Compliance Filing, Order No. OrderFiled by Eversource Energy
Compliance Filing
- Type of filing
- Compliance filing (Compliance Filing, Order No. Order)
- Date filed
- March 31, 2026
- Filed by
- Eversource Energy
- Files
- 1
As listed on the current system: Compliance Filings, 03/31/2026 [26-08-08] Order No.Order No 1 in Final decision 24-08-08 / Eversource Energy / Compliance Filing
Files
Dkt 26-08-08 - NWS Order 1 TDRP Filing.pdf
PDF · 163 KB · 2 pagesText searchable
Download Dkt 26-08-08 - NWS Order 1 TDRP Filing.pdfRead the text of Dkt 26-08-08 - NWS Order 1 TDRP Filing.pdf
Text of Dkt 26-08-08 - NWS Order 1 TDRP Filing.pdf
Extracted from the file · 2,288 characters
March 31, 2026
Mr. Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re:
PURA Docket No. 26-08-08, Non-Wires Solutions Process Cycle 1 (Compliance with
Order No. 1 of the Final Decision in Docket No. 24-08-08)
Dear Mr. Gaudiosi:
The Connecticut Power and Light Company d/b/a Eversource Energy (the “Company”) submits
this compliance filing regarding the requirement to file its Annual Reliability Report Filing in this
docket.
Order No. 1 in the December 18, 2024 final decision in Docket No. 24-08-08, Non-Wires Solutions
Process Initiation Phase (the “NWS Decision”) states the following:
Effective on December 18, 2025 [sic], the issuance date of this Decision, the EDCs
shall follow the annual NWS Process steps and requirements discussed herein and
outlined in the Design Document.
The Design Document referenced in Order No. 1 is the Design Document filed as Appendix A to
the November 9, 2022 final decision in Docket No. 17-12-03RE07, PURA Investigation into
Distribution System Planning of the Electric Distribution Companies – Non-Wires Alternatives
(the “RE07 Decision”). The Design Document directs the Company to file certain reliability
metrics 1 in the annual Non-Wires Solutions (“NWS”) docket. Design Document at 12. Further,
Table 4 in the NWS Decision lists the “EDC Annual Reliability Report Data Filing” as a Process
Milestone in the annual NWS Docket. NWS Decision at 22.
0
The “EDC Annual Reliability Report” in the above-referenced Decisions is the Transmission and
Distribution Reliability Performance (“TDRP”) Report required by Order No. 12 of Docket No.
86-12-03, which is to be filed by March 31 of each year.
1
See page 12 of the Design Document for a listing of the reliability metrics.
-1-
In compliance with Order No. 1 of the NWS Decision, the Company files the TDRP in this Docket
to satisfy the requirements of the Design Document. The TDRP filed here is the Company’s March
31, 2026 TDRP Report that was also filed in Docket Nos. 86-12-03. If you have any questions,
please contact the undersigned.
Sincerely,
Vincent P. Pace
Vincent P. Pace
Eric Eggleston
On behalf of the Connecticut Light and
Power Company d/b/a Eversource Energy
Attachment
cc: Service List
-2-