Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 27 of 79

    5.7 Service to PCS Towers A. Where personal communication system (PCS) towers, antennas or other similar systems are installed on leased property, a PCS Agreement must be signed by both the tower owner and the land owner. Before planning any service, please contact UI’s Engineering Department. B. For stand-alone towers, new electric service will be administered according to the applicable UI policies and procedures. The initial service installed must have sufficient electrical capacity (including meter provisions) to supply the maximum number of carriers for which the tower is designed. C. Where the construction of the proposed service will not comply with UI standards and/or access to the electric facilities is restricted, UI may require a primary voltage service with a single primary meter. All facilities beyond the primary meter are to be installed, owned and maintained by the customer. D. For service additions to stand-alone towers, UI prefers one service entrance with one meter location. Where it is impractical to combine the new service with the existing service, UI will allow a second meter location provided both services originate from the same UI source, a placard of the service locations is posted at each entry gate, and it is approved by the authority having jurisdiction. E. For towers or antennas attached to existing buildings or other structures, the preferred method of service is to utilize the existing service. This may involve a service increase and/or a reconfiguration of the existing metering. A separate service to the building (including line side taps in the service entrance equipment) is not permitted unless granted in writing by UI and approved by the authority having jurisdiction. Refer to UI Guidebook Section 2, Paragraph D. When submitting application for service, the following is required: 1. A copy of the Lease Property Agreement between the land owner and the tower owner 2. An A2 survey plot showing the property lines 3. A completed UI Load Information Form 4. Documentation stating the maximum number of carriers that the tower can accommodate, stamped by a professional engineer licensed in the State of Connecticut. 24
  2. Page 28 of 79

    6. MOTORS 6.1 General Requirements If a motor is connected to a secondary system that also supplies other UI customers, the following conditions must be met in order to minimize voltage flicker and other disturbances caused by the starting currents. The starting current of a motor is assumed to be the locked rotor current stated on the nameplate or obtained from the manufacturer’s coding or test data. A. When two or more motors start simultaneously, the sum of all their horsepower ratings shall be totaled. The maximum allowable total starting current shall not exceed the value listed in Section 6.3 or 6.4, as applicable, for the total of the horsepower rating of all motors that are started simultaneously. B. If the locked rotor current of any motor exceeds the allowable starting current listed in Section 6.3 or 6.4, then the motor shall not be started across the line. The customer must furnish, install, own and maintain a reduced voltage starter or other device to bring the starting current within the allowable value. C. Motors should be rated for use at the service voltage provided by UI, and you should verify your service voltage prior to buying any equipment. The nominal service voltages available are 120, 208 and 240 volts single-phase and 208, 240 and 480 volts three-phase. Motors rated at 220, 230, 440 or 460 volts may not operate satisfactorily. 6.2 Protective Devices A. UI strongly recommends that all motors be controlled and protected from damage that can occur by operation under abnormal conditions. These conditions include single phasing, under voltage, phase reversals, voltage transients and other operating hazards. The company is not responsible for equipment and/or collateral damage due to abnormal conditions. Customers are advised to install adequate protection on all motors. Protective equipment must conform to the requirements of the National Electrical Code. B. There are advantages to incorporating timed under-voltage relays for motors on certain applications. Due to the normal, rapid reclosure of our supply circuit breakers, many manual restarts can be avoided by delaying motor contactor opening. 25
  3. Page 29 of 79

    6.3 Single-Phase Motors A. Single-phase motors not exceeding 50 A of starting current (typically up to 1 horsepower, 12,000 BTUs or 1 ton) may be connected for 120 volt operation. B. Single-phase motors not exceeding 150 A of starting current (typically up to 5 horsepower, 60,000 BTUs or 5 tons) should be connected for 240 volt operation. 6.4 Three-Phase Motors A. Three-phase Design Code B, C and D motors, up to 50 horsepower inclusive, may be started across the line if they do not have locked rotor currents per phase conductor in excess of the following: Maximum Allowable Motor Starting Current for Across the Line Starting HP 208V 240V 480V Up to 10 179 155 78 11 -20 321 278 139 21 -30 481 417 208 31 -40 641 556 278 41 -50 802 695 347 B. For motors larger than 50 HP or for motors served at primary voltage (above 480 volts), contact UI’s Engineering Department for motor starting requirements. 7. EMERGENCY INTERRUPTION OF SERVICE & EMERGENCY GENERATORS 7.1 Interruption of Service The company makes every effort to maintain its system to the highest possible standards but cannot assume liability as a result of any failure of its service or equipment. The company reserves the right to interrupt service to a customer without notice when repairs or changes make such a procedure necessary and also to restore service without notice when such work is completed. Any equipment that might endanger life or damage property under conditions of low voltage, single-phase operation or normal switching should be provided with suitable automatic protection by the customer. Please contact UI’s Engineering Department for guidance. 26
  4. Page 30 of 79

    7.2 Emergency Generators An independent source of electricity (such as gasoline, or diesel-driven generators) may be installed by a customer to supply its load during emergencies. Such installations require a suitable double throw or open transition switch. The double throw switch must disconnect the company’s lines from the customer’s wiring before the generator can be connected to supply electricity. Customers considering use of a closed transition switch in conjunction with an emergency/standby generator must follow the interconnection process as described in Section 8.1. 8. ALTERNATE ENERGY SOURCE 8.1 Parallel Generation Subject to certain requirements, the company will allow parallel generation. The company adheres to interconnection standards (and applicable documents) that were approved by the State of Connecticut Public Utilities Regulatory Authority (PURA) through proceedings held by PURA and PURA’s decisions issued as a result of those proceedings. Please visit our website at uinet.com and then click on the Generators link. The website provides an overview of the interconnection process, copies of the interconnection guidelines, technical requirements and application documentation. The application should be filed early in the planning process to obtain assistance and the necessary approvals. 8.2 Uninterruptible Power Supply (UPS) If this type of service is desired, it will be installed, owned, operated and maintained by the customer. The customer must provide automatic prevention of any feed into UI’s de-energized system. Please contact UI’s Engineering Department for guidance. 27
  5. Page 31 of 79

    9. QUALITY OF SERVICE 9.1 Voltage Regulation UI is required to maintain its voltage variations to within the requirements of the Regulations of Connecticut State Agencies, Title 16: Public Utilities Regulatory Authority (PURA) Code of Electrical Standards and Specifications, Section 16-11-115, UI will be glad to answer questions regarding voltage or power quality concerns. Please contact UI’s Engineering Department. UI is constantly seeking new ways to improve the quality of power and reliability of service provided to its customers. Unfortunately, there are many variables that could possibly contribute to poor power quality that are beyond the company’s control, including, but not limited to: equipment failure, tree contact, animal contact, severe weather, auto accidents, emergency switching, etc. Each of these events can produce voltage transients that may cause misoperation of, or possibly damage to, electronic and other equipment. Some of these events will result in momentary periods of low voltage or loss of voltage. In general, these events will not damage electronic equipment but result in their mis-operation. Extended periods of low voltage may also cause damage to motor-operated equipment. Refer to Guidebook Section 6 – Motors. Other events will produce brief periods of high voltage, which may damage electronic or other equipment. To protect against high voltages, the equipment manufacturer’s recommendations regarding surge protection should be followed. In addition, installation of a surge-protective device at the service entrance will provide an added level of protection. Customers supplied with three-phase service should consider additional protection from certain disturbances on the UI system. Partial loss of power can result in single-phasing which may cause damage to your equipment. The company is not responsible for equipment and/or collateral damage due to these abnormal conditions. Customers are advised to install adequate protection. 28
  6. Page 32 of 79

    9.2 Non-Linear Loads Adjustable speed drives, solid-state lighting ballasts and electronic power supplies are all examples of non-linear loads. The term non-linear comes from the fact that the current drawn by this type of load is not sinusoidal and is referred to as containing harmonic currents. These harmonic currents can result in distorted voltage, added losses, and heating in equipment supplying the load, as well as interference on communication circuits. Problems caused by these non-linear loads are to be corrected by the customer at their expense. If these loads cause problems to UI’s system or to other customers’ equipment, correction is a mandatory condition of service. Customers with non-linear loads of more than 25 percent of their total load must contact UI’s Engineering Department for assistance in applying the loads. 10. METERING 10.1 General Requirements A. The company will furnish, install, own and maintain all meters required for billing purposes at the delivery voltage on the customer’s side of the service point in accordance with the company’s applicable tariff and applicable state laws and regulations. This includes meter instrument transformers and meter cable when required. B. The company will not supply service to a customer whose wiring is designed for resale of electricity through submetering except for recreational campgrounds, marinas or other facilities as approved, in writing, by the Public Utilities Regulatory Authority (PURA). C. The customer is required by regulations of the State of Connecticut to provide the company reasonable access to its equipment, and access shall include three feet of clear space in front of the meter and be neither obstructed nor hazardous as defined by the National Electrical Code. D. All unauthorized persons are forbidden to connect, disconnect, relocate, tamper with or break seals on service entrance equipment, metering equipment or pull boxes and troughs housing unmetered conductors. This requirement is not intended to prevent the customer from operating the main switch or replacing blown fuses. 29
  7. Page 33 of 79

    E. When it is necessary to cut or remove a meter seal and/or de-energize an existing meter for any reason, the company must be notified immediately. Please call UI’s Customer Care Center at [phone removed]. Any time a meter is de-energized without authorization, our automated systems may dispatch company personnel to the outage. The company will bill the electrician for unauthorized nonemergency meter removals. All other equipment such as a water heater adaptor, a surge-protective device or a GenerLink must be handled with care and the company notified so this equipment can be reinstalled. F. All costs associated with damaged metering equipment or personal liability claims as a result of work performed by non-UI employees will be charged to the responsible party. 10.2 Metering Installation Requirements A. Outdoor Metering Requirement On all new construction and renovations of existing services, all meter(s) at the premises shall be located outdoors and mounted on the structure. The company will, in certain circumstances, give permission in writing to install the meter(s) indoors. The following circumstances are pertinent to UI’s decision to allow permission for indoor metering: 1. The addition of one house meter to an existing service is not considered a renovation. The new house meter should be located with the existing meters. 2. Lack of exterior wall space or the inability to terminate service cables or conduits in a feasible exterior location for the metering provisions as determined by company field technicians will be considered. 3. Personal financial hardship will not be considered sufficient reason for retaining indoor metering equipment to avoid normal installation costs associated with installing the metering outdoors. If indoor metering is desired, the customer must send a written request detailing their specific reasons to the company’s Standard Field Department as far in advance of construction as possible to avoid last-minute delays. The company will then send the customer a letter approving or denying their request. Standard Field Department Supervision is the only company representative authorized to grant such approval. 30
  8. Page 34 of 79

    For all indoor meter locations (granted by UI prior to the start of any construction) the owner will be required to provide a one-inch minimum diameter Schedule 40 PVC conduit from the meter location to the outside of the structure and a dedicated circuit from the owner’s (house) panel to facilitate the installation of antennas for automated meter reading equipment. B. All meter locations must be installed according to company requirements: 1. Where the location of an outdoor meter would be a hazard to the public or to the equipment, the company will determine a more suitable location or require the customer to provide additional protection for the meter(s). 2. Meters and low voltage service equipment shall not be installed in transformer vaults, high voltage switchgear rooms or other such restricted access areas. 3. Meters will not be installed where they will be subject to corrosive fumes, excessive moisture, dust, vibration or possible damage. 4. In large office buildings and apartment buildings, where separate meters are required for the various offices, apartments, suites or lofts, metering equipment may be installed indoors, in groups, at locations approved in writing by UI. All such locations (designated meter rooms or closets) will be required to provide an additional one-inch minimum diameter Schedule 40 PVC conduit from the meter location to the outside of the structure and/or a dedicated circuit from the owner’s (house) panel to facilitate the installation of antennas for automated meter reading equipment. 5. Meters for emergency systems, such as fire pumps, are to be located adjacent to other meters serving the building unless an alternate location is approved by UI’s Standard Field Department. 6. Meters may be allowed to be mounted on pedestal-style socket equipment only in mobile home developments or other service locations such as outdoor signs, communications towers, etc. These installations are limited to single-phase, 120/240 volt, 200 A or less. Other types of freestanding metering provisions must be approved in writing by UI and include suitable physical protection from damage. 7. In some shoreline areas designated as a tidal flood plain, the customer may be required by the local town electrical inspector to install the meter provision higher than the maximum 72 inches allowed by the company. In such cases, the customer will be required to construct a suitable stepped platform or other means to facilitate access for company employees to perform meter work. For more detail and exemptions, refer to Guidebook Standard #28, Section 13. Failure to comply will result in the company de-energizing the service, and the customer and/or contractor will be responsible for bringing the service to UI standards. 31
  9. Page 35 of 79

    C. For two-family or multi-dwelling units, all common facilities (lighting, alarm systems, well pumps, communication, etc., or other needs for public areas) must be metered separately per NEC, Section 210-25(B). This separate meter is known as the house meter. D. The customer is required to install individual meter sockets a minimum of 4 feet and a maximum of 5 feet from the finished grade to the center of the socket. A customer with a multiple meter installation is required to install meter sockets a minimum of 21/2 feet and a maximum of 6 feet from the finished grade to the center of each socket. E. Meter sockets may not be located in driveways or other locations that will pose a hazard to pedestrian or vehicle traffic. F. Under no condition will the company approve the installation of metered and unmetered conductors in the same conduit or raceway. In combination meter-main service equipment, the line and load wiring must be isolated to their respective compartments. G. To ensure safety, all meter sockets that are without a meter and energized will be protected with a see-thru polycarbonate cover. These covers are available from UI and are to be installed by the electrical contractor. If the meter socket is intended to be a spare or otherwise left without a meter for a period exceeding six months, then a gasket or silicone sealant should be applied between the polycarbonate cover and the meter socket cover to prevent the entry of water. H. Electric meter provisions shall not be installed above or below gas meters and require a minimum of 3 feet of horizontal separation. I. Electric meter provisions require a minimum of 10 feet of horizontal separation from propane relief valves, vents or filling covers (NFPA 58). J. Meter sockets cannot be used as a grounding point. The grounding electrode conductor shall not be run through the meter socket, and the grounding electrode conductor connection shall not be made within the meter provision. K. For all three-phase, four-wire delta or wye services where the secondary service is grounded at any point, the grounded conductor shall be run to each main switch or service disconnect (in accordance with the National Electrical Code). In addition, the grounded conductor shall be run to each meter provision (i.e., meter socket or current transformer cabinet). 32
  10. Page 36 of 79

    L. Meter socket enclosures are not to be used as a raceway or splice box. Any connections made between the load side of the meter and the main breaker (for parallel generation, for example) must be made outside of the meter enclosure. M. For customer parallel generation, UI normally installs one watt-hour meter capable of measuring bidirectional power flow in the existing meter socket enclosure. UI may choose to meter generator output, customer loads or other quantities it deems necessary. The customer may be required to install metering facilities, such as meter sockets, to facilitate this metering. This additional metering is subject to the same requirements as that of revenue metering. N. Auxiliary Equipment, Emergency Circuits and Emergency Generators 1. No ammeter, voltmeter, pilot light, surge-protective device or other device shall be connected to the secondary of the metering transformers or to the service conductors between the point of entrance and the point at which the metering equipment is connected to the circuit unless an integral part of an approved UL listed switchboard design. No field add-on will be allowed. 2. Where state or local ordinance requires the installation of a circuit for emergency systems, such as fire pumps, fire alarms or exit lighting, on the line side of the normal metering, an additional metering provision shall be required. 3. Services to electric motor-driven fire pumps must be metered using a switch-fuse-meter sequence and utilize transformer-rated metering to ensure that the meter is not called upon to carry overloads required by NFPA and does not serve as a disconnecting means and interrupt power to the fire pump if it is removed for any reason. 4. Metering must always be installed on the line side of control circuitry in such a manner that the meter is always energized when the service is energized. 5. If a double throw switch is installed by the customer to supply its load from an emergency generator, it must use an open transition throwover scheme. The switch must be installed on the load side of the meter and must be connected so that the electricity from the customer’s generator will not flow back into the company’s lines. See Section 7.2 – Emergency Generators. 33

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)