Interrogatories
To UI; CL&P, questions 1 thru 2
Files1
26-08-09 Set 1 Interrogatories.pdf
PDF · 148 KB · 3 pagesText searchable
Download 26-08-09 Set 1 Interrogatories.pdfRead the text of 26-08-09 Set 1 Interrogatories.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
November 13, 2026
In reply, please refer to:
Docket No. 26-08-09
Vincent Pace, Esq.
Assistant General Counsel
Eversource Energy Service Company
P.O. Box 270
Hartford, CT 06141
Christie Prescott
UIL Holdings Corporation
180 Marsh Hill Road, MS AD-2A
Orange, CT 06477
Re: Docket No. 26-08-09 - Annual Electric Distribution Company and Resilience
Framework Review
Dear Attorney Pace and Ms. Prescott:
Enclosed are interrogatories numbered RSR-1 through RSR-2, directed
separately to the Connecticut Light and Power Company d/b/a Eversource Energy and
the United Illuminating Company.
The responses to these questions have been deemed necessary by the Public
Utilities Regulatory Authority (Authority) in connection with the above-referenced docket
and will become a part of the record in this proceeding. Please note that persons
responsible for responses must be available for cross-examination during a hearing, if
held, and must attest to the truth and accuracy of their responses.
Please submit the responses to the Authority’s Executive Secretary no later than
November 27, 2026, at 4:00 p.m. The Authority encourages the submission of
responses as soon as they are available rather than delaying until all answers are
completed. Please list each question and answer on the same sheet of paper
using a separate sheet for each interrogatory number, and sequentially number
the pages of each response (e.g., p. 1 of 5, etc.). At the top of each page, clearly
identify the Docket Number, the interrogatory number (including the prefix), the
name of the company and the person responsible for the response, and the date
of submission.
Similarly, each Late Filed Exhibit that may be submitted after hearing in this
docket shall be sequentially numbered and identified with the Docket Number, Late
Filed Exhibit Number, page number, the name of the company and the person
responsible for the exhibit, and the date of submission.
If a response to any of the requested information has already been filed in response
to another Parties’ interrogatory(ies) in this proceeding, please reference the interrogatory
which provides the information. It is the respondent’s responsibility to ensure that any
such information is on file with the Executive Secretary of the Authority.
ELECTRONIC SUBMISSION OF FILINGS
IMPORTANT NOTE: The Authority has indefinitely suspended the paper
copy filing requirement. Anyone filing material with the Authority should file only
an electronic copy through the PURA Web Filing System. Please refer to the
Electronic Filing webpage for more information, including on confidential
materials: Make An Electronic Filing
CONFIDENTIAL DOCUMENTS
No confidential material may be filed publicly through the web filing system.
Confidential material can be filed electronically by emailing the material to
[email removed] with a subject line labeled in all capital letters “CONFIDENTIAL
MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic
confidential information shall also contain a header “CONFIDENTIAL – NOT FOR
PUBLIC DISCLOSURE.” The motion for a protective order shall be filed electronically.
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, Conn. Gen. Stat. §1-200 et. seq. In those
exceptional circumstances where a participant believes that information it intends to file
is confidential under law, it may file a Motion for a Protective Order requesting an
exemption from public disclosure. The Motion must provide specific legal arguments with
reference to state or federal law describing with supporting facts why the information
should be kept confidential. A certified affidavit supplied by a competent witness in
support of the Motion must be appended to the Motion. The Authority will rule on the
Motion forthwith, and it will give further direction as necessary.
The current service list for this docket is available on the Authority's website
located at http://www.dpuc.state.ct.us/DPUCPublicList.NSF.
By the Direction of the Authority,
PUBLIC UTILITIES REGULATORY AUTHORITY
Enclosure
cc:
Service List
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Interrogatories RSR-1 through RSR-2 are directed separately to the Connecticut
Light and Power Company d/b/a Eversource Energy and the United Illuminating
Company.
RSR-1
In an unlocked Excel worksheet, provide the following reliability data for
each town in the Company’s service territory for the last four years. Provide
both all-in metrics and metrics excluding planned outages and major storms
using IEEE and RE08 exclusion methods:
a. SAIDI, SAIFI, and CAIDI;
b. CEMI-X for X=3, 5, 7, and 9;
c. CELID-Y for Y=3, 6, 9, and 12;
d. Total customer outage minutes;
e. The average annual number of customers served; and
f. The leading outage cause.
RSR-2
For each year from 1995 to present, provide the Company’s system wide,
SAIDI, SAIFI, and CAIDI value calculated using the IEEE major event day
methodology and the RE08 major storm exclusion methodology.
As listed on the current system
Interrogs from RSR to UI;CL&P 1 thru 2-Issued 11/13/2026 [26-08-09]