the purpose of distributing electric energy in bulk from convenient points of the transmission system to the distribution system and in certain cases to ultimate consumers. Switch A device that can open or close an electrical circuit. Some switches are able to interrupt load current (loadbreak) while others can only be operated with the circuit de-energized (non-loadbreak). Thermovision A trade name for a system of infrared cameras and sensors used to detect heat. On an electric utility system, excessive heating of hardware is often a sign of impending failure due to loose or poor connections or other overheating equipment. Transformer (Line) An electromagnetic device for changing the voltage of alternating-current electricity which has been classified as distribution equipment. Tree-Wire A conductor with an abrasion-resistant outer covering, usually nonmetallic, and intended for use on overhead lines passing through trees (Refer to the definition of Covered Conductor). 67
  10. Page 68 of 176

    03/31/2026 Docket No. 86-12-03 Appendix 3: Customers Served The United Illuminating Company Docket Number 86-12-10 PURA Order 1 Customers Served 2025 January 346,654 February 346,840 March 346,919 April 346,870 May 346,949 June 347,099 July 346,766 August 346,987 September 347,285 October 347,557 November 348,146 December 348,979 (Average) 347,254 68

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)