Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Biennial Forecast of Natural Gas Demand and Supply

Files2

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
  1. Page 7 of 53Match

    Heating Degree Days (“EHDD”), and any interruptible load served. 6 7 Formats. PURA believes that a uniform presentation format should be used by all three LDCs and directs the Companies to develop consistent formats regarding the above revisions. The Companies are encouraged to provide additional input that would enhance the forecasts and the subsequent review process. Distributed Generation Supply Impacts. PURA requires the Companies to provide, at a minimum, summary information regarding these units within their forecasts. In future forecasts, the Companies shall provide filings electric generation statistics, similar to the presentation provided the Department by Connecticut Natural Gas and Southern Connecticut Gas in their response to Interrogatory GA-213 in Docket Nos. 06-0304PH02 and 05-03-17PH02. In addition to this data, the filing should also include the estimated megawatts (“MW”) associated with each category. D. Distributed Generation (Section III) FORECAST HIGHLIGHTS Demand Total annual gas demand on the Eversource system (weather normalized) is projected to increase from 61.5 Bcf in 2026 to 62.7 Bcf in 2031, a compound average annual growth rate of 0.4 percent. Total weather-normalized firm sales and transportation volumes, including Special Contracts, are expected to grow at an annual rate of 0.4 percent over the forecast period, increasing from 58.0 Bcf in 2026 to 59.2 Bcf in 2031. This compares to an annual growth rate of 0.9 percent over the 2021-2025 period. Residential volumes, which have increased at a compound rate of –0.2% percent per year during the historical period, are expected to grow 1.1 percent per year on average over the forecast period. The 2026 level of 17.7 Bcf is projected to grow to 18.7 Bcf by 2031. The firm commercial market net of Special Contracts is expected to grow 0.5 percent per year over the forecast period, down from the five-year historical rate of 1.9 percent.
  2. Page 8 of 53

    Over the forecast period, the firm industrial market net of Special Contracts is expected to decrease from 12.1 Bcf in 2026 to 11.6 Bcf in 2031. The number of industrial customers is expected to decrease over the forecast period, from 1,365 to around 1,260. The non-firm forecast includes interruptible sales and transportation gas, as well as seasonal customers. The estimated non-firm volumes are projected to average 3.5 Bcf over the five-year forecast period. The Company is actively engaged in the investigation into the future role of natural gas systems in achieving the climate goals of Connecticut. As described herein; to forecast gas demand, the Company utilizes historic data. If gas demand, in fact, is reduced due to efforts to promote electrification, the Company will adjust its forecast to reflect this change. Because Forecast and Supply Plans (“FSPs”) are filed with the Authority every two years, if in fact there is a reduction in gas demand due to electrification, this reduction will be included in the historical data compiled by the Company and reflected in the Company’s forecast. A departure from Eversource’s current approach of forecasting would only jeopardize the Company’s ability to provide reliable gas service to its customers by replacing actual historical data with conjecture and unsupported assumptions about future load. Supply E. Based on the forecasted levels of firm throughput, the Company utilizing a diverse portfolio of resources will meet its Supplier of Last Resort (“SOLR”) obligation. UPDATES ON DEVELOPMENTS AFFECTING THE INDUSTRY This section of the Report discusses some key current issues related to the integrated resource planning process. The planning process is complex and is greatly impacted by the overall environment in the energy industry. Significant issues and events continue to unfold, making planning challenging and some of those macro issues are listed below: Gas Supply, Price, and Competitiveness Market and regulatory restructuring of wholesale and retail natural gas markets over the last few decades have increased the complexity associated with acquiring and managing a least-cost resource portfolio. Virtually every aspect of LDC portfolio management has been transformed by regulatory and market changes. In the broadest of terms, the very markets that LDCs such as Yankee Gas participate in, the types of products and services that are bought and sold, and the manner in which these transactions are completed are vastly different today than they were 40, 30 or even 20 years ago. Market transformation has brought about many new opportunities and risks for all market participants, including LDCs, which must continue to reliably meet the supply requirements of their customers. The U.S. natural gas industry has experienced significant change over the past twenty years, including the discovery and production of natural gas from prolific shale gas deposits. The
  3. Page 9 of 53

    increasing domestic production of natural gas has resulted in numerous changes to not only the broader U.S. natural gas market, but also to the New England region. Specifically, in the New England region, the increase in domestic natural gas supplies has generally resulted in lower annual natural gas prices and an increase in the demand for natural gas with the most recent market volatility due to the COVID-19 pandemic, geopolitical issues and other market forces. Today’s marketplace is witnessing another fundamental change that is reinforcing the need for LDC’s to manage the responsibility to supply their customers under design conditions. As the New England region grapples with how to counter the impacts of climate change, a new reality has impacted on how to access new sources of supply to reliably serve existing and new customers. The public has become increasingly more vocal in its opposition to any new gas infrastructure to be added in New England that would help alleviate bottlenecks that would allow access to new supplies sourced out of the Marcellus region. As a result, there is not enough infrastructure in New England to adequately serve the demand of both LDC load and the gas fired generators load in New England. Electric generators are now the largest single consumers of natural gas in New England, yet the vast majority of these consumers do not have enough pipeline capacity to supply their needs during the winter months. This has led to regional pipelines that consistently operate at maximum capacity, winter prices in New England that are forecasted to be far higher than other parts of the country and a dramatic reduction in the flexibility historically experienced on the pipelines that serve New England. Currently access to incremental supplies to serve LDC demand is limited to imported LNG from either Constellation’s Everett Marine Terminal (“EMT”), Repsol’s St. John LNG (aka Canaport), or other LNG facilities that can provide supplies from the backend of the pipeline system that does not require pipeline expansions to serve incremental growth. The EMT is a unique physical facility that has the capability to perform non-ratable hourly deliveries of large volumes of gas directly into the interstate pipeline networks of Algonquin Gas Transmission and Tennessee Gas Pipeline. The EMT facility provides vital supply and pressure support on a nearly instantaneous basis at the end of the system when it is needed for several hours or days without need for refill. EMT can refill its entire storage facility (approximately 3BBtu) in less than 48 hours, if necessary, from LNG ships. The EMT’s unique configuration allows Constellation to shape deliveries to align with demand requirements of natural gas customers and interstate pipelines serving New England, which has become more important as the regional infrastructure has become increasingly stressed in the last several years. The EMT was set to close on June 1, 2024, but a collection of Massachusetts Gas LDCs contracted for supplies to keep the facility open for 6 years. St. John LNG, Canaport is a unique facility as it provides critical supply diversity to the region with its over 9 BBtu of storage capacity and sufficient pipeline capacity to re-deliver significant quantities of gas to the east end of the pipeline systems. While relying on imported LNG to serve demand exposes LDCs to costs that are set by volatile global LNG markets during winter months, it is the only incremental resource of scale available to the region in the near term. Regarding natural gas infrastructure, while there had been numerous projects placed into service and/or planned in the Mid-Atlantic that transport new natural gas supplies from the Appalachian
  4. Page 10 of 53Match

    Marcellus area, it has become increasingly difficult to complete these projects. The significant delays and changes to various projects in the Marcellus and New England region have left the region devoid of the incremental pipeline capacity needed to meet the growing demand in the region. The region has recently shown to be more receptive to new pipeline capacity as seen by the approval of the Algonquin Gas Transmission Reliable, Affordable and Resilient “RARE” pipeline contracts in Massachusetts. Until more incremental projects into the region are completed, the pipeline infrastructure in the region remains constrained resulting in the region being reliant upon LNG imports for its marginal supply. Although the New England region is constrained, Yankee Gas is in a satisfactory near-term supply position as far as supply and transportation contracts and deliverability. State Energy Policy Pursuant to Section 51 of House Bill 6360 (“H.B. 6360”), “An Act Concerning Implementation of Connecticut’s Comprehensive Energy Strategy”, Connecticut General Statutes (“Conn. Gen. Stat.”) §§ 16-11, 16-19kk, 16-19oo, 16-43, 16a-3d, and in accordance with DEEP’s 2013 Connecticut Comprehensive Energy Strategy dated February 19, 2013, Eversource requested that PURA approve Connecticut’s Gas Local Distribution Companies’ Joint Natural Gas Infrastructure Expansion Plan, to provide Connecticut residents with greater access to natural gas, and to significantly reduce energy costs and environmental impacts. The Company filed its natural gas expansion plan, including its detailed capacity plan, in Docket No. 13-06-02 PURA Investigation of Connecticut's Local Distribution Companies' Proposed Expansion Plans to Comply with Connecticut's Comprehensive Energy Strategy on June 14, 2013. The final decision was rendered on November 22, 2013, directing the Company to submit certain compliance filings relative to the capacity plan (see Order Nos. 1, 3, and 20), including the submission of a revised capacity plan for approval by the Authority. On December 26, 2013, PURA issued its approval of the revised capacity plan. The expansion plan commenced on January 1, 2014, and recently was terminated on December 31, 2023, by PURA. While the program has reduced its annual growth from the Plan’s original projections the Company continues to add new customers at a modest rate. The number of new customers added will be discussed later in this forecast. Most recently, the Connecticut Department of Energy and Environmental Policy (“DEEP”) has begun the development of the new Comprehensive Energy Strategy (“CES”). Eversource remains engaged and committed to working with DEEP and the State on ways to decarbonize the building sector, in addition to other sectors, through the development of this policy. The Company will continue to monitor and participate in related efforts to ensure reliable and affordable energy is being provided to its customers and the region.
  5. Page 11 of 53

    SECTION II – ENERGY EFFICIENCY A. CONSERVATION & LOAD MANAGEMENT PLAN B. Background The Companies have administered natural gas conservation and load management (“C&LM”) programs since the Connecticut General Assembly’s passage of 2005 energy independence legislation—Public Act 05-01, An Act Concerning Electricity and Energy Efficiency. This legislation created a funding mechanism for the Natural Gas Companies to develop and implement cost-effective energy efficiency programs that reduce natural gas consumption for residential and commercial and industrial (“C&I”) customers. On November 1, 2024, in accordance with Connecticut General Statutes § 16-245m and § 16-32f, Connecticut’s Electric Companies (Eversource and United Illuminating) and Natural Gas Companies (Connecticut Natural Gas, Eversource, and Southern Connecticut Gas), collectively “the Companies”, filed the 2025-2027 Conservation & Load Management Plan (“2025-2027 Plan”).2 The 2025-2027 Plan detailed the Companies’ plans for implementing costeffective electric and natural gas C&LM programs and initiatives. The Department of Energy and Environmental Protection (“DEEP”) approved the 2025-2027 Plan with its Final Decision and Conditions of Approval on September 9, 2025. The 2025-2027 Plan is the fourth three-year plan developed after the passage of Public Act 13-228.3 The Companies design the triennial plans as living documents that the Companies modify throughout the three-year terms via annual Plan updates and budget reconciliation filings. The Companies filed two Plan updates during the 2025- 2027 term, the 2025 Plan Update and 2026 Plan Update.4 The 2025-2027 Plan’s priorities are decarbonization, equity, and energy affordability. Currently, the Companies are developing the 2027 Plan Update to the 2025-2027 Plan. The 2027 Plan Update will be filed on October 1, 2026. In drafting the 2027 Plan Update, the Companies carry forward the three priorities from the previous term—decarbonization, equitable access, and energy affordability. Though the Companies made progress toward meeting these priorities, they recognize that they should build upon the momentum, delivery platforms, and insight gained to make additional progress. The Companies will file two Plan updates for the 2026 and 2027 program years, which will report on program modifications and changes to budgets and goals made in response to new legislation, code standards, state policies, relevant federal funding impacts, and emerging technologies.5 Starting January 1, 2025, the Companies’ C&LM programs will no longer provide incentive and rebate support for new natural gas combustion heating, hot water, and commercial kitchen equipment with the exception of limited projects that meet the decision tree components as outlined in DEEP’s Condition of Approval 15, filed March 18, 2026.The Companies will 2 The 2025-2027 Plan was originally filed on Nov. 1, 2024 and resubmitted as a budget reconciliation filing on Feb. 28, 2025, to reflect 2024 year-end actual budgets and savings. 3 Public Act 13-228, An Act Concerning Implementation of Connecticut’s Comprehensive Strategy and Various Revisions to the Energy Statutes. The legislation requires the Electric and Natural Gas Companies to file three-year C&LM Plans. 4 2025 Plan Update to the 2025-2027 Plan, filed Feb. 28, 2025 and approved by DEEP on Dec. 31, 2025 and the 2026 Plan Update to the 2025-207 Plan, filed on Mar. 9, 2026. 5 The Companies will file the 2027 Plan Update with DEEP on Oct. 1, 2026, and resubmit as a budget reconciliation filing with DEEP on Mar. 1, 2027.
  6. Page 12 of 53

    continue to implement weatherization programs for both residential (market rate and income eligible), commercial, and small business customers. The Companies will continue to support electrification for all sectors, residential and commercial. 2026 Program Budgets and Goals In Tables II-1 and II-2 below, Eversource Gas provides a comparison of its proposed budgets, goals, and benefit-cost ratios for the 2026 program year, filed March 2, 2026. The 2025-2027 Plan represents a continued commitment to enhance energy efficiency in Connecticut, and also continues to leverage existing electric Energy Efficiency Fund funding for electric measures delivered by these programs to serve both natural gas and electric customers, and to optimize the use of Connecticut’s energy efficiency dollars. Table II-1: 2026 Eversource Gas Conservation Budget and Savings Goals
  7. Page 13 of 53

    Table II-2: 2026 Eversource Gas Conservation Budget and Savings Goals C. 2026 NATURAL GAS CONSERVATION PLAN DEVELOPMENT The Plan Pursuant to Connecticut General Statutes § 16-245m and § 16-32f, the Companies developed the 2025-2027 Plan with the advice and assistance of the Energy Efficiency Board (“EEB”) and its technical consultants. The EEB holds public meetings on a regular basis and hosts several public input sessions with the development of three-year plans and annual plan updates. Each triennial plan builds upon the momentum of the previous three-year term by making continuous improvements to C&LM program design. To ensure the utility delivers high-quality energy efficiency programs to Connecticut’s natural gas customers, Eversource leverages the experiences of its Energy Efficiency department. The department utilizes technical, procedural, tracking, accounting, and information technology (“IT”) systems to effectively manage, implement, and report out on the C&LM programs. In developing the current 2025-2027 Plan, Eversource worked with the other Electric and Natural Gas Companies, DEEP, the EEB, and other Connecticut stakeholders to determine the
  8. Page 14 of 53

    appropriate areas and levels of emphasis and funding to best serve customers’ energy needs. The EEB’s technical consultants also reviewed the 2025-2027 Plan and provided valuable insights and guidance during its development and throughout the term. Eversource monitors program results and, if deemed appropriate, modifies programs to reflect customer needs and market trends. The Companies use and evaluate industry- accepted guidelines, projects, programs, and economic assumptions to determine cost effectiveness. After implementation, projects are reviewed and inspected to ensure compliance with program rules. The 2025-2027 Plan builds upon lessons learned and recognizes some of the immediate challenges facing customers and adds new elements to further serve their needs. While the 20252027 Plan was designed to maximize energy and demand savings, Eversource monitors overall market response and program effectiveness and maintains the flexibility to reallocate under-spent program dollars to other programs. This flexibility allows Eversource to react swiftly to market conditions and maximize the achievement of cost-effective savings. The Electric Companies have a long and successful history of developing, deploying, and administering C&LM programs in Connecticut. The integration, where appropriate, of natural gas and electric programs makes it easier for customers to receive more services and benefits at a lower cost with greater convenience. These synergies allow the Companies to deliver a more streamlined approach to C&LM program delivery. For example, many of the same contractors can deliver services to both electric and natural gas customers; thereby leveraging existing resources to serve more customers. Combining C&LM program delivery also provides opportunities for cross-promotion to common customers resulting in more cost-effective efforts. A partnership of the Natural Gas Companies and Electric Companies allows coordinated energy efficiency services to be delivered and enhances the quality of the services provided to customers. The Natural Gas and Electric Companies’ synergies are further leveraged through the marketing and promotion of C&LM programs. Marketing efforts include bill inserts, direct mail, website links, some print advertising and trade shows, and association meetings. In addition, the Companies leverage the “Energize Connecticut” website to ensure consistent and statewide messaging to customers. As part of its oversight responsibility, Eversource monitors vendor performance and overall program results including customer satisfaction and market responsiveness. Eversource works with its Account Executives and the Customer Service organization to promote natural gas efficiency projects with customers. Eversource also utilizes the contractor and business community to maximize tactical marketing opportunities where appropriate (e.g., Manufacturing Alliance of Connecticut, Connecticut Business and Industry Association, Chambers of Commerce, various trade associations, and Energy Efficiency Department vendors).
  9. Page 15 of 53

    D. 2026 NATURAL GAS ENERGY EFFICIENCY PROGRAM ANALYSIS Cost Effectiveness The Companies use common benefit-cost (“B/C”) screening tools, consistent values and similar assumptions for key variables to develop and implement C&LM programs. The Companies use of common cost-effectiveness testing methodologies and savings assumptions allows the Authority, DEEP, the EEB, the EEB’s technical consultants, and others to compare the benefits, costs, and benefit/cost ratios (“BCRs”) on a common basis. All natural gas energy efficiency measures are evaluated within an integrated supply and demand planning framework to ensure programs are cost effective and yield positive net benefits to the customers. For the 2025-2027 Plan, the Companies have based the electric and fossil fuel avoided costs on a regional avoided energy supply cost study completed in 2024 for New England ("2024 AESC”)6. The transmission and distribution (electric) avoided costs are based on studies conducted by the Companies. For the 2028-2030 Plan, the Companies will use the avoided energy supply cost study to be completed in 2026 for New England (“2026 AESC”). The transmission and distribution (electric) avoided costs are based on studies conducted by the Companies. Avoided costs were estimated using the provided “User Interface” as part of the 2024 AESC study that allowed for the creation of avoided cost tables for specific states and scenarios. The New England energy efficiency program administrators sponsored the 2024 AESC. In addition, other non-utility parties (e.g., regulators and consultants) formed the Avoided Cost Study Group to oversee the development of the 2024 AESC. Previous iterations of an avoided cost study were conducted on a biennial basis. However, beginning in 2015, the AESC moved to a three-year cycle which coincides with the current three-year planning cycle in Connecticut. The development of the 2025-2027 Plan coincided with the release of the 2024 AESC. The Natural Gas Companies use the Connecticut Program Savings Documentation (“PSD”) manual to document energy savings assumptions and to highlight technical changes resulting from program evaluations and studies. For the C&LM programs, the Companies utilize the PSD’s provided engineering estimates, savings algorithms, and measure life estimates. The PSD also reflects the results of evaluations by providing realization rates to “true-up” savings. The 2026 PSD was filed with DEEP alongside the 2026 Plan Update on March 2, 2026 and utilizes the 2024 AESC. The Companies will file the 2027 PSD on October 1, 2026 in conjunction with the 2025-2027 Plan filing. 6 Synapse Energy Economics, Inc., Avoided Energy Supply Component in New England: 2024 Report, Feb. 7, 2024.
  10. Page 16 of 53

    SECTION III -- DEMAND Section III presents the overall demand forecast, including the results of the class-specific firm and non-firm forecasts, as well as information concerning the assumptions and methodologies used to generate these forecasts. The section is comprised of the following subsections, which detail the various components of the total demand forecast. Detailed model information is contained in the Appendix at the end of this section. Section III A. -- Reference Cas Forecast Results Section III B. -- Major Forecast Inputs Section III C. -- Modeling Approach and Development Appendix -- Econometric Model Output and Statistics A. REFERENCE CASE FORECAST RESULTS Background Total firm gas volumes include sales and transportation gas for the residential, firm commercial and industrial classes, and Special Contract customers. The non-firm volumes are composed of seasonal (non-heating season) and interruptible services to commercial, industrial, and electric generation customers. The overall reference case demand forecast represents the sum of separate, yet related, gas forecasts for each of the customer classes identified above. The Company developed firm customer-class sales and customer forecasts independently using sectorspecific forecasting models. A total of seven econometric models is estimated for the three sectors (residential, commercial, and industrial), which are described in detail later in this section. Three customer count models were estimated for the total population for each sector. Use per customer (UPC) models were estimated for the total population for residential and industrial sectors, while the commercial sector split comprehensive energy strategy (CES) and baseline populations into two use per customer models. The customer and use per customer results are multiplied together to obtain each class forecast. These forecasts are then adjusted for the impacts of out-of-model programs. These adjustments include estimates of the Mcf demand reductions of Company sponsored conservation and load management (“C&LM”) efforts and large new customer additions. The forecast of Special Contracts is developed from an examination of the recent behavior of these customers, adjusted for any known or anticipated changes in their contracts. For all of these Special Contract customers, Yankee Gas does not carry the Supplier of Last Resort (“SOLR”) obligation. The interruptible forecast is developed by examining the recent history of the sector. Excluded for the model forecasts are volumes associated with any off-system sales.

As listed on the current system

Corres. 10/01/2026 [26-10-03] (Eversource Energy) - Biennial Forecast of Natural Gas Demand and Supply

This filing on the current system (opens in a new tab)