CorrespondenceFiled by EOE
EOE Correspondence - APO Notification
Part of
Docket 26-09-07Closed
Application for Cellco Partnership d/b/a Verizon Wireless for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way New Canaan SC47 CT
- Type of filing
- Correspondence
- Date filed
- September 22, 2026
- Filed by
- EOE
- Files
- 1
As listed on the current system: Corres. 09/22/2026 [26-09-07] (EOE) - EOE Correspondence - APO Notification
Files
26-09-07 APO Letter and Information - Cognetta.pdf
PDF · 596 KB · 10 pagesText searchable
Download 26-09-07 APO Letter and Information - Cognetta.pdfRead the text of 26-09-07 APO Letter and Information - Cognetta.pdf
Text of 26-09-07 APO Letter and Information - Cognetta.pdf
Extracted from the file · 17,828 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
EDUCATION, OUTREACH, & ENFORCEMENT
FEDEX
September 22, 2026
Michael J. Cognetta and Immacolata Cognetta
954 Ponus Ridge
New Canaan, CT 06840
Re:
Docket No. 26-09-07 – Application for Approval of a Construction Plan to
Install Wireless Facilities Within Certain Public Rights-of-Way.
Dear Mr. Cognetta and Ms. Cognetta:
The Public Utilities Regulatory Authority (Authority or PURA) is in receipt of an
application submitted by Cellco Partnership d/b/a Verizon Wireless. The Company has
requested that the Authority approve specific construction plans to install wireless
facilities within the public right-of-way. In response to this request, the Authority has
opened the above-referenced contested proceeding to review the subject application. The
Company has informed the Authority that it has provided notification of its intent to install
these facilities to all adjoining property owners as well as the chief elected official in your
town, as required by General Statutes § 16-234(f).
The Company has notified the Authority that you have expressed opposition to the
installation of these wireless facilities by the Company. Accordingly, you have been
designated as a party in the proceeding in which the Authority will consider the Company’s
application. The Authority has also designated the Office of Consumer Counsel (OCC)
and the Commissioner of the Department of Energy and Environmental Protection
(DEEP) as parties to this proceeding.
If you intend to formally object to this application, you must file a written summary
setting forth the basis of your objection(s) within 30 days of the date of this letter – by
October 22, 2026. If the Authority does not receive a written objection within 30 days of
the date of this letter, the Authority will conclude that your objection is withdrawn, and the
Authority will review the application and render a decision. Your written objection should
be sent via e-mail to: [email removed] .
If you are unable to send your written objection via e-mail, please mail it to:
PURA Executive Secretary
Ten Franklin Square
New Britain, CT 06051
10 Franklin Square, New Britain, CT 06051
An Equal Opportunity Employer
www.ct.gov/pura
PLEASE REFERENCE DOCKET NUMBER 26-09-07 IN CORRESPONDENCE TO THE
AUTHORITY REGARDING THIS MATTER.
Please note that the Authority cannot deny the request to construct wireless
facilities on the basis of an objection to the radio frequency (RF) emissions
generated by the wireless facilities if the RF levels are within the allowable limits
set by the Federal Communications Commission (FCC).1 Attachment 3 of the
Company’s application in this docket states that the calculations show the total
percentage of the maximum permissible exposure under the FCC guidelines is 8.02
% at two meters above the ground, for this proposed small cell wireless
telecommunications facility, which is within the allowable limit (less than 100%),
and, therefore, within allowable limits.
Upon receipt of a written objection, the Authority’s Office of Education, Outreach
& Enforcement will reach out to the parties to pursue potential mediation. Should the
mediation fail to resolve the dispute to the parties’ mutual satisfaction, the Authority will
conduct a noticed public hearing in this matter.
Additional
information
is
available
at
the
Authority’s
website,
http://www.ct.gov/pura/, regarding the procedural practices of the Authority. All of the
filings in this docket are available on the Authority’s website under the “Docket
Information” link. Persons may register to receive e-mail notifications when documents
are filed or issued in this docket. For assistance with any Authority online service, contact
the PURA case coordinator assigned to this docket, Ussawin “Robin” Bumpen, via
email at [email removed]. The Authority’s Education, Outreach, and
Enforcement point of contact assigned to this docketed matter is Eric Beckenstein, who
can be reached at [email removed] .
Enclosed for your review are the following documents: (1) relevant sections of
General Statutes § 16-234, (2) Guide to Public Hearings for Antenna Attachments to
Utility Poles, (3) PURA Docket Process, and (4) FAQ/General Information.
Sincerely,
PUBLIC UTILITIES REGULATORY AUTHORITY
Education, Outreach, and Enforcement
Enclosure
cc: Service List
1 For more information, visit https://www.fcc.gov/engineering-technology/electromagnetic-compatibility-
division/radio-frequency-safety/faq/rf-safety#Q10.
Excerpt of General Statutes § 16-234
Sec. 16-234. Conducting vegetation management; notice to abutting and private
property owners. Changing location of, erecting or placing wires, conductors,
fixtures, structures or apparatus over, on or under any highway or public ground;
rights of adjoining proprietors. Objections or requests for modifications.
(a) As used in this section:
(1) “Utility” means a telephone, telecommunications or electric distribution company, each
as defined in section 16-1;
(2) “Utility protection zone” means any rectangular area extending horizontally for a
distance of eight feet from any outermost electrical conductor or wire installed from pole
to pole and vertically from the ground to the sky;
(3) “Hazardous tree” means any tree or part of a tree that is (A) dead, (B) extensively
decayed, or (C) structurally weak, which, if it falls, would endanger utility infrastructure,
facilities or equipment;
(4) “Vegetation management” means the retention of trees and shrubs that are compatible
with the utility infrastructure and the pruning or removal of trees, shrubs or other
vegetation that pose a risk to the reliability of the utility infrastructure. Until such time as
the Department of Energy and Environmental Protection issues standards for identifying
such compatible trees and shrubs, the standards and identification of such compatible
trees and shrubs shall be as set forth in the 2012 final report of the State Vegetation
Management Task Force;
(5) “Pruning” means the selective removal of plant parts to meet specific utility
infrastructure reliability goals and objectives, when performed according to current
professional tree care standards and in a manner that retains the structural integrity and
health of the vegetation;
(6) “Abutting property owner” means the owner of the property abutting or adjacent to that
portion of a public road, public highway or public grounds where the tree or shrub that the
utility proposes to remove or prune is located; and
(7) “Private property owner” means the owner of the property where a tree or shrub the
utility proposes to remove or prune is located, which may include municipally owned land.
...
(f) No utility shall exercise any powers which may have been conferred upon it to change
the location of, or to erect or place, wires, conductors, fixtures, structures or apparatus of
any kind over, on or under any public road, public highway or public ground, without the
consent of the adjoining proprietors or, if such company is unable to obtain such consent,
without the approval of the Public Utilities Regulatory Authority, which shall be given only
after a hearing upon notice to such proprietors. The authority may, if it finds that public
convenience and necessity require, authorize the changing of the location of, or the
erection or placing of, such wires, conductors, fixtures, structures or apparatus over, on
or under such public road or highway or public ground.
Guide to Public Hearings for Antenna Attachments to Utility Poles
Background
Certain types of telecommunications companies, such as commercial mobile radio
service (CMRS) providers, (described as “Company” in this guide) are installing small cell
wireless facilities designed to increase their ability to handle cellular voice and data traffic in
specified project areas. CMRS provider is a term described in the Code of Federal Regulations
(C.F.R.). 47 C.F.R. § 20.15(d).
In the case of a proposal to install an antenna on a utility pole in the public right-of-way,
the Public Utilities Regulatory Authority (PURA or Authority) determines whether the installation
is in the public interest, and, if so, allows the installation.
A Company must apply to PURA for approval of its construction plan to install a small cell
wireless telecommunications facility on a utility pole within the public right-of-way.
You may have received written notification about a specific construction plan or have been
made aware of a construction plan. This guide is being provided as an introduction to the PURA
docket process.
How did this location get selected for an antenna?
The Company conducts a survey of a geographic area for small cell installations when its
capability to accommodate cellular service traffic is near or at capacity, the point at which it
cannot provide reliable service.
The Company then looks for utility pole locations where it can install an antenna and its
associated equipment.
Utility poles are owned by the regulated utility companies (e.g., Eversource, Frontier and
United Illuminating). The pole owners have design and engineering restrictions that may limit
which utility poles may be used for small cell facilities. For example, some utility poles may
already be heavily encumbered by utility equipment and would not accommodate an antenna
installation.
What does the antenna look like?
The size and visual impact of the antenna and its related equipment is roughly equivalent
to equipment commonly mounted to poles throughout the State, such as electric transformers.
The utility pole is the same as other poles commonly used throughout the state.
PURA has attached photos of typical antenna installations to aid you in understanding
the size of the equipment involved. In some cases, the antenna is located on a side-mounted
bracket on the pole when electric lines are at the top of the pole.
-4-
-5-
Example of a Utility Pole Top Mounted
Antenna and Related Facilities
Example of a Utility Pole Side Mounted
Antenna and Related Facilities
The antenna is located at the very top of the pole and the
wireless system connection for the antenna system is the
lowest utility box attached to the pole in this example:
-6-
PURA Docket Process
Step 1
•
The CMRS provider notifies the Adjoining Property Owner2 (APO) and advises the
affected municipality in writing via certified letter, FedEx, or UPS of the planned
construction and gives 30 days to respond with an objection.
Step 2
•
APOs are allowed 30 days to respond to the Company or PURA to advise as to whether
they are opposed.
Step 3
•
A PURA docket is initiated at the time the Company files its Application to PURA.
Step 4
•
•
•
If there are no APOs opposed to the project, PURA issues a Notice of Proceeding in the docket
and will proceed with review and a decision.
If there are APOs opposed to the project, PURA issues an Acknowledgement Letter via mail
(FedEx or UPS) to the APOs that are opposed to the construction.
APOs that have not filed an opposition to the Company and Non APOs will not receive PURA
communication.
Step 5
•
•
Objecting APO Response to PURA
APOs that received an Acknowledgement Letter from PURA are allowed 30 days to submit
a formal written objection to PURA to advise whether they continue to oppose the
construction.
Non APOs may file a public comment.
2 The term “adjoining property owners” includes property owners whose property is physically contiguous to the
affected section of the PROW as well as property owners across the street from the affected section. Decision,
June 2, 2017, Docket No. 17-02-49, PURA Formalization of Small Cell Antenna Applicant Processes and
Procedures to Construct Facilities in Connecticut’s Public Rights-of-Way, p. 4. Tenants are not APOs.
-7-
Step 6
•
•
•
If the APO does not respond to PURA within the 30-day time period, PURA will proceed with
its review and issue a decision.
If the APO submits a written objection to PURA within the 30-day time period, the Authority’s
Office of Education, Outreach, and Enforcement will reach out to the parties to pursue
potential mediation in an effort to try and resolve the dispute.
Should the mediation fail to resolve the dispute to the parties’ mutual satisfaction, the
Authority will conduct a noticed public hearing in this matter.
Step 7
•
•
•
PURA Proposed Final Decision
PURA decides a case based on the information contained in the record made over the
course of the proceeding.
Parties will have an opportunity to file written exceptions to the PURA Proposed Final
Decision and also can request Oral Argument.
Step 10
•
Briefing Period (if applicable)
A briefing period may follow the hearing. Briefs are written arguments about issues the
Commissioners must decide. They are usually written by attorneys for the Company, PURA,
and others. Participating APOs may also file a brief.
Step 9
•
Hearing Held (if scheduled)
A hearing will be scheduled based on PURA, Company, and Party availability. Hearings are
held at PURA offices, Ten Franklin Square, New Britain, Connecticut.
Step 8
•
Upon Receipt of Written Objection,
Mediation is Pursued
Final Decision
PURA will review written exceptions and consider oral arguments, if any, and issue a Final
Decision during a Regular or Special Meeting.
Copies of the decision are available on PURA’s website in its Final Decision Database.
-8-
FAQ/General Information
What is a public hearing all about?
A public hearing is one step in determining whether the Authority will allow
construction of the antenna.
Unless otherwise noted in a Notice of Hearing, the Authority holds all hearings at
its offices at 10 Franklin Square, New Britain. The Authority has a long tradition of
encouraging public participation in the regulation of the state’s utilities.
The PURA public hearing process offers the opportunity for consumers, local
government officials, industry representatives, and others to bring their thoughts and
concerns to the attention of the Authority’s commissioners in a timely manner. Bringing
these concerns and views to a public hearing is essential if the commissioners are to
reach the most fair and reasonable decision possible.
Any person or entity given status during the proceeding may ask the Company
questions regarding the proposed installation after the company has adopted its
testimony and is ready for cross examination.
Please keep in mind that both the Company and the objectors have the same due
process rights to participate in the hearing process, as well as to receive a timely decision
based on the relevant facts and applicable law.
I’ve never testified before PURA. Is it difficult?
No, it is easy to testify. You do not need a lawyer.
At the beginning of the hearing, the commissioner/hearing officer will ask if there
are any members of the public who wish to speak for the record. At that time, simply
stand up or raise your hand. You will be sworn in and invited to tell your story in your
own words. You may also submit documents or photos relating to your testimony.
After you present your testimony the Authority staff and other parties may cross
examine you (ask you questions).
Once that is completed, commissioners, hearing officers, and any of the parties
to the case who may be in attendance cannot answer questions during this portion of the
hearing process; this is their opportunity to hear your t e st im o n y .
How do I conduct cross examination of the witnesses?
Cross examination is asking questions of the sworn witnesses regarding the
application, documents filed, and any oral testimony given at the hearing. Keep in mind
that the commissioners, hearing officers, company attorneys, and Authority staff are not
subject to cross examination.
10 Franklin Square, New Britain, CT 06051
An Equal Opportunity Employer
www.ct.gov/pura
What if a hearing is scheduled, and I cannot attend the public hearing?
If you are an adjoining property owner and are unable to attend a public hearing, but
wish to make your position known to the Authority, you may mail your comments to:
Public Utilities Regulatory Authority
Attn: Executive Secretary
10 Franklin Square
New Britain, CT 06051
Comments may also be provided to [email removed] via email.
Non-APOs may file a public comment.
Please include the docket number of the proceeding in all correspondence to PURA.
PURA does not accept comments about cases over the phone. Your comments
must be in writing to be included as part of the record in the case. With a public hearing, the
proceeding becomes a contested case. You may not have ex parte communications
regarding facts or legal issues relevant to your case with the PURA commissioners or staff
outside of the hearings or noticed meetings. However, you may contact the case
coordinator for assistance regarding how the process (dates and times of hearings,
how to file etc.) works.
What is the Public Utilities Regulatory Authority (PURA)? https://portal.ct.gov/pura
PURA is statutorily charged with regulating the rates and services of
Connecticut’s investor-owned electricity, natural gas, water, and telecommunication
companies;PURA is also the franchising authority for the state’s cable television companies.
PURA employs a staff of subject matter experts in accounting, finance,
engineering, law, and customer service. On occasion, the Authority will hire experts if
needed to supplement available staff in complex proceedings. All decisions issued by
PURA have the force of law.
What is the Office of Consumer Counsel (OCC)? https://portal.ct.gov/OCC
The OCC is the designated and official advocate of the ratepayer.
For contested PURA proceedings, the OCC is an automatic party/participant
and may appeal decisions to the Connecticut Superior Court.
-10-