Answers to questions 15 thru 17

Interrogatory responses

Filed by UI

Part of

Non-Wires Solutions Process Cycle 2

Type of filing
Response (Interrogatory responses)
Date filed
March 24, 2026
Filed by
UI
Files
8

As listed on the current system

Question(s) Answered 15 thru 17 (UI) Date Filed: 03/24/2026

This filing on the current system (opens in a new tab)

Files8

RSR-015 The United Illuminating Company Witness: Elder Romero Dan McGrade Maritza Estremera Jimenez Docket No. 26-08-08 Page 1 of 1 Date Submitted: March 24, 2026 RSR-015 Q: Provide the most up to date version of UI’s system planning documentation. Specifically, the planning documentation should contain UI’s standards for (1) the capital project approval process, (2) infrastructure planning criteria (e.g., thermal loading criteria, infrastructure replacement criteria etc.), and (3) planning methodology (e.g., forecasting methodology, solution development process etc.). RSR-015 A: Please refer to Appendix 1 – Avangrid Capital Planning Process, which outlines the formal procedural steps for evaluating and advancing capital projects. Appendix 2 – Avangrid’s Distribution Planning Criteria provides the infrastructure planning criteria, including thermal loading thresholds, and other engineering standards that inform system planning and reliability decisions. Appendix 3 – 2025 Eversource/UI Connecticut DER Forecast Summary details the forecasting methodology, including data sources, and data granularity. This document was also provided as part of the NWS annual filing package as Appendix 2.