Motion No. 008Filed by CL&P dba Eversource Energy
Protected Order and Example cover letter
- Type of filing
- Motion (Motion No. 008)
- Date filed
- June 17, 2026
- Filed by
- CL&P dba Eversource Energy
- Files
- 3
As listed on the current system: Motion No. 008 06/17/2026 (CL&P dba Eversource Energy) - Protected Order and Example cover letter [26-08-08]
Files
DN 26-08-08 - Redaction Example MPO.pdf
PDF · 149 KB · 9 pagesText searchable
Download DN 26-08-08 - Redaction Example MPO.pdfRead the text of DN 26-08-08 - Redaction Example MPO.pdf
DN 26-08-08 - Redaction Example Affidavit.pdf
PDF · 95 KB · 1 pageText searchable
Download DN 26-08-08 - Redaction Example Affidavit.pdfRead the text of DN 26-08-08 - Redaction Example Affidavit.pdf
DN. 26-08-08 - Redaction Example Cover.pdf
PDF · 91 KB · 1 pageText searchable
Download DN. 26-08-08 - Redaction Example Cover.pdfRead the text of DN. 26-08-08 - Redaction Example Cover.pdf
Text of DN 26-08-08 - Redaction Example MPO.pdf
Extracted from the file · 14,318 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
NON-WIRES SOLUTIONS PROCESS
CYCLE 2
:
:
:
:
DOCKET NO. 26-08-08
JUNE 17, 2026
MOTION OF THE CONNECTICUT LIGHT AND POWER COMPANY
D/B/A EVERSOURCE ENERGY FOR PROTECTIVE ORDER
1.
The Connecticut Light and Power Company d/b/a Eversource Energy
(“Eversource” or the “Company”) hereby moves that the Public Utilities Regulatory Authority
(“PURA”) grant protective treatment as described in this motion to ensure that certain confidential
information provided by the Company in the above-referenced proceeding is not subject to public
disclosure, pursuant to the Protective Order submitted to PURA on February 24, 2026.
Eversource filed a motion (“Motion No. 7”) on May 8, 2026 requesting a full panel review to
discuss the Company’s concerns with complying with PURA’s April 16, 2026 Ruling on Motion
No. 5 (the “Motion No. 5 Ruling”). Specifically, the Company argued in Motion No. 7 that, while
PURA granted the redaction of Critical Energy Infrastructure Information (“CEII”),1 certain
information that was not specifically listed as CEII in the Motion No. 5 Ruling could be used by
potential bad actors to expose the vulnerabilities in Eversource’s system. Accordingly, the
Company requested a technical meeting for the Company’s subject matter experts to explain the
concern or, alternatively, requested PURA to allow the Company to file sample documents that
1
18 C.F.R. § 388.113(c)(2) defines CEII: “Critical energy infrastructure information means specific engineering,
vulnerability, or detailed design information about proposed or existing critical infrastructure that” (i) Relates details
about the production, generation, transportation, transmission, or distribution of energy; (ii) Could be useful to a
person in planning an attack on critical infrastructure; (iii) Is exempt from mandatory disclosure under the Freedom
of Information Act, 5 U.S.C. § 552; and (iv) Does not simply give the general location of the critical infrastructure.”
show the additional information the Company proposes to redact. Motion No. 7 at 7-8. PURA’s
May 27, 2026 Ruling on Motion No. 7 (the “Motion No. 7 Ruling”) directed the Company to file
a sample of documents that show the additional information the Company proposes to redact.
Motion No. 7 Ruling at 2.
Eversource hereby submits Attachment 1 to Q-RSR-012 and
Attachment 1 to Q-RSR-003 as the requested sample documents (the “Confidential
Attachments”) in accordance with the Motion No. 7 Ruling.
2.
The Company proposes redacting the following from the Confidential Attachments,
in accordance with the exemption from disclosure provided in Conn. Gen. Stat. §1-210(b)(19):
(i) the Project Need Statement (“Statement”) in its entirety, which includes references to
transformer and substation names, locations, ages, condition of the equipment, loading forecast,
and Company rankings or other assessments; (ii) all other references throughout the Confidential
Attachments to the previously-mentioned data individually; (iii) technical justifications; (iv)
project scopes; (v) potential alternative solutions studied; (vi) results of Substation
Constructability Reviews; and (vii) engineering schematics, maps, photographs, and diagrams.
The Company also proposes redacting Eversource employee names from the Confidential
Attachments, in accordance with the exemptions from disclosure provided in Conn. Gen. Stat. §§
1-210(b)(2) and 1-210(b)(5)(B).
3.
Conn. Gen. Stat. § 1-210(b)(19) exempts from public disclosure “[r]ecords when
there are reasonable grounds to believe disclosure may result in a safety risk, including the risk of
harm to any person, any government-owned or leased institution or facility or any fixture or
appurtenance and equipment attached to, or contained in, such institution or facility…as used in
this section, “government-owned or leased institution or facility” includes, but is not limited to, an
institution or facility owned or leased by a public service company.”
2
4.
The items listed in Paragraph 2(i) through (vii) above meet the definition of records
described as exempt by Conn. Gen. Stat. § 1-210(b)(19). The information relates details about the
distribution of energy throughout the Company’s system, describes vulnerabilities outlined in
project filings that could be useful to a person or entity planning an attack on critical infrastructure,
and gives specific details about the location of the equipment. Public disclosure of this information
creates a safety risk to facilities owned by the Company, as well as potentially resulting in a safety
risk for the public.
5.
The Company asserts that the entirety of the Statement, technical justifications,
project scope narratives, and descriptions of alternative solution considerations be protected from
disclosure under the exemption permitted by Conn. Gen. Stat. § 1-210(b)(19). These sections of
the Confidential Attachments provide narrative descriptions of the specific vulnerabilities of the
equipment at issue, including names and location descriptions, the age and general condition of
the equipment, and vulnerabilities of adjoining substations and/or circuits. These narratives create
a roadmap for potential bad actors to determine weak points in the existing system by describing
the vulnerabilities of specific facilities as well as the relationship with other potentially vulnerable
facilities.
6.
In addition, the Company proposes redacting the results of Substation
Constructability Reviews. These constructability reviews are intended to uncover potential issues
with the project or needed additions to the project to address vulnerabilities not originally
considered. The reporting of these reviews contained in the Confidential Attachments illustrates
needed upgrades to existing stations to eliminate these issues. For that reason, the results of these
reviews contain information that meets the exemption for disclosure under Conn. Gen. Stat. § 1210(b)(19).
3
7.
The Company also proposes redacting facility names, schematics, photographs,
diagrams and maps throughout the Confidential Attachments. This information can be used to
locate the substations, providing potential bad actors with the locations of facilities requiring
equipment replacements. The safety risk of the Company’s facilities due to providing this
information publicly is not merely theoretical, as threats and risks to energy infrastructure are
increasing. Motion No. 7 at 5-6. This information is therefore exempt from disclosure under
Conn. Gen. Stat. § 1-210(b)(19).
8.
The redactions proposed in the Confidential Attachments are more numerous and
cover more information than other similar documents previously afforded protective treatment by
PURA. See Docket No. 26-01-03, PURA Annual Review of the Rate Adjustment Mechanisms of
The Connecticut Light and Power Company, March 10, 2026 Ruling on Motion No. 6 (providing
protective treatment to one-line diagrams and transmission-related CEII). However, this docket
introduces an important difference that must be considered in the context of Conn. Gen. Stat. § 1210(b)(19). In Docket No. 26-01-03, the project documentation represented completed projects,
where the project itself has removed the vulnerability or risk of damage. In this docket, the projects
described are proposed projects, meaning the vulnerabilities exist today. This prospective look at
potential projects the Company will implement in the future, providing knowledge of the current
system vulnerabilities rather than where vulnerabilities have already been addressed, heightens the
safety risk to Eversource’s facilities and therefore heightens the sensitivity of the information
contained in the Confidential Attachments.
9.
In addition to the prospective vs. retrospective context of the information provided
in the Confidential Attachments, the Company also recognizes the impact of technological
advances, particularly Artificial Intelligence (“AI”), on the ability of potential bad actors to access,
4
compile, and organize significant amounts of information across years of public filings in PURA
dockets and other communications in mere minutes. Where in the past, an individual or entity
would need to spend significant resources manually researching dockets and saving filings without
confidence that they had found all the relevant documents, a series of fairly simple AI scripts can
program an agent to search all filings and save the relevant information in minutes, while including
a summary of what it had found. The rapid increase of mapping and geographic image technology
available to the public online in recent years also increases the possibility of using AI to compare
images available in the Confidential Attachments to those public images to determine fairly precise
locations of equipment shown in those images.
These technological advances require the
Company and PURA, as well as all public agencies and stakeholders, to rethink the submittal of
redacted copies of confidential information in the context of weighing the public interest in the
disclosure against the risk of making information publicly available and accessible by AI.
10.
While not everything in the Confidential Attachments is the type of information
listed in Paragraph 5, redacting the entire narrative sections from the Confidential Attachments is
a reasonable approach to satisfy the Freedom of Information Act (“FOIA”). The information listed
in Paragraph 5 comprises most of the Statement; once that information is redacted, there remains
only a series of single words or short phrases which do not provide any useful context to the public.
In addition, the Company estimates roughly 1,100 pages of attachments must be reviewed for
redactions following PURA’s ruling on this Motion. Permitting the Company to redact these entire
sections rather than parsing each word over the course of 1,100 pages reduces the time and expense
of producing the redactions without reducing the transparency of the final redacted document.
11.
The Confidential Attachments also contain Eversource employee names. While
not CEII (which is the focus of the Company’s Motion No. 7 and PURA’s Motion No. 7 Ruling),
5
the Company nevertheless moves here to protect this information due to the increased volume of
attempted phishing attacks that utilities have been facing. Maintaining the confidentiality of
Eversource employee names reduces the risk that cyber criminals can learn this information
publicly and attempt to use it in cyber scams targeting utility employees to gain access to utility
systems.
12.
Conn. Gen. Stat. § 1-210(b)(5)(B) exempts from public disclosure “[c]ommercial
or financial information given in confidence, not required by statute.” The Eversource employee
names listed in the Confidential Attachments is commercial information; it is given to PURA in
confidence and is not required to be disclosed by any Connecticut statute. Therefore, the
Eversource Employee names meet the exemption requirements of Conn. Gen. Stat. § 1210(b)(5)(B).
13.
Conn. Gen. Stat. § 1-210(b)(2) exempts from public disclosure “[p]ersonnel or
medical files and similar files the disclosure of which would constitute an invasion of personal
privacy.” The disclosure of Eversource employee names increases the risk of cyber-attacks
targeting specific utility employees as described in Item 2 above, which would constitute an
invasion of personal privacy. Therefore, the Eversource employee names meet the exemption
requirements of Conn. Gen. Stat. § 1-210(b)(2).
14.
PURA granted protective treatment to Eversource employee names as consistent
with Conn. Gen. Stat. §§ 1-210(b)(2) and 1-210(b)(5) in the current Rate Adjustment Mechanism
(“RAM”) docket. See Docket No. 26-01-03, PURA Annual Review of the Rate Adjustment
Mechanisms of The Connecticut Light and Power Company, June 2, 2026 Ruling on Motion No.
14 (providing protective treatment to, inter alia, Eversource employee names).
6
15.
The Company submits both the original and redacted versions of the Confidential
Attachments confidentially for protected treatment under this Motion. The purpose of providing
the sample redactions is so PURA can review and rule on the merits of redacting the specific
information discussed herein. If PURA does not agree with all the Company’s redactions, having
the redacted versions of these Confidential Attachments publicly available will indicate
information that the Company believes is critical, and highlights that to the public. There is no
harm done to the public by protecting the redacted versions of the Confidential Attachments during
this review; all the attachments subject to the ruling on this Motion will be redacted in accordance
with such ruling and filed publicly at that time.
16.
The Office of Consumer Counsel and the Department of Energy & Environmental
Protection shall have access to the Confidential Attachments based on the terms of the Protective
Order submitted to PURA on February 6, 2026.
17.
Neither federal law nor Connecticut statutes require that the Company submit the
Confidential Attachments. In this case, the necessity of withholding public disclosure of the
Confidential Attachments outweighs the public interest in such disclosure.
18.
Attached in support of this motion is the Affidavit of Lavelle A. Freeman, Vice
President of Distribution System Planning for Eversource Energy Service Company. The affidavit
addresses the need for protective treatment of the Confidential Attachments described in this
motion.
19.
For the above reasons, the Company respectfully requests that PURA grant this
motion for protective order.
7
RESPECTFULLY SUBMITTED,
THE CONNECTICUT LIGHT AND POWER
COMPANY d/b/a EVERSOURCE ENERGY
By: Eric Eggleston
Eric Eggleston
Eversource Energy
P.O. Box 270
Hartford, CT 06410-0270
Phone: [phone removed]
Fax: [phone removed]
[email removed]
8
CERTIFICATION
I hereby certify that on June 17, 2026, a copy of the foregoing was sent to the Public
Utilities Regulatory Authority, the Office of Consumer Counsel, and to the official service list in
this proceeding in Compliance with Conn. Regs. §16-1-15, as amended.
Eric Eggleston
Eric Eggleston
Commissioner of the Superior Court
9
Text of DN 26-08-08 - Redaction Example Affidavit.pdf
Extracted from the file · 1,679 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
NON-WIRES SOLUTIONS PROCESS CYCLE 2
:
:
:
DOCKET NO. 26-08-08
JUNE 17, 2026
AFFIDAVIT OF LAVELLE A. FREEMAN
I am over the age of eighteen and understand the obligations of making statements under
oath. The following statements are true to the best of my knowledge and belief:
1. I am Vice President, Distribution System Planning for Eversource Energy Service
Company ("Eversource").
2. I submit this affidavit in support of a Motion for Protective Order, of even date herewith
(“Motion”), as it relates to the Confidential Attachments (as defined in the Motion),
which consists of detailed information related to prospective projects required to
address system vulnerabilities. These Confidential Attachments contain transformer
and substation names, locations, ages, condition of the equipment, loading forecast,
Company rankings, technical justifications and scopes for projects to address system
vulnerabilities, potential alternatives, results of constructability reviews, engineering
schematics, maps, photographs, diagrams, and employee names.
3. To the best of my knowledge, reasonable efforts have been used to keep and maintain
this information as confidential, and to the best of my knowledge, this information for
these projects have not been disclosed or released to the public.
4. I have been advised by Eversource’s legal counsel that neither federal nor Connecticut
statutes require that the Confidential Information be filed in the public record.
Lavelle A. Freeman
Subscribed and sworn before me this
17th day of June 2026.
Eric Eggleston
Eric Eggleston
CT Juris No. 434692
Virtually Acknowledged
1
Text of DN. 26-08-08 - Redaction Example Cover.pdf
Extracted from the file · 1,743 characters
107 Selden Street, Berlin, CT 06037
P.O. Box 270, Hartford, CT 06141-0270
Eric Eggleston
Counsel
[email removed]
June 17, 2026
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re:
Docket No. 26-08-08, Non-Wires Solutions Process Cycle 2 – Motion for Protective
Order for Redaction Examples in Response to Motion No. 7 Ruling
Dear Mr. Gaudiosi:
The Connecticut Light and Power Company d/b/a Eversource Energy (the “Company”) submits
the attached Motion for Protective Order in the above-captioned docket. In the Public Utilities
Regulatory Authority’s (“PURA’s”) Ruling on Motion No. 7 in the above-captioned docket,
PURA directed the Company to provide samples of redactions it proposed to apply to confidential
attachments filed in response to PURA interrogatories (the “Interrogatories”) on March 31, 2026.
This Motion and the accompanying attachments provide examples of redactions proposed by the
Company to address the concerns raised in Motion No. 7. In accordance with Connecticut law
and previous PURA rulings, this Motion respectfully requests that PURA grant protection from
public disclosure to certain confidential information provided in Attachment 1 to Q-RSR-012 and
Attachment 1 to Q-RSR-003 included with this filing, and respectfully requests PURA review the
Company’s motion and rule on the proposed redactions to be applied consistently to the remaining
confidential attachments that respond to the Interrogatories.
The Company appreciates PURA’s attention to this motion.
Respectfully submitted,
Eric Eggleston
Eric Eggleston
Counsel
On Behalf of Connecticut Light and Power Company d/b/a Eversource Energy
cc:
Service List
-1-