Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Words on different pages
  1. Page 7 of 79

    Our Energy Conservation Department offers technical assistance, consulting services and incentives at every phase of your construction or retrofit project encouraging the design, construction and operation of energy-efficient buildings and equipment. This assistance covers the major energy-consuming systems such as lighting, heating ventilation and air conditioning equipment (HVAC), refrigeration equipment, motors, air compressors, process equipment and building envelopes. Below are the phone and fax numbers for the listed departments: DEPARTMENT Customer Care Center PHONE # FAX # [phone removed] [phone removed] Email: [email removed] Standard Field [phone removed] [phone removed] Engineering [phone removed] [phone removed] Economic Development [phone removed] [phone removed] Distributed Energy Resources [phone removed] Email: [email removed] Energy Conservation [phone removed] [phone removed] Refer to Section 4, Request for Electric Service for detailed information about applying for service, or visit us on our website at uinet.com. 2. GENERAL REQUIREMENTS FOR SERVICE A. All requests for new service and changes to existing services must be ordered through our Customer Care Center either by phone, fax or the Internet. Call [phone removed] from 7 a.m. to 7 p.m. Monday through Friday and 7 a.m. to 4 p.m. on Saturday. You can fax your Electric Service Information Form to 888.442.-6070 or apply on the Internet at uinet.com at any time. A UI job number will be assigned; this number is required to obtain a release from the authority having jurisdiction. NOTE: Any request for new service or changes to existing service jobs which have no action for 180 days will be canceled, and the request process, if needed, will have to be repeated. B. All service requests must include the name and address of the party who will be responsible for paying the electric bill. The customer may be required to sign a Service Contract and, in some cases, make a deposit. 4
  2. Page 8 of 79

    C. All service requests are subject to UI approval. This includes the service location, voltage and phase characteristics, outdoor meter location and configuration, and other associated requirements. NOTE: ALL new and renovated meter provisions MUST be located outdoors unless approved in writing. Do not purchase any equipment or proceed with any construction until you have obtained these requirements from UI in writing. To avoid problems and delays, this should be done early in the project planning stages. D. In general, service to a customer’s premises will be delivered at a single point. If the capacity requirements to a single building or multiple buildings on a single parcel of land warrant additional service, both UI and the authority having jurisdiction must jointly grant approval. UI reserves the right to restrict the service to a single point of delivery or require additional payment for the cost to provide the additional service. E. When requested by UI: customers consultants or contractors shall complete a UI Load Information Form. This form provides greater details about the project (including the total connected load in kilowatts) and should be submitted to the Engineering Department. It augments and does not replace the service order placed through our Customer Care Center (see Paragraph A above). F. The characteristics of certain electrical equipment such as motors, inverter-based generators and non-linear loads may adversely affect your service and the operation of UI’s electrical system. All adverse effects on UI’s electrical system caused by customer equipment must be corrected by the customer at the customer’s expense. For additional information, please reference Section 6 – Motors and Section 9 – Quality of Service. This incorporates solar, standby generators or any other alternative power generation methods. G. The company requires clear access to its facilities at all times and reserves the right to enter the customer’s property to inspect, maintain and/or upgrade our equipment without notice. If access into a building is required, UI will make every attempt to do this during normal working hours or will make specific arrangements with the property owner. UI reserves the right to disconnect services as allowed by law. 5
  3. Page 9 of 79

    H. When the estimated expenditures of the company to provide service to a customer’s premises exceed the estimated income to be derived from that service, additional payments by the customer may be required. The company may require the customer to pay, in advance, the estimated cost difference to provide such service or to guarantee a minimum annual payment for a term of years as stated in UI’s Terms and Conditions (CPUCA No. 647, Item 4). I. Customers shall consult the company when contemplating changes in the size or electrical characteristics of their equipment. UI normally sizes its equipment to serve the actual electrical load of the customer and not the full potential load of the customer’s service entrance equipment. UI must be notified of customer load increases in advance and be provided the opportunity to replace its equipment, if necessary, prior to the load increase. Damages to company equipment resulting from unauthorized changes shall be the responsibility of the customer. J. All wiring must comply with the latest approved version of the National Electrical Code and the latest versions of the Building and Fire Safety Codes that have been adopted by the State of Connecticut Department of Public Safety. NOTE: UI will not schedule or energize any new or renovated service unless the release from the authority having jurisdiction is posted in our system. The contractor should make arrangements with the proper authority in advance to avoid delays. 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service territory of UI. All services are either single-phase, three wire or three-phase, four wire and the neutral conductor must be grounded in accordance with the National Electrical Code. Please contact our Engineering Department to verify that the requested service can be provided by UI prior to making any commitments or ordering any equipment. A. Single-phase, three-wire, 120/240 volt service is generally supplied to all residential customers and is typically available for all customers. B. Single-phase, three-wire, 120/208 volt service is only supplied when singlephase metered service is required and a three-phase 120/208Y volt source is available. Typically, this involves large apartment buildings, a condominium or an office complex, or service in the underground network area. 6
  4. Page 10 of 79

    C. Three-phase, four-wire delta (120/240/240 volt) service may be supplied for commercial and industrial customers provided that the minimum connected three-phase load is 5 KW and the minimum total demand is 10 KW. For pole mounted transformers, the minimum service size is 100 A and the maximum service size is 600 A. This voltage is not available from padmount transformers. D. Three-phase, four-wire wye (120/208Y volt) service may be supplied for large residential projects and for commercial and industrial customers. For polemounted transformers, the minimum service size is 400 A with a minimum demand of 30 KW. For padmount transformers, the minimum service size is 600 A with a minimum demand of 65 KW. E. Three-phase, four-wire wye (277/480Y volt) service may be supplied for large commercial and industrial customers. For pole-mounted and padmount transformers, the minimum service size is 400 A with a minimum demand of 100 KW. F. Three-phase, three-wire delta (240 volt and 480 volt) service is no longer provided. For existing services with either of these voltages, please contact Engineering before planning any changes. Conversion to a three-phase, four-wire service may be required. G. Primary service voltages above 480 volts are supplied by special contract. Contact Engineering for additional information. NOTES: When three-phase service is supplied, every effort should be made to balance the load among all three phases. Three-phase service is not generally supplied for residential use but may be furnished if loads warrant and facilities are available. UI’s Engineering Department shall be consulted prior to making commitments for any such service. 7
  5. Page 11 of 79

    3.2 Single- and Three-Phase Service from Pole-Mounted Transformers Maximum Service Size from Transformers Mounted on Poles Main Switch Size and Equivalent KVA Ratings Maximum Size Main Allowed from Street Pole Off-Street Pole Transformer Capacity Allowed on U.G. by U.G. by Poles Cust. Cust. (Note 1) O.H. (Note 2) O.H. (Note 2) VOLTS 400A 600A 800A 120/240 1φ 3 Wire 96 KVA N/A N/A 100 KVA 400 A 400 A 400 A 400 A 120/240/240 3 φ 4 Wire 166 KVA 250 KVA N/A 300 KVA 400 A 400 A 400 A 400A (10 KW Min. Demand) 600 A No longer available for new services. Contact UI’s Engineering Department 240 3φ 3 Wire before making any additions or changes. 120/208Y/ 3 φ 4 Wire 144 KVA 216 KVA 288 KVA 300 KVA 400 A 400 A 400 A 400 A (30 KW Min. Demand) 600 A 800 A 277/480Y 3 φ 4 Wire (100 KW Min. Demand) 332 KVA N/A N/A 300 KVA (Note 3) (Note 3) 400 A 400 A NOTES: 1. 3 φ 3 wire underground services (240V or 480V) are no longer available. Contact UI’s Engineering Department before making any additions or changes to existing service. 2. Conduit shall be no smaller than 1¼ inch nor larger than 4 inch in diameter. Location on the riser pole shall be designated by UI and is typically on the field side of the pole away from traffic. Do not trench to any pole without first obtaining approval from UI. A maximum of two conduits per pole is allowed for electric service and a maximum of three wires for single-phase and four wires for threephase can be installed in each conduit. While allowed by NEC, UI does not allow doubled conductors in a single riser conduit. All riser pole conduits and sweeps to be rigid galvanized steel conduit and supported 3 inches clear of the pole. Install only the first vertical 10-foot length and provide the remaining conduit, brackets, weatherhead and grounding clamp for installation by UI. Service entrance conductors are supplied by the customer and must extend a minimum of three feet beyond the weatherhead to allow for a drip loop. Do not install conductors without UI assistance. 3. 277/480Y services are not available from street poles (private property poles are required). 8
  6. Page 12 of 79

    3.3 Services from Padmount Transformers A. The design, location, voltages and materials for underground services must be approved by UI prior to making any commitments. Please contact UI’s Engineering Department for more information. B. The company has a residential policy (OP-D36) which states that the developer must provide all trenching required for the electrical system. Also, the developer must supply and install foundations and conduit to UI specifications. UI will then install the primary and secondary electric system. UI requires a permanent easement for this equipment. The customer for each individual lot will supply, install, own and maintain the service entrance cables and conduit. Voltages available are 120/240 volt single-phase and 120/208Y volt three-phase for large multi-unit housing. Contact UI’s Engineering Department for more information. C. The company has a commercial/industrial policy (OP-D32) governing service to office or industrial parks. The developer must provide all trenching required for the electrical system. Also, the developer must supply and install foundations and conduit to UI specifications. UI will then install the electric system necessary to supply the individual lots. UI requires a permanent easement for this equipment. The services to the individual lots are installed under separate contracts. See Paragraph D below. Contact UI’s Engineering Department for more information. D. For service to an individual commercial/industrial lot, the customer must supply, install, own and maintain all primary conduit, transformer foundations and the service entrance conduit and cables. The primary conduit shall be installed from the high voltage supply designated by UI to the transformer foundation per UI specifications. UI will install the primary cable and transformer and make all connections to company-owned equipment. Voltages available are single-phase, three-wire 120/240 volt (800 A max.) and three-phase, four-wire 120/208Y (3,000 A max.) or 277/480Y (2,500 A max.). Contact UI’s Engineering Department for more information. 3.4 Services from Transformer Vaults A. The design, location, voltages and materials for these underground services must be approved by the company prior to making any commitments. Contact UI’s Engineering Department for more information. 9
  7. Page 13 of 79

    B. For downtown New Haven or Bridgeport, the company has a policy (OP-D10N) for service from the network grid. Services up to 800 A at 120/208Y volts will be connected to the grid. The customer must pay for that portion of the service between the main switch or junction box and the curb. Services exceeding 800 A in total capacity at 120/208Y and all services rated 277/480Y cannot be connected directly to the network grid. In this case, the customer is required to install, own and maintain a vault to UI specifications. Voltages available are three-phase, four wire 120/208Y or 277/480Y, and are limited to 3000 A. (Refer to Guidebook Standards #8 and #9 in Section 13.) NOTE: Other municipalities have underground systems in portions of their downtown areas (e.g., East Haven and Derby). Contact UI’s Engineering Department for specific requirements for service in these areas. C. With the exception of single meter installations, the underground service conduit shall terminate in a junction or pull box supplied and installed by the customer. The junction or pull box shall meet both UI and National Electrical Code requirements and is subject to the approval of the authority having jurisdiction. The junction box will connect to the customer’s main switch or switches. The minimum size of the box shall be based on the service size, and the conduit shall enter from the back or the end of the box. The service conductors shall not be spliced but may be tapped where multiple main switches are used. The junction or pull box shall have provisions for company locks and seals. Contact UI’s Engineering Department for drawings of approved junction boxes. D. In each of the above cases, the service entrance disconnect must be either a switch with current limiting fuses or a circuit breaker of equivalent interrupting capacity. The short circuit capacity of these devices shall be not less than 200,000 A symmetrical for downtown network areas, and the service must be configured in cold sequence (i.e., switch-fuse-meter). For all other areas, contact UI’s Engineering Department. E. Customers in non-network areas may be required to install, own and maintain a transformer vault to UI specifications. This occurs when the service entrance capacity requires the installation of transformers on the customer’s property and there is not sufficient area for a padmount transformer. Voltages available are three-phase, four-wire 120/208Y (3,000 A max.) or 277/480Y (2500 A max.). The short circuit capacity of these devices shall be calculated by UI, and the service must be configured in cold sequence (i.e., switch-fuse-meter). Contact UI’s Engineering Department for more information. 10
  8. Page 14 of 79

    3.5 Temporary Service A. Temporary service is available upon request provided that the cost to install and remove the necessary facilities is paid in full and in advance by the customer. Contact United Illuminating, 100 Marsh Hill Rd., Orange, CT 06478. B. Where UI facilities are already in place- a single-phase temporary service can be supplied by a simple service drop or underground service lateral. A standard flat rate fee applies. C. For more complex temporary services, the Engineering Department will provide the customer with a written estimate of the cost associated with providing such service. D. Services that utilize temporary conductors connected to the load side of the meter provision must be applied for as a temporary service even if the permanent conductors are installed on the line side of the meter. This is billable at the current rate. 3.6 Primary Voltage Services Primary voltage services are generally supplied by high voltage switchgear (either fused interrupters or circuit breakers) and are primary metered. Contact UI’s Engineering Department for additional information. 4. REQUEST FOR ELECTRIC SERVICE To establish electric service, temporary or permanent, contact UI’s Customer Care Center by calling [phone removed] from 7 a.m. to 7 p.m., Monday through Friday, and 7 a.m. to 4 p.m. on Saturday. You may fax a completed Electric Service Information Form to [phone removed] (available 24 hours a day/7 days per week). You may also apply by completing an application on our website at uinet.com. Please request a service order and a meter application. NOTE: Before UI can schedule or energize any new or renovated service, the authority having jurisdiction must approve the construction, and the acceptance of such construction must be posted in UI’s system. 11
  9. Page 15 of 79

    4.1 General Service Information The following general service information is required on all applications: A. Project/Owner Name B. Number & Street Address, Town and Zip Code C. Lot # (if applicable) and nearest intersecting street D. Complete billing information including: – Owner’s billing address and telephone number – Total number of meters requested E. Connecticut electrical contractor’s license number (E-1/E-9) F. Electrical Contractor’s cell phone number and email address G. Service information including: – Residential or Commercial/Industrial – Overhead or Underground – Service size in amperes – Requested service voltage – Single-phase (three-wire) or three-phase (four-wire) – Temporary or permanent H. Type of construction (new, replacement, increase, removal, demolition, cut tap or repair) I. Dates temporary and permanent service is required 4.2 Residential Overhead Service Drops For single-phase residential overhead service drops rated 200 A and below, the following additional information is required by UI: A. Pole number of requested service pole B. Confirmation if the requested service pole has UI secondaries (yes/no) C. Number of pole spans from transformer to service pole D. Span distance (in feet) from service pole to service location 12
  10. Page 16 of 79

    Where UI facilities are already in place, residential overhead service drops are typically designed and located by the customer’s licensed electrical contractor. This includes temporary services to construction trailers that meet the above criteria (the standard flat rate fee for temporary service applies). Upon receiving complete information, UI will provide a job number immediately from our Customer Care Representative or by the next business day if you faxed in your request. Customer Electricians or trained field technicians are expected to determine the proper location for the service based on guidebook standards #1, 2, 3, 4, 10 and 12. If you have requested UI to “spot the service,” then typically you will be contacted within five business days by the Standard Field Department. Midspan service taps are nonstandard construction and generally not acceptable. Contact UI Engineering for other options. 4.3 All Other Service Drops & Laterals The following are requirements for all other overhead service drops and underground service laterals, services where additional poles and wires are needed, all residential overhead services over 200 A, all underground services and all commercial/ industrial services: A. One complete set of an approved A2 survey plot plan showing topography, wetlands (if any), proposed location of other utilities, drainage, property boundaries, roads, sidewalks, driveways, location of buildings and desired service location. Street and property lines must be clearly and accurately marked at the project site. B. A completed UI electrical load information form. C. Construction start and completion dates. You will not receive the UI job number until your request has been reviewed and the job requirements determined by the UI Engineering Department. Typically, you will be contacted by our engineer to discuss the job and/or arrange for a job site meeting within five business days of placing the order. The job requirements will be written by our engineer and sent to you with a copy of the service order by US mail or email. Refer to Guidebook Standards #5, 6, 7, 8, 9, 11 and 13 in Section 13. 13

Text of UI-Attachment 4a.pdf

Extracted from the file · 60 pages · 136,974 characters

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)