Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 39 of 79

    R. Class 320 Metering Installations Customers applying for a 400 A service at a delivery voltage of 120/240, 120/208 or 277/480 volts who propose to install a self-contained 320 A meter socket shall meet the following criteria: 1. Class 320 meter provisions may only be installed where the load-side capacity is not more than 320 A continuous (NEC Article 220). 2. Class 320 meters used in multimeter banks must be cold sequence. 3. The customer shall reserve space for a future instrument transformer cabinet, since any failure of the company’s self-contained meter due to loads greater than 320 continuous amperes will require an upgrade to instrument transformer metering prior to re-energization. 4. NOTE: Class 400 bolt-in metering is not approved by UI. Installations that do not meet the continuous current requirements for Class 320 metering must use instrument transformer metering. S. Requirements for Transformer-Rated Metering 1. All services above 400 A and all services to fire pumps, regardless of size, require transformer-rated metering. 2. The company will provide and install all metering transformers, meters, test switches and wiring to the test switches. 3. Where a ground fault Interrupter is installed on a customer’s service, the customer shall supply and install a grounding electrode to the current transformer enclosure. The current transformer secondary will be grounded to the grounding electrode conductor and not to the system neutral. The intent of this requirement is to avoid incorrect tripping of the GFCI. 4. The customer shall provide a 1½” conduit, either metallic or nonmetallic, without junction boxes for the wiring between the metering transformers and the meter socket enclosure. The remote meter socket enclosure shall be effectively bonded either through the metallic conduit or by a #10 AWG copper wire installed in the conduit. The electrical contractor shall install a pull line. Conduit fittings with removable covers (LBs, CS, etc.) shall only be used at the CT compartment and at the meter provision, with no more than two of these fittings per installation. The maximum height for fittings with removable covers is eight feet. Any exceptions to this requirement must be approved in writing by UI’s Standard Field Department. 36
  2. Page 40 of 79

    5. For services of 800 A or below, the maximum circuit length from the metering transformers to the meter socket must not exceed 75 feet. For services of more than 800 A, the maximum circuit length from the metering transformers to the meter socket must not exceed 150 feet. Any exceptions to this requirement must be approved in writing by UI’s Standard Field Department. 6. In general, meter sockets should be mounted on an outside wall as close to the metering transformer location as possible. 7. A current transformer cabinet or combination switch shall not be used as a wiring trough. Full-width barriers on the top and bottom of the metering section shall isolate the current transformer compartment of a combination switch. If additional gutter space is required, the current transformer compartment shall be provided with side and/or rear barriers.  Where a current transformer compartment is enclosed within a larger enclosure, the current transformer wiring must exit the current transformer compartment in conduit that is securely attached to the compartment. T. Optional Metering Services Optional offerings such as meter load output pulses and web-based energy profile information are available to all customers. There is a charge for such services. Please contact UI for a schedule of charges and more information. 37
  3. Page 41 of 79

    10.3 Metering Equipment Table of available metering equipment: Service Type Service # Phases # Wires Voltage Service Amperes # Meter Terminals Hot/Cold Sequence Self-Contained Metering (320 A continuous and below) Residential/ 120/240 1 3 Commercial 100/200/ 400 4 Hot * Residential/ Commercial 120/208 1 3 100 / 200 5 Hot Commercial Network 120/208 1 3 100 / 200 5 Cold Commercial 277/480 1 3 100 / 400 5 Cold Commercial 120/208 3 4 200 / 400 7 Hot * Commercial Network 120/208 3 4 200 / 400 7 Cold Commercial 277/480 3 4 200 / 400 7 Cold Transformer-Rated Metering Residential 120/240 1 3 Above 400 6 Cold Commercial 120/208 1 3 Above 400 8 Cold Commercial Network 277/480 3 4 Above 400 13 Cold Commercial 120/208 277/480 3 4 Above 400 13 Cold Fire Pump 120/208 277/480 3 4 Any 13 Cold HOT SEQUENCE: METER-SWITCH-FUSE COLD SEQUENCE: SWITCH-FUSE-METER * CLASS 320 METERS USED IN MULTI-METER BANKS MUST BE COLD SEQUENCE 1. Beginning with the 2016 edition of this Guidebook, UI will no longer provide an itemized list of approved metering equipment, but will instead provide a listing of attributes and criteria for metering equipment. 2. This equipment is also subject to the approval of the authority having jurisdiction (normally, the Municipal Electrical Inspector). 38
  4. Page 42 of 79

    3. All metering equipment is to be furnished and installed by the contractor unless otherwise specified by the company. 4. Approved mounting details and dimensions are shown on company standard drawings. 5. Unusual conditions which are not covered must be referred to the company for approval. 6. Custom-built meter centers, modular meter panels and switchgear with instrument transformer enclosures must be approved by UI prior to fabrication. 7. On occasion, it may be necessary to disallow certain metering equipment due to safety or other concerns. Any such equipment will be noted in the online version of this document until the condition causing it to be disallowed is rectified. A. General Requirements 1. All meter sockets shall have an independent test laboratory listing agency label certifying compliance to ANSI/UL 414. ANSI C12.7, NEMA 250, NEMA Publication No. EL-17 and NFPA 70 (NEC). 2. All meter sockets shall be ringless, and individual covers must have a hasp provision for the company’s seal. 3. UI reserves the right to modify sockets or enclosures to add protective, locking or other devices. 4. All meter socket enclosures shall be outdoor NEMA 3R rated and withstand the ambient and environmental conditions where located. Meter facilities shall be protected from dust, moisture, corrosion, etc. Some extreme conditions may require a minimum NEMA 4X rated enclosure. 5. Meter sockets may not be locked within a larger enclosure. B. Self-Contained Meter Socket Criteria 1. All self-contained meter sockets shall have a manual lever operated bypass. Horn type, sliding type and automatic bypasses are not permitted. 2. All 200 A and 320 A sockets shall have a bypass with locking jaws; 100 A meter sockets may have a non-locking jaw bypass. 3. When in the bypass position, the operating lever shall prevent the cover from being replaced. 4. A safety flash shield is required on all meter positions that have a lever operated bypass. 39
  5. Page 43 of 79

    5. All wiring within the meter socket shall be placed as to not interfere with the operation of the bypass lever. 6. Jaw assembly shall permit use of mylar plastic disconnect sleeves being applied over the blades of the watt-hour meter without cutting or mutilating the insulator material. 7. Ringless sockets with the fifth terminal at the 9 o’clock position are required for all single-phase, three-wire, 120/208 volt services up to and including 200 A. 8. Ringless sockets with the fifth terminal at the 6 o’clock position are required for all three-phase, three-wire services up to and including 200 A. Factoryprovided grounding jumpers must be removed by the customer. (For replacement of existing meter sockets only.) 9. For residential rate RT (and former rate A) customers who have an existing six-jaw meter socket used in conjunction with water heater control, and who are renovating or upgrading their electric service, lever bypass sockets must be installed without fifth and sixth jaws. The Company will then need to be notified so that it can install tank-mounted water heater control equipment. 10. Overhead type meter sockets shall have a hub opening at the top center of individual sockets, or at the top of the central wiring space of ganged meter sockets. 11. Meter socket jaw assemblies rated less than 200 A shall be compatible with Class 200 rated watt-hour meters. 12. The neutral position shall be bonded to the meter socket enclosure – with the following exception: If neutral isolation is required by NEC or the local authority having jurisdiction, only an accessory neutral isolation kit from the manufacturer of the meter socket shall be used. The neutral wire may not pass straight through the meter socket, nor will in-line splices be accepted. 13. Bolted or lay-in type terminals and terminal blocks shall have Allen or hex head terminal screws rated for 150 inch-pound (17 Newton-meters) tightening torque minimum. 14. Underground (bottom entry) meter socket types and central wiring space of ganged types shall have 3/8 inch (10 mm) diameter stud terminals capable of pulling tensions up to 400 lbs. (1.78 kN) force. a. The electrician shall install crimp-type or approved spring-type compression connectors. Mechanical (bolted) connectors are not acceptable. b. Parallel conductors (two maximum) attached to stud terminals shall be terminated with stackable crimp-type compression connectors (or spacers approved for the purpose). c. Completed connection requires two threads of the stud exposed. 40
  6. Page 44 of 79

    15. The meter socket meets the wire bending radius within the enclosure and at terminations according to the NEC. C. Instrument Transformer Enclosures and Transformer-Rated Meter Sockets. 1. Ringless sockets with provision for mounting a test switch must be used for all transformer-rated metering applications. 2. The minimum size for current transformer (CT) enclosures is 36” wide x 36” high x 10” deep. 3. CT cabinets must be NEMA 3R rainproof for indoor/outdoor use. 4. CT cabinet must have rolled lip covers and permanently installed hinge pins, and the cover must be removable in the open position. 5. CT cabinets must be listed by independent recognized testing laboratory. 6. The CT cabinet must have provisions for locking and sealing. In addition, the main switch must have provision for padlocking in the open position. 7. Neutral isolation – If neutral isolation is required by NEC or the local authority having jurisdiction, only an accessory neutral isolation kit from the manufacturer of the CT cabinet shall be used. The neutral wire may not pass straight through the CT cabinet, nor will in-line splices be accepted. 8. For services up to and including 1,200 A, the CT enclosures must be equipped with mounting plates for bar-type current transformers with 117/8 inch long primary bars. For services greater than 1,200 A, the CT enclosures must have removable bolt-in bus bars with supplemental support brackets of non-conductive material to adequately support window-type (donut) CTs. 9. Window-type CTs without a bolt-in bar (i.e., around conductors or transformer bushings) may be used to renovate existing facilities, provided no CT cabinet was present before, no space is available for a new CT cabinet, the customer is not served from a network vault and it will not be necessary to de-energize other customers’ service to install or remove them. Requests to use window-type CTs in this manner must be submitted by the customer, in writing, to UI’s Engineering Department. If permission is granted, the reply will be in writing. This type of installation is not approved for new construction. 41
  7. Page 45 of 79

    D. Group Metering 1. In multiple socket installations, the company requires a vertical or horizontal, pre-bussed arrangement. Wire troughs are no longer allowed. 2. Dwelling unit and suite meter sockets shall have individual covers for each socket with provisions for barrel locks and company seals. 3. Barriers are required between meter positions. 4. Individual meter covers must allow access to any customer circuit breakers. 11. ENERGY DIVERSION / THEFT OF SERVICE Under no circumstances will electricity be supplied without being metered or otherwise accounted for under special written contracts made with UI. Any installation where the use of electricity is not billed constitutes energy diversion and is subject to financial restitution and criminal penalties. If the electrical contractor discovers a potential theft of service prior to starting work. He/she will stop the job and report the potential theft of service by calling UI’s revenue protection department at [phone removed]. 11.1 General Requirements A. The company reserves the right to enter the customer’s property and inspect and test UI’s equipment at any time without notice. If access into a building is required, UI will make every attempt to do this during normal working hours, or UI will make specific arrangements with the property owner. B. The company reserves the right to enter the customer’s property and inspect and test customer-owned equipment that houses unmetered electricity at any time without notice. The company reserves the right to install locking devices on this equipment. 11.2 Refusal or Discontinuance of Service A. The company may discontinue service without notice in the event unmetered electricity is found to be used or if a known dangerous condition exists in the customer’s wiring or appliances. 42
  8. Page 46 of 79

    B. The company reserves the right to discontinue service to any location where additional metering is required and/or proper permits have not been filed with the authority having jurisdiction (usually the Municipal Electrical Inspector). C. The company may terminate service for the following: 1. Fraud or material misrepresentation in obtaining utility service. This includes but is not limited to: a. The use of personal identification or personal identifying information of another to include a minor child or one’s own minor child. b. The alteration, elimination or exclusion of information on documents for purposes of deception or misrepresentation. 2. Violation of or non-compliance with the rules of the company which have been filed with and approved by PURA. a. This includes equipment that is not company approved. 3. Failure of the customer to provide the company reasonable and unobstructed access to its equipment. a. Failure to provide reasonable access may include two or more failed appointments. b. All metering must have at least three feet of open space surrounding the equipment for purposes of safety. 4. In the event unauthorized service, either metered or unmetered, is found to be used. a. The company will hold the individuals liable for all unauthorized service upon determining the point in time at which the individual began receiving such service. 5. Customer refuses to correct an unsafe condition when such condition is a result of faulty or poorly maintained customer equipment or is in violation of applicable codes. a. All corrected conditions must meet NEC and NESC standards and be inspected by the appropriate local official (usually the Municipal Electrical Inspector). 6. Customer fails to install/move the meter provision (on a service upgrade) outside and fails to obtain prior approval for an inside meter provision. D. A fee may be charged to defray the costs in such matters as per policy approved by PURA. 43
  9. Page 47 of 79

    11.3 Jumpered Metering UI allows electrical contractors to install jumpers in meter sockets as a means to facilitate work and to minimize disruption of service to its customers. Electrical contractors are obligated to obtain permits and electrical inspectors’ releases in a timely manner to minimize the time that the meter socket is jumpered. Failure to do so is a violation of UI requirements and may result in the suspension of your qualification to perform electrical service work in UI’s franchise area. In addition, the jumpers may be removed and/or the service disconnected by UI in accordance with Section 11.2. The company will install a meter on all load-carrying meter provisions within 30 days. 12. SERVICE MATERIALS AVAILABLE AT TOWN HALLS Town Ansonia Bridgeport Derby East Haven Easton Fairfield Hamden Milford New Haven North Branford North Haven Orange Shelton Stratford Trumbull West Haven Woodbridge Service Bolts No No No No No Yes No Yes Yes No No No Yes No Yes No Yes Meter Covers No No No No Yes Yes No Yes Yes No No No Yes No Yes No Yes Jumpers No No No No No Yes No No No No No No Yes No No No No All materials, including jumpers, are also available at UI’s Operations Center located on 100 Marsh Hill Rd., Orange, CT. 44
  10. Page 48 of 79

    13. GUIDEBOOK STANDARDS Guidebook Standard #1 Guidebook Standard #2 Guidebook Standard #3 Guidebook Standard #4 Guidebook Standard #5 Guidebook Standard #6 Guidebook Standard #7 Guidebook Standard #8 Guidebook Standard #9 Guidebook Standard #10 Guidebook Standard #11 Guidebook Standard #12 Guidebook Standard #13 Guidebook Standard #14 Guidebook Standard #15 Guidebook Standard #16 Guidebook Standard #17 Guidebook Standard #18 Guidebook Standard #19 Guidebook Standard #20 Guidebook Standard #21 Guidebook Standard #22 Guidebook Standard #23 Guidebook Standard #24 Guidebook Standard #25 Guidebook Standard #28 Overhead Service Overhead Service Entrance Facilities Service Attachment for Masonry Building Service Mast Road Crossing Pole Overhead Service Road Crossing Pole Underground Service Road Crossing Pole – Greater Than Standard Span Guideline for Network Services – 800 A or Less 120/208 Volts Guideline for Network Services – Greater Than 800 A 120/208 Volt or 277/480 Volt Temporary Overhead Service Post Installation Temporary Underground Service Typical Outdoor Meter Installation Overhead Single-Phase Service Meter –Switch – Fuse Sequence Typical Outdoor Meter Installation Underground Single-Phase Service Meter – Switch – Fuse Sequence Service Cable in Conduit Typical Indoor Meter Installations Single-Phase three-Wire Self Contained Switch – Fuse – Meter Sequence Individual Service Ratings 200 A. Max. Typical Indoor Meter Installations Three-Phase Four-Wire Self Contained Switch – Fuse – Meter Sequence Individual Service Ratings 320 A. Max. Typical CT Rated Meter Installation Switch – Fuse – Meter Sequence Typical Single- & Three-Phase Transformer Rated Socket with Mounting Provision for Test Switch Typical Current Transformer Cabinet with CT Rack Typical Metering Enclosures for Primary and Secondary Transformer Rated Meter & Test Switch Up to 320 A – Single-Phase Three-Wire 120/240V Four-Terminal Meter Socket Up to 200 A – Single-Phase Three-Wire 120/208V Network Five-Terminal Meter Socket Up to 320 A – Three-Phase Four-Wire 208Y/120V or 480Y/277V Grounded Wye Seven-Terminal Meter Socket Up to 320 A – Three-Phase Four-Wire 120/240/240V Delta Seven-Terminal Meter Socket Underground Service from Wood Poles Underground Services from Transformers or Hand Holes Flood Plain Metering Requirements 45

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)