Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf
3 pages match
  1. Page 32 of 108Match

    30 (1) Buy-All; or (2) Netting. Under the Buy-All tariff, the project is provided with fixed compensation for all energy and RECs produced over the 20-year term. Compensation is provided in the form of either monetary on-bill credits or quarterly direct payments. Customers can assign a portion or all of the tariff compensation to a third party. Alternatively, under the Netting tariff, the qualified NRES project is compensated (1) for all energy produced at the retail electric rate at the time of generation (i.e., all renewable energy production not consumed within the established netting interval) and (2) for the RECs created at a fixed rate over a 20-year term. A customer’s energy consumption and monthly energy bill are reduced by the energy produced and used onsite. REC payments are made to either the customer of record or a third-party beneficiary on a quarterly basis. The Authority annually reviews the NRES Program in Docket No. XX-08-03, where XX is the last two digits of the year (e.g., “24” for 2024). PURA reviewed the 2025 (Year 4) NRES deployment data and 2026 program documents in Docket No. 25-08-03, Annual Non-Residential Renewable Energy Solutions Program Review – Year 5. PURA issued a Decision on December 17, 2025 (Year 5 NRES Decision), which implemented several changes to better align the NRES Program with its program objectives. The Year 5 NRES Decision increased the price caps for the small, medium, and large project categories in 2026, to reflect changed circumstances resulting from the impending loss of the federal Investment Tax Credit (which will no longer be available for projects that fail to “commence construction” by July 4, 2026, or achieve full commercial operation by December 31, 2027, or do not meet new foreign entity of concern requirements). Adjusting price caps was intended to ensure continued project viability and support achievement of statutory clean energy goals. The Year 5 NRES Decision also introduced an annual budgetary cap, recognizing the ratepayer cost implications of a higher price cap, to limit total NRES Program costs to the level reached in 2024. The Authority determined that this approach was consistent with General Statutes § 16-244z, which permits the selection of projects above the NRES Program's MW cap subject to a cost-based constraint based on 2024 expenditure levels. More information and resources are available at the PURA NRES Program webpage and on each of the EDCs’ dedicated NRES Program webpages (Eversource Non-residential; United Illuminating Non-Residential). 2. Procurement Results NRES price caps, which represent the extent of the state’s willingness to pay for a given resource block, while allowing competitive forces to set the actual bid prices paid to
  2. Page 33 of 108

    31 winning bidders, are shown in Table 8 for NRES Years 2, 3, and 4 (i.e., 2023, 2024, and 2025). Table 8: NRES Buy-All Bid Price Caps45 NRES Buy-All Bid Price Caps Category Small Zero-Emission Medium Zero-Emission Large Zero-Emission Low-Emission School Solar46 Year 2 Price Cap ($/MWh) Year 3 Price Cap ($/MWh) $200.97 $190 $159 $159 N/A $199.82 $188.9 $145.97 $159 N/A Year 4 Price Cap ($/MWh) $199.82 $188.9 $145.97 $159 $188.9 Year 5 Price Cap ($/MWh) $250.42 $236.74 $182.94 N/A $236.74 Table 9 represents the combined outcomes of the first four NRES program solicitations, occurring in February 2022 (Year 1), February and August 2023 (Year 2), February and August 2024 (Year 3), and February 2025 (Year 4). The August 2025 (Year 4) solicitation data was not yet available at the time of this report. Table 9: NRES Solicitation Data from February 2022–February 202547 NRES Solicitation Data from February 2022 – February 2025 (Table includes Year 1, Year 2, Year 3, and Year 4 February Solicitation) Eversource UI Size Category Total # of Executed Agreements MW Executed Agreements Small Zero-Emission 541 66.0 Medium Zero-Emission 112 79.1 Large Zero-Emission 33 104.7 Low-Emission 15 27.7 Small Zero-Emission 124 16.7 45 Year 5 NRES Decision, p. 12; Year 4 NRES Decision, p. 6; Year 3 NRES Decision, p. 7. 46 School solar compensation rates are administratively set, and are equal to the medium zero emission price cap. See Decision, Nov. 6, 2024, Docket No. 24-08-03 – Annual Non-Residential Renewable Energy Solutions Program Review – Year 4, p. 14. 47 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-25); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 202511-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-25).
  3. Page 34 of 108

    32 Medium Zero-Emission 46 24.4 Large Zero-Emission 7 10.8 Low-Emission 3 3.0 881 332.6 Total In total, across the first four program years, the zero-emission categories executed contracts for 301.8 MW out of the 350 MW available (86%).48 Note that the available MW allocations are based on the full annual capacity allocation, but selected projects do not include those selected in the August 2025 solicitation. Additionally, selected projects may reflect reallocation of unused MW between the competitively selected project categories. Table 10: NRES Capacity Selected Size Category Small Zero-Emission Medium Zero-Emission Large Zero-Emission Capacity Selected (MW) Capacity Available (MW) Percent Selected 82.7 103.5 115.6 97.5 114 138.5 85% 91% 83% The low emission category executed 30.8 MW out of the 40 MW available (77%), before the low emission category was removed in Public Act No. 25-173, § 9, effective October 1, 2025. Solar projects represented 85% of the MW capacity selected, or 11 out of the 18 projects selected, in the low emission NRES category between the 2022 and February 2025 solicitations. Figure 15 indicates the total capacity of eligible NRES bids received and selected in each year across both EDCs. The chart does not include disqualified, declined, terminated, or withdrawn bids. 48 Id.
  4. Page 35 of 108

    33 Figure 15. NRES MW Received and Selected49 60 50 MW 40 30 20 10 2022 2023 Feb 2023 Aug Selected 2024 Feb 2024 Aug Low Large Zero Medium Zero Small Zero Large Zero Medium Zero Small Zero Low Large Zero Medium Zero Small Zero Low Large Zero Medium Zero Small Zero Large Zero Medium Zero Small Zero Low Large Zero Medium Zero Small Zero 0 2025 Feb Not Selected Figure 16 summarizes the bid preferences of selected NRES projects. Out of 216 total bids selected in the competitive project categories through the February 2025 solicitation, 107 received a distressed municipality bid preference, two received a brownfield bid preference, 20 received a landfill bid preference, and 20 received a solar canopy or carport bid preference. Note that small zero-emission projects do not receive bid preferences, as they are not competitively selected. 49 Id.
  5. Page 36 of 108

    34 Figure 16. Bid Preferences of Selected NRES Projects50 140 120 MW Selected 100 80 60 40 20 0 Small Zero Medium Zero Large Zero Low Emission Size Category None Distressed Municipality Brownfield Landfill Solar Carport/Canopy Table 11, below, provides the average pricing for the projects selected through the Years 1–4 NRES solicitations. Table 11: Average Bid Price for Selected Projects in NRES Years 1–4 Solicitations51 (Year 4 includes only February solicitation) Small Zero-Emission Medium Zero-Emission Large Zero-Emission Low-Emission Year 1 Average ($/MWh) Year 2 Average ($/MWh) Year 3 Average ($/MWh) Year 4 Feb Average ($/MWh) $200.97 $163.8 $143.1 $137.9 $200.97 $160.1 $134.5 $151.2 $199.82 $161.1 $126.5 $142.3 $199.82 $170.6 $130.9 $149.1 50 Id. 51 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-25); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 202511-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-25).
  6. Page 37 of 108

    35 Figure 17 below provides the cumulative MW deployed by the NRES Program. As of September 2025, a total of 29.76 MW of selected projects under the NRES Program have reached deployment, of which 25.44 MW is solar PV. 52 Figure 17. Cumulative MW Deployed via the NRES Program53 35.00 30.00 MW Deployed 25.00 20.00 15.00 10.00 5.00 0.00 2022 2023 2024 Solar PV 2025 Fuel Cell 52 Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-01); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 202511-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-01). 53 Id.
  7. Page 38 of 108

    36 D. Shared Clean Energy (SCEF) Program and SCEF Pilot Program 1. Program Description and History Pursuant to General Statutes § 16-244z(a)(1)(C), the SCEF Program was established as a competitive procurement effort to provide benefits of clean energy to customers who meet income requirements or are unable to install clean energy projects at their home or business. SCEF is Connecticut’s version of a community clean energy program. The goal of the SCEF Program is to provide savings to specific categories of customers, particularly customers with low- to moderate-incomes, low-income service organizations, and customers who reside in EJCs. Typically, residents or businesses can choose to invest in, or lease, a renewable energy system on the rooftops of their homes or businesses. However, some Connecticut residents and businesses, especially LMI customers, may face substantial barriers to investing in or leasing an individual installation, such as high installation costs, unsuitable rooftop orientation, shaded property, or renting a property instead of owning one. In addition to the goal of providing savings to these specific categories of customers, the SCEF Program objectives are to cost-effectively allocate up to 50 MWs to SCEFs annually, and to lower or eliminate barriers to entry for subscriber organizations. A SCEF project enables multiple customers to benefit directly from a facility's energy production. Participating SCEF customers, or subscribers, receive clean energy savings in the form of a fixed monthly credit of $0.025/kWh on their utility bill. The EDCs administer the SCEF Program in coordination with DEEP. The EDCs are responsible for subscription management, identification, and enrollment of customers/subscribers, as well as project selection through an annual, competitive solicitation. The Authority reviews the program requirements, price caps, and bid preferences each year to ensure the program’s effectiveness. The SCEF owner is responsible for the financing and construction of the project, which delivers energy and RECs to the EDCs. In turn, the SCEF owner receives direct payment for the energy production of the project on a quarterly basis over a 20-year term. The Program allocated 25 MW of new clean power generation per year for the first three program years (2020– 2022) and 50 MW per year for subsequent program years. In 2024, Public Act No. 2431, § 6(c)(1)(C)(ii) extended the SCEF program from six to eight years, with the final procurement in 2027, for a total of 325 MW available over eight years. The MW allocation is split 80%/20% between Eversource and UI, respectively.
  8. Page 39 of 108

    37 The SCEF project requirements and tariff design, including the program timeline, project eligibility requirements, and the EDCs’ solicitation and bid selection process were approved by PURA in the December 18, 2019 Decision in Docket No. 19-07-01, Review of Statewide Shared Clean Energy Facility Program Requirements. The Authority conducts an annual review proceeding each year to determine whether any adjustments to next year’s procurement are necessary.54 This year, the 2026 Program documents and manual were reviewed and approved by PURA in the December 17, 2025 Decision in Docket No. 25-08-04, Annual Review of Statewide Shared Clean Energy Facility Program Requirements – Year 7 (Year 7 SCEF Decision). The Year 7 SCEF Decision implemented several program changes in addition to the annual revision and approval of the SCEF Program Manual and related program documents. First, the decision increased the SCEF price cap from $133/MWh to $182.94/MWh to reflect changed circumstances, including recent modifications to the federal investment tax credit (ITC) enacted through the One Big Beautiful Bill Act. This change also aligned the SCEF price cap with that of the NRES Program and reduced artificial pricing disparities between programs serving similar project types and developer markets, thereby improving market efficiency and predictability. At the same time, the decision recognized the ratepayer cost implications of a higher price cap. To balance these considerations, it established an annual budgetary cap to ensure that total SCEF Program costs do not exceed those reached in 2024, the fifth SCEF Program year, consistent with the intent of General Statutes § 16-244z(c)(1)(B). The Year 7 SCEF Decision also maintained the Program’s bid preference amounts to provide stability and avoid introducing uncertainty for developers. Finally, the decision removed the SCEF Program’s slope-based site restrictions. These restrictions, which limited projects to no more than 10% of land with slopes greater than 15% and prohibited grading to meet this threshold, were determined to be duplicative of the review conducted under DEEP’s General Permit and to increase administrative burden, development costs, and review timelines. Accordingly, the slope requirements were eliminated through the Year 7 SCEF Decision. 2. SCEF Pilot Program The current SCEF Program design is largely based off lessons learned from a pilot program administered under General Statutes § 16-244x and approved by PURA in Docket No. 17-06-28, Application to Approve the Selected Projects Under the Shared 54 Annual reviews are conducted in Docket No. XX-08-04, where XX is the last two digits of the year (e.g., “25” for 2025).
  9. Page 40 of 108Match

    38 Clean Energy Facility Pilot Program. In the November 8, 2017 Decision in Docket No. 17-06-28, PURA approved DEEP’s selection of three solar projects for a two-year SCEF Pilot Program with the EDCs. The selected projects consist of a 2.0 MW facility by CHIP Fund 5 and a 1.62 MW facility by Clean Energy Collective located in Eversource territory, and a 1.6 MW facility by US Solar Corporation located in UI territory. Currently, only the 1.62 MW facility in Eversource territory is in service under the SCEF Pilot Program.55 The RFP issued by DEEP to select pilot projects was conducted pursuant to General Statutes § 16-244x. The statute directed DEEP to: (1) establish a billing credit for subscribers of a SCEF; (2) establish consumer protections for subscribers and potential subscribers of such facility; and (3) select, pursuant to a competitive RFP process, SCEF projects with an aggregate total nameplate capacity rating of no more than 6 MW, including no more than 2 MW in the aggregate in the service territory of UI, and no more than 4 MW in the aggregate in the service territory of Eversource. Additional information on the SCEF Pilot Program can be found on DEEP’s webpage. 3. Procurement Results & Deployment Below is an overview of program procurement results through Year 5 of the SCEF Program. In April 2022, Public Act No. 22-14, § 3 doubled SCEF’s program capacity from 25 MW to 50 MW. As shown in Table 12, the increased program capacity was largely met by increased demand. However, the weighted average selected bid price also increased, which may be the result of several factors, including the increased program capacity because bids further down the bid stack were selected. Table 13 indicates the price cap and bid preferences for the SCEF Year 7 procurement. 55 DEEP Interrog. Resp. CAE-18, Nov. 17, 2023, Docket No. 23-08-01, Att. 1.
  10. Page 41 of 108

    39 Table 12: Committed Capacity & Average Bid Prices by SCEF Program Year56 Committed Capacity & Average Bid Prices by SCEF Program Year SCEF Program Year Committed Capacity (MW)57 Terminated Capacity (MW)58 Weighted Average Selected Bid Price ($/MWh) 1 (2020) 2 (2021) 3 (2022) 4 (2023) 5 (2024) 6 (2025) 25 21.9 24.97 45 52.35 50.69 11 9 8 4 0 0 $99.46 $94.33 $104.04 $102.63 $129.51 $148.62 56 Eversource, Connecticut SCEF Program Information, Annual SCEF Summary Data, last visited Feb. 2, 2026, available at: https://www.eversource.com/residential/about/doing-business-withus/interconnections/connecticut/scef-program-development/scef-program-information; UI, RFP for SCEF, SCEF Year 6 RFP Results, last visited Feb. 2, 2026, available at: https://www.uinet.com/suppliers_and_partners/power_procurement/rfp-for-scef. Public procurement data was used rather than the EDCs’ CRE-24 filings as the CRE-24 filings appear to exclude projects selected in the second 2024 and 2025 procurements. See Eversource Compliance, Nov. 14, 2025, Order No. 1, Att. 2025 ES A1, A2, A3 Interrogatories.xlsx (RRES NRES SCEF sheet, Interrog. CRE-24); UI Compliance, Nov. 17, 2025, Order No. 1, Att. 2025-11-17 UI Attachment 2 #25-08-01.xlsx, (RRES NRES SCEF sheet, Interrog. CRE-24). 57 Public Act No. 22-14, § 3 allows for uncommitted capacity to be rolled over into the next Program Year, starting with Program Year 4. Stated another way, uncommitted capacity from SCEF Program Years 1 through 3 was ineligible to roll over into SCEF Program Year 4, but the 5 MW uncommitted in SCEF Program Year 4 was eligible to roll into SCEF Program Year 5. 58 Note that several projects have terminated SCEF contracts after being accepted into the program. For consistency with past years, the “Committed Capacity” column reflects all projects (including those that later terminated) that were initially selected in each program year. Projects with terminated agreements are broken out separately in the “Terminated Capacity” column.

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)