STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
October 21, 2026
In reply, please refer to:
Docket No. 26-08-08
Motion No. 8
Vincent P. Pace, Esq.
Eric Eggleston, Esq.
Eversource Energy
P.O. Box 270
Hartford, CT 06410
Re: Docket No. 26-08-08 – Non-Wires Solutions Process Cycle 2
Dear Attorneys Pace and Eggleston:
On June 17, 2026, The Connecticut Light and Power Company d/b/a Eversource
Energy (Company) filed a motion (Motion No. 8) in response to the Authority’s May 27,
2026, Motion No. 7 Ruling requesting that the Public Utilities Regulatory Authority
(Authority) approve the Company’s proposed redactions to Q-RSR-012, Attachment 1
and Q-RSR-003, Attachment 1 (Attachments) and permit the Company to apply such
proposed redactions to various documents submitted in response to Authority
interrogatories in this proceeding (Documents).1 Specifically, the Company asserts that
the redacted information in the Documents are exempt from public disclosure under
Connecticut’s Freedom of Information Act (FOIA), General Statutes § 1-210(b)(2),(5), and
(19). The motion is granted, in part, and denied, in part.
I.
BACKGROUND
The Authority’s April 16, 2026, Motion No. 5 Ruling granted, in part, and denied, in
part, the Company’s request to provide protective treatment for the Documents.
Specifically, the ruling determined that while the Documents contained certain information
that constitutes critical energy infrastructure information (CEII), the Company’s request to
designate the entirety of the Documents as CEII and exempt them from public disclosure
was overly broad.2 Motion No. 5 Ruling, p. 3. The Authority indicated that certain
information, such as generic descriptions of the identified projects, a statement of need
for the projects, the project objectives, a scope of work, various alternative projects
considered and the advantages and disadvantages of each, and a proposed schedule
that includes projected or suggested in-service dates, could not be reasonably construed
1 Specifically, Attachments 1 and 2 to Interrogatory Response RSR-004; Attachment 1 to Interrogatory
Response RSR-005; Attachment 1 to RSR-011; Attachments 1, 2A, 2B, and 3 to Interrogatory Responses
RSR-012 and RSR-013; and Attachment 1 to RSR-003. Motion No. 5 Ruling, pp. 1-2.
2 The Authority determined that Interrogatory Response RSR-011, Attachments 2 and 3 are exempt from
public disclosure under General Statutes § 1-210(b)(5). Motion No. 5 Ruling, p. 2.
10 Franklin Square, New Britain, CT 06051
An Equal Opportunity Employer
www.ct.gov/pura
Docket No. 26-08-08
Page 2
as CEII. Id. As such, the Authority directed the Company to file no later than May 8,
2026, public versions of the Documents that redacted only information constituting CEII,
“such as circuit diagrams, the specific location of certain infrastructure, and the number
of critical customers served by a circuit.” Id., p. 3. The Authority also indicated that the
Company could renew its motion for protective order upon resubmittal of the redacted
Attachments. Id.
The Company subsequently filed a motion for full panel review arguing that the
Motion No. 5 Ruling was too narrow and rendered the Company unable to redact
confidential and sensitive electric system information that constitutes CEII. Motion No. 7,
pp. 4-5. Additionally, the Company requested that the Authority either convene a technical
meeting where the Company could explain in more detail the type of information the
confidential attachments that constitute CEII or direct the Company to file a sample of
documents that show the additional information the Company proposes to redact. Id., pp.
7–8. The full panel of commissioners affirmed the Motion No. 5 Ruling but directed the
Company to file a sample of documents proposing the additional information the
Company sought to redact. Motion No. 7 Ruling, p. 2.
The Company filed proposed redactions to the Attachments and Motion No. 8,
arguing that the redactions protect confidential information exempt from public disclosure
under General Statutes § 1-210(b)(2), (5), and (19). Motion No. 8, p. 2. On June 22,
2026, the Office of Consumer Counsel (OCC) filed a response in opposition to Motion No.
8 (OCC Opposition).
II.
LEGAL STANDARD
Under FOIA, the general rule is that “all records maintained or kept on file by any
public agency, whether or not such records are required by any law or by any rule or
regulation,” are public records. General Statutes § 1-210(a). Certain records are exempt
from mandatory public disclosure by FOIA, however.3 General Statutes § 1-210(b). The
burden of establishing an exemption from disclosure under FOIA rests on the party
claiming the exemption. New Haven v. Freedom of Information Commission, 205 Conn.
767, 775 (1988). A claimant must “provide more than conclusory language, generalized
allegations or mere arguments of counsel. Rather, a sufficiently detailed record must
reflect the reasons why an exemption applies to the materials requested.” Id. at 776.
Moreover, while some records may qualify for an exemption in their entirety,
“[w]hen portions of a document are subject to [a FOIA] exemption, those portions are
redacted, and the remainder are to be disclosed.” Commissioner, Dept. of Correction v.
Freedom of Information Comm’n, Nos. CV084016692S, CV094020945S, 2009 WL
3 FOIA exemptions are permissive, not mandatory, and agencies may elect to disclose information that is
subject to an exemption. See Opinions, Conn. Atty. Gen. No. 2005-026 (October 14, 2005), pp. 1, 3;
Massachusetts Mutual Life Ins. Co. v. State, No. CV054014549, 2005 WL 2277264 at *4 (Conn. Super.
Ct. Aug. 25, 2005) (“exemptions listed at General Statutes § 1-210(b) . . . are permissive”); State Office
of the Attorney General v. Freedom of Information Commission, Superior Court, No. CV094021768S,
2011 WL 522872 at *6 (Conn. Super. Ct. Jan. 20, 2011) (discretion exists for disclosures of information
“controlled by the permissive language ‘nothing . . . shall be construed to require disclosure of’”).
Docket No. 26-08-08
Page 3
4852114, *5 (Conn. Super. Ct. Dec. 17, 2009) (citing Gordon v. Sandoval County
Assessor, 130 N.M. 573, 28 P.3d 1114 (N.M.App. 2001). “The redaction of portions of a
record has been recognized from the creation of the FOIC as a partial disclosure remedy
under FOIA.” Id. The use of redactions is consistent with the Authority’s “strong
presumption that all documents filed with it are public records subject to the right of public
inspection and copying.” Notice of Proceeding, Jan. 23, 2026, p. 3.
Trade secrets and confidential commercial or financial information may be exempt
from disclosure under FOIA. General Statutes § 1-210(b)(5). Trade secrets are defined
as “information, including formulas, patterns, compilations, programs, devices, methods,
techniques, processes, drawings, cost data, customer lists, film or television scripts or
detailed production budgets that (i) derive independent economic value, actual or
potential, from not being generally known to, and not being readily ascertainable by
proper means by, other persons who can obtain economic value from their disclosure or
use, and (ii) are the subject of efforts that are reasonable under the circumstances to
maintain secrecy.” General Statutes § 1-210(b)(5)(A). “Commercial or financial
information given in confidence, not required by statute” is not required to be disclosed
under FOIA. General Statutes § 1-210(b)(5)(B).
Personnel, medical, and similar files, “the disclosure of which would constitute an
invasion of personal privacy” may be exempt from disclosure under FOIA. General
Statutes § 1-210(b)(2). “When a claim for exemption is based upon § 1-210(b)(2), the
person claiming the exemption must meet a twofold burden of proof. First, the person
claiming the exemption must establish that the files are personnel, medical or similar files.
. . Second, the person claiming the exemption under § 1-210(b)(2) must also prove that
disclosure of the files would constitute an invasion of personal privacy.” Rocque v.
Freedom of Information Commission, 255 Conn. 651, 661 (2001). In addition, the
exemption for personal privacy applies “only when the information sought does not pertain
to legitimate matters of public concern, and [disclosure] is highly offensive to a reasonable
person.” Dept. of Children & Families v. Freedom of Information Commission, 48 Conn.
App. 467, 472 (1998).
Additionally, records may be exempt from disclosure under FOIA when:
there are reasonable grounds to believe disclosure may result in a safety
risk, including the risk of harm to any person, any government-owned or
leased institution or facility or any fixture or appurtenance and equipment
attached to, or contained in, such institution or facility. . . .
General Statutes § 1-210(b)(19).4,5 For executive branch agencies, the determination of
whether there are “reasonable grounds” that disclosure of a record may result in a safety
4 “Government-owned or leased institution or facility” includes institutions or facilities owned by a public
service company, such as Eversource. General Statutes § 1-210(b)(19).
5 General Statutes § 1-210(b)(19)(i) through (vii) provide a non-exhaustive list of records that are exempt
from public disclosure. The Company does not assert that any of the information contained in the
documents falls within the enumerated list in General Statutes §1-210(b)(19).
Docket No. 26-08-08
Page 4
risk is made by the Commissioner of Administrative Services, after consultation with the
chief executive officer of an executive branch state agency. General Statutes § 1210(b)(19)(A)(i). As with other FOIA exemptions, the burden of proving the applicability
of the FOIA exemption rests with the party claiming the exemption; therefore, the party
seeking the exemption is obligated to seek a public safety determination from the
appropriate entity under General Statutes § 1-210(b)(19). Director, Dept. of Information
Technology of the Town of Greenwich v. Freedom of Information Commission. 274 Conn.
179, 189–190 (2005) (noting legislative history contemplates municipalities, certain state
agencies, public service companies, telecommunications companies, and water utilities
applying for permission to keep sensitive documents from the public (emphasis added)).
III.
ANALYSIS
The Documents consist of a wide array of Company planning documents,
including, but not limited to, a spreadsheet listing substation projects, a description of the
projects, the status of projects, a “solution selection form,” an “operations project
authorization form,” an “initial funding request form.” The Company proposes to exempt
the following information from public disclosure: (1) the solution selection form in its
entirety;6 (2) project need statements in their entirety, which include references to
transformer and substation names, locations, ages, conditions of the equipment, loading
forecast, and Company rankings or other assessments; 3) any references throughout the
Documents to any of the information previously mentioned; 4) technical justifications;
project scopes; potential alternative solutions studied; results of substation
constructability reviews; and engineering schematics, maps, photographs, and diagrams.
Motion No. 8, p. 2.
The Company primarily argues that the above-referenced information provides
descriptions of specific vulnerabilities of the equipment at issue in the Documents, which
would enable bad actors to identify weak points in the distribution system by describing
the vulnerabilities of specific facilities and their relationship with other vulnerable facilities.
Id., p. 3. Moreover, while the Company states that its proposed redactions are more
numerous and cover more information than other documents previously afforded
protective treatment, it argues that additional protections in this proceeding are necessary
since the documentation provided describes current grid vulnerabilities, rather than those
already addressed by completed projects. Id., p. 4.
OCC emphasizes that FOIA exemptions protect only specific portions of
documents subject to those exemptions, rather than an entire document. OCC
Opposition, p. 1. Further, while OCC states that cybersecurity matters are critical, it is
concerned that safety concerns can be used to indiscriminately override FOIA’s general
presumption of public disclosure and prevent the public from engaging with materials in
docketed proceedings. Id., pp. 2–3. More specifically, OCC raises concerns that the
proposed redactions are overly broad and exempt items, such as project costs, or whole
6 Although not stated explicitly in the motion, it is implied that the Company seeks protective treatment of
the entire solution selection form since it omitted the first 43 pages of the document in its proposed
redactions to Interrogatory Response RSR-003, Attachment 1.
Docket No. 26-08-08
Page 5
paragraphs where more precision may be necessary. Id., p. 2. Finally, OCC also raises
concerns that some of the proposed redactions encompass the type of information that
has been filed publicly in the past or in other docketed proceedings. Id.
As previously stated, while the Authority is consulted as to whether there are
reasonable grounds to believe disclosure of records may result in a safety risk under
General Statutes § 1-210(b)(19), the Commissioner of Administrative Services ultimately
renders such a determination on behalf of executive agencies. The Company, as the
party seeking the FOIA exemption, is obligated to seek a public safety determination from
the Commissioner of Administrative Services. Town of Greenwich v. Freedom of
Information Commission, 274 Conn. at 189–190. The Authority is unaware of any such
efforts made by the Company nor has it been consulted as to whether reasonable grounds
exist to exempt such information from public disclosure under FOIA. As such, the
Authority cannot independently rule on whether portions of the Documents are exempt
from public disclosure under General Statutes § 1-210(b)(19).
Nevertheless, the Authority shares OCC’s concerns that the Company’s proposed
redactions are overly broad. For instance, the name of the substation or transformer does
not disclose the specific location of the infrastructure at issue or provide any meaningful
insight into the project or its vulnerabilities. Statements indicating that a certain
transformer or equipment is past its useful life, is aging, or is overloaded generally do not
provide critical insights into vulnerable infrastructure. To the contrary, this information is
crucial to transparently communicating to the Authority, parties, and the public about why
certain capital projects have been or will be pursued by the Company. Moreover, the
Company publicly disclosed specific substation names, ongoing reliability and resiliency
concerns on a specific substation, the age of transformers, in past docketed proceedings.
See, e.g., Compliance, Jan. 20, 2023, Docket No. 22-06-05, PURA Implementation of
Public Act 22-55, Att. 1–3.
The Company’s proposed full redaction of its solution selection form is also overly
broad as it exempts in full, among other things, descriptions regarding certain project
costs, information about the need for the project, project objectives, and alternatives
considered. While certain statements made within such topic areas could potentially be
exempt from public disclosure, complete redaction would hinder discussion in public
hearings regarding projects ratepayers are or will be paying for and would run contrary to
the open conduct of government business to the public and FOIA’s general presumption
of public disclosure.
While the Authority recognizes that the Documents consist of approximately 1,100
pages, the Authority has recently reiterated its reluctance to permit public service
companies to forego filing redacted versions of documents simply because doing so may
be burdensome. See, e.g., Procedural Order Regarding Protected Materials, Docket No.
26-05-10, Application of the Connecticut Light and Power Company d/b/a/ Eversource
Energy to Amend its Rate Schedule, p. 2 (“Sheer volume is not a sufficient basis for
submitting bulk filings only confidentially, without submitting a public version.”). Such is
consistent with the standard to which government agencies are held by the Freedom of
Information Commission and the courts. See, e.g., Office of Corporation Counsel of City
Docket No. 26-08-08
Page 6
of Danbury, v. Freedom of Information Com’n, 20. No. HHBCV126017045S, 2013 WL
5289790 at *6 (Conn. Super. Ct. Aug. 23, 2013) (“a records request that is simply
burdensome does not excuse an agency from its obligations under the FOI Act” (citing,
Wildin v. Freedom of Information, 56 Conn. App. 683, 687, (2000))).
Finally, the Company seeks to redact all Eversource employee names listed in the
Documents pursuant to General Statutes § 1-210(b)(2) and (5) because the disclosure of
employee names increases the risk of cyber attacks targeting the specific employee
identified. Motion No. 8, p. 6. However, the Company fails to demonstrate that the
Documents constitute personnel, medical or similar files within the meaning of General
Statutes § 1-210(b)(2) or, besides a bald assertion, that disclosure would constitute an
invasion of personal privacy. Moreover, the Company fails to demonstrate that the
employees’ names constitute a trade secret or financial or commercial information given
in confidence and not required by statute.7 Accordingly, the Authority finds that employee
names as they appear on the Documents are not exempt from public disclosure.
The Authority reiterates that it takes the security of Company infrastructure and
cybersecurity matters seriously. However, the Authority must abide by the strong
presumption that all documents filed with it are public records subject to the right of public
inspection and copying, the transparent conduct of government business, and the judicial
mandate that FOIA exemptions be narrowly construed. Stamford v. Freedom of
Information Commissioner, 241 Conn. 310, 314 (1997).
IV.
CONCLUSION
Motion No. 8 is granted, in part, and denied, in part. The Authority affirms its prior
determinations in its Motion Nos. 5 and 7 Rulings that the Company may redact
information in the Documents that constitute CEII, including, but not limited to, circuit
diagrams, pictures of critical infrastructure, the specific location of certain infrastructure,
and the number of critical customers served by a circuit. Additionally, the Authority
determines that employee names in the Documents are not exempt from public disclosure
under General Statutes § 1-210(b)(2),(5). Finally, the Authority determines that
exemptions under General Statutes § 1-210(b)(19) for executive branch agencies are
within the discretion of the Commissioner of Administrative Services, in consultation with
the Authority. Therefore, the Authority is unable to independently render a determination
as to whether General Statutes § 1-210(b)(19) apply.
Based on the forgoing, submission of unredacted versions of the Documents is
stayed pending a determination from the Commissioner of Administrative Services on the
applicability of General Statutes § 1-210(b)(19) on the Documents. Within 30 days of
receipt of a determination from the Commissioner of Administrative Services, the
Company shall file unredacted versions of the Documents in this proceeding in
accordance with the Commissioner’s determination. In the event the Company forgoes
7 Notably, Eversource employees provide public testimony on distribution system projects and planning.
Moreover, popular professional networking websites, such as LinkedIn, often publicly disclose employee
names and job titles.
Docket No. 26-08-08
Page 7
such a determination, the Company shall publicly file redacted versions of the Documents
no later than 30 days from this ruling. The publicly redacted version of the Documents
shall redact only information constituting CEII with an accompanying explanation with
specific legal argument explaining why each category of information redacted constitutes
CEII.
By the following commissioners,
Thomas H. Wiehl
Chairman
David Arconti, Jr.
Vice Chairman
Everett Smith
Commissioner
cc: Service List
Janice A. Beecher
Commissioner
Holly H. Cheeseman
Commissioner
As listed on the current system
Ruling to Motion No.: 008 - 10/21/2026 (PURA) - Type Ruling = Granted in part - Denied in part [26-08-08]