Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 11 of 79

    3.2 Single- and Three-Phase Service from Pole-Mounted Transformers Maximum Service Size from Transformers Mounted on Poles Main Switch Size and Equivalent KVA Ratings Maximum Size Main Allowed from Street Pole Off-Street Pole Transformer Capacity Allowed on U.G. by U.G. by Poles Cust. Cust. (Note 1) O.H. (Note 2) O.H. (Note 2) VOLTS 400A 600A 800A 120/240 1φ 3 Wire 96 KVA N/A N/A 100 KVA 400 A 400 A 400 A 400 A 120/240/240 3 φ 4 Wire 166 KVA 250 KVA N/A 300 KVA 400 A 400 A 400 A 400A (10 KW Min. Demand) 600 A No longer available for new services. Contact UI’s Engineering Department 240 3φ 3 Wire before making any additions or changes. 120/208Y/ 3 φ 4 Wire 144 KVA 216 KVA 288 KVA 300 KVA 400 A 400 A 400 A 400 A (30 KW Min. Demand) 600 A 800 A 277/480Y 3 φ 4 Wire (100 KW Min. Demand) 332 KVA N/A N/A 300 KVA (Note 3) (Note 3) 400 A 400 A NOTES: 1. 3 φ 3 wire underground services (240V or 480V) are no longer available. Contact UI’s Engineering Department before making any additions or changes to existing service. 2. Conduit shall be no smaller than 1¼ inch nor larger than 4 inch in diameter. Location on the riser pole shall be designated by UI and is typically on the field side of the pole away from traffic. Do not trench to any pole without first obtaining approval from UI. A maximum of two conduits per pole is allowed for electric service and a maximum of three wires for single-phase and four wires for threephase can be installed in each conduit. While allowed by NEC, UI does not allow doubled conductors in a single riser conduit. All riser pole conduits and sweeps to be rigid galvanized steel conduit and supported 3 inches clear of the pole. Install only the first vertical 10-foot length and provide the remaining conduit, brackets, weatherhead and grounding clamp for installation by UI. Service entrance conductors are supplied by the customer and must extend a minimum of three feet beyond the weatherhead to allow for a drip loop. Do not install conductors without UI assistance. 3. 277/480Y services are not available from street poles (private property poles are required). 8
  2. Page 12 of 79

    3.3 Services from Padmount Transformers A. The design, location, voltages and materials for underground services must be approved by UI prior to making any commitments. Please contact UI’s Engineering Department for more information. B. The company has a residential policy (OP-D36) which states that the developer must provide all trenching required for the electrical system. Also, the developer must supply and install foundations and conduit to UI specifications. UI will then install the primary and secondary electric system. UI requires a permanent easement for this equipment. The customer for each individual lot will supply, install, own and maintain the service entrance cables and conduit. Voltages available are 120/240 volt single-phase and 120/208Y volt three-phase for large multi-unit housing. Contact UI’s Engineering Department for more information. C. The company has a commercial/industrial policy (OP-D32) governing service to office or industrial parks. The developer must provide all trenching required for the electrical system. Also, the developer must supply and install foundations and conduit to UI specifications. UI will then install the electric system necessary to supply the individual lots. UI requires a permanent easement for this equipment. The services to the individual lots are installed under separate contracts. See Paragraph D below. Contact UI’s Engineering Department for more information. D. For service to an individual commercial/industrial lot, the customer must supply, install, own and maintain all primary conduit, transformer foundations and the service entrance conduit and cables. The primary conduit shall be installed from the high voltage supply designated by UI to the transformer foundation per UI specifications. UI will install the primary cable and transformer and make all connections to company-owned equipment. Voltages available are single-phase, three-wire 120/240 volt (800 A max.) and three-phase, four-wire 120/208Y (3,000 A max.) or 277/480Y (2,500 A max.). Contact UI’s Engineering Department for more information. 3.4 Services from Transformer Vaults A. The design, location, voltages and materials for these underground services must be approved by the company prior to making any commitments. Contact UI’s Engineering Department for more information. 9
  3. Page 13 of 79

    B. For downtown New Haven or Bridgeport, the company has a policy (OP-D10N) for service from the network grid. Services up to 800 A at 120/208Y volts will be connected to the grid. The customer must pay for that portion of the service between the main switch or junction box and the curb. Services exceeding 800 A in total capacity at 120/208Y and all services rated 277/480Y cannot be connected directly to the network grid. In this case, the customer is required to install, own and maintain a vault to UI specifications. Voltages available are three-phase, four wire 120/208Y or 277/480Y, and are limited to 3000 A. (Refer to Guidebook Standards #8 and #9 in Section 13.) NOTE: Other municipalities have underground systems in portions of their downtown areas (e.g., East Haven and Derby). Contact UI’s Engineering Department for specific requirements for service in these areas. C. With the exception of single meter installations, the underground service conduit shall terminate in a junction or pull box supplied and installed by the customer. The junction or pull box shall meet both UI and National Electrical Code requirements and is subject to the approval of the authority having jurisdiction. The junction box will connect to the customer’s main switch or switches. The minimum size of the box shall be based on the service size, and the conduit shall enter from the back or the end of the box. The service conductors shall not be spliced but may be tapped where multiple main switches are used. The junction or pull box shall have provisions for company locks and seals. Contact UI’s Engineering Department for drawings of approved junction boxes. D. In each of the above cases, the service entrance disconnect must be either a switch with current limiting fuses or a circuit breaker of equivalent interrupting capacity. The short circuit capacity of these devices shall be not less than 200,000 A symmetrical for downtown network areas, and the service must be configured in cold sequence (i.e., switch-fuse-meter). For all other areas, contact UI’s Engineering Department. E. Customers in non-network areas may be required to install, own and maintain a transformer vault to UI specifications. This occurs when the service entrance capacity requires the installation of transformers on the customer’s property and there is not sufficient area for a padmount transformer. Voltages available are three-phase, four-wire 120/208Y (3,000 A max.) or 277/480Y (2500 A max.). The short circuit capacity of these devices shall be calculated by UI, and the service must be configured in cold sequence (i.e., switch-fuse-meter). Contact UI’s Engineering Department for more information. 10
  4. Page 14 of 79

    3.5 Temporary Service A. Temporary service is available upon request provided that the cost to install and remove the necessary facilities is paid in full and in advance by the customer. Contact United Illuminating, 100 Marsh Hill Rd., Orange, CT 06478. B. Where UI facilities are already in place- a single-phase temporary service can be supplied by a simple service drop or underground service lateral. A standard flat rate fee applies. C. For more complex temporary services, the Engineering Department will provide the customer with a written estimate of the cost associated with providing such service. D. Services that utilize temporary conductors connected to the load side of the meter provision must be applied for as a temporary service even if the permanent conductors are installed on the line side of the meter. This is billable at the current rate. 3.6 Primary Voltage Services Primary voltage services are generally supplied by high voltage switchgear (either fused interrupters or circuit breakers) and are primary metered. Contact UI’s Engineering Department for additional information. 4. REQUEST FOR ELECTRIC SERVICE To establish electric service, temporary or permanent, contact UI’s Customer Care Center by calling [phone removed] from 7 a.m. to 7 p.m., Monday through Friday, and 7 a.m. to 4 p.m. on Saturday. You may fax a completed Electric Service Information Form to [phone removed] (available 24 hours a day/7 days per week). You may also apply by completing an application on our website at uinet.com. Please request a service order and a meter application. NOTE: Before UI can schedule or energize any new or renovated service, the authority having jurisdiction must approve the construction, and the acceptance of such construction must be posted in UI’s system. 11
  5. Page 15 of 79

    4.1 General Service Information The following general service information is required on all applications: A. Project/Owner Name B. Number & Street Address, Town and Zip Code C. Lot # (if applicable) and nearest intersecting street D. Complete billing information including: – Owner’s billing address and telephone number – Total number of meters requested E. Connecticut electrical contractor’s license number (E-1/E-9) F. Electrical Contractor’s cell phone number and email address G. Service information including: – Residential or Commercial/Industrial – Overhead or Underground – Service size in amperes – Requested service voltage – Single-phase (three-wire) or three-phase (four-wire) – Temporary or permanent H. Type of construction (new, replacement, increase, removal, demolition, cut tap or repair) I. Dates temporary and permanent service is required 4.2 Residential Overhead Service Drops For single-phase residential overhead service drops rated 200 A and below, the following additional information is required by UI: A. Pole number of requested service pole B. Confirmation if the requested service pole has UI secondaries (yes/no) C. Number of pole spans from transformer to service pole D. Span distance (in feet) from service pole to service location 12
  6. Page 16 of 79

    Where UI facilities are already in place, residential overhead service drops are typically designed and located by the customer’s licensed electrical contractor. This includes temporary services to construction trailers that meet the above criteria (the standard flat rate fee for temporary service applies). Upon receiving complete information, UI will provide a job number immediately from our Customer Care Representative or by the next business day if you faxed in your request. Customer Electricians or trained field technicians are expected to determine the proper location for the service based on guidebook standards #1, 2, 3, 4, 10 and 12. If you have requested UI to “spot the service,” then typically you will be contacted within five business days by the Standard Field Department. Midspan service taps are nonstandard construction and generally not acceptable. Contact UI Engineering for other options. 4.3 All Other Service Drops & Laterals The following are requirements for all other overhead service drops and underground service laterals, services where additional poles and wires are needed, all residential overhead services over 200 A, all underground services and all commercial/ industrial services: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. A completed UI electrical load information form. C. Construction start and completion dates. You will not receive the UI job number until your request has been reviewed and the job requirements determined by the UI Engineering Department. Typically, you will be contacted by our engineer to discuss the job and/or arrange for a job site meeting within five business days of placing the order. The job requirements will be written by our engineer and sent to you with a copy of the service order by US mail or email. Refer to Guidebook Standards #5, 6, 7, 8, 9, 11 and 13 in Section 13. 13
  7. Page 17 of 79

    4.4 Residential Developments Overhead line extensions and Underground Residential Distribution (URD) projects require more information, drawings and advance planning. Therefore, it is important that our Engineering Department obtain the following information: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. Name of real property owner and the approximate date property was purchased (obtain volume number, page number and date recorded, if available). C. Sizes (sq. ft.) and number of buildings, including the number of units per building and any house meters, if applicable. If this represents only a portion or section of the total development, indicate the total number of future buildings and units planned for the development. D. A completed UI electrical load information form for a typical unit or building. E. Construction start and completion dates. UI needs six to eight weeks after receipt of complete information to prepare the necessary project documents and cannot install or energize any facilities until the necessary contracts are signed and all applicable easements have been recorded on the land records. These documents include: A. As-Planned Engineering Drawing with proposed UI facilities. B. As-Planned Easement Drawing with proposed easement strip. C. Responsibility Agreement/URD Contract. 14
  8. Page 18 of 79

    4.5 Commercial & Industrial Developments Commercial and industrial developments supplied by overhead power lines or underground cable systems require additional information, drawings and advance planning. Therefore, it is important that our Engineering Department obtain the following information: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. One complete set of the electrical series drawings, including the power riser or one-line diagram for the service(s), and any other drawings that detail trenching and conduit placement, transformer foundations, or other items relating to the service from UI’s facilities to the customer’s service entrance equipment. C. Name of real property owner and the approximate date property was purchased (obtain volume number, page number and date recorded, if available). D. Sizes (sq. ft.) and number of buildings, including the number of units per building and any house meters, if applicable. If this represents only a portion or section of the total development, indicate the total number of future buildings and units planned for the development. E. A completed UI electrical load information form for each service. F. Construction start and completion dates. UI needs six to eight weeks after receipt of complete information to prepare the necessary project documents and cannot install or energize any facilities until the necessary contracts are signed and all applicable easements have been recorded on the land records. These documents include: A. As-Planned Engineering Drawing with proposed UI facilities. B. As-Planned Easement Drawing with proposed easement strip. C. Responsibility Agreement /OP-D32 Contract. 15
  9. Page 19 of 79

    4.6 Service Request Dos and Don’ts REMEMBER: Do: Contact UI’s Customer Care Center to apply for electric service and provide complete and accurate information. Please allow sufficient time for UI to review your request, order necessary materials and schedule the required work. Label meter provisions and main switches with the same identifying mark as the unit the meter serves. Have the authority having jurisdiction inspect and release the service (new or renovated) and notify UI of such release. Install meter provisions outside. Don’t: Install electric service without first applying for service and obtaining the job requirements and a job number from UI. Excavate underground facilities before contacting Call Before You Dig at 811 or [phone removed]. Install meter provisions indoors.  Install service conduits to poles until such poles have been approved by UI and the location of the conduit has been clearly marked on the pole. Install more than one 10-foot vertical section of conduit or any service entrance conductors in conduits to poles, padmount transformers or hand holes without coordinating the installation with UI. 5. DESIGN CRITERIA & CONSTRUCTION PRACTICES 5.1 Overhead and Underground Services A. Overhead Service Drops 1. Overhead service drops are installed, owned and maintained by the company. A clear path, devoid of vegetation, is required. Customer is responsible to maintain this clear path. 2. Overhead service drops must not exceed 150 feet in length. 16
  10. Page 20 of 79

    3. The point of attachment on the customer’s premises will be approved by the company and shall be the shortest practical distance from the company’s pole. Service bolts will be supplied by the company (see Section 12 to find the locations where service bolts are available) and installed by the customer. The bolt shall be adequately anchored at the point of attachment to safely withstand the strain imposed by the service drop. The service bolt must be installed in such a manner that it can withstand at least 650 pounds. of tension. The contractor should install the bolt into brick, concrete block or masonry construction when available. 4. The point of attachment shall be safely accessible by UI crews from a ladder on level ground, and the height above finished grade shall not be less than 12 feet nor more than 26 feet. The point of attachment shall also be such that the minimum conductor clearances conform to NEC 230.24. Attachment height must allow for 12 inches of separation between any communication cable and the service conductor along the length of the cable run. NOTE: If the height of a structure is not adequate to maintain these clearances, a service mast may be necessary. Refer to Guidebook Standards #1, 2, 3 and 4 in Section 13. 5. The point of attachment shall be designated such that UI’s service drop is not readily accessible as defined by the National Electrical Code and the National Electrical Safety Code and adequate horizontal and vertical clearance can be maintained. In no case shall UI provide, own or maintain a service drop that runs horizontally along the surface of a building. 6. Service entrance conductors provided by the customer shall conform to the National Electrical Code and the local authority having jurisdiction and shall be properly identified. 7. If allowed by the local authority having jurisdiction, a maximum of two service masts with a total of six-wires for single-phase or eight-wires for three-phase can be connected to a single service drop. B. Underground Service Laterals 1. Underground service laterals (both the conduit and the service entrance conductors) are supplied, owned and maintained by the customer from the service entrance equipment to the designated point of attachment to UI facilities. 17

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)