Motion No. 057Filed by Town of Darien, DarienTV
Application on behalf of DarienTV, Town of Darien, to update PEG Meeting Rooms Studio equipment
Part of
Docket 26-10-02Open
Annual Allocation of the Public Educational and Governmental Programming and Education Technology Investment Account
- Type of filing
- Motion (Motion No. 057)
- Date filed
- November 18, 2026
- Filed by
- Town of Darien, DarienTV
- Files
- 1
As listed on the current system: Motion No. 057 11/18/2026 (Town of Darien, DarienTV) - Application on behalf of DarienTV, Town of Darien, to update PEG Meeting Rooms
Studio equipment [26-10-02]
Files
26-10-02 PEGPETIA Application - DarienTV Executed.pdf
PDF · 1.4 MB · 18 pagesText searchable
Download 26-10-02 PEGPETIA Application - DarienTV Executed.pdfRead the text of 26-10-02 PEGPETIA Application - DarienTV Executed.pdf
Text of 26-10-02 PEGPETIA Application - DarienTV Executed.pdf
Extracted from the file · 37,653 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
Public Educational and Governmental Programming and Education Technology
Investment Account (PEGPETIA) Grant Program Application & Itemized Budget
Instructions for Filing a Motion to Apply for a PEGPETIA Grant
Motion Deadline
The Public Utilities Regulatory Authority (Authority or PURA) oversees a program
to award Public Educational and Governmental Programming Grants (PEG Grants) and
Education Technology Investment Grants (ETI Grants) to eligible entities. See General
Statutes § 16-331cc. This PEGPETIA Grant Program Application must be filed as a
motion in Docket No. 26-10-02 no later than noon on November 20, 2026.
Program Funding Eligibility
PEG grant funding is intended to improve public, educational, and governmental
access programming in Connecticut, and funds should be used for capital and equipment
costs that aid the production or procurement of public, educational, and governmental
programs. To ensure the funding is used appropriately, after completion of the project,
PEG grant recipients must file a report of the project enabled by the grant funds.
ETI grant funding is intended to support education technology initiatives of boards
of education and other education entities (public and private schools are eligible to apply).
To ensure the funding is used appropriately, after completion of the project, ETI grant
recipients must file a report of the project enabled by the grant funds.
Submission of Motion
Applicants must complete and file the Application with Itemized Budget
electronically to PURA as a motion in Docket No. 26-10-02, at
.
Applicants who have not
previously registered must first register for an account.
otions must include an
on n temized udget for the project to
be funded by the grant. Quotes, invoices, or similar documentation must be
submitted for each item to be purchased with grant funds.
The
tion will be assigned a unique motion number after it is filed. The
allowable electronic filing size is 20 MB. If the
Application
with
t plus
attachments exceed the allowable limit, the
Application with Itemized Budget, and the
attachments must be filed as supplemental filings to the same motion. Subsequent
supplement
under the assigned motion
number.
Questions regarding the electronic filing of the
directed to
at
.gov or (860) 827-
should be
6.
Docket No. 26-10-02
I.
Town of Darien
______________________________________________
Applicant Information
Town of Darien
Organization Name: ___________________________________________________
2 Renshaw Rd, Darien, CT 06820
Mailing Address: _____________________________________________________
06-6001981
Employer Identification Number: _________________________________________
4 Contact Person for Service List (required) ✔
if n
p at
Peter Riordan
Name: _____________________________________________________________
38 Phillips Ln, Darien, CT 06820
Mailing Address: _____________________________________________________
[phone removed]
Phone Number: ______________________________________________________
[email removed]
Email Address: _______________________________________________________
5 Additional Contact Person for Service List (optional) ✔
if n
p at
Mike Wheeler
Name: _____________________________________________________________
440 Heights Rd #314, Darien CT, 06820
Mailing Address: _____________________________________________________
[phone removed]
Phone Number: ______________________________________________________
[email removed]
Email Address: _______________________________________________________
6 Authorized Representative (required)
Note: The authorized representative will not be on the service list unless also
listed as a contact person, above.
Jennifer Charneski
Name: _____________________________________________________________
2 Renshaw Rd, Darien, CT 06820
Mailing Address: _____________________________________________________
[phone removed]
Phone Number: ______________________________________________________
[email removed]
Email Address: _______________________________________________________
Purpose of Grant (check one):
✔ PEG Grant (capital and equipment for producing/procuring programming)
☐
☐ ETI Grant (educational technology initiative)
49,000
Amount Requested: $__________________________________________________
Note: The "Amount Requested" will autocalculate upon completion of the Itemized Budget, below.
Page 1 of 10
Town of Darien
______________________________________________
Docket No. 2 -10-02
II.
Applicant Eligibility
Organization Type (check one):
PEG (Programming)
☐ Local community antenna television and video advisory council
☐ State-wide video advisory council
☐ Public, educational and governmental programmer
✔
☐
Public, educational and governmental studio operator
ETI (Educational Technology Initiative)
☐ Board of Education
☐ Public library
☐ Other education entity: _______________________________________________
☐
✔
☐
☐
5
Provide Secretary of the State No.: ___________
☐
For each of the PEGPETIA Grant cycles el w, indicate whether your
organization received a grant and submitted all required compliance filings:
Date of Compliance Filing
Docket No.
Grant Received?
2 -10-02
☐ Yes
✔ No
☐
2 -10-02
☐ Yes
✔ No
☐
2 -10-
☐ Yes
✔ No
☐
-1 -1
☐ Yes
✔ No
☐
Order No. 2
Order No. 3
Order No. 4
Note: If you have received a grant in any of the dockets listed above, you must
submit any outstanding compliance filings prior to submitting this application.
Page 2 of 10
Docket No. 2 -10-02
III.
Town of Darien
______________________________________________
Investment or Initiative Eligibility
1 .
ide description of proposed capital and equipment investment or education
technology i iti ti e t te e pe ted e h
eme ts t
p g mmi g
edu ti te h l g I ppli
le st te wh simil e uipme t is t
il le
m
the l
l mmu it
ess studi
l
DarienTV requests the maximum available grant amount to help replace the failing,
manually operated broadcast system serving Darien Town Hall’s three public meeting
rooms: Room 206 (council chamber), the Auditorium, and Room 119. The project
installs ten AI-tracking 4K PTZ cameras, ceiling array microphones, three vMix
production systems, a 32x32 video router, a Cablecast playout server for Optimum
Channel 79 (DarienTV), and fully documented new cabling and network infrastructure.
The result: every room can record unmanned at the touch of a button, up to three
meetings can stream live at once, and meetings reach YouTube the same day instead
of days later. Residents gain more coverage, clearer audio and video, and reliable
hybrid Zoom participation.
This equipment must be permanently installed where Town government meets. A
community access studio cannot provide it.
______________________________________________________________________
1 . Identify the affected geographical area(s) and/or school system(s) that will benefit from
the investment or initiative:
Darien, CT
______________________________________________________________________
1 . t te the umber of subscribers served stude ts imp ted:
Potential subscriber base of 22,000+ residents reached through a combination of
Optimum and YouTube
______________________________________________________________________
Page 3 of 10
Docket No. 2 -10-02
Town of Darien
______________________________________________
1 . ist the schedule for implementation, i ludi g estimated dates for key
mpleti
milestones and
Note: Completed projects are not eligible.
• November 2026: Application filed
• Spring 2027: Award decision; DNR contract executed; design begins
• June 2027: Grant disbursed; equipment ordered
• July 2027: Delivery and offsite rack build
• Mid-July to mid-August 2027: On-site installation, staged room by room to keep
DarienTV on air
• Late August 2027: Commissioning and training
• August 31, 2027: Project complete
• May 2028: Compliance report filed
______________________________________________________________________
. Identify objective performance measures that can be used to evaluate the success or
effectiveness of the investment or initiative:
Measured against a 12-month baseline and reported in our compliance filing:
• 90% of scheduled public meetings recorded and published
• Same-day or next-day YouTube publishing for at least 90% of recorded meetings
• Share of meetings produced unmanned, and operator hours saved per meeting
• 99% uptime of DarienTV playout feed to Optimum (measured at server output,
excluding planned outages) recorded
______________________________________________________________________
1 . Description of organization, including experience and competence related to the
p p sed p e t
DarienTV is the Town of Darien’s government and community access channel, serving
residents on Optimum Channel 79, YouTube (@DarienTVCT), and darientv.com. We
cover approximately 450 Town meetings a year across boards, commissions, and the
Representative Town Meeting. Program Director Jim Cameron leads the channel under
the DarienTV Advisory Board.
Project lead Peter Riordan brings more than 35 years of broadcast and media
technology leadership at Discovery Communications, Encompass Digital Media, Ion
Media, and Amazon Web Services. In 2026 DarienTV rebuilt its website, reorganized
its full on-demand video library, and selected integrator DNR Labs through a formal,
competitive scope process. DNR is a 20-year Connecticut AV firm with licensed
installers and a one-year workmanship warranty.
______________________________________________________________________
Page 4 of 10
Docket No. 2 -10-02
IV.
Town of Darien
______________________________________________
Budget Information
1 . Partner organization(s) or other funding sources (if applicable):
We plan to request funding from the Town of Darien will to cover costs that are not
covered by potential grants. Partial supplemental funding from other local foundations
may also be pursued.
______________________________________________________________________
e you completed the PEGPETIA Itemized Budget form el w with
itemized udget
the i estme t i iti ti e ?
✔ Yes.
☐
☐ No. Explain:
_____________________________________________________
Have you provided supporting documentation for each item, such as copies of bids,
estimates, and quotes?
✔ Yes.
☐
DNR Labs Estimate DNR-26-121-2 is attached and supports
☐ No. Explain: every line item.
_____________________________________________________
Are the non-equipment costs for design and engineering, installation, training, and
warranties/insurance less than 10% of the overall grant request?
Note: Software may be categorized as equipment. Other non-equipment
expenses (such as salaries, service agreements, or stipends) are not permitted as
part of the grant request.
✔ Yes.
☐
Our grant request is limited to the hardware/software related
☐ No. Explain: costs of the project. No services or labor are included in this
request.
_____________________________________________________
Page 5 of 10
Docket No. 26-10-02
Town of Darien
PEG Grant CAP Acknowledgment
comply with the relevant community access provider operating rules and regulations,
organization or company providing community access operations shall exercise
• Yes.
• No.
VI. Signature of Authorized Representative
Jennifer Charneski
_, am authorized to sign this application on behalf of the
applicant organization. Under the penalty of law, by signing this application, I affirm that
the information provided to the Authority is true and correct to the best of my knowledge
and supporting documentation required by this Application.
1/12/2026
(Daté)
(Signature)
Page 6 of 10
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
PEGPETIA ITEMIZED BUDGET
Instructions
Required Information
You must provide this itemized budget for the capital and equipment investment or
education technology initiative proposed in your application. For each expense, you must
provide the following information:
(1) Name of expense
(2) Total amount of expense (unit cost x quantity)
(3) Brief description
(4) Quantity requested
(5) Unit price
(6) A copy of a bid, estimate, or similar documentation; and
(7) Type of cost (equipment, design, engineering, installation, training, warranty,
insurance, other)
For each expense listed, you must attach a copy of the bid, estimate, or similar
documentation.
Note: The Authority cannot accept links to online vendors as documentation
of expenses. You may, however, attach saved or printed copies of equipment listed
for sale with online vendors as documentation.
Types of Costs
Non-equipment costs (such as design, engineering, installation, training,
warranties, or insurance) must be reasonable and should be limited to less than 10% of
the overall grant. Other non-equipment expenses (such as salaries, service agreements,
or stipends) are not permitted as part of the grant request.
Note: Software may be categorized as equipment.
I.
Applicant Information
Town of Darien
1. Organization Name: ___________________________________________________
26-10-02
2. Docket Number: ______________________________________________________
PEGPETIA (Public, Educational, and Governmental Programming
and Education Technology Investment Account)
3. Docket Name: _______________________________________________________
Page 7 of 10
Docket Number: 26-10-02 PEGPETIA
PEGPETIA ITEMIZED BUDGET
1. Organization Name:
2. Docket Number:
3. Docket Name:
I. Applicant Information
Q-SYS CORE 8: 8 local I/O, 64x64 network I/O, 8 AEC, Dante 8x8, 1RU. DNR
Labs Est. DNR-26-121-2 p. 3
$99.00 Wiremold or conduit for microphone cabling. DNR Labs Est. DNR-26-121-2 p. 5
1
3
3
1
2
1
1
1
1
1
1
2
10
Quantity
$4,534.00
$16,400.00
$50.00
$1,200.00
$2,829.00
$6,429.00
$985.00
$3,525.00
$99.00
$150.00
$2,470.00
$2,470.00
$3,095.00
$3,295.00
Unit Price
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
Equipment
II. Budget Template
Town of Darien - DarienTV
26-10-02
PEGPETIA (Public, Educational, and Governmental Programming and Education Technology Investment Account)
Q-SYS SLDAN-32-P software Dante 32x32 license, perpetual. DNR Labs Est.
$985.00
DNR-26-121-2 p. 3
1
$2,951.00
✔
Equipment
Bid/ Estimate
Attached
Type of Cost
Q-SYS Dante 32x32 license (software)
Custom vMix PC: 8-core 4.7GHz, 64GB RAM, 2x2TB SSD, 16GB GPU, Win 11
$12,858.00
Pro, DeckLink Duo 8 SDI in/out. DNR Labs Est. DNR-26-121-2 p. 3
Custom vMix PC: 8-core 4.7GHz, 32GB RAM, 1TB, 16GB GPU, Win 11 Pro,
DeckLink Quad. DNR Labs Est. DNR-26-121-2 p. 3
2
$2,189.00
✔
Description
vMix production PC, primary/secondary
$4,534.00 AJA KUMO 3232 video routing matrix. DNR Labs Est. DNR-26-121-2 p. 3
1
$1,219.00
Equipment
Amount
AJA KUMO 32x32 SDI router
1
✔
Expense
Netgear M4250 PoE++ managed switch
Netgear GSM4230UP-100NAS, 24x PoE++ 1440W, 4x SFP. Primary and backup.
$5,902.00
DNR Labs Est. DNR-26-121-2 p. 3
APC SRT2200RMXLA rackmount UPS / power conditioning for headend. DNR
$2,189.00
Labs Est. DNR-26-121-2 p. 3
$535.00
PTZ camera joystick controller
Ceiling array microphone, Room 206
Ceiling array microphone, Room 119
Microphone mounting hardware
Wiremold / conduit
Q-SYS Core 8 audio processor
vMix production PC, Room 119
vMix Pro license (software)
vMix Zoom integration license (software)
Cable playout / VOD / storage server
$150.00
$3,525.00
$2,829.00
$3,600.00
Zoom integration for vMix, native send to Zoom, one per PC. DNR Labs Est. DNR$150.00
26-121-2 p. 4
Cablecast VIO Lite Omni (CBL-VIOLITE-OMNI-800): 1x1 linear playout to
$16,400.00 Optimum, live streaming, automation, scheduling, CG, 8TB content drive. Vendor
budget figure. DNR Labs Est. DNR-26-121-2 p. 4
vMix PRO perpetual license, one per production PC. DNR Labs Est. DNR-26-1212 p. 3
Sony RM-IP500 IP joystick, one per control room operator position. DNR Labs Est.
$6,190.00
DNR-26-121-2 p. 4
TCC M ceiling mic, surface mount, white (TCC M-S-W), Room 206 council chamber.
$2,470.00
DNR Labs Est. DNR-26-121-2 p. 5
TCC M ceiling mic, flush mount, white (TCC M-F-W), Room 119. DNR Labs Est.
$2,470.00
DNR-26-121-2 p. 5
Mounting hardware for ceiling microphone install. DNR Labs Est. DNR-26-121-2 p.
5
Sony SRG-A40 (white) 4K NDI/SDI PTZ, AI auto-tracking, PoE++, vMix integration.
Auditorium 4, Room 206 3, Room 119 3. DNR Labs Est. DNR-26-121-2 pp. 4-5
APC double-conversion UPS
$1,219.00 Lowell LER-3527, 27in deep, 35RU. DNR Labs Est. DNR-26-121-2 p. 3
1
$32,950.00
Equipment rack, 35RU
$535.00 Lowell LFD-35FV vented door, 35U. DNR Labs Est. DNR-26-121-2 p. 3
Sony SRG-A40 4K PTZ camera w/ mount
Rack vented front door
Docket Number: 26-10-02 PEGPETIA
Equipment
Bid/ Estimate
Attached
Type of Cost
✔
Equipment
Unit Price
$94.00
✔
Quantity
2
$400.00
Description
$188.00 Vertical rack power distribution. DNR Labs Est. DNR-26-121-2 p. 3
1
Equipment
Amount
Rack vertical power strip
$400.00 Shielded ZMax patch panel Z6AS-PF-24. DNR Labs Est. DNR-26-121-2 p. 3
✔
Expense
Shielded patch panel
$500.00
Equipment
1
✔
Equipment
$500.00 Assorted patch cables for rack. DNR Labs Est. DNR-26-121-2 p. 3
$90.00
✔
Equipment
Patch cables
1
$800.00
✔
Equipment
Operator monitors
Stream Deck XL control surface
$90.00 Router for system network / remote access. DNR Labs Est. DNR-26-121-2 p. 3
1
$320.00
✔
Network router
6
$350.00
Equipment
Rackmount utility computer
4
✔
$1,400.00
Rackmount utility machine for system management. DNR Labs Est. DNR-26-121-2
$800.00
p. 3
Dell Pro 27 Plus QHD P2725D, 3 per operator position, 2 positions. DNR Labs
$1,920.00
Est. DNR-26-121-2 p. 4
Elgato Stream Deck XL, 2 per operator position. DNR Labs Est. DNR-26-121-2 p.
4
$181.00
Equipment
4
✔
Equipment
$724.00 Yamaha HS5, pair per operator position. DNR Labs Est. DNR-26-121-2 p. 4
$278.00
✔
Equipment
Studio audio monitors
3
$584.00
✔
Equipment
Equipment
3
$125.00
✔
Equipment
✔
2
$1,400.00
✔
Equipment
$253.00
8
$392.00
✔
Equipment
2
8
$3,682.00
✔
Equipment
$506.00 Mackie Big Knob, one per operator position. DNR Labs Est. DNR-26-121-2 p. 4
1
$1,518.00
✔
Monitor controller
DNR custom 1-gang keypad: start / stop / pause record, one per room. DNR Labs
Est. DNR-26-121-2 pp. 4-5
1
($6,000.00)
$834.00
DNR custom PoE-powered exit-sign-size On Air indicator, one per room. DNR Labs
$1,752.00
Est. DNR-26-121-2 pp. 4-5
Decimator MD-LX to capture Zoom room video, Rooms 206 and 119. DNR Labs
Est. DNR-26-121-2 pp. 4-5
$250.00
$11,200.00 Belden 4694R SDI cable, 1000 ft reels. DNR Labs Est. DNR-26-121-2 p. 5
Cat6 high-bandwidth industrial cable, 1000 ft boxes. DNR Labs Est. DNR-26-121$3,136.00
2 p. 5
Connectors, custom cables, printed labels, main system. DNR Labs Est. DNR-26$3,682.00
121-2 p. 5
Connectors, custom cables, printed labels, central control. DNR Labs Est. DNR-26121-2 p. 5
$1,518.00
($6,000.00) Discount applied by DNR Labs on equipment. DNR Labs Est. DNR-26-121-2 p. 5
$121,955.00
1
Tier 1 record control keypad
On Air / Recording LED sign
Zoom video capture converter
SDI video cable, 1000 ft
Cat6 shielded data cable, 1000 ft
Connectors, custom cabling, labeling (lot 1)
Connectors, custom cabling, labeling (lot 2)
Vendor discount
Total Amount:
26-10-02 Town of Darien
Docket No.
Signature of Authorized Representative
Jennifer Charneski
authorized to sign this Itemized
budget on behalf of the applicant organization.am
Under the penalty of law, by signing
and resubmitted.
(Signature)
11/12/26
/
Page 10 of 10
(Daté)
Project Estimate: Darien Town Hall:
Darien TV AV Upgrade
Estimate Number: DNR-26-121-2
Our Info:
76 Westbury Park Road, Suite 101E
Watertown, CT 06795
[email removed]
[phone removed]
Date Prepared:
Client Info:
Darien Town Hall
2 Renshaw Rd,
Darien
CT 06820
3/13/2026
Lead Time: TBD
*Estimate is Valid
for 30 Days from the
above date
Work Location:
On-site:
Contact Phone: [phone removed]
Contact Email: [email removed]
Contact Name: Peter Riordan
Multi-Room
21 Business Days
dnr's Guarantee
Thank you for considering DNR Labs, a Watertown (CT) based, boutique audio visual company. We're a small business dedicated to customer service and end
user experience; specializing in quality and reliability. DNR competes to provide the highest value, not the lowest price.
Celebrating our 20th anniversary, DNR has grown from humble beginnings. What started in a barn in Woodbury is now a 40,000 square foot shop, office, and logistics center
in Watertown. And though we've grown rapidly, DNR keeps our origins in mind. We remain small enough to have real people answer the phone as calls come in, but big
enough to work with the world's leaders in AV innovation; young enough to stay up to date on the latest technologies as they rapidly advance, but old enough to have our
core team members going on their 15th year with us. Guaranteeing our product, we offer a full 1 year warranty on all craftsmanship and new technology. Superior quality
products, advanced programming, and clean installs are where we shine. Everything we spec, bid, and install has been thoroughly tested for months and sometimes years.
DNR creates simple interfaces, fit for any (and we mean any) user, but offers an advanced control access for power users. Our designs are simple. Our systems are
functional. And our work is meticulous; laid out and labeled down to every last wire. Complete with remote assistance for troubleshooting and a dedicated service team;
even after the job is done we're still there to help.
It's our mission to be your vendor of choice by providing exemplary customer service, the highest quality systems and design, and cutting through the noise
of the increasingly complex world of AV technology.
- Lauren Stanley, President >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> - Don Gamsjager, Owner >>>>
Scope of Work:
Darien TV Broadcast System Upgrade
Simplified Multi-Tier Production System
This project includes a complete replacement of the existing broadcast system, delivering a modern, flexible platform designed for ease of use, reliability, and fast publishing of meetings.
Full System Replacement (Turnkey)
Complete removal of existing system
All new wiring throughout
All new broadcast equipment
New central equipment rack, professionally built and labeled
All cables labeled at both ends with printed labels
Full system diagrams and documentation provided
Installed by licensed professionals
Fully commissioned and tested
This is a true turnkey system delivered ready for daily operation.
Three-Tier Production Model
The system is designed around three simple levels of operation, allowing the Town to scale production based on staffing and needs.
Tier 1 – Simple / Unmanned Recording
Designed for no operator required.
One-touch start/stop recording in each room
Automatically records cameras and microphones
LED “On Air / Recording” indicator in each room
Scheduled recording (start/stop automatically)
Manual override at any time
Files automatically named with date/time or event name
Can be monitored:
From control room
Remotely offsite
Goal: Fast, reliable “gavel-to-gavel” recording with zero complexity.
Page 1 of
Tier 2 – Assisted Production (Onsite or Remote)
Designed for basic operator control.
Operated from control room or remotely
Uses vMix production software
PTZ cameras with preset shots
Simple switching between camera angles
Optional Zoom integration
Goal: Improve production quality with minimal operator effort.
Tier 3 – Full Production
Designed for fully produced meetings.
Multi-camera live switching
Full Zoom integration
AI-assisted camera tracking and framing
Operator-controlled production with dynamic shots
Graphics and overlays as needed
Goal: Broadcast-quality production for high-visibility meetings.
Streaming & Broadcast Strategy
The system is optimized for speed, simplicity, and minimal workflow.
Primary Focus: Streaming & Archiving
Direct streaming to YouTube
Automatic archiving of meetings
Fast “end of meeting → online” turnaround
No complex editing required
Designed for true gavel-to-gavel publishing
Multi-Room Capability
Up to 3 meetings can stream live simultaneously (YouTube or online platforms)
Each room operates independently
Cable Broadcast Server (Linear Channel)
A simplified and reliable approach to cable broadcasting:
Dedicated “1 in / 1 out” cable server
Acts as:
Final broadcast output to cable channel
Backup archive point
Only one meeting at a time goes to cable
Ensures controlled, reliable on-air playback
Cameras & Automation
New PTZ cameras in all rooms
AI-assisted tracking and framing
Preset camera positions for quick recall
Remote control capability (onsite or offsite)
Benefit:
Professional-looking video with minimal operator effort.
Audio Systems
Existing auditorium audio integrated into the system
Council chamber upgraded with beam-steering ceiling microphone
Room 119 equipped with ceiling microphone
All audio routed directly into recording/streaming system
Goal: Clear, consistent speech capture in all rooms.
Remote Operation
Systems can be operated onsite or remotely
Secure remote access via third-party platform (subscription-based)
DNR will assist in selecting:
Secure
Low-latency
Easy-to-use solution
Warranty & Support
Full system warranty (as specified)
One year of support included
Remote support available evenings and weekends
Training provided for staff and operators
Summary
This system delivers:
Simple operation when needed (Tier 1)
Flexible production capability (Tier 2 & 3)
Fast publishing to YouTube
Reliable cable broadcast output
Scalable system for future growth
Materials For:
Description
Quantity
Material:
Main Rack Upgrade
*cut part of counter out
*install full size rack
*install all new video processing gear
Page 2 of
Price
Total
Model Number:
Router
Rackmount Utility Machine
Aja KUMO router 32x32
Shielded ZMax Patch Panel
Patch Cables assorted
1
1
1
1
1
$90.00
$800.00
$4,534.00
$400.00
$500.00
$90.00
$800.00
$4,534.00
$400.00
$500.00
KUMO 3232
APC UPS
Primary
1
$2,189.00
$2,189.00
APC-SRT2200RMXLA
1
$2,951.00
$2,951.00
GSM4230UP-100NAS
1
$2,951.00
$2,951.00
2
1
1
$94.00
$535.00
$1,219.00
$188.00
$535.00
$1,219.00
LFD-35FV
1
$3,525.00
$3,525.00
CORE 8
1
$985.00
$985.00
Netgear AV Line M4250 Series GSM4230UP 30-Port / 24x PoE++ 1440W / 2x
1G / 4x SFP Managed Ethernet Switch
*primary POE power and network
Netgear AV Line M4250 Series GSM4230UP 30-Port / 24x PoE++ 1440W / 2x
1G / 4x SFP Managed Ethernet Switch
*backup POE and secondary equipment switch
Vertical Power Strip
Vented Door 35U
Lowell 27 deep rack, 35 RU tall
Q-SYS Core Processor with 8 local audio I/O channels, 64x64 network I/O
channels with 8x8 Software-based Dante license included, USB AV bridging,
dual LAN ports, VoIP telephony, 8x8 GPIO, 8 AEC processors, Half-size 1RU.
Includes Scripting/UCI functionality.
Q-SYS Software-based Dante 32x32 Channel (16x16 Flows) License,
Perpetual.
GSM4230UP-100NAS
Subtotal
Primary Vmix Unit
vMix PC
4.7GHz 8-Core Processor
CPU Cooler
64 GB Of Ram
x2 2TB SSD
16GB Video Card
Modular PSU
Windows 11 PRO Server
Decklink Duo for 8 SDI Inputs, 8 SDI outputs
Secondary Vmix Unit
vMix PC
4.7GHz 8-Core Processor
CPU Cooler
64 GB of RAM
x2 2TB SSD
16GB Video Card
Modular PSU
Windows 11 Server
Decklink Duo for 8 SDI Inputs, 8 SDI outputs
Lower Meeting room Vmix Unit
vMix PC
4.7GHz 8-Core Processor
CPU Cooler
32GB RAM
1 TB of storage
16GB Video Card
Modular PSU
Windows 11 Pro Server
Decklink Quad
VMIX License - PRO, One Time fee
Z6AS-PF-24
LER-3527
SLDAN-32-P
$20,867.00
1
$6,429.00
$6,429.00
1
$6,429.00
$6,429.00
1
$2,829.00
$2,829.00
3
$1,200.00
$3,600.00
Page 3 of
Zoom Room license integration for vmix - allows Vmix to send to Zoom
Native for live meeting
3
$50.00
$150.00
Playback and Storage Server
*this is budget place holder only, dnr will work with end user on design and
final cost
Web-centric 1x1 Broadcast, VOD and Live Streaming Solution in a whisper
quiet 2 RU chassis. Streams H.264 HLS Adaptive bitrate to mobile devices,
OTT and desktops. Pulls in and records NDI, RTP, RTMP, RTSP, SRT and HLS
streams as well as SDI. Includes Cablecast Automation, scheduling and CG
Software. Includes graphics, crawl, bug, and bug text on streaming output.
Includes an 8TB Content drive and 256GB OS drive. 3 year hardware
warranty, system commissioning and one year of Gold support included. Rack
rails not included.
1
$16,400.00
$16,400.00
Subtotal
Control Room Work Consoles
Position 1
Operating Monitors and Multi Views
Dell Pro 27 Plus QHD Monitor - P2725D
Stream Deck XL
Sony Joystick IP500
Audio Monitors HS5 Yamaha
Mackie Big Knob
3
2
1
2
1
$320.00
$350.00
$3,095.00
$181.00
$253.00
$960.00
$700.00
$3,095.00
$362.00
$253.00
Position 1
Operating Monitors and Multi Views
Dell Pro 27 Plus QHD Monitor - P2725D
Stream Deck XL
Sony Joystick IP500
Audio Monitors HS5 Yamaha
Mackie Big Knob
3
2
1
2
1
$320.00
$350.00
$3,095.00
$181.00
$253.00
$960.00
$700.00
$3,095.00
$362.00
$253.00
4
$3,295.00
$13,180.00
1
$278.00
$278.00
1
$584.00
$584.00
3
$3,295.00
$9,885.00
1
$125.00
$125.00
1
$278.00
$278.00
1
$584.00
$584.00
Cameras and Audio
Auditorium Cameras
Sony SRG 40 in white w/ mount
*Sony 4k NDI and SDI camera
*AI tracking
*POE ++ Power
*Full Vmix integration
Teir 1 Control and Alerting
dnr custom - 1 Gang Keypad for Teir 1 Control - Start Record, Stop Record,
Pause record
dnr custom - exit sign sized LED POE Powered Warning sign that states the
system is on and recording
CBL-VIOLITE-OMNI-800
$35,837.00
SRG-A40
*re-use audio feed from dnr sound system
*re-use video feed from dnr video matrix on projector
Room 206 (2nd floor council room behind control room)
Sony SRG 40 in white w/ mount
*Sony 4k NDI and SDI camera
*AI tracking
*POE ++ Power
*Full Vmix integration
Re-use Zoom TV
Decimator to capture zoom room video
Teir 1 Control and Alerting
dnr custom - 1 Gang Keypad for Teir 1 Control - Start Record, Stop Record,
Pause record
dnr custom - exit sign sized LED POE Powered Warning sign that states the
system is on and recording
Page 4 of
MD-LX
Subtotal
$35,654.00
Audio
Ceiling microphone
TCCM in white surface mount
Mounting Hardware budget
Wiremold or conduit budget
1
1
1
$2,470.00
$150.00
$99.00
$2,470.00
$150.00
$99.00
Subtotal
TCC M-S-W
$2,719.00
Connectors, Custom Cabling, Labeling (Material LOT)
Subtotal
1
$3,682.00
$3,682.00
$98,759.00
3
$3,295.00
$9,885.00
1
1
$125.00
$125.00
Teir 1 Control and Alerting
dnr custom - 1 Gang Keypad for Teir 1 Control - Start Record, Stop Record, Pause 1
record
$278.00
dnr custom - exit sign sized LED POE Powered Warning sign that states the system is1on and recording
$584.00
$278.00
$584.00
Audio
Ceiling microphone
TCCM Ceiling mic
1
$2,470.00
$2,470.00
TCC M-F-W
New Video Cabling
Re-use Fiber to 119 and other rooms
SDI Video cable BL-4694R-1000BK
Cat6s High Bandwidth Industrial Data Cable (1000ft box)
8
8
$1,400.00
$392.00
$11,200.00
$3,136.00
23-4P OAS SOL CMR C6 Blk Jkt
Discount
1
-$6,000.00
-$6,000.00
Connectors, Custom Cabling, Labeling (Material LOT)
Central Control and Processing Subtotal:
1
$1,518.00
$1,518.00
$23,196.00
Stock, Assorted
Central Control and Processing:
Room 119 (lower level near gym)
Sony SRG 40 in white w/ mount
*Sony 4k NDI and SDI camera
*AI tracking
*POE ++ Power
*Full Vmix integration
Re-use Zoom TV
Decimator to capture zoom room video
MD-LX
Stock, Assorted
Work Summary
Total Phase Breakdown:
Total
$121,955.00
Material Total
Total Material Cost:
$121,955.00
Total Labor Breakdown:
Engineering, Design, Specs, Documents/Drawings
Programming - Control System, DSP, Network
Hours
15
12
Rate
$175.00
$175.00
Total
$2,625.00
$2,100.00
Integration - Offsite Prep/Onsite Install
Training, Commissioning, Support
Project Management
Travel/Logistics/Lodging Fees (Proximity Based)
Freight
165
24
12
N/A
N/A
$175.00
$175.00
$175.00
Totaled
Totaled
$28,875.00
$4,200.00
$2,100.00
$2,500.00
$1,220.00
Page 5 of
Notes
Administration
Total Labor Hours:
CT Sales Tax/Status:
N/A
Flat
$1,500.00
228
Total Labor Cost:
$45,120.00
Exempt
Exempt
Tariff
Project Total:
$0.00
$0.00
$167,075.00
*Though this estimate can be broken into PHASES, it is priced as one unified install; I.E. Lifts, ladders, wire, conduit/wiremold/rigging/piping, administration, project management, and freight are SHARED
amongst all facets as it's more economical to do all work under a single contract proceeding. Please expect at least a 10-15% increase on a single area/section's subtotal should it be broken into multiple
contracts/phases. We thank you for your understanding.*
General Terms & Conditions:
1. Equipment may be substituted for functional equivalent in cases of supply chain issues or suitability for the job. Equipment will come with the same
warranty and functions but could be a different model/version depending on availability from our suppliers. In the case of such, a written notice will be sent
requesting client approval for the swap. DNR Laboratories will await formal written approval in order to proceed. A final list of equipment will be provided
with the as built documentation at the close out of the project.
2. ALL DESIGNS, PLANS, AND IDEAS REPRESENTED BY THIS PROJECT ARE THE PROPERTY OF AND OWNED BY DNR LABORATORIES LLC. THEY HAVE BEEN
DEVELOPED FOR USE ON THE SPECIFIED PROJECT ONLY. NO PERSON OR CORPORATION MAY USE ANY OF THE REPRESENTED DESIGNS, PLANS, OR IDEAS FOR
ANY PURPOSE WITHOUT THE WRITTEN CONSENT OF DNR LABORATORIES LLC
3. Proposal is subject to change based on site conditions, electrical conditions, and changes to scope.
4. Proposal pricing is limited to 30 days, after 30 days a new quote will need to be issued. This due to frequent price increases from manufacturers, out of the
control of DNR Laboratories.
5. Delays in project start, progress and completion due to supply chain issues or transportation issues is at no fault to dnr Laboratories.
6. All programing, codes and passwords are property of the client, dnr will not withhold any access to the system from client.
7. 1 year warranty on dnr labor & workmanship
8. Individual MFR warranties apply to hardware; client responsible for warranty registration with MFRs
9. All pricing presumes existing cabling and owner furnished equipment (OFE) is intact and fully functional according to specifications, pricing may be subject
to change if existing equipment if found to be defective, and as project needs and construction plans evolve
10. Sustainable Refurbished Alternative Equipment (B-Stock) at DNR has been cleaned, checked for no damages, and tested to be in full working condition.
DNR gives this option when possible to offer the client a lower cost for the same high quality product while helping reduce electronic waste in the
environment. These items are sold "as-is", no warranty
11. The state of Connecticut and entire US is overtaxed and the power grid is suffering. This results in frequent black/brown outs and voltage variations within
the power grid. Variations as much as 1V can fry delicate (and expensive) pieces of technology. For this reason all systems come standard with a Double
Conversion, Power Conditioning Battery Backup per each AV headend location. Though these options can be passed up, DNR requires a waiver to be signed,
voiding our 1 year all-included warranty of all provided new equipment, and the manufacturer warranty as none will cover power/power supply related issues
(we've tried). This policy is born from the countless amounts of fried tech we've dealt with first hand throughout the last two years, and how the number of
dead, not warrantied, pieces of equipment continues to climb at an alarming rate.
12. Clients are responsible for providing an internet handoff to the DNR router (if quoted). Failure to do so will result in a change order encompassing the labor
cost for DNR technicians to pull wire to the network uplink location. DNR's service and warranty is voided by refusal of remote access (if quoted) as it allows
DNR staff to identify the issue and send out the appropriate technician, or even fix the problem immediately. Remote service and diagnostics come free with
DNR's 1 year warranty.
13. 1 year after system install is complete DNR's warranty expires. At this point DNR will offer a service contract to maintain priority scheduling and pricing for
support both in person and remotely. Without a service contract DNR's support is billable hourly (at a four hour minimum) with availability on a first-come-firstserve basis. Furthermore after hours/weekend service is not guaranteed without a service contract, and subject emergency support pricing.
14. All support inquiries MUST go through the [email removed] email or be called into the office line @ [phone removed] both during and after business
hours to be processed.
**Estimate MUST be signed and sent to [email removed] for approval.
APPROVAL DATE:
SIGNATURE:
NAME/TITLE:
*APPROVAL LOCKS IN PROJECT PRICING
*PRICING IS ALL INCLUSIVE AND SET TO SCOPE ABOVE
*FORMAL CONTRACT DOCUMENTS TO FOLLOW WITHIN 20 DAYS
Page 6 of
*DEPOSIT (50% OF TOTAL) TO BE INVOICED UPON RETURNED, SIGNED CONTRACT (IF REQUIRED)
*MATERIALS TO BE ORDERED UPON RECEPTION OF DEPOSIT/PO
*SCHEDULING FOR INSTALL DATES OCCURS AFTER GATHERING PRODUCT ETAs BASED ON ORDERING
Page 7 of