Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf
Words on different pages
  1. Page 13 of 60

    3 Fast Track Process 3.1 Applicability The Fast Track Process is available to any Generator proposing to interconnect its Generating Facility with the Distribution System if (a) the proposed Generating Facility is 50 kW or less, certified, but did not pass the 50 kW or less screen(s) (b) the proposed Generating Facility is no larger than 2 MW and passes the technical screens associated with the Fast Track process, and (c) the proposed Generating Facility (i) meets the Codes and Standards and other certification requirements of these Guidelines or (ii) is determined to be safe to operate by the Interconnecting EDC, in its sole discretion. 3.2 Initial Review Within fifteen (15) Business Days after the Interconnecting EDC notifies the Generator it has received a complete Interconnection Request, the Interconnecting EDC shall perform an initial review using the screens set forth below, shall notify the Generator of the results, and include with the notification copies of the analysis and data underlying the determinations under the screens. DER Rating and Export Capabilities The technical evaluation will be conducted based on the name plate rating or the Maximum Export Capacity or Derated Name plate rating of the DER. Refer to section 4.2.8 in the Exhibit B Technical Requirements document for further guidance on and acceptable methods for export limitation. Consult with the applicable EDC on the specific acceptable options for formal equipment derating. These may include a recertification letter or memo from the equipment manufacturer, updating the physical nameplate affixed to the equipment, and/or other approved means. Screen Criteria The EDC will use the following criteria for performing screening evaluations of all proposed Generating Facilities greater than 50 kW and less than or equal to 2 MW: a) For Interconnection of a proposed Generating Facility, the aggregated nameplate generation capacity shall not exceed the nameplate rating of the service transformer for those Generating Facilities directly connected to the distribution transformer. b) For Interconnection of a proposed Generating Facility based to a radial distribution circuit, the aggregated generation including the proposed Generating Facility, on the circuit shall not exceed fifteen percent (15%) of the Line Section annual peak load as most recently measured at the substation. A line section is that portion of an Interconnecting EDC’s electric system connected to a customer bounded by automatic sectionalizing devices or the end of the distribution line. Alternatively, the EDC may use internal data and modeling tools for any proposed Generating Facility to determine if the screen passes. NOTE: EDC-approved methods of export limitation and equipment derating may 13
  2. Page 14 of 60

    be considered as acceptable means to pass this screen. Refer to section 4.2.8 in the Exhibit B Technical Requirements document for further guidance. c) For Interconnection of a proposed Generating Facility to the load side of Spot Network protectors, the proposed Generating Facility must utilize an inverter-based equipment package and, together with the aggregated other inverter-based generation, shall not exceed the lesser of five percent (5%) of a Spot Network's maximum load or 50 kW. d) For Interconnection of a proposed Generating Facility to the load side of an area network, the following screen will be conducted: a. The unit is a Certified Inverter-based generator or inverter based using a utility grade relay package exclusively in its design. b. The network primary feeders supplying the network to which the generation is attached are from the same electrical bus or normally tied buses. c. The maximum DG size will be limited to 50 kW at any location. A location is defined as any manhole or service box where the DG is connected to the network secondary system. This will ensure that no more than 50 kW of DG is located between the same set(s) of cable limiters. d. Total aggregate DG interconnected to an area network will be limited to 3% of the maximum network transformer connected kVA with the feeder supplying the largest number of network units out of service, or a maximum of 500 kW, whichever is less. e) The proposed Generating Facility, in aggregation with other generation on the distribution circuit, shall not contribute more than ten percent (10%) to the distribution circuit's maximum fault current at the point on the high voltage (primary) level nearest the proposed point of change of ownership. f) The proposed Generating Facility, in aggregation with other generation on the distribution circuit, shall not cause any distribution protective devices and equipment (including, but not limited to, substation breakers, fuse cutouts, load-break elbows, and line reclosers), or Generating Facility equipment on the EPS to exceed eighty-seven and one-half percent (87.5%) of the short circuit interrupting capability; nor shall the Interconnection be permitted for a circuit that already exceeds eighty-seven and one-half percent (87.5%) of the short circuit interrupting capability. g) The table below sets forth the type of Interconnection applicable to each type of primary distribution line. This screen criterion includes a review of the type of electrical service provided to the Generator, including line configuration and the transformer connection to limit the potential for creating over-voltages on the Interconnecting EDC’s EPS due to a loss of ground during the operating time of any anti-islanding function. 14
  3. Page 15 of 60

    Primary Distribution Line Type of Interconnection to Result/Criteria Type Primary Distribution Line Three-phase, three wire 3-phase or single phase, Pass screen phase-to-phase Three-phase, four wire Effectively grounded 3 phase Pass screen or Single-phase, line-to- neutral h) If the proposed Generating Facility is to be interconnected on single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the proposed Generating Facility, shall not exceed the line ampacity rating. i) If the proposed Generating Facility is single-phase and is to be interconnected on a center tap neutral of a 240-volt service, its addition shall not create an imbalance between the two sides of the 240-volt service of more than twenty percent (20%) of the nameplate rating of the affected service transformer. j) The Generating Facility (in aggregation with other generation interconnected to the side of a substation transformer feeding the circuit where the Generating Facility is proposed to be interconnected) shall not exceed 10 MW in an area where there are known, or posted, transient stability limitations to DER units located in the general electrical vicinity (e.g., three or four busses from the Point of Interconnection). k) No construction of facilities by the Interconnecting EDC on its EPS shall be required to accommodate the Generating Facility. At the discretion of the EDC, hosting capacity map data may be used in lieu of the Fast Track screens above. If the Interconnecting EDC determines that the proposed Interconnection passes the screen criteria set forth in Section 3.2.1, the Interconnection Request shall be approved, and the Interconnecting EDC will provide the Generator an executable Interconnection Agreement within five (5) Business Days after such determination. If the proposed Interconnection fails the screens, but the Interconnecting EDC determines that the Generating Facility may nevertheless be interconnected consistent with safety, reliability, and power quality standards, the Interconnecting EDC shall provide the Generator an executable Interconnection Agreement within five (5) Business Days after such determination. If there are additional requirements set forth by ISO-NE for any proposed Generating Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement. If the proposed Interconnection fails the screens, but the Interconnecting EDC is unable to determine from the initial review that the Generating Facility may nevertheless be interconnected consistent with safety, reliability, and power quality standards (unless the Generator is willing to consider minor modifications or further study), the Interconnecting EDC shall provide the 15
  4. Page 16 of 60

    Generator with the opportunity to attend a customer options meeting described in Section 3.3. 3.3 Customer Options Meeting If the Interconnecting EDC determines that the Interconnection Request cannot be approved without (a) minor modifications at minimal cost, (b) a supplemental study or other additional studies or actions, or (c) modifications at significant cost to address safety, reliability, or power quality problems, then the EDC shall notify the Generator and provide copies of all analyses underlying its conclusion within the five (5) Business Day period after such determination. At the request of the Generator, the Interconnecting EDC shall offer to convene a customer options meeting with the Generator to review possible Generating Facility modifications or the screen analysis and related results in order to determine what further steps are needed to permit the Generating Facility to be connected safely and reliably and to allow DER system modifications to avoid upgrades to the distribution system.. At the time of notification of the determination, or at the customer options meeting: a) The Interconnecting EDC shall offer to perform, at the Generator’s expense, modifications to the EDC’s Interconnection Facilities or minor modifications to the Interconnecting EDC’s EPS (e.g., changing meters, fuses, relay settings) and provide a non-binding good faith estimate of the limited cost to make such modifications to the Interconnecting EDC’s EPS; b) The Interconnecting EDC shall offer to perform, at the Generator’s expense, a supplemental review in accordance with Section 4.4 if the EDC concludes in its sole discretion that the supplemental review might reasonably determine that the Generating Facility could continue to qualify for Interconnection pursuant to the Fast Track Process, and provide a non-binding good faith estimate of the costs of such supplemental review; or c) The Interconnecting EDC and the Generator shall agree to continue evaluating the Interconnection Request under Section 4 (Study Process). 3.4 Supplemental Review In order to accept the Interconnecting EDC’s offer to conduct a supplemental review, the Generator must accept such offer in writing within fifteen (15) Business Days of such offer and submit a payment to the Interconnecting EDC for the estimated costs set forth in such offer. The Generator shall be responsible for the Interconnecting EDC’s actual costs of conducting the supplemental review. The Generator must pay any review costs that exceed the estimated cost payment within twenty (20) Business Days of the later or (a) receipt of an invoice from the Interconnecting EDC or (b) resolution of any dispute concerning such invoice. If the estimated cost payment exceeds the actual costs, the Interconnecting EDC will refund such excess without interest within twenty (20) Business Days of the calculation of the actual costs. 16
  5. Page 17 of 60

    Supplemental Review requirements a) Within ten (10) Business Days following receipt of the payment for a supplemental review, the Interconnecting EDC shall conduct a supplemental review to determine whether the Generating Facility can be interconnected safely and reliably. b) If so, and no modifications to the Generating Facility are required by the Interconnecting EDC, the Interconnecting EDC shall forward an Interconnection Agreement to the Generator for execution within five (5) Business Days of such determination. c) If so, and modifications to the Generating Facility are required by the Interconnecting EDC, the Interconnecting EDC will provide a written summary of estimated costs of such modifications, and the Generator shall provide written notice to the Interconnecting EDC of whether the Generator agrees to make the required Generating Facility modifications at the Generator’s cost within thirty (30) Business Days of receiving such written summary from the Interconnecting EDC. Within five (5) Business Days after confirmation that the Generator has agreed in writing to make the required changes at the Generator’s cost, the Interconnecting EDC shall forward an Interconnection Agreement (Exhibit A) to the Generator for execution. d) If so, and minor modifications to the Interconnecting EDC’s EPS are required by the Interconnecting EDC, the Generator shall pay the costs of such EPS modifications prior to Interconnection. The Interconnecting EDC shall forward an executable Interconnection Agreement to the Generator within ten (10) Business Days of such a determination. e) If not, the Interconnection Request shall be evaluated under Section 5 (Study Process). Technical Requirements for certified inverter-based Generating Facilities are provided in the Exhibit B. 17
  6. Page 18 of 60

    4 Study Process 4.1 Applicability The Study Process shall be used by a Generator proposing to interconnect its Generating Facility with the Distribution System if the Generating Facility (a) is larger than 2 MW, (b) is 2 MW or less and is not certified, or (c) is 2 MW or less and is certified but did not pass the Fast Track Process. 4.2 Scoping Meeting Requirements A Scoping Meeting can be held at the request of either the EDC or the Generator, but should not occur until the EDC is satisfied with the proposed design details provided and the project is ready to proceed into the Study phase. The Interconnecting EDC, the Generator and any Affected Party(ies) will bring to the meeting personnel, including system engineers, and other resources as may be reasonably necessary in order to accomplish the purpose of the meeting. The purpose of the Scoping Meeting is to discuss the Interconnection Request, review the appropriate jurisdiction for application submittal, and review whether the proposed project will require a corresponding ISO-NE System Impact Study to be performed and also to review existing studies relevant to the Interconnection Request. At the Scoping Meeting, the Parties shall further discuss whether the Interconnecting EDC should perform a Feasibility Study or proceed directly to either or both of the System Impact Studies, a Facility Study, or an Interconnection Agreement. If the Parties agree that a Feasibility Study should be performed, the Interconnecting EDC shall provide the Generator, as soon as practicable, but not later than five (5) Business Days after the Scoping Meeting, a Feasibility Study Agreement in the form of Attachment IV, including an outline of the scope of the Feasibility Study and a non-binding good faith estimate of the cost to perform the Feasibility Study. The Parties may mutually agree to forgo the Scoping Meeting if (a) the Generator requests a Feasibility Study or (b) the Interconnecting EDC determines that a Feasibility Study is not required, and the Parties agree to proceed to either or both of the System Impact Studies. a) A Generator who has requested a Feasibility Study must return the executed Feasibility Study Agreement within fifteen (15) Business Days after the Generator’s Interconnection Request is deemed complete. b) If the Interconnecting EDC determines that a Feasibility Study is not required and the Parties agree to proceed to either or both System Impact Studies, then the Interconnecting EDC shall provide the Generator, no later than five (5) Business Days after the scoping meeting, the appropriate System Impact Study agreement(s) including an outline of the scope of such System Impact Study and a non-binding good faith estimate of the cost to perform such System Impact Study. The form of Distribution System Impact Study Agreement is attached hereto as Attachment V. Transmission System Impact Study process and documents can be found on the ISO-NE website. (www.iso-newengland.com). 18
  7. Page 19 of 60

    4.3 Feasibility Study The Feasibility Study may be used to review multiple interconnection options and locations with the goal of identifying the most feasible point of interconnection for the Generating Facility, any potential adverse system impacts that would result from the Interconnection of the Generating Facility, or for the EDC to provide specific circuit and/or substation data to the developer for further refinement of their proposal (i.e. to develop a proposed dispatch limiting schedule for ESS projects). The Generator must pay the good faith cost estimate set forth in the Feasibility Study Agreement prior to the Interconnecting EDC’s initiation of the Feasibility Study. The scope of and cost responsibilities for the Feasibility Study are more fully described in the Feasibility Study Agreement (Attachment V). In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed Feasibility Study Agreement with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the Feasibility Study Agreement with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. If the Feasibility Study shows no potential for adverse system impacts, the EDC shall send the Generator a Facility Study Agreement in the form of Attachment VI, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If the Feasibility Study shows that no additional facilities are necessary, an Interconnection Agreement shall be tendered to the Generator for execution within five (5) Business Days after the completion of the Feasibility Study. If the Feasibility Study shows the potential for adverse system impacts, the review process shall proceed to the System Impact Study(ies). In the case where either the Feasibility Study or the System Impact Study(ies) are determined to be unnecessary, the Interconnecting EDC shall notify the Generator within five (5) Business Days that such study(ies) are not required. 4.4 System Impact Studies 19
  8. Page 20 of 60

    The System Impact Studies shall (a) identify and detail the EPS impacts that would result if the proposed Generating Facility were interconnected without project modifications or electric system modifications, focusing on the adverse system impacts identified in the Feasibility Study, and/or (b) study potential impacts, including but not limited to those identified in the Scoping Meeting. If potential adverse distribution system impacts are identified at the Scoping Meeting or in the Feasibility Study, then a Distribution System Impact Study shall be required. If a Distribution System Impact Study is required, then the Interconnecting EDC shall send the Generator a Distribution System Impact Study Agreement within fifteen (15) Business Days of (a) transmittal of the results of the Feasibility Study (if performed) or (b) the Scoping Meeting (if no Feasibility Study is performed), including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If potential adverse transmission system impacts are identified, the Interconnecting EDC shall send the Generator a Transmission System Impact Study Agreement within five (5) Business Days following transmittal of the Study results of the Feasibility Study or the Distribution System Impact Study, as the case may be, including an outline of the scope of the Transmission System Impact Study and a non-binding good faith estimate of the cost to perform the Transmission System Impact Study. If a Transmission System Impact Study is not required, but EPS adverse system impacts are shown by the Feasibility Study to be possible and no Distribution System Impact Study has been conducted, the EDC shall send the Generator a Distribution System Impact Study Agreement. If the System Impact Study(ies) shows no potential for adverse impacts to the transmission system or the distribution system, then the EDC shall send to the Generator for execution either (a) a Facility Study Agreement, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study, or (b) an Interconnection Agreement, as applicable. In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed System Impact Study Agreements with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the System Impact Study Agreements with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. A payment of the good faith estimated System Impact Study costs shall be required in full of the Generator prior to initiation of the System Impact Studies. The scope of and cost responsibilities for a System Impact Studies are set forth in the applicable System Impact Study agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study 20
  9. Page 21 of 60

    agreement. Any Affected Parties shall be invited to participate in the System Impact Studies and provide information necessary or helpful to complete the System Impact Studies. 4.5 Facility Study Once the required System Impact Studies, if any, are completed, the Interconnecting EDC shall prepare a System Impact Studies report and provide a copy of such report to the Generator along with a Facility Study Agreement within five (5) Business Days of completion of the System Impact Studies, including an outline of the scope of the Facility Study and a non-binding good faith estimate of the cost to perform the Facility Study. Within five (5) Business Days following receipt of the report described in Section 4.5, the Generator shall notify the Interconnecting EDC in writing as to whether it will either pursue the Facility Study or waive the Facility Study and elect an expedited Interconnection. a) If the Generator waives the Facility Study, it shall commit to the following milestones in the Interconnection Agreement: (a) siting approval by the appropriate regulatory authorities for the Generating Facility and Interconnection Facilities; (b) engineering of Interconnection Facilities shall be subject to prior approval by the Interconnecting EDC; (c) the ordering of long lead time material by the EDC for Interconnection Facilities and system upgrades; (iv) an In-Service Date; and (v) Commercial Operation Date. b) If the Generator does not waive the Facility Study, in order to remain under consideration for Interconnection and in the EDC’s Interconnection queue, then the Generator must return the executed Facility Study Agreement or a request for an extension of time within thirty (30) Business Days following receipt of the Facility Study from the Interconnecting EDC. Any such extension shall not exceed sixty (60) Business Days. The Facility Study shall specify and estimate the cost of the equipment, engineering, procurement and construction work (including overheads) needed to safely and reliably interconnect the Generating Facility. This includes service connection details and implementation of the System Impact Study(ies) conclusions. Design for any required Interconnection Facilities and/or Generating Facility upgrades shall be provided for under the Facility Study Agreement. The Interconnecting EDC may contract with outside consultants to provide such design(s). The Generator, the Interconnecting EDC and any Affected Party(ies), may agree to allow the Generator to separately arrange for such design(s). In such cases, facilities design shall be subject to review and prior by the Interconnecting EDC, in accordance with the Facility Study Agreement. If the Parties agree to separately arrange for design and construction, and provided security and confidentiality requirements can be met, the Interconnecting EDC shall make sufficient information available to the Generator in accordance with confidentiality and critical infrastructure requirements to permit the Generator to obtain an independent design and cost estimate for any necessary facilities. In order to remain under consideration for Interconnection and in the Interconnecting EDC’s 21
  10. Page 22 of 60

    Interconnection queue, the Generator must return executed Facility Study Agreement with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the Facility Study Agreement with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. A payment of the good faith estimated Facility Study costs shall be required in full from the Generator prior to execution of the Facility Study. The scope of and cost responsibilities for the Facility Study are described in the attached Facility Study Agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. Within thirty (30) Business Days of receipt of the Facility Study results, the Generator shall provide written notice whether it agrees to pay for the Interconnection Facilities and upgrades identified in the Facility Study. An executable Interconnection Agreement shall be tendered by the Interconnecting EDC to the Generator within five (5) Business Days of receipt of such written notice. 22

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)