A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Motion No. 080Filed by Kent Memorial Library

Application for Kent Memorial Library

Part of

Docket 26-10-02Open

Annual Allocation of the Public Educational and Governmental Programming and Education Technology Investment Account

Type of filing
Motion (Motion No. 080)
Date filed
November 19, 2026
Filed by
Kent Memorial Library
Files
2
As listed on the current system: Motion No. 080 11/19/2026 (Kent Memorial Library) - Application for Kent Memorial Library [26-10-02]

This filing on the current system (opens in a new tab)

Files

Text of finalKentGrantApplicationPEGPETIA.pdf

Extracted from the file · 18,419 characters
STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Public Educational and Governmental Programming and Education Technology Investment Account (PEGPETIA) Grant Program Application & Itemized Budget Instructions for Filing a Motion to Apply for a PEGPETIA Grant Motion Deadline The Public Utilities Regulatory Authority (Authority or PURA) oversees a program to award Public Educational and Governmental Programming Grants (PEG Grants) and Education Technology Investment Grants (ETI Grants) to eligible entities. See General Statutes § 16-331cc. This PEGPETIA Grant Program Application must be filed as a motion in Docket No. 26-10-02 no later than noon on November 20, 2026. Program Funding Eligibility PEG grant funding is intended to improve public, educational, and governmental access programming in Connecticut, and funds should be used for capital and equipment costs that aid the production or procurement of public, educational, and governmental programs. To ensure the funding is used appropriately, after completion of the project, PEG grant recipients must file a report of the project enabled by the grant funds. ETI grant funding is intended to support education technology initiatives of boards of education and other education entities (public and private schools are eligible to apply). To ensure the funding is used appropriately, after completion of the project, ETI grant recipients must file a report of the project enabled by the grant funds. Submission of Motion Applicants must complete and file the Application with Itemized Budget electronically to PURA as a motion in Docket No. 26-10-02, at https://portal.ct.gov/ pura/about/filing-and-forms/make-an-electronic-filing. Applicants who have not previously registered must first register for an account. Motions must include an Application and Itemized Budget for the projects to be funded by the grant. Quotes, invoices, or similar documentation must be submitted for each item to be purchased with grant funds. The motion will be assigned a unique motion number after it is filed. The allowable electronic filing size is 20 MB. If the motion's attachments (Application with Itemized Budget plus other attachments) exceed the allowable limit, the motion may include only the completed Application with Itemized Budget, and the remaining attachments must be filed as supplemental filings to the same motion. Subsequent supplements must also be filed as supplemental filings under the assigned motion number. Questions regarding the electronic filing of the motion and supplements should be directed to Docket Control at PURA.ExecutiveSecretary.gov or [phone removed]. Docket No. 26-10-02 I. Town of Suffield ______________________________________________ Applicant Information 1. Organization Name: Town of Suffield ___________________________________________________ 50 North Main Street, Suffield, CT 06078 2. Mailing Address: _____________________________________________________ 3. Employer Identification Number: _________________________________________ 4. Contact Person for Service List (required) (check if new/updated) Name: Rebecca Osleger _____________________________________________________________ 83 Mountain Road Suffield, CT 06078 Mailing Address: _____________________________________________________ Phone Number: [phone removed] ______________________________________________________ [email removed] Email Address: _______________________________________________________ 5. Additional Contact Person for Service List (optional) (check if new/updated) Name: _____________________________________________________________ Mailing Address: _____________________________________________________ Phone Number: ______________________________________________________ Email Address: _______________________________________________________ 6. Authorized Representative (required) Note: The authorized representative will not be on the service list unless also listed as a contact person, above. Colin Moll Name: _____________________________________________________________ 83 Mountain Road Suffield, CT 06078 Mailing Address: _____________________________________________________ [phone removed] Phone Number: ______________________________________________________ [email removed] Email Address: _______________________________________________________ 7. Purpose of Grant (check one): ☐ PEG Grant (capital and equipment for producing/procuring programming) ✔ ☐ ETI Grant (educational technology initiative) $ 36,893.96 8. Amount Requested: $__________________________________________________ Note: The "Amount Requested" will autocalculate upon completion of the Itemized Budget, below. Page 1 of 10 Town of Suffield ______________________________________________ Docket No. 26-10-02 II. Applicant Eligibility 9. Organization Type (check one): PEG (Programming) ☐ Local community antenna television and video advisory council ☐ State-wide video advisory council ✔ ☐ Public, educational and governmental programmer ☐ Public, educational and governmental studio operator ETI (Educational Technology Initiative) ☐ Board of Education ✔ ☐ Public library ☐ Other education entity: _______________________________________________ 10. Which of the following describes your organization? ☐ Connecticut State Agency ✔ Municipality ☐ ☐ Nonprofit 501(c)(3) organization. Provide Secretary of the State No.: ___________ ☐ Other (e.g., LLC or corporation). Provide Secretary of the State No.: ___________ 11. For each of the PEGPETIA Grant cycles below, indicate whether your organization received a grant and submitted all required compliance filings: Date of Compliance Filing Docket No. 24-10-02 23-10-02 22-10-02 21-10-13 Grant Received? ☐ Yes ✔ No ☐ ☐ Yes ✔ No ☐ ✔ Yes ☐ ☐ Yes ☐ No Order No. 2 3/11/2025 ✔ No ☐ Order No. 3 Order No. 4 02/07/2025 Submitted Note: If you have received a grant in any of the dockets listed above, you must submit any outstanding compliance filings prior to submitting this application. Page 2 of 10 Docket No. 26-10-02 III. Town of Suffield ______________________________________________ Investment or Initiative Eligibility 12. Provide a description of proposed capital and equipment investment or education technology initiative. State expected enhancements to PEG programming or education technology. If applicable, state why similar equipment is not available from the local community access studio (PEG only). The Town of Suffield proposes to modernize the audiovisual infrastructure of the Suffield Public Library theater to support educational presentations, public learning programs, accessible lectures, multimedia demonstrations, and community programming. The initiative will provide an integrated 4K laser projection and fixed-frame screen system; intuitive touch-panel switching and control; a dedicated speech-reinforcement system with handheld and wearable wireless microphones; a height-adjustable accessible presentation lectern; Auracast assistive listening technology with receivers and signage; and acoustic panels to improve speech intelligibility. The proposed equipment will build on existing functional surround-sound components rather than replace usable infrastructure. Improved clarity, accessibility, and ease of operation will expand the library’s ability to deliver inclusive technology-enabled learning experiences for residents of varying ages and abilities. ______________________________________________________________________ 13. Identify the affected geographical area(s) and/or school system(s) that will benefit from the investment or initiative: The Town of Suffield, Connecticut, including Kent Memorial Library patrons, community organizations, educators, students, and residents participating in library-based educational and civic programs. The theater may serve local school and community partnerships where scheduled. ______________________________________________________________________ 14. State the number of subscribers served or students impacted: Kent Memorial Library serves a community of 16,000 residents. ______________________________________________________________________ Page 3 of 10 Docket No. 26-10-02 Town of Suffield ______________________________________________ 15. List the schedule for implementation, including estimated dates for key milestones and completion. Note: Completed projects are not eligible. Approximately six weeks after notice to proceed Week 1 project kickoff Week 2 engineering Week 3 procurement Week 4 programming and rack fabrication Week 5 on-site installation Week 6 commissioning and training. Calendar dates will be established after award and purchasing authorization. ______________________________________________________________________ 16. Identify objective performance measures that can be used to evaluate the success or effectiveness of the investment or initiative: 1. Successful installation and commissioning of all six quoted equipment categories; 2. Functional testing of 4K video switching, projection, speech amplification, microphones, and touch-panel modes; 3. Verification of height-adjustable lectern operation and assistive-listening receiver function; 4. Completion of staff orientation and acceptance testing; 5. Number of educational and community programs and attendees using the theater during the first 12 months, compared with a pre-upgrade baseline where available 6. User and staff feedback on audibility, accessibility, and system ease of use ______________________________________________________________________ 17. Description of organization, including experience and competence related to the proposed project: The Town of Suffield operates municipal public services and maintains technology infrastructure serving public-facing facilities. Kent Memorial Library provides community access to information, educational resources, and programming. The Town will coordinate project oversight, procurement, acceptance testing, and post-award reporting with library personnel and its technology team. Conference Technologies, Inc. (CTI) has provided a detailed integrated audiovisual design and an approximately six-week implementation plan ______________________________________________________________________ Page 4 of 10 Docket No. 26-10-02 IV. Town of Suffield ______________________________________________ Budget Information 18. Partner organization(s) or other funding sources (if applicable): ______________________________________________________________________ 19. Have you completed the PEGPETIA Itemized Budget form below (with an itemized budget for the investment or initiative)? ✔ Yes. ☐ ☐ No. Explain: _____________________________________________________ 20. Have you provided supporting documentation for each item, such as copies of bids, estimates, and quotes? ✔ Yes. ☐ ☐ No. Explain: _____________________________________________________ 21. Are the non-equipment costs for design and engineering, installation, training, and warranties/insurance less than 10% of the overall grant request? Note: Software may be categorized as equipment. Other non-equipment expenses (such as salaries, service agreements, or stipends) are not permitted as part of the grant request. ☐ Yes. ✔ No. Explain: ☐ _____________________________________________________ Page 5 of 10 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY PEGPETIA ITEMIZED BUDGET Instructions Required Information You must provide this itemized budget for the capital and equipment investment or education technology initiative proposed in your application. For each expense, you must provide the following information: (1) Name of expense (2) Total amount of expense (unit cost x quantity) (3) Brief description (4) Quantity requested (5) Unit price (6) A copy of a bid, estimate, or similar documentation; and (7) Type of cost (equipment, design, engineering, installation, training, warranty, insurance, other) For each expense listed, you must attach a copy of the bid, estimate, or similar documentation. Note: The Authority cannot accept links to online vendors as documentation of expenses. You may, however, attach saved or printed copies of equipment listed for sale with online vendors as documentation. Types of Costs Non-equipment costs (such as design, engineering, installation, training, warranties, or insurance) must be reasonable and should be limited to less than 10% of the overall grant. Other non-equipment expenses (such as salaries, service agreements, or stipends) are not permitted as part of the grant request. Note: Software may be categorized as equipment. I. Applicant Information Town of Suffield 1. Organization Name: ___________________________________________________ 2. Docket Number: 26-10-02 ______________________________________________________ PEGPETIA Grant Program Application 3. Docket Name: _______________________________________________________ Page 7 of 10 Docket No. 26-10-02 V. Town of Suffield PEG Grant CAP Acknowledgment 22. For PEG Grant Applicants Only: The Applicant understands that it must review and comply with the relevant community access provider operating rules and regulations, including the prohibition of the presentation of any advertising material designed to promote the sale of commercial products or services (including advertising by or on behalf of candidates for public office). The Applicant further acknowledges that no organization or company providing community access operations shall exercise editorial control over programming, except as to programming that is obscene and except as otherwise allowed by applicable state and federal law. □ Yes. □ No. VI. Signature of Authorized Representative I, Colin Moll am authorized to sign this application on behalf of the applicant organization. Under the penalty of law, by signing this application, I affirm that the information provided to the Authority is true and correct to the best of my knowledge and that any errors of omissions will be timely corrected and resubmitted. I understand that grant funding may be denied due to failure to provide the information and supporting documentation required by this Application. C.1 ))_,_ November 19, 2026 (Date) (Signature) Page 6 of 10 Docket No. 26-10-02 Town of Suffield II. Budget Template Description Expense Amount (Example) Studio Camera $ 1,400.00 (Example) Make, Model No. XYZ123, Qty 4, Unit Price $350 (Example) Camera Install $ 175.00 (Example) Installation of all cameras, connection to existing studio setup, and training personnel Quantity Unit Price 4 $350/each 1 $175 Bid/ Estimate Attached ✔ ✔ Type of Cost Equipment Installation AV Control $ 164.63 Extron TLCA 2 (60-1748-20) 1 $164.63 equipment AV Control $ 1,786.59 Extron TLP Pro 835-Black (60-1997-02) 1 $1786.59 equipment AV Control $ 60.98 Extron RSB 129 Gray (60-604-02) 1 $60.98 equipment AV Control $ 2,768.29 DTP3 IN2004 DO (60-1962-02) 1 $2768.29 equipment AV Control $ 656.50 Netgear Av Line M4250-9g1f-Poe+ (GSM4210PD-100NAS 1 $656.50 equipment AV Control $ 553.17 Middle Atlantic 15A 9 OUT SERIES SURGE W/CTRL (PDX-915R-SP) 1 $553.17 equipment AV Control $ 701.22 Extron DTP3 R 201 1 $701.22 equipment AV Control $ 817.07 LinkLicene for TLP Ctl Process 1 $817.07 equipment AV Control $ 2,692.00 Software 1 $2692 Software 4K Projector and Fixed Screen $ 218.96 Chief Universal RPA White (RPAUW) 1 $218.96 equipment 4K Projector and Fixed Screen $ 5,552.44 4K 6000 Lm Laser DLP Projector 1 $5552.44 equipment 4K Projector and Fixed Screen $ 133.46 Chief ADJ Pipe 18" to 24" White (CMS018024W) 1 $133.46 equipment 4K Projector and Fixed Screen $ 2,689.02 Da-Lite Cinema Contour PRLX Str 1.0 133D 65X116 (29966V) 1 $2689.02 equipment 4K Projector and Fixed Screen $ 180.73 1 $180.73 equipment Chief Flex Joint 1 1/2" NPT (CMA345) 1 Speech Non-Surround Sound System $ 32.49 Ansmann AA NiMH 2850mAh Rechargeable Battery - 4 Pack (5035212) 1 $32.49 equipment Speech Non-Surround Sound System $ 795.73 JBL AC18/26 in white (AC18/26-WH) 1 $795.73 equipment Speech Non-Surround Sound System $ 821.30 Audio Technica System 20 PRO 2CH Combo WLS|ATW-R1440 rack-mount receiver ch 1 $821.30 equipment Total Amount: $ 36,893.96 Page 8 of 10 Docket No. 26-10-02 Town of Suffield Bid/ Estimate Attached Type of Cost Quantity Unit Price Extron XPA U 2002 SB, 2 CH. Power Amp 1 $725.61 equipment $ 102.65 JBL MTU-18-WH U?Bracket for Models AC18/XX, White 1 $102.65 equipment Speech Non-Surround Sound System $ 312.80 Two-Bay Charge Station Bundle|Charger bundle includes ATW CHG3NAnetworked two- 1 $312.80 equipment Speech Non-Surround Sound System $ 3,057.32 Fixed I/O DSP with 12 analog inputs, 8 analog outputs, 8 channels configurab 1 $3057.32 equipment 1 $425.61 equipment Expense Amount Speech Non-Surround Sound System $ 725.61 Speech Non-Surround Sound System Description 1 ADA-Compliant PresentationLectern $ 425.61 AVF 12U Rack Module for LEXYZ34 (DIR9200-12) ADA-Compliant PresentationLectern $ 2,682.93 AVF (LEXYZ234CWT) Electric Lift Lectern (Crystal White)• 27.;31" W x 43. 1 $2682.93 equipment ADA Assistive Listening AuracastSystem $ 2,435.66 Williams AV (BA SYS1-00) Infinium System with Enhanced Scale & Management (E 1 $2435.66 equipment 1 Acoustic Treatment $ 2,926.80 Acoustical Fulfillment Acoustical Panels 8 $365.85 equipment Implementation $ 3,600.00 Implementation Services 1 3600 Implementation Total Total Amount: Amount: $ 36,893.96 Page 9 of 10 Docket No. 26-10-02 Town of Suffield Signature of Authorized Representative Colin Moll I, _________________________________, am authorized to sign this itemized budget on behalf of the applicant organization. Under the penalty of law, by signing this document, I affirm that the information provided to the Authority is true and correct to the best of my knowledge and that any errors of omissions will be timely corrected and resubmitted. I understand that grant funding may be denied due to failure to provide the information and supporting documentation required by the application. ________________________________ (Signature) November 19, 2026 _____________ Page 10 of 10 (Date)

Text of Quote.pdf

Extracted from the file · 28,998 characters
PROPOSAL Town of Suffield/Suffield Schools Suffield Library - Theater AV Upgrade - J26450821 Date Friday, November 13, 2026 Prepared by Tim Hill Design Consultant www.CTI.com [email removed] [phone removed] Dear Brian Stortz, It was a pleasure to speak with you regarding your upcoming project. Thank you for the time to review your needs and identify your requirements. Based on our needs analysis we have developed a recommended solution for you. Conference Technologies, Inc. has the industry experience to create customized solutions to meet today's technology challenges. These solutions include consulting, design, implementation, and service. Enclosed is a project proposal for your review and consideration that outlines scope, timelines, deliverables, and our support plan to care for your investment. After review I will contact you to discuss any questions you or your team may have about this solution. Our team is excited about the opportunity to provide you with a fantastic experience and making your project a success. Sincerely, Tim Hill Design Consultant CTI [phone removed] [email removed] Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 2 | 24 Scope of Work Proposal Number: J26450821 Proposal Date: 11/13/2026 Prepared for: Town of Suffield/Suffield Schools Attn: Brian Stortz Prepared by: Tim Hill Phone: 8602500147 Phone: [phone removed] Email: [email removed] Email: [email removed] Bill to: Town of Suffield/Suffield Schools , Ship to: Town of Suffield/Suffield Schools 50 N MAIN ST SUFFIELD, CT 06078-2117 Executive Summary Suffield Library – Theater AV Upgrade Overview In short: the Library's theater already has working surround sound and an equipment rack, and this proposal adds modern, easy-to-use upgrades around them. A base upgrade protects the equipment and gives every user a simple touch screen to run the room. Five optional upgrades can then be added one at a time or in groups: (1) a sharper laser projector and screen, (2) a speech sound system with wireless microphones, (3) a heightadjustable lectern that replaces the equipment rack, (4) an assistive listening system for people with hearing loss, and (5) acoustic treatment that improves how the room sounds. This proposal outlines a modular audiovisual upgrade for the Suffield Library theater. The room already has relatively good bones: a fully operational surround sound system and an ERK equipment rack are in place. Rather than replace what works, CTI will build on that investment, reusing all of the existing surround sound loudspeakers, the surround sound processor, and the equipment rack, and adding the capabilities the room needs most. The upgrade is structured as a base-level scope plus five independent quotes. Each quote can be purchased a la carte or grouped with others to fit the Library’s needs, schedule, and grant funding. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 3 | 24 Existing Equipment to Be Reused All existing surround sound loudspeakers The existing surround sound processor The existing ERK equipment rack (replaced by the lectern if Quote 3 is purchased, with the equipment moved into the lectern’s 12RU rack) Reusing this equipment reduces project cost, shortens installation time, and keeps proven components in service.    Base AV Switcher, Touch Panel, and Surge Protection The base upgrade protects the equipment and makes the room simple to run. It adds a surge-protected power unit (a heavy-duty power strip that guards against power surges) to the equipment rack, along with an HDMI switcher (a device that routes video and sound from a user's laptop or player) and a touch panel. With the touch panel, any user can turn the system on or off, choose what to play, and adjust the volume. Everything else in this proposal builds on this foundation. Key Features 4K/60 video capability: The switching and distribution path supports 4K resolution at 60 frames per second, so modern laptops, media players, and presentation sources look sharp and smooth. Independent surround sound output: A dedicated HDMI output feeds the existing surround sound processor, separate from the CAT6A output that carries video to the projector. Seamless mode selection: Because the two outputs are independent, users can choose a full surround sound viewing experience or a simple media presentation with a single touch on the panel. Guided operation: The touch panel guides users step by step and provides meaningful on-screen instructions, so no training or manual is needed. Digital system reset: When the system is power cycled, the touch panel can completely reset the system digitally, returning it to a known, working state. Room Modes The touch panel lets users choose between two room modes, each set up automatically behind the scenes. Movie mode: Bitstream surround sound is sent to the existing surround sound processor. The analog Extron output is not relied upon in this mode. Presentation mode: A laptop or streaming source provides two-channel PCM audio, and the IN2004 analog output can feed the presentation sound system for maximum speech intelligibility. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 4 | 24 Benefits of Investment Protects the investment: Guards the reused surround sound processor and all new electronics from power surges and electrical noise. Reduces downtime and repair costs: Helps avoid equipment failures that would take the theater out of service. Organized power: Provides clean, centralized power distribution inside the rack. Anyone can operate it: No technical training is needed, so staff and community groups can use the room with confidence. Fewer support calls: Simple, consistent controls reduce user errors and reliance on staff or outside support. Flexible sources: Easy source selection makes it simple to present from different devices. Equipment protection: Proper power-on and power-off behavior supports longer equipment life. Optional Quotes Quote 1: 4K Laser Projector and Fixed-Frame Screen An upgraded 4K laser projector paired with a new fixed-frame screen replaces the current video presentation components. Benefits of Investment Sharper, brighter image: 4K resolution and high brightness deliver clear presentations, films, and slides, even with some ambient light. Low maintenance: Laser light sources eliminate lamp replacements and provide a long service life. Fast on and off: A laser projector powers on and off much faster, behaving more like a display. Lamp-based projectors can take more than a minute to warm up or cool down, so presentations and events start and end without the wait. Consistent picture quality: A fixed screen stays flat and taut, giving a uniform viewing surface for every event. Future-ready: Supports current and emerging 4K content and sources. Quote 2: Speech Non-Surround Sound System (Public Address Loudspeaker and Wireless Microphones) A dedicated public address and presentation loudspeaker, the JBL AC18/26, driven by a 400 watt bridged Extron amplifier, and a two-channel wireless microphone system provide clear speech reinforcement, independent of the surround sound system. The system starts with two microphones, one handheld and one wearable, and is designed to grow. Key Features Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 5 | 24 JBL AC18/26 loudspeaker: A purpose-built waveguide delivers great coverage of the audience without exciting the room, which keeps speech clear and reduces reflections. The white wooden cabinet blends in with the room’s finishes. Dedicated 400 watt bridged Extron amplification: An Extron XPA U 2002 SB twochannel amplifier is bridged into a single 400 watt channel to drive the loudspeaker, providing plenty of power and headroom for clear, undistorted speech. Efficient, quiet operation: The amplifier is convection cooled with no fans, so it is silent in the room, and it saves energy by entering standby when idle and waking in under 100 milliseconds when audio returns. Built-in protection: The amplifier protects itself and the loudspeaker against output shorts, thermal overload, and DC faults, and automatically limits gain to prevent clipping distortion. Audio DSP included: This quote includes an audio digital signal processor that provides the outputs for the assistive listening system and drives the touch panel audio control features, such as volume control. Handheld and wearable microphones: The system includes one handheld transmitter and one body-pack transmitter with a rack-mounted receiver, giving presenters hands-free or hand-held options. Remote-mounted antenna: The wireless microphone receiver features a remote mountable antenna that is extended out of the equipment rack and mounted at 96" AFF. This provides excellent pickup and coverage without line-of-sight or interruption concerns. Room to grow: The receiver can accept two additional microphones, such as a gooseneck microphone to sit on the lectern if the lectern option is pursued. Always ready to use: A networked two-bay charging station and rechargeable batteries keep the transmitters charged and ready for each event. Benefits of Investment Speech clarity: Presenters, speakers, and performers are heard clearly by everyone in the room. Right tool for the job: A dedicated loudspeaker is designed for voice, while the surround system continues to handle movie and program audio. Freedom of movement: Wireless microphones let presenters move naturally and support panels, programs, and community events. Accessibility and inclusion: Better intelligibility improves the experience for all attendees. Quote 3: ADA-Compliant Presentation Lectern An ADA-compliant, height adjustable presentation lectern, the AVFI LEXYZ34 height adjustable multimedia lectern, gives presenters a purpose-built, accessible station for the theater. This quote includes the 12RU equipment rack option, and the lectern will replace the existing equipment rack. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 6 | 24 Key Features Replaces the existing equipment rack: The lectern takes the place of the existing equipment rack, housing the system electronics in a beautiful, professional piece of furniture instead of an industrial-looking rack. 12RU equipment rack included: The lectern includes the 12RU rack option, so the system equipment is neatly installed inside the cabinet and stays easy to operate and service. Height adjustable work surface: A silent lift mechanism raises and lowers the work surface from 32.5" to 48.5", suiting both tall and short presenters. Built for presenting: The work surface supports a laptop and the touch panel, and the locking door keeps the equipment secure. Mobile and finished: Heavy-duty locking casters let the lectern roll where it is needed, and the durable thermowrap finish is highly resistant to wear. Benefits of Investment Accessible to every presenter: An ADA-compliant design allows presenters of all abilities to use the stage and speaking position comfortably. Supports compliance: Helps the Library meet its accessibility obligations and strengthens grant applications that prioritize inclusive public spaces. Organized presenting position: Provides a dedicated, professional location for presenter devices and microphones, keeping cables and equipment neat and out of the way. Welcoming for the community: Gives guest speakers, staff, and community groups a consistent, easy-to-use place to present. Quote 4: ADA Assistive Listening Auracast System An assistive listening system using Auracast broadcast audio sends the theater’s sound directly to listeners with hearing loss. The system is intended to support the Library’s ADA assistive listening needs for a room with amplified speech and includes the transmitter, receivers with hearing accessories, and the required notification signage. Note: the assistive listening outputs come from the audio DSP included in Quote 2. If this quote is purchased without Quote 2, an additional audio mixing or DSP device may be required, which can add cost. Key Features Auracast broadcast audio: Built on Bluetooth LE Audio, a single transmitter broadcasts to an unlimited number of compatible receivers without pairing. Use your own device: Visitors with Auracast-enabled hearing aids, cochlear implants, earbuds, or headphones can listen directly, with no borrowed equipment required. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 7 | 24 Receivers for everyone else: Dedicated receivers with neckloops or headphones are provided for guests without personal Auracast devices, with the quantity sized to the room’s seating capacity. Connected to the presentation sound: The transmitter is fed from the theater’s presentation audio so listeners hear clear, direct speech. Notification signage: Signage tells visitors that assistive listening is available. Benefits of Investment Clear speech for everyone: Audio goes directly to the listener, bypassing room acoustics, distance, and background noise. Supports accessibility requirements: Helps the Library meet its assistive listening obligations and strengthens grant applications that prioritize inclusive public spaces. Private and comfortable: Listeners control their own volume and can use familiar personal devices. Future-ready: Auracast is a growing, open standard, and support is increasingly available across hearing aid manufacturers and consumer earbuds. Quote 5: Acoustic Treatment Acoustic treatment improves how the room itself handles sound, controlling reflections and reverberation. Benefits of Investment Improved intelligibility: Reduced echo and reverberation make speech easier to understand. Better overall sound: Film, music, and program audio sound tighter and more natural. Maximizes other investments: Treatment helps the new voice-lift system and the reused surround system perform at their best. Comfortable listening: A more controlled acoustic environment reduces listener fatigue during longer events. Quote Summary Item Base AV Switcher, Touch Panel, and Surge Protection Quote 1 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 Scope Surge-protected PDU for the existing equipment rack, plus HDMI switcher and touch panel control (on/off, source select, volume) 4K laser projector and fixedframe screen CONFIDENTIAL J26450821 8 | 24 Quote 2 Quote 3 Quote 4 Quote 5 JBL AC18/26 public address / presentation loudspeaker driven by a 400 watt bridged Extron amplifier, plus wireless microphone system with one handheld and one wearable microphone, charging station, and rechargeable batteries ADA-compliant height adjustable presentation lectern (AVFI LEXYZ34) with 12RU equipment rack, replacing the existing equipment rack ADA assistive listening system using Auracast broadcast audio, with receivers, hearing accessories, and signage Acoustic treatment Purchasing Options and Grant Funding Each quote can be purchased on its own or combined with others. This lets the Library phase the project, prioritize the improvements with the greatest impact, and align purchases with available grant funding. The base quote, with its surge-protected PDU and simple system control, is recommended with any combination of optional quotes to protect the existing and new equipment and keep the room easy to use. An itemized bill of materials and pricing summary for each quote is provided in the accompanying quote report. Quote Combinations and Audio Processing Some combinations of quotes may cost more because extra audio mixing or processing equipment is needed. Quote 2 (the speech sound system) includes an audio processor that feeds the assistive listening system (Quote 4) and makes the touch panel's volume controls work. If Quote 2 is not purchased, additional equipment may be needed for those functions, and any added cost will appear in the itemized pricing in the accompanying quote report. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 9 | 24 A Request to Those Preparing the Grant or Bid Specification If you are assembling a grant application or a public bid specification from this summary, we respectfully ask that you request the exact bill of materials for each quote from CTI and include it in your documents as written. Please do not rely on this summary alone to describe the equipment. Every component in this proposal was carefully selected to work with the others and with the equipment the Library already owns. The result is a compatible, cohesive system that is easy to own, operate, and service. Please be very careful when considering alternative or "equal" equipment. A substitution that looks equivalent on paper can: Break compatibility: Changing a switcher, processor, amplifier, or control device can affect signal formats, audio routing, and touch panel functions that depend on one another. Complicate operation: Mixed or unfamiliar equipment can make the system harder for staff and community groups to use, undoing the simple, guided operation this design provides. Make service harder: A consistent set of equipment is quicker to support, and mismatched parts can mean more troubleshooting, more downtime, and higher longterm cost. Add hidden costs: Alternates may require additional processing, cabling, programming, or rework to function as intended, and can reduce the value of the investment. If alternates must be allowed, we recommend requiring that any proposed substitution be reviewed against the complete bill of materials and demonstrated to be fully compatible before approval. We are glad to help review submitted alternates and to answer any questions while the specification is being prepared. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 10 | 24 Timeframe To complete the work outlined in the project scope, we will need approximately 6 weeks from proposal acceptance. A project manager will be assigned to communicate with you at critical milestones. Upon notice to proceed, we will begin your project plan immediately. Phase Week Notice to Proceed & Project Kickoff 1 Engineering 2 Procurement 3 Programming & Rack Fabrication 4 Onsite Installation 5 Commissioning & Training 6 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 11 | 24 Your Investment Below is the cost of this solution based on the outlined scope of work. If you have questions about the complete solution, please let us know how we can help align this investment with additional needs or changes in scope. Proposal Summary Description Price Equipment $30,601.96 Implementation Services $29,682.23 Subtotal $60,284.19 Tax $3,402.46 Grand Total $63,686.65 Recommended Description Price 2 Additional Years CTI Complete Service Agreement $5,204.73 4 Additional Years CTI Complete Service Agreement $10,409.46 Down Payment Requirements Down payment of 60% required to initiate order. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 12 | 24 Why Choose CTI? Built one project at a time since 1988, our reputation has made us one of the country's fastest-growing and most respected technology solutions providers. Our Mission: Provide a Fantastic Customer Experience. Our Promise: We will be Fair, Fast, and Flexible. Our People: We put the Right People in the Right Place at the Right Time. About CTI        Founded in 1988 as Conference Technologies, Inc., with a single office in St. Louis Now the largest privately held systems integrator in the US Over 1,200 employees in 43 offices: New York to Los Angeles, Minneapolis to Houston, and serving the UK from London and Nottinghamshire. Available in 65 countries on six continents via the PSNI Global Alliance. Authorized reseller of more than 320 product lines Demonstrated value through past projects and client testimonials From a single room to a global project, CTI can build it right Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 13 | 24 CTI Complete Your relationship with CTI doesn't end when the integration is finished: every CTI integration includes a year of CTI COMPLETE support from our CTI CARE Team      Built around your team and your needs! Proactive Monitoring and Preventive Maintenance On-Demand Service & Support CTI Care Team Critical Meeting support AV Managed Services and Support     Service plans tailored to your environment, goals, and systems Preventive maintenance, along with proactive monitoring and service Available for all systems, not just those integrated by CTI From on-call to fully managed with embedded staff. Let’s talk about what you need. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 14 | 24 Base AV Switcher, Touch Panel, and Surge Protection Description Price Equipment $7,508.45 Implementation Services $7,492.81 Subtotal $15,001.26 Tax $804.25 Grand Total $15,805.51 Bill of Materials Base AV Switcher, Touch Panel, and Surge Protection Manufacturer P/N Description Qty Unit Price Ext. Price General: $7,508.45 Extron 60-1748-20 TLCA 2 1 $164.63 $164.63 Extron 60-1997-02 TLP Pro 835T Black 1 $1,786.59 $1,786.59 Extron 60-604-02 RSB 129 GRAY 1 $60.98 $60.98 Extron 60-1962-02 DTP3 IN2004 DO 1 $2,768.29 $2,768.29 Netgear GSM4210PD100NAS Av Line M42509g1f-Poe+ 1 $656.50 $656.50 Middle Atlantic PDX-915RSP 15A 9 OUT SERIES SURGE W/CTRL 1 $553.17 $553.17 Extron 60-1869-63 DTP3 R 201 1 $701.22 $701.22 Extron 79-2577-01 LinkLicense for TLP Ctl Proces 1 $817.07 $817.07 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 15 | 24 4K Projector and Ambient Light Rejecting Fixed Frame Screen Description Price Equipment $8,774.61 Implementation Services $5,395.35 Subtotal $14,169.96 Tax $866.25 Grand Total $15,036.21 Bill of Materials 4K Projector and Ambient Light Rejecting Fixed Frame Screen Manufacturer P/N Description Qty Unit Price Ext. Price General: $8,774.61 Chief RPAUW UNIVERSAL RPA WHITE 1 $218.96 $218.96 Sharp XP-P601Q-W 4K 6000 Lm Laser, DLP Projector 1 $5,552.44 $5,552.44 Chief CMS018024W ADJ. PIPE 18" TO 24" WHITE 1 $133.46 $133.46 Da-Lite 29966V CINEMA CONTOUR PRLX STR 1.0 133D 65X116 1 $2,689.02 $2,689.02 Chief CMA345 FLEX JOINT, 11/2" NPT 1 $180.73 $180.73 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 16 | 24 Speech Non-Surround Sound System (Public Address Loudspeaker and Wireless Microphones) Description Price Equipment $5,847.90 Implementation Services $5,445.52 Subtotal $11,293.42 Tax $594.48 Grand Total $11,887.90 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 17 | 24 Bill of Materials Speech Non-Surround Sound System (Public Address Loudspeaker and Wireless Microphones) Manufacturer P/N Description Qty Unit Price Ext. Price General: $5,847.90 Ansmann 5035212 AA NiMH 2850mAh Rechargeable Battery - 4 Pack 1 $32.49 $32.49 JBL AC18/26-WH AC18/26 in white. 1 $795.73 $795.73 Audio Technica ATW-1423 System 20 PRO 2CH Combo WLS|ATW-R1440 rack-mount receiver chassis,ATW-RU14 receiver unit, 2.4 GHz antenna x4, AC adapter, rackmount/joining plate adaptors, and ATW-T1401 body-pack transmitter, andATW-1402 handheld transmitter 1 $821.30 $821.30 Extron 60-1758-01 XPA U 2002 SB, 2 Ch. Power Amp 1 $725.61 $725.61 JBL MTU-18-WH U?Bracket For Models AC18/xx, White 1 $102.65 $102.65 Audio Technica ATWCHG3NAAD Two-Bay Charge Station Bundle|Charger 1 $312.80 $312.80 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 18 | 24 bundle includes ATWCHG3NAnetworked two-bay charging station and ADSA1230XA AC adapter Biamp TesiraFORTE DAN CI Fixed I/O DSP with 12 analog inputs, 8 analog outputs, 8 channels configurable USB audio, 32 x 32 channels of Dante, and AEC technology (all 12 inputs) 1 $3,057.32 $3,057.32 ADA-Compliant Presentation Lectern Description Price Equipment $3,108.54 Implementation Services $3,496.95 Subtotal $6,605.49 Tax $390.17 Grand Total $6,995.66 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 19 | 24 Bill of Materials ADA-Compliant Presentation Lectern Manufacturer P/N Description Qty Unit Price Ext. Price General: $3,108.54 AVF AVF DIR9200-12 12U Rack Module for LEXYZ34 1 $425.61 $425.61 LEXYZ34 CWT Electric Lift Lectern (Crystal White)• 27.;31" W x 43.2" H x 28.85" D• Roll-about electric lift multimedia lectern (silent lift mechanism)• Surface to support monitors, laptops and room control systems• Interior adjustable shelf which can be removed to install an optional 12U rack module• Secondary shelf for storing your items• 1 locking door• 4" heavy duty casters (2 locking) 1 $2,682.93 $2,682.93 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 20 | 24 ADA Assistive Listening Auracast System Description Price Equipment $2,435.66 Implementation Services $3,323.88 Subtotal $5,759.54 Tax $326.67 Grand Total $6,086.21 Bill of Materials ADA Assistive Listening Auracast System Manufacturer P/N Description Qty Unit Price Ext. Price $2,435.66 $2,435.66 General: $2,435.66 Williams AV BA SYS100 Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 Infinium System with Enhanced Scale & Management (ESM) | 2 Receivers Includes BA CT1 package plus 2 receivers, 1 2-bay charger, 2 headphones, 1 neckloop, 1 rack mount kit and an Auracast assistive listening wall plaque 1 CONFIDENTIAL J26450821 21 | 24 Acoustic Treatment Description Price Equipment $2,926.80 Implementation Services $4,527.72 Subtotal $7,454.52 Tax $420.64 Grand Total $7,875.16 Bill of Materials Acoustic Treatment Manufacturer P/N Description Qty Unit Price Ext. Price $365.85 $2,926.80 General: $2,926.80 Acoustical Fulfillment Acoustic Panels Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 Acoustic Panels 8 CONFIDENTIAL J26450821 22 | 24 Standard Disclaimer CTI provides for twelve (12) months of CTI Complete on all system purchases. CTI warrants the system implemented is free from defects in material and workmanship, in accordance with the contract, drawings, specifications, alterations and additions thereto, for a period of twelve (12) months from the date of commencement of use, substantial completion, or date of notice of completion, whichever occurs first. This coverage does not protect against consumables, severe weather, and acts of God. Terms Taxes and Tariffs Town of Suffield/Suffield Schools is responsible for all applicable taxes, including but not limited to sales tax, value-added tax (VAT), and goods and services tax (GST), as well as any import duties, tariffs, and customs fees imposed by the destination location. These charges are not included in the product price or freight and must be paid by Town of Suffield/Suffield Schools. The Seller will provide all necessary documentation for customs clearance, and both parties agree to comply with all relevant laws and regulations regarding these charges. Installation Description and Requirements Provided by CTI: If installation is purchased, CTI will install all A/V components. CTI will also perform all programming, alignments, and end-user training. CTI will provide A/V project management, and provide drawings as required. This install price assumes a Monday through Friday 8:00am to 5:00pm install time. Room availability must be in consecutive 8-hour blocks. Any required changes or rushes may affect the final price. Provided by Others Electrical requirements are to be provided by others unless specifically included in CTI Scope of Work. Statement This system proposal is the property of CTI and is delivered with the sole intent of being viewed by management of Town of Suffield/Suffield Schools for evaluation purposes only. This proposal or any part of this proposal is not to be presented to, or viewed by any other party, vendor, or CTI competitor without the written consent of CTI. Any effort to do so will be considered a violation of copyright law. Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 23 | 24 Next Steps 1. Upon Notice to Proceed, CTI will begin executing the project plan with an internal handoff of the project to our operations team. 2. If you have questions about the process as we move forward, please contact me at [email removed] or [phone removed]. 3. You will be contacted by a CTI Project Manager to schedule a project kickoff meeting to review the project scope and schedule. Total J26450821 - $63,686.65 Customer Signature CTI Signature Printed Name Printed Name Title Title Date Date Springfield WWW.CTI.COM 20 1st Ave Chicopee 01020 CONFIDENTIAL J26450821 24 | 24