Motion No. 001
CIEC Motion for Participant Status
Files1
26-08-09 CIEC Motion for Participant Status.pdf
PDF · 96 KB · 2 pagesText searchable
Download 26-08-09 CIEC Motion for Participant Status.pdfRead the text of 26-08-09 CIEC Motion for Participant Status.pdf
540 Broadway, P.O. Box 22222, Albany, New York 12201-2222 • [phone removed]
July 21, 2026
VIA ELECTRONIC FILING
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
State of Connecticut Public
Utilities Regulatory Authority
Ten Franklin Square
New Britain, CT 06051
Re:
Docket No. 26-08-09 – Annual Electric Distribution Company Reliability and
Resilience Framework Review – CIEC Motion for Participant Status
Dear Mr. Gaudiosi:
Pursuant to the Connecticut Gen. Stat. § 16-19pp, the Connecticut Industrial Energy
Consumers (“CIEC”) submits this Motion to be designated as a participant in the above-referenced
proceeding.
CIEC is a coalition of industrial and large commercial end-users that collectively employ
tens of thousands of Connecticut workers at numerous locations throughout the State, including in
the service territories of The Connecticut Light and Power Company d/b/a Eversource Energy
(“Eversource”) and The United Illuminating Company (“UI”; collectively the “EDCs”). As large,
high-load-factor customers, the safety, reliability, resiliency, and cost of the electric delivery
service provided by the EDCs is of significant importance to CIEC members.
The Authority established this proceeding to review the EDCs’ “maintenance plans,
reliability performance information, and vegetation management practices [to] ensure that the
Authority is fully informed as to the manner of operation of the EDCs’ reliability and resilience
programs.”1 Access to safe, reliable, resilient, and affordable electric delivery service is integral
to the operations of CIEC’s members, and the interests of CIEC’s members – industrial and large
commercial end-users – are not otherwise exclusively represented in this proceeding by any other
party. Thus, CIEC is requesting participant status in this proceeding.
1
Docket No. 26-08-09, Annual Electric Distribution Company Reliability and Resilience
Framework Review, Notice of Proceeding (issued July 7, 2026).
July 21, 2026
Page 2
CIEC requests that the following individuals be listed on the Service List in this
proceeding:
Amanda De Vito Trinsey, Esq.
S. Jay Goodman, Esq.
Couch White, LLP
540 Broadway, P.O. Box 22222
Albany, New York 12201-2222
Tel: [phone removed]
Fax: [phone removed]
E-mail: [email removed]
[email removed]
CIEC plans to participate in this docket to the extent necessary to protect its members’
interests, including receiving and reviewing information filed in this docket, participating in the
discovery process, reserving the right to submit comments, testimony, and other pleadings on the
same dates and at the same times as other participants, as well as participating in hearings, filing a
brief, reply brief, written exceptions, and presenting oral argument in this proceeding on the same
dates and at the same times as other participants.
I certify that a copy of this submission has been sent to all parties and/or participants of
record as of this date, and has also been filed with the Authority as an electronic web filing and is
complete.
Thank you for your attention to this matter.
Respectfully submitted,
CONNECTICUT INDUSTRIAL ENERGY CONSUMERS
S. Jay Goodman
S. Jay Goodman, Esq.
cc:
Service List (via e-mail)
As listed on the current system
Motion No. 001 07/21/2026 (CIEC) - CIEC Motion for Participant Status [26-08-09]