A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
CorrespondenceFiled by EOE - PURA

Letter to Applicant -Application is Incomplete

Part of

Docket 26-09-06Open

Application for Approval to Install and Use an Electric Submetering System at 101 Merritt 7, Norwalk, CT

Type of filing
Correspondence
Date filed
October 5, 2026
Filed by
EOE - PURA
Files
1
As listed on the current system: Corres. 10/05/2026 [26-09-06] (EOE - PURA) - Letter to Applicant -Application is Incomplete

This filing on the current system (opens in a new tab)

Files

Text of 26-09-06 Incomplete Application Letter 10.5.26.pdf

Extracted from the file · 2,366 characters
STATE OF CONNECTICUT , PUBLIC UTILITIES REGULATORY AUTHORITY OFFICE OF EDUCATION, OUTREACH, & ENFORCEMENT October 5, 2026 Lofts M7, LLC 2453 Route 6 Brewster, NY 10509 Peter Sicher 555 Pleasantville Road Briarcliff Manor, NY 10510t Re: Docket No. 26-09-06 - Application for Approval to Install and Use an Electric Submetering System at 101 Merritt 7, Norwalk, CT – Electric Submetering Application Is Incomplete Dear Lofts M7, LLC and Peter Sicher: On September 11, 2026, Lofts M7, LLC (Company or Applicant) filed an application to submeter electricity (Application) at 101 Merritt 7, Norwalk, CT (Property) with the Public Utilities Regulatory Authority (Authority). After reviewing the Application, EOE has determined that the information and documentation the Company provided is insufficient to move forward with the review process The Application was found to be missing information and Exhibits, including, but not limited to the following: 1. Portions of Section A of the application are missing; 2. Section B-8d is missing; 3. Exhibit B-8a is insufficient; 4. Section B-11 is unanswered; 5. Section C-2g response is missing; 6. Exhibits C-3a and C-3b are insufficient; 7. Exhibit C-3c, is not a complete copy of the lease and fails to reference the administrative fees the Company charges tenants listed in Exhibit D-8. 8. Confirm that Exhibit C-6b is provided to tenants; 9. Section D-4 is unanswered. Please refer to the language of the fillable pdf application form, link here: PURA Electric Submetering Application Form 2026 - fillable pdf, and the instructions for completing and filing the form and the accompanying exhibits, link here: PURA Instructions for Electric Submetering Applications 2026. The Company must file a 10 Franklin Square, New Britain, CT 06051 An Equal Opportunity Employer www.ct.gov/pura complete application by 2:00pm on October 26, 20261 or EOE will close Docket No. 2609-06 and order the Company to refrain from submetering electricity until the Authority has approved electric submetering at the Property. Sincerely, By: /s/Rebecca Adams Rebecca Adams, Esq. Staff Attorney PUBLIC UTILITIES REGULATORY AUTHORITY Office of Education, Outreach, and Enforcement cc: Counsel Kate Boucher Pullman & Comley, LLC [email removed] 1 Please file all subsequent Application materials as “supplemental” to the Application.