A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Compliance Filing, Order No. 1Filed by Avangrid

UI Compliance with Order Nos 1 and 4

Part of

Docket 26-08-08Open

Non-Wires Solutions Process Cycle 2

Type of filing
Compliance filing (Compliance Filing, Order No. 1)
Date filed
February 6, 2026
Filed by
Avangrid
Files
9
As listed on the current system: Compliance Filings, 02/06/2026 [26-08-08] Order No.1 (Annual) & 4 (Quarterly) / Avangrid / UI Compliance with Order Nos 1 and 4

This filing on the current system (opens in a new tab)

Files

Text of 2026-02-06 UI Compliance with Order Nos 1 and 4 #26-08-08.pdf

Extracted from the file · 2,336 characters
February 6, 2026 Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-08, Non-Wires Solutions Process Cycle 2, Compliance with Order Nos. 1 and 4 of the Final Decision in Docket No. 24-08-08 Dear Mr. Gaudiosi: The United Illuminating Company (“UI” or the “Company”) submits its Annual Electric Distribution Company (“EDC”) Data Filing and NWS Annual Grid Needs Filing in accordance with Order No. 1 of the Public Utility Regulatory Authority’s (“PURA”) Final Decision dated December 18, 2024 in Docket No. 24-08-08, Non-Wires Solutions Process Initiation Phase (the “NWS Decision”). The Company also submits its first NWS quarterly filing for 2026 in accordance with Order No. 4 in the NWS Decision. Order No. 1 of the NWS Decision stated: Effective on December 18, [2024], the issuance date of this Decision, the EDCs shall follow the annual NWS Process steps and requirements discussed herein and outlined in the Design Document. Exhibit 1 along with Appendix 1 through 8 contain UI’s Annual EDC Data Filing, Annual Grid Needs Filing, and Narrative Document for the 2026 NWS Process. These documents contain the entirety of information requested in the NWS Decision and the Design Document included in the Final Decision in Docket No. 17-12-03RE07, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – Non-Wires Alternatives, referenced as the “Design Document” in Order No. 1 of the NWS Decision. Order No. 4 of the NWS Decision stated: No later than the first Friday of February, May, August, and November of each year for every NWS cycle, the EDCs shall file as compliance in the applicable annual proceeding (e.g., Docket No. 2X-08-08) the summary document of the quarterly NWS process described in Section III.B.1.c., Suitability Criteria – Cost Threshold. Exhibit 1 and Appendix 5 comprise the February 2026 quarterly NWS process filing described in Order No. 4. The Company will file the next quarterly filing no later than May 1, 2026. -1- I hereby certify service of this filing upon all parties and intervenors of record in this proceeding. Sincerely, James Nitz Manager, Regulatory Services UIL Holdings Corporation As Agent for The United Illuminating Company cc: Service list -2-

Text of 2026-02-06 Final Exhibit 1- UI NWS Annual Filing #26-08-08.pdf

Extracted from the file · 23,825 characters
The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 1 of 12 Non-Wires Solutions Program Annual Filing February 6, 2026 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 2 of 12 Table of Contents I. BACKGROUND ........................................................................................................ 3 II. COMPANY INFORMATION...................................................................................... 4 III. EDC DATA FILING ................................................................................................... 4 A. SYSTEM DATA ........................................................................................................ 4 B. FINANCIAL DATA .................................................................................................... 8 C. DER DEPLOYMENT............................................................................................... 10 IV. QUARTERLY FILING ............................................................................................. 11 V. GRID NEEDS FILING ............................................................................................. 11 VI. APPENDICES......................................................................................................... 12 Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) ........................................................ 12 Appendix 2- 2025 Eversource UI CT DER Forecast Summary ................................................................................ 12 Appendix 3- System Data Requirement No. 12 and 14......................................................................................... 12 Appendix 4- CIP-7 CAPEX – 2026-2030 ................................................................................................................. 12 Appendix 5- NWS Quarterly Filing........................................................................................................................ 12 Appendix 6- Grid Needs Filing.............................................................................................................................. 12 Appendix 7- Grid Needs Filing Narrative Document............................................................................................. 12 Appendix 8: DER Deployment Requirement No. 1 and 2...................................................................................... 12 100 Marsh Hill Road, Orange, Connecticut 06477 2 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 3 of 12 I. Background In accordance with Docket No. 24-08-08: Non-Wires Solutions (“NWS”) Initiation Phase Final Decision (“NWS Final Decision”) issued on December 18, 2024, this annual filing shall meet the requirements for The United Illuminating Company’s (hereinafter “UI” or “the Company””) Electric Distribution Company (“EDC”) Data Filing, Grid Needs Filing and Narrative Document, and Quarterly Filing1. UI will file their first quarterly filing of each year as part of the NWS Annual Filing. Subsequent quarterly filings will be made separately. The EDC Data Filing is made up of 47 data requests pertaining to system data, financial information, and Distributed Energy Resource (“DER”) deployment data. This information will be provided within the context of this filing, while other larger and confidential data will be provided in the Appendices of this filing. Please note that some of the data request responses are confidential and protected via the NWS Final Decision2. Responses deemed confidential in accordance with the NWS Final Decision will be withheld from public record. The Grid Needs Filing is a five (5) year summary of UI’s distribution projects that are developed annually with the purpose of identifying possible system needs that could be addressed by an NWS in a more cost-effective manner than traditional “wires” solutions. The Grid Needs Filing is a forward-looking project list for projects above $500,000. Projects between $500,000 and $1,000,000 shall be categorized as “Potential NWS Solicitation Opportunities,” whereas projects over $1,000,000 shall be categorized as “Likely NWS Solicitation Opportunities.” These projects will also contain a Narrative Document which will be located in Appendix 7 of the NWS Annual Filing package. These projects are subject to stakeholder review process and a question-and-answer period. Approval of these projects is expected by mid-August of each year. Lastly, the Quarterly Filing is forward-looking and shall contain projects between $250,000 and $500,000 and includes projects that need to be in-service within 12 months, and projects deemed as asset condition, safety, or maintenance related. This filing shall take place on the first Friday of every February, May, August, and November. The Process Monitor will provide their decision on the EDCs quarterly filings by March 31st of each year. This decision shall include the Process Monitor’s evaluation of all projects filed in the prior year's NWS cycle and evaluate if the Company made the proper solution 1 The EDC Data Filing and Grid Needs Filing are due annually on February 8. NWS Final Decision at 4. The Quarterly Filing is due on the first Friday of February. NWS Final Decision Order No. 4 2 Exhibit A- Requirement for Annual EDC Data Filing clearly identifies the information by PURA permits to be filed under confidential treatment. 100 Marsh Hill Road, Orange, Connecticut 06477 3 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 4 of 12 selection or not. If the Company did not select the best solution, the Process Monitor is expected to elaborate and provide greater insight and analysis on their suggestion. II. Company Information UI is a subsidiary of Avangrid, Inc. that operates approximately 3,600 miles of electric distribution lines and 138 miles of transmission lines across 17 Connecticut towns in the greater Bridgeport and New Haven areas totaling 335 square miles (see Figure 1). UI serves approximately 343,000 customers which is a population of about 780,000. Figure 1: UI’s Service Territory III. EDC Data Filing a. System Data 1. System Data Requirement No. 1: Annual peak load growth; i.e., the circuit, substation, town, operating area, or system level for each of the past 5 years and forecasted load growth for each of the next ten years. Response: Please see, Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) Tab Q1. Please note that this response contains confidential information and is protected via the NWS Final Decision3. The information provided reflects the most recently completed 10-year load forecast analysis. The Company's 10-year load forecast is finalized annually in the middle of the first quarter. Therefore, due to the February filing deadline, the forecast is provided through 2034. Also note that peak load growth and forecasts are evaluated and calculated on the substation level at UI. 3 Id. 100 Marsh Hill Road, Orange, Connecticut 06477 4 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 5 of 12 2. System Data Requirement No. 2: Distribution system circuit capacity, customer count, historic loading for maximum peak day and minimum day for each circuit. Load forecast for circuits if available or used by the EDCs. Justification for exclusion of any omitted circuit load forecasts. Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) Tab Q2. Please note that this response contains confidential information and is protected via NWS Final Decision. Forecasts are evaluated and calculated on the substation level at UI; therefore, load forecast at the circuit level is not available. 3. System Data Requirement No. 3: In the NWS Final Decision this System Data Requirement was removed and replaced with “N/A.” Response: Since System Data Requirement No. 3 states “N/A” and no data requirement is posed, there is no response available. 4. System Data Requirement No. 4: Discussion of how DER, and at what level DER is considered, in load forecasting (e.g., distribution feeder, sub-transmission level, distribution substation, bulk distribution substation level, or system-wide) and any expected changes in load forecasting methodology. Response: Please see Appendix 2- 2025 Eversource UI CT DER Forecast Summary to learn how DERs are included in the overall load forecasting methodology. 5. System Data Requirement No. 5: Most recent distribution system annual loss percentage for the prior year (system-wide and by circuit, where available). Response: As discussed during technical sessions and written comments in Docket No. 21-05-15RE02 – PURA Investigation into Performance Mechanisms for a Performance-Based Regulation Framework (“PBR”) discussion, UI does not have accurate data on system losses at the distribution level with any level of granularity to be meaningful, and does not currently have the means to accurately measure or calculate losses at the desired level of granularity. During the August 26, 2024 Technical Session in the aforementioned Docket, the Company maintained that it does not consider a distribution-system losses scorecard to be valid or useful because 1) losses are a small component of overall distribution power flow (typically 2-5% depending on feeder voltage and load profile), 2) the Company has limited or no ability to mitigate a large proportion of the losses (particularly transformer no-load losses), and 3) data and models of 100 Marsh Hill Road, Orange, Connecticut 06477 5 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 6 of 12 sufficient accuracy do not currently exist to disaggregate losses by equipment and facilitate targeted investment decisions. 6. System Data Requirement No. 6: The maximum hourly coincident monthly load, in kilo-volt-ampere (kVA), for the distribution system, in the past 12 months, as measured at the interface between the transmission and distribution system. Indicate if calculated using SCADA data or interval metered data or other nonbilling metering / monitoring systems. Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) Tab Q6. Please note that this response contains confidential information and is protected via NWS Final Decision. Please note that this response was calculated using hourly load data from SCADA. 7. System Data Requirement No. 7: Total distribution substation transformer nameplate in kVA. Response: UI’s total distribution substation transformer nameplate rating is 3,159,000 kVA. 8. System Data Requirement No. 8: Total distribution line transformer nameplate in kVA. Response: UI’s distribution line transformer nameplate rating is 4,011,607 kVA. 9. System Data Requirement No. 9: List and map of distribution substation transformers (which feed only distribution level customers) that are: a. 90-100% within their normal rating; b. 80-90% within their normal rating; and c. Less than 80% of their normal rating. Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) Tab Q9. Please note that this response contains confidential information and is protected via NWS Final Decision. 10. System Data Requirement No. 10: A list of all distribution feeders broken down by distribution feeders that are: a. 90-100% within their normal rating; b. 80-90% within their normal rating; and c. Less than 80% of their normal rating. Response: Please see Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) Tab Q10. Please note that this response contains confidential 100 Marsh Hill Road, Orange, Connecticut 06477 6 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 7 of 12 information and is protected via NWS Final Decision. 11. System Data Requirement No. 11: Utility-wide System Average Interruption Duration Index (SAIDI), System Average Interruption Frequency Index (SAIFI), Customer Average Interruption Duration Index (CAIDI) excluding and including major storms for the past three years. Response: Please note that the data provided in this response may be updated and provided as part of the Transmission and Distribution Reliability Performance (“TDRP”) filing at the end of March, which will also be filed in Docket No. 26-0808. Index Category SAIDI SAIFI CAIDI SAIDI (non-storm) SAIFI (non-storm) CAIDI (non-storm) Value Minutes Minutes Minutes Minutes 2025 70 0.63 111 35 0.46 76 2024 122 0.79 154 49 0.61 79 2023 56 0.75 75 43 0.58 74 12. System Data Requirement No. 12: Ranking of circuits according to tiers 1, 2, and 3 in the “Worst-Performing Circuits 2.0” program for the past three years outlined by the Authority in Docket No.17-12-03RE08 Decision. Due to the new implementation of that program, three years of data may not be available immediately. Until that information is available for all three years, the EDCs may supplement missing data with contribution to SAIDI and SAIFI including and excluding major storms. Response: Please see Appendix 3- System Data Requirement No. 12 and 14 Tab Q12. Please note that the data provided in this response may be updated and provided as part of the TDRP filing at the end of March, which will also be filed in Docket No. 26-08-08. 13. System Data Requirement No. 13: Number of separately metered electric vehicle level 2 and level 3 (i.e., direct current fast charging or DCFC) charging systems added to the Company's distribution system over each of the past three years. Response: Please refer to the table shown below. UI defines “separately metered electric vehicle level 2 and level 3 charging systems” as a network of chargers located behind a customer meter with a separate electric account identified to UI as EV charging only. Some locations may have both level 2 and level 3 chargers. In these cases, the highest level of charger is counted (i.e. level 3). 100 Marsh Hill Road, Orange, Connecticut 06477 7 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 8 of 12 2025 Level 2 31 Level 3 1 2024 Level 2 21 Level 3 8 2023 Level 2 12 Level 3 10 14. System Data Requirement No. 14: Forecasted electric vehicle load (MW) at the substation level for the next three to five years. Response: Please see Appendix 3- System Data Requirement No. 12 and 14 Tab Q14. b. Financial Data 1. Financial Requirement No. 1: Historical distribution system spending for the past 10-years, in each category: a. Age-Related Replacements and Asset Renewal; b. System Expansion or Upgrades for Capacity; c. System Expansion or Upgrades for Reliability and Power Quality; d. New Customer Projects and New Revenue; e. Grid Modernization and Pilot Projects; f. Government Mandates; g. Metering; h. Other. Response: UI provides categorized data as requested in the table below for the 10-year period of 2016 through 2025. NWS Categories Age-Related Replacements and Asset Renewal System Expansion or Upgrades for Capacity System Expansion or Upgrades for Reliability and Power Quality New Customer Projects and New Revenue Grid Modernization and Pilot Projects Government Mandates Metering Others5 Grand Total Sum of 2016-2025 $294,691,751 $(1,716,683)4 $ 38,672,625 $96,888,295 $16,737,009 $112,036,683 $65,261,161 $519,375,993 $1,141,946,834 2. Financial Requirement No. 2: Current 5-year Capital Plan. 4 A credit is observed in category System Expansion or Upgrades for Capacity because an initial distribution/transmission allocation is assumed for study costs. When the study is completed the study costs are transferred accordingly. 5 Other category is inclusive of all other categories not listed including customer service technology, compliance and safety, operations, etc. 100 Marsh Hill Road, Orange, Connecticut 06477 8 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 9 of 12 Response: Please reference Appendix 4- CIP-7 CAPEX - 2026-2030. 3. Financial Requirement No. 3: Documentation for planned distribution capital projects for reliability/capacity/resilience/power quality/interconnection projects exceeding cost of $250,000 including: a. Justification/drivers for the project (e.g., see categories listed under Financial Data No. 1); b. Timeline for improvement; c. Estimate of project cost; d. Project scope and key materials (e.g., transformer, etc.); e. Identification of project risks (e.g., potential for delays or cost overruns). Response: Please refer to Appendix 5- NWS Quarterly Filing for projects between $250,000 through $500,000 and Appendix 6- Grid Needs Filing for projects beyond $500,000. Please refer to Appendix 7- Grid Needs Filing Narrative Document. 4. Financial Requirement No. 4: Disclose all Unknown Priority Investments over $250,000 from prior years, including: a. Justification/drivers for the project (e.g., see categories listed under Financial Data No. 1); b. Timeline for improvement; c. Estimate of project cost; d. Project scope and key materials (e.g., transformer, etc.); e. Identification of project risks (e.g., potential for delays or cost overruns). Response: Please refer to Appendix 5- NWS Quarterly Filing for projects between $250,000 through $500,000. For more detailed information, please refer to Appendix 6: Grid Needs Filing. Please reference Appendix 7- Grid Needs Filing Narrative Document. 5. Financial Requirement No. 5: Provide a retrospective analysis of NWS implemented in prior years, including an accounting of their actual costs and the realized benefits. Response: This analysis is not provided as no NWS projects have been implemented to date. 6. Financial Requirement No. 6: Provide the most up-to-date information on the metrics included in the EM&V plans for each NWS currently in service. Response: This analysis is not provided as no NWS projects have been implemented to date. 100 Marsh Hill Road, Orange, Connecticut 06477 9 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 10 of 12 c. DER Deployment 1. DER Deployment Requirement No. 1: Current distributed generation deployment by type (photovoltaic, hydro, wind, etc.), size ((1) 0 kW to 25 kW, (2) more than 25 kW to 200 kW, (3) more than 200 kW to 600 kW, (4) more than 600 kW to 2,000 kW, and (5) more than 2,000 kW), and geographic dispersion (as useful for planning purposes; such as, by planning areas, service/work center areas, cities, etc.). Response: Please refer to Appendix 8- DER Deployment Requirement No. 1 and 2 Tab Q1. 2. DER Deployment Requirement No. 2: Projected distributed generation deployment by type (photovoltaic, hydro, wind, etc.), size (≤100 kilowatt (“kW”), 100kW-1 megawatt (“MW”), >1MW), and geographic dispersion (as useful for planning purposes; such as, by planning areas, service/work center areas, cities, etc.) over the next three and five years, respectively. Response: Please refer to Appendix 8- DER Deployment Requirement No. 1 and 2 Tab Q2. The data provided includes all distributed generation types. The data was not broken out by distributed generation types because over 95% of the data is made up of solar, battery, or both. A forecast for other distributed generation types is not likely to be accurate due to the very small number of installations historically within the Company’s territory. Geographical dispersion is not provided as this data was not previously captured. Due to limitations in historical data, some forecasting may be less representative of actual trends. The forecast and historical data provided is subject to change based upon external and unknown factors to UI. Additionally, projections may be revised as newly acquired information, updated records, or refined assumptions become available, ensuring alignment with the most accurate and current data. 3. DER Deployment Requirement No. 3: Information on areas with existing or forecasted transient voltage or frequency issues that may benefit from the utilization of advanced inverter technology, energy storage systems, or NWS more broadly; provide information describing experiences where distributed generation installations have caused operational challenges such as power quality, voltage or system overload issues, and associated customer complaints. Response: To avoid power quality issues such as flicker and transient overvoltage conditions, UI requires Voltage Fluctuation Analysis when a DER interconnection system impact study is conducted. Voltage Fluctuation Analysis evaluates the rapid change in voltage caused by output changes at the generating station to ensure that transient voltage does not cause excessive voltage swings. The interconnection system impact study also requires a harmonics analysis to 100 Marsh Hill Road, Orange, Connecticut 06477 10 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 11 of 12 evaluate harmonics injection from a generator and inverter to ensure compliance with Total Harmonic Distortion (“THD”) requirements. All DER inverters must comply with cumulative overvoltage contributions and harmonics percentages identified in the Institute of Electrical and Electronics Engineers (“IEEE”) Standard 1547−2018. UI has not identified any applications that required significant upgrades to the distribution system. In most cases, using a grounding transformer in compliance with IEEE 1547−2018 has resolved transient overvoltage voltage issues. UI will consider alternatives to mitigate transient overvoltage issues on a case-by-case basis. UI forecasts that substations with high DER penetrations significantly exporting onto the transmission system may create transient voltage condition that may be mitigated by advanced inverter technology, energy storage systems, NWS, or traditional solutions such as reconductoring or substation transformer replacement. 4. DER Deployment Requirement No. 4: Provide currently available Hosting Capacity Maps for all measures of Hosting Capacity. Response: Please refer to UI's Hosting Capacity Map available online at: https://www.uinet.com/smartenergy/innovation/distributed_generation/hostingcap acity IV. Quarterly Filing The quarterly filing is forward looking and shall contain projects between $250,000 and $500,000 and includes projects that need to be in-service within 12 months, and projects deemed as asset condition, safety, or maintenance related. This filing shall take place on the first Friday of every February, May, August, and November. The Process Monitor will provide their decision on the EDCs quarterly filing by March 31st of each year. The NWS Quarterly Filing can be found in Appendix 5. V. Grid Needs Filing The Grid Needs Filing is a forward-looking project list for projects above $500,000. Projects between $500,000 and $1,000,000 shall be categorized as “Potential NWS Solicitation Opportunities” whereas projects over $1,000,000 should be categorized as “Likely NWS Solicitation Opportunities.” These projects are subject to stakeholder review process and question and answer period. Approval for these projects is expected by midAugust of each year. The Grid Needs Filing can be found in Appendix 6, and the narrative document can be found in Appendix 7. 100 Marsh Hill Road, Orange, Connecticut 06477 11 The United Illuminating Company Exhibit 1 Docket No. 26-08-08 Page 12 of 12 VI. Appendices Appendix 1- System Data Requirement No. 1, 2, 6, 9, and 10 (Confidential) Appendix 2- 2025 Eversource UI CT DER Forecast Summary Appendix 3- System Data Requirement No. 12 and 14 Appendix 4- CIP-7 CAPEX – 2026-2030 Appendix 5- NWS Quarterly Filing Appendix 6- Grid Needs Filing Appendix 7- Grid Needs Filing Narrative Document Appendix 8: DER Deployment Requirement No. 1 and 2 100 Marsh Hill Road, Orange, Connecticut 06477 12

Text of 2026-02-06 Appendix 2- 2025 Eversource UI CT DER Forecast Summary #26-08-08.pdf

Extracted from the file · 2,478 characters
The United Illuminating Company Docket No. 26-08-08 Appendix 2- 2025 Eversource UI CT DER Forecast Summary Forecast Framework Connecticut January 5, 2024 1 of 2 The United Illuminating Company Docket No. 26-08-08 Appendix 2- 2025 Eversource UI CT DER Forecast Summary Forecast Methodology Summary Eversource and UI apply an advanced forecasting methodology to ensure accurate load projections, maintaining system reliability and guiding infrastructure investments. 1) Forecast Components a) Baseload: Underlying customer demand before DER impacts and demand side modifiers. Uses historical demand, weather, and economic indicators at 50th and 90th percentile scenarios. b) DER Adjustment: Integrates DER and demand modifier impacts at localized levels (e.g., feeders) while following overall adoption trends at system level (includes policy impacts). c) Load and Generation Profiles: technology specific data to model DER behavior e.g. PV generation, EV charging, etc. 2) Forecast Granularity Level: a) System Level: Policy driven trends for state and regional DER adoption macro-economic indicators b) Bulk Distribution Substation Level: Informed by system level DER trends, adoption spatially allocated based on lower-level data (e.g. customer propensity factors, census tract). Aggregated to station level. c) Distribution Feeder Level: Localized DER impacts, e.g. in-queue solar projects. 3) DERs and Demand Side Modifiers Evaluated: a) Solar (PV): Modeled using historical generation profiles, weather data, and installed capacity trends. b) Energy Storage: Adoption trends modeled, peak shaving impact not explicitly considered in forecast as it is a solution. c) Electric Vehicles: Forecasted using adoption scenarios, traffic patterns and charging behavior. d) Demand Response: not explicitly considered in forecast as it is a solution. 4) Future Improvements a) Increased Granularity: Eversource and UI are planning to incorporate real-time data from smart meters. As DER adoption grows, forecasts will require finer temporal and spatial resolution, b) Scenario Analysis: For long term demand assessment, there are various scenarios for DER growth under different policy impacts, technology adoption rates, and grid modernization initiatives. Data inputs are updated for each annual forecast c) Dynamic Load Shapes: Customer behaviors and technology use is evolving and as more data becomes available it necessitated continuous updates to load profiles. 2 of 2

Text of 2026-02-06 Appendix 3- System Data Requirement No. 12 and 14 #26-08-08.xlsx

Extracted from the file · 15,542 characters
[Sheet: Q12] System Data Requirement No. 12: | Ranking of circuits according to tiers 1, 2, and 3 in the “Worst-Performing Circuits 2.0” program for the past three years outlined by the Authority in the 17-12-03RE08 Decision. Due to the new implementation of that program, three years of data may not be available immediately. Until that information is available for all three years, the EDCs may supplement missing data with contribution to SAIDI and SAIFI including and excluding major storms. 2023 | 2024 | 2025 | 2022 | 2023 | 2024 | 2025 Tier | Circuit | Total | Tier | Circuit | Total | Tier | Circuit | Total | Tier | Circuits | Tier | Circuits | Tier | Circuits | Tier | Circuits Tier 1 | 2683 | 1 | Tier 1 | 512 | 1 | Tier 1 | 512 | 1 | Tier 1 | 15 | Tier 1 | 17 | Tier 1 | 12 | Tier 1 | 12 Tier 1 | 2684 | 1 | Tier 1 | 2688 | 1 | Tier 1 | 510 | 1 | Tier 2 | 97 | Tier 2 | 104 | Tier 2 | 102 | Tier 2 | 96 Tier 1 | 2685 | 1 | Tier 1 | 2673 | 1 | Tier 1 | 3466 | 1 | Tier 3 | 121 | Tier 3 | 112 | Tier 3 | 122 | Tier 3 | 121 Tier 1 | 2686 | 1 | Tier 1 | 3466 | 1 | Tier 1 | 506 | 1 Tier 1 | 2690 | 1 | Tier 1 | 2682 | 1 | Tier 1 | 1694 | 1 Tier 1 | 2664 | 1 | Tier 1 | 2550 | 1 | Tier 1 | 2684 | 1 Tier 1 | 2669 | 1 | Tier 1 | 2617 | 1 | Tier 1 | 2800 | 1 Tier 1 | 1906 | 1 | Tier 1 | 2740 | 1 | Tier 1 | 2617 | 1 Tier 1 | 1605 | 1 | Tier 1 | 1608 | 1 | Tier 1 | 2803 | 1 Tier 1 | 1686 | 1 | Tier 1 | 2503 | 1 | Tier 1 | 514 | 1 Tier 1 | 1688 | 1 | Tier 1 | 3638 | 1 | Tier 1 | 2615 | 1 Tier 1 | 2641 | 1 | Tier 1 | 3460 | 1 | Tier 1 | 2801 | 1 Tier 1 | 550 | 1 | Tier 2 | 273 | 1 | Tier 2 | 2685 | 1 Tier 1 | 1548 | 1 | Tier 2 | 2625 | 1 | Tier 2 | 1645 | 1 Tier 1 | 1647 | 1 | Tier 2 | 576 | 1 | Tier 2 | 2805 | 1 Tier 1 | 2801 | 1 | Tier 2 | 2502 | 1 | Tier 2 | 1686 | 1 Tier 1 | 3659 | 1 | Tier 2 | 1521 | 1 | Tier 2 | 1646 | 1 Tier 2 | 2536 | 1 | Tier 2 | 2684 | 1 | Tier 2 | 2625 | 1 Tier 2 | 512 | 1 | Tier 2 | 2519 | 1 | Tier 2 | 1430 | 1 Tier 2 | 2633 | 1 | Tier 2 | 2803 | 1 | Tier 2 | 1695 | 1 Tier 2 | 2617 | 1 | Tier 2 | 1605 | 1 | Tier 2 | 627 | 1 Tier 2 | 2550 | 1 | Tier 2 | 2805 | 1 | Tier 2 | 2807 | 1 Tier 2 | 1862 | 1 | Tier 2 | 2806 | 1 | Tier 2 | 2806 | 1 Tier 2 | 2630 | 1 | Tier 2 | 2669 | 1 | Tier 2 | 1531 | 1 Tier 2 | 2541 | 1 | Tier 2 | 2801 | 1 | Tier 2 | 646 | 1 Tier 2 | 1852 | 1 | Tier 2 | 551 | 1 | Tier 2 | 551 | 1 Tier 2 | 2519 | 1 | Tier 2 | 2802 | 1 | Tier 2 | 1440 | 1 Tier 2 | 1608 | 1 | Tier 2 | 2548 | 1 | Tier 2 | 2673 | 1 Tier 2 | 2642 | 1 | Tier 2 | 2686 | 1 | Tier 2 | 576 | 1 Tier 2 | 2615 | 1 | Tier 2 | 2626 | 1 | Tier 2 | 2644 | 1 Tier 2 | 2688 | 1 | Tier 2 | 3540 | 1 | Tier 2 | 545 | 1 Tier 2 | 506 | 1 | Tier 2 | 2685 | 1 | Tier 2 | 1706 | 1 Tier 2 | 1692 | 1 | Tier 2 | 510 | 1 | Tier 2 | 1540 | 1 Tier 2 | 2538 | 1 | Tier 2 | 2668 | 1 | Tier 2 | 2686 | 1 Tier 2 | 3542 | 1 | Tier 2 | 2807 | 1 | Tier 2 | 2536 | 1 Tier 2 | 1545 | 1 | Tier 2 | 1692 | 1 | Tier 2 | 1709 | 1 Tier 2 | 1540 | 1 | Tier 2 | 3673 | 1 | Tier 2 | 500 | 1 Tier 2 | 1441 | 1 | Tier 2 | 2804 | 1 | Tier 2 | 1530 | 1 Tier 2 | 1750 | 1 | Tier 2 | 3648 | 1 | Tier 2 | 2626 | 1 Tier 2 | 1648 | 1 | Tier 2 | 506 | 1 | Tier 2 | 2540 | 1 Tier 2 | 2546 | 1 | Tier 2 | 2662 | 1 | Tier 2 | 1648 | 1 Tier 2 | 501 | 1 | Tier 2 | 1901 | 1 | Tier 2 | 3540 | 1 Tier 2 | 2626 | 1 | Tier 2 | 1709 | 1 | Tier 2 | 2542 | 1 Tier 2 | 2624 | 1 | Tier 2 | 2536 | 1 | Tier 2 | 1431 | 1 Tier 2 | 3652 | 1 | Tier 2 | 1531 | 1 | Tier 2 | 516 | 1 Tier 2 | 626 | 1 | Tier 2 | 1862 | 1 | Tier 2 | 1606 | 1 Tier 2 | 633 | 1 | Tier 2 | 1708 | 1 | Tier 2 | 2550 | 1 Tier 2 | 2667 | 1 | Tier 2 | 1695 | 1 | Tier 2 | 2515 | 1 Tier 2 | 1694 | 1 | Tier 2 | 545 | 1 | Tier 2 | 1688 | 1 Tier 2 | 1531 | 1 | Tier 2 | 1604 | 1 | Tier 2 | 1910 | 1 Tier 2 | 2540 | 1 | Tier 2 | 2635 | 1 | Tier 2 | 2669 | 1 Tier 2 | 2516 | 1 | Tier 2 | 1691 | 1 | Tier 2 | 1708 | 1 Tier 2 | 1640 | 1 | Tier 2 | 2661 | 1 | Tier 2 | 3654 | 1 Tier 2 | 2507 | 1 | Tier 2 | 2644 | 1 | Tier 2 | 624 | 1 Tier 2 | 3676 | 1 | Tier 2 | 1689 | 1 | Tier 2 | 2740 | 1 Tier 2 | 2666 | 1 | Tier 2 | 1541 | 1 | Tier 2 | 1603 | 1 Tier 2 | 1606 | 1 | Tier 2 | 1707 | 1 | Tier 2 | 1862 | 1 Tier 2 | 2668 | 1 | Tier 2 | 1907 | 1 | Tier 2 | 1649 | 1 Tier 2 | 1901 | 1 | Tier 2 | 3659 | 1 | Tier 2 | 1532 | 1 Tier 2 | 2643 | 1 | Tier 2 | 2547 | 1 | Tier 2 | 1711 | 1 Tier 2 | 593 | 1 | Tier 2 | 1526 | 1 | Tier 2 | 2503 | 1 Tier 2 | 1685 | 1 | Tier 2 | 1540 | 1 | Tier 2 | 550 | 1 Tier 2 | 2676 | 1 | Tier 2 | 2687 | 1 | Tier 2 | 3638 | 1 Tier 2 | 3674 | 1 | Tier 2 | 1532 | 1 | Tier 2 | 2688 | 1 Tier 2 | 3653 | 1 | Tier 2 | 1643 | 1 | Tier 2 | 2639 | 1 Tier 2 | 1701 | 1 | Tier 2 | 1542 | 1 | Tier 2 | 1520 | 1 Tier 2 | 2805 | 1 | Tier 2 | 1687 | 1 | Tier 2 | 1608 | 1 Tier 2 | 3650 | 1 | Tier 2 | 1704 | 1 | Tier 2 | 1697 | 1 Tier 2 | 530 | 1 | Tier 2 | 501 | 1 | Tier 2 | 1759 | 1 Tier 2 | 3460 | 1 | Tier 2 | 1759 | 1 | Tier 2 | 3636 | 1 Tier 2 | 3642 | 1 | Tier 2 | 514 | 1 | Tier 2 | 2548 | 1 Tier 2 | 3675 | 1 | Tier 2 | 1440 | 1 | Tier 2 | 2502 | 1 Tier 2 | 2619 | 1 | Tier 2 | 1646 | 1 | Tier 2 | 3659 | 1 Tier 2 | 621 | 1 | Tier 2 | 1530 | 1 | Tier 2 | 2543 | 1 Tier 2 | 1705 | 1 | Tier 2 | 1603 | 1 | Tier 2 | 3460 | 1 Tier 2 | 2673 | 1 | Tier 2 | 3653 | 1 | Tier 2 | 1541 | 1 Tier 2 | 592 | 1 | Tier 2 | 1906 | 1 | Tier 2 | 1906 | 1 Tier 2 | 3632 | 1 | Tier 2 | 2639 | 1 | Tier 2 | 3677 | 1 Tier 2 | 2515 | 1 | Tier 2 | 2800 | 1 | Tier 2 | 2662 | 1 Tier 2 | 3658 | 1 | Tier 2 | 2624 | 1 | Tier 2 | 2624 | 1 Tier 2 | 3543 | 1 | Tier 2 | 621 | 1 | Tier 2 | 2633 | 1 Tier 2 | 1752 | 1 | Tier 2 | 1606 | 1 | Tier 2 | 1545 | 1 Tier 2 | 1431 | 1 | Tier 2 | 2500 | 1 | Tier 2 | 3637 | 1 Tier 2 | 3637 | 1 | Tier 2 | 1545 | 1 | Tier 2 | 1433 | 1 Tier 2 | 1542 | 1 | Tier 2 | 1433 | 1 | Tier 2 | 2661 | 1 Tier 2 | 2737 | 1 | Tier 2 | 1548 | 1 | Tier 2 | 2689 | 1 Tier 2 | 2660 | 1 | Tier 2 | 1430 | 1 | Tier 2 | 2682 | 1 Tier 2 | 644 | 1 | Tier 2 | 2615 | 1 | Tier 2 | 1702 | 1 Tier 2 | 1543 | 1 | Tier 2 | 2622 | 1 | Tier 2 | 504 | 1 Tier 2 | 3648 | 1 | Tier 2 | 1753 | 1 | Tier 2 | 1548 | 1 Tier 2 | 1646 | 1 | Tier 2 | 2515 | 1 | Tier 2 | 1642 | 1 Tier 2 | 3545 | 1 | Tier 2 | 3677 | 1 | Tier 2 | 2668 | 1 Tier 2 | 1689 | 1 | Tier 2 | 2689 | 1 | Tier 2 | 1707 | 1 Tier 2 | 1690 | 1 | Tier 2 | 3642 | 1 | Tier 2 | 2663 | 1 Tier 2 | 2731 | 1 | Tier 2 | 1702 | 1 | Tier 2 | 1605 | 1 Tier 2 | 2740 | 1 | Tier 2 | 624 | 1 | Tier 2 | 630 | 1 Tier 2 | 514 | 1 | Tier 2 | 2542 | 1 | Tier 2 | 2675 | 1 Tier 2 | 2503 | 1 | Tier 2 | 1694 | 1 | Tier 2 | 3543 | 1 Tier 2 | 2689 | 1 | Tier 2 | 626 | 1 | Tier 2 | 2660 | 1 Tier 2 | 2662 | 1 | Tier 2 | 1690 | 1 | Tier 2 | 623 | 1 Tier 2 | 3649 | 1 | Tier 2 | 3636 | 1 | Tier 2 | 2737 | 1 Tier 2 | 2622 | 1 | Tier 2 | 2623 | 1 | Tier 2 | 2683 | 1 Tier 2 | 3679 | 1 | Tier 2 | 3637 | 1 | Tier 2 | 625 | 1 Tier 2 | 516 | 1 | Tier 2 | 1908 | 1 | Tier 2 | 2676 | 1 Tier 2 | 802 | 1 | Tier 2 | 3633 | 1 | Tier 2 | 3676 | 1 Tier 2 | 1544 | 1 | Tier 2 | 2734 | 1 | Tier 2 | 622 | 1 Tier 2 | 3671 | 1 | Tier 2 | 2616 | 1 | Tier 2 | 3673 | 1 Tier 2 | 510 | 1 | Tier 2 | 500 | 1 | Tier 2 | 2622 | 1 Tier 2 | 3677 | 1 | Tier 2 | 2619 | 1 | Tier 3 | 1543 | 1 Tier 2 | 504 | 1 | Tier 2 | 2627 | 1 | Tier 3 | 1908 | 1 Tier 2 | 513 | 1 | Tier 2 | 2618 | 1 | Tier 3 | 1703 | 1 Tier 2 | 500 | 1 | Tier 2 | 1642 | 1 | Tier 3 | 1690 | 1 Tier 2 | 3633 | 1 | Tier 2 | 3679 | 1 | Tier 3 | 1441 | 1 Tier 2 | 3672 | 1 | Tier 2 | 627 | 1 | Tier 3 | 1859 | 1 Tier 2 | 3673 | 1 | Tier 3 | 1685 | 1 | Tier 3 | 1750 | 1 Tier 2 | 503 | 1 | Tier 3 | 1750 | 1 | Tier 3 | 3631 | 1 Tier 2 | 505 | 1 | Tier 3 | 3675 | 1 | Tier 3 | 1692 | 1 Tier 2 | 630 | 1 | Tier 3 | 1431 | 1 | Tier 3 | 2630 | 1 Tier 2 | 1711 | 1 | Tier 3 | 2660 | 1 | Tier 3 | 1881 | 1 Tier 2 | 3635 | 1 | Tier 3 | 1706 | 1 | Tier 3 | 1684 | 1 Tier 2 | 2661 | 1 | Tier 3 | 2683 | 1 | Tier 3 | 1544 | 1 Tier 3 | 2682 | 1 | Tier 3 | 623 | 1 | Tier 3 | 2690 | 1 Tier 3 | 2637 | 1 | Tier 3 | 1543 | 1 | Tier 3 | 1890 | 1 Tier 3 | 1917 | 1 | Tier 3 | 1697 | 1 | Tier 3 | 501 | 1 Tier 3 | 1704 | 1 | Tier 3 | 1859 | 1 | Tier 3 | 3653 | 1 Tier 3 | 624 | 1 | Tier 3 | 2546 | 1 | Tier 3 | 592 | 1 Tier 3 | 1863 | 1 | Tier 3 | 2540 | 1 | Tier 3 | 2546 | 1 Tier 3 | 3631 | 1 | Tier 3 | 504 | 1 | Tier 3 | 1696 | 1 Tier 3 | 2535 | 1 | Tier 3 | 2737 | 1 | Tier 3 | 3648 | 1 Tier 3 | 1907 | 1 | Tier 3 | 1648 | 1 | Tier 3 | 2538 | 1 Tier 3 | 2803 | 1 | Tier 3 | 1756 | 1 | Tier 3 | 1756 | 1 Tier 3 | 1696 | 1 | Tier 3 | 1852 | 1 | Tier 3 | 647 | 1 Tier 3 | 2670 | 1 | Tier 3 | 2516 | 1 | Tier 3 | 1753 | 1 Tier 3 | 1687 | 1 | Tier 3 | 275 | 1 | Tier 3 | 3679 | 1 Tier 3 | 3638 | 1 | Tier 3 | 3657 | 1 | Tier 3 | 3671 | 1 Tier 3 | 1530 | 1 | Tier 3 | 633 | 1 | Tier 3 | 2672 | 1 Tier 3 | 2543 | 1 | Tier 3 | 1693 | 1 | Tier 3 | 3635 | 1 Tier 3 | 3466 | 1 | Tier 3 | 2690 | 1 | Tier 3 | 2637 | 1 Tier 3 | 1433 | 1 | Tier 3 | 1686 | 1 | Tier 3 | 1912 | 1 Tier 3 | 2616 | 1 | Tier 3 | 2733 | 1 | Tier 3 | 631 | 1 Tier 3 | 2687 | 1 | Tier 3 | 3660 | 1 | Tier 3 | 633 | 1 Tier 3 | 646 | 1 | Tier 3 | 592 | 1 | Tier 3 | 1643 | 1 Tier 3 | 1753 | 1 | Tier 3 | 530 | 1 | Tier 3 | 3652 | 1 Tier 3 | 3660 | 1 | Tier 3 | 1703 | 1 | Tier 3 | 273 | 1 Tier 3 | 2542 | 1 | Tier 3 | 2535 | 1 | Tier 3 | 3675 | 1 Tier 3 | 2802 | 1 | Tier 3 | 2730 | 1 | Tier 3 | 3660 | 1 Tier 3 | 1709 | 1 | Tier 3 | 1649 | 1 | Tier 3 | 593 | 1 Tier 3 | 3636 | 1 | Tier 3 | 2665 | 1 | Tier 3 | 2802 | 1 Tier 3 | 1602 | 1 | Tier 3 | 646 | 1 | Tier 3 | 2687 | 1 Tier 3 | 3654 | 1 | Tier 3 | 3545 | 1 | Tier 3 | 1917 | 1 Tier 3 | 1881 | 1 | Tier 3 | 3658 | 1 | Tier 3 | 2636 | 1 Tier 3 | 545 | 1 | Tier 3 | 277 | 1 | Tier 3 | 1705 | 1 Tier 3 | 2672 | 1 | Tier 3 | 1880 | 1 | Tier 3 | 1913 | 1 Tier 3 | 1908 | 1 | Tier 3 | 3543 | 1 | Tier 3 | 1689 | 1 Tier 3 | 1708 | 1 | Tier 3 | 622 | 1 | Tier 3 | 2734 | 1 Tier 3 | 2730 | 1 | Tier 3 | 632 | 1 | Tier 3 | 3674 | 1 Tier 3 | 1604 | 1 | Tier 3 | 3631 | 1 | Tier 3 | 2638 | 1 Tier 3 | 812 | 1 | Tier 3 | 1441 | 1 | Tier 3 | 3545 | 1 Tier 3 | 1759 | 1 | Tier 3 | 3655 | 1 | Tier 3 | 2664 | 1 Tier 3 | 2663 | 1 | Tier 3 | 1752 | 1 | Tier 3 | 1860 | 1 Tier 3 | 1754 | 1 | Tier 3 | 1602 | 1 | Tier 3 | 621 | 1 Tier 3 | 1649 | 1 | Tier 3 | 1645 | 1 | Tier 3 | 2547 | 1 Tier 3 | 1892 | 1 | Tier 3 | 1684 | 1 | Tier 3 | 3633 | 1 Tier 3 | 1440 | 1 | Tier 3 | 1701 | 1 | Tier 3 | 1685 | 1 Tier 3 | 2500 | 1 | Tier 3 | 2640 | 1 | Tier 3 | 2535 | 1 Tier 3 | 551 | 1 | Tier 3 | 2638 | 1 | Tier 3 | 1863 | 1 Tier 3 | 2675 | 1 | Tier 3 | 2672 | 1 | Tier 3 | 2642 | 1 Tier 3 | 2638 | 1 | Tier 3 | 1647 | 1 | Tier 3 | 1647 | 1 Tier 3 | 1880 | 1 | Tier 3 | 1902 | 1 | Tier 3 | 2741 | 1 Tier 3 | 2665 | 1 | Tier 3 | 625 | 1 | Tier 3 | 2545 | 1 Tier 3 | 2547 | 1 | Tier 3 | 3635 | 1 | Tier 3 | 3655 | 1 Tier 3 | 2627 | 1 | Tier 3 | 2633 | 1 | Tier 3 | 626 | 1 Tier 3 | 2625 | 1 | Tier 3 | 1754 | 1 | Tier 3 | 1542 | 1 Tier 3 | 1691 | 1 | Tier 3 | 2545 | 1 | Tier 3 | 1604 | 1 Tier 3 | 1603 | 1 | Tier 3 | 3651 | 1 | Tier 3 | 1704 | 1 Tier 3 | 1697 | 1 | Tier 3 | 2642 | 1 | Tier 3 | 2623 | 1 Tier 3 | 1645 | 1 | Tier 3 | 2630 | 1 | Tier 3 | 1701 | 1 Tier 3 | 1756 | 1 | Tier 3 | 2664 | 1 | Tier 3 | 2619 | 1 Tier 3 | 622 | 1 | Tier 3 | 593 | 1 | Tier 3 | 2500 | 1 Tier 3 | 632 | 1 | Tier 3 | 2631 | 1 | Tier 3 | 1752 | 1 Tier 3 | 1702 | 1 | Tier 3 | 1890 | 1 | Tier 3 | 1602 | 1 Tier 3 | 1695 | 1 | Tier 3 | 3676 | 1 | Tier 3 | 632 | 1 Tier 3 | 2548 | 1 | Tier 3 | 631 | 1 | Tier 3 | 3649 | 1 Tier 3 | 2741 | 1 | Tier 3 | 1696 | 1 | Tier 3 | 1754 | 1 Tier 3 | 627 | 1 | Tier 3 | 3547 | 1 | Tier 3 | 3641 | 1 Tier 3 | 623 | 1 | Tier 3 | 552 | 1 | Tier 3 | 3658 | 1 Tier 3 | 620 | 1 | Tier 3 | 3641 | 1 | Tier 3 | 3632 | 1 Tier 3 | 2640 | 1 | Tier 3 | 812 | 1 | Tier 3 | 1442 | 1 Tier 3 | 2742 | 1 | Tier 3 | 1711 | 1 | Tier 3 | 620 | 1 Tier 3 | 2806 | 1 | Tier 3 | 2741 | 1 | Tier 3 | 1853 | 1 Tier 3 | 1860 | 1 | Tier 3 | 1860 | 1 | Tier 3 | 1889 | 1 Tier 3 | 647 | 1 | Tier 3 | 1544 | 1 | Tier 3 | 1691 | 1 Tier 3 | 1707 | 1 | Tier 3 | 2675 | 1 | Tier 3 | 2616 | 1 Tier 3 | 2635 | 1 | Tier 3 | 3465 | 1 | Tier 3 | 1907 | 1 Tier 3 | 1442 | 1 | Tier 3 | 2543 | 1 | Tier 3 | 2627 | 1 Tier 3 | 533 | 1 | Tier 3 | 1705 | 1 | Tier 3 | 2730 | 1 Tier 3 | 2623 | 1 | Tier 3 | 1912 | 1 | Tier 3 | 3657 | 1 Tier 3 | 270 | 1 | Tier 3 | 2505 | 1 | Tier 3 | 3651 | 1 Tier 3 | 2545 | 1 | Tier 3 | 1688 | 1 | Tier 3 | 1892 | 1 Tier 3 | 1607 | 1 | Tier 3 | 2663 | 1 | Tier 3 | 2631 | 1 Tier 3 | 272 | 1 | Tier 3 | 1913 | 1 | Tier 3 | 2733 | 1 Tier 3 | 2505 | 1 | Tier 3 | 2641 | 1 | Tier 3 | 552 | 1 Tier 3 | 3651 | 1 | Tier 3 | 533 | 1 | Tier 3 | 2742 | 1 Tier 3 | 631 | 1 | Tier 3 | 3632 | 1 | Tier 3 | 2641 | 1 Tier 3 | 1643 | 1 | Tier 3 | 550 | 1 | Tier 3 | 505 | 1 Tier 3 | 3540 | 1 | Tier 3 | 3649 | 1 | Tier 3 | 533 | 1 Tier 3 | 3661 | 1 | Tier 3 | 513 | 1 | Tier 3 | 3547 | 1 Tier 3 | 1703 | 1 | Tier 3 | 647 | 1 | Tier 3 | 2738 | 1 Tier 3 | 625 | 1 | Tier 3 | 3674 | 1 | Tier 3 | 3465 | 1 Tier 3 | 1890 | 1 | Tier 3 | 516 | 1 | Tier 3 | 1687 | 1 Tier 3 | 2734 | 1 | Tier 3 | 3654 | 1 | Tier 3 | 2667 | 1 Tier 3 | 1541 | 1 | Tier 3 | 1881 | 1 | Tier 3 | 2643 | 1 Tier 3 | 275 | 1 | Tier 3 | 2738 | 1 | Tier 3 | 2618 | 1 Tier 3 | 2636 | 1 | Tier 3 | 2742 | 1 | Tier 3 | 2516 | 1 Tier 3 | 1693 | 1 | Tier 3 | 2538 | 1 | Tier 3 | 3642 | 1 Tier 3 | 1912 | 1 | Tier 3 | 2637 | 1 | Tier 3 | 1693 | 1 Tier 3 | 1902 | 1 | Tier 3 | 620 | 1 | Tier 3 | 530 | 1 Tier 3 | 2639 | 1 | Tier 3 | 2676 | 1 | Tier 3 | 2665 | 1 Tier 3 | 3641 | 1 | Tier 3 | 2667 | 1 | Tier 3 | 2670 | 1 Tier 3 | 1706 | 1 | Tier 3 | 1917 | 1 | Tier 3 | 1880 | 1 Tier 3 | 1684 | 1 | Tier 3 | 3671 | 1 | Tier 3 | 1902 | 1 Tier 3 | 1532 | 1 | Tier 3 | 1442 | 1 | Tier 3 | 1640 | 1 Tier 3 | 552 | 1 | Tier 3 | 3652 | 1 | Tier 3 | 513 | 1 Tier 3 | 1642 | 1 | Tier 3 | 1892 | 1 | Tier 3 | 2640 | 1 Tier 3 | 2644 | 1 | Tier 3 | 1607 | 1 | Tier 3 | 1607 | 1 Tier 3 | 2631 | 1 | Tier 3 | 2643 | 1 | Tier 3 | 644 | 1 Tier 3 | 2733 | 1 | Tier 3 | 2636 | 1 | Tier 3 | 1526 | 1 Tier 3 | 3657 | 1 | Tier 3 | 2670 | 1 | Tier 3 | 2505 | 1 Tier 3 | 1430 | 1 | Tier 3 | 1863 | 1 | Tier 3 | 1755 | 1 Tier 3 | 1889 | 1 | Tier 3 | 505 | 1 Tier 3 | 3655 | 1 | Tier 3 | 2731 | 1 Tier 3 | 1913 | 1 | Tier 3 | 644 | 1 Tier 3 | 1859 | 1 | Tier 3 | 270 | 1 Tier 3 | 630 | 1 Tier 3 | 1755 | 1 Tier 3 | 1889 | 1 [Sheet: Q14] System Data Requirement No. 14: | Forecasted electric vehicle load (MW) at the substation level for the next three to five years. Substation | 2026 | 2027 | 2028 | 2029 | 2030 ALLINGS CROSSING | 0.13 | 0.18 | 0.27 | 0.37 | 0.49 ANSONIA | 0.13 | 0.18 | 0.27 | 0.38 | 0.5 ASH CREEK | 0.53 | 0.72 | 1.05 | 1.41 | 1.86 BARNUM | 0.17 | 0.24 | 0.36 | 0.49 | 0.65 BROADWAY | 0.15 | 0.21 | 0.32 | 0.44 | 0.58 EAST SHORE | 0.18 | 0.25 | 0.38 | 0.53 | 0.71 ELMWEST | 0.19 | 0.27 | 0.41 | 0.58 | 0.76 HAWTHORNE | 0.43 | 0.58 | 0.84 | 1.12 | 1.48 INDIAN WELL | 0.18 | 0.26 | 0.39 | 0.53 | 0.7 JUNE ST | 0.27 | 0.37 | 0.54 | 0.73 | 0.97 MILL RIVER | 0.17 | 0.24 | 0.36 | 0.5 | 0.66 MILVON | 0.31 | 0.44 | 0.64 | 0.88 | 1.16 MIX AVE | 0.35 | 0.49 | 0.74 | 1.01 | 1.33 NEW BAIRD | 0.13 | 0.18 | 0.28 | 0.38 | 0.51 NEW CONGRESS | 0.37 | 0.53 | 0.8 | 1.11 | 1.47 NORTH HAVEN | 0.12 | 0.17 | 0.25 | 0.34 | 0.45 OLD TOWN | 0.25 | 0.35 | 0.52 | 0.71 | 0.95 PEQUONNOCK | 0.06 | 0.09 | 0.13 | 0.18 | 0.24 POOTATUCK | 0.05 | 0.08 | 0.11 | 0.15 | 0.2 QUINNIPIAC | 0.16 | 0.22 | 0.33 | 0.45 | 0.6 SACKETT | 0.09 | 0.13 | 0.19 | 0.26 | 0.35 TRAP FALLS | 0.06 | 0.08 | 0.12 | 0.16 | 0.22 TRUMBULL | 0.13 | 0.19 | 0.28 | 0.37 | 0.49 WATER ST | 0.09 | 0.13 | 0.19 | 0.26 | 0.35 WOODMONT | 0.18 | 0.25 | 0.37 | 0.51 | 0.67

Text of 2026-02-06 Appendix 4- CIP-7 CAPEX - 2026-2030 #26-08-08.xlsx

Extracted from the file · 6,148 characters
[Sheet: Sheet1] The United Illuminating Company 2026 – 2030 Distribution Only Investment Category | 2026 | 2027 | 2028 | 2029 | 2030 | 2026-2030 Customer New Connections | 9621469.462174667 | 7573342.33984375 | 7621918.1796875 | 10814456.7109375 | 11815265.76953125 | 47446452.46217467 State & Municipal | 4834483.178181106 | 5135892.46484375 | 5279938.943359375 | 4655559.80859375 | 4745145.576171875 | 24651019.971149854 Metering | 12313718.635115873 | 5852424.120666504 | 7442477.88684082 | 8413944.922546387 | 8582223.75592041 | 42604789.32109 Customer Lighting | 7883654.7839871645 | 1419505.65625 | 1445191.2578125 | 1336162.484375 | 1362885.8125 | 13447399.994924664 Customer Service Technology | 9234630.782902645 | 10236698.061442725 | 9003348.373516407 | 6620943.778341406 | 3540008.8318374995 | 38635629.82804069 Third Part Pole Attachments/Replacements | 10651530.117236366 | 10888835.4765625 | 11130887.171875 | 12591522.21875 | 12843353.140625 | 58106128.125048876 Other Customer Programs | 1398306.031249997 | 1454238.25 | 1667505.51875 | 1572904.109375 | 1635820.2578125 | 7728774.167187497 Total Customer | 55937792.99084783 | 42560936.36960923 | 43591267.331841595 | 46005494.03291905 | 44524703.14439854 | 232620193.86961627 System Reliability Capacity Feeder Transfers | 441300.7346408087 | 2647804.3125 | 1323902.1484375 | 0 | 0 | 4413007.195578309 Substation Load Relief | 593166.9899245525 | 1618383.953125 | 1082190.4609375 | 2090715.953125 | 2090715.953125 | 7475173.310237052 Total Capacity | 1034467.7245653612 | 4266188.265625 | 2406092.609375 | 2090715.953125 | 2090715.953125 | 11888180.50581536 Corrective Reliability Reliability Improvement projects | 3499491.626431871 | 3557335.131591797 | 3616335.5185546875 | 3519323.940673828 | 3589710.5036621094 | 17782196.720914293 Total Corrective Reliability | 3499491.626431871 | 3557335.131591797 | 3616335.5185546875 | 3519323.940673828 | 3589710.5036621094 | 17782196.720914293 System Resiliency Step Down Bank Removals | 3233672.5853706207 | 3584249.6560058594 | 3550008.46875 | 3863864.96875 | 3941142.25 | 18172937.928876482 Other System Resiliency | 519831.71126100956 | 1901457.78125 | 1873750.421875 | 2090715.953125 | 2090715.953125 | 8476471.82063601 Total System Resiliency | 3753504.2966316305 | 5485707.437255859 | 5423758.890625 | 5954580.921875 | 6031858.203125 | 26649409.749512494 Infrastructure Replacement - Substations Substation Rebuilds | 14112270.673016245 | 10669561.5625 | 10744119.75 | 3890131.78125 | 0 | 39416083.76676624 Substation Removals | 1809516.954647672 | 0 | 0 | 0 | 0 | 1809516.954647672 Total Infrastructure Replacement - Substations | 15921787.627663916 | 10669561.5625 | 10744119.75 | 3890131.78125 | 0 | 41225600.72141392 Infrastructure Replacement - Distribution System Splice Chambers | 6748914.912314216 | 10255171.09765625 | 8669589.5390625 | 5438109.90625 | 5546872.09375 | 36658657.549032964 Transformer Replacement | 4518513.9355663555 | 4608884.1875 | 4701061.875 | 4795083.015625 | 4890984.765625 | 23514527.779316355 Cable Replacement | 0 | 6702650.9375 | 1002686.640625 | 899281.546875 | 917267.16015625 | 9521886.28515625 Pole Replacement | 3747935.539743036 | 3822894.25 | 3899352.140625 | 3977339.125 | 4056886.4375 | 19504407.492868036 Network Infrastructure | 10417395.93270732 | 9745568.21875 | 10988268.651367188 | 7427731.16796875 | 4403069.8115234375 | 42982033.7823167 Ground Mounted Equipment | 4031731.533863537 | 4349140.486328125 | 3919048.3359375 | 4320048.759765625 | 4470506.55078125 | 21090475.666676037 Other Infrastructure Replacement | 1144127.728789993 | 1167010.2841796875 | 1190350.478515625 | 1214157.4765625 | 1238440.607421875 | 5954086.57546968 Total Infrastructure Replacement - Distribution System | 30608619.582984462 | 40651319.46191406 | 34370357.66113281 | 28071750.998046875 | 25524027.426757812 | 159226075.130836 Total System Reliability | 54817870.85827725 | 64630111.85888672 | 56560664.4296875 | 43526503.5949707 | 37236312.08666992 | 256771462.8284921 System Operations Operations | 9707054.738131328 | 9742263.69140625 | 9755047.5703125 | 10877360.91796875 | 11094907.96484375 | 51176634.88266258 Compliance & Safety | 938993.4761624997 | 969512.7351937499 | 1004651.9519437498 | 1056246.2559 | 1179077.0153937498 | 5148481.43459375 Fleet | 5671210.709999996 | 6885475.9116 | 7324749.9072 | 5849524.6348 | 6025009.7732 | 31755970.9368 Facilities | 2059972.3588 | 1248709.7180249998 | 590595.20788125 | 959945.866034375 | 557191.45631875 | 5416414.607059375 Total System Operations | 18377231.28309382 | 18845962.056224998 | 18675044.6373375 | 18743077.674703125 | 18856186.209756244 | 93497501.86111571 Business Effectiveness & Evolution Business Effectiveness Information Technology | 8572598.719299998 | 8440470.4355125 | 10689458.2678125 | 6462210.6984875 | 6530390.876281248 | 40695128.99739374 Operational Technology | 2376962.600483724 | 1064750.4396972656 | 1827472.2060546875 | 876737.9975585938 | 2097837.4790039062 | 8243760.722798176 Other Business Effectiveness | 210348.82000000004 | 214997.64 | 219646.46000000002 | 225035.8 | 228944.1 | 1098972.8200000003 Total Business Effectiveness | 11159910.139783721 | 9720218.515209766 | 12736576.933867186 | 7563984.496046093 | 8857172.455285154 | 50037862.54019192 Modernization Electric Vehicle | 427799.9765625 | 441299.9921875 | 427799.9765625 | 427799.9765625 | 441299.9921875 | 2165999.9140625 Distribution Automation | 0 | 3825526.28125 | 4634931.90625 | 5058487.25 | 5058487.25 | 18577432.6875 Energy Storage | 6382254.00234375 | 5250836.1390625 | 3037523.96875 | 0 | 0 | 14670614.11015625 Other Modernization | 310411.9501114632 | 0 | 0 | 0 | 0 | 310411.9501114632 Total Modernization | 7120465.929017713 | 9517662.4125 | 8100255.8515625 | 5486287.2265625 | 5499787.2421875 | 35724458.66183022 Total Business Effectiveness & Evolution | 18280376.068801437 | 19237880.927709766 | 20836832.785429686 | 13050271.722608592 | 14356959.697472654 | 85762321.20202214 Total Capital Expenditures | 147413271.20102027 | 145274891.2124307 | 139663809.18429625 | 121325347.02520148 | 114974161.1382974 | 668651479.7612462

Text of 2026-02-06 Appendix 5- NWS Quarterly Filing #26-08-08.xlsx

Extracted from the file · 34,411 characters
[Sheet: Sheet1] Project ID | Name of Project | Projected Date of Need/Timeline for improvement | Estimated Distribution Investment Cost | Project Justification | EDC Proposed NWS Solicitation? | Proposed Preliminary RFI? | Notes | Project scope and key materials (e.g., transformer, etc.) | Identification of project risks (e.g., potential for delays or cost overruns) Unlikely NWS Solicitation Opportunities (All Other Planned Investments Under $500,000, including Unknown and Known Priority Investments Required within a Year) PRJ-001134 | Brookmead Ct SDB removal | 2026 | 355000.845587522 | System Reliability | No | No | Safety | As part of the commitment to improving the distribution system’s resiliency, UI has an ongoing program to review, identify and when deemed appropriate, convert areas behind step down banks (SDB) that pose a risk for an outage event due to SDB transformer failure.  If one (or more) of the step down transformers fail, power cannot be restored until the UI crews have replaced the SDB. The Brookmead SBD in North Branford Ct is scheduled to be replaced in 2026. Key material includes but is not limited to: replace 5 poles, 3 pad mount & 1 pole-top, cutouts, etc. MR Before - OH to Remove Old Terminations to all old Live Front Padmounted Transformers: L.1, L.2, L.3 - OH to Remove all Old Live Front Padmounted Transformers: L.1, L.2, L.3 - CVL to Remove all Old Concrete Foundations for L.1, L.2, L.3 - OH to Install new Ground Grids at locations L.1 and L.3 - CVL to Install Secondary Pedestal at Location L.2 - CVL to Install approx. 100' of 2-4" GS Conduits from P.726 to L.2 - CVL to Install 3 New Secondary Pedestals, intercepting existing conduits infront of Buildings 7, 6, & 5 - OH to Make up Secondary Connections in the three new Secondary Pedestals - OH to Install new 1PH 50KVA 120/240 DR Padmounted Transformer at L.1 - OH to Install new 1PH 75KVA 120/240 DR Padmounted Transformer at L.3 - OH to Install new 1PH 50KVA 120/240 DR Overhead Transformer at P.726 - OH to Pull out old 5kV Non Standard Primary Cable for the following spans: P.725 to L.1, P.726 to L.2, P.728 to L.3 - OH to Remove old OH Terminations on P.725, P.726, and P.728 - OH to Pull in approx. 60' of 15kV 1 - #2 AL EPR Primary Cable from P.725 to L.1 - OH to Pull in approx. 75' of 15kV 1 - #2 AL EPR Primary Cable from P.728 to L.3 - OH to Install new 15kV Floating Terminations on P.725 and P.728 - OH to Pull in 2 Sets of 350 MCM UG Secondary Cable Approx. 100' Each from P.725 to L.2 - OH to make up all necessary Primary Cable and Secondary Connections to Transformers at L.1 and L.3 and in the Secondary Pedestal at L.3 - OH to Remove approx. 620' of Open Wire Secondary - OH to Install Approx. 620' of 1/0 AL TPX Secondary - OH to Fuse all Cutouts @ 4.16kV Conversion Before - OH to SW & Gnd @ P.1336 - OH to Decomssion Step Down Bank at P.724 - OH to Transfer Dual Ration Voltage Switch at all Transformers (L.1, P.726, P.727, L.3) - OH to Re-Fuse all Cutouts @ 15kV | UI aging infrastructure worsens -Cascading effects: 1. Environmental Issues - more expensive, risk of harm to both humans and environment. Failure of live-front transformer will result in longer outage duration for these customers in order to complete emergency civil work. 2. System reliability (SAIDI/ SAIFI) will be affected. SDB failure will result in 36 customers experiencing a long outage (> 8 hours duration). 3. Distribution network could experience higher rate of damage in these areas as equipment is reaching the end of their service life and this may also impact communication and third party equipment. 4. Deferring overhead system upgrades for the SDB area will require additional stockroom materials for this primary voltage level. PRJ-002762 | L855 Bpt Network Vault Rebuild | 2026 | 3351812.800727459 | Infrastructure Replacement - Distribution System | No | No | Safety | CNB network vault L855 located on Main Street in Bridgeport has two network primary feeders: 803 and 591 feeding two 750 KVA 125/216V network transformers and two 2825 amps 125/216V network protectors. This vault has some serious structural and electrical issues that compromise the safety of UI crews and the operation of the network system. The project description is to rebuild today a new double unit network vault that meets UI current standard and NECS standard in the Street site of the existing vault. Install duct bank, laterals, and remove the old vault L855. The Scope of this project is to install a double unit network vault that can fit two 750 KVA 125/216V network transformers along with 2-1875 amps 125/216V network protectors to support the load in the area, install duct banks, laterals conduits, primary and secondary cables and demo the old vault. | This network vault is currently supporting the Bridgeport network secondary grid. The plan is to keep this vault energized until the new double unit network vault is completed. One of the risk is the available space requirement to fit a double unit spot network in the Street right away. There may be other utilies in the underground and UI may not be able to rebuild this new vault in the area and keep the existing one energized. Another risk may be some environmental issues and these risks will definitely affect the capital budget. UI will need to perform some test pits to make sure that there are no other utilities in the underground area and also test the soil to mitigate this plan. If UI does not get an easement it is also another risk. PRJ-005550 | Mark III - Sikorsky Airport | 2026 | 556437.6430961175 | Infrastructure Replacement - Distribution System | No | No | Asset Condition | Sikorsky Airport in Stratford, CT has two vintage Mark III switches on site that power the main buildings at the airport - including the control tower. Both units are in poor condition and require change out. The Airport used to have two primary feeds with one currently from Main St and the back up from Access Rd. The Primary feeds also run underground across the tarmac to the customer's facilities. In the late 1990s, the back up feed from Access Rd failed due to a conduit collapse. Customer owns the UG infrastructure in the area, while UI owns the Primary Cable feed up to the Switches, and Switches themselves. Change out both units aging units with two PME-9 Switches, and change out old concentric neutral cable with new EPR primary cable. Negotiate with customer on ownership after the riser pole due to difficulty of maintaining underground equipment across the Tarmac, clearances, and scheduling. Looking to install primary metering before the riser pole. Key materials include but is not limited to switch replacement, etc. | PME-9 switches are long lead devices which then can potentially delay the project. To mitigate this risk, the Company will order the PME-9 switches ahead of time so it is ready in time of construction. Another risk is scheduling the work. Because this is an active airport, scheduling the work is difficult and the window to perform the construction is very small. To mitigate this, the company will have to work with the airport to perform the work. PRJ-005556 | Network Vault Roof Replacement | Program -Ongoing | 2667319.3594149556 | Infrastructure Replacement - Distribution System | No | No | Asset Condition | UI has an ongoing program to inspect network vaults in New Haven and Bridgeport, CT. A number of vaults have been identified with deteriorated roofs that should be replaced. Current scope is to replace the roofs on the following network vaults: L270 (WNCH 266 George St) L271 (Madison Tower) L851 (140 Fairfield Ave,Bpt ) | Risk - the roof could deteriorate faster than we expect. Mitigation - take action to replace the roof or install temporary supports until the roof can be replaced. Risk - concrete to fall into the equipment causing hazard or a fault. Mitigation - install temporary barrier to prevent debris hitting the equipment. PRJ-003598 | Old Town SS - CAP Package 2 | 2026 | 6036835.74766093 | Infrastructure Replacement - Substations | No | No | Cutover to new substation | The UI Projects group is undertaking a complete rebuild of the Old Town substation under Project 800936. This project is required to cut-over the existing eleven 13.8 kV outgoing distribution feeders from the old substation to the new substation. Per current design standards, all new substation getaway must have two diverse outgoing paths. This project includes the installation of 2 new triangular splice chamber in front of the station and new ductline connecting these chambers to the existing underground and overhead system picking up the 11 distribution feeders. Once the new substation is complete there will be a cut over process from the existing infrastructure to the new infrastructure. The work required to cut the feeders over from the old station to the new station and remove any old cable will be part of this project. Old Town substation currently has eleven 13.8kV outgoing distribution feeders (9 underground and 2 overhead) serving parts of both Trumbull and Bridgeport. To continuously maintain service, a new substation will be built (all new transformers, control house, transmission interconnects, etc) within the existing footprint of the station. This includes a completely new getaway to be constructed outside the substation. Once the new substation is complete there will be a cut over process from the existing infrastructure to the new infrastructure. Step “A” Northern getaway ONLY. This would include 2 Triangular splice chambers SC2029 and SC2028 outside of the substation (SC6), and one regular splice chamber SC2030 (8 x 14’ SC) up the road (new SC). Install ~150’ of duct line connecting SC2029-SC2030 and approximately another 150’ of duct line connecting SC2029-SC2028. Install galvanized steel laterals SC1718 to P105 and to a New Pole. From SC1720 to P11893 and to a New Pole. This step is entirely civil in nature – electrical work will be done in other steps closer to the completion of the substation. Work will include the furnishing and installation of splice chambers and ductline, electrical cable, splice kits, and terminations kits. | The substation work will constrain the timing for the cutover of the 11 circuits from the old to the new station and the removal of old cables after cutovers. Electrical cutover sequence details need to be finalized. This can impact the effort required (number of switching orders) to perform the cutovers. This project must be completed ahead of the station to allow for the circuits to be cut over to the new station. PRJ-005560 | SDB - Cottage St | 2026 | 451819.2565489308 | System Resiliency | No | No | Asset Condition | As part of the commitment to improving the distribution system’s resiliency, UI has an ongoing program to review, identify and when deemed appropriate, convert areas behind step down banks (SDB) that pose a risk for an outage event due to SDB transformer failure.  If one (or more) of the step down transformers fail, power cannot be restored until the UI crews have replaced the SDB. The Cottage St SDB in Derby was selected to be replaced in 2026. 1. Set 13 - poles 2. Cut the tops of 13 poles 3. Install 800 feet of 3-1/0 tree wire & Remove 8 spans of primary 4. Remove a set of 3-4kV disconnects 5. Install/remove 5 sets of 3P cutouts 6. Install roughly 1,600 feet of 3/C-1/0 triplexed secondary – Remove 21 spans of open wire secondary 7. Replace 15 services and transfer 5 services 8. Shift 4 street lights 9. Replace 2 OH 1P Transformers 10. Replace 3P Transformers in 1 vault 11. Once the make ready is completed, execute the conversion and remove SDB transformers. Key materials include but is not limited to transformers, cable, etc. | Risk: Supply Shortage Mitigation: Logistics Forecasting Risk: Resource Shortage Mitigation: Upgrade equipment/complete voltage conversion prior to storm and vacation season UI aging infrastructure worsens -Cascading effects: 1. Environmental Issues - more expensive, risk of harm to both humans and environment. Failure of live-front transformer will result in longer outage duration for these customers in order to complete emergency civil work. 2. System reliability (SAIDI/ SAIFI) will be affected. SDB failure will result in 36 customers experiencing a long outage (> 8 hours duration). 3. Distribution network could experience higher rate of damage in these areas as equipment is reaching the end of their service life and this may also impact communication and third party equipment. 4. Deferring overhead system upgrades for the SDB area will require additional stockroom materials for this primary voltage level. PRJ-005562 | SDB - Grove St - Phase 2 | 2026 | 1054244.902598554 | System Resiliency | No | No | Asset Condition | As part of the commitment to improving the distribution system’s resiliency, UI has an ongoing program to review, identify and when deemed appropriate, convert areas behind step down banks (SDB) that pose a risk for an outage event due to SDB transformer failure.  If one (or more) of the step down transformers fail, power cannot be restored until the UI crews have replaced the SDB. The Grove St SDB has been selected to be removed in 2026 1. Set 8 - 45’ poles 2. Assist TelCo to set 2 - 45’ poles 3. Cut the tops of 10 poles 4. Install 601 feet of 3-1/0 tree wire – Remove 6 spans of primary 5. Install 625 feet of 1-1/0 tree wire - Remove 6 spans of primary 6. Remove 2 sets of 3-4kV disconnects 7. Install/remove 2 - 1P cutout 8. Install roughly 1,200 feet of 3/C-1/0 triplexed secondary – Remove 18 spans of open wire secondary 8. Replace 4 services and transfer 46 services 9. Shift 10 street lights 10. Replace 6 OH 1P Transformers 11. Replace 11 OH/UG 3P Transformers 12. Replace 265 feet of 3-#2 Primary Cable 13. Replace 531 feet of OH Secondary wire 14. Install 1,000 feet of secondary triplex cable 15. Replace 1 3P padmount transformer 16. Install 2 sets of Under-arm switches 17. Once the make ready is completed, execute the conversion and remove SDB transformers. Key materials include but is not limited to transformers, cable, switches, etc. | UI aging infrastructure worsens -Cascading effects: 1. Environmental Issues - more expensive, risk of harm to both humans and environment. 2. System reliability (SAIDI/ SAIFI) will be affected. SDB failure will result in 179 customers experiencing a long outage (> 8 hours duration). 3. Distribution network could experience higher rate of damage in these areas as equipment is reaching the end of their service life and this may also impact communication and third party equipment. 4. Deferring overhead system upgrades for the SDB area will require additional stockroom materials for this primary voltage level. PRJ-005561 | SDB - Jefferson St | 2026 | 1269396.924648361 | System Resiliency | No | No | Asset Condition | As part of the commitment to improving the distribution system’s resiliency, UI has an ongoing program to review, identify and when deemed appropriate, convert areas behind step down banks (SDB) that pose a risk for an outage event due to SDB transformer failure.  If one (or more) of the step down transformers fail, power cannot be restored until the UI crews have replaced the SDB. The Jefferson St SBD in Bridgeport, Ct is scheduled to be replaced in 2026. 1. Set 61 - poles 2. Cut the tops of 25 poles 3. Install 1,300 feet of 3-1/0 tree wire & 3,000 feet of 3-397 tree wire– Remove 37 spans of primary 4. Remove a set of 3-4kV disconnects & 3 sets of 3P cutouts 5. Install/remove 4 sets of 3-cutouts 6. Install roughly 4,100 feet of 3/C-1/0 triplexed secondary – Remove 70 spans of open wire secondary 7. Replace 116 services and transfer 60 services 8. Shift 12 street lights 9. Replace 14 OH 1P Transformers and 5 OH 3P Transformers 10. Install 2 reclosers. 11. Install 1 gang operated load break switch & 2 sets of u-arm switches. 12. Once the make ready is completed, execute the conversion and remove SDB transformers. Key materials include but is not limited to switches, cables, etc. | UI aging infrastructure worsens -Cascading effects: 1. Environmental Issues - more expensive, risk of harm to both humans and environment. 2. System reliability (SAIDI/ SAIFI) will be affected. SDB failure will result in 179 customers experiencing a long outage (> 8 hours duration). 3. Distribution network could experience higher rate of damage in these areas as equipment is reaching the end of their service life and this may also impact communication and third party equipment. 4. Deferring overhead system upgrades for the SDB area will require additional stockroom materials for this primary voltage level. 800871.01 | SDB Removal Program TYP | Program -Ongoing | 7805007.21875 | System Resiliency | No | No | Asset Condition | SDB Removal Program TYP There are approximately 75 multi-customer step-down bank locations across UI s service territory. Modern UI standards adhere to a 13.8kV primary side utilization voltage allowing UI to operate and maintain its distribution system more effectively. Areas supplied by SDBs are isolated pockets of 4kV typically with no backup and therefore are a risk to UI s goals of improving resiliency and reliability. Most of the SDB s do not have a tie to a backup circuit on the low voltage side. Power flow cannot be restored until UI crews have replaced the SDB resulting in a prolonged outage. UI has undertaken a yearly program to prioritize, design, construct and convert to allow for the elimination of the SDB s based on risks for outage or power quality performance. In addition, many of these locations present concerns ranging from safety hazards, operational difficulties, environmental problems, NESC violations, and access issues that must be corrected to bring them up to modern standards. Many SDBs are reaching the end of their service life. The overhead and underground infrastructure integrity in some of these locations is severely degraded and, at some point will become unsafe to operate while energized. Some locations have non-standard transformation making it difficult for UI to restore power once equipment fails. Some customer locations are plagued with access issues making it difficult for UI to perform maintenance, switching, and restoration in timely a manor affecting other customers. This project is designed rebuild and convert areas fed by step down banks to UI's standard distribution operating voltage of 13.8kV. Overhead infrastructure (poles, wires, transformers, etc.) downstream of the 2.4/4.16kV step down bank are replaced with new 13.8kV voltage class equipment. In some cases, it is necessary to upgrade transformer vaults to overhead or padmounted structure to meet NESC. | UI aging infrastructure worsens -Cascading effects: 1. Environmental Issues - more expensive, risk of harm to both humans and environment. Failure of live-front transformer will result in longer outage duration for these customers in order to complete emergency civil work. 2. System reliability (SAIDI/ SAIFI) will be affected. SDB failure will result in Multiple customers experiencing a long outage (> 8 hours duration) depending on how many are served or the complexity of the SDB. 3. Distribution network could experience higher rate of damage in these areas as equipment is reaching the end of their service life and this may also impact communication and third party equipment. 4. Deferring overhead system upgrades for the SDB area will require additional stockroom materials for this primary voltage level. PRJ-002742 | Switchgear Replacement Program | Program -Ongoing | 7872618.084192798 | Infrastructure Replacement - Distribution System | No | No | Asset Condition | There are over 100 high voltage non-network services (>600volts) across UI's service territory which we operate, maintain, and in many cases own the switching demarcations. Through a specific inspection plan, UI is to identify and prioritize the locations that have reached the end of their useful life, and/or present concerns ranging from safety, operational difficulties, code/access issues, and environmental. In 2026, UI plans to replace the switchgear in the Old Post Publishing building @ 600 State Street in Bridgeport. This building was sold and is being repurposed as a retail site. Therefore, it does not have the electrical load of the previous CT Post printing plant. Scope of work is to replace the 1970’s vintage 15kV switchgear with a fused riser to the existing transformer building vault. This will allow us to safely remove the old switchgear from the building. | Currently the building is vacant and in the process of being repurposed as general retail space. The risk is working with the customer on timing of the cutover if not executed the replacement as expected. PRJ-002101 | UI - Elec Better CAP | Program -Ongoing | 10405569.038732525 | Corrective Reliability | No | No | Asset Condition | This program is a reactive program based on existing field equipment conditions. The type of work done under this Program includes: - ADMS (Follow-up work for outage, trouble, pole hits, etc.) - Equipment Install/Replace (Cap Bank, ABS, Txf, Recloser, etc.) - Make Ready (Construction required to connect customers) - NESC (Pole work for compliance) - Reliability/WPC/TDRP (Remove bells sleeve thru primary, reconductor secondary, reconfigure circuit, Install recloser, Install/Replace ABS, Cutouts, Bells, Insulators, etc.) - Dist. OH & UG (Civil/UG/URD work, DLI Follow-up work, Replace Txf, Cutout, Pole Shifts, Dist. OH & UG Repairs, Engineering, Voltage Comp, Pole For Pad, etc.). | No action would result in leaving defective equipment in service, not meeting customer demands/connections, and accepting the reliability and safety risk of failure. PRJ-002133 | UI - Network Infrastructure Pgm CAP | Program -Ongoing | 1296089.949194331 | Infrastructure Replacement - Distribution System | No | No | Asset condition | During the course of the year, UI experienced equipment failure into the network system. Therefore, UI performs annual inspections and has a program to remediate vaults that show minor structural or electrical issues which can compromise the operation of the network as designed. This program is also used to replace ventilation grade, sump pump, access hatches, removable access equipment, grounding grid, secondary collector bus, network transformer, network protector, and lighting issues. The scope of work includes the following: • Replace ventilation grade, access hatches, removable slab that have issues. • Replace the lighting equipment to make sure that there is enough light. • Reinforce or replace the grounding grid and network transformer or protector in the vault. • Bonded all metal to the grounding grid. | The equipment required will continue to deteriorate and eventually fail, and this failure can compromise the operation of the network and pose a safety risk to the public because these vaults are below grade. The mitigation plan is to replace these items before a failure occurs. 800842.01 | Whitney Sub Decommissioning LVSS UH-U0000005 | 2026 | 1809516.954647672 | Infrastructure Replacement - Substations | No | No | S/S Removal | This project is part of Low Voltage Substation Removal Program. The program's objective is to complete the removal of service and retirement of assets associated with all 4.16 kV and 2.4 kV substations on the distribution system due to the age of the equipment and the inability to maintain this obsolete equipment. The age range of these substations is 50-70 years old. Removal of low voltage (4.16kV) substations is accomplished through either total conversion of the distribution infrastructure supported by the low substation to 13.8kV or through partial conversion to 13.8kV and the utilization of Step Down Banks where there is significant remaining life in the distribution infrastructure. Whitney Avenue Substation is one of two remaining substations left in this program to be de-commissioned. The remaining scope on the project is the conversion of Circuits 270, 273 and 275. | Required vegetation management and clearance could impede the necessary construction that abide UI standards. Approvals from town/city and adjacent customers for vegetation clearance could result in scheduling delays or inability to complete required construction. This is mitigated by using alternate construction to avoid vegetation areas with no clear solution or approval from interested parties as mentioned previously. Additionally, UI would work closely with interested parties to determine a solution that would allow required construction. Premature failure of substation equipment could lead to long duration outages and the execution emergency voltage conversions impacting project budget. This can be mitigated by preparing voltage conversion plans well in advance to prepare for emergency scenarios. Access to UI equipment on customer property and/or customer owned equipment impacting the ability to perform required work. Working closely with customers with constant communication and properly developed action plans which would mitigate schedule delays and control cost. Customer unwilling to cooperate with required equipment replacements and/or the inability of customer equipment to operate at the higher required voltage can cause scheduling delays. This can be mitigated by working closely with customers with constant communication and properly developed action plans. As a last resort, step-down bank transformers can be installed to allow voltage conversions to be completed. 800166.01/PRJ-003790 | 2012 Cage Replacement Program | 2026 | 1551644.2662375846 | Infrastructure Replacement - Distribution System | No | No | Safety | There are service points in the supply territory of the United Illuminating Company where pole top transformers are installed on concrete foundations at ground level and are protected by a caged enclosure. These locations typically have unguarded medium and low voltage live components connected to the transformers. This type of construction is referred to as a transformer cage. UI has undertaken a program to inspect these cage locations and modify or remediate existing conditions to ensure compliance with National Electric Safety Code. At a high level, the goal at each location is to evaluate and identify any NECS code requirements and applicable solution(s). Following an evaluation to determine suitable remediation options, the customer is alerted of the need for involvement, as each transformer cage infrastructure (concrete slab, primary and secondary conduits, service entrance equipment) is typically customer owned. Following an agreement between the UI and the customer, the appropriate solution is applied to maintain compliance with the NESC. This typically involves a range of options from fence maintenance, cage style transformer replacements, or a new padmount transformer and required infrastructure. 1.1720 Fairfield Ave., BPT – L483 a.Remove the existing ariel cable and primary metering feed, currently attached to the customers building structure. b.Remove two transformer services currently housed in the transformer cage L483. c.Remove 1st 1,500 kVA 240/480V service, which will be replaced by a 1,500 kVA 480Y/277V padmount transformer. d.Remove 2nd single phase 167 kVA 120/240V transformer, which will be replaced by a single phase 120/240V padmount transformer. e.Install new vista switch foundation and conduits to re-feed existing and new transformers. f.Re-feed existing 750 kVA padmount transformer and feed new padmounts using a 422-vista switch. g.Install new riser pole, ABS and underground 13.8 kV feed (approx. 200’ away) for 422 vista switch. h.Replaced existing primary metering with secondary metering equipment. Service entrance equipment that doesn’t not meet current NEC and local building codes will be replaced. 2.317 Mountain Grove St., BPT – L505 a.Remove the existing 13.8 kV primary voltage transformer supply ariel primary cable. b.Remove the 3 x 333 kVA pole top pots currently housed in the transformer cage L505. c.Install new riser pole and new primary conduit as well as a new 7’x8’ precast foundation. d.Install new service conduits and service conductors to re-feed new or existing service entrance equipment. e.Install approx. 130’ of new #2 3/C 13.8 kV primary cable between new riser pole and the new padmount transformer foundation. f.Install new 1,000 kVA 480Y/277V padmount transformer. 3.584 Long Hill Ave., SHLT – L99 a.De-energize and remove 3-75 kVA pole top pots from the existing transformer cage L99. b.Remove approx. 360’ of existing #2 3/C primary cable. c.Install new riser pole and new primary conduit as well as a new 7’x8’ precast foundation. d.Install new service conduits and service conductors to re-feed the existing service entrance equipment. e.Install approx. 330`’ #2 3/C 13.8 kV primary cable between new rise pole and new padmount transformer installation. f.Install new 300 kVA 208Y/120V padmount transformer. Key materials include but is not limited to fencing, padmount transformers, etc. | Failure to comply with the National Electrical Safety Code (NESC) can have several consequences, including but not limited to: Safety Risks: Non-compliance can put the safety of company employees as well as customers who interact with transformer cage installations at risk. Liability: Compliance with the NESC does not necessarily relieve a company of liability, however if a situation arises, non-compliance will be a strong consideration as it relates to any damages or legal consequences. Decreased Reliability: Equipment not in compliance with the NESC is often a greater risk of failure and not likely to be as performant or as effective as other equipment or installations that are in compliance. Risk or no action regarding transformer cage remediation could place The Company at an elevated risk for potential damages to life, property, and business. PRJ-005551 | G&W / Mark III Switch Replacement Program | 2026 | 2337605.3494649623 | Infrastructure Replacement - Distribution System | No | No | Asset Condition | G&W PVI-9 Padmounted switch locations throughout UI territory are showing high levels of deterioration. Increasingly, G&W PVI-9’s are being found during their yearly inspections to have lost SF6 insulating gas. This loss of insulating gas pressure puts the customers this switch supports at risk of an extended outage. At the level that some of the worst switches continues to leak, there is a risk that during either a switching event or during a fault condition presenting on the load side, the switch will be unable to “snuff” out the internal arc. This project evaluates each location individually and prioritizes the highest risk locations first. The goal is to remove these distribution risks from the UI territory before they cause safety risks or extended outages. To prevent risk of an event with an extended outage, UI has made a proactive effort to evaluate replacing or removing Padmounted switches presenting with documented risks. Any construction and design at each location will be evaluated based on existing conditions and equipment. Replacement of switch can include the need to install a new concrete foundation, replace existing distribution high voltage cables and connectors may also be required. Starting in 2025, UI plans to replace two PVI-9 switches per year for the next three years. Key materials include but is not limited to voltage cables, switches, etc. | Potential of increased safety risks due to low SF6 insulating gas and increased risk to extended customer outages. Some of G&W PVI-9 switch locations support upwards of two hundred residential customers while others may support commercial customers. PRJ-005548 | Radial Vault Replacement Program | Program -Ongoing | 4317880.964065788 | Infrastructure Replacement - Distribution System | No | No | Asset Condition | Pole top transformer at the end of its useful life and there's very limited space in the vaults for the new transformer. Key project material includes but is not limited to: remediate existing tranformer and replace them with new pad or pole-mounted transformers, H-frame structures, or equipment that meets NESC requirements | Non-compliant with current NESC requirements and UI construction standards. PRJ-005553 | UI Network - Primary switch install | 2026 | 2647560.9931245595 | Infrastructure Replacement - Distribution System | No | No | Safety | UI's current practice is to replace a network transformer or protector to de-energize the entire feeder serving that transformer. This is a costly and complex process that takes multiple days since each transformer on that circuit must be de-energized. Installing primary switches in each vault allows UI crews to safely isolate any given transformer and replace it without de-energizing the feeder. This will save time and money over the existing procedure. The scope of work includes the following: • UI to complete two network vaults per year. • Install 4 network primary switches (2 switches per network vault). • Install approximately 400 ft of 4/0 primary cables (100 ft per switches) • Install 8 sets of 600 amps elbows for the primary switches (2 sets of elbows per switch). • Install 4 sets of straight terminations 4/0 EPR. • Install straight and wye splices for the primary cables. • Prep and install 4 network primary switches. • Deenergize and reenergize the network feeders. Key materials include but is not limited to cable, switches, etc. | Two underground unit network vaults have internal dimensions of 34ft long, 10ft height, and 8ft wide. Most of the space is taken by the equipment: two network transformers, two protectors, associated cables, a collector bus and communication equipment. UI underground network vault is limited to primary switches that have a maximum length of 44” long and maximum width of 28”. Some of the old existing vaults do not have the space required to install two primary switches and this can jeopardize the completion of the project on time. The Mitigation plan is to find available space in the street right away, perform test pit to make sure there are no other utilities in the ground, and install a small vault that can hold the primary switches.

Text of 2026-02-06 Appendix 6- Grid Needs Filing #26-08-08.xlsx

Extracted from the file · 4,217 characters
[Sheet: Sheet1] Project ID | Name of Project | Projected Date of Need/Timeline for improvement | Estimated Distribution Investment Cost | Project Justification | EDC Proposed NWS Solicitation? | Proposed Preliminary RFI? | Notes | Project scope and key materials (e.g., transformer, etc.) | Identification of project risks (e.g., potential for delays or cost overruns) Likely NWS Solicitation Opportunities (Over $1 Million, and Eligible Project Justification) PRJ-003790 | UI Regional Career High School Microgrid - Energy Storage Resiliency - New Haven | 2027 | 4689808.2 | Modernization | Yes | Yes | CT. Public Act 22-55 was approved by the CT. General Assembly in May of 2022. This act allowed PURA to direct each EDC to submit no more than 3 proposals for pilot projects to build, own, and operate Battery Energy Storage Systems (BESS) in their service territories. This New Haven BEES Microgrid project was approved in PURA Docket Number 22-06-05 PURA Implementation of Public Act 22-55. Hill Regional Career High School is located at 140 Legion Ave. New Haven, CT. within the UI operations territory. The building is served by New Haven circuit 1526 (13.8 kV) via a branch of the circuit approx. 1.2 miles from the Water St. Substation. The circuit serves approximately 1,949 customers and a peak load of 8.56 MW (Summer). The building is served by a 3-phase, 750kVA pad-mount transformer at a voltage of 277/480 Vac. The facility hosts a 143kW rooftop solar array and a 75kW natural gas-powered combined heat and power generation unit. The facility has been designated as a top 10 tier 1 priority (critical infrastructure2) for electrical restoration after an outage and is located within a DOE Disadvantaged Community. | Installation of a 2.5 MW, 7.0 MWh battery mid-circuit on circuit 1526 to provide outage mitigation to emergency shelter (Hill Regional HS) and adjacent circuit branch serving EJC and DAC customers as approved in DN 22-06-05. This battery storage project consists of installing a 2.5 MW, 7.0 MWh Battery Energy Storage System (BESS) mid-circuit on circuit 1526 in New Haven, CT. The battery will be used to provide circuit resiliency and capacity benefits. Specific use cases for this project include: 1. Resiliency and back up to a targeted section of a poor performing circuit 2. Provides back-up to LMI and environmental justice customers 3. Provides targeted relief during ISO-NE capacity events 4. Provides load relief to an overloaded circuit" Key materials include but is not limited to BESS, cable, etc. | The primary risk to this project are budget overruns due to rising BESS implementation costs, high internal costs associated to overheads and the relative complexity involved in the installation, commissioning and operation of a microgrid. Within its decision (DN 22-06-05) approving the microgrid, PURA required all approved BESS microgrid projects to pass certain benefit-cost analysis (BCA) hurdles throughout the major milestones of the project development and execution. The next major milestone will be the release and evaluation of an RFP (anticipated early 2026) which will require a revised BCA conducted based upon actual costs. If the BCA value falls below a 1.0, the scope of the project needs to be revised, or the project needs to be cancelled outright. Budgetary risk mitigation includes strict adherance to internal budgets, timelines and milestones through a robust project management strategy, a comprehensive RFP process to help mitigate additional risk contingencies built into pricing Secondary risks are associated to the siting of the BESS microgrid itself. The BESS is currently designed to be installed on public property, in close vicinity of a public high school and residential community, and has not gone through the full zoning and siting process with the City of New Haven or Connecticut. Mitigation of these risks starts with close collaboration with city and state officials, building owners and residents, and local community groups to help build and gain support for the benefits this project will deliver to the community. Potential NWS Solicitation Opportunities ($500,000 – $1 Million) Not applicable.

Text of 2026-02-06 Appendix 7- Grid Needs Filing Narrative Document #26-08-08.pdf

Extracted from the file · 8,715 characters
The United Illuminating Company Docket No. 26-08-08 Appendix 7-Grid Needs Filing Narrative Document Non-Wires Solutions Program Grid Needs Filing Narrative Document February 6, 2026 1 of 5 The United Illuminating Company Docket No. 26-08-08 Appendix 7-Grid Needs Filing Narrative Document 2 of 5 Table of Contents I. DOCUMENT BACKGROUND .................................................................................. 3 II. GRID NEEDS FILINGS PROJECTS NARRATIVES ................................................ 3 1. UI REGIONAL CAREER HIGH SCHOOL MICROGRID - ENERGY STORAGE RESILIENCY - NEW HAVEN.......................................................................................... 3 A. PROJECT DESCRIPTION........................................................................................ 3 B. SYSTEM NEEDS AND JUSTIFICATION ................................................................. 4 C. PROPOSED SCOPE OF WORK .............................................................................. 4 D. SOLUTION ALTERNATIVES CONSIDERED .......................................................... 4 E. RISK OF NO ACTION............................................................................................... 4 F. PROJECT BENEFITS............................................................................................... 5 G. PROJECT RELATIONSHIPS (IF APPLICABLE) ..................................................... 5 100 Marsh Hill Road, Orange, Connecticut 06477 2 The United Illuminating Company Docket No. 26-08-08 I. Appendix 7-Grid Needs Filing Narrative Document 3 of 5 Document Background This Grid Needs Filing Narrative Document serves as a supplement to Appendix 6 Grid Needs Filing of the NWS annual filing package. This document is intended to provide greater detail in an effort to increase the Public Utility Regulatory Authority and their Process Monitor’s awareness of project solutions alternatives and the solution selection process per project contained in the Grid Needs Filing. II. Grid Needs Filings Projects Narratives 1. UI Regional Career High School Microgrid - Energy Storage Resiliency - New Haven Project ID#: PRJ-003790 Estimated Start Year (Construction): 2027 Regulatory Category: Resiliency, Modernization Estimated In Service Year (Energized): 2027 Project Cost: $4,689,808 a. Project Description CT. Public Act 22-55 was approved by the CT. General Assembly in May of 2022. This act allowed PURA to direct each EDC to submit no more than 3 proposals for pilot projects to build, own, and operate Battery Energy Storage Systems (BESS) in their service territories. This New Haven BEES Microgrid project was approved in PURA Docket Number 22-06-05 PURA Implementation of Public Act 22-55. Hill Regional Career High School is located at 140 Legion Ave. New Haven, Connecticut within the UI operations territory. The building is served by New Haven circuit 1526 (13.8 kV) via a branch of the circuit approx. 1.2 miles from the Water St. Substation. The circuit serves approximately 1,949 customers with a peak load of 8.56 MW (Summer). The building is served by a 3-phase, 750kVA pad-mount transformer at a voltage of 277/480 Vac. The facility hosts a 143kW rooftop solar array and a 75kW natural gas-powered combined heat and power generation unit. The facility is designated as a critical facility on New Haven circuit 1526 and serves as an emergency shelter for the community during a natural disaster or prolonged electrical outage. This facility’s primary non-emergency use is as a magnet high school that also provides many community support functions. The facility has been designated as a top 10 tier 1 priority for 100 Marsh Hill Road, Orange, Connecticut 06477 3 The United Illuminating Company Docket No. 26-08-08 Appendix 7-Grid Needs Filing Narrative Document 4 of 5 electrical restoration after an outage and is located within a DOE Disadvantaged Community (DAC).1 b. System Needs and Justification Since January 2015, circuit 1526 has experienced 56 unexpected outages resulting in 7,441 unique customer-outage events (the average outage affected 127 customers). The average unexpected outage duration was 4.7 hours. A very high percentage of unexpected outages (82%) had a duration of four hours or less. Of the historical unexpected outages on New Haven Circuit 1526 since 2015, zero were caused by faults that occurred at the critical service pole. Therefore, the critical facility could avoid 100% of historical unexpected outages if electrically isolated as part of an islanding scheme. c. Proposed Scope of Work Installation of a 2.5 MW, 7.0 MWh battery mid-circuit on circuit 1526 to provide outage mitigation to emergency shelter (Hill Regional HS) and adjacent circuit branch serving Environmental Justice Community (EJC) and DAC customers as approved in DN 22-06-05. This battery storage project consists of installing a 2.5 MW, 7.0 MWh Battery Energy Storage System (BESS) mid-circuit on circuit 1526 in New Haven, Connecticut. The battery will be used to provide circuit resiliency and capacity benefits. Specific use cases for this project include: 1. Resiliency and back up to a targeted section of a poor performing circuit 2. Provides back-up to Low to Moderate Income (LMI) and EJC 3. Provides targeted relief during ISO-NE capacity events 4. Provides load relief to an overloaded circuit d. Solution Alternatives Considered Alternative 1: The first equivalent alternative considered was a traditional resiliency poles & wires solution which consists of a dual-feed solution that provides backup power from a neighboring circuit utilizing a Vista switch. It also includes converting a section of the circuit to aerial cable and adding an electronic recloser to better isolate the critical facility from outages on the downstream circuit. The total cost of the traditional poles and wires solution is estimated to be $1,687,970. Alternative 2: The second equivalent alternative solution considered was a natural gas generator to provide outage back-up capabilities to the three critical facilities. The total estimated capital cost of a natural gas generator is $1,010,000 with annual recurring OPEX costs of $10,000 for fuel and maintenance, with a total lifetime cost (15 years) of $1,200,000. e. Risk of No Action The primary risk to this project is budget overruns due to rising BESS implementation costs, high internal costs associated to overheads and the relative complexity involved in the installation, commissioning and operation of a microgrid. Within its decision (DN 22-06-05) approving the 1 https://www.energy.gov/diversity/justice40-initiative 100 Marsh Hill Road, Orange, Connecticut 06477 4 The United Illuminating Company Docket No. 26-08-08 Appendix 7-Grid Needs Filing Narrative Document 5 of 5 microgrid, PURA required all approved BESS microgrid projects to pass certain benefit-cost analysis (BCA) hurdles throughout the major milestones of the project development and execution. The next major milestone will be the release and evaluation of an RFP (anticipated early 2026) which will require a revised BCA conducted based upon actual costs. If the BCA value falls below a 1.0, the scope of the project needs to be revised, or the project needs to be cancelled outright. Budgetary risk mitigation includes strict adherence to internal budgets, timelines and milestones through a robust project management strategy, a comprehensive RFP process to help mitigate additional risk contingencies built into pricing. Secondary risks are associated with the siting of the BESS microgrid itself. The BESS will be designed to be installed on public property, in close proximity to a public high school and residential community and is subject to the full zoning and siting process with the City of New Haven and the State of Connecticut. Mitigating these risks has involved extensive and continuous outreach, including close collaboration with city and state officials, building owners, residents, and local community groups to foster understanding and secure support for the benefits this project brings to the community. f. Project Benefits Energy storage will be required to meet the State’s clean energy goals enabling the integration of renewable intermittent resources like solar and wind. This project addresses an existing operational resiliency need and utilizes existing connected intermittent resources to optimize battery charging and discharging cycles. This project also helps Connecticut move towards its goal of 1 GW of energy storage by 2030. g. Project Relationships (if applicable) Not applicable. 100 Marsh Hill Road, Orange, Connecticut 06477 5

Text of 2026-02-06 Appendix 8- DER Deployment Requirement No. 1 and 2 #26-08-08.xlsx

Extracted from the file · 23,508 characters
[Sheet: Q1] DER Deployment Requirement No. 1: | Current distributed generation deployment by type (photovoltaic, hydro, wind, etc.), size ((1) 0 kW to 25 kW, (2) more than 25 kW to 200 kW, (3) more than 200 kW to 600 kW, (4) more than 600 kW to 2,000 kW, and (5) more than 2,000 kW), and geographic dispersion (as useful for planning purposes; such as, by planning areas, service/work center areas, cities, etc.). Column Labels Battery | Fuel Cell | Other | Photovoltaic | Reciprocating Engine | Turbine | Total Quantities | Total System Design Capacity Row Labels | Quantities | System Design Capacity | Quantities | System Design Capacity | Quantities | System Design Capacity | Quantities | System Design Capacity | Quantities | System Design Capacity | Quantities | System Design Capacity 0 kW to 25 kW | 105 | 1546.7229999999993 | 5 | 5 | 7 | 100.72 | 37794 | 261292.28110000948 | 4 | 38.8 | 5 | 9 | 37920 | 262992.52410000016 ANSONIA | 6 | 73.25 | 1177 | 7656.230000000027 | 1183 | 7729.4800000000205 ANSONIA | 6 | 73.25 | 1062 | 6915.70800000002 | 1068 | 6988.958000000021 INDIAN | 112 | 725.7220000000002 | 112 | 725.7220000000002 MILVON | 2 | 7.6 | 2 | 7.6 SACKETT | 1 | 7.2 | 1 | 7.2 BRIDGEPORT | 15 | 180.91000000000003 | 2 | 5 | 1 | 7.88 | 5695 | 32551.587999998887 | 5713 | 32745.377999999917 ANSONIA | 2 | 8.88 | 2 | 8.88 ASHCREEK | 1 | 15 | 240 | 1410.4329999999989 | 241 | 1425.4329999999989 BAIRD | 162 | 797.3599999999998 | 162 | 797.3599999999998 BARNUM | 22 | 117.39999999999998 | 22 | 117.39999999999998 BRIDGEPORT | 2 | 22.810000000000002 | 1 | 5 | 84 | 602.4699999999999 | 87 | 630.2799999999999 BROADWAY | 1 | 7.6 | 1 | 7.6 CARN | 30 | 152.22 | 30 | 152.22 CONGRESS | 7 | 84.85 | 1 | 7.88 | 3169 | 17861.272999999856 | 3177 | 17954.002999999855 HAWTHORN | 30 | 222.66799999999995 | 30 | 222.66799999999995 MIX_AVE | 1 | 5.1 | 1 | 5.1 OLD_TOWN | 5 | 58.25 | 1635 | 9611.500000000067 | 1640 | 9669.750000000065 PEQUONCK | 1 | 0 | 319 | 1754.6839999999966 | 320 | 1754.6839999999966 DERBY | 5 | 73.36 | 1 | 15.2 | 671 | 4798.725000000003 | 1 | 0 | 678 | 4887.285000000002 ANSONIA | 3 | 32.8 | 1 | 15.2 | 616 | 4413.658000000001 | 620 | 4461.658000000001 INDIAN | 2 | 40.56 | 52 | 358.848 | 1 | 0 | 55 | 399.40800000000013 JUNE_ST | 1 | 10.819 | 1 | 10.819 MILVON | 1 | 5 | 1 | 5 QUINNIPC | 1 | 10.4 | 1 | 10.4 EAST HAVEN | 2 | 32 | 1 | 10 | 2110 | 14785.554000000056 | 2113 | 14827.554000000053 E_SHORE | 2 | 32 | 1388 | 9282.671000000044 | 1390 | 9314.671000000044 East Haven | 1 | 10 | 29 | 250.08799999999997 | 30 | 260.08799999999997 HAWTHORN | 1 | 10 | 1 | 10 INDIAN | 3 | 25.3 | 3 | 25.3 JUNE_ST | 1 | 9 | 1 | 9 MIX_AVE | 1 | 5.76 | 1 | 5.76 QUINNIPC | 686 | 5195.135000000009 | 686 | 5195.135000000009 WATRSTUI | 1 | 7.6 | 1 | 7.6 EASTON | 4 | 83.6 | 369 | 4092.839000000001 | 373 | 4176.439 ANSONIA | 1 | 14.79 | 1 | 14.79 HAWTHORN | 4 | 83.6 | 344 | 3723.629000000001 | 348 | 3807.2290000000003 OLD_TOWN | 24 | 354.42 | 24 | 354.42 FAIRFIELD | 7 | 109.6 | 1850 | 14350.706200000055 | 1857 | 14460.306200000028 ANSONIA | 2 | 13.6 | 2 | 13.6 ASHCREEK | 811 | 6020.515000000019 | 811 | 6020.515000000019 CONGRESS | 169 | 1097.1299999999999 | 169 | 1097.1299999999999 HAWTHORN | 7 | 109.6 | 730 | 6350.26420000001 | 737 | 6459.864200000009 MIX_AVE | 1 | 3.8 | 1 | 3.8 OLD_TOWN | 13 | 110.075 | 13 | 110.075 SACKETT | 2 | 20 | 2 | 20 TRUMBULL | 4 | 20.18 | 4 | 20.18 TUNXS | 118 | 715.1420000000004 | 118 | 715.1420000000004 HAMDEN | 10 | 166.2 | 3940 | 26202.646999999542 | 1 | 6 | 3951 | 26374.846999999747 BROADWAY | 72 | 440.6750000000002 | 72 | 440.6750000000002 E_SHORE | 1 | 5 | 1 | 5 Hamden | 1 | 11 | 45 | 338.76000000000005 | 1 | 6 | 47 | 355.76000000000005 JUNE_ST | 1 | 3.8 | 1 | 3.8 MILL_RV | 23 | 134.05999999999997 | 23 | 134.05999999999997 MIX_AVE | 9 | 155.2 | 3299 | 22176.968999999757 | 3308 | 22332.168999999754 N_HAVEN | 57 | 362.575 | 57 | 362.575 OLD_TOWN | 2 | 13.92 | 2 | 13.92 POOTATCK | 1 | 3.42 | 1 | 3.42 QUINNIPC | 1 | 4.2 | 1 | 4.2 SACKETT | 392 | 2458.607999999997 | 392 | 2458.607999999997 WHITNEY | 46 | 260.65999999999997 | 46 | 260.65999999999997 NEW HAVEN | 8 | 90.63999999999999 | 1 | 0 | 1 | 11.44 | 3173 | 18821.210999999847 | 2 | 21.2 | 1 | 0 | 3186 | 18944.491000000024 ALLINGS | 1 | 5 | 1 | 5 BROADWAY | 538 | 2924.493000000002 | 538 | 2924.493000000002 E_SHORE | 1 | 13.61 | 1 | 0 | 883 | 5371.007000000024 | 1 | 0 | 886 | 5384.617000000025 ELM_WEST | 85 | 527.0990000000002 | 1 | 1.2 | 86 | 528.2990000000002 JUNE_ST | 1 | 15.2 | 633 | 4074.9590000000035 | 634 | 4090.1590000000033 MILL_RV | 2 | 15 | 406 | 2375.1459999999975 | 1 | 20 | 409 | 2410.145999999998 MILVON | 2 | 10.6 | 2 | 10.6 MIX_AVE | 10 | 62.209999999999994 | 10 | 62.209999999999994 N_HAVEN | 1 | 1.87 | 1 | 1.87 New Haven | 3 | 35.42 | 1 | 11.44 | 41 | 246.311 | 45 | 293.17100000000005 PEQUONCK | 1 | 4.32 | 1 | 4.32 QUINNIPC | 143 | 928.3969999999998 | 143 | 928.3969999999998 SACKETT | 39 | 215.07200000000003 | 39 | 215.07200000000003 WATRSTUI | 1 | 11.41 | 308 | 1584.2659999999967 | 309 | 1595.6759999999965 WHITNEY | 53 | 374.12600000000003 | 53 | 374.12600000000003 WVILL | 29 | 116.33499999999998 | 29 | 116.33499999999998 NORTH HAVEN | 1 | 10 | 2166 | 17654.84100000006 | 1 | 0 | 2168 | 17664.84100000003 CONGRESS | 1 | 5 | 1 | 5 E_SHORE | 27 | 211.28999999999996 | 27 | 211.28999999999996 MIX_AVE | 82 | 533.814 | 82 | 533.814 N_HAVEN | 985 | 8308.848000000038 | 985 | 8308.848000000038 QUINNIPC | 482 | 4140.180999999995 | 1 | 0 | 483 | 4140.180999999995 SACKETT | 1 | 10 | 589 | 4455.707999999998 | 590 | 4465.707999999998 ORANGE | 4 | 80.42999999999999 | 1018 | 9144.501000000011 | 1022 | 9224.930999999999 ALLINGS | 2 | 37.6 | 555 | 4900.245999999998 | 557 | 4937.846 ANSONIA | 117 | 1165.1809999999998 | 117 | 1165.1809999999998 ELM_WEST | 1 | 5 | 1 | 5 INDIAN | 3 | 11 | 3 | 11 JUNE_ST | 1 | 11.4 | 1 | 11.4 MILVON | 67 | 602.8050000000002 | 67 | 602.8050000000002 Orange | 2 | 42.83 | 20 | 185.57799999999997 | 22 | 228.40799999999996 WOODMONT | 254 | 2263.290999999999 | 254 | 2263.290999999999 STRATFORD | 8 | 118.92 | 4105 | 25894.074999999557 | 1 | 3 | 4114 | 26015.995000000163 BAIRD | 5 | 75.31 | 1356 | 8057.02400000007 | 1 | 3 | 1362 | 8135.334000000072 BARNUM | 3 | 43.61 | 2287 | 14505.635000000082 | 2290 | 14549.245000000084 CANAL | 113 | 573.13 | 113 | 573.13 CARN | 23 | 113.19999999999997 | 23 | 113.19999999999997 CONGRESS | 28 | 168.85999999999999 | 28 | 168.85999999999999 MILVON | 1 | 11.4 | 1 | 11.4 SACKETT | 1 | 5.76 | 1 | 5.76 STRATFORD | 39 | 341.62800000000004 | 39 | 341.62800000000004 TRAPFALS | 120 | 1097.7520000000004 | 120 | 1097.7520000000004 TRUMBULL | 137 | 1019.686 | 137 | 1019.686 TRUMBULL | 7 | 120.81 | 1733 | 14226.237000000048 | 1740 | 14347.047000000011 ASHCREEK | 1 | 10 | 1 | 10 BAIRD | 1 | 6 | 1 | 6 BARNUM | 1 | 5.76 | 1 | 5.76 CONGRESS | 281 | 2103.580999999997 | 281 | 2103.580999999997 HAWTHORN | 2 | 39.45 | 183 | 1725.229 | 185 | 1764.6790000000003 MILL_RV | 2 | 16.48 | 2 | 16.48 OLD_TOWN | 5 | 81.36 | 820 | 6503.490000000014 | 825 | 6584.850000000014 TRAPFALS | 12 | 83.59 | 12 | 83.59 TRUMBULL | 431 | 3766.1069999999995 | 431 | 3766.1069999999995 WOODMONT | 1 | 6 | 1 | 6 WOODBRIDGE | 1 | 14.423 | 1 | 0 | 514 | 4904.457000000006 | 516 | 4918.880000000006 ALLINGS | 6 | 56.2 | 6 | 56.2 ANSONIA | 6 | 75.4 | 6 | 75.4 JUNE_ST | 1 | 14.423 | 1 | 0 | 502 | 4772.857000000005 | 504 | 4787.280000000005 WEST HAVEN | 12 | 168.65000000000003 | 3267 | 20802.758899999706 | 1 | 17.6 | 3280 | 20989.008899999986 ALLINGS | 2 | 25.22 | 583 | 3816.5539999999996 | 585 | 3841.7739999999994 BROADWAY | 1 | 13.6 | 1 | 13.6 ELM_WEST | 10 | 143.43 | 2643 | 16653.19190000001 | 1 | 17.6 | 2654 | 16814.221899999986 MIX_AVE | 2 | 15.2 | 2 | 15.2 WATRSTUI | 5 | 47.540000000000006 | 5 | 47.540000000000006 WHAVN | 33 | 256.67300000000006 | 33 | 256.67300000000006 SHELTON | 10 | 159.41 | 2 | 38.6 | 1934 | 15594.531000000079 | 1 | 0 | 1947 | 15792.541000000043 INDIAN | 2 | 32.81 | 2 | 38.6 | 1230 | 9761.74400000004 | 1234 | 9833.154000000042 OLD_TOWN | 23 | 190.97599999999994 | 23 | 190.97599999999994 POOTATCK | 2 | 35.2 | 173 | 1416.2789999999995 | 175 | 1451.4789999999994 SHELTON | 3 | 33.8 | 28 | 226.32799999999997 | 1 | 0 | 32 | 260.128 TRAPFALS | 149 | 1130.0740000000003 | 149 | 1130.0740000000003 TRUMBULL | 3 | 57.6 | 330 | 2861.529999999999 | 333 | 2919.129999999999 WOODMONT | 1 | 7.6 | 1 | 7.6 BRANFORD | 2 | 36.519999999999996 | 1 | 17.6 | 587 | 5083.508999999998 | 590 | 5137.628999999999 N_HAVEN | 1 | 6 | 1 | 6 North Branford | 1 | 15 | 2 | 17.688 | 3 | 32.687999999999995 QUINNIPC | 1 | 21.52 | 1 | 17.6 | 584 | 5059.820999999999 | 586 | 5098.940999999999 SEYMOUR | 3 | 49.800000000000004 | 3 | 49.800000000000004 ANSONIA | 2 | 25.200000000000003 | 2 | 25.200000000000003 SEYMOUR | 1 | 24.6 | 1 | 24.6 MISSING | 3 | 28 | 1 | 0 | 3480 | 24663.370999999588 | 3484 | 24691.371000000116 ALLINGS | 46 | 349.42299999999994 | 46 | 349.42299999999994 ANSONIA | 2 | 2 ASHCREEK | 72 | 724.0810000000002 | 72 | 724.0810000000002 BARNUM | 219 | 1236.7039999999986 | 219 | 1236.7039999999986 CONGRESS | 1 | 3.8 | 1 | 3.8 ELM_WEST | 1 | 12.24 | 1 | 12.24 HAWTHORN | 5 | 57.48 | 5 | 57.48 INDIAN | 5 | 31.9 | 5 | 31.9 Milford | 29 | 176.81499999999997 | 29 | 176.81499999999997 MILVON | 2 | 23 | 1 | 0 | 2000 | 13897.504000000059 | 2003 | 13920.504000000059 MIX_AVE | 3 | 36.2 | 3 | 36.2 New Haven | 3 | 29.85 | 3 | 29.85 NOBLE | 5 | 23.535 | 5 | 23.535 QUINNIPC | 3 | 40 | 3 | 40 TRAPFALS | 2 | 11.399999999999999 | 2 | 11.399999999999999 WATRSTUI | 2 | 18.6 | 2 | 18.6 WOODMONT | 1 | 5 | 1082 | 8013.839000000057 | 1083 | 8018.839000000058 WALLINGFORD | 2 | 14.7 | 2 | 14.7 N_HAVEN | 2 | 14.7 | 2 | 14.7 More than 2,000 kW | 7 | 41172.8 | 19 | 121163 | 1 | 4900 | 18 | 71931.58 | 12 | 81650 | 10 | 78859 | 67 | 399676.38 ANSONIA | 1 | 4140 | 1 | 3900 | 2 | 8040 ANSONIA | 1 | 4140 | 1 | 3900 | 2 | 8040 BRIDGEPORT | 1 | 4990 | 6 | 56410 | 4 | 13240.6 | 2 | 7050 | 13 | 81690.6 BAIRD | 2 | 7050 | 2 | 7050 CONGRESS | 4 | 43950 | 1 | 4999 | 5 | 48949 PEQUONCK | 1 | 4990 | 2 | 12460 | 3 | 8241.6 | 6 | 25691.6 DERBY | 2 | 18800 | 3 | 11130 | 5 | 29930 ANSONIA | 1 | 2800 | 1 | 3120 | 2 | 5920 INDIAN | 1 | 16000 | 2 | 8010 | 3 | 24010 FAIRFIELD | 1 | 4300 | 1 | 4300 ASHCREEK | 1 | 4300 | 1 | 4300 HAMDEN | 1 | 2459.4 | 1 | 2459.4 MIX_AVE | 1 | 2459.4 | 1 | 2459.4 NEW HAVEN | 1 | 4990 | 3 | 7414 | 5 | 23000 | 6 | 57700 | 15 | 93104 BROADWAY | 1 | 2314 | 2 | 7000 | 4 | 36800 | 7 | 46114 E_SHORE | 1 | 4990 | 1 | 2800 | 1 | 4000 | 3 | 11790 MILL_RV | 2 | 12000 | 1 | 3500 | 3 | 15500 QUINNIPC | 1 | 2300 | 1 | 2300 WATRSTUI | 1 | 17400 | 1 | 17400 NORTH HAVEN | 6 | 23787.98 | 1 | 2250 | 1 | 2970 | 8 | 29007.98 E_SHORE | 1 | 2300 | 1 | 2300 N_HAVEN | 1 | 2250 | 1 | 2250 QUINNIPC | 3 | 14958 | 1 | 2970 | 4 | 17928 SACKETT | 2 | 6529.98 | 2 | 6529.98 STRATFORD | 1 | 2784.4 | 1 | 4999 | 1 | 10265 | 3 | 18048.4 BARNUM | 1 | 2784.4 | 1 | 4999 | 2 | 7783.4 TRAPFALS | 1 | 10265 | 1 | 10265 TRUMBULL | 1 | 3400 | 1 | 4900 | 3 | 21350 | 5 | 29650 BARNUM | 1 | 6150 | 1 | 6150 TRAPFALS | 1 | 4900 | 1 | 4900 TRUMBULL | 1 | 3400 | 2 | 15200 | 3 | 18600 WOODBRIDGE | 1 | 2200 | 2 | 6250 | 3 | 8450 INDIAN | 1 | 2125 | 1 | 2125 JUNE_ST | 1 | 2200 | 1 | 4125 | 2 | 6325 WEST HAVEN | 2 | 20959 | 1 | 9423 | 1 | 3624 | 4 | 34006 ELM_WEST | 2 | 20959 | 1 | 9423 | 1 | 3624 | 4 | 34006 SHELTON | 1 | 5000 | 1 | 28000 | 2 | 33000 BROADWAY | 1 | 5000 | 1 | 5000 INDIAN | 1 | 28000 | 1 | 28000 MISSING | 1 | 4990 | 3 | 18800 | 1 | 4200 | 5 | 27990 HAWTHORN | 1 | 5000 | 1 | 4200 | 2 | 9200 MILVON | 1 | 4990 | 2 | 13800 | 3 | 18790 More than 200 kW to 600 kW | 3 | 1218 | 29 | 10140 | 1 | 500 | 135 | 44300.87500000001 | 8 | 3585 | 5 | 1670 | 181 | 61413.875000000015 ANSONIA | 4 | 1624.3 | 4 | 1624.3 ANSONIA | 4 | 1624.3 | 4 | 1624.3 BRIDGEPORT | 3 | 1050 | 1 | 500 | 12 | 3601.375 | 1 | 600 | 17 | 5751.375 BAIRD | 3 | 950 | 3 | 950 BRIDGEPORT | 2 | 620 | 2 | 620 CONGRESS | 1 | 210 | 3 | 1026 | 1 | 600 | 5 | 1836 HAWTHORN | 1 | 210 | 1 | 210 PEQUONCK | 2 | 840 | 1 | 500 | 3 | 795.375 | 6 | 2135.375 DERBY | 1 | 210 | 2 | 799.8 | 1 | 260 | 4 | 1269.8 ANSONIA | 2 | 799.8 | 1 | 260 | 3 | 1059.8 INDIAN | 1 | 210 | 1 | 210 EAST HAVEN | 1 | 210 | 1 | 210 E_SHORE | 1 | 210 | 1 | 210 EASTON | 3 | 992 | 3 | 992 HAWTHORN | 3 | 992 | 3 | 992 FAIRFIELD | 2 | 610 | 8 | 2911 | 1 | 300 | 1 | 360 | 12 | 4181 ASHCREEK | 2 | 610 | 4 | 1346 | 1 | 300 | 1 | 360 | 8 | 2616 CONGRESS | 2 | 583 | 2 | 583 HAWTHORN | 2 | 982 | 2 | 982 HAMDEN | 4 | 1660 | 17 | 5808.3 | 1 | 250 | 22 | 7718.3 MIX_AVE | 3 | 1260 | 13 | 4478.3 | 1 | 250 | 17 | 5988.3 N_HAVEN | 2 | 480 | 2 | 480 SACKETT | 1 | 400 | 2 | 850 | 3 | 1250 NEW HAVEN | 7 | 2650 | 16 | 5401.5999999999985 | 4 | 1835 | 27 | 9886.599999999999 BROADWAY | 6 | 1663.3999999999999 | 6 | 1663.3999999999999 JUNE_ST | 1 | 480 | 1 | 480 MILL_RV | 3 | 1200 | 4 | 1374.9 | 7 | 2574.9 N_HAVEN | 1 | 400 | 1 | 400 New Haven | 1 | 250 | 1 | 250 QUINNIPC | 1 | 400 | 3 | 985 | 1 | 500 | 5 | 1885 WATRSTUI | 2 | 800 | 2 | 898.3 | 2 | 935 | 6 | 2633.3 NORTH HAVEN | 3 | 810 | 11 | 3270.2 | 14 | 4080.2 E_SHORE | 1 | 300 | 1 | 300 N_HAVEN | 3 | 685.8 | 3 | 685.8 QUINNIPC | 1 | 210 | 1 | 252 | 2 | 462 SACKETT | 1 | 300 | 7 | 2332.4 | 8 | 2632.4 ORANGE | 1 | 300 | 7 | 2033.3 | 8 | 2333.3 ALLINGS | 3 | 893 | 3 | 893 WOODMONT | 1 | 300 | 4 | 1140.3 | 5 | 1440.3 STRATFORD | 1 | 210 | 11 | 3542.3 | 1 | 500 | 13 | 4252.3 BAIRD | 6 | 2358.3 | 6 | 2358.3 BARNUM | 1 | 210 | 4 | 944 | 5 | 1154 STRATFORD | 1 | 240 | 1 | 240 TRAPFALS | 1 | 500 | 1 | 500 TRUMBULL | 1 | 300 | 11 | 3730.8 | 12 | 4030.8 CONGRESS | 1 | 375 | 1 | 375 HAWTHORN | 1 | 250 | 1 | 250 OLD_TOWN | 1 | 300 | 5 | 1855.8 | 6 | 2155.8 TRUMBULL | 4 | 1250 | 4 | 1250 WOODBRIDGE | 1 | 300 | 3 | 662 | 4 | 962 JUNE_ST | 1 | 300 | 3 | 662 | 4 | 962 WEST HAVEN | 3 | 1200 | 12 | 3908 | 15 | 5108 ALLINGS | 1 | 460 | 2 | 475 | 3 | 935 ELM_WEST | 2 | 740 | 8 | 2433 | 10 | 3173 WHAVN | 2 | 1000 | 2 | 1000 SHELTON | 1 | 440 | 6 | 2006.2 | 2 | 850 | 9 | 3296.2 INDIAN | 1 | 440 | 3 | 1049.2 | 1 | 250 | 5 | 1739.1999999999998 POOTATCK | 1 | 600 | 1 | 600 TRAPFALS | 2 | 732 | 2 | 732 TRUMBULL | 1 | 225 | 1 | 225 BRANFORD | 1 | 400 | 1 | 300 | 2 | 700 QUINNIPC | 1 | 400 | 1 | 300 | 2 | 700 MISSING | 2 | 1008 | 12 | 4009.7000000000003 | 14 | 5017.7 ASHCREEK | 1 | 300 | 1 | 300 MILVON | 2 | 1008 | 2 | 699.9000000000001 | 4 | 1707.8999999999999 MIX_AVE | 1 | 450 | 1 | 450 WOODMONT | 8 | 2559.8 | 8 | 2559.8 More than 25 kW to 200 kW | 17 | 512.286 | 3 | 557.5 | 1 | 26.52 | 654 | 52623.35599999999 | 33 | 2545 | 7 | 410 | 715 | 56674.66199999999 ANSONIA | 7 | 921 | 7 | 921 ANSONIA | 7 | 921 | 7 | 921 BRIDGEPORT | 1 | 27.6 | 104 | 7426.595000000001 | 4 | 375 | 1 | 30 | 110 | 7859.195 ASHCREEK | 4 | 153.67000000000002 | 4 | 153.67000000000002 BAIRD | 12 | 1141 | 12 | 1141 BARNUM | 11 | 330 | 11 | 330 CONGRESS | 1 | 27.6 | 49 | 3557.5299999999997 | 2 | 255 | 1 | 30 | 53 | 3870.13 HAWTHORN | 2 | 120.6 | 1 | 60 | 3 | 180.6 OLD_TOWN | 5 | 294.7 | 5 | 294.7 PEQUONCK | 21 | 1829.0949999999998 | 1 | 60 | 22 | 1889.0949999999998 DERBY | 15 | 1845.9 | 15 | 1845.9 ANSONIA | 12 | 1591.5 | 12 | 1591.5 INDIAN | 3 | 254.4 | 3 | 254.4 EAST HAVEN | 14 | 1664.9 | 2 | 110 | 16 | 1774.9 E_SHORE | 12 | 1344.9 | 1 | 35 | 13 | 1379.9 QUINNIPC | 2 | 320 | 1 | 75 | 3 | 395 EASTON | 4 | 128.90699999999998 | 21 | 820.7600000000001 | 25 | 949.6670000000001 HAWTHORN | 3 | 98.707 | 18 | 620.36 | 21 | 719.0670000000001 OLD_TOWN | 1 | 30.2 | 3 | 200.39999999999998 | 4 | 230.59999999999997 FAIRFIELD | 6 | 166.07000000000002 | 1 | 200 | 75 | 5260.196 | 1 | 50 | 1 | 60 | 84 | 5736.266 ASHCREEK | 2 | 55.760000000000005 | 1 | 200 | 42 | 2761.15 | 1 | 50 | 1 | 60 | 47 | 3126.91 CONGRESS | 2 | 264 | 2 | 264 HAWTHORN | 4 | 110.31 | 28 | 2009.046 | 32 | 2119.356 OLD_TOWN | 1 | 86.4 | 1 | 86.4 TUNXS | 2 | 139.6 | 2 | 139.6 HAMDEN | 1 | 26.8 | 60 | 4993.6680000000015 | 5 | 420 | 1 | 30 | 67 | 5470.468000000001 Hamden | 2 | 59.44 | 2 | 59.44 MILL_RV | 1 | 25.8 | 1 | 25.8 MIX_AVE | 1 | 26.8 | 55 | 4813.028000000002 | 5 | 420 | 1 | 30 | 62 | 5289.828000000001 N_HAVEN | 1 | 43.2 | 1 | 43.2 WHITNEY | 1 | 52.2 | 1 | 52.2 NEW HAVEN | 1 | 200 | 73 | 6456.571 | 13 | 915 | 1 | 100 | 88 | 7671.571000000001 BROADWAY | 18 | 1841.835 | 3 | 300 | 21 | 2141.835 E_SHORE | 1 | 200 | 4 | 307.5 | 5 | 507.5 ELM_WEST | 2 | 138.9 | 2 | 138.9 JUNE_ST | 12 | 831.715 | 12 | 831.715 MILL_RV | 21 | 1903.3210000000001 | 7 | 365 | 1 | 100 | 29 | 2368.321 N_HAVEN | 1 | 185 | 1 | 185 QUINNIPC | 3 | 140 | 3 | 140 SACKETT | 1 | 100 | 1 | 100 WATRSTUI | 6 | 589.3 | 3 | 250 | 9 | 839.3 WHITNEY | 5 | 419 | 5 | 419 NORTH HAVEN | 2 | 56.799 | 47 | 3553.0589999999993 | 2 | 95 | 51 | 3704.858 E_SHORE | 4 | 344.8 | 4 | 344.8 MIX_AVE | 3 | 82.75999999999999 | 3 | 82.75999999999999 N_HAVEN | 1 | 29 | 23 | 1917.3400000000001 | 2 | 95 | 26 | 2041.3400000000001 QUINNIPC | 4 | 164.06 | 4 | 164.06 SACKETT | 1 | 27.799 | 12 | 848.0989999999999 | 13 | 875.8979999999999 WOODMONT | 1 | 196 | 1 | 196 ORANGE | 1 | 26.52 | 27 | 2525.4000000000005 | 1 | 75 | 29 | 2626.92 ALLINGS | 17 | 1583.64 | 1 | 75 | 18 | 1658.64 ANSONIA | 1 | 140 | 1 | 140 MILVON | 1 | 26.52 | 2 | 60.92 | 3 | 87.44 WOODMONT | 7 | 740.84 | 7 | 740.84 STRATFORD | 46 | 3648.624999999999 | 2 | 300 | 48 | 3948.624999999999 BAIRD | 29 | 2332.8249999999994 | 29 | 2332.8249999999994 BARNUM | 12 | 971.4000000000001 | 1 | 150 | 13 | 1121.4 STRATFORD | 2 | 192 | 2 | 192 TRAPFALS | 2 | 127.2 | 1 | 150 | 3 | 277.2 TRUMBULL | 1 | 25.2 | 1 | 25.2 TRUMBULL | 1 | 25.2 | 1 | 157.5 | 30 | 2454.8860000000004 | 32 | 2637.5860000000002 ASHCREEK | 1 | 150 | 1 | 150 CONGRESS | 2 | 172 | 2 | 172 HAWTHORN | 5 | 483.46 | 5 | 483.46 OLD_TOWN | 1 | 25.2 | 1 | 157.5 | 13 | 1057.0600000000002 | 15 | 1239.7600000000002 TRUMBULL | 9 | 592.366 | 9 | 592.366 WOODBRIDGE | 16 | 836.774 | 2 | 150 | 1 | 65 | 19 | 1051.774 JUNE_ST | 16 | 836.774 | 2 | 150 | 1 | 65 | 19 | 1051.774 WEST HAVEN | 21 | 1843.942 | 21 | 1843.942 ALLINGS | 3 | 240 | 3 | 240 ELM_WEST | 18 | 1603.942 | 18 | 1603.942 SHELTON | 2 | 80.91 | 26 | 2178.56 | 28 | 2259.47 INDIAN | 2 | 80.91 | 14 | 967.4999999999999 | 16 | 1048.4099999999999 POOTATCK | 3 | 284 | 3 | 284 SHELTON | 1 | 30.46 | 1 | 30.46 TRAPFALS | 7 | 856.6 | 7 | 856.6 TRUMBULL | 1 | 40 | 1 | 40 BRANFORD | 8 | 777.5 | 8 | 777.5 QUINNIPC | 8 | 777.5 | 8 | 777.5 MISSING | 64 | 5415.019999999999 | 2 | 130 | 1 | 50 | 67 | 5595.0199999999995 ASHCREEK | 4 | 171.4 | 4 | 171.4 BARNUM | 1 | 57.6 | 1 | 57.6 INDIAN | 1 | 29.24 | 1 | 29.24 Milford | 1 | 100 | 1 | 100 MILVON | 25 | 2427.66 | 1 | 70 | 26 | 2497.66 MIX_AVE | 1 | 200 | 1 | 200 WOODMONT | 31 | 2429.12 | 1 | 60 | 1 | 50 | 33 | 2539.12 More than 600 kW to 2,000 kW | 7 | 9625.2 | 15 | 19926.2 | 1 | 768 | 92 | 107335.70000000001 | 16 | 19890 | 7 | 9209 | 138 | 166754.09999999998 ANSONIA | 5 | 5698 | 5 | 5698 ANSONIA | 5 | 5698 | 5 | 5698 BRIDGEPORT | 1 | 1000 | 3 | 4100 | 8 | 9767 | 3 | 4389 | 2 | 3600 | 17 | 22856 BAIRD | 1 | 2000 | 1 | 1250 | 2 | 3250 CONGRESS | 1 | 1000 | 1 | 700 | 4 | 6058 | 2 | 2789 | 2 | 3600 | 10 | 14147 HAWTHORN | 1 | 760 | 1 | 760 PEQUONCK | 1 | 1400 | 2 | 1699 | 1 | 1600 | 4 | 4699 DERBY | 1 | 1100 | 1 | 966 | 2 | 1535 | 2 | 1400 | 6 | 5001 ANSONIA | 1 | 1100 | 1 | 966 | 1 | 625 | 3 | 2691 INDIAN | 1 | 910 | 2 | 1400 | 3 | 2310 EAST HAVEN | 4 | 5949 | 4 | 5949 E_SHORE | 1 | 990 | 1 | 990 QUINNIPC | 3 | 4959 | 3 | 4959 FAIRFIELD | 1 | 998 | 2 | 3035 | 3 | 4033 ASHCREEK | 1 | 998 | 1 | 1760 | 2 | 2758 HAWTHORN | 1 | 1275 | 1 | 1275 HAMDEN | 3 | 3195 | 4 | 4896 | 2 | 3076 | 9 | 11167 BROADWAY | 1 | 1000 | 1 | 1000 MIX_AVE | 2 | 2137 | 3 | 3896 | 2 | 3076 | 7 | 9109 SACKETT | 1 | 1058 | 1 | 1058 NEW HAVEN | 3 | 3911.2 | 14 | 17921.5 | 1 | 750 | 1 | 750 | 19 | 23332.699999999997 BROADWAY | 1 | 1586.2 | 3 | 2872.2 | 4 | 4458.4 E_SHORE | 1 | 750 | 1 | 750 MILL_RV | 1 | 1425 | 1 | 2000 | 2 | 3425 New Haven | 2 | 3920 | 2 | 3920 QUINNIPC | 2 | 1716 | 2 | 1716 WATRSTUI | 1 | 900 | 6 | 7413.299999999999 | 1 | 750 | 8 | 9063.3 NORTH HAVEN | 3 | 4920 | 7 | 8468 | 1 | 1250 | 1 | 1959 | 12 | 16597 E_SHORE | 1 | 2000 | 1 | 2000 N_HAVEN | 1 | 920 | 4 | 4143 | 1 | 1250 | 6 | 6313 QUINNIPC | 1 | 2000 | 1 | 1700 | 1 | 1959 | 3 | 5659 SACKETT | 2 | 2625 | 2 | 2625 ORANGE | 4 | 4285 | 4 | 4285 ALLINGS | 2 | 1660 | 2 | 1660 WOODMONT | 2 | 2625 | 2 | 2625 STRATFORD | 3 | 4351.2 | 3 | 2190 | 6 | 6541.2 BAIRD | 2 | 3104.2 | 2 | 1490 | 4 | 4594.2 BARNUM | 1 | 1247 | 1 | 700 | 2 | 1947 TRUMBULL | 2 | 3050 | 1 | 2000 | 3 | 5050 TRAPFALS | 1 | 1050 | 1 | 1050 TRUMBULL | 1 | 2000 | 1 | 2000 | 2 | 4000 WOODBRIDGE | 9 | 8400 | 9 | 8400 JUNE_ST | 9 | 8400 | 9 | 8400 WEST HAVEN | 5 | 4530 | 5 | 4530 ALLINGS | 1 | 990 | 1 | 990 ELM_WEST | 4 | 3540 | 4 | 3540 SHELTON | 1 | 1247 | 1 | 768 | 3 | 2508.2 | 3 | 3230 | 1 | 1500 | 9 | 9253.2 INDIAN | 1 | 768 | 1 | 750 | 1 | 1500 | 3 | 3018 POOTATCK | 1 | 1247 | 2 | 1533.2 | 3 | 2780.2 TRAPFALS | 1 | 975 | 2 | 2480 | 3 | 3455 BRANFORD | 13 | 14653 | 13 | 14653 QUINNIPC | 13 | 14653 | 13 | 14653 SEYMOUR | 3 | 6000 | 3 | 6000 ANSONIA | 3 | 6000 | 3 | 6000 MISSING | 1 | 1927 | 1 | 750 | 8 | 10106 | 1 | 625 | 11 | 13408 Milford | 1 | 1000 | 1 | 1000 MILVON | 1 | 1927 | 1 | 750 | 5 | 6640 | 1 | 625 | 8 | 9942 WOODMONT | 2 | 2466 | 2 | 2466 Grand Total | 139 | 54075.008999999984 | 71 | 151791.7 | 11 | 6295.240000000001 | 38693 | 537483.7921000095 | 73 | 107708.8 | 34 | 90157 | 39021 | 947511.5411000005 [Sheet: Q2] DER Deployment Requirement No. 2: | Projected distributed generation deployment by type (photovoltaic, hydro, wind, etc.), size (≤100 kilowatt (“kW”), 100kW-1 megawatt (“MW”), >1MW), and geographic dispersion (as useful for planning purposes; such as, by planning areas, service/work center areas, cities, etc.) over the next three and five years, respectively1. Linear Growth Forecast of Interconnection Applications Fast Track and Study YEAR | 0 kW to 25 kW | More than 25 kW to 200 kW | More than 200 kW to 600 kW | More than 600 kW to 2,000 kW | More than 2,000 kW 2019 | 3953 | 44 | 6 | 20 2020 | 3137 | 34 | 9 | 10 | 1 2021 | 3354 | 88 | 15 | 6 | 2 2022 | 2578 | 32 | 10 | 7 | 1 2023 | 3579 | 43 | 4 | 8 | 7 2024 | 3392 | 93 | 16 | 12 | 10 2025 | 3693 | 112 | 13 | 21 | 8 2026 (Forecast) | 3994 | 131 | 10 | 30 | 6 2027 (Forecast) | 4295 | 150 | 7 | 39 | 4 2028 (Forecast) | 4596 | 169 | 4 | 48 | 2 2029 (Forecast) | 4897 | 188 | 1 | 57 | 0 2030 (Forecast) | 5198 | 207 | -2 | 66 | -2 Exponential Growth Forecast of Interconnection Applications Fast Track and Study YEAR | 0 kW to 25 kW | More than 25 kW to 200 kW | More than 200 kW to 600 kW | More than 600 kW to 2,000 kW | More than 2,000 kW 2019 | 3953 | 44 | 6 | 20 | 0 2020 | 3137 | 34 | 9 | 10 | 1 2021 | 3354 | 88 | 15 | 6 | 2 2022 | 2578 | 32 | 10 | 7 | 1 2023 | 3579 | 43 | 4 | 8 | 7 2024 | 3392 | 93 | 16 | 12 | 10 2025 | 3693 | 112 | 13 | 21 | 8 2026 (Forecast) | 4020.7102004716985 | 134.88172043010752 | 10.5625 | 36.75 | 6.4 2027 (Forecast) | 4377.500816728179 | 162.4382009480865 | 8.58203125 | 64.3125 | 5.120000000000001 2028 (Forecast) | 4765.95239274091 | 195.62450006651278 | 6.972900390625 | 112.546875 | 4.096000000000001 2029 (Forecast) | 5188.874465327884 | 235.59079577902617 | 5.6654815673828125 | 196.95703125 | 3.276800000000001 2030 (Forecast) | 5649.3258845683595 | 283.72224868011756 | 4.603203773498535 | 344.6748046875 | 2.621440000000001 1 These forecasts are derived using linear and exponential regression models based on the provided data from 2019 to 2025.