The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 1 of 12
Non-Wires
Solutions Program
Annual Filing
February 6, 2026
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 2 of 12
Table of Contents
I.
BACKGROUND ........................................................................................................ 3
II. COMPANY INFORMATION...................................................................................... 4
III. EDC DATA FILING ................................................................................................... 4
A. SYSTEM DATA ........................................................................................................ 4
B. FINANCIAL DATA .................................................................................................... 8
C. DER DEPLOYMENT............................................................................................... 10
IV. QUARTERLY FILING ............................................................................................. 11
V. GRID NEEDS FILING ............................................................................................. 11
VI. APPENDICES......................................................................................................... 12
Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) ........................................................ 12
Appendix 2- 2025 Eversource UI CT DER Forecast Summary ................................................................................ 12
Appendix 3- System Data Requirement No. 12 and 14......................................................................................... 12
Appendix 4- CIP-7 CAPEX – 2026-2030 ................................................................................................................. 12
Appendix 5- NWS Quarterly Filing........................................................................................................................ 12
Appendix 6- Grid Needs Filing.............................................................................................................................. 12
Appendix 7- Grid Needs Filing Narrative Document............................................................................................. 12
Appendix 8: DER Deployment Requirement No. 1 and 2...................................................................................... 12
100 Marsh Hill Road, Orange, Connecticut 06477
2
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 3 of 12
I.
Background
In accordance with Docket No. 24-08-08: Non-Wires Solutions (“NWS”) Initiation
Phase Final Decision (“NWS Final Decision”) issued on December 18, 2024, this annual
filing shall meet the requirements for The United Illuminating Company’s (hereinafter “UI”
or “the Company””) Electric Distribution Company (“EDC”) Data Filing, Grid Needs Filing
and Narrative Document, and Quarterly Filing1. UI will file their first quarterly filing of each
year as part of the NWS Annual Filing. Subsequent quarterly filings will be made
separately.
The EDC Data Filing is made up of 47 data requests pertaining to system data,
financial information, and Distributed Energy Resource (“DER”) deployment data. This
information will be provided within the context of this filing, while other larger and
confidential data will be provided in the Appendices of this filing. Please note that some
of the data request responses are confidential and protected via the NWS Final Decision2.
Responses deemed confidential in accordance with the NWS Final Decision will be
withheld from public record.
The Grid Needs Filing is a five (5) year summary of UI’s distribution projects that are
developed annually with the purpose of identifying possible system needs that could be
addressed by an NWS in a more cost-effective manner than traditional “wires” solutions.
The Grid Needs Filing is a forward-looking project list for projects above $500,000.
Projects between $500,000 and $1,000,000 shall be categorized as “Potential NWS
Solicitation Opportunities,” whereas projects over $1,000,000 shall be categorized as
“Likely NWS Solicitation Opportunities.” These projects will also contain a Narrative
Document which will be located in Appendix 7 of the NWS Annual Filing package. These
projects are subject to stakeholder review process and a question-and-answer period.
Approval of these projects is expected by mid-August of each year.
Lastly, the Quarterly Filing is forward-looking and shall contain projects between
$250,000 and $500,000 and includes projects that need to be in-service within 12 months,
and projects deemed as asset condition, safety, or maintenance related. This filing shall
take place on the first Friday of every February, May, August, and November. The
Process Monitor will provide their decision on the EDCs quarterly filings by March 31st of
each year. This decision shall include the Process Monitor’s evaluation of all projects filed
in the prior year's NWS cycle and evaluate if the Company made the proper solution
1 The EDC Data Filing and Grid Needs Filing are due annually on February 8.
NWS Final Decision at 4. The
Quarterly Filing is due on the first Friday of February. NWS Final Decision Order No. 4
2
Exhibit A- Requirement for Annual EDC Data Filing clearly identifies the information by PURA permits to be
filed under confidential treatment.
100 Marsh Hill Road, Orange, Connecticut 06477
3
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 4 of 12
selection or not. If the Company did not select the best solution, the Process Monitor is
expected to elaborate and provide greater insight and analysis on their suggestion.
II.
Company Information
UI is a subsidiary of Avangrid, Inc. that operates approximately 3,600 miles of electric
distribution lines and 138 miles of transmission lines across 17 Connecticut towns in the
greater Bridgeport and New Haven areas totaling 335 square miles (see Figure 1). UI
serves approximately 343,000 customers which is a population of about 780,000.
Figure 1: UI’s Service Territory
III.
EDC Data Filing
a. System Data
1. System Data Requirement No. 1: Annual peak load growth; i.e., the circuit,
substation, town, operating area, or system level for each of the past 5 years and
forecasted load growth for each of the next ten years.
Response: Please see, Appendix 1- System Data Requirement No. 1, 2, 6, 9, and
10 (Confidential) Tab Q1. Please note that this response contains confidential
information and is protected via the NWS Final Decision3. The information provided
reflects the most recently completed 10-year load forecast analysis. The
Company's 10-year load forecast is finalized annually in the middle of the first
quarter. Therefore, due to the February filing deadline, the forecast is provided
through 2034. Also note that peak load growth and forecasts are evaluated and
calculated on the substation level at UI.
3 Id.
100 Marsh Hill Road, Orange, Connecticut 06477
4
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 5 of 12
2. System Data Requirement No. 2: Distribution system circuit capacity, customer
count, historic loading for maximum peak day and minimum day for each circuit.
Load forecast for circuits if available or used by the EDCs. Justification for
exclusion of any omitted circuit load forecasts.
Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and
10 (Confidential) Tab Q2. Please note that this response contains confidential
information and is protected via NWS Final Decision. Forecasts are evaluated and
calculated on the substation level at UI; therefore, load forecast at the circuit level
is not available.
3. System Data Requirement No. 3: In the NWS Final Decision this System Data
Requirement was removed and replaced with “N/A.”
Response: Since System Data Requirement No. 3 states “N/A” and no data
requirement is posed, there is no response available.
4. System Data Requirement No. 4: Discussion of how DER, and at what level DER
is considered, in load forecasting (e.g., distribution feeder, sub-transmission level,
distribution substation, bulk distribution substation level, or system-wide) and any
expected changes in load forecasting methodology.
Response: Please see Appendix 2- 2025 Eversource UI CT DER Forecast
Summary to learn how DERs are included in the overall load forecasting
methodology.
5. System Data Requirement No. 5: Most recent distribution system annual loss
percentage for the prior year (system-wide and by circuit, where available).
Response: As discussed during technical sessions and written comments in
Docket No. 21-05-15RE02 – PURA Investigation into Performance Mechanisms
for a Performance-Based Regulation Framework (“PBR”) discussion, UI does not
have accurate data on system losses at the distribution level with any level of
granularity to be meaningful, and does not currently have the means to accurately
measure or calculate losses at the desired level of granularity.
During the August 26, 2024 Technical Session in the aforementioned Docket, the
Company maintained that it does not consider a distribution-system losses
scorecard to be valid or useful because 1) losses are a small component of overall
distribution power flow (typically 2-5% depending on feeder voltage and load
profile), 2) the Company has limited or no ability to mitigate a large proportion of
the losses (particularly transformer no-load losses), and 3) data and models of
100 Marsh Hill Road, Orange, Connecticut 06477
5
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 6 of 12
sufficient accuracy do not currently exist to disaggregate losses by equipment and
facilitate targeted investment decisions.
6. System Data Requirement No. 6: The maximum hourly coincident monthly load,
in kilo-volt-ampere (kVA), for the distribution system, in the past 12 months, as
measured at the interface between the transmission and distribution system.
Indicate if calculated using SCADA data or interval metered data or other nonbilling metering / monitoring systems.
Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and
10 (Confidential) Tab Q6. Please note that this response contains confidential
information and is protected via NWS Final Decision. Please note that this
response was calculated using hourly load data from SCADA.
7. System Data Requirement No. 7: Total distribution substation transformer
nameplate in kVA.
Response: UI’s total distribution substation transformer nameplate rating is
3,159,000 kVA.
8. System Data Requirement No. 8: Total distribution line transformer nameplate in
kVA.
Response: UI’s distribution line transformer nameplate rating is 4,011,607 kVA.
9. System Data Requirement No. 9: List and map of distribution substation
transformers (which feed only distribution level customers) that are:
a. 90-100% within their normal rating;
b. 80-90% within their normal rating; and
c. Less than 80% of their normal rating.
Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and
10 (Confidential) Tab Q9. Please note that this response contains confidential
information and is protected via NWS Final Decision.
10. System Data Requirement No. 10: A list of all distribution feeders broken down
by distribution feeders that are:
a. 90-100% within their normal rating;
b. 80-90% within their normal rating; and
c. Less than 80% of their normal rating.
Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and
10 (Confidential) Tab Q10. Please note that this response contains confidential
100 Marsh Hill Road, Orange, Connecticut 06477
6
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 7 of 12
information and is protected via NWS Final Decision.
11. System Data Requirement No. 11: Utility-wide System Average Interruption
Duration Index (SAIDI), System Average Interruption Frequency Index (SAIFI),
Customer Average Interruption Duration Index (CAIDI) excluding and including
major storms for the past three years.
Response: Please note that the data provided in this response may be updated
and provided as part of the Transmission and Distribution Reliability Performance
(“TDRP”) filing at the end of March, which will also be filed in Docket No. 26-0808.
Index Category
SAIDI
SAIFI
CAIDI
SAIDI (non-storm)
SAIFI (non-storm)
CAIDI (non-storm)
Value
Minutes
Minutes
Minutes
Minutes
2025
70
0.63
111
35
0.46
76
2024
122
0.79
154
49
0.61
79
2023
56
0.75
75
43
0.58
74
12. System Data Requirement No. 12: Ranking of circuits according to tiers 1, 2, and
3 in the “Worst-Performing Circuits 2.0” program for the past three years outlined
by the Authority in Docket No.17-12-03RE08 Decision. Due to the new
implementation of that program, three years of data may not be available
immediately. Until that information is available for all three years, the EDCs may
supplement missing data with contribution to SAIDI and SAIFI including and
excluding major storms.
Response: Please see Appendix 3- System Data Requirement No. 12 and 14 Tab
Q12. Please note that the data provided in this response may be updated and
provided as part of the TDRP filing at the end of March, which will also be filed in
Docket No. 26-08-08.
13. System Data Requirement No. 13: Number of separately metered electric vehicle
level 2 and level 3 (i.e., direct current fast charging or DCFC) charging systems
added to the Company's distribution system over each of the past three years.
Response: Please refer to the table shown below. UI defines “separately metered
electric vehicle level 2 and level 3 charging systems” as a network of chargers
located behind a customer meter with a separate electric account identified to UI
as EV charging only. Some locations may have both level 2 and level 3 chargers.
In these cases, the highest level of charger is counted (i.e. level 3).
100 Marsh Hill Road, Orange, Connecticut 06477
7
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 8 of 12
2025
Level 2
31
Level 3
1
2024
Level 2
21
Level 3
8
2023
Level 2
12
Level 3
10
14. System Data Requirement No. 14: Forecasted electric vehicle load (MW) at the
substation level for the next three to five years.
Response: Please see Appendix 3- System Data Requirement No. 12 and 14 Tab
Q14.
b. Financial Data
1. Financial Requirement No. 1: Historical distribution system spending for the past
10-years, in each category:
a. Age-Related Replacements and Asset Renewal;
b. System Expansion or Upgrades for Capacity;
c. System Expansion or Upgrades for Reliability and Power Quality;
d. New Customer Projects and New Revenue;
e. Grid Modernization and Pilot Projects;
f. Government Mandates;
g. Metering;
h. Other.
Response: UI provides categorized data as requested in the table below for the
10-year period of 2016 through 2025.
NWS Categories
Age-Related Replacements and Asset Renewal
System Expansion or Upgrades for Capacity
System Expansion or Upgrades for Reliability
and Power Quality
New Customer Projects and New Revenue
Grid Modernization and Pilot Projects
Government Mandates
Metering
Others5
Grand Total
Sum of 2016-2025
$294,691,751
$(1,716,683)4
$ 38,672,625
$96,888,295
$16,737,009
$112,036,683
$65,261,161
$519,375,993
$1,141,946,834
2. Financial Requirement No. 2: Current 5-year Capital Plan.
4 A credit is observed in category System Expansion or Upgrades for Capacity because an initial
distribution/transmission allocation is assumed for study costs. When the study is completed the study costs
are transferred accordingly.
5 Other category is inclusive of all other categories not listed including customer service technology,
compliance and safety, operations, etc.
100 Marsh Hill Road, Orange, Connecticut 06477
8
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 9 of 12
Response: Please reference Appendix 4- CIP-7 CAPEX - 2026-2030.
3. Financial Requirement No. 3: Documentation for planned distribution capital
projects for reliability/capacity/resilience/power quality/interconnection projects
exceeding cost of $250,000 including:
a. Justification/drivers for the project (e.g., see categories listed under
Financial Data No. 1);
b. Timeline for improvement;
c. Estimate of project cost;
d. Project scope and key materials (e.g., transformer, etc.);
e. Identification of project risks (e.g., potential for delays or cost overruns).
Response: Please refer to Appendix 5- NWS Quarterly Filing for projects
between $250,000 through $500,000 and Appendix 6- Grid Needs Filing for
projects beyond $500,000. Please refer to Appendix 7- Grid Needs Filing
Narrative Document.
4. Financial Requirement No. 4: Disclose all Unknown Priority Investments over
$250,000 from prior years, including:
a. Justification/drivers for the project (e.g., see categories listed under
Financial Data No. 1);
b. Timeline for improvement;
c. Estimate of project cost;
d. Project scope and key materials (e.g., transformer, etc.);
e. Identification of project risks (e.g., potential for delays or cost overruns).
Response: Please refer to Appendix 5- NWS Quarterly Filing for projects
between $250,000 through $500,000. For more detailed information, please refer
to Appendix 6: Grid Needs Filing. Please reference Appendix 7- Grid Needs
Filing Narrative Document.
5. Financial Requirement No. 5: Provide a retrospective analysis of NWS
implemented in prior years, including an accounting of their actual costs and the
realized benefits.
Response: This analysis is not provided as no NWS projects have been
implemented to date.
6. Financial Requirement No. 6: Provide the most up-to-date information on the
metrics included in the EM&V plans for each NWS currently in service.
Response: This analysis is not provided as no NWS projects have been
implemented to date.
100 Marsh Hill Road, Orange, Connecticut 06477
9
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 10 of 12
c. DER Deployment
1. DER Deployment Requirement No. 1: Current distributed generation
deployment by type (photovoltaic, hydro, wind, etc.), size ((1) 0 kW to 25 kW, (2)
more than 25 kW to 200 kW, (3) more than 200 kW to 600 kW, (4) more than 600
kW to 2,000 kW, and (5) more than 2,000 kW), and geographic dispersion (as
useful for planning purposes; such as, by planning areas, service/work center
areas, cities, etc.).
Response: Please refer to Appendix 8- DER Deployment Requirement No. 1
and 2 Tab Q1.
2. DER Deployment Requirement No. 2: Projected distributed generation
deployment by type (photovoltaic, hydro, wind, etc.), size (≤100 kilowatt (“kW”),
100kW-1 megawatt (“MW”), >1MW), and geographic dispersion (as useful for
planning purposes; such as, by planning areas, service/work center areas, cities,
etc.) over the next three and five years, respectively.
Response: Please refer to Appendix 8- DER Deployment Requirement No. 1 and
2 Tab Q2. The data provided includes all distributed generation types. The data
was not broken out by distributed generation types because over 95% of the data
is made up of solar, battery, or both. A forecast for other distributed generation
types is not likely to be accurate due to the very small number of installations
historically within the Company’s territory. Geographical dispersion is not provided
as this data was not previously captured.
Due to limitations in historical data, some forecasting may be less representative
of actual trends. The forecast and historical data provided is subject to change
based upon external and unknown factors to UI. Additionally, projections may be
revised as newly acquired information, updated records, or refined assumptions
become available, ensuring alignment with the most accurate and current data.
3. DER Deployment Requirement No. 3: Information on areas with existing or
forecasted transient voltage or frequency issues that may benefit from the
utilization of advanced inverter technology, energy storage systems, or NWS more
broadly; provide information describing experiences where distributed generation
installations have caused operational challenges such as power quality, voltage or
system overload issues, and associated customer complaints.
Response: To avoid power quality issues such as flicker and transient overvoltage
conditions, UI requires Voltage Fluctuation Analysis when a DER interconnection
system impact study is conducted. Voltage Fluctuation Analysis evaluates the
rapid change in voltage caused by output changes at the generating station to
ensure that transient voltage does not cause excessive voltage swings. The
interconnection system impact study also requires a harmonics analysis to
100 Marsh Hill Road, Orange, Connecticut 06477
10
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 11 of 12
evaluate harmonics injection from a generator and inverter to ensure compliance
with Total Harmonic Distortion (“THD”) requirements. All DER inverters must
comply with cumulative overvoltage contributions and harmonics percentages
identified in the Institute of Electrical and Electronics Engineers (“IEEE”) Standard
1547−2018.
UI has not identified any applications that required significant upgrades to the
distribution system. In most cases, using a grounding transformer in compliance
with IEEE 1547−2018 has resolved transient overvoltage voltage issues. UI will
consider alternatives to mitigate transient overvoltage issues on a case-by-case
basis.
UI forecasts that substations with high DER penetrations significantly exporting
onto the transmission system may create transient voltage condition that may be
mitigated by advanced inverter technology, energy storage systems, NWS, or
traditional solutions such as reconductoring or substation transformer
replacement.
4. DER Deployment Requirement No. 4: Provide currently available Hosting
Capacity Maps for all measures of Hosting Capacity.
Response: Please refer to UI's Hosting Capacity Map available online at:
https://www.uinet.com/smartenergy/innovation/distributed_generation/hostingcap
acity
IV.
Quarterly Filing
The quarterly filing is forward looking and shall contain projects between $250,000
and $500,000 and includes projects that need to be in-service within 12 months, and
projects deemed as asset condition, safety, or maintenance related. This filing shall take
place on the first Friday of every February, May, August, and November. The Process
Monitor will provide their decision on the EDCs quarterly filing by March 31st of each year.
The NWS Quarterly Filing can be found in Appendix 5.
V.
Grid Needs Filing
The Grid Needs Filing is a forward-looking project list for projects above $500,000.
Projects between $500,000 and $1,000,000 shall be categorized as “Potential NWS
Solicitation Opportunities” whereas projects over $1,000,000 should be categorized as
“Likely NWS Solicitation Opportunities.” These projects are subject to stakeholder review
process and question and answer period. Approval for these projects is expected by midAugust of each year.
The Grid Needs Filing can be found in Appendix 6, and the narrative document can
be found in Appendix 7.
100 Marsh Hill Road, Orange, Connecticut 06477
11
The United Illuminating Company
Exhibit 1
Docket No. 26-08-08
Page 12 of 12
VI.
Appendices
Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential)
Appendix 2- 2025 Eversource UI CT DER Forecast Summary
Appendix 3- System Data Requirement No. 12 and 14
Appendix 4- CIP-7 CAPEX – 2026-2030
Appendix 5- NWS Quarterly Filing
Appendix 6- Grid Needs Filing
Appendix 7- Grid Needs Filing Narrative Document
Appendix 8: DER Deployment Requirement No. 1 and 2
100 Marsh Hill Road, Orange, Connecticut 06477