Biennial Forecast of Natural Gas Demand and Supply

Files2

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
  1. Page 31 of 53

    Commercial Baseline Usage per Customer Model Exhibit A-3 Dependent Variable: UPC_COM_BASELINE Method: Least Squares Date: 09/08/25 Time: 16:16 Sample (adjusted): 2014M01 2025M07 Included observations: 139 after adjustments Variable C ECON_NMEMP_CT PRICE_COM_3M(-1) JA60+FB60+DC60 NV60+MR60 OC60+AP60 D_M05Y16 D_M05Y17 D_M05Y19 YR_2018 D_M05Y21 D_M02Y14 D_M07Y25 D_M02Y23 (JUL+AUG)*YR24_AFT MAY*YR20_AFT R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) Coefficient Std. Error t-Statistic 18.791 0.012 -0.547 0.088 0.086 0.079 14.867 14.482 11.774 2.154 3.976 -11.525 -6.266 -4.954 -3.537 5.667 0.995 0.995 2.627 849.095489 -323.006 1689.862 0.000 7.519 0.005 0.109 0.001 0.001 0.002 2.688 2.675 2.671 0.809 2.883 2.689 3.294 2.670 1.917 1.277 2.499 2.574 -5.005 130.246 83.526 35.375 5.530 5.414 4.408 2.663 1.379 -4.287 -1.902 -1.855 -1.845 4.440 Prob. 0.014 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.009 0.170 0.000 0.059 0.066 0.067 0.000 Mean dependent var 65.406 S.D. dependent var 35.695 Akaike info criterion 4.878 Schwarz criterion 5.215572 Hannan-Quinn criter. 5.015 Durbin-Watson stat 1.958
  2. Page 32 of 53

    Commercial CES Usage per Customer Model Exhibit A-4 Dependent Variable: UPC_COM_CES Method: Least Squares Date: 09/11/25 Time: 14:33 Sample (adjusted): 2015M06 2025M07 Included observations: 122 after adjustments Variable C JA60+FB60+DC60+NV60+MR60+AP60+MA60+OC60 ECON_NMEMP_CT YR_2016 YR_2017 D_M11Y16 YR_2015 D_M01Y16 D_M11Y23_M10Y24 D_M11Y24_AFT D_M08Y22 D_M04Y24 D_M12Y24 D_M02Y17 D_M05Y23 D_M03Y22 D_M08Y23 (JAN+FEB+DEC)*YR20_AFT NOV D_M03Y20 R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) Coefficient Std. Error t-Statistic 16.527 0.080 0.025 -34.719 -14.991 59.591 -40.461 -23.183 34.042 45.571 -18.427 -12.813 13.296 -16.168 17.814 14.621 13.598 5.482 -17.066 11.154 0.963 0.956 8.658 7646.67183 -425.529 137.966 0.000 26.205 0.003 0.018 3.057 2.937 9.586 3.544 9.286 3.008 3.442 8.777 9.083 9.362 9.123 8.780 8.806 8.809 3.030 3.187 8.821 0.631 28.945 1.427 -11.356 -5.104 6.216 -11.416 -2.497 11.318 13.241 -2.099 -1.411 1.420 -1.772 2.029 1.660 1.544 1.809 -5.356 1.265 Prob. 0.530 0.000 0.157 0.000 0.000 0.000 0.000 0.014 0.000 0.000 0.038 0.161 0.159 0.079 0.045 0.100 0.126 0.073 0.000 0.209 Mean dependent var 84.077 S.D. dependent var 41.077 Akaike info criterion 7.304 Schwarz criterion 7.763426 Hannan-Quinn criter. 7.490 Durbin-Watson stat 1.865
  3. Page 33 of 53

    Commercial Customer Model Exhibit A-5 Dependent Variable: D(CUST_COM_TOTAL) Method: Least Squares Date: 08/13/25 Time: 15:51 Sample: 2017M04 2025M07 Included observations: 100 Variable C D(ECON_NMEMP_CT(-4)) DEC APR JUL+AUG D_M11Y18 D_M06Y21 D_M07Y21 D_M11Y22 D_M07Y18 D_M06Y19 D_M10Y22 D_M12Y18 D_M12Y22 D_M06Y18 D_M06Y17 D_M12Y19 D_M09Y19 D_M07Y20 R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) Coefficient 26.882 1.757 192.204 -228.307 -76.121 1532.528 1083.715 -628.804 1008.355 -390.260 -505.530 -441.755 -624.530 -482.064 413.627 -270.816 260.108 -246.628 517.632 0.788 0.741 157.592 2011656.771 -637.359 16.695 0.000 Std. Error t-Statistic 20.738 0.895 74.552 56.514 47.618 158.946 159.022 163.516 158.946 163.272 158.975 158.949 173.152 173.131 158.946 158.947 173.547 158.945 180.620 Mean dependent var S.D. dependent var Akaike info criterion Schwarz criterion Hannan-Quinn criter. Durbin-Watson stat 1.296 1.963 2.578 -4.040 -1.599 9.642 6.815 -3.846 6.344 -2.390 -3.180 -2.779 -3.607 -2.784 2.602 -1.704 1.499 -1.552 2.866 Prob. 0.199 0.053 0.012 0.000 0.114 0.000 0.000 0.000 0.000 0.019 0.002 0.007 0.001 0.007 0.011 0.092 0.138 0.125 0.005 21.445 309.365 13.127 13.622 13.328 2.281
  4. Page 34 of 53

    Industrial Usage Per Customer Model Exhibit A-6 Dependent Variable: UPC_IND_TOTAL Method: ARMA Conditional Least Squares (Marquardt - EViews legacy) Date: 09/11/25 Time: 14:01 Sample (adjusted): 2015M06 2025M07 Included observations: 122 after adjustments Convergence achieved after 9 iterations Variable Coefficient Std. Error t-Statistic Prob. 465.684 0.367 -15.484 0.404 0.370 -53.232 50.143 26.311 -100.352 -89.068 -39.718 -44.048 24.701 37.969 24.534 61.794 26.057 20.937 -19.424 0.889 55.674 0.138 7.244 0.010 0.011 17.008 16.730 16.996 19.943 19.443 16.782 16.699 16.843 11.914 11.783 16.758 6.839 17.001 11.914 0.048 8.364 2.662 -2.137 41.716 34.974 -3.130 2.997 1.548 -5.032 -4.581 -2.367 -2.638 1.467 3.187 2.082 3.687 3.810 1.232 -1.630 18.368 0.000 0.009 0.035 0.000 0.000 0.002 0.003 0.125 0.000 0.000 0.020 0.010 0.146 0.002 0.040 0.000 0.000 0.221 0.106 0.000 R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) 0.982 0.979 22.322 50823.168 -541.068 299.858 0.000 Mean dependent var 545.461 S.D. dependent var 154.535 Akaike info criterion 9.198 Schwarz criterion 9.658 Hannan-Quinn criter. 9.385 Durbin-Watson stat 2.192 Inverted AR Roots 0.890 C ECON_MFEMP_CT*YR18_AFT PRICE_IND_3M(-2) JA60 DC60+FB60+MR60+AP60+NV60+MA60+OC60 D_M02Y17 D_M03Y16 D_M11Y20 D_M11Y15 D_M10Y15 D_M04Y21 D_M06Y16 D_M05Y22 D_M08Y22+D_M08Y23 (MAR+APR)*YR24_AFT D_M08Y24+D_M07Y24 DEC D_M10Y24 D_M10Y17+D_M10Y16 AR(1)
  5. Page 35 of 53

    Industrial Customer Model Exhibit A-7 Dependent Variable: D(CUST_IND_TOTAL) Method: ARMA Conditional Least Squares (Marquardt - EViews legacy) Date: 09/08/25 Time: 10:41 Sample : 2010M01 2025M07 Include d obse rvations: 187 Conve rge nce achie ve d afte r 10 ite rations Variable C D(GO_DIFF) D_M10Y15 D_M06Y16 D_M11Y18 D_M05Y16 D_M07Y16 SEP D_M09Y15 D_M01Y13 D_M07Y13 D_M02Y13 D_M12Y14 D_M11Y13 APR D_M03Y16 D_M04Y16 D_M06Y21 D_M12Y18 OCT D_M08Y10 D_M05Y21 D_M04Y25+D_M05Y25 AR(1) Coefficient Std. Error 3.598 5.657 235.894 247.358 228.092 -180.507 -169.937 -29.624 -112.913 -99.413 -78.197 72.866 90.971 114.376 -22.650 -98.034 151.584 100.508 -118.536 -13.251 -135.788 -68.030 -25.343 -0.517 R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) 0.777 0.746 28.994 137024.65 -882.143 24.735 0.000 Inverted AR Roots -0.520 1.885 2.197 29.261 32.593 28.773 33.347 29.152 7.987 29.265 28.371 26.308 28.384 26.533 26.210 7.743 29.133 33.370 28.445 28.555 8.064 26.071 28.546 15.752 0.069 t-Statistic Prob. 1.909 2.575 8.062 7.589 7.927 -5.413 -5.829 -3.709 -3.858 -3.504 -2.972 2.567 3.429 4.364 -2.925 -3.365 4.543 3.533 -4.151 -1.643 -5.208 -2.383 -1.609 -7.460 0.058 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.003 0.011 0.001 0.000 0.004 0.001 0.000 0.001 0.000 0.102 0.000 0.018 0.110 0.000 Mean dependent var -0.810 S.D. dependent var 57.514 Akaike info criterion 9.691 Schwarz criterion 10.10606 Hannan-Quinn criter. 9.859 Durbin-Watson stat 2.101
  6. Page 36 of 53

    SECTION IV – DISPOSITION OF GAS SUPPLY TO MEET FORECAST DEMAND A. INTRODUCTION As described in Section I, the natural gas marketplace continues to evolve and will present challenges as well as opportunities for the Company throughout the planning period. Summarized below is how the Company intends to approach its supply planning: B. Supply Planning: Eversource plans its supply portfolio based on the Authorityapproved obligation to serve the needs of all firm customers under design conditions. A “design day” is defined as the coldest day in 30 years. For Eversource, this represents a 75 effective heating degree day (“EHDD”) with a previous day effective heating degree day of 67. Unbundling Efforts: LDCs in Connecticut must continue to hold sufficient capacity to meet their SOLR obligations. Firm Transportation (“FT”) volumes are supplied using Eversource’s capacity and supply per a percentage of the marketer’s peak-day MDQ as determined by an annual open season in accordance with rulings by PURA. Of that amount, one half is long haul capacity release and one quarter each is for gas storage and gas peaking. Price Volatility: Eversource offers its customers the option to pay their bills via a Budget Billing program. Additionally, customer bill volatility is significantly mitigated through the workings of the PGA mechanism and use of storage. Capacity Plan: The Company is in a good capacity position to accommodate its forecasted demand growth because of 1) its current capacity portfolio, 2) longterm incremental pipeline expansion commitments, approved by PURA have been placed in-service and 3) the effects of energy conservation. THE MODEL The New Energy Associates SENDOUT® model is a sophisticated regression-based model that allows the user to input multiple variables and to control multiple levels of detail. The model is a Windows-based application and allows for multiple scenarios to be examined at once. The “what-if” capabilities of the SENDOUT® model are its major strength. Sales Forecast Base loads and heat factors of forecasted firm throughput are input into the model based on the sales forecasts developed for the study. These base loads and heat factors are combined with two weather patterns (normal and design) consisting of EHDD
  7. Page 37 of 53

    values to produce requirements for a normal winter and a design winter case. The resulting output reports generated by the SENDOUT® model are then created and put into spreadsheet format and presented in Tables IV-6 – IV-7. The number of customers and level of potential interruptible sales is forecast based on a historical customer demand analysis enhanced through field contact with customers. Interruptible customers are required to have dual-fuel capability and can switch to or from natural gas on short notice, therefore it is desirable to begin with historical sales and field estimates and assume no supply constraints. The model then determines based upon the availability of gas (after meeting firm requirements) whether it will be possible to make interruptible sales. Model Operation Base loads and heat factors are input into the SENDOUT® model for all customer classes. All aspects of the supply portfolio are also entered the model as dispatchable resources. Using proprietary regression techniques, a best-fit, least cost supply disposition is derived. The model has the flexibility to constrain or unconstrain all assets within the supply portfolio. In determining this best-fit supply disposition, the model considers the daily availability of gas from each portfolio option. Gas nominated and delivered by marketers for customer transportation is automatically dispatched. The model calculates the amount of gas purchased from each supply source, injected into and withdrawn from storage, and made by the Company’s on-system production facilities to meet the daily demands. Additionally, when the model is used for long-range planning, it identifies shortfalls of supply to meet firm demand. If sufficient gas is not available to meet firm demand, the shortfall volume is projected and reported for each day that insufficient supply exists. Supply personnel can combine this information with normal and design weather conditions to determine what type of incremental service should be acquired. Gas Dispatching The model considers both economic and operational factors in dispatching sources of gas supply. In general, the model dispatches gas based on a best cost approach with the lowest cost sources of supply having priority. Importantly, the model also factors in operational parameters such as the number of days of availability for a supply source and the location at which the supply is required. C. FIRM TRANSPORTATION The Company must not only be prepared to serve all firm sales customers’ load requirements, but also the requirements of FT customers should a third-party marketer fail to perform. For this reason, Eversource has modeled its supplies under the
  8. Page 38 of 53

    assumption that all its firm customers take supply from Eversource. This is done to ensure that Eversource’s supply planning is sufficient to meet its SOLR obligations. For the reasons stated above, the Company has not focused its attention on attempts to model potential, possible or foreseeable FT activity. The Company mitigates the FT uncertainty by increasing the flexibility of the current supply portfolio to obtain maximum value, while retaining the assets necessary to perform its SOLR obligation under the wide spectrum of FT scenarios. The use of on-system peaking supply, such as LNG, provides the Company with the ability to meet the heat-sensitive needs of its customers while, at the same time, providing a high degree of reliability and ensuring the continuation of its distribution system in the event of a third-party failure. The Company believes that, through the steps outlined above, the supply assets supporting the forecast are sufficiently flexible to accommodate a variety of FT participation levels. The Company must also consider the hourly needs of its supply resources as it designs its distribution system to serve its customers safely and reliably during the most extreme weather conditions which includes an assessment of the Design Hour system requirements. The Company maintains a Design Hour (the peak hour on a Design Day) planning criteria for planning purposes to determine the level of supply and pressure needed to deliver gas without interruption when demand is highest – typically during the early morning hours (when customers generally turn up the thermostat and use gas for hot water/cooking), on days that meet the Design Day criteria. The Design Hour criteria is based upon customer usage data and can vary throughout the system. The Design Hour criteria determine the level of deliverability capacity to and from city gate stations as well as on-system supply resources during the hour of the day when maximum gas is consumed. If customers used the same volume of gas each hour, it would suffice to look at the daily demand and divide by twenty-four to ensure the system could provide that amount of gas each hour. The reality is that customers tend to use more gas in the early morning hours, typically 6 a.m. to 10 a.m., and again in the evening from 4 p.m. to 8 p.m. The Company uses the Design Hour criteria to perform various analyses necessary for distribution system operations (e.g., regulator pressure settings, LNG requirements) and capital planning. After the January 21, 2019 incident, when National Grid had to curtail gas service to 7,455 customers in Rhode Island during a cold snap due low inlet pressure to its system from AGT, AGT issued warnings to its customers to manage their hourly takes to fall within the calculated hourly flow limits so as to not jeopardize the operations of the interstate pipeline. As the upstream pipelines serving the Company’s distribution system continue to become more constrained, the operational flexibilities which they have historically provided will continue to diminish.
  9. Page 39 of 53

    D. PIPELINE/STORAGE DEMAND COSTS The interstate gas capacity situation into Connecticut (and New England) continues to be highly constrained. This is consistent with decades of history. All existing capacity is fully subscribed on every New England pipeline. A listing of Yankee Gas pipeline and storage contracts are included in Exhibit IV-1.1 and Exhibit IV-1.2. The rates governing these contracts are regulated by FERC and generally will only change with a pipeline rate case filing. The incremental cost of adding capacity is higher due to the higher current cost of steel, compression, land, other materials and labor, as well as the requirements to conform to numerous siting and environmental requirements from the local to the federal level and recently delays caused by protesters in various state and federal venues. The exception can be backhauling capacity to specific areas and points subject to various pipeline and lateral bottlenecks for such backhaul deliveries and subject to supply availability from downstream sources such as LNG which varies based upon market conditions and other factors. LDCs must look far into the future to project a need for new long-term capacity to continue to provide reliable service to growing firm markets. These commitments require long-term contracts. The attached analysis in Exhibit IV-8 compares the incremental and rolled in costs for various key transportation routes to and upstream from Connecticut. Incremental pricing is the practice of a pipeline charging a customer a transportation rate higher than the system average rate when relatively expensive facilities are necessary to provide the requested service. Typically, pipelines offering an incremental price are fully contracted for the levels of service that the existing pipeline infrastructure can provide. Rolled-in pricing is the practice of charging a customer the average system rate. Both rolled-in and incremental rates are FERC regulated. Incremental pricing has been employed for decades in New England for capacity additions. The current incremental cost based upon pipeline projections is several multiples of the FERC rolled in maximum rate cost due to current cost versus partially depreciated historic cost. The analysis does not consider lower commodity costs that can offset the higher incremental capacity cost (i.e., Marcellus Shale supply source). Incremental gas storage is also more expensive compared to existing storage which utilizes largely depreciated facilities and lower cost base gas. The attached analysis compares the cost of rolled in gas storage to the incremental cost, concluding that incremental gas storage is several times more expensive than rolled in storage, again due to current cost versus partially depreciated historical cost. When evaluating new projects, the LDCs will select those that have the best fit using reliability, cost, supply access and operational needs criteria. The existing FERC policy favors incremental pricing as the means of sending the proper price signals to the market. As part of the policy, the threshold requirement in establishing the public convenience and necessity for existing pipelines proposing an expansion project is that the pipeline must be prepared to financially support the project without relying on subsidization from its existing customers. The policy is based on the concept that existing customers (at rolled-in rates) of the expanding pipeline should not have to subsidize a project that does not serve them.
  10. Page 40 of 53

    Exhibit IV-1.1 YANKEE GAS SERVICES COMPANY FIRM TRANSPORTATION CONTRACTS Contract Number Algonquin 93009 93409 94000 510724 510802 933006 934006 93013EC 93209C 9B106C Rate S chedule AFT-1 (F-1) AFT-1 (F-4) AFT-1 (ITP) AFT-1 AFT1AIM AFT-1 (PSS-T) AFT-1 (FTP) AFT-E (F-1, WS-1) AFT-1 (F-2, F-3) AFT-1 (STB) Eastern Gas 700054 Maximum Daily Quantity Maximum Annual Quantity Primary Receipt Point(s) Primary Delivery Point(s) Current Annual Demand Charges* Termination Date 100% Load Factor Rate 31,963 8,862 15,000 8,291 100,000 125 5,078 35,816 7,863 3,055 11,092,743 3,234,630 5,475,000 3,026,215 36,500,000 45,625 1,853,470 10,314,856 2,869,995 648,709 Lambertville / Hanover Lambertville Lambertville M ahwah Ramapo Lambertville Lambertville Lambertville / Hanover Lamb, Centerville Lambertville Yankee CG Yankee CG Yankee CG Danbury Yankee CG Stonington / Westerly, RI Yankee CG Yankee CG Yankee CG Yankee CG $ $ $ $ $ $ $ $ $ $ 4,544,103 1,259,889 2,132,514 1,178,712 50,143,440 17,771 721,927 5,091,875 1,117,864 434,322 10/31/27 10/31/27 10/31/27 11/30/27 01/06/32 03/31/28 10/31/27 10/31/27 10/31/27 10/31/27 $0.4096 $0.3895 $0.3895 $0.3895 $1.3738 $0.3895 $0.3895 $0.4936 $0.3895 $0.6695 FT (FT-GSS) 125 18,875 GSS Storage (300128) Chambersburg, PA $ 3,717 03/31/30 $0.1969 Iroquois 590-01 590-04 590-12 590-13 590-15 590-17 590-18 590-19 RTS-1 RTS-2 RTS-2 RTS-2 RTS-2 RTS-2 RTS-2 RTS-2 9,105 17,704 6,115 10,160 20,000 12,939 3,000 22,000 3,323,325 6,461,960 2,231,975 3,708,400 7,300,000 4,722,735 1,095,000 8,030,000 Waddington, NY Waddington, NY Waddington, NY Waddington, NY Waddington, NY Waddington, NY Waddington, NY Waddington, NY Wright, NY New M ilford Bfld; So.Comack, Shelton A&B, YG CG Brookfield, Shelton A&B, YG CG Shelton A&B/ N M ilfd/Bfld IGT CG - Shelton B AGT CG - Waterbury TGP City gates $ $ $ $ $ $ $ $ 468,922 1,499,182 517,821 860,353 2,557,200 1,095,680 254,041 1,862,969 11/01/32 11/01/32 11/01/29 11/01/29 11/01/32 11/01/32 11/01/32 11/01/32 $0.1411 $0.2320 $0.2320 $0.2320 $0.3503 $0.2320 $0.2320 $0.2320 Millennium 210168 FT-1 50,000 18,250,000 Corning NY Ramapo $ 11,860,675 03/31/34 $0.6499 National Fuel N10258 N10553 FST FST 5,499 14,300 2,007,135 5,219,500 NFG Storage NFG Storage Rose Lake Wharton, PA $ $ 404,836 1,052,766 03/31/28 03/31/28 $0.2017 $0.2017 Tennessee 333 1596 2121 7541 10782 68830 79704 95351 109393 302013 331574 FT-A FT-A FT-A FT-A FT-A FT-BH FT-A FT-A FT-A FT-A FT-A 15,861 15,419 9,526 14,000 10,250 5,000 8,000 9,000 20,000 4,165 27,100 5,789,265 5,627,935 3,476,990 5,110,000 3,741,250 1,825,000 2,920,000 3,285,000 7,300,000 1,520,225 9,891,500 Zone 4 - No. Storage Production Area, Zone 0 Zone 5 - Niagara, NY Production Area, Zone 1 Zone 4 - Roselake Shelton A/IGTS Shelton A/ Zone 6 Zone 5 - Wright, NY Shelton M ahwah Wright, NY Yankee CG Yankee CG Yankee CG Yankee CG Yankee CG Yankee CG Yankee CG Yankee CG Stamford/Norwalk Stamford Yankee CG $ $ $ $ $ $ $ $ $ $ $ 1,212,670 3,559,569 640,021 3,020,613 783,675 111,582 357,053 604,681 892,632 279,833 6,293,368 10/31/27 03/31/31 10/31/28 03/31/31 10/31/27 10/31/27 10/31/27 11/30/31 10/31/27 11/30/27 10/31/32 $0.2095 $0.6325 $0.1841 $0.5911 $0.2095 $0.0611 $0.1223 $0.1841 $0.1223 $0.1841 $0.6362 Texas Eastern 800108 800308 800441 800442 800476 FT-1 FT-1 CDS CDS FT-1 (ITP) 6,210 47,058 14,233 1,064 18,199 2,266,650 17,176,170 5,195,045 388,360 6,642,635 M 3 - Leidy & Holbrook Production Area Production Area M 3 - FSS-1 Storage M 2 - Lebanon, Oakford M 3 - Lambertville M 3 - Lambertville M 3 - Lambertville M 3 - Lambertville M 3 - Lambertville $ $ $ $ $ 989,386 14,012,489 4,325,854 133,528 3,413,841 10/31/27 10/31/27 10/31/27 10/31/27 10/31/27 $0.4365 $0.8158 $0.8327 $0.3438 $0.5139 TransCanada 41223 41236 41237 FT FT FT 5,058 40,417 19,273 1,846,170 14,752,205 7,034,645 Dawn, Ontario Dawn, Ontario Dawn, Ontario Waddington, NY Waddington, NY Waddington, NY $ $ $ 513,512 4,103,323 1,956,685 10/31/33 10/31/33 10/31/33 $0.2781 $0.2781 $0.2781 Transcontinental 1006430 FT 1,797 655,905 Wharton, PA Centerville, NJ $ 102,747.52 06/01/28 $0.1567 Union Gas M 12-2XX M 12 65,452 23,889,980 Dawn, Ontario Parkway, CA $ 2,585,334 10/31/28 $0.1082 $ 138,972,975 Total Pipeline Transportation Demand: * Demand Charges as of October 1, 2026

As listed on the current system

Corres. 10/01/2026 [26-10-03] (Eversource Energy) - Biennial Forecast of Natural Gas Demand and Supply