STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-08-12
PETITION FOR APPROVAL OF METHOD AND
MANNER OF CONSTRUCTION AND PERMISSION TO
ENERGIZE THE DANBURY UNDERGROUND CABLE
REPLACEMENT PROJECT 1270 AND 1337 LINES
(APPROXIMATELY 50 FEET OF OPEN DUCT BANK
CROSSING)
September 30, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
DECISION
DECISION
I.
SUMMARY
On August 12, 2026, The Connecticut Light and Power Company d/b/a Eversource
Energy (Eversource or Company) submitted a petition (Petition) requesting that the Public
Utilities Regulatory Authority (Authority or PURA) approve the method and manner of
construction of and provide permission to energize approximately 50 feet of an
underground concrete encased duct bank limited to the Enbridge Algonquin Gas Pipeline
Crossing located between Station 180+00 and Station 180+50 (Project). 1 The Authority
approves the method and manner of construction of the Project and approves permission
to energize following completion of the Project.
II.
STANDARD OF REVIEW
The Company is required to provide the following in conformance with Conn.
Agencies Regs. §§ 16-11-137 and 16-11-139:
•
•
•
•
•
•
•
•
•
•
•
Local names of the points through which the line will pass and the towns
through which it will pass;
the length of the line;
electrical descriptions of the line including voltage, frequency, number of
phases, and number of conductors;
the general types of construction to be employed; the character of materials to
be employed;
a description of lightning protection;
titles of specifications and standards to which the construction will conform;
names of utilities and municipalities whose facilities are crossed or paralleled
by the line;
the dates of planned construction and energization;
drawings showing location, depth, and clearances of all known underground
circuits, tracks, and other underground facilities of other utilities and
municipalities;
maps showing the route of the line and locations of the circuits; and
copies of letters from each railroad, municipality or other utility affected, stating
that it has been notified of the details of the proposed line and that it offers no
objection to the method or manner of construction.
1 On March 6, 2025, the Connecticut Siting Council (CSC) approved the transmission project.
Petition, p.
5; see CSC Petition No. 1642 The Connecticut Light and Power Company d/b/a Eversource Energy petition
for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed
Danbury Underground Cable Replacement Project consisting of the replacement and partial relocation of
its existing 115-kilovolt (kV) 1270 and 1337 high pressure fluid filled (HPFF) electric transmission cables
with cross linked polyethylene (XLPE) electric transmission cables along approximately 3.6 miles of existing
and new right-of-way between Triangle Street Substation and Middle River Substation in Danbury,
Connecticut and related electric transmission cable and substation improvements.
Docket No. 26-08-12
III.
Page 2
EVERSOURCE PETITION AND PROJECT DESCRIPTION
In Docket No. 25-06-27, Petition for Approval of Method and Manner of
Construction and Permission to Energize the Danbury Underground Cable Replacement
Project (1270 and 1337 Lines), the Authority approved the Danbury Underground Cable
Replacement Project involving the 1270 and 1337 Lines between Triangle Substation and
Middle River Substation in Danbury. The Danbury Underground Cable Replacement
Project involves replacing the existing high-pressure fluid-filled transmission cables,
which have exceeded their operating life, with solid-dielectric insulated cross-linked
polyethylene (XLPE) cables. See Decision, August 6, 2025, Docket No. 25-06-27. The
Enbridge Algonquin Gas Pipeline Crossing Project constitutes a segment of the Danbury
Underground Cable Replacement Project; however, approval of that segment was
deferred pending completion of an engineering review by Algonquin Gas Transmission
LLC (Enbridge) concerning the proposed crossing beneath facilities owned and operated
by Enbridge. 2 Id.
This Petition seeks solely for the construction of and permission to energize
approximately 50 feet of an underground concrete encased duct bank segment limited to
the Enbridge Algonquin Gas Pipeline Crossing (Station 180+00 to Station 180+50).
Petition, p. 3. Specifically, the duct bank will be installed at a depth below grade of
approximately 12 feet, crossing under the 42-inch Enbridge Algonquin Gas Pipeline.
Within the duct bank, the 3-phase conductor cables, communication lines, and grounding
lines will be pulled through individually placed polyvinyl chloride (PVC) conduits, with their
alignment held in place using specifically designed conduit spacer assemblies then
encased with high-strength thermal concrete. Id.
The proposed construction will take place on Westville Avenue Extension which
intersects Middle River Road and Filmore Avenue within the City of Danbury (Danbury).
Id., p. 2. Materials to be used in the construction of the transmission lines include:
•
•
•
•
•
•
•
Minimum 3,000 psi concrete encased duct banks;
Schedule 40 PVC conduits;
Thermally Controlled Low Strength Material with a maximum compressive
strength of 200 psi;
Road materials as prescribed, if necessary, by Danbury and the DOT;
115-kV 5000-kcmil aluminum cables with XLPE insulation;
Two 500-kcmil ground continuity conductors; and
Fiber optic cables for communication.
Id., p. 3.
2 Enbridge has authorized Eversource to construct the underground transmission lines construction near
its infrastructure provided that all work is performed in accordance with all applicable local, state, and
federal regulations and the National Electrical Safety Code (NESC). Petition, Exhibit B.
Docket No. 26-08-12
Page 3
The Project was reviewed to identify the utilities, municipalities, agencies, and
railroads affected by the Project, whose exposed or underground circuits, or other
facilities are crossed over or under by the proposed work. 3 Petition, p. 4.
Construction of the approximately 50-foot underground concrete encased duct
bank crossing is scheduled to begin in early Fall 2026 and is expected to be completed
within 30 days. Id. Eversource will energize these circuits after completion of construction
of the entire Danbury Underground Cable Replacement Project which is anticipated by
2028. Id.
IV.
AUTHORITY ANALYSIS
The Company provided the information required by Conn. Agencies Regs. §§ 1611-137 and 16-11-139. See, Petition, pp. 1-5, Exhibits A, B and C. All construction plans
comply in accordance with Part 2 of the 2023 Edition of the NESC required by Conn.
Agencies Regs. § 16-11-134. Id., p. 4.
The Authority reviewed the information and plans filed in the record pursuant to
General Statutes § 16-243 and Conn. Agencies Regs §§ 16-11-137 and 16-11-139. The
Authority finds that the Company satisfied the application requirements and grants
approval of construction at the locations cited above. The Authority also grants approval
to energize after completion of the Project.
V.
CONCLUSION AND ORDER
The Authority approves the method and manner of construction of the Project and
approves permission to energize following completion of the Project.
To comply with the order below, the Company shall file an electronic version of any
compliance through the Authority’s website at www.ct.gov/pura. Submissions filed in
compliance with the Authority’s orders must be identified by all three of the following:
Docket Number, Title, and Order Number.
1.
Not more than 30 days following completion of the Project, the Company shall file
as compliance the date on which construction was completed. The Authority will
not require a field inspection for this Project.
3 A Letter of No Objection from Enbridge is included as an attachment to the Petition.
Petition, Exhibit B.
DOCKET NO. 26-08-12
PETITION FOR APPROVAL OF METHOD AND
MANNER OF CONSTRUCTION AND PERMISSION TO
ENERGIZE THE DANBURY UNDERGROUND CABLE
REPLACEMENT PROJECT 1270 AND 1337 LINES
(APPROXIMATELY 50 FEET OF OPEN DUCT BANK
CROSSING)
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Holly H. Cheeseman
Janice A. Beecher
Everett Smith, III
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
September 30, 2026
Jeffrey R. Gaudiosi, Esq.
Date
As listed on the current system
Final Decision, 09/30/2026 [26-08-12]