Extension on RSR 014
Filed by CL&P dba Eversource Energy and The United Illuminating Co.
- Type of filing
- Motion (Motion No. 003)
- Date filed
- March 18, 2026
- Filed by
- CL&P dba Eversource Energy and The United Illuminating Co.
- Files
- 1
As listed on the current system
Motion No. 003 03/18/2026 (CL&P dba Eversource Energy and The United Illuminating Co.) - Extension on RSR 014 [26-08-08]
Files1
Dkt 26-08-08 IR Set 1 MET.pdf
PDF · 132 KB · 3 pagesText searchable
Download Dkt 26-08-08 IR Set 1 MET.pdfRead the text of Dkt 26-08-08 IR Set 1 MET.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
NON-WIRES SOLUTIONS PROCESS
CYCLE 2
:
:
:
DOCKET NO. 26-08-08
MARCH 18, 2026
MOTION FOR EXTENSION OF TIME
The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”)
respectfully requests that the Public Utilities Regulatory Authority (“PURA”) grant an extension
of time for Eversource to submit responses to discovery questions RSR-1 through RSR-14 issued
in Docket No. 26-08-08 by PURA on March 10, 2026 (“IR Set 1”). Eversource requests an
extension of time for IR Set 1 consistent with PURA’s Notice of Proceeding issued on January 23,
2026 (“Notice”), which requires that any person requesting a procedural change or other Authority
approval must file a motion. Notice at 3. Specifically, the Notice requires that motions for
extension of time “shall be filed in advance of the prescribed deadline and should provide sufficient
time for the Authority to consider timely objections and to rule on the motion.” Id. Eversource
submits this motion four business days in advance of the current due date for IR Set 1.
IR Set 1 was issued with an initial due date of March 24, 2026, containing fourteen
questions directed at Eversource, including several with multiple parts. IR Set 1 seeks detailed
information related to relevant aspects of Eversource’s Initial Grid Needs Filing and First
Quarterly Filing (“Filings”) made on February 6, 2026. Specifically, IR Set 1 requests detailed
information pertaining to Eversource’s projects included in the Filings.
At this time, Eversource has determined it is unlikely it will be able to produce a complete
and accurate response to IR Set 1 within the current due date. IR Set 1 requires in-depth research,
data extraction, analysis and review, and input from subject matter experts and numerous
1
individuals from various parts of the organization, including management personnel and legal
counsel, to ensure a complete and accurate response. In addition, Eversource activated its
Emergency Response Plan (“ERP”) in response to the storms of March 16–17, 2026, an action that
has required a multi-day restoration. Activation of the ERP redirected the same subject matter
expert resources required to respond to IR Set 1 to perform critically important storm response
tasks rather than their blue-sky roles and responsibilities. The discovery requests by PURA require
documenting and compiling a significant number of records for the designated projects.
Eversource is working diligently and using best efforts to produce a response to IR Set 1
on a timely basis. However, for the reasons stated in this Motion, Eversource requires a five
business-day extension of time for IR Set 1 to have a reasonable amount of time to research,
prepare, review, and submit complete and accurate responses to IR Set 1. Eversource will continue
to use best efforts to submit its response as soon as possible. Eversource has limited this extension
request to ensure that it does not prejudice any other party.
Based on the reasons above, Eversource respectfully requests that PURA grant this motion
for extension of time, extending the deadline for responding to IR Set 1 to Tuesday, March 31,
2026, at 4 pm. Thank you for consideration of this motion.
Respectfully submitted,
THE CONNECTICUT LIGHT AND POWER
COMPANY d/b/a EVERSOURCE ENERGY
By: Eric Eggleston
Eric Eggleston, Esq.
Eversource Energy
P.O. Box 270
Hartford, CT 06410-0270
Phone: [phone removed]
Email: [email removed]
2
CERTIFICATE OF SERVICE
I hereby certify that on this day, a copy of the foregoing was sent to the service list for
this proceeding in compliance with Regs. Conn. State Agencies Section 16-1-15.
By: Eric Eggleston
Commissioner of the Superior Court
3