Motion No. 080Filed by Kent Memorial Library
Application for Kent Memorial Library
Part of
Docket 26-10-02Open
Annual Allocation of the Public Educational and Governmental Programming and Education Technology Investment Account
- Type of filing
- Motion (Motion No. 080)
- Date filed
- November 19, 2026
- Filed by
- Kent Memorial Library
- Files
- 2
As listed on the current system: Motion No. 080 11/19/2026 (Kent Memorial Library) - Application for Kent Memorial Library [26-10-02]
Files
finalKentGrantApplicationPEGPETIA.pdf
PDF · 1.4 MB · 11 pagesText searchable
Download finalKentGrantApplicationPEGPETIA.pdfRead the text of finalKentGrantApplicationPEGPETIA.pdf
Text of finalKentGrantApplicationPEGPETIA.pdf
Extracted from the file · 18,419 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
Public Educational and Governmental Programming and Education Technology
Investment Account (PEGPETIA) Grant Program Application & Itemized Budget
Instructions for Filing a Motion to Apply for a PEGPETIA Grant
Motion Deadline
The Public Utilities Regulatory Authority (Authority or PURA) oversees a program
to award Public Educational and Governmental Programming Grants (PEG Grants) and
Education Technology Investment Grants (ETI Grants) to eligible entities. See General
Statutes § 16-331cc. This PEGPETIA Grant Program Application must be filed as a
motion in Docket No. 26-10-02 no later than noon on November 20, 2026.
Program Funding Eligibility
PEG grant funding is intended to improve public, educational, and governmental
access programming in Connecticut, and funds should be used for capital and equipment
costs that aid the production or procurement of public, educational, and governmental
programs. To ensure the funding is used appropriately, after completion of the project,
PEG grant recipients must file a report of the project enabled by the grant funds.
ETI grant funding is intended to support education technology initiatives of boards
of education and other education entities (public and private schools are eligible to apply).
To ensure the funding is used appropriately, after completion of the project, ETI grant
recipients must file a report of the project enabled by the grant funds.
Submission of Motion
Applicants must complete and file the Application with Itemized Budget
electronically to PURA as a motion in Docket No. 26-10-02, at https://portal.ct.gov/
pura/about/filing-and-forms/make-an-electronic-filing.
Applicants who have not
previously registered must first register for an account.
Motions must include an Application and Itemized Budget for the projects to
be funded by the grant. Quotes, invoices, or similar documentation must be
submitted for each item to be purchased with grant funds.
The motion will be assigned a unique motion number after it is filed. The
allowable electronic filing size is 20 MB. If the motion's attachments (Application
with Itemized Budget plus other attachments) exceed the allowable limit, the motion
may include only the completed Application with Itemized Budget, and the remaining
attachments must be filed as supplemental filings to the same motion. Subsequent
supplements must also be filed as supplemental filings under the assigned motion
number.
Questions regarding the electronic filing of the motion and supplements should be
directed to Docket Control at PURA.ExecutiveSecretary.gov or [phone removed].
Docket No. 26-10-02
I.
Town of Suffield
______________________________________________
Applicant Information
1. Organization Name: Town of Suffield
___________________________________________________
50 North Main Street, Suffield, CT 06078
2. Mailing Address: _____________________________________________________
3. Employer Identification Number: _________________________________________
4. Contact Person for Service List (required)
(check if new/updated)
Name: Rebecca Osleger
_____________________________________________________________
83 Mountain Road Suffield, CT 06078
Mailing Address: _____________________________________________________
Phone Number: [phone removed]
______________________________________________________
[email removed]
Email Address: _______________________________________________________
5. Additional Contact Person for Service List (optional)
(check if new/updated)
Name: _____________________________________________________________
Mailing Address: _____________________________________________________
Phone Number: ______________________________________________________
Email Address: _______________________________________________________
6. Authorized Representative (required)
Note: The authorized representative will not be on the service list unless also
listed as a contact person, above.
Colin Moll
Name: _____________________________________________________________
83 Mountain Road Suffield, CT 06078
Mailing Address: _____________________________________________________
[phone removed]
Phone Number: ______________________________________________________
[email removed]
Email Address: _______________________________________________________
7. Purpose of Grant (check one):
☐ PEG Grant (capital and equipment for producing/procuring programming)
✔
☐
ETI Grant (educational technology initiative)
$ 36,893.96
8. Amount Requested: $__________________________________________________
Note: The "Amount Requested" will autocalculate upon completion of the Itemized Budget, below.
Page 1 of 10
Town of Suffield
______________________________________________
Docket No. 26-10-02
II.
Applicant Eligibility
9. Organization Type (check one):
PEG (Programming)
☐ Local community antenna television and video advisory council
☐ State-wide video advisory council
✔
☐
Public, educational and governmental programmer
☐ Public, educational and governmental studio operator
ETI (Educational Technology Initiative)
☐ Board of Education
✔
☐
Public library
☐ Other education entity: _______________________________________________
10. Which of the following describes your organization?
☐ Connecticut State Agency
✔ Municipality
☐
☐ Nonprofit 501(c)(3) organization. Provide Secretary of the State No.: ___________
☐ Other (e.g., LLC or corporation). Provide Secretary of the State No.: ___________
11. For each of the PEGPETIA Grant cycles below, indicate whether your
organization received a grant and submitted all required compliance filings:
Date of Compliance Filing
Docket No.
24-10-02
23-10-02
22-10-02
21-10-13
Grant Received?
☐ Yes
✔ No
☐
☐ Yes
✔ No
☐
✔ Yes
☐
☐ Yes
☐ No
Order No. 2
3/11/2025
✔ No
☐
Order No. 3
Order No. 4
02/07/2025
Submitted
Note: If you have received a grant in any of the dockets listed above, you must
submit any outstanding compliance filings prior to submitting this application.
Page 2 of 10
Docket No. 26-10-02
III.
Town of Suffield
______________________________________________
Investment or Initiative Eligibility
12. Provide a description of proposed capital and equipment investment or education
technology initiative. State expected enhancements to PEG programming or
education technology. If applicable, state why similar equipment is not available from
the local community access studio (PEG only).
The Town of Suffield proposes to modernize the
audiovisual infrastructure of the Suffield Public Library theater to support educational
presentations, public learning
programs, accessible lectures, multimedia demonstrations, and community
programming. The initiative will provide
an integrated 4K laser projection and fixed-frame screen system; intuitive touch-panel
switching and control; a
dedicated speech-reinforcement system with handheld and wearable wireless
microphones; a height-adjustable
accessible presentation lectern; Auracast assistive listening technology with receivers
and signage; and acoustic
panels to improve speech intelligibility. The proposed equipment will build on existing
functional surround-sound
components rather than replace usable infrastructure. Improved clarity, accessibility,
and ease of operation will
expand the library’s ability to deliver inclusive technology-enabled learning experiences
for residents of varying ages
and abilities.
______________________________________________________________________
13. Identify the affected geographical area(s) and/or school system(s) that will benefit from
the investment or initiative:
The Town of Suffield, Connecticut, including Kent Memorial Library
patrons, community organizations, educators, students, and residents participating in
library-based educational and
civic programs. The theater may serve local school and community partnerships where
scheduled.
______________________________________________________________________
14. State the number of subscribers served or students impacted:
Kent Memorial Library serves a community of 16,000 residents.
______________________________________________________________________
Page 3 of 10
Docket No. 26-10-02
Town of Suffield
______________________________________________
15. List the schedule for implementation, including estimated dates for key
milestones and completion.
Note: Completed projects are not eligible.
Approximately six weeks after notice to proceed
Week 1 project kickoff
Week 2 engineering
Week 3 procurement
Week 4 programming and rack fabrication
Week 5 on-site installation
Week 6 commissioning and training. Calendar dates will be established after award
and purchasing authorization.
______________________________________________________________________
16. Identify objective performance measures that can be used to evaluate the success or
effectiveness of the investment or initiative:
1. Successful installation and commissioning of all six quoted equipment
categories;
2. Functional testing of 4K video switching, projection, speech amplification, microphones, and
touch-panel modes;
3. Verification of height-adjustable lectern operation and assistive-listening receiver function;
4. Completion of staff orientation and acceptance testing;
5. Number of educational and community programs and
attendees using the theater during the first 12 months, compared with a pre-upgrade baseline where available
6. User and staff feedback on audibility, accessibility, and system ease of use
______________________________________________________________________
17. Description of organization, including experience and competence related to the
proposed project:
The Town of Suffield operates municipal public services and
maintains technology infrastructure serving public-facing facilities. Kent Memorial
Library provides community access to information, educational resources, and
programming. The Town will coordinate project oversight, procurement, acceptance
testing, and post-award reporting with library personnel and its technology team.
Conference Technologies, Inc. (CTI) has provided a detailed integrated audiovisual
design and an approximately six-week implementation plan
______________________________________________________________________
Page 4 of 10
Docket No. 26-10-02
IV.
Town of Suffield
______________________________________________
Budget Information
18. Partner organization(s) or other funding sources (if applicable):
______________________________________________________________________
19. Have you completed the PEGPETIA Itemized Budget form below (with an
itemized budget for the investment or initiative)?
✔ Yes.
☐
☐ No. Explain:
_____________________________________________________
20. Have you provided supporting documentation for each item, such as copies of bids,
estimates, and quotes?
✔ Yes.
☐
☐ No. Explain:
_____________________________________________________
21. Are the non-equipment costs for design and engineering, installation, training, and
warranties/insurance less than 10% of the overall grant request?
Note: Software may be categorized as equipment. Other non-equipment
expenses (such as salaries, service agreements, or stipends) are not permitted as
part of the grant request.
☐ Yes.
✔ No. Explain:
☐
_____________________________________________________
Page 5 of 10
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
PEGPETIA ITEMIZED BUDGET
Instructions
Required Information
You must provide this itemized budget for the capital and equipment investment or
education technology initiative proposed in your application. For each expense, you must
provide the following information:
(1) Name of expense
(2) Total amount of expense (unit cost x quantity)
(3) Brief description
(4) Quantity requested
(5) Unit price
(6) A copy of a bid, estimate, or similar documentation; and
(7) Type of cost (equipment, design, engineering, installation, training, warranty,
insurance, other)
For each expense listed, you must attach a copy of the bid, estimate, or similar
documentation.
Note: The Authority cannot accept links to online vendors as documentation
of expenses. You may, however, attach saved or printed copies of equipment listed
for sale with online vendors as documentation.
Types of Costs
Non-equipment costs (such as design, engineering, installation, training,
warranties, or insurance) must be reasonable and should be limited to less than 10% of
the overall grant. Other non-equipment expenses (such as salaries, service agreements,
or stipends) are not permitted as part of the grant request.
Note: Software may be categorized as equipment.
I.
Applicant Information
Town of Suffield
1. Organization Name: ___________________________________________________
2. Docket Number: 26-10-02
______________________________________________________
PEGPETIA Grant Program Application
3. Docket Name: _______________________________________________________
Page 7 of 10
Docket No. 26-10-02
V.
Town of Suffield
PEG Grant CAP Acknowledgment
22. For PEG Grant Applicants Only: The Applicant understands that it must review and
comply with the relevant community access provider operating rules and regulations,
including the prohibition of the presentation of any advertising material designed to
promote the sale of commercial products or services (including advertising by or on
behalf of candidates for public office). The Applicant further acknowledges that no
organization or company providing community access operations shall exercise
editorial control over programming, except as to programming that is obscene and
except as otherwise allowed by applicable state and federal law.
□ Yes.
□ No.
VI.
Signature of Authorized Representative
I, Colin Moll
am authorized to sign this application on behalf of the
applicant organization. Under the penalty of law, by signing this application, I affirm that
the information provided to the Authority is true and correct to the best of my knowledge
and that any errors of omissions will be timely corrected and resubmitted.
I understand that grant funding may be denied due to failure to provide the information
and supporting documentation required by this Application.
C.1 ))_,_
November 19, 2026
(Date)
(Signature)
Page 6 of 10
Docket No. 26-10-02
Town of Suffield
II.
Budget Template
Description
Expense
Amount
(Example) Studio Camera
$ 1,400.00 (Example) Make, Model No. XYZ123, Qty 4, Unit Price $350
(Example) Camera Install
$
175.00 (Example) Installation of all cameras, connection to existing studio setup, and training personnel
Quantity
Unit Price
4
$350/each
1
$175
Bid/
Estimate
Attached
✔
✔
Type of
Cost
Equipment
Installation
AV Control
$ 164.63
Extron TLCA 2 (60-1748-20)
1
$164.63
equipment
AV Control
$ 1,786.59
Extron TLP Pro 835-Black (60-1997-02)
1
$1786.59
equipment
AV Control
$ 60.98
Extron RSB 129 Gray (60-604-02)
1
$60.98
equipment
AV Control
$ 2,768.29
DTP3 IN2004 DO (60-1962-02)
1
$2768.29
equipment
AV Control
$ 656.50
Netgear Av Line M4250-9g1f-Poe+ (GSM4210PD-100NAS
1
$656.50
equipment
AV Control
$ 553.17 Middle Atlantic 15A 9 OUT SERIES SURGE W/CTRL (PDX-915R-SP)
1
$553.17
equipment
AV Control
$ 701.22
Extron DTP3 R 201
1
$701.22
equipment
AV Control
$ 817.07
LinkLicene for TLP Ctl Process
1
$817.07
equipment
AV Control
$ 2,692.00
Software
1
$2692
Software
4K Projector and Fixed Screen $ 218.96
Chief Universal RPA White (RPAUW)
1
$218.96
equipment
4K Projector and Fixed Screen $ 5,552.44
4K 6000 Lm Laser DLP Projector
1
$5552.44
equipment
4K Projector and Fixed Screen $ 133.46
Chief ADJ Pipe 18" to 24" White (CMS018024W)
1
$133.46
equipment
4K Projector and Fixed Screen $ 2,689.02 Da-Lite Cinema Contour PRLX Str 1.0 133D 65X116 (29966V)
1
$2689.02
equipment
4K Projector and Fixed Screen $ 180.73
1
$180.73
equipment
Chief Flex Joint 1 1/2" NPT (CMA345)
1
Speech Non-Surround Sound System
$ 32.49
Ansmann AA NiMH 2850mAh Rechargeable Battery - 4 Pack (5035212)
1
$32.49
equipment
Speech Non-Surround Sound System
$ 795.73
JBL AC18/26 in white (AC18/26-WH)
1
$795.73
equipment
Speech Non-Surround Sound System
$ 821.30 Audio Technica System 20 PRO 2CH Combo WLS|ATW-R1440 rack-mount receiver ch
1
$821.30
equipment
Total Amount:
$ 36,893.96
Page 8 of 10
Docket No. 26-10-02
Town of Suffield
Bid/
Estimate
Attached
Type of
Cost
Quantity
Unit Price
Extron XPA U 2002 SB, 2 CH. Power Amp
1
$725.61
equipment
$ 102.65
JBL MTU-18-WH U?Bracket for Models AC18/XX, White
1
$102.65
equipment
Speech Non-Surround Sound System
$ 312.80
Two-Bay Charge Station Bundle|Charger bundle includes ATW CHG3NAnetworked two-
1
$312.80
equipment
Speech Non-Surround Sound System
$ 3,057.32 Fixed I/O DSP with 12 analog inputs, 8 analog outputs, 8 channels configurab
1
$3057.32
equipment
1
$425.61
equipment
Expense
Amount
Speech Non-Surround Sound System
$ 725.61
Speech Non-Surround Sound System
Description
1
ADA-Compliant PresentationLectern
$ 425.61
AVF 12U Rack Module for LEXYZ34 (DIR9200-12)
ADA-Compliant PresentationLectern
$ 2,682.93 AVF (LEXYZ234CWT) Electric Lift Lectern (Crystal White)• 27.;31" W x 43.
1
$2682.93
equipment
ADA Assistive Listening AuracastSystem
$ 2,435.66 Williams AV (BA SYS1-00) Infinium System with Enhanced Scale & Management (E
1
$2435.66
equipment
1
Acoustic Treatment
$ 2,926.80
Acoustical Fulfillment Acoustical Panels
8
$365.85
equipment
Implementation
$ 3,600.00
Implementation Services
1
3600
Implementation
Total
Total Amount:
Amount:
$ 36,893.96
Page 9 of 10
Docket No. 26-10-02
Town of Suffield
Signature of Authorized Representative
Colin Moll
I, _________________________________, am authorized to sign this itemized
budget on behalf of the applicant organization. Under the penalty of law, by signing
this document, I affirm that the information provided to the Authority is true and correct
to the best of my knowledge and that any errors of omissions will be timely corrected
and resubmitted.
I understand that grant funding may be denied due to failure to provide the information
and supporting documentation required by the application.
________________________________
(Signature)
November 19, 2026
_____________
Page 10 of 10
(Date)
Text of Quote.pdf
Extracted from the file · 28,998 characters
PROPOSAL
Town of Suffield/Suffield Schools
Suffield Library - Theater AV Upgrade - J26450821
Date
Friday, November 13, 2026
Prepared by
Tim Hill
Design Consultant
www.CTI.com
[email removed]
[phone removed]
Dear Brian Stortz,
It was a pleasure to speak with you regarding your upcoming project. Thank you for the
time to review your needs and identify your requirements. Based on our needs analysis we
have developed a recommended solution for you. Conference Technologies, Inc. has the
industry experience to create customized solutions to meet today's technology
challenges. These solutions include consulting, design, implementation, and service.
Enclosed is a project proposal for your review and consideration that outlines scope,
timelines, deliverables, and our support plan to care for your investment. After review I will
contact you to discuss any questions you or your team may have about this solution. Our
team is excited about the opportunity to provide you with a fantastic experience and
making your project a success.
Sincerely,
Tim Hill
Design Consultant
CTI
[phone removed]
[email removed]
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
2 | 24
Scope of Work
Proposal Number: J26450821
Proposal Date: 11/13/2026
Prepared for: Town of Suffield/Suffield Schools
Attn: Brian Stortz
Prepared by: Tim Hill
Phone: 8602500147
Phone: [phone removed]
Email: [email removed]
Email: [email removed]
Bill to:
Town of Suffield/Suffield Schools
,
Ship to:
Town of Suffield/Suffield Schools
50 N MAIN ST
SUFFIELD, CT 06078-2117
Executive Summary
Suffield Library – Theater AV Upgrade
Overview
In short: the Library's theater already has working surround sound and an equipment rack,
and this proposal adds modern, easy-to-use upgrades around them. A base upgrade
protects the equipment and gives every user a simple touch screen to run the room. Five
optional upgrades can then be added one at a time or in groups: (1) a sharper laser
projector and screen, (2) a speech sound system with wireless microphones, (3) a heightadjustable lectern that replaces the equipment rack, (4) an assistive listening system for
people with hearing loss, and (5) acoustic treatment that improves how the room sounds.
This proposal outlines a modular audiovisual upgrade for the Suffield Library theater. The
room already has relatively good bones: a fully operational surround sound system and an
ERK equipment rack are in place. Rather than replace what works, CTI will build on that
investment, reusing all of the existing surround sound loudspeakers, the surround sound
processor, and the equipment rack, and adding the capabilities the room needs most.
The upgrade is structured as a base-level scope plus five independent quotes. Each quote
can be purchased a la carte or grouped with others to fit the Library’s needs, schedule, and
grant funding.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
3 | 24
Existing Equipment to Be Reused
All existing surround sound loudspeakers
The existing surround sound processor
The existing ERK equipment rack (replaced by the lectern if Quote 3 is purchased,
with the equipment moved into the lectern’s 12RU rack)
Reusing this equipment reduces project cost, shortens installation time, and keeps proven
components in service.
Base AV Switcher, Touch Panel, and Surge Protection
The base upgrade protects the equipment and makes the room simple to run. It adds a
surge-protected power unit (a heavy-duty power strip that guards against power surges) to
the equipment rack, along with an HDMI switcher (a device that routes video and sound
from a user's laptop or player) and a touch panel. With the touch panel, any user can turn
the system on or off, choose what to play, and adjust the volume. Everything else in this
proposal builds on this foundation.
Key Features
4K/60 video capability: The switching and distribution path supports 4K resolution at
60 frames per second, so modern laptops, media players, and presentation sources
look sharp and smooth.
Independent surround sound output: A dedicated HDMI output feeds the existing
surround sound processor, separate from the CAT6A output that carries video to the
projector.
Seamless mode selection: Because the two outputs are independent, users can
choose a full surround sound viewing experience or a simple media presentation with a
single touch on the panel.
Guided operation: The touch panel guides users step by step and provides meaningful
on-screen instructions, so no training or manual is needed.
Digital system reset: When the system is power cycled, the touch panel can
completely reset the system digitally, returning it to a known, working state.
Room Modes
The touch panel lets users choose between two room modes, each set up automatically
behind the scenes.
Movie mode: Bitstream surround sound is sent to the existing surround sound
processor. The analog Extron output is not relied upon in this mode.
Presentation mode: A laptop or streaming source provides two-channel PCM audio,
and the IN2004 analog output can feed the presentation sound system for maximum
speech intelligibility.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
4 | 24
Benefits of Investment
Protects the investment: Guards the reused surround sound processor and all new
electronics from power surges and electrical noise.
Reduces downtime and repair costs: Helps avoid equipment failures that would take
the theater out of service.
Organized power: Provides clean, centralized power distribution inside the rack.
Anyone can operate it: No technical training is needed, so staff and community
groups can use the room with confidence.
Fewer support calls: Simple, consistent controls reduce user errors and reliance on
staff or outside support.
Flexible sources: Easy source selection makes it simple to present from different
devices.
Equipment protection: Proper power-on and power-off behavior supports longer
equipment life.
Optional Quotes
Quote 1: 4K Laser Projector and Fixed-Frame Screen
An upgraded 4K laser projector paired with a new fixed-frame screen replaces the current
video presentation components.
Benefits of Investment
Sharper, brighter image: 4K resolution and high brightness deliver clear presentations,
films, and slides, even with some ambient light.
Low maintenance: Laser light sources eliminate lamp replacements and provide a
long service life.
Fast on and off: A laser projector powers on and off much faster, behaving more like a
display. Lamp-based projectors can take more than a minute to warm up or cool down,
so presentations and events start and end without the wait.
Consistent picture quality: A fixed screen stays flat and taut, giving a uniform viewing
surface for every event.
Future-ready: Supports current and emerging 4K content and sources.
Quote 2: Speech Non-Surround Sound System (Public Address
Loudspeaker and Wireless Microphones)
A dedicated public address and presentation loudspeaker, the JBL AC18/26, driven by a
400 watt bridged Extron amplifier, and a two-channel wireless microphone system provide
clear speech reinforcement, independent of the surround sound system. The system starts
with two microphones, one handheld and one wearable, and is designed to grow.
Key Features
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
5 | 24
JBL AC18/26 loudspeaker: A purpose-built waveguide delivers great coverage of the
audience without exciting the room, which keeps speech clear and reduces reflections.
The white wooden cabinet blends in with the room’s finishes.
Dedicated 400 watt bridged Extron amplification: An Extron XPA U 2002 SB twochannel amplifier is bridged into a single 400 watt channel to drive the loudspeaker,
providing plenty of power and headroom for clear, undistorted speech.
Efficient, quiet operation: The amplifier is convection cooled with no fans, so it is
silent in the room, and it saves energy by entering standby when idle and waking in
under 100 milliseconds when audio returns.
Built-in protection: The amplifier protects itself and the loudspeaker against output
shorts, thermal overload, and DC faults, and automatically limits gain to prevent
clipping distortion.
Audio DSP included: This quote includes an audio digital signal processor that
provides the outputs for the assistive listening system and drives the touch panel audio
control features, such as volume control.
Handheld and wearable microphones: The system includes one handheld
transmitter and one body-pack transmitter with a rack-mounted receiver, giving
presenters hands-free or hand-held options.
Remote-mounted antenna: The wireless microphone receiver features a remote
mountable antenna that is extended out of the equipment rack and mounted at 96"
AFF. This provides excellent pickup and coverage without line-of-sight or interruption
concerns.
Room to grow: The receiver can accept two additional microphones, such as a
gooseneck microphone to sit on the lectern if the lectern option is pursued.
Always ready to use: A networked two-bay charging station and rechargeable batteries
keep the transmitters charged and ready for each event.
Benefits of Investment
Speech clarity: Presenters, speakers, and performers are heard clearly by everyone in
the room.
Right tool for the job: A dedicated loudspeaker is designed for voice, while the
surround system continues to handle movie and program audio.
Freedom of movement: Wireless microphones let presenters move naturally and
support panels, programs, and community events.
Accessibility and inclusion: Better intelligibility improves the experience for all
attendees.
Quote 3: ADA-Compliant Presentation Lectern
An ADA-compliant, height adjustable presentation lectern, the AVFI LEXYZ34 height
adjustable multimedia lectern, gives presenters a purpose-built, accessible station for the
theater. This quote includes the 12RU equipment rack option, and the lectern will replace
the existing equipment rack.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
6 | 24
Key Features
Replaces the existing equipment rack: The lectern takes the place of the existing
equipment rack, housing the system electronics in a beautiful, professional piece of
furniture instead of an industrial-looking rack.
12RU equipment rack included: The lectern includes the 12RU rack option, so the
system equipment is neatly installed inside the cabinet and stays easy to operate and
service.
Height adjustable work surface: A silent lift mechanism raises and lowers the work
surface from 32.5" to 48.5", suiting both tall and short presenters.
Built for presenting: The work surface supports a laptop and the touch panel, and the
locking door keeps the equipment secure.
Mobile and finished: Heavy-duty locking casters let the lectern roll where it is needed,
and the durable thermowrap finish is highly resistant to wear.
Benefits of Investment
Accessible to every presenter: An ADA-compliant design allows presenters of all
abilities to use the stage and speaking position comfortably.
Supports compliance: Helps the Library meet its accessibility obligations and
strengthens grant applications that prioritize inclusive public spaces.
Organized presenting position: Provides a dedicated, professional location for
presenter devices and microphones, keeping cables and equipment neat and out of the
way.
Welcoming for the community: Gives guest speakers, staff, and community groups a
consistent, easy-to-use place to present.
Quote 4: ADA Assistive Listening Auracast System
An assistive listening system using Auracast broadcast audio sends the theater’s sound
directly to listeners with hearing loss. The system is intended to support the Library’s ADA
assistive listening needs for a room with amplified speech and includes the transmitter,
receivers with hearing accessories, and the required notification signage.
Note: the assistive listening outputs come from the audio DSP included in Quote 2. If this
quote is purchased without Quote 2, an additional audio mixing or DSP device may be
required, which can add cost.
Key Features
Auracast broadcast audio: Built on Bluetooth LE Audio, a single transmitter
broadcasts to an unlimited number of compatible receivers without pairing.
Use your own device: Visitors with Auracast-enabled hearing aids, cochlear implants,
earbuds, or headphones can listen directly, with no borrowed equipment required.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
7 | 24
Receivers for everyone else: Dedicated receivers with neckloops or headphones are
provided for guests without personal Auracast devices, with the quantity sized to the
room’s seating capacity.
Connected to the presentation sound: The transmitter is fed from the theater’s
presentation audio so listeners hear clear, direct speech.
Notification signage: Signage tells visitors that assistive listening is available.
Benefits of Investment
Clear speech for everyone: Audio goes directly to the listener, bypassing room
acoustics, distance, and background noise.
Supports accessibility requirements: Helps the Library meet its assistive listening
obligations and strengthens grant applications that prioritize inclusive public spaces.
Private and comfortable: Listeners control their own volume and can use familiar
personal devices.
Future-ready: Auracast is a growing, open standard, and support is increasingly
available across hearing aid manufacturers and consumer earbuds.
Quote 5: Acoustic Treatment
Acoustic treatment improves how the room itself handles sound, controlling reflections
and reverberation.
Benefits of Investment
Improved intelligibility: Reduced echo and reverberation make speech easier to
understand.
Better overall sound: Film, music, and program audio sound tighter and more natural.
Maximizes other investments: Treatment helps the new voice-lift system and the
reused surround system perform at their best.
Comfortable listening: A more controlled acoustic environment reduces listener
fatigue during longer events.
Quote Summary
Item
Base AV Switcher, Touch
Panel, and Surge
Protection
Quote 1
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
Scope
Surge-protected PDU for
the existing equipment
rack, plus HDMI switcher
and touch panel control
(on/off, source select,
volume)
4K laser projector and fixedframe screen
CONFIDENTIAL
J26450821
8 | 24
Quote 2
Quote 3
Quote 4
Quote 5
JBL AC18/26 public address
/ presentation loudspeaker
driven by a 400 watt bridged
Extron amplifier, plus
wireless microphone
system with one handheld
and one wearable
microphone, charging
station, and rechargeable
batteries
ADA-compliant height
adjustable presentation
lectern (AVFI LEXYZ34) with
12RU equipment rack,
replacing the existing
equipment rack
ADA assistive listening
system using Auracast
broadcast audio, with
receivers, hearing
accessories, and signage
Acoustic treatment
Purchasing Options and Grant Funding
Each quote can be purchased on its own or combined with others. This lets the Library
phase the project, prioritize the improvements with the greatest impact, and align
purchases with available grant funding. The base quote, with its surge-protected PDU and
simple system control, is recommended with any combination of optional quotes to
protect the existing and new equipment and keep the room easy to use. An itemized bill of
materials and pricing summary for each quote is provided in the accompanying quote
report.
Quote Combinations and Audio Processing
Some combinations of quotes may cost more because extra audio mixing or processing
equipment is needed. Quote 2 (the speech sound system) includes an audio processor
that feeds the assistive listening system (Quote 4) and makes the touch panel's volume
controls work. If Quote 2 is not purchased, additional equipment may be needed for those
functions, and any added cost will appear in the itemized pricing in the accompanying
quote report.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
9 | 24
A Request to Those Preparing the Grant or Bid
Specification
If you are assembling a grant application or a public bid specification from this summary,
we respectfully ask that you request the exact bill of materials for each quote from CTI and
include it in your documents as written. Please do not rely on this summary alone to
describe the equipment.
Every component in this proposal was carefully selected to work with the others and with
the equipment the Library already owns. The result is a compatible, cohesive system that
is easy to own, operate, and service. Please be very careful when considering alternative or
"equal" equipment. A substitution that looks equivalent on paper can:
Break compatibility: Changing a switcher, processor, amplifier, or control device can
affect signal formats, audio routing, and touch panel functions that depend on one
another.
Complicate operation: Mixed or unfamiliar equipment can make the system harder for
staff and community groups to use, undoing the simple, guided operation this design
provides.
Make service harder: A consistent set of equipment is quicker to support, and
mismatched parts can mean more troubleshooting, more downtime, and higher longterm cost.
Add hidden costs: Alternates may require additional processing, cabling,
programming, or rework to function as intended, and can reduce the value of the
investment.
If alternates must be allowed, we recommend requiring that any proposed substitution be
reviewed against the complete bill of materials and demonstrated to be fully compatible
before approval. We are glad to help review submitted alternates and to answer any
questions while the specification is being prepared.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
10 | 24
Timeframe
To complete the work outlined in the project scope, we will need approximately 6 weeks
from proposal acceptance. A project manager will be assigned to communicate with you at
critical milestones. Upon notice to proceed, we will begin your project plan immediately.
Phase
Week
Notice to Proceed & Project Kickoff
1
Engineering
2
Procurement
3
Programming & Rack Fabrication
4
Onsite Installation
5
Commissioning & Training
6
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
11 | 24
Your Investment
Below is the cost of this solution based on the outlined scope of work. If you have
questions about the complete solution, please let us know how we can help align this
investment with additional needs or changes in scope.
Proposal Summary
Description
Price
Equipment
$30,601.96
Implementation Services
$29,682.23
Subtotal
$60,284.19
Tax
$3,402.46
Grand Total
$63,686.65
Recommended
Description
Price
2 Additional Years CTI Complete Service Agreement
$5,204.73
4 Additional Years CTI Complete Service Agreement
$10,409.46
Down Payment Requirements
Down payment of 60% required to initiate order.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
12 | 24
Why Choose CTI?
Built one project at a time since 1988, our reputation has made us one of the country's
fastest-growing and most respected technology solutions providers.
Our Mission: Provide a Fantastic Customer Experience.
Our Promise: We will be Fair, Fast, and Flexible.
Our People: We put the Right People in the Right Place at the Right Time.
About CTI
Founded in 1988 as Conference Technologies, Inc., with a single office in St. Louis
Now the largest privately held systems integrator in the US
Over 1,200 employees in 43 offices: New York to Los Angeles, Minneapolis to
Houston, and serving the UK from London and Nottinghamshire.
Available in 65 countries on six continents via the PSNI Global Alliance.
Authorized reseller of more than 320 product lines
Demonstrated value through past projects and client testimonials
From a single room to a global project, CTI can build it right
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
13 | 24
CTI Complete
Your relationship with CTI doesn't end when the integration is finished: every CTI
integration includes a year of CTI COMPLETE support from our CTI CARE Team
Built around your team and your needs!
Proactive Monitoring and Preventive Maintenance
On-Demand Service & Support
CTI Care Team
Critical Meeting support
AV Managed Services and Support
Service plans tailored to your environment, goals, and systems
Preventive maintenance, along with proactive monitoring and service
Available for all systems, not just those integrated by CTI
From on-call to fully managed with embedded staff. Let’s talk about what you need.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
14 | 24
Base AV Switcher, Touch Panel, and Surge Protection
Description
Price
Equipment
$7,508.45
Implementation Services
$7,492.81
Subtotal
$15,001.26
Tax
$804.25
Grand Total
$15,805.51
Bill of Materials
Base AV Switcher, Touch Panel, and Surge Protection
Manufacturer
P/N
Description
Qty
Unit Price
Ext. Price
General: $7,508.45
Extron
60-1748-20
TLCA 2
1
$164.63
$164.63
Extron
60-1997-02
TLP Pro 835T Black
1
$1,786.59
$1,786.59
Extron
60-604-02
RSB 129 GRAY
1
$60.98
$60.98
Extron
60-1962-02
DTP3 IN2004 DO
1
$2,768.29
$2,768.29
Netgear
GSM4210PD100NAS
Av Line M42509g1f-Poe+
1
$656.50
$656.50
Middle
Atlantic
PDX-915RSP
15A 9 OUT SERIES
SURGE W/CTRL
1
$553.17
$553.17
Extron
60-1869-63
DTP3 R 201
1
$701.22
$701.22
Extron
79-2577-01
LinkLicense for
TLP Ctl Proces
1
$817.07
$817.07
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
15 | 24
4K Projector and Ambient Light Rejecting Fixed Frame Screen
Description
Price
Equipment
$8,774.61
Implementation Services
$5,395.35
Subtotal
$14,169.96
Tax
$866.25
Grand Total
$15,036.21
Bill of Materials
4K Projector and Ambient Light Rejecting Fixed Frame Screen
Manufacturer
P/N
Description
Qty
Unit Price
Ext. Price
General: $8,774.61
Chief
RPAUW
UNIVERSAL RPA
WHITE
1
$218.96
$218.96
Sharp
XP-P601Q-W
4K 6000 Lm
Laser, DLP
Projector
1
$5,552.44
$5,552.44
Chief
CMS018024W
ADJ. PIPE 18" TO
24" WHITE
1
$133.46
$133.46
Da-Lite
29966V
CINEMA
CONTOUR PRLX
STR 1.0 133D
65X116
1
$2,689.02
$2,689.02
Chief
CMA345
FLEX JOINT, 11/2" NPT
1
$180.73
$180.73
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
16 | 24
Speech Non-Surround Sound System (Public Address Loudspeaker and
Wireless Microphones)
Description
Price
Equipment
$5,847.90
Implementation Services
$5,445.52
Subtotal
$11,293.42
Tax
$594.48
Grand Total
$11,887.90
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
17 | 24
Bill of Materials
Speech Non-Surround Sound System (Public Address Loudspeaker and
Wireless Microphones)
Manufacturer
P/N
Description
Qty
Unit Price
Ext. Price
General: $5,847.90
Ansmann
5035212
AA NiMH 2850mAh
Rechargeable
Battery - 4 Pack
1
$32.49
$32.49
JBL
AC18/26-WH
AC18/26 in white.
1
$795.73
$795.73
Audio
Technica
ATW-1423
System 20 PRO
2CH Combo
WLS|ATW-R1440
rack-mount
receiver
chassis,ATW-RU14
receiver unit, 2.4
GHz antenna x4,
AC adapter,
rackmount/joining
plate adaptors,
and ATW-T1401
body-pack
transmitter,
andATW-1402
handheld
transmitter
1
$821.30
$821.30
Extron
60-1758-01
XPA U 2002 SB, 2
Ch. Power Amp
1
$725.61
$725.61
JBL
MTU-18-WH
U?Bracket For
Models AC18/xx,
White
1
$102.65
$102.65
Audio
Technica
ATWCHG3NAAD
Two-Bay Charge
Station
Bundle|Charger
1
$312.80
$312.80
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
18 | 24
bundle includes
ATWCHG3NAnetworked
two-bay charging
station and ADSA1230XA AC
adapter
Biamp
TesiraFORTE
DAN CI
Fixed I/O DSP with
12 analog inputs, 8
analog outputs, 8
channels
configurable USB
audio, 32 x 32
channels of Dante,
and AEC
technology (all 12
inputs)
1
$3,057.32
$3,057.32
ADA-Compliant Presentation Lectern
Description
Price
Equipment
$3,108.54
Implementation Services
$3,496.95
Subtotal
$6,605.49
Tax
$390.17
Grand Total
$6,995.66
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
19 | 24
Bill of Materials
ADA-Compliant Presentation Lectern
Manufacturer
P/N
Description
Qty
Unit Price
Ext. Price
General: $3,108.54
AVF
AVF
DIR9200-12
12U Rack Module
for LEXYZ34
1
$425.61
$425.61
LEXYZ34
CWT
Electric Lift
Lectern (Crystal
White)•
27.;31" W x 43.2" H
x 28.85" D•
Roll-about
electric lift
multimedia
lectern (silent lift
mechanism)•
Surface to
support monitors,
laptops and room
control
systems•
Interior
adjustable shelf
which can be
removed to install
an optional 12U
rack module•
Secondary shelf
for storing your
items• 1
locking door•
4" heavy duty
casters (2 locking)
1
$2,682.93
$2,682.93
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
20 | 24
ADA Assistive Listening Auracast System
Description
Price
Equipment
$2,435.66
Implementation Services
$3,323.88
Subtotal
$5,759.54
Tax
$326.67
Grand Total
$6,086.21
Bill of Materials
ADA Assistive Listening Auracast System
Manufacturer
P/N
Description
Qty
Unit Price
Ext. Price
$2,435.66
$2,435.66
General: $2,435.66
Williams AV
BA SYS100
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
Infinium System
with Enhanced
Scale &
Management
(ESM) | 2
Receivers
Includes BA CT1
package plus 2
receivers, 1 2-bay
charger, 2
headphones, 1
neckloop, 1 rack
mount kit and an
Auracast
assistive listening
wall plaque
1
CONFIDENTIAL
J26450821
21 | 24
Acoustic Treatment
Description
Price
Equipment
$2,926.80
Implementation Services
$4,527.72
Subtotal
$7,454.52
Tax
$420.64
Grand Total
$7,875.16
Bill of Materials
Acoustic Treatment
Manufacturer
P/N
Description
Qty
Unit Price
Ext. Price
$365.85
$2,926.80
General: $2,926.80
Acoustical
Fulfillment
Acoustic
Panels
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
Acoustic Panels
8
CONFIDENTIAL
J26450821
22 | 24
Standard Disclaimer
CTI provides for twelve (12) months of CTI Complete on all system purchases. CTI warrants the
system implemented is free from defects in material and workmanship, in accordance with the
contract, drawings, specifications, alterations and additions thereto, for a period of twelve (12)
months from the date of commencement of use, substantial completion, or date of notice of
completion, whichever occurs first. This coverage does not protect against consumables, severe
weather, and acts of God.
Terms
Taxes and Tariffs
Town of Suffield/Suffield Schools is responsible for all applicable taxes, including but not limited
to sales tax, value-added tax (VAT), and goods and services tax (GST), as well as any import duties,
tariffs, and customs fees imposed by the destination location. These charges are not included in
the product price or freight and must be paid by Town of Suffield/Suffield Schools. The Seller will
provide all necessary documentation for customs clearance, and both parties agree to comply with
all relevant laws and regulations regarding these charges.
Installation Description and Requirements
Provided by CTI: If installation is purchased, CTI will install all A/V components. CTI will also
perform all programming, alignments, and end-user training. CTI will provide A/V project
management, and provide drawings as required. This install price assumes a Monday through
Friday 8:00am to 5:00pm install time. Room availability must be in consecutive 8-hour blocks. Any
required changes or rushes may affect the final price.
Provided by Others
Electrical requirements are to be provided by others unless specifically included in CTI Scope of
Work.
Statement
This system proposal is the property of CTI and is delivered with the sole intent of being viewed by
management of Town of Suffield/Suffield Schools for evaluation purposes only. This proposal or
any part of this proposal is not to be presented to, or viewed by any other party, vendor, or CTI
competitor without the written consent of CTI. Any effort to do so will be considered a violation of
copyright law.
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
23 | 24
Next Steps
1. Upon Notice to Proceed, CTI will begin executing the project plan with an internal
handoff of the project to our operations team.
2. If you have questions about the process as we move forward, please contact me at
[email removed] or [phone removed].
3. You will be contacted by a CTI Project Manager to schedule a project kickoff meeting to
review the project scope and schedule.
Total
J26450821 - $63,686.65
Customer Signature
CTI Signature
Printed Name
Printed Name
Title
Title
Date
Date
Springfield
WWW.CTI.COM
20 1st Ave Chicopee 01020
CONFIDENTIAL
J26450821
24 | 24