Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 34 of 79

    For all indoor meter locations (granted by UI prior to the start of any construction) the owner will be required to provide a one-inch minimum diameter Schedule 40 PVC conduit from the meter location to the outside of the structure and a dedicated circuit from the owner’s (house) panel to facilitate the installation of antennas for automated meter reading equipment. B. All meter locations must be installed according to company requirements: 1. Where the location of an outdoor meter would be a hazard to the public or to the equipment, the company will determine a more suitable location or require the customer to provide additional protection for the meter(s). 2. Meters and low voltage service equipment shall not be installed in transformer vaults, high voltage switchgear rooms or other such restricted access areas. 3. Meters will not be installed where they will be subject to corrosive fumes, excessive moisture, dust, vibration or possible damage. 4. In large office buildings and apartment buildings, where separate meters are required for the various offices, apartments, suites or lofts, metering equipment may be installed indoors, in groups, at locations approved in writing by UI. All such locations (designated meter rooms or closets) will be required to provide an additional one-inch minimum diameter Schedule 40 PVC conduit from the meter location to the outside of the structure and/or a dedicated circuit from the owner’s (house) panel to facilitate the installation of antennas for automated meter reading equipment. 5. Meters for emergency systems, such as fire pumps, are to be located adjacent to other meters serving the building unless an alternate location is approved by UI’s Standard Field Department. 6. Meters may be allowed to be mounted on pedestal-style socket equipment only in mobile home developments or other service locations such as outdoor signs, communications towers, etc. These installations are limited to single-phase, 120/240 volt, 200 A or less. Other types of freestanding metering provisions must be approved in writing by UI and include suitable physical protection from damage. 7. In some shoreline areas designated as a tidal flood plain, the customer may be required by the local town electrical inspector to install the meter provision higher than the maximum 72 inches allowed by the company. In such cases, the customer will be required to construct a suitable stepped platform or other means to facilitate access for company employees to perform meter work. For more detail and exemptions, refer to Guidebook Standard #28, Section 13. Failure to comply will result in the company de-energizing the service, and the customer and/or contractor will be responsible for bringing the service to UI standards. 31
  2. Page 35 of 79

    C. For two-family or multi-dwelling units, all common facilities (lighting, alarm systems, well pumps, communication, etc., or other needs for public areas) must be metered separately per NEC, Section 210-25(B). This separate meter is known as the house meter. D. The customer is required to install individual meter sockets a minimum of 4 feet and a maximum of 5 feet from the finished grade to the center of the socket. A customer with a multiple meter installation is required to install meter sockets a minimum of 21/2 feet and a maximum of 6 feet from the finished grade to the center of each socket. E. Meter sockets may not be located in driveways or other locations that will pose a hazard to pedestrian or vehicle traffic. F. Under no condition will the company approve the installation of metered and unmetered conductors in the same conduit or raceway. In combination meter-main service equipment, the line and load wiring must be isolated to their respective compartments. G. To ensure safety, all meter sockets that are without a meter and energized will be protected with a see-thru polycarbonate cover. These covers are available from UI and are to be installed by the electrical contractor. If the meter socket is intended to be a spare or otherwise left without a meter for a period exceeding six months, then a gasket or silicone sealant should be applied between the polycarbonate cover and the meter socket cover to prevent the entry of water. H. Electric meter provisions shall not be installed above or below gas meters and require a minimum of 3 feet of horizontal separation. I. Electric meter provisions require a minimum of 10 feet of horizontal separation from propane relief valves, vents or filling covers (NFPA 58). J. Meter sockets cannot be used as a grounding point. The grounding electrode conductor shall not be run through the meter socket, and the grounding electrode conductor connection shall not be made within the meter provision. K. For all three-phase, four-wire delta or wye services where the secondary service is grounded at any point, the grounded conductor shall be run to each main switch or service disconnect (in accordance with the National Electrical Code). In addition, the grounded conductor shall be run to each meter provision (i.e., meter socket or current transformer cabinet). 32
  3. Page 36 of 79

    L. Meter socket enclosures are not to be used as a raceway or splice box. Any connections made between the load side of the meter and the main breaker (for parallel generation, for example) must be made outside of the meter enclosure. M. For customer parallel generation, UI normally installs one watt-hour meter capable of measuring bidirectional power flow in the existing meter socket enclosure. UI may choose to meter generator output, customer loads or other quantities it deems necessary. The customer may be required to install metering facilities, such as meter sockets, to facilitate this metering. This additional metering is subject to the same requirements as that of revenue metering. N. Auxiliary Equipment, Emergency Circuits and Emergency Generators 1. No ammeter, voltmeter, pilot light, surge-protective device or other device shall be connected to the secondary of the metering transformers or to the service conductors between the point of entrance and the point at which the metering equipment is connected to the circuit unless an integral part of an approved UL listed switchboard design. No field add-on will be allowed. 2. Where state or local ordinance requires the installation of a circuit for emergency systems, such as fire pumps, fire alarms or exit lighting, on the line side of the normal metering, an additional metering provision shall be required. 3. Services to electric motor-driven fire pumps must be metered using a switch-fuse-meter sequence and utilize transformer-rated metering to ensure that the meter is not called upon to carry overloads required by NFPA and does not serve as a disconnecting means and interrupt power to the fire pump if it is removed for any reason. 4. Metering must always be installed on the line side of control circuitry in such a manner that the meter is always energized when the service is energized. 5. If a double throw switch is installed by the customer to supply its load from an emergency generator, it must use an open transition throwover scheme. The switch must be installed on the load side of the meter and must be connected so that the electricity from the customer’s generator will not flow back into the company’s lines. See Section 7.2 – Emergency Generators. 33
  4. Page 37 of 79

    O. Equipment Marking Requirements 1. Where more than one set of metering equipment is supplied through one service entrance, each set of metering equipment and each corresponding apartment, distribution panel or load center must be marked, using a nameplate or other permanent marking, with the corresponding number or letter designations of each unit (such as Apt. C or Suite #103). 2. Each service disconnect shall be permanently marked in large conspicuous block letters as either main switch or service disconnect, per NEC requirements. 3. Where more than one kind of service is supplied, each service disconnect should be identified in the same manner, per NEC requirements. The nameplate or sign should also state the voltage and phase characteristics of the service and the number and location of the other services. 4. On three-phase, four-wire delta services (120/240/240 volts), the phase having the higher voltage to ground shall be permanently marked with an orange color in switchboards, panelboards and CT cabinets. On services utilizing modular gang socket metering (up to and including 200 A provisions) and feeding both three-phase and single-phase meter sockets, the equipment must be capable of field modification through phase balancing taps to configure the high leg on the upper right jaw of the three-phase sockets while maintaining proper 120/240 volt configuration to the single-phase sockets. 4. EXCEPTION: On services exclusively utilizing transformer rated metering, this phase is required on the right; however, if the switchgear is manufactured with this phase in the center, it will be allowed to remain in the center. P. Sequence of Service Entrance Equipment – Rated 480 Volts and Below Meter sockets have a short circuit withstand rating of 10,000 A RMS symmetrical at 300 VAC. Any meter installed on a service with an available fault current greater than 10,000 A must be installed in cold sequence and protected by a device that limits the fault current to 10,000 A or less. Consult the Engineering Department to determine available fault current. 1. The meter-switch-fuse (hot) sequence shall be used for all single-meter self-contained socket-type installations on services rated 320 continuous amperes and below and voltages of 120/240 single-phase, 120/208 single- or three-phase. See Exception below in Paragraph Q2. 2. EXCEPTION: For services where the available short circuit current exceeds the rating of the meter socket, the switch-fuse-meter (cold) sequence shall be installed. Typically, this requirement pertains to services from vaults where the short circuit protection requirements are 200,000 A. Refer to Guidebook Section 3.4. 34
  5. Page 38 of 79

    3. The meter-switch-fuse (hot) sequence is preferred for all installations of pre-bussed multiple meter banks where six sockets or fewer are installed and Exception 10.2.P.2 does not apply. NOTE: The customer may install a fusible main switch or circuit breaker in lieu of a main lug section and switch-fuse-meter (cold) sequence is then acceptable. 4. The switch-fuse-meter (cold) sequence shall be used for all installations of multiple meter banks where troughs or wireways are used or where seven or more pre-bussed sockets are installed (i.e,. a main switch is required). 5. The switch-fuse-meter (cold) sequence and transformer-rated metering shall be used for all installations rated above 400 A, as well as optionally for all 400 A services. 6. The switch-fuse-meter (cold) sequence shall be used for all 277/480 volt, installations. 7. The switch-fuse-meter (cold) sequence and transformer rated metering shall be used for all services to electric motor-driven fire pumps. Refer to 10.2.N.3. Q. Installation of Sockets 1. Meter sockets must be mounted plumb using round-head, rust-resisting screws of sufficient length to hold the socket securely, independent of conduit or cable connections. 2. Suitable anchors must be used on masonry or brick walls for outdoor installations. 3. A meter board is required for all indoor installations. This board should be made of moistureproof plywood at least ¾” thick and painted. It should be mounted plumb and level on a permanent wall with at least ¾” air space between the board and the wall. 4. In multiple socket installations, the company requires a vertical or horizontal, pre-bussed arrangement. Wire troughs are no longer allowed for single or multiple meter installations. For the addition of one or more meters to an existing trough, contact UI for written approval before proceeding. 5. For underground services utilizing self-contained metering, the line-side conductors shall enter the bottom and shall be routed up through the left-side gutter to the line-side lugs. For overhead services, the line-side conductors shall be top entry. 35
  6. Page 39 of 79

    R. Class 320 Metering Installations Customers applying for a 400 A service at a delivery voltage of 120/240, 120/208 or 277/480 volts who propose to install a self-contained 320 A meter socket shall meet the following criteria: 1. Class 320 meter provisions may only be installed where the load-side capacity is not more than 320 A continuous (NEC Article 220). 2. Class 320 meters used in multimeter banks must be cold sequence. 3. The customer shall reserve space for a future instrument transformer cabinet, since any failure of the company’s self-contained meter due to loads greater than 320 continuous amperes will require an upgrade to instrument transformer metering prior to re-energization. 4. NOTE: Class 400 bolt-in metering is not approved by UI. Installations that do not meet the continuous current requirements for Class 320 metering must use instrument transformer metering. S. Requirements for Transformer-Rated Metering 1. All services above 400 A and all services to fire pumps, regardless of size, require transformer-rated metering. 2. The company will provide and install all metering transformers, meters, test switches and wiring to the test switches. 3. Where a ground fault Interrupter is installed on a customer’s service, the customer shall supply and install a grounding electrode to the current transformer enclosure. The current transformer secondary will be grounded to the grounding electrode conductor and not to the system neutral. The intent of this requirement is to avoid incorrect tripping of the GFCI. 4. The customer shall provide a 1½” conduit, either metallic or nonmetallic, without junction boxes for the wiring between the metering transformers and the meter socket enclosure. The remote meter socket enclosure shall be effectively bonded either through the metallic conduit or by a #10 AWG copper wire installed in the conduit. The electrical contractor shall install a pull line. Conduit fittings with removable covers (LBs, CS, etc.) shall only be used at the CT compartment and at the meter provision, with no more than two of these fittings per installation. The maximum height for fittings with removable covers is eight feet. Any exceptions to this requirement must be approved in writing by UI’s Standard Field Department. 36
  7. Page 40 of 79

    5. For services of 800 A or below, the maximum circuit length from the metering transformers to the meter socket must not exceed 75 feet. For services of more than 800 A, the maximum circuit length from the metering transformers to the meter socket must not exceed 150 feet. Any exceptions to this requirement must be approved in writing by UI’s Standard Field Department. 6. In general, meter sockets should be mounted on an outside wall as close to the metering transformer location as possible. 7. A current transformer cabinet or combination switch shall not be used as a wiring trough. Full-width barriers on the top and bottom of the metering section shall isolate the current transformer compartment of a combination switch. If additional gutter space is required, the current transformer compartment shall be provided with side and/or rear barriers.  Where a current transformer compartment is enclosed within a larger enclosure, the current transformer wiring must exit the current transformer compartment in conduit that is securely attached to the compartment. T. Optional Metering Services Optional offerings such as meter load output pulses and web-based energy profile information are available to all customers. There is a charge for such services. Please contact UI for a schedule of charges and more information. 37
  8. Page 41 of 79

    10.3 Metering Equipment Table of available metering equipment: Service Type Service # Phases # Wires Voltage Service Amperes # Meter Terminals Hot/Cold Sequence Self-Contained Metering (320 A continuous and below) Residential/ 120/240 1 3 Commercial 100/200/ 400 4 Hot * Residential/ Commercial 120/208 1 3 100 / 200 5 Hot Commercial Network 120/208 1 3 100 / 200 5 Cold Commercial 277/480 1 3 100 / 400 5 Cold Commercial 120/208 3 4 200 / 400 7 Hot * Commercial Network 120/208 3 4 200 / 400 7 Cold Commercial 277/480 3 4 200 / 400 7 Cold Transformer-Rated Metering Residential 120/240 1 3 Above 400 6 Cold Commercial 120/208 1 3 Above 400 8 Cold Commercial Network 277/480 3 4 Above 400 13 Cold Commercial 120/208 277/480 3 4 Above 400 13 Cold Fire Pump 120/208 277/480 3 4 Any 13 Cold HOT SEQUENCE: METER-SWITCH-FUSE COLD SEQUENCE: SWITCH-FUSE-METER * CLASS 320 METERS USED IN MULTI-METER BANKS MUST BE COLD SEQUENCE 1. Beginning with the 2016 edition of this Guidebook, UI will no longer provide an itemized list of approved metering equipment, but will instead provide a listing of attributes and criteria for metering equipment. 2. This equipment is also subject to the approval of the authority having jurisdiction (normally, the Municipal Electrical Inspector). 38
  9. Page 42 of 79

    3. All metering equipment is to be furnished and installed by the contractor unless otherwise specified by the company. 4. Approved mounting details and dimensions are shown on company standard drawings. 5. Unusual conditions which are not covered must be referred to the company for approval. 6. Custom-built meter centers, modular meter panels and switchgear with instrument transformer enclosures must be approved by UI prior to fabrication. 7. On occasion, it may be necessary to disallow certain metering equipment due to safety or other concerns. Any such equipment will be noted in the online version of this document until the condition causing it to be disallowed is rectified. A. General Requirements 1. All meter sockets shall have an independent test laboratory listing agency label certifying compliance to ANSI/UL 414. ANSI C12.7, NEMA 250, NEMA Publication No. EL-17 and NFPA 70 (NEC). 2. All meter sockets shall be ringless, and individual covers must have a hasp provision for the company’s seal. 3. UI reserves the right to modify sockets or enclosures to add protective, locking or other devices. 4. All meter socket enclosures shall be outdoor NEMA 3R rated and withstand the ambient and environmental conditions where located. Meter facilities shall be protected from dust, moisture, corrosion, etc. Some extreme conditions may require a minimum NEMA 4X rated enclosure. 5. Meter sockets may not be locked within a larger enclosure. B. Self-Contained Meter Socket Criteria 1. All self-contained meter sockets shall have a manual lever operated bypass. Horn type, sliding type and automatic bypasses are not permitted. 2. All 200 A and 320 A sockets shall have a bypass with locking jaws; 100 A meter sockets may have a non-locking jaw bypass. 3. When in the bypass position, the operating lever shall prevent the cover from being replaced. 4. A safety flash shield is required on all meter positions that have a lever operated bypass. 39
  10. Page 43 of 79

    5. All wiring within the meter socket shall be placed as to not interfere with the operation of the bypass lever. 6. Jaw assembly shall permit use of mylar plastic disconnect sleeves being applied over the blades of the watt-hour meter without cutting or mutilating the insulator material. 7. Ringless sockets with the fifth terminal at the 9 o’clock position are required for all single-phase, three-wire, 120/208 volt services up to and including 200 A. 8. Ringless sockets with the fifth terminal at the 6 o’clock position are required for all three-phase, three-wire services up to and including 200 A. Factoryprovided grounding jumpers must be removed by the customer. (For replacement of existing meter sockets only.) 9. For residential rate RT (and former rate A) customers who have an existing six-jaw meter socket used in conjunction with water heater control, and who are renovating or upgrading their electric service, lever bypass sockets must be installed without fifth and sixth jaws. The Company will then need to be notified so that it can install tank-mounted water heater control equipment. 10. Overhead type meter sockets shall have a hub opening at the top center of individual sockets, or at the top of the central wiring space of ganged meter sockets. 11. Meter socket jaw assemblies rated less than 200 A shall be compatible with Class 200 rated watt-hour meters. 12. The neutral position shall be bonded to the meter socket enclosure – with the following exception: If neutral isolation is required by NEC or the local authority having jurisdiction, only an accessory neutral isolation kit from the manufacturer of the meter socket shall be used. The neutral wire may not pass straight through the meter socket, nor will in-line splices be accepted. 13. Bolted or lay-in type terminals and terminal blocks shall have Allen or hex head terminal screws rated for 150 inch-pound (17 Newton-meters) tightening torque minimum. 14. Underground (bottom entry) meter socket types and central wiring space of ganged types shall have 3/8 inch (10 mm) diameter stud terminals capable of pulling tensions up to 400 lbs. (1.78 kN) force. a. The electrician shall install crimp-type or approved spring-type compression connectors. Mechanical (bolted) connectors are not acceptable. b. Parallel conductors (two maximum) attached to stud terminals shall be terminated with stackable crimp-type compression connectors (or spacers approved for the purpose). c. Completed connection requires two threads of the stud exposed. 40

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters