Compliance Filing, Order No. OrderFiled by Eversource Energy

Compliance Filing

Part of

Docket 26-08-08Open

Non-Wires Solutions Process Cycle 2

Type of filing
Compliance filing (Compliance Filing, Order No. Order)
Date filed
March 31, 2026
Filed by
Eversource Energy
Files
1
As listed on the current system: Compliance Filings, 03/31/2026 [26-08-08] Order No.Order No 1 in Final decision 24-08-08 / Eversource Energy / Compliance Filing

This filing on the current system (opens in a new tab)

Files

Text of Dkt 26-08-08 - NWS Order 1 TDRP Filing.pdf

Extracted from the file · 2,288 characters
March 31, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: PURA Docket No. 26-08-08, Non-Wires Solutions Process Cycle 1 (Compliance with Order No. 1 of the Final Decision in Docket No. 24-08-08) Dear Mr. Gaudiosi: The Connecticut Power and Light Company d/b/a Eversource Energy (the “Company”) submits this compliance filing regarding the requirement to file its Annual Reliability Report Filing in this docket. Order No. 1 in the December 18, 2024 final decision in Docket No. 24-08-08, Non-Wires Solutions Process Initiation Phase (the “NWS Decision”) states the following: Effective on December 18, 2025 [sic], the issuance date of this Decision, the EDCs shall follow the annual NWS Process steps and requirements discussed herein and outlined in the Design Document. The Design Document referenced in Order No. 1 is the Design Document filed as Appendix A to the November 9, 2022 final decision in Docket No. 17-12-03RE07, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – Non-Wires Alternatives (the “RE07 Decision”). The Design Document directs the Company to file certain reliability metrics 1 in the annual Non-Wires Solutions (“NWS”) docket. Design Document at 12. Further, Table 4 in the NWS Decision lists the “EDC Annual Reliability Report Data Filing” as a Process Milestone in the annual NWS Docket. NWS Decision at 22. 0 The “EDC Annual Reliability Report” in the above-referenced Decisions is the Transmission and Distribution Reliability Performance (“TDRP”) Report required by Order No. 12 of Docket No. 86-12-03, which is to be filed by March 31 of each year. 1 See page 12 of the Design Document for a listing of the reliability metrics. -1- In compliance with Order No. 1 of the NWS Decision, the Company files the TDRP in this Docket to satisfy the requirements of the Design Document. The TDRP filed here is the Company’s March 31, 2026 TDRP Report that was also filed in Docket Nos. 86-12-03. If you have any questions, please contact the undersigned. Sincerely, Vincent P. Pace Vincent P. Pace Eric Eggleston On behalf of the Connecticut Light and Power Company d/b/a Eversource Energy Attachment cc: Service List -2-