STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-09-20
APPLICATION OF FIBER ASSETCO, LLC D/B/A ZAYO
FOR APPROVAL TO INSTALL FACILITIES UNDER AND
OVER CERTAIN PUBLIC RIGHTS-OF-WAY
October 27, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
PROPOSED FINAL DECISION
This proposed final Decision is being distributed to the parties in this proceeding for comment. The
proposed Decision is not final. The Authority will consider the parties’ arguments and exceptions before
reaching a final Decision, which may differ from the proposed Decision. Therefore, this proposed Decision
does not establish any precedent and does not necessarily represent the Authority’s final conclusion.
PROPOSED FINAL DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority grants approval of Fiber
AssetCo, LLC d/b/a Zayo to install fiber optic wireline facilities on utility poles within the
public rights-of-way.
B.
BACKGROUND OF THE PROCEEDING
On September 25, 2026, the Public Utilities Regulatory Authority (Authority)
received an application (Application) from Fiber AssetCo, LLC d/b/a Zayo (Zayo or
Company) requesting approval to initiate construction plans to install fiber optic cabling
(Facilities) on utility poles within the public rights-of-way (PROW).
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding: Fiber
AssetCo, LLC d/b/a Zayo, 1401 Wynkoop Street, Suite 500, Denver, CO 80202; the Office
of Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the
Commissioner of the Department of Energy and Environmental Protection, 79 Elm Street,
Hartford, CT 06106.
II.
STANDARD OF REVIEW
Pursuant to Conn. Agencies Regs. § 16-247c-5(a), “[n]o certified
telecommunications company shall install, maintain, operate, manage or control facilities
under or over any public highway or street for the provision of telecommunications service
without the approval of the [Authority].”
III.
AUTHORITY ANALYSIS
The Application was filed pursuant to General Statutes § 16-247h and Conn.
Agencies Regs. § 16-247c-5,1 and proposes constructing a total of 0.23 miles of Facilities
in Newington and Bethel, Connecticut. Attachment C, Application p. 2. According to the
1
The Company was granted a CPCN to operate as a reseller and facilities-based provider of
telecommunications services throughout Connecticut in the September 17, 2025, Decision in Docket No.
25-06-14, Application of Fiber AssetCo, LLC for a Certificate of Public Convenience and Necessity.
Docket No. 26-09-20
Page 2
Company, the Facilities will utilize single-mode, bend-sensitive fiber cabling
manufactured by Corning Cable Systems, AFL, Prysmian, or ofs. Id. Zayo submitted
under protective order the specific locations and route maps indicating where the
Company intends to construct those facilities. Zayo proposes to begin construction on
November 24, 2026, and complete construction on January 29, 2027. Id.
The purpose of the Facilities is to allow Zayo to provide services to residences and
businesses in the areas where Facilities are installed, as well as consistent with the
Company’s tariff. Attachment C, Application p. 1. Zayo will install the Facilities within the
communications space on utility poles owned by The Southern New England Telephone
Company d/b/a Frontier Communications and either The United Illuminating Company or
The Connecticut Light and Power Company d/b/a Eversource Energy. Id.
As Conn. Agencies Regs. § 16-247c-5(b) requires that applications for approval to
construct facilities in the public rights-of-way must be filed with the Authority at least 90
days prior to the commencement of construction, the Company requests a waiver of that
requirement to 60 days. Attachment C, Application, Attachment II.
The Authority finds that the Facilities are in the public interest because the
Facilities increase the capacity of the existing telecommunications system and do not
represent a threat to public health and safety. Under General Statutes § 16-247h, the
public interest is served by, among other things, “facilitating the efficient development and
deployment of an advanced telecommunications infrastructure.” The Authority waives
the requirements of Conn. Agencies Regs. § 16-247c-5(b). Consequently, the Facilities
are consistent with statutory language encouraging the efficient deployment of
telecommunications infrastructure as being in the public interest.
IV.
CONCLUSION AND ORDERS
A.
CONCLUSION
The Authority reviewed all information in the record and approves the Company’s
construction plans to install Facilities on utility poles within the PROW.
The Authority’s determination in this docket is based on the information submitted
by the Company. The Authority may reverse its ruling or revoke the Company’s
registration if any material information provided proves to be false or misleading. The
Company is reminded that it is obligated to notify the Authority within 10 days of any
changes to any of the information it has provided.
Docket No. 26-09-20
B.
Page 3
ORDERS
For the following Orders, file an electronic version through the Authority's website
at www.ct.gov/pura. Submissions filed in compliance with the Authority’s Orders must be
identified by all three of the following: Docket Number, Title and Order Number.
1.
No later than 10 days after the completion of each construction project, the
Company shall notify the Authority of the actual date of completion of the
construction. Such notification shall certify that the Company obtained all
applicable pole attachment licenses, municipal permits and any permit bonds
required by the DOT.
2.
Prior to commencing construction, the Company shall obtain pole attachment
licenses from the pole owners and acquire all other applicable state and municipal
permits.
DOCKET NO. 26-09-20
APPLICATION OF FIBER ASSETCO, LLC D/B/A ZAYO
FOR APPROVAL TO INSTALL FACILITIES UNDER AND
OVER CERTAIN PUBLIC RIGHTS-OF-WAY
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Holly H. Cheeseman
Everett Smith, III
Janice A. Beecher
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
Date