Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance Filing, Order No. No

Compliance filingFiled by Eversource Energy24 files
Part of docket 26-08-07Open
  • Electric
Innovative Energy Solutions Program Cycle 5

Files24

Search terms highlighted
Eversource rate increase is on 5 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
Words on different pages

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.pdf

Extracted from the file · 23 pages · 37,559 characters

Text of ES-Attachment 2b 2026 TDRP-Appendix 8.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 3.pdf

Extracted from the file · 1 page · 7,205 characters

Text of ES-Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 4.pdf

Extracted from the file · 44 pages · 108,591 characters

Text of ES-Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES-Attachment 5.pdf

Extracted from the file · 30 pages · 79,263 characters

Words on different pagesRead the text of ES-Attachment 5.pdf

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES-Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of UI-Attachment 1.pdf

Extracted from the file · 176 pages · 247,894 characters

Words on different pagesRead the text of UI-Attachment 1.pdf

Text of UI-Attachment 2.pdf

Extracted from the file · 108 pages · 171,300 characters

Text of UI-Attachment 3.pdf

Extracted from the file · 79 pages · 105,929 characters

Words on different pagesRead the text of UI-Attachment 3.pdf
Words on different pages
  1. Page 19 of 60

    4.3 Feasibility Study The Feasibility Study may be used to review multiple interconnection options and locations with the goal of identifying the most feasible point of interconnection for the Generating Facility, any potential adverse system impacts that would result from the Interconnection of the Generating Facility, or for the EDC to provide specific circuit and/or substation data to the developer for further refinement of their proposal (i.e. to develop a proposed dispatch limiting schedule for ESS projects). The Generator must pay the good faith cost estimate set forth in the Feasibility Study Agreement prior to the Interconnecting EDC’s initiation of the Feasibility Study. The scope of and cost responsibilities for the Feasibility Study are more fully described in the Feasibility Study Agreement (Attachment V). In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed Feasibility Study Agreement with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the Feasibility Study Agreement with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. If the Feasibility Study shows no potential for adverse system impacts, the EDC shall send the Generator a Facility Study Agreement in the form of Attachment VI, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If the Feasibility Study shows that no additional facilities are necessary, an Interconnection Agreement shall be tendered to the Generator for execution within five (5) Business Days after the completion of the Feasibility Study. If the Feasibility Study shows the potential for adverse system impacts, the review process shall proceed to the System Impact Study(ies). In the case where either the Feasibility Study or the System Impact Study(ies) are determined to be unnecessary, the Interconnecting EDC shall notify the Generator within five (5) Business Days that such study(ies) are not required. 4.4 System Impact Studies 19
  2. Page 20 of 60

    The System Impact Studies shall (a) identify and detail the EPS impacts that would result if the proposed Generating Facility were interconnected without project modifications or electric system modifications, focusing on the adverse system impacts identified in the Feasibility Study, and/or (b) study potential impacts, including but not limited to those identified in the Scoping Meeting. If potential adverse distribution system impacts are identified at the Scoping Meeting or in the Feasibility Study, then a Distribution System Impact Study shall be required. If a Distribution System Impact Study is required, then the Interconnecting EDC shall send the Generator a Distribution System Impact Study Agreement within fifteen (15) Business Days of (a) transmittal of the results of the Feasibility Study (if performed) or (b) the Scoping Meeting (if no Feasibility Study is performed), including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. If potential adverse transmission system impacts are identified, the Interconnecting EDC shall send the Generator a Transmission System Impact Study Agreement within five (5) Business Days following transmittal of the Study results of the Feasibility Study or the Distribution System Impact Study, as the case may be, including an outline of the scope of the Transmission System Impact Study and a non-binding good faith estimate of the cost to perform the Transmission System Impact Study. If a Transmission System Impact Study is not required, but EPS adverse system impacts are shown by the Feasibility Study to be possible and no Distribution System Impact Study has been conducted, the EDC shall send the Generator a Distribution System Impact Study Agreement. If the System Impact Study(ies) shows no potential for adverse impacts to the transmission system or the distribution system, then the EDC shall send to the Generator for execution either (a) a Facility Study Agreement, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study, or (b) an Interconnection Agreement, as applicable. In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed System Impact Study Agreements with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the System Impact Study Agreements with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. A payment of the good faith estimated System Impact Study costs shall be required in full of the Generator prior to initiation of the System Impact Studies. The scope of and cost responsibilities for a System Impact Studies are set forth in the applicable System Impact Study agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study 20
  3. Page 21 of 60

    agreement. Any Affected Parties shall be invited to participate in the System Impact Studies and provide information necessary or helpful to complete the System Impact Studies. 4.5 Facility Study Once the required System Impact Studies, if any, are completed, the Interconnecting EDC shall prepare a System Impact Studies report and provide a copy of such report to the Generator along with a Facility Study Agreement within five (5) Business Days of completion of the System Impact Studies, including an outline of the scope of the Facility Study and a non-binding good faith estimate of the cost to perform the Facility Study. Within five (5) Business Days following receipt of the report described in Section 4.5, the Generator shall notify the Interconnecting EDC in writing as to whether it will either pursue the Facility Study or waive the Facility Study and elect an expedited Interconnection. a) If the Generator waives the Facility Study, it shall commit to the following milestones in the Interconnection Agreement: (a) siting approval by the appropriate regulatory authorities for the Generating Facility and Interconnection Facilities; (b) engineering of Interconnection Facilities shall be subject to prior approval by the Interconnecting EDC; (c) the ordering of long lead time material by the EDC for Interconnection Facilities and system upgrades; (iv) an In-Service Date; and (v) Commercial Operation Date. b) If the Generator does not waive the Facility Study, in order to remain under consideration for Interconnection and in the EDC’s Interconnection queue, then the Generator must return the executed Facility Study Agreement or a request for an extension of time within thirty (30) Business Days following receipt of the Facility Study from the Interconnecting EDC. Any such extension shall not exceed sixty (60) Business Days. The Facility Study shall specify and estimate the cost of the equipment, engineering, procurement and construction work (including overheads) needed to safely and reliably interconnect the Generating Facility. This includes service connection details and implementation of the System Impact Study(ies) conclusions. Design for any required Interconnection Facilities and/or Generating Facility upgrades shall be provided for under the Facility Study Agreement. The Interconnecting EDC may contract with outside consultants to provide such design(s). The Generator, the Interconnecting EDC and any Affected Party(ies), may agree to allow the Generator to separately arrange for such design(s). In such cases, facilities design shall be subject to review and prior by the Interconnecting EDC, in accordance with the Facility Study Agreement. If the Parties agree to separately arrange for design and construction, and provided security and confidentiality requirements can be met, the Interconnecting EDC shall make sufficient information available to the Generator in accordance with confidentiality and critical infrastructure requirements to permit the Generator to obtain an independent design and cost estimate for any necessary facilities. In order to remain under consideration for Interconnection and in the Interconnecting EDC’s 21
  4. Page 22 of 60

    Interconnection queue, the Generator must return executed Facility Study Agreement with a payment, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. If Generator does not return executed the Facility Study Agreement with a payment within the allowed thirty (30) Business Days, the EDC will notify the Generator, and provide a ten (10) Business Days cure period prior to withdrawing the Generator from the queue. A payment of the good faith estimated Facility Study costs shall be required in full from the Generator prior to execution of the Facility Study. The scope of and cost responsibilities for the Facility Study are described in the attached Facility Study Agreement. Once the study agreement is signed and all outstanding milestone deliverables are received, the EDC may notify the Generator when the study begins, along with providing an expected timeframe for completion. This information may also be included in the respective study agreement. Within thirty (30) Business Days of receipt of the Facility Study results, the Generator shall provide written notice whether it agrees to pay for the Interconnection Facilities and upgrades identified in the Facility Study. An executable Interconnection Agreement shall be tendered by the Interconnecting EDC to the Generator within five (5) Business Days of receipt of such written notice. 22
  5. Page 23 of 60

    5 Provisions that Apply to all Interconnections and Associated Applications 5.1 Reasonable Efforts The Interconnecting EDC shall make reasonable efforts to meet all time frames provided in these Guidelines; provided, however, that the Interconnecting EDC and the Generator may agree to different time frames. If the Interconnecting EDC fails to meet a deadline provided herein, it shall (a) notify the Generator, (b) explain the reason for the failure to meet the deadline, and (c) provide an estimated date by which it will complete the applicable Interconnection procedure in the process. 5.2 Dispute Resolution Process The Parties shall agree to attempt to resolve all disputes promptly, equitably and in a good faith manner. If Parties are unable to informally resolve their dispute, the following dispute resolution process must be followed: a) In the event of a dispute, the disputing Party shall provide the other Party a written Notice of Dispute containing the relevant known facts pertaining to the dispute, the specific dispute and the relief sought, and express notice by the disputing Party that it is invoking the procedures under this Section. The notice shall be sent to the non-disputing Party’s email address and physical address set forth in the Interconnection Agreement or Application, if there is no Interconnection Agreement. A copy of the notice shall also be sent to Interconnection Ombudsperson. The non-disputing Party shall acknowledge the notice within three (3) Business Days of its receipt and identify a representative with the authority to make decisions for the non-disputing Party with respect to the dispute. b) The Interconnection Ombudsperson is to be appointed by the PURA chairperson or the chairperson’s designee, and should be a member of PURA’s Office of Education, Outreach, and Enforcement. c) If the dispute is principally related to one or both Parties’ compliance with timelines specified in these Interconnection Procedures or associated agreements, the Parties shall seek assistance from Interconnection Ombudsperson if the Parties cannot mutually resolve the dispute within eight (8) Business Days. d) If the dispute is not principally related to one or both Parties’ compliance with a timeline, then the non-disputing Party shall provide the disputing Party with all relevant regulatory and/or technical details and analysis regarding any Utility interconnection requirements under dispute within ten (10) Business Days of the date of the notice of dispute. Within twenty (20) Business Days of the date of the notice of dispute, the Parties’ authorized representatives shall meet and confer to try to resolve the dispute. Parties shall operate in good faith and use best efforts to resolve the dispute. e) If a resolution is not reached in thirty (30) Business Days from the date of the notice of dispute, either (1) a Party may request to continue negotiations for an additional twenty (20) Business Days, or (2) the Parties may by mutual agreement make a written request for mediation to the Interconnection Ombudsperson. Alternatively, both Parties by mutual agreement may request mediation from an outside third-party mediator with costs to be shared equally between the Parties.
  6. Page 24 of 60

    f) For the third party mediation process, the Parties shall agree to a mutually agreeable mediation process and mediator. Each party will select a mediator within five (5) Business Days of the end of the negotiation period and the two selected mediators will attempt to, within five (5) Business Days, select a third, mutually agreeable, mediator. The Parties shall share the cost of mediation equally. Once the three mediators are selected and the mediation commences, the Parties agree to engage in mediation in good faith for a period of not less than 30 days. g) If the results of the mediation are not accepted by one or more Parties and there is still disagreement, the dispute shall proceed to the formal complaint process provided by the Authority, where either party may commence an action at PURA for resolution of the dispute All timeframes in this process and the Dispute Resolution Process itself may be modified by mutual written agreement of the Parties. h) At any time, either Party may file a complaint before the Authority pursuant to its rules. i) If neither Party elects to seek assistance from the Authority, or if the attempted dispute resolution fails, then either Party may exercise whatever rights and remedies it may have in equity or law consistent with the terms of these procedures. The dispute resolution process and time frames set forth in Section 5.2.1 may be modified by mutual written agreement of the Parties. 5.3 Interconnection Metering Any metering necessitated by the use of the Generating Facility shall be installed at the Generator's expense in accordance with Applicable Reliability Standards then in effect. 5.4 Monitoring and Control DERs equal or greater than 500 KW will require a DER monitoring gateway in compliance with indivual EDC requirements regardless of impact on the Distribution System. 5.5 Commissioning Commissioning tests of the Generator's installed equipment shall be performed pursuant to applicable Codes and Standards, and equipment manufacturers’ recommendations. The Generator shall provide a certified commissioning test procedure to the Interconnecting EDC for approval. A list of tests commonly required by IEEE 1547 is outlined in Section 7 of the Exhibit B Technical Requirements document. The Interconnecting EDC must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests. The Interconnecting EDC will not assist in performance of, or provide equipment for the commissioning test. The Interconnecting EDC will provide a Contingent Approval to the Generator when all EDC application review elements have been satisfied. When the Commissioning Test has been successfully completed the Interconnecting EDC will provide an “Approval to Energize Form”
  7. Page 25 of 60

    to the Generator. 5.6 Periodic Interconnection Tests At the time of scheduling of a commissioning test, the Generator shall provide a written periodic Interconnection test procedure to the Interconnecting EDC. (Such procedures are typically provided by the equipment manufacturer.) The procedure shall describe a test process that will verify all Interconnection-related protective functions and associated batteries are functional, but need not replicate the commissioning test procedures. The interval between periodic tests shall be specified by the manufacturer, system integrator, or the authority having jurisdiction over the Interconnection. Written test reports or a log for inspection shall be maintained by the Generator. The Interconnecting EDC may audit the Generator’s written test reports, logs and other materials regarding the Interconnection or the Generating Facility at its discretion. If the functional software or firmware of the Interconnection system has been modified or if any hardware component of the Interconnection system has been modified, replaced or repaired with parts different from the tested configuration, and if such hardware, software or firmware have not been previously approved, then the applicable commissioning tests shall be performed by an independent testing facility. If such hardware, software or firmware has been previously approved or if settings have been changed, then only the commissioning tests applicable to the changes made shall be conducted. This requirement is in accordance with IEEE 1547.2. 5.7 Safe Operation and Maintenance The Generator shall operate and maintain the Generating Facility in accordance with Good Utility Practice and comply with all aspects of the Interconnection Agreement and applicable Guidelines and tariffs, terms and conditions. Moreover, the Generator shall comply, at all times, with all applicable laws, regulations, and other legal requirements. In the event that the Generating Facility may pose an unreasonable risk to the EPS, the Interconnection Agreement provides that (a) the EDC may install equipment to monitor the Generating Facility and (b) the EDC may disconnect the Generating Facility as set forth in the Guidelines. 5.8 Confidentiality The Interconnecting EDC shall maintain confidentiality of all information of by the Generator clearly designated as “Confidential” except as otherwise required by system operators, applicable laws and regulations. In the event that the Interconnecting EDC is requested to produce such confidential information, the Interconnecting EDC shall provide advance notice to Generator, if possible, to give Generator an opportunity to seek protective treatment of such information. If such information is requested or required by the DPUC, the Interconnecting EDC will seek protective treatment of such confidential information. Confidential information does not include information that is: (a) in or becomes part of the public domain; (b) known to the Interconnecting EDC previously; (c) independently developed by the Interconnecting EDC; (d) rightfully obtained by the Interconnecting EDC from third parties without a duty of confidentiality; or (e) required to be publicly disclosed by law, statute or regulation. 5.9 Record Retention
  8. Page 26 of 60

    The Interconnecting EDC shall, at a minimum, maintain for three (3) years, subject to audit, records of all Interconnection Requests received under these procedures, the times required to complete Interconnection Request approvals and disapprovals, and justification for the actions taken on the Interconnection Requests. 5.10 Interconnection Agreement The Generator and the Interconnecting EDC shall be Parties to the Interconnection Agreement. The Interconnecting EDC shall provide an Interconnection Agreement to the Generator in accordance with these Guidelines. After the Interconnecting EDC provides an Interconnection Agreement to the Generator for execution, the Generator shall have thirty (30) Business Days or another mutually agreeable timeframe to sign and return the Interconnection Agreement. After the Interconnection Agreement is fully executed, the Interconnection of the Generating Facility shall proceed under the provisions of the Interconnection Agreement and these Guidelines. The Generator shall promptly update the EDC of any changes to the projected In-Service Date as they occur. Also, upon request by the EDC for such updates, the Generator shall provide a response to such requests within ten (10) Business Days with the reasons for the schedule adjustment and any relevant evidence to support the need for the adjustment. Provided that the Generator demonstrates that they are operating in good faith to further the project’s development, the Interconnection Agreement shall remain in effect. If the Generator does not respond to the EDC’s inquiries within the ten (10) Business Days or does not demonstrate that they are operating in good faith, the EDC will then issue a ten (10) Business Day withdrawl notice, prior to termination of the agreement. Any disputes as to the enforcement of this provision shall be remedied via the Dispute Resolution Process in Section 5.2.1. 5.11 Performance Assurance Performance Assurance will only be required in rare cases where abnormally high ongoing maintenance cost are anticipated to support the Interconnection or in unusual cases where there is a potential for wide variation between the actual and estimated costs for the Interconnection. If performance assurance is required for an Interconnection, the EDC will provide a written explanation of the reasons therefor to the Generator. 5.12 Coordination with Affected Systems If the Interconnecting EDC determines that any Interconnection Request may have an impact on other Affected Systems, the Interconnecting EDC will include representatives of such Affected Systems in all meetings and proceedings pertinent to such impact. 5.13 Generating Facility Capacity The Generating Facility Capacity, for the purpose of analysis, shall be determined as follows: a) If the Interconnection Request is for an increase in capacity for an existing Generating Facility, the Interconnection Request shall be evaluated on the basis of the new total nameplate capacity of the Generating Facility. b) If the Interconnection Request is for a Generating Facility that includes multiple energy production devices at a site for which the Generator seeks a single Point of Interconnection, the Interconnection Request shall be evaluated on the basis of the
  9. Page 27 of 60

    aggregate nameplate capacity of such multiple devices. c) The Interconnection Request shall be evaluated using the maximum continuous rated nameplate capacity of the Generating Facility.
  10. Page 28 of 60

    ATTACHMENT I F E A S I B I L I T Y S T U D Y A G R E E ME N T Feasibility Study Agreement This Feasibility Study Agreement (this “Agreement”), dated as of (t he “Effective Date”), is entered into by and between [Eversource Energy, a Connecticut corporation with a principal place of business at 107 Selden St, Berlin, CT, 06037] [or] [The United Illuminating Company, a specially charted Connecticut corporation with a principal place of business at 180 Marsh Hill Road, Orange, CT 06477] (the “EDC”), and , a with a principal place of business at , (“Generator”). (EDC and Generator are collectively referred to as the “Parties” and individually as a “Party”). RECITALS WHEREAS, Generator is proposing to develop a Generating Facility or increase the generating capacity of an existing Generating Facility consistent with the Interconnection Request completed by Generator on ; WHEREAS, Generator desires to interconnect the Generating Facility with the Distribution System; and WHEREAS, Generator has requested the EDC to perform a Feasibility Study to assess the feasibility of interconnecting the proposed Generating Facility with the facilities that are part of the EDC’s Distribution System, and of any Affected Systems (the “Feasibility Study”). NOW, THEREFORE, in consideration of and subject to the mutual covenants contained herein the Parties agree as follows: 1.0 Capitalized terms used herein but not defined herein shall have the meanings ascribed to such terms in the EDC’s Guidelines for Generator Interconnection (the “Guidelines”). 2.0 The EDC shall conduct a Feasibility Study in accordance with the Guidelines. 3.0 The scope of the Feasibility Study shall be subject to the assumptions set forth in Exhibit A to this Agreement. 4.0 The Feasibility Study shall be based on the technical information provided by the Generator in its Interconnection Request, as may be modified as the result of the Scoping Meeting. At the reasonable request of the EDC, the Generator shall promptly provide additional technical information to the EDC. 5.0 In performing the Feasibility Study, the EDC may rely, to the extent reasonably practicable, on other existing studies in the EDC’s possession. I-1

Text of UI-Attachment 4b.pdf

Extracted from the file · 32 pages · 73,024 characters

Text of UI-Attachment 5.pdf

Extracted from the file · 10 pages · 12,154 characters

Words on different pagesRead the text of UI-Attachment 5.pdf

Text of UI-Attachment 6.pdf

Extracted from the file · 29 pages · 55,721 characters

Words on different pagesRead the text of UI-Attachment 6.pdf

Text of UI-Attachment 7.pdf

Extracted from the file · 33 pages · 83,950 characters

Words on different pagesRead the text of UI-Attachment 7.pdf

Text of UI-Attachment 9.pdf

Extracted from the file · 14 pages · 33,843 characters

Words on different pagesRead the text of UI-Attachment 9.pdf

Text of UI-Attachment 11.pdf

Extracted from the file · 4 pages · 13,890 characters

Text of UI-Attachment 12.pdf

Extracted from the file · 36 pages, 2 without text · 106,019 characters

As listed on the current system

Compliance Filings, 10/01/2026 [26-08-07] Order No.No 4 in docket 17-12-03RE05 / Eversource Energy /

This filing on the current system (opens in a new tab)