Draft decisionFiled
Draft Decision
Part of
Docket 26-09-14Closed
Application of Green Mountain Power Corporation for Qualification of Newbury Hydro, Wells River, Newbury, VT as a Class I Renewable Energy Source
- Type of filing
- Draft decision (Draft Decision)
- Date filed
- October 26, 2026
- Filed by
- Not recorded
- Files
- 1
As listed on the current system: Draft Decision, 10/26/2026 [26-09-14]
Files
Text of df260914.pdf
Extracted from the file · 4,910 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-09-14
APPLICATION OF GREEN MOUNTAIN POWER
CORPORATION FOR QUALIFICATION OF NEWBURY
HYDRO, WELLS RIVER, NEWBURY, VT AS A CLASS I
RENEWABLE ENERGY SOURCE
October 26, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
PROPOSED FINAL DECISION
This proposed final Decision is being distributed to the parties in this proceeding for comment. The
proposed Decision is not final. The Authority will consider the parties’ arguments and exceptions before
reaching a final Decision, which may differ from the proposed Decision. Therefore, this proposed Decision
does not establish any precedent and does not necessarily represent the Authority’s final conclusion.
PROPOSED FINAL DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority determines that the
Newbury hydropower generation facility located on the Wells River in Newbury,
Vermont qualifies as a Class I renewable energy source.
B.
BACKGROUND OF THE PROCEEDING
By Application received September 22, 2026 (Application), Green Mountain
Power Corporation (Company) requests that the Public Utilities Regulatory Authority
(Authority) determine that the Newbury hydropower, generation facility (Newbury or
Project) qualifies as a Class I renewable energy source.
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding: Green
Mountain Power Corporation, 163 Acorn Lane, Colchester, VT 05404; the Office of
Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the
Commissioner of the Department of Energy and Environmental Protection, 79 Elm
Street, Hartford, CT 06106.
II.
STANDARD REVIEW
Pursuant to General Statutes § 16-1(a)(20), “Class I renewable energy source”
includes energy derived from a run-of-river hydropower facility that received a new
license after January 1, 2018, has a generating capacity of not more than 60 megawatts,
is not based on a new dam or a dam identified as a candidate for removal, and meets
applicable state and federal requirements, including state dam safety requirements and
applicable site-specific standards for water quality and fish passage.
III.
AUTHORITY ANALYSIS
As provided in the Application, Newbury generates electricity using hydropower.
The Project is located on the Wells River in Newbury, Vermont. Newbury originally began
commercial operation on September 8, 1983, and received an Order Issuing Subsequent
License from FERC on March 28, 2024 (Subsequent License). The Subsequent License
Docket No. 26-09-14
Page 2
requires the Project to operate in a run-of-the-river mode where project outflow
approximates inflow on a continuous basis.
Newbury has an installed capacity of 0.365 MW. The Project's NEPOOL GIS
Identification Number is NON178956. Newbury is a behind-the-meter generation facility
located in Vermont, which is within the control area of the ISO-NE. VELCO is the thirdparty verifier of the electricity produced.
According to its Subsequent License, the Project is not based on a new dam or a
dam identified as a candidate for removal. Newbury meets all applicable requirements,
including state dam safety requirements and applicable site-specific standards for water
quality and fish passage.
IV.
CONCLUSION
The Authority reviewed all information in the record and finds that pursuant to
General Statutes § 16-1(a)(20), the Facility qualifies as a Class I renewable energy
source, effective July 1, 2026. The Authority assigns the Facility Connecticut
Renewable Portfolio Standard Registration No. CT260914.
The Authority’s determination in this docket is based on the information
submitted by the Company. The Authority may reverse its ruling or revoke the
Company’s registration if any material information provided proves to be false or
misleading. The Company is reminded that it is obligated to notify the Authority within
10 days of any changes to any of the information it has provided.
DOCKET NO. 26-09-14
APPLICATION OF GREEN MOUNTAIN POWER
CORPORATION FOR QUALIFICATION OF NEWBURY
HYDRO, WELLS RIVER, NEWBURY, VT AS A CLASS I
RENEWABLE ENERGY SOURCE
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Holly H. Cheeseman
Everett Smith, III
Janice A. Beecher
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
Date