Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files1

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY DOCKET NO. 26-08-12 PETITION FOR APPROVAL OF METHOD AND MANNER OF CONSTRUCTION AND PERMISSION TO ENERGIZE THE DANBURY UNDERGROUND CABLE REPLACEMENT PROJECT 1270 AND 1337 NOTICE OF PROCEEDING On August 12, 2026, The Connecticut Light and Power Company d/b/a Eversource Energy (Company or Eversource) submitted a petition (Petition) requesting that the Public Utilities Regulatory Authority (Authority or PURA) approve the method and manner of construction and provide permission to energize the 1270 and 1337 transmission lines for the Danbury Underground Cable Replacement Project (Project). See General Statutes § 16-243 and Conn. Agencies Regs. §§ 16-11-137 and 16-11-139. The purpose of the Project is to construct two new 115-kV, 60-hertz, cross-linked polyethylene (XLPE) transmission lines to replace the existing high-pressure fluid filled (HPFF) lines (Line 1270 and Line 1337). Petition, p. 2. The Project will entail the installation of approximately 50 feet of an underground concrete encased duct bank limited to the Enbridge Algonquin Gas Pipeline Crossing located between Station 180+00 and Station 180+50 on Westville Avenue Extension where it intersects Middle River Road and Filmore Avenue. Petition, p. 3. In response, the Authority is conducting this uncontested proceeding pursuant to Conn. Agencies Regs. § 16-1-134, et seq. to address the issues raised in the Petition. Additional information is available at the Authority's website, https://portal.ct.gov/pura, regarding the procedural practices of the Authority. All of the filings in this docket are available on the Authority’s website under the “Docket Information” link. Persons may register to receive e-mail notifications when documents are filed or issued in this docket. For assistance with any Authority online service, contact the PURA case coordinator assigned to this docket, Laura Lupoli, who can be reached via email at [email removed]. PANEL OF COMMISSIONERS AND PRESIDING OFFICER In accordance with General Statutes § 16-2(c), the chairperson assigns this proceeding to a panel of all appointed and qualifying commissioners—presently, Chairman Wiehl, Vice-Chairman Arconti, and Commissioners Beecher, Smith, and Cheeseman. The panel designates Vice-Chairman Arconti as the presiding officer. PARTICIPANTS TO THE PROCEEDING The Authority has designated Eversource, the Office of Consumer Counsel (OCC), and the Commissioner of the Department of Energy and Environmental Protection (DEEP) as participants in this proceeding. Conn. Agencies Regs. § 16-1-15 requires Docket No. 26-08-12 Page 2 participants to serve a copy of each filed document to every person or entity on the service list, which is available on the Authority’s website at http://www.ct.gov/pura. ATTORNEYS Attorneys not admitted to practice law before the Connecticut Superior Court must comply with Connecticut’s pro hac vice procedures in order to participate in any administrative proceeding before the Authority. REQUEST FOR PARTICIPANT STATUS Other persons seeking participant status in this proceeding must file a motion in accordance with General Statutes § 16-19pp no later than September 15, 2026, before 4:00 p.m., Eastern time. Each person seeking participant status may designate up to two persons for inclusion on the service list. Others who wish to receive e-mail notifications, but do not seek official status in the matter, may register on the PURA website for an email notification account at http://www.dpuc.state.ct.us/DPUCPublicList.NSF. Persons seeking participant status have the option to do so by completing and filing the Motion for Intervenor/Participant Status form as a motion in this docket. APPLICATION FOR STAKEHOLDER GROUP COMPENSATION The Authority’s Stakeholder Group Compensation Program makes funds available to groups representing the interests of residential utility customers residing in an environmental justice community, residential utility customers receiving protection as hardship cases, or small business customers. To apply for stakeholder group compensation, an eligible stakeholder group must file a Notice of Intent to Apply for Stakeholder Group Compensation (Notice of Intent) and an Application for Stakeholder Group Compensation (Application) by September 15, 2026. Additional information about the Stakeholder Group Compensation Program, including required forms, can be found at https://portal.ct.gov/pura/public-participation/stakeholder-group-compensationprogram. The Notice of Intent must be filed as correspondence in both this docket and in Docket No. 23-09-34. By filing a Notice of Intent in Docket No. 23-09-34, applicants will automatically be designated as participants in Docket No. 23-09-34. The Notice of Intent must be filed before or contemporaneously with the Application. The Application must be filed as a motion in Docket No. 23-09-34. The Application must be accompanied by a Stakeholder Group Compensation Itemized Budget. Applicants must also comply with the procedures in this Notice of Proceeding to request participant status in this docket. A motion for participant status may be filed in this docket simultaneously with the Notice of Intent. The Motion for Intervenor/Participant Status form may be used to request participant status in this docket. MOTIONS Any person seeking a procedural change or other Authority approval must file a motion with the Authority. Motions must be served on the service list for this proceeding. Motions for extension of time shall be filed in advance of the prescribed deadline and Docket No. 26-08-12 Page 3 should provide sufficient time for the Authority to consider timely objections and to rule on the motion. Objections and responses to all other motions are due no later than seven (7) calendar days following Authority receipt. ELECTRONIC SUBMISSION OF FILINGS Unless otherwise specified, the Authority requires electronic submission of all filings, including applications and motions, using the Authority’s online filing system (links and instructions at https://portal.ct.gov/pura). Persons filing electronically or wishing to be listed as a contact must first create an account through the Authority’s website under Docket Services (Make a Filing). Unless otherwise specified, filings are to be submitted no later than 4:00 p.m. on the due date. INFORMATION PROTECTED FROM PUBLIC DISCLOSURE The Authority operates with the strong presumption that all documents filed with it are public records subject to the right of public inspection and copying in accordance with the Connecticut Freedom of Information Act, General Statutes § 1-200 et seq. In those exceptional circumstances where a party or intervenor believes that information is exempt from public disclosure under law, a motion for a protective order may be filed. The motion must provide specific facts and legal arguments, with reference to state or federal law, explaining why the information should not be filed publicly. A certified affidavit supplied by a competent witness in support of the motion must be appended to the motion. Until otherwise directed by the Authority, all prospective protected material must be submitted electronically by email to [email removed] contemporaneously with the filing of a motion. The email’s subject line and each page of any attached documents shall state in all capital letters “PROTECTED MATERIAL - NOT FOR PUBLIC DISCLOSURE.” The associated motion for a protective order shall be filed publicly. EX PARTE COMMUNICATION PROHIBITED This uncontested proceeding is not subject to the legal restrictions on ex parte communications applicable to contested proceedings. Nonetheless, for this matter, the Commissioners will not engage in (and request that all participants refrain from engaging in) ex parte communications. Accordingly, communications with the commissioners or PURA staff should (1) occur only during a noticed public hearing or meeting or (2) be submitted in writing through the public case management system, with service to all other parties and intervenors. Communication with the PURA case coordinator regarding scheduling or administrative matters is permitted. REQUESTS FOR ACCOMMODATION The Authority, which is within DEEP for administrative purposes only, is committed to complying with the requirements of the Americans with Disabilities Act (ADA). If you are seeking a communication aid or service, have limited proficiency in English, wish to file an ADA or Title VI discrimination complaint or require some other accommodation, including equipment to facilitate virtual participation, please contact the DEEP Office of Diversity and Equity at [phone removed] or via email at [email removed]. Any person needing an accommodation for hearing impairment may call the State of Docket No. 26-08-12 Page 4 Connecticut relay number, 7-1-1. In order to facilitate efforts to provide an accommodation, please request all accommodations as soon as possible following notice of any agency hearing, meeting, program, or event. Dated at New Britain, Connecticut, this 31st day of August, 2026. By direction of the Presiding Officer, Jeffrey R. Gaudiosi, Esq. Executive Secretary

As listed on the current system

Notice, Notice of Proceeding 08/31/2026 ( ... ) [26-08-12]

This filing on the current system (opens in a new tab)