›Text of Windsor Public Schools - 26-10-02 - PEGPETIA Grant Program & Itemized Budget.pdf
Extracted from the file · 16,674 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
Public Educational and Governmental Programming and Education Technology
Investment Account (PEGPETIA) Grant Program Application & Itemized Budget
Instructions for Filing a Motion to Apply for a PEGPETIA Grant
Motion Deadline
The Public Utilities Regulatory Authority (Authority or PURA) oversees a program
to award Public Educational and Governmental Programming Grants (PEG Grants) and
Education Technology Investment Grants (ETI Grants) to eligible entities. See General
Statutes § 16-331cc. This PEGPETIA Grant Program Application must be filed as a
motion in Docket No. 26-10-02 no later than noon on November 20, 2026.
Program Funding Eligibility
PEG grant funding is intended to improve public, educational, and governmental
access programming in Connecticut, and funds should be used for capital and equipment
costs that aid the production or procurement of public, educational, and governmental
programs. To ensure the funding is used appropriately, after completion of the project,
PEG grant recipients must file a report of the project enabled by the grant funds.
ETI grant funding is intended to support education technology initiatives of boards
of education and other education entities (public and private schools are eligible to apply).
To ensure the funding is used appropriately, after completion of the project, ETI grant
recipients must file a report of the project enabled by the grant funds.
Submission of Motion
Applicants must complete and file the Application with Itemized Budget
electronically to PURA as a motion in Docket No. 26-10-02, at https://portal.ct.gov/
pura/about/filing-and-forms/make-an-electronic-filing.
Applicants who have not
previously registered must first register for an account.
Motions must include an Application and Itemized Budget for the projects to
be funded by the grant. Quotes, invoices, or similar documentation must be
submitted for each item to be purchased with grant funds.
The motion will be assigned a unique motion number after it is filed. The
allowable electronic filing size is 20 MB. If the motion's attachments (Application
with Itemized Budget plus other attachments) exceed the allowable limit, the motion
may include only the completed Application with Itemized Budget, and the remaining
attachments must be filed as supplemental filings to the same motion. Subsequent
supplements must also be filed as supplemental filings under the assigned motion
number.
Questions regarding the electronic filing of the motion and supplements should be
directed to Docket Control at PURA.ExecutiveSecretary.gov or [phone removed].
Docket No. 26-10-02
I.
Windsor Public Schools
______________________________________________
Applicant Information
1. Organization Name: Windsor Public Schools
___________________________________________________
601 Matianuck Avenue Windsor, CT 06095
2. Mailing Address: _____________________________________________________
066001688
3. Employer Identification Number: _________________________________________
4. Contact Person for Service List (required)
(check if new/updated)
Name: Rebecca Zenczak
_____________________________________________________________
50 Sage Park Road Windsor, CT 06095
Mailing Address: _____________________________________________________
Phone Number: [phone removed]
______________________________________________________
[email removed]
Email Address: _______________________________________________________
5. Additional Contact Person for Service List (optional)
(check if new/updated)
Name: _____________________________________________________________
Mailing Address: _____________________________________________________
Phone Number: ______________________________________________________
Email Address: _______________________________________________________
6. Authorized Representative (required)
Note: The authorized representative will not be on the service list unless also
listed as a contact person, above.
Dr. Noha Abdel-Hady, Ed-D
Name: _____________________________________________________________
601 Matianuck Avenue, Windsor, CT 06095
Mailing Address: _____________________________________________________
[phone removed]
Phone Number: ______________________________________________________
Email Address: [email removed]
_______________________________________________________
7. Purpose of Grant (check one):
☐ PEG Grant (capital and equipment for producing/procuring programming)
✔
☐
ETI Grant (educational technology initiative)
32,404.00
8. Amount Requested: $__________________________________________________
Note: The "Amount Requested" will autocalculate upon completion of the Itemized Budget, below.
Page 1 of 10
Windsor Public Schools
______________________________________________
Docket No. 26-10-02
II.
Applicant Eligibility
9. Organization Type (check one):
PEG (Programming)
☐ Local community antenna television and video advisory council
☐ State-wide video advisory council
☐ Public, educational and governmental programmer
☐ Public, educational and governmental studio operator
ETI (Educational Technology Initiative)
✔
☐
Board of Education
☐ Public library
☐ Other education entity: _______________________________________________
10. Which of the following describes your organization?
☐ Connecticut State Agency
✔ Municipality
☐
☐ Nonprofit 501(c)(3) organization. Provide Secretary of the State No.: ___________
☐ Other (e.g., LLC or corporation). Provide Secretary of the State No.: ___________
11. For each of the PEGPETIA Grant cycles below, indicate whether your
organization received a grant and submitted all required compliance filings:
Date of Compliance Filing
Docket No.
24-10-02
23-10-02
22-10-02
21-10-13
Grant Received?
✔ Yes
☐
☐ No
☐ Yes
✔ No
☐
✔ Yes
☐
☐ Yes
☐ No
Order No. 2
Order No. 3
Order No. 4
n/a
05/14/2026 05/14/2026
12/16/2024
n/a
12/16/2024
✔ No
☐
Note: If you have received a grant in any of the dockets listed above, you must
submit any outstanding compliance filings prior to submitting this application.
Page 2 of 10
Docket No. 26-10-02
III.
Windsor Public Schools
______________________________________________
Investment or Initiative Eligibility
12. Provide a description of proposed capital and equipment investment or education
technology initiative. State expected enhancements to PEG programming or
education technology. If applicable, state why similar equipment is not available from
the local community access studio (PEG only).
Our proposed educational technology initiative represents an ongoing commitment to
modernizing classroom infrastructure across our K–12 schools and shared learning
spaces. Specifically, this project will outfit 8 alternative education classrooms (grades
9–12) with interactive flat-panel display units.
These displays will serve as the primary instructional hub for teachers, replacing
outdated and failing projection technology that currently limits daily instruction. With
flexible wired and wireless connectivity to our high-speed network, both educators and
students can seamlessly present, interact, and collaborate from a variety of devices.
Additionally, these units will integrate with a central management console, allowing our
IT Department to streamline essential maintenance, push centralized firmware and
software updates, and broadcast visual and livestreamed announcements district-wide.
This investment directly supports the Connecticut Commission for Educational
Technology’s goals for digital learning infrastructure and aligns with state objectives to
ensure robust, high-speed digital connectivity in every classroom.
______________________________________________________________________
13. Identify the affected geographical area(s) and/or school system(s) that will benefit from
the investment or initiative:
LP Wilson, alternative education classrooms (601 Matianuck Avenue, Windsor, CT 06095)
This initiative will benefit 100% of the students at our alternative education program site since
all students actively learn and work in the designated spaces where the flat-panel technology
will be installed.
______________________________________________________________________
14. State the number of subscribers served or students impacted:
The number of students impacted will be 25; however, this number generally increases
throughout the school year.
______________________________________________________________________
Page 3 of 10
Docket No. 26-10-02
Windsor Public Schools
______________________________________________
15. List the schedule for implementation, including estimated dates for key
milestones and completion.
Note: Completed projects are not eligible.
Grant Award & Initial Preparation (May 2027)
- Notify central office and finance department upon grant award notice.
- Finalize vendor quotes and issue purchase orders for interactive flat-panel displays and mounting hardware.
Procurement & Equipment Installation (June 2027 – August 2027)
- Receive equipment delivery and coordinate vendor installation.
- Decommission and recycle outdated projection/display equipment.
- Mount flat-panel displays, configure wired and wireless network connectivity, and connect central management
software across targeted classrooms before the start of the school year.
Teacher Onboarding & Professional Learning (August 2027 – September 2027)
- Conduct hands-on professional development sessions for teachers during back-to-school orientation.
- Train staff on interactive display features, wireless device presentation, and collaborative instructional software tools.
Full Classroom Integration & Follow-Up Support (October 2027 – Spring 2028)
- Deploy flat-panel units as primary instructional hubs for daily classroom instruction.
- Provide ongoing technical support, instructional coaching, and IT management console maintenance.
Evaluation & Compliance Reporting (May 2028)
- Gather teacher and student feedback against project performance measures.
- Compile itemized invoices/proof of payment and submit required compliance filings to PURA.
______________________________________________________________________
16. Identify objective performance measures that can be used to evaluate the success or
effectiveness of the investment or initiative:
1. We will solicit ongoing feedback from teachers regarding their learning needs to ensure successful classroom
integration. Project success will be evaluated using the ISTE Educator Standard 2.6, Facilitator: Educators facilitate
learning with technology to support student achievement of the ISTE Standards for Students.
2. Effectiveness will also be measured through: Implementation & Adoption: 100% of targeted classrooms using
interactive flat panels for daily instruction.
3. Operational Efficiency: 100% of display updates and management centralized through the IT console.
Feedback: End-of-year surveys assessing improved instructional flexibility and student engagement.
______________________________________________________________________
17. Description of organization, including experience and competence related to the
proposed project:
Windsor Public Schools serves nearly 4,000 students in north-central Connecticut. Guided by our 2025–2030
Strategic Operating Plan, our mission is to develop the genius in every child and create lifelong learners by
providing equitable access to high-quality, personalized learning experiences.
Our district technology vision directly mirrors the goals of the Connecticut Commission for Educational
Technology, ensuring all learning in Windsor benefits from reliable, future-ready infrastructure that supports
impactful teaching, collaboration, and student achievement.
The Windsor Public Schools Technology Department possesses extensive experience and demonstrated
competence in planning, deploying, and maintaining large-scale educational technology projects. The
department successfully manages a sustained 1:1 student device environment across grades 3–12,
centralized IT management platforms, and high-speed network infrastructure across all district facilities.
Through strong technical oversight, remote management systems, and ongoing collaboration with
instructional leadership, the IT team ensures seamless technology integration, minimal operational downtime,
and sustainable asset management.
______________________________________________________________________
Page 4 of 10
Docket No. 26-10-02
IV.
Windsor Public Schools
______________________________________________
Budget Information
18. Partner organization(s) or other funding sources (if applicable):
N/A
______________________________________________________________________
19. Have you completed the PEGPETIA Itemized Budget form below (with an
itemized budget for the investment or initiative)?
✔ Yes.
☐
☐ No. Explain:
_____________________________________________________
20. Have you provided supporting documentation for each item, such as copies of bids,
estimates, and quotes?
✔ Yes.
☐
☐ No. Explain:
_____________________________________________________
21. Are the non-equipment costs for design and engineering, installation, training, and
warranties/insurance less than 10% of the overall grant request?
Note: Software may be categorized as equipment. Other non-equipment
expenses (such as salaries, service agreements, or stipends) are not permitted as
part of the grant request.
✔ Yes.
☐
☐ No. Explain:
_____________________________________________________
Page 5 of 10
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
PEGPETIA ITEMIZED BUDGET
Instructions
Required Information
You must provide this itemized budget for the capital and equipment investment or
education technology initiative proposed in your application. For each expense, you must
provide the following information:
(1) Name of expense
(2) Total amount of expense (unit cost x quantity)
(3) Brief description
(4) Quantity requested
(5) Unit price
(6) A copy of a bid, estimate, or similar documentation; and
(7) Type of cost (equipment, design, engineering, installation, training, warranty,
insurance, other)
For each expense listed, you must attach a copy of the bid, estimate, or similar
documentation.
Note: The Authority cannot accept links to online vendors as documentation
of expenses. You may, however, attach saved or printed copies of equipment listed
for sale with online vendors as documentation.
Types of Costs
Non-equipment costs (such as design, engineering, installation, training,
warranties, or insurance) must be reasonable and should be limited to less than 10% of
the overall grant. Other non-equipment expenses (such as salaries, service agreements,
or stipends) are not permitted as part of the grant request.
Note: Software may be categorized as equipment.
I.
Applicant Information
Windsor Public Schools
1. Organization Name: ___________________________________________________
2. Docket Number: 26-10-02
______________________________________________________
Annual Allocation of the Public Educational and Governmental
Programming and Education Technology Investment Account
3. Docket Name: _______________________________________________________
Page 7 of 10
Docket No. 26-10-02
Windsor Public Schools
II.
Budget Template
Description
Expense
Amount
(Example) Studio Camera
$ 1,400.00 (Example) Make, Model No. XYZ123, Qty 4, Unit Price $350
(Example) Camera Install
$
175.00 (Example) Installation of all cameras, connection to existing studio setup, and training personnel
ClearTouch Interactive Panel $20,600.00 ClearTouch Interactive CTI-6075NOVA-UH50 - 75" 6000 Nova Series
ClearTouch Limited Warranty $840.00 ClearTouch Interactive CTI-EXWTY-6075-2Y - Extended Limited Warranty
HDMI Wall Plate $4,624.00
HDMI & USB Tx/ Rx Wall Plate
Power Extension $720.00
Power Extension to Lower Outlet
Pro AV Installation $3,920.00 Pro AV Systems Installation - De-Install existing tech & install new panels
Pro AV Project Management $260.00 Project Management & Site Coordination for classroom systems
ClearTouch Shipping $1,440.00
Standard Shipping for ClearTouch
Total Amount:
$32,404.00
Page 8 of 10
Bid/
Estimate
Attached
Type of
Cost
Quantity
Unit Price
4
$350/each
1
$175
✔
Installation
8
8
8
8
1
1
1
$2575.00
✔
Equipment
$105.00
$578.00
$90.00
$3,920.00
$260.00
$1440.00
✔
Equipment
✔
Equipment
✔
Equipment
✔
✔
✔
✔
Equipment
Installation
Installation
Shipping
Docket No.
Expense
Amount
Total
Total Amount:
Amount:
$ 0.00
Quantity
Description
Page 9 of 10
Unit Price
Bid/
Estimate
Attached
Type of
Cost