Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 23 of 79

    5.3 Private Line Poles (PLP) A. Where off-street overhead facilities for a single customer are required, all facilities beyond the standard 150-foot span of overhead wire are billable to the customer. The company will install, own and maintain the overhead facilities. The property owner must sign a Private Property Permit or permanent easement. Future changes to or relocations of these facilities requested by the customer are also billable. B. Where off-street overhead facilities for multiple customers are required, the company will install, own and maintain the overhead facilities. These facilities will be installed at no cost to the customers. A permanent easement must be granted to UI by the property owner(s). Future changes to or relocations of these facilities requested by the customer are billable. C. When company-owned poles are installed on private property, permanent truck access to all poles must be provided and maintained by the property owner. 5.4 Cut & Reconnect Policy POLICY DESCRIPTION: The United Illuminating Company will permit electrical contractors and electricians (herein jointly called “electricians”), licensed by the State of Connecticut, to cut and reconnect residential services at the weatherhead in order to expedite work requested by customers. Failure to follow the steps contained within the procedure of this policy may result in additional corrective work and expense for the electrician. The electrician will be billed for any corrective work performed by the company. Unauthorized connections to the company’s service conductors will be treated as tampering and may result in criminal prosecution. The electrician shall be responsible for obtaining the appropriate permits from the local municipal authority. Homeowners are not authorized to cut and reconnect electric services. Homeowners can only install de-energized or dead services. To participate in the program, an electrician must hold an E-1or E-9 license issued by the Connecticut Electrical Work Examining Board or work in the capacity of an E-2 Journeyman or electrical apprentice under the employment of an E-1 licensee. Under this condition, physical work may be performed; however, the permit must be obtained by the licensee who is responsible for the work at the location. 20
  2. Page 24 of 79

    The electrician, its employees and those under its control shall perform all work as independent contractors and shall not be deemed to be employees or agents of United Illuminating for any purpose whatsoever. UI shall not be liable for direct, indirect or consequential damages of any kind, whether resulting from injuries to persons or property or otherwise arising out of the electrician’s work. SCOPE OF WORK: Services to be cut and reconnected must meet the following criteria: – Single-phase, overhead service drop, 200 A class (maximum) with voltages of 120V line to ground. – UI requires permanent connections, which will be inspected by UI in order to reduce customer damage due to poor connections. PROCEDURE: The electrician shall perform the following: 1.  The electrician shall contact the company at [phone removed] prior to starting work to avoid possible code violations or non-compliance with company requirements. A service location request can also be submitted online at uinet.com. NOTE: In the remarks section, This Work Involves Cut and Reconnect, the work must be completed within 15 days from the required service date. 2.  The electrician shall cut the drip loop at the house, on the line side, immediately adjacent to the company’s existing connectors. 3.  The electrician shall replace/repair the service entrance/meter box up to the first disconnecting device. 4.  The electrician shall connect the replaced or repaired service entrance/meter box to the live ends of the company’s service drop using properly sized connector types as outlined below: – Phase/hot leg: Insulation Piercing Connectors – Neutral: Parallel Groove Connectors – Connectors must be approved for use with the type (copper/aluminum) of conductors being installed. NOTE: Split bolt and taped connectors are not acceptable for permanent connections. 5. The electrician shall install approved rated jumpers and optically clear meter socket cover(s) to avoid damage to the meter socket, ensure public safety and provide access for visual inspection. Covers and service bolts are available through the local building official’s office or from UI. Jumpers may be obtained at UI’s Operations Center located at 100 Marsh Hill Rd., Orange, CT. 21
  3. Page 25 of 79

    6.  The electrician shall leave the old meter in close proximity to the new meter socket. In no case shall the electric meter be reinstalled. 7.  The electrician shall be responsible for obtaining municipal inspection/ approval and shall advise the company within one business day of completing Steps 1-6 above. 8.  The company shall ensure that the installation meets company requirements and install the necessary meters. 9. Service requests older than six months that have not been completed may be canceled. Contractors may be required to request service again and be issued a new job number. It is the responsibility of the contractor to inform local jurisdiction of this change. VIOLATIONS: In any instance of deviation from the above procedure: 1.  The company will bill the electrician for de-energizing meters without an active service request. Any time a meter is de-energized without authorization, our automated systems may dispatch company personnel to the outage. 2.  The company will send written notification to the electrician and the municipal authority, describing the specific violation of this policy. This notification will serve as a warning. 3.  The company will bill the electrician for costs incurred by the company due to the violation. 4.  The company will notify the appropriate municipal and state authorities after multiple warning letters have been issued. This constitutes a violation letter. 5.  The company will suspend the electrician’s privilege to participate in the Residential Overhead Service Policy, which includes the Cut and Reconnect Policy. 6. The Trade Practice Division of the Department of Consumer Protection of the State of Connecticut will review complaints to determine if Connecticut General Statute Section 20-334 has been violated and take appropriate action, up to and including penalties, as described in the Connecticut General Statute Section 20-341. 22
  4. Page 26 of 79

    5.5 Buildings Vacant for Periods Greater Than Six Months Reference: State of CT House Bill 6292 (Session 2003) If the owner of a building or portion of a building that has been unoccupied and disconnected from the electric distribution system for a period of six months or longer wishes to resume the delivery of electricity, the owner shall contact United Illuminating to request a service reconnection form to be signed and notarized by the building owner’s contracted electrician, stating that an inspection of all customer-owned facilities on private property used to supply electric power to such building is electrically safe and does not constitute a public safety hazard. Services disconnected due to fire, flood or similar circumstances will not be reconnected without the proper notification and/or permit by an appropriate public official. Please contact UI for any additional guidance in determining the inspection requirements. 5.6 Demolition A. To terminate UI service to any building or structure designated for demolition, a notarized letter from the property owner must be received by UI. For condemnations, eminent domain proceedings, etc., a letter from the municipality is acceptable. Please send the letter to: United Illuminating Standard Field Department 100 Marsh Hill Road (MS OP-GB) Orange, CT 06477-3628 B. The letter must list the legal address of the property as determined by the tax records, and the front of the building must be clearly marked with this number in orange paint. C. UI personnel must have access to the premises for verification of the service disconnect and for removal of UI equipment. If the building structure is unsafe for entry or UI cannot gain access to the premises, then the building owner is responsible for verifying that the service to the building has been disconnected before proceeding with the demolition. D. When completed, UI will prepare a letter stating that all of its facilities have been removed from said property. The letter will be sent to the originator of the request and to the appropriate municipal authority. Contact UI’s Standard Field Department. 23
  5. Page 27 of 79

    5.7 Service to PCS Towers A. Where personal communication system (PCS) towers, antennas or other similar systems are installed on leased property, a PCS Agreement must be signed by both the tower owner and the land owner. Before planning any service, please contact UI’s Engineering Department. B. For stand-alone towers, new electric service will be administered according to the applicable UI policies and procedures. The initial service installed must have sufficient electrical capacity (including meter provisions) to supply the maximum number of carriers for which the tower is designed. C. Where the construction of the proposed service will not comply with UI standards and/or access to the electric facilities is restricted, UI may require a primary voltage service with a single primary meter. All facilities beyond the primary meter are to be installed, owned and maintained by the customer. D. For service additions to stand-alone towers, UI prefers one service entrance with one meter location. Where it is impractical to combine the new service with the existing service, UI will allow a second meter location provided both services originate from the same UI source, a placard of the service locations is posted at each entry gate, and it is approved by the authority having jurisdiction. E. For towers or antennas attached to existing buildings or other structures, the preferred method of service is to utilize the existing service. This may involve a service increase and/or a reconfiguration of the existing metering. A separate service to the building (including line side taps in the service entrance equipment) is not permitted unless granted in writing by UI and approved by the authority having jurisdiction. Refer to UI Guidebook Section 2, Paragraph D. When submitting application for service, the following is required: 1. A copy of the Lease Property Agreement between the land owner and the tower owner 2. An A2 survey plot showing the property lines 3. A completed UI Load Information Form 4. Documentation stating the maximum number of carriers that the tower can accommodate, stamped by a professional engineer licensed in the State of Connecticut. 24
  6. Page 28 of 79

    6. MOTORS 6.1 General Requirements If a motor is connected to a secondary system that also supplies other UI customers, the following conditions must be met in order to minimize voltage flicker and other disturbances caused by the starting currents. The starting current of a motor is assumed to be the locked rotor current stated on the nameplate or obtained from the manufacturer’s coding or test data. A. When two or more motors start simultaneously, the sum of all their horsepower ratings shall be totaled. The maximum allowable total starting current shall not exceed the value listed in Section 6.3 or 6.4, as applicable, for the total of the horsepower rating of all motors that are started simultaneously. B. If the locked rotor current of any motor exceeds the allowable starting current listed in Section 6.3 or 6.4, then the motor shall not be started across the line. The customer must furnish, install, own and maintain a reduced voltage starter or other device to bring the starting current within the allowable value. C. Motors should be rated for use at the service voltage provided by UI, and you should verify your service voltage prior to buying any equipment. The nominal service voltages available are 120, 208 and 240 volts single-phase and 208, 240 and 480 volts three-phase. Motors rated at 220, 230, 440 or 460 volts may not operate satisfactorily. 6.2 Protective Devices A. UI strongly recommends that all motors be controlled and protected from damage that can occur by operation under abnormal conditions. These conditions include single phasing, under voltage, phase reversals, voltage transients and other operating hazards. The company is not responsible for equipment and/or collateral damage due to abnormal conditions. Customers are advised to install adequate protection on all motors. Protective equipment must conform to the requirements of the National Electrical Code. B. There are advantages to incorporating timed under-voltage relays for motors on certain applications. Due to the normal, rapid reclosure of our supply circuit breakers, many manual restarts can be avoided by delaying motor contactor opening. 25
  7. Page 29 of 79

    6.3 Single-Phase Motors A. Single-phase motors not exceeding 50 A of starting current (typically up to 1 horsepower, 12,000 BTUs or 1 ton) may be connected for 120 volt operation. B. Single-phase motors not exceeding 150 A of starting current (typically up to 5 horsepower, 60,000 BTUs or 5 tons) should be connected for 240 volt operation. 6.4 Three-Phase Motors A. Three-phase Design Code B, C and D motors, up to 50 horsepower inclusive, may be started across the line if they do not have locked rotor currents per phase conductor in excess of the following: Maximum Allowable Motor Starting Current for Across the Line Starting HP 208V 240V 480V Up to 10 179 155 78 11 -20 321 278 139 21 -30 481 417 208 31 -40 641 556 278 41 -50 802 695 347 B. For motors larger than 50 HP or for motors served at primary voltage (above 480 volts), contact UI’s Engineering Department for motor starting requirements. 7. EMERGENCY INTERRUPTION OF SERVICE & EMERGENCY GENERATORS 7.1 Interruption of Service The company makes every effort to maintain its system to the highest possible standards but cannot assume liability as a result of any failure of its service or equipment. The company reserves the right to interrupt service to a customer without notice when repairs or changes make such a procedure necessary and also to restore service without notice when such work is completed. Any equipment that might endanger life or damage property under conditions of low voltage, single-phase operation or normal switching should be provided with suitable automatic protection by the customer. Please contact UI’s Engineering Department for guidance. 26
  8. Page 30 of 79

    7.2 Emergency Generators An independent source of electricity (such as gasoline, or diesel-driven generators) may be installed by a customer to supply its load during emergencies. Such installations require a suitable double throw or open transition switch. The double throw switch must disconnect the company’s lines from the customer’s wiring before the generator can be connected to supply electricity. Customers considering use of a closed transition switch in conjunction with an emergency/standby generator must follow the interconnection process as described in Section 8.1. 8. ALTERNATE ENERGY SOURCE 8.1 Parallel Generation Subject to certain requirements, the company will allow parallel generation. The company adheres to interconnection standards (and applicable documents) that were approved by the State of Connecticut Public Utilities Regulatory Authority (PURA) through proceedings held by PURA and PURA’s decisions issued as a result of those proceedings. Please visit our website at uinet.com and then click on the Generators link. The website provides an overview of the interconnection process, copies of the interconnection guidelines, technical requirements and application documentation. The application should be filed early in the planning process to obtain assistance and the necessary approvals. 8.2 Uninterruptible Power Supply (UPS) If this type of service is desired, it will be installed, owned, operated and maintained by the customer. The customer must provide automatic prevention of any feed into UI’s de-energized system. Please contact UI’s Engineering Department for guidance. 27
  9. Page 31 of 79

    9. QUALITY OF SERVICE 9.1 Voltage Regulation UI is required to maintain its voltage variations to within the requirements of the Regulations of Connecticut State Agencies, Title 16: Public Utilities Regulatory Authority (PURA) Code of Electrical Standards and Specifications, Section 16-11-115, UI will be glad to answer questions regarding voltage or power quality concerns. Please contact UI’s Engineering Department. UI is constantly seeking new ways to improve the quality of power and reliability of service provided to its customers. Unfortunately, there are many variables that could possibly contribute to poor power quality that are beyond the company’s control, including, but not limited to: equipment failure, tree contact, animal contact, severe weather, auto accidents, emergency switching, etc. Each of these events can produce voltage transients that may cause misoperation of, or possibly damage to, electronic and other equipment. Some of these events will result in momentary periods of low voltage or loss of voltage. In general, these events will not damage electronic equipment but result in their mis-operation. Extended periods of low voltage may also cause damage to motor-operated equipment. Refer to Guidebook Section 6 – Motors. Other events will produce brief periods of high voltage, which may damage electronic or other equipment. To protect against high voltages, the equipment manufacturer’s recommendations regarding surge protection should be followed. In addition, installation of a surge-protective device at the service entrance will provide an added level of protection. Customers supplied with three-phase service should consider additional protection from certain disturbances on the UI system. Partial loss of power can result in single-phasing which may cause damage to your equipment. The company is not responsible for equipment and/or collateral damage due to these abnormal conditions. Customers are advised to install adequate protection. 28
  10. Page 32 of 79

    9.2 Non-Linear Loads Adjustable speed drives, solid-state lighting ballasts and electronic power supplies are all examples of non-linear loads. The term non-linear comes from the fact that the current drawn by this type of load is not sinusoidal and is referred to as containing harmonic currents. These harmonic currents can result in distorted voltage, added losses, and heating in equipment supplying the load, as well as interference on communication circuits. Problems caused by these non-linear loads are to be corrected by the customer at their expense. If these loads cause problems to UI’s system or to other customers’ equipment, correction is a mandatory condition of service. Customers with non-linear loads of more than 25 percent of their total load must contact UI’s Engineering Department for assistance in applying the loads. 10. METERING 10.1 General Requirements A. The company will furnish, install, own and maintain all meters required for billing purposes at the delivery voltage on the customer’s side of the service point in accordance with the company’s applicable tariff and applicable state laws and regulations. This includes meter instrument transformers and meter cable when required. B. The company will not supply service to a customer whose wiring is designed for resale of electricity through submetering except for recreational campgrounds, marinas or other facilities as approved, in writing, by the Public Utilities Regulatory Authority (PURA). C. The customer is required by regulations of the State of Connecticut to provide the company reasonable access to its equipment, and access shall include three feet of clear space in front of the meter and be neither obstructed nor hazardous as defined by the National Electrical Code. D. All unauthorized persons are forbidden to connect, disconnect, relocate, tamper with or break seals on service entrance equipment, metering equipment or pull boxes and troughs housing unmetered conductors. This requirement is not intended to prevent the customer from operating the main switch or replacing blown fuses. 29

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /