Compliance Filing, Order No. Q4Filed by Eversource Energy

Compliance Filing

Part of

Docket 26-08-08Open

Non-Wires Solutions Process Cycle 2

Type of filing
Compliance filing (Compliance Filing, Order No. Q4)
Date filed
November 3, 2026
Filed by
Eversource Energy
Files
3
As listed on the current system: Compliance Filings, 11/03/2026 [26-08-08] Order No.Q4 of the NWS decision No 4 / Eversource Energy / Compliance Filing

This filing on the current system (opens in a new tab)

Files

Text of Dkt 26-08-08 - Quarter 4 Filing Cover.pdf

Extracted from the file · 1,754 characters
107 Selden Street, Berlin, CT 06037 P.O. Box 270, Hartford, CT 06141-0270 Vincent P. Pace Assistant General Counsel [email removed] November 3, 2026 Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-08, Non-Wires Solutions Process Cycle 2 Fourth Quarter Screening Results for Investments between $250,000 and $500,000 Dear Mr. Gaudiosi: The Connecticut Light and Power Company d/b/a Eversource Energy (the “Company”) submits its fourth Non-Wires Solutions (“NWS”) quarterly screening results for 2026 in accordance with Order No. 4 of the Public Utility Regulatory Authority’s (“PURA’s”) Final Decision dated December 18, 2024 in Docket No. 24-08-08, Non-Wires Solutions Process Initiation Phase (“NWS Decision”). Order No. 4 Order No. 4 of the NWS Decision stated: No later than the first Friday of February, May, August, and November of each year for every NWS cycle, the EDCs shall file as compliance in the applicable annual proceeding (e.g., Docket No. 2X-08-08) the summary document of the quarterly NWS process described in Section III.B.1.c., Suitability Criteria – Cost Threshold. (NWS Decision at 23). Attachment 1_NWS Q4 Quarterly Filing comprises the November 2026 quarterly NWS process filing described in Order No. 4. The Company will file the next quarterly filing no later than February 5, 2027. If you have any questions concerning this filing, please contact myself at [phone removed] or Eric Eggleston at [email removed] or [phone removed]. Very truly yours, Vincent P. Pace Vincent P. Pace Assistant General Counsel On Behalf of the Connecticut Light and Power Company d/b/a Eversource Energy cc: Service list -1-

Text of Attachment 1_NWS Q4 Quarterly Filing.xlsx

Extracted from the file · 4,667 characters
[Sheet: Filing] Project # | Name of Project | Projected Date of Need/Timeline for improvement | Estimated Distribution Investment Cost | Project Justification | EDC Proposed NWS Solicitation? | Proposed Preliminary RFI? | Notes | Project scope and key materials (e.g., transformer, etc.) | Identification of project risks (e.g., potential for delays or cost overruns) Unlikely NWS Solicitation Opportunities (Other Planned Investments OVER $500,000, (i.e. Asset Condition, Maintenance, and Safety Projects) CD02996 | Tanglewood Dr. Preston DB Cable replacement | 2026 | 1011000 | Infrastructure Replacement | NO | NO | Full CPAC Approved Asset Condition | Project Summary & Scope: This project addresses the radial DB fault, resulting in damage to non-jacketed primary conductors, and (4) DB submersible transformers that were installed in the early 1950s at Tanglewood Rd in Preston, CT | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Materials Shortage or long lead times CD02998 | Lasalle Rd Raise Vault 252 and Replace Top | 2026 | 1134800 | Customer Additions | NO | NO | Full CPAC Approved Asset Condition | Project Summary & Scope: This project is established to accommodate the Town of West Hartford’s LaSalle Road streetscape project, which lowers the roadway grade at Vault#252. Following the field evaluation of the existing structure, the preferred solution is to replace the entire vault with a new poured-in-place vault at the required lower evaluation, including associated cable rework and the previously planned vault top replacement. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Materials Shortage or long lead times CS00747 | Sandy Hook 37F - 1X Transformer Emergent Replacement | 2026 | $8.0M | Emergent Failure | NO | NO | EPAC Partial Funding Approved Asset Condition | This project involves the emergent replacement of the 37F-1X transformer at Sandy Hook 37F substation in Sandy Hook, CT. The project will replace the existing 37F-1X transformer with a new 62.5 MVA power transformer and will include the replacement, modification, and installation of associated station equipment necessary to support the new transformer and restore the station to permanent service. | •Weather Delays •Internal construction resources not available to perform the work •Materials Shortage or long lead times Unlikely NWS Solicitation Opportunities (All Other Planned Investments Under $500,000, including Unknown and Known Priority Investments Required within a Year and Projects that are a Safety, Maintenance or Asset Condition Related. CD02853 | Eastern Nova Recloser Replacements | 2026 | 395800 | Infrastructure Replacement | NO | NO | Full CPAC Approved Wires & Poles | Project Summary & Scope: This project addresses the replacement of 4 reclosers in the Eastern Region affected by the manufacturer defect. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02970 | 1G08 Cable Replacement | 2026 | 760100 | Infrastructure Replacement | NO | NO | Full CPAC Approved Asset Condition | Project Summary & Scope: This project has been created to address the 1G08 feeder lockout. A total of 4 faulted locations were found to be on the feeder cables, which were all PILC. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02971 | Troutbrook DB Cable Replacement | 2026 | 890300 | Infrastructure Replacement | NO | NO | Full CPAC Approved Asset Condition | Project Summary & Scope: This project was created to address poor circuit reliability caused by faults in Direct Buried (DB) cable sections of the 3R06 circuit on Henkel Way, Rocky Hill. This specific section of DB cable on Trout Brook Crossing/Henkel Way has a history of five cable faults within the past three years, resulting in outages and reduced reliability for customers. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02972 | Reconductor Country Club Rd., Ridgefield | 2026 | 434500 | Infrastructure Replacement | NO | NO | Design CPAC Approved Wires & Poles | Project Summary & Scope: This project addresses Country Club Rd, Ridgefield, a lateral side tap in the Norwalk Area Work Center with bare wire and poor reliability over the past four years. | •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work

Text of Attachment 1_NWS Q4 Quarterly Filing.pdf

Extracted from the file · 4,674 characters
Connecticut Light and Power dba Eversource Energy Docket No. 26-08-08 November 3, 2026 NWS Q4 Quarterly Filing Project # CD02996 CD02998 CS00747 Name of Project Tanglewood Dr. Preston DB Cable replacement Lasalle Rd Raise Vault 252 and Replace Top Sandy Hook 37F - 1X Transformer Emergent Replacement Projected Date of Need/Timeline for improvement Estimated Distribution Investment Cost 2026 $1.M 2026 2026 Project Justification EDC Proposed Proposed NWS Solicitation? Preliminary RFI? Notes Project scope and key materials (e.g., transformer, etc.) Identification of project risks (e.g., potential for delays or cost overruns) Unlikely NWS Solicitation Opportunities (Other Planned Investments OVER $500,000, (i.e. Asset Condition, Maintenance, and Safety Projects) $1.1M $8.0M Infrastructure Replacement Customer Additions Emergent Failure NO NO NO NO NO NO Full CPAC Approved Asset Condition Project Summary & Scope: This project addresses the radial DB fault, resulting in damage to non-jacketed primary conductors, and (4) DB submersible transformers that were installed in the early 1950s at Tanglewood Rd in Preston, CT Full CPAC Approved Asset Condition Project Summary & Scope: This project is established to accommodate the Town of West Hartford’s LaSalle Road streetscape project, which lowers the roadway grade at •Customer Permission / Siting Council / Municipal approvals Vault#252. Following the field evaluation of the existing •Internal construction resources not available to perform the work structure, the preferred solution is to replace the entire vault •Materials Shortage or long lead times with a new poured-in-place vault at the required lower evaluation, including associated cable rework and the previously planned vault top replacement. EPAC Partial Funding Approved Asset Condition •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Materials Shortage or long lead times This project involves the emergent replacement of the 37F1X transformer at Sandy Hook 37F substation in Sandy Hook, CT. The project will replace the existing 37F-1X transformer with a new 62.5 MVA power transformer and will include the replacement, modification, and installation of associated station equipment necessary to support the new transformer •Weather Delays •Internal construction resources not available to perform the work and restore the station to permanent service. •Materials Shortage or long lead times Unlikely NWS Solicitation Opportunities (All Other Planned Investments Under $500,000, including Unknown and Known Priority Investments Required within a Year and Projects that are a Safety, Maintenance or Asset Condition Related. CD02853 Eastern Nova Recloser Replacements 2026 $.4M Infrastructure Replacement NO NO Full CPAC Approved Wires & Poles CD02970 1G08 Cable Replacement 2026 $.8M Infrastructure Replacement NO NO Full CPAC Approved Asset Condition Project Summary & Scope: This project addresses the replacement of 4 reclosers in the Eastern Region affected by the manufacturer defect. Project Summary & Scope: This project has been created to address the 1G08 feeder lockout. A total of 4 faulted locations were found to be on the feeder cables, which were all PILC. •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work •Customer Permission / Siting Council / Municipal approvals •Internal construction resources not available to perform the work CD02971 Troutbrook DB Cable Replacement 2026 $.9M Infrastructure Replacement NO NO Full CPAC Approved Asset Condition Project Summary & Scope: This project was created to address poor circuit reliability caused by faults in Direct Buried (DB) cable sections of the 3R06 circuit on Henkel Way, •Customer Permission / Siting Council / Municipal approvals Rocky Hill. This specific section of DB cable on Trout Brook •Internal construction resources not available to perform the work Crossing/Henkel Way has a history of five cable faults within the past three years, resulting in outages and reduced reliability for customers. CD02972 Reconductor Country Club Rd., Ridgefield 2026 $.4M Infrastructure Replacement NO NO Design CPAC Approved Wires & Poles Project Summary & Scope: This project addresses Country Club Rd, Ridgefield, a lateral side tap in the Norwalk Area •Customer Permission / Siting Council / Municipal approvals Work Center with bare wire and poor reliability over the past •Internal construction resources not available to perform the work four years.