InterrogatoriesFiled by PMUI
To UI, questions 1 thru 11
- Type of filing
- Interrogatory (Interrogatories)
- Date filed
- March 20, 2026
- Filed by
- PMUI
- Files
- 1
As listed on the current system: Interrogs from PMUI to UI 1 thru 11-Issued 03/20/2026 [26-08-08]
Files
26-08-08_Interrog_Set 1_UI_03-20-2026.pdf
PDF · 53 KB · 3 pagesText searchable
Download 26-08-08_Interrog_Set 1_UI_03-20-2026.pdfRead the text of 26-08-08_Interrog_Set 1_UI_03-20-2026.pdf
Text of 26-08-08_Interrog_Set 1_UI_03-20-2026.pdf
Extracted from the file · 4,259 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
NON-WIRES SOLUTIONS PROCESS
CYCLE 2
DOCKET NO. 26-08-08
March 20, 2026
PROCESS MONITOR
FIRST SET OF INTERROGATORIES
Dunsky Energy + Climate Advisors (Dunsky) serves as the Non-Wires Solutions Process
Monitor in Docket No. 26-08-08, Non-Wires Solutions Process Cycle 2, with NV5, Inc. (NV5)
serving as a subcontractor to Dunsky (together, the Process Monitor Team).
The Process Monitor Team requests responses from the United Illuminating Company (“UI”
or “Company”) to the following interrogatories in the above-captioned proceeding April 3,
2026. If there are any objections to any questions or if providing responses to certain
questions would be unduly burdensome, please contact the Process Monitor Team as soon
as possible.
SCOPE
The Process Monitor Team requests additional clarifying data concerning EDC data filing
requirements as established in Docket No. 24-08-08 Final Decision, Orders 1 and 4,
comprised of System, Financial, DER, and Reliability & Resilience Data, including
confidential data (together, EDC Filings).
PMUI-1: Please confirm if the Annual Grid Needs Filing (Appendix 6) in this and future
process cycles only includes grid needs that were identified after the Annual Grid Needs
Filing in the prior process cycle. If no, please describe what this filing represents.
PMUI-2: Please append the projects in last year's Annual Grid Needs Filing (Appendix 5, as
filed in 25-08-08) to this year's Annual Filing (Appendix 6), adding a column to indicate the
process cycle in which a project was originally filed.
1
PMUI-3: In the expanded Annual Filing, please indicate if projects filed in the prior Process
Cycle have been installed, cancelled, have had changes in scope of the grid need or the
expected price of the wires or non-wires solution or if they have moved to more advanced
funding stages.
PMUI-4: As noted in the prior cycle, "NWS solutions would be evaluated as projects
advance in funding stages".1 As part of the response to PMUI-2 and PMUI-3, please also
indicate if additional NWS evaluation has occurred, or is ongoing, for each project filed in
the prior process cycle.
PMEV-5: If you have not performed additional evaluation on the applicable projects from
last year’s filing, please confirm whether you plan to do so, describe the timing and process
of this evaluation, and specify whether you plan to explicitly include the projects in future
Grid Needs Filings.
PMEV-6: Are there any factors that may cause you to reevaluate projects that had been
previously identified as “Likely NWS Opportunities” but did not proceed to an NWS RFP? If
so, what are these factors and what would cause them to trigger a re-evaluation (i.e.
change in cost of the wired option, change in forecast over the distribution circuit,
reduction in costs of specific NWS solutions, etc.).
PMUI-7: Did you complete a Cost-Benefit Analysis when developing this year’s Grid Needs
Filing? If so, was that analysis aligned with the approach defined in the finalized BCA
Manual submitted on June 16, 2025 and approved by PURA through 24-08-08?2,3 If not,
please describe the screening process that was used to inform the preferred solution in
this year’s Grid Needs Filings and the rationale for using that process.
PMEV-8: Please describe how any additional benefits from the NWS alternative were
estimated and included in the Cost-Benefit Analysis.
PMUI-9: Regarding Financial Data Requirement #4 (Appendix 5), several projects are
justified as “Infrastructure Replacement”, or similar permutations. Please update the
“Project Justification” column rationale to align with the exclusion criteria set forth in the
24-08-08 Final Decision.4
Eversource Comments, July 18, 2025
Finalized BCA Reference Manual
3
PURA BCA Manual Ruling
4
24-08-08 Final Decision
1
2
2
PMUI-10: Regarding Financial Data Requirement #4 (Appendix 5), for all projects exceeding
$500,000, we request that additional details be provided to support classifying these
projects under the 24-08-08 Final Decision exclusion criteria.
PMUI-11: Please provide additional details on the circuit for PRJ-003790. Specifically,
please detail any overload conditions and how the proposed NWS provides load relief.
3