Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 20 of 79

    3. The point of attachment on the customer’s premises will be approved by the company and shall be the shortest practical distance from the company’s pole. Service bolts will be supplied by the company (see Section 12 to find the locations where service bolts are available) and installed by the customer. The bolt shall be adequately anchored at the point of attachment to safely withstand the strain imposed by the service drop. The service bolt must be installed in such a manner that it can withstand at least 650 pounds. of tension. The contractor should install the bolt into brick, concrete block or masonry construction when available. 4. The point of attachment shall be safely accessible by UI crews from a ladder on level ground, and the height above finished grade shall not be less than 12 feet nor more than 26 feet. The point of attachment shall also be such that the minimum conductor clearances conform to NEC 230.24. Attachment height must allow for 12 inches of separation between any communication cable and the service conductor along the length of the cable run. NOTE: If the height of a structure is not adequate to maintain these clearances, a service mast may be necessary. Refer to Guidebook Standards #1, 2, 3 and 4 in Section 13. 5. The point of attachment shall be designated such that UI’s service drop is not readily accessible as defined by the National Electrical Code and the National Electrical Safety Code and adequate horizontal and vertical clearance can be maintained. In no case shall UI provide, own or maintain a service drop that runs horizontally along the surface of a building. 6. Service entrance conductors provided by the customer shall conform to the National Electrical Code and the local authority having jurisdiction and shall be properly identified. 7. If allowed by the local authority having jurisdiction, a maximum of two service masts with a total of six-wires for single-phase or eight-wires for three-phase can be connected to a single service drop. B. Underground Service Laterals 1. Underground service laterals (both the conduit and the service entrance conductors) are supplied, owned and maintained by the customer from the service entrance equipment to the designated point of attachment to UI facilities. 17
  2. Page 21 of 79

    2. Trenching for underground laterals from wood poles shall not start until the service location is approved and the conduit location is marked at the pole by UI. A maximum of two risers for the electric service can be installed on the pole, and a maximum of three wires for single-phase and four wires for three-phase can be installed in each conduit. While allowed by NEC, UI does not allow multiple sets of conductors in a single conduit. The contractor installs only the first ten-foot vertical length of conduit and one stand-off bracket (a minimum of eight feet above final grade). The conduit must be installed per Guidebook Standard #24 with the conduit being installed away from the flow of traffic and three inches from the pole. The additional conduit, stand-off brackets, weatherhead and UL listed conduit grounding clamp or ground lug kit on the weatherhead are provided by the customer and installed by UI. The riser conduit and elbow at the pole must be rigid galvanized steel. To facilitate the installation of the wires, UI recommends that the elbow at the pole be larger than the minimum allowable radius for the trade diameter conduit being installed. 3. Conduit from the service entrance equipment back to the property line can be either rigid galvanized steel or PVC, subject to the requirements of the NEC and the authority having jurisdiction. Conduit in the street right-of-way (curb to property line) must be rigid galvanized steel. 4. For underground services from single-phase padmount transformers or secondary hand holes, the contractor must locate and extend the PVC conduit stub at the UI point of service connection. If no stub is available, contact UI’s Engineering Department for assistance. Do not attempt to install any conduit or cable into the transformer or hand hole without contacting UI. 5. Direct buried services must extend in rigid galvanized steel conduit from the pole onto private property or extend five feet in Schedule 40 PVC conduit from the single-phase padmount transformer or hand hole. The conduit at the service entrance must extend perpendicularly away from the building foundation wall a minimum of five feet. NOTE: UI does not recommend the installation of direct buried services. 6. Service entrance conductors from poles, padmount transformers or hand holes must be continuous to the meter location. Pull boxes or tap boxes are prohibited except when located next to and installed as part of the service entrance equipment. 18
  3. Page 22 of 79

    7. Protection from ground movement for underground service entrance conductors shall be provided by the installation of a UL listed slip fitting at all meter provisions. The slip joint shall be the appropriate match to the trade diameter of the service conduit and be securely fastened to the building with a minimum of two clamps. Refer to Guidebook Standard #13 in Section 13. Upon pre-approval in writing from the company, specific applications may be authorized to use flexible metal conduit in place of a slip joint. 8. Our Standard Field Department will schedule the installation and connection of your underground service entrance conductors. You will be contacted after the authority having jurisdiction has inspected the service and the release is posted in our system. 5.2 Road Crossing Poles The company will make every effort to treat all customers equally, no matter which side of the street they reside on. UI will therefore install road crossing poles as follows: A. The company will install overhead secondary service from a pole on the street provided the span does not exceed 150 feet. (100 feet for 400 A services). If the pole is on the opposite side of the street and the service would be within the 150 feet limitation if the pole was on the other side of the street, then a road crossing pole will be set at no cost. If additional poles beyond the road crossing pole are required to reach the building, they will be installed by the company on a billable basis and are covered under UI’s Private Line Pole Policy. Refer to Section 5.3 below and to Guidebook Standard #5 in Section 13. B. If the customer elects to install underground service, UI will install a road crossing pole at no charge to save the customer the cost of trenching across the street. If the customer elects not to have the pole installed, no credit for said pole would be granted by UI. Refer to Guidebook Standard #6 in Section 13. C. The company will install one section of wire, at no charge, from a street pole on the customer’s side of the street. If the street pole line is located on the opposite side of the street, the company will install a pole on the customer’s side of the street, if necessary, and the previously mentioned section of wire will be installed from that pole at no charge. Refer to Guidebook Standard #7 in Section 13. 19
  4. Page 23 of 79

    5.3 Private Line Poles (PLP) A. Where off-street overhead facilities for a single customer are required, all facilities beyond the standard 150-foot span of overhead wire are billable to the customer. The company will install, own and maintain the overhead facilities. The property owner must sign a Private Property Permit or permanent easement. Future changes to or relocations of these facilities requested by the customer are also billable. B. Where off-street overhead facilities for multiple customers are required, the company will install, own and maintain the overhead facilities. These facilities will be installed at no cost to the customers. A permanent easement must be granted to UI by the property owner(s). Future changes to or relocations of these facilities requested by the customer are billable. C. When company-owned poles are installed on private property, permanent truck access to all poles must be provided and maintained by the property owner. 5.4 Cut & Reconnect Policy POLICY DESCRIPTION: The United Illuminating Company will permit electrical contractors and electricians (herein jointly called “electricians”), licensed by the State of Connecticut, to cut and reconnect residential services at the weatherhead in order to expedite work requested by customers. Failure to follow the steps contained within the procedure of this policy may result in additional corrective work and expense for the electrician. The electrician will be billed for any corrective work performed by the company. Unauthorized connections to the company’s service conductors will be treated as tampering and may result in criminal prosecution. The electrician shall be responsible for obtaining the appropriate permits from the local municipal authority. Homeowners are not authorized to cut and reconnect electric services. Homeowners can only install de-energized or dead services. To participate in the program, an electrician must hold an E-1or E-9 license issued by the Connecticut Electrical Work Examining Board or work in the capacity of an E-2 Journeyman or electrical apprentice under the employment of an E-1 licensee. Under this condition, physical work may be performed; however, the permit must be obtained by the licensee who is responsible for the work at the location. 20
  5. Page 24 of 79

    The electrician, its employees and those under its control shall perform all work as independent contractors and shall not be deemed to be employees or agents of United Illuminating for any purpose whatsoever. UI shall not be liable for direct, indirect or consequential damages of any kind, whether resulting from injuries to persons or property or otherwise arising out of the electrician’s work. SCOPE OF WORK: Services to be cut and reconnected must meet the following criteria: – Single-phase, overhead service drop, 200 A class (maximum) with voltages of 120V line to ground. – UI requires permanent connections, which will be inspected by UI in order to reduce customer damage due to poor connections. PROCEDURE: The electrician shall perform the following: 1.  The electrician shall contact the company at [phone removed] prior to starting work to avoid possible code violations or non-compliance with company requirements. A service location request can also be submitted online at uinet.com. NOTE: In the remarks section, This Work Involves Cut and Reconnect, the work must be completed within 15 days from the required service date. 2.  The electrician shall cut the drip loop at the house, on the line side, immediately adjacent to the company’s existing connectors. 3.  The electrician shall replace/repair the service entrance/meter box up to the first disconnecting device. 4.  The electrician shall connect the replaced or repaired service entrance/meter box to the live ends of the company’s service drop using properly sized connector types as outlined below: – Phase/hot leg: Insulation Piercing Connectors – Neutral: Parallel Groove Connectors – Connectors must be approved for use with the type (copper/aluminum) of conductors being installed. NOTE: Split bolt and taped connectors are not acceptable for permanent connections. 5. The electrician shall install approved rated jumpers and optically clear meter socket cover(s) to avoid damage to the meter socket, ensure public safety and provide access for visual inspection. Covers and service bolts are available through the local building official’s office or from UI. Jumpers may be obtained at UI’s Operations Center located at 100 Marsh Hill Rd., Orange, CT. 21
  6. Page 25 of 79

    6.  The electrician shall leave the old meter in close proximity to the new meter socket. In no case shall the electric meter be reinstalled. 7.  The electrician shall be responsible for obtaining municipal inspection/ approval and shall advise the company within one business day of completing Steps 1-6 above. 8.  The company shall ensure that the installation meets company requirements and install the necessary meters. 9. Service requests older than six months that have not been completed may be canceled. Contractors may be required to request service again and be issued a new job number. It is the responsibility of the contractor to inform local jurisdiction of this change. VIOLATIONS: In any instance of deviation from the above procedure: 1.  The company will bill the electrician for de-energizing meters without an active service request. Any time a meter is de-energized without authorization, our automated systems may dispatch company personnel to the outage. 2.  The company will send written notification to the electrician and the municipal authority, describing the specific violation of this policy. This notification will serve as a warning. 3.  The company will bill the electrician for costs incurred by the company due to the violation. 4.  The company will notify the appropriate municipal and state authorities after multiple warning letters have been issued. This constitutes a violation letter. 5.  The company will suspend the electrician’s privilege to participate in the Residential Overhead Service Policy, which includes the Cut and Reconnect Policy. 6. The Trade Practice Division of the Department of Consumer Protection of the State of Connecticut will review complaints to determine if Connecticut General Statute Section 20-334 has been violated and take appropriate action, up to and including penalties, as described in the Connecticut General Statute Section 20-341. 22
  7. Page 26 of 79

    5.5 Buildings Vacant for Periods Greater Than Six Months Reference: State of CT House Bill 6292 (Session 2003) If the owner of a building or portion of a building that has been unoccupied and disconnected from the electric distribution system for a period of six months or longer wishes to resume the delivery of electricity, the owner shall contact United Illuminating to request a service reconnection form to be signed and notarized by the building owner’s contracted electrician, stating that an inspection of all customer-owned facilities on private property used to supply electric power to such building is electrically safe and does not constitute a public safety hazard. Services disconnected due to fire, flood or similar circumstances will not be reconnected without the proper notification and/or permit by an appropriate public official. Please contact UI for any additional guidance in determining the inspection requirements. 5.6 Demolition A. To terminate UI service to any building or structure designated for demolition, a notarized letter from the property owner must be received by UI. For condemnations, eminent domain proceedings, etc., a letter from the municipality is acceptable. Please send the letter to: United Illuminating Standard Field Department 100 Marsh Hill Road (MS OP-GB) Orange, CT 06477-3628 B. The letter must list the legal address of the property as determined by the tax records, and the front of the building must be clearly marked with this number in orange paint. C. UI personnel must have access to the premises for verification of the service disconnect and for removal of UI equipment. If the building structure is unsafe for entry or UI cannot gain access to the premises, then the building owner is responsible for verifying that the service to the building has been disconnected before proceeding with the demolition. D. When completed, UI will prepare a letter stating that all of its facilities have been removed from said property. The letter will be sent to the originator of the request and to the appropriate municipal authority. Contact UI’s Standard Field Department. 23
  8. Page 27 of 79

    5.7 Service to PCS Towers A. Where personal communication system (PCS) towers, antennas or other similar systems are installed on leased property, a PCS Agreement must be signed by both the tower owner and the land owner. Before planning any service, please contact UI’s Engineering Department. B. For stand-alone towers, new electric service will be administered according to the applicable UI policies and procedures. The initial service installed must have sufficient electrical capacity (including meter provisions) to supply the maximum number of carriers for which the tower is designed. C. Where the construction of the proposed service will not comply with UI standards and/or access to the electric facilities is restricted, UI may require a primary voltage service with a single primary meter. All facilities beyond the primary meter are to be installed, owned and maintained by the customer. D. For service additions to stand-alone towers, UI prefers one service entrance with one meter location. Where it is impractical to combine the new service with the existing service, UI will allow a second meter location provided both services originate from the same UI source, a placard of the service locations is posted at each entry gate, and it is approved by the authority having jurisdiction. E. For towers or antennas attached to existing buildings or other structures, the preferred method of service is to utilize the existing service. This may involve a service increase and/or a reconfiguration of the existing metering. A separate service to the building (including line side taps in the service entrance equipment) is not permitted unless granted in writing by UI and approved by the authority having jurisdiction. Refer to UI Guidebook Section 2, Paragraph D. When submitting application for service, the following is required: 1. A copy of the Lease Property Agreement between the land owner and the tower owner 2. An A2 survey plot showing the property lines 3. A completed UI Load Information Form 4. Documentation stating the maximum number of carriers that the tower can accommodate, stamped by a professional engineer licensed in the State of Connecticut. 24
  9. Page 28 of 79

    6. MOTORS 6.1 General Requirements If a motor is connected to a secondary system that also supplies other UI customers, the following conditions must be met in order to minimize voltage flicker and other disturbances caused by the starting currents. The starting current of a motor is assumed to be the locked rotor current stated on the nameplate or obtained from the manufacturer’s coding or test data. A. When two or more motors start simultaneously, the sum of all their horsepower ratings shall be totaled. The maximum allowable total starting current shall not exceed the value listed in Section 6.3 or 6.4, as applicable, for the total of the horsepower rating of all motors that are started simultaneously. B. If the locked rotor current of any motor exceeds the allowable starting current listed in Section 6.3 or 6.4, then the motor shall not be started across the line. The customer must furnish, install, own and maintain a reduced voltage starter or other device to bring the starting current within the allowable value. C. Motors should be rated for use at the service voltage provided by UI, and you should verify your service voltage prior to buying any equipment. The nominal service voltages available are 120, 208 and 240 volts single-phase and 208, 240 and 480 volts three-phase. Motors rated at 220, 230, 440 or 460 volts may not operate satisfactorily. 6.2 Protective Devices A. UI strongly recommends that all motors be controlled and protected from damage that can occur by operation under abnormal conditions. These conditions include single phasing, under voltage, phase reversals, voltage transients and other operating hazards. The company is not responsible for equipment and/or collateral damage due to abnormal conditions. Customers are advised to install adequate protection on all motors. Protective equipment must conform to the requirements of the National Electrical Code. B. There are advantages to incorporating timed under-voltage relays for motors on certain applications. Due to the normal, rapid reclosure of our supply circuit breakers, many manual restarts can be avoided by delaying motor contactor opening. 25
  10. Page 29 of 79

    6.3 Single-Phase Motors A. Single-phase motors not exceeding 50 A of starting current (typically up to 1 horsepower, 12,000 BTUs or 1 ton) may be connected for 120 volt operation. B. Single-phase motors not exceeding 150 A of starting current (typically up to 5 horsepower, 60,000 BTUs or 5 tons) should be connected for 240 volt operation. 6.4 Three-Phase Motors A. Three-phase Design Code B, C and D motors, up to 50 horsepower inclusive, may be started across the line if they do not have locked rotor currents per phase conductor in excess of the following: Maximum Allowable Motor Starting Current for Across the Line Starting HP 208V 240V 480V Up to 10 179 155 78 11 -20 321 278 139 21 -30 481 417 208 31 -40 641 556 278 41 -50 802 695 347 B. For motors larger than 50 HP or for motors served at primary voltage (above 480 volts), contact UI’s Engineering Department for motor starting requirements. 7. EMERGENCY INTERRUPTION OF SERVICE & EMERGENCY GENERATORS 7.1 Interruption of Service The company makes every effort to maintain its system to the highest possible standards but cannot assume liability as a result of any failure of its service or equipment. The company reserves the right to interrupt service to a customer without notice when repairs or changes make such a procedure necessary and also to restore service without notice when such work is completed. Any equipment that might endanger life or damage property under conditions of low voltage, single-phase operation or normal switching should be provided with suitable automatic protection by the customer. Please contact UI’s Engineering Department for guidance. 26

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)