A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Response to Motion No. 001Filed by Eversource Energy

Response type: Other

Part of

Docket 27-01-01Open

ADMINISTRATIVE PROCEEDING TO REVIEW THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY’S STANDARD SERVICE AND SUPPLIER OF LAST RESORT SERVICE 2027 PROCUREMENT RESULTS AND RATES

Type of filing
Response (Response to Motion No. 001)
Date filed
November 23, 2026
Filed by
Eversource Energy
Files
55
As listed on the current system: Response to Motion No.: 001 - 11/23/2026 (Eversource Energy) - Type Response = Other [27-01-01]

This filing on the current system (opens in a new tab)

Files

Text of Motion No. 2 DN. 27.01.01.Appl. Energy Supply Rates.pdf

Extracted from the file · 19,690 characters
Vincent P. Pace, Esq. Assistant General Counsel Legal Department E-mail: [email removed] November 23, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 27-01-01 - Administrative Proceeding to Review The Connecticut Light and Power Company d/b/a Eversource Energy’s Standard Service and Supplier of Last Resort Service 2027 Procurement Results and Rates Revised Motion for Adjustment to January 1, 2027 Energy Supply Rates Dear Mr. Gaudiosi: On November 17, 2026, The Connecticut Light and Power Company d/b/a Eversource Energy (“CL&P” or the “Company”) submitted Motion No. 1 for approval to adjust its January 1, 2027 Energy Supply Rates. On November 20, 2026, PURA denied Motion No. 1, directing the Company to refile the information and to include the following additional information (the “November 20 Ruling”). Specifically, PURA directed the Company to file in this docket a “set of proposed tariffs and supporting exhibits reflecting no adjustment to the NBFMCC” and a “complete set of supporting exhibits, including the weighting factors for each customer group used by the Company to calculate the service supply expense component of the GSC for SS load weighted averages, no later than Monday, November 23, 2026, by noon.” (Nov. 20, Ruling on Motion No. 1 at page 2.) In compliance with the above-quoted orders from the November 20 Ruling on Motion No. 1, the Company hereby submits this new Motion (which can be designated as Motion No. 2) that provides all of the information requested in the November 20 Ruling. 1 Accordingly, pursuant to Conn. Gen. Stat. §§ 16-19b and 16-244c, the August 20, 2008 decision in Docket No. 06-01-08RE02, DPUC Development and Review of Standard Service and Supplier of Last Resort Service - Protocol for Public Disclosure of Procurement Information (the “Decision”) and the November 20 Ruling on Motion No. 1, CL&P submits the attached new motion that identifies the proposed, new electric energy supply adjustments to the Generation Services Charge (“GSC”) and Bypassable Federally Mandated Congestion Charge (“BFMCC”) for Standard Service (“Standard Service”) and Supplier of Last Resort Service (“LRS”) effective January 1, 2027. 2 0F 1F 1 This new Motion is being filed because PURA stated that the “Authority denies Motion No. 1”. (Nov. 20 Ruling at 2.) This filing is submitted as a motion pursuant to the April 19, 2021 Procedural Order issued by the Authority in Docket No. 21-01-01, Administrative Proceeding to Review The Connecticut Light and Power Company d/b/a Eversource Energy’s Standard Service and Supplier of Last Resort Service 2021 Procurement Results and Rates, and other dockets. 2 In addition, in compliance with the November 20 Ruling on Motion No. 1, the Company is today submitting in the Company’s separate rate adjustment mechanism (“RAM”) docket, Docket No. 2601-03, “one set of proposed tariffs and supporting exhibits reflecting approval of the rate adjustment for NBFMCC rates”. (November 20 Ruling at 2.) The November 20 Ruling on Motion No. 1 directed this additional set of tariffs proposing a change to the NBFMCC rate to be filed in the separate RAM proceeding in Docket No. 26-01-03. (Id.) Under the oversight and with the approval of PURA’s Procurement Manager and with the participation of the Office of Consumer Counsel (“OCC”), CL&P purchases electricity from third party wholesale electric suppliers. The purchased electricity is passed through to customers at the cost paid by CL&P, with no markup, and is used to meet the needs of consumers who choose not to purchase their supply through licensed retail electric suppliers that sell electricity in Connecticut. The proposed, new energy supply rates identified in this filing result from recent procurements of energy from third-party wholesale electric suppliers on the basis of contracts ratified by PURA’s Procurement Manager and PURA in Docket No. 26-01-01, Administrative Proceeding to Review The Connecticut Light and Power Company’s d/b/a Eversource Energy’s Standard Service and Supplier of Last Resort Service 2025 Procurement Results and Rates. As PURA is aware – and as it has been informing consumers – the price of oil and natural gas around the world directly impacts the wholesale price of electricity in New England, particularly during the winter as the region is reliant on natural gas fired power plants to meet electricity needs. Due to the continuing volatility of natural gas prices, the impact of the conflict with Iran on energy markets, and the upcoming rate period including the two typically highest-priced months (January and February), the price of electric energy for Connecticut consumers will increase on January 1, 2027. No portion of the upcoming January 1, 2027 bill adjustment is driven by a change to distribution rates (i.e., the charge on the bill for CL&P’s employees to operate and maintain the poles, wires, substations, etc., that distribute electricity). This filing demonstrates that – due to typical increases in the cost of underlying commodity prices during winter months and resulting increases in the wholesale price of electric energy – the energy supply rate for LRS for industrial and large commercial customers will increase on January 1, 2027 compared to the current rate. The energy supply rates for residential and small business customers on Standard Service will also increase on January 1, 2027. The August 20, 2008 Decision requires CL&P to file these new energy supply rates now to provide competitive retail suppliers, who are licensed to sell electricity in our State, with prior notice so they can prepare their marketing and price offerings to consumers who can elect to purchase their electricity from a retail supplier instead of CL&P. No change has been made to the proposed Standard Service and LRS rates that CL&P identified in its November 17, 2026 filing of Motion No. 1. The only changes reflected in this new filing are CL&P has provided the weighting factors, exhibits and tariffs sheets it was ordered to provide in PURA’s November 20 Ruling. As PURA is aware, CL&P does not make any profit or markup on the sale of electric energy that it procures on behalf of customers who have not chosen a retail electric supplier. Instead, the energy supply rate for customers who purchase their supply from CL&P reflects the actual supply cost 2 CL&P pays to third-party sellers of wholesale electric market products or the actual commodity cost paid by the Company directly from the wholesale electric market, when and if needed. In addition, consistent with the rate changes proposed in the November 17, 2026 Motion No. 1, on an overall basis, this filing explains that there will be the following impact to the energy supply rates on January 1, 2027: • For all rates under Standard Service, customers on average will see an increase to the average Standard Service supply rate of approximately 27.8% on January 1st. • For all LRS customers combined, on average there will be a January 1st rate increase to the average LRS supply rate of approximately 38.7%. LRS customers are industrial and large commercial customers many of whom employ their own energy professionals. Nearly all LRS customers already purchase their energy supply from competitive retail suppliers, so only approximately 130 customer accounts currently purchase their LRS energy supply from CL&P. Additionally, in compliance with PURA’s direction to the Company in its May 19, 2023 Ruling on Motion No. 7 in Docket No. 23-01-01, Administrative Proceeding to Review The Connecticut Light and Power Company d/b/a Eversource Energy’s Standard Service and Supplier of Last Resort Service 2023 Procurement Results and Rates, CL&P is including as Attachment 1 hereto the weighting factors for each customer group used by the Company to calculate the service supply expense component of the GSC for Standard Service load weighted averages. 3 2F The Company’s November 17, 2026 Motion No. 1 identified the additional steps the Company has already taken or will used to proactively notify and educate customers about rate changes, and therefore, CL&P will not repeat that information in this filing. If PURA elects to convene an administrative or other proceeding concerning this filing, the Company will participate fully and constructively to answer any and all questions from PURA and stakeholders. Respectfully submitted, Vincent P. Pace Vincent P. Pace Jennifer E. Galiette Counsel for Eversource Energy cc: Service List Docket No. 23-01-01, Administrative Proceeding to Review The Connecticut Light and Power Company d/b/a Eversource Energy’s Standard Service and Supplier of Last Resort Service 2023 Procurement Results and Rates, Ruling on Motion No. 7 (May 19, 2023) (“the Authority directs Eversource to include the weighting factors for each customer group used by the Company to calculate the service supply expense component of the GSC for SS load weighted averages in all future SS filings in this above-referenced docket and in all subsequent SS dockets thereafter (i.e., 23-01-01, 24-01-01, 25-01-01, etc.)”) at 4. 3 3 STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY ADMINISTRATIVE PROCEEDING TO REVIEW THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY’S STANDARD SERVICE AND SUPPLIER OF LAST RESORT SERVICE 2027 PROCUREMENT RESULTS AND RATES : : : : : : : DOCKET NO. 27-01-01 NOVEMBER 23, 2026 REVISED MOTION TO ESTABLISH JANUARY 1, 2027 STANDARD SERVICE AND LAST RESORT SERVICE ENERGY SUPPLY RATES I. INTRODUCTION Pursuant to Conn. Gen. Stat. §§ 16-19b and 16-244c and the August 20, 2008 decision in Docket No. 06-01-08RE02, DPUC Development and Review of Standard Service and Supplier of Last Resort Service--Auction Approval, The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource” or the “Company”) is submitting this filing to the Public Utilities Regulatory Authority (“PURA”) to establish Eversource’s Standard Service (“SS”) and Last Resort Service (“LRS”) energy supply rates effective January 1, 2027. On November 17, 2026, CL&P submitted Motion No. 1 for approval to adjust its January 1, 2027 Energy Supply Rates. On November 20, 2026, PURA denied Motion No. 1, directing the Company to refile the information and to include the following additional information (the “November 20 Ruling”). Specifically, PURA directed the Company to file in this docket a “set of proposed tariffs and supporting exhibits reflecting no adjustment to the NBFMCC” and a “complete set of supporting exhibits, including the weighting factors for each customer group used by the Company to calculate the service supply expense component of the GSC for SS load weighted averages, no later than Monday, November 23, 2026, by noon.” (Nov. 20 Ruling on Motion No. 1 at page 2.) In compliance with the above-quoted orders from the November 20 Ruling on Motion No. 1, the Company hereby submits this new Motion (which can be designated as Motion No. 2) that provides all of the information requested in the November 20 Ruling. Importantly, this new Motion does not change any of the proposed Standard Service and LRS rates that were proposed in the November 17, 2026 filing of Motion No. 1. Instead, this new Motion is being filed because PURA stated that the “Authority denies Motion No. 1”, and this new Motion contains the weighting factors and revised tariffs that PURA’s November 20 Ruling on Motion No. 1 ordered the Company to file. II. PROPOSAL TO ESTABLISH STANDARD SERVICE AND LRS RATES EFFECTIVE JANUARY 1, 2027. Customers’ bills include power supply-related charges for “supplier services” that are collected through the Generation Services Charge (“GSC”), which recovers energy costs, and the Bypassable Federally Mandated Congestion Charge (“BFMCC”), which recovers costs including but not limited to costs for congestion and electrical line losses. The January 1, 2027 changes to the GSC and BFMCC rates are discussed in Section II (A) below. A. Supplier Service Rates for Standard Service and LRS: GSC & BFMCC Rates A portion of customers’ bills contains the generation services that are collected through the GSC and BFMCC rates. These costs are collected by Eversource and paid directly to thirdparty wholesale electric suppliers or are used to pay for the wholesale market electric products that are needed to provide energy service to customers. Eversource does not profit from any portion of these energy service costs. 2 This filing reflects the proposed retail Standard Service and LRS rates that will be effective on January 1, 2027 and are based on Eversource’s procurement activities performed in accordance with the approvals provided by PURA and its Procurement Manager in Docket No. 26-01-01, Administrative Proceeding to Review The Connecticut Light and Power Company d/b/a Eversource Energy’s Standard Service and Supplier of Last Resort Service 2026 Procurement Results and Rates. 1. Standard Service. In Docket No. 26-01-01, PURA approved Eversource’s Standard Service GSC and BFMCC rates for the six (6) month period of July 1, 2026 to December 31, 2026. The new GSC and BFMCC rates for the first six months of 2027 will have a combined charge of 14.634 ¢/kWh. The new average GSC rate for Standard Service customers will change from 11.660 ¢/kWh to 14.884 ¢/kWh and the BFMCC rate will change from -0.210 ¢/kWh to -0.250 ¢/kWh. (See Table 1 in Section III hereto.) Exhibit 4 provides the new BFMCC rate for the first six months of 2027. Exhibit 5, page 3 of 3 provides the new GSC rate for each rate class within Standard Service for the first six months of 2027. 2. Last Resort Service. With respect to LRS, Eversource’s proposed new GSC and BFMCC rates will have a combined charge of 18.476 ¢/kWh on average for the first three months of 2027. (See Table 2 in Section III hereto.) Under this proposal, the GSC will include prices that vary each month, but the average GSC rate for LRS customers over the first three months of 2027 will change from 13.529 ¢/kWh to 18.726 ¢/kWh, due to increased power supply costs as compared to the power supply costs paid during the fourth quarter of 2026; and the BFMCC rate will change from -0.210 3 ¢/kWh to -0.250 ¢/kWh. (See Table 2 in Section III hereto.) 4 The new GSC of 18.726 ¢/kWh plus 3F the BFMCC of -0.250 ¢/kWh equals 18.476 ¢/kWh. Exhibit 6, page 3 of 3, provides the new GSC rate for each rate class within LRS. Connecticut law no longer requires PURA to convene an administrative proceeding to incorporate these Procurement Manager-approved Request for Proposal results into the GSC and BFMCC rates, unless requested by the electric distribution company, an interested party or member of the public. PURA can, however, elect to convene an administrative proceeding to ask any questions it deems necessary or appropriate about this filing. B. Delivery Service Charges for Both Standard Service and LRS: Distribution, ESI, Transmission, CTA, SBC, C&LM, CAM, RDM, Renewables and NBFMCC Rates. This filing does not propose any changes to the delivery service rates on customer bills. PURA already approved changes to those rates, which went into effect on May 1, 2026, and further proposed adjustments to the NBFMCC and ESI would go into effect on December 1, 2026, if approved by PURA. 5 After December 1, 2026, the delivery service rates will next be 4F adjusted on May 1, 2027. See Docket No. 20-01-01, Administrative Proceeding To Review The Connecticut Light And Power Company's Standard Service And Supplier Of Last Resort Service 2020 Procurement Results And Rates, Dec. 2, 2020 Final Decision at 10. 4 LRS prices are provided on a monthly basis and this represents the weighted average price for LRS. See Doc. 26-01-03, Aug. 13, 2026 Decision at Page 2 (“The Authority issued the Interim Decision in the present docket on April 22, 2026 (Interim Decision), which directed the Company to adjust the rates for the NBFMCC, TAC, SBC, CTA, ESI, and RDM effective May 1, 2026, while indicating that the Authority may adjust the Company’s approved rates effective September 1, 2026, based on the Authority’s subsequent review in this proceeding.”); and Id. at Page 6 (stating “In this Decision, the Authority does not find any further adjustments necessary for the period September 1, 2026, through April 30, 2027, in accordance with the principles enumerated in General Statutes § 16-19e(a). The Authority directs Eversource to maintain the GSC, BFMCC, NBFMCC, TAC, SBC, CTA, ESI, and RDM rates in effect as of May 1, 2026.”). 5 4 III. TABLES REFLECTING PROPOSED JANUARY 1, 2027 ENERGY SUPPLY RATE CHANGES. The following table reflects the average proposed change to the GSC and BFMCC rates for all Standard Service customers combined (i.e., Rates 1, 5, 7, 18, etc.) for the first half of calendar year 2027. Exhibit 5, Page 3 of 3 provides the new GSC rate for each rate class within SS. T ABLE 1 AVERAGE CHANGE TO STANDARD SERVICE RATES (GSC & BFMCC ONLY) nd st Rate Component Current Avg. 2 Half Proposed Avg. 1 Half 2027 2026 Rate Rate (¢/kWh) (¢/kWh) GSC 11.660 14.884 B FMCC -0.210 -0.250 TOTAL 11.450 14.634 The following table reflects the average proposed change to the GSC and BFMCC rates for all LRS customers combined. LRS rates will change on a monthly basis during the first quarter of 2027 and they will vary from the monthly average provided below. Exhibit 6, Page 3 of 3 provides the new GSC rate for each rate class within LRS. T ABLE 2 AVERAGE CHANGE TO LAST RESORT SERVICE RATES (GSC & BFMCC ONLY) Rate Component GSC B FMCC TOTAL th Current Avg. 4 Quarter 2026 Rate (¢/kWh) 13.529 -0.210 13.319 st Proposed Avg. 1 Quarter 2027 Rate (¢/kWh) 18.726 -0.250 18.476 Consistent with page 8 of the August 20, 2008 decision in Docket No. 06-01-08RE02, DPUC Development and Review of Standard Service and Supplier of Last Resort Service Protocol For Public Disclosure of Procurement Information, Exhibit 5 hereto shows the January 5 1, 2027 GSC and BFMCC rate changes for each Standard Service customer class. Exhibit 6 hereto shows the January 1, 2027 GSC and BFMCC rate changes for each LRS customer class. IV. LIST OF EXHIBITS • Exhibit 1: Proposed Tariffs • Exhibit 2: Red-Lined Tariffs • Exhibit 3: Comparison of Current Rates vs Proposed Rates • Exhibit 4: New BFMCC Rate • Exhibit 5: New Standard Service GSC Rates • Exhibit 6: New LRS GSC Rates • Exhibit 7: Summary of Revenues and Average Rates • Exhibit 8: Standard Service Typical Bills • Exhibit 9: LRS Typical Bills o Attachment 1 to this filing contains the weighting factors {remainder intentionally left blank} 6 V. CONCLUSION Eversource respectfully requests that PURA: (i) approve Eversource’s proposed adjustments to its GSC and BFMCC rates effective January 1, 2027; and (ii) issue a final order by December 11, 2026 that approves Eversource’s revised tariff sheets. Respectfully submitted, THE CONNECTICUT LIGHT AND POWER COMPANY d/b/a EVERSOURCE ENERGY By: Vincent P. Pace Vincent P. Pace Jennifer E. Galiette 107 Selden Street Berlin, CT 06037 [phone removed] [email removed] [email removed] Its Attorneys CERTIFICATE OF SERVICE I hereby certify that, effective as of the date set forth below, I will have served the foregoing document upon each person designated on PURA’s official service list in this proceeding in accordance with Conn. Regs. § 16-1-15, as amended. Dated at Berlin, Connecticut this 23rd day of November 2026. Jennifer E. Galiette Jennifer E. Galiette 7

Text of Motion Filing Dated November 23, 2026 - Attachment 1.pdf

Extracted from the file · 747 characters
Year 2027 2027 2027 2027 2027 2027 Month Period Jan Feb Mar Apr May Jun 1H2027 1H2027 1H2027 1H2027 1H2027 1H2027 Overall Jan. - Jun. 2027 Weighting Weighting Factors By Customer Class LCI-Off RES-On RES-Off LCI-On 0.186180 0.204212 0.219950 0.223458 0.164085 0.168178 0.184002 0.182684 0.168288 0.163769 0.160867 0.164119 0.148245 0.144126 0.125395 0.132453 0.151721 0.157288 0.123763 0.135930 0.181481 0.162427 0.186023 0.161355 25.386% 74.614% 25.321% 74.679% SCI-On 0.194231 0.173120 0.163638 0.137870 0.136468 0.194673 25.726% SCI-Off 0.204000 0.173206 0.161276 0.140662 0.147113 0.173744 74.274% SL-On 0.442580 0.416348 0.140148 0.000924 0.000000 0.000000 4.576% SL-Off 0.130613 0.142015 0.113142 0.138045 0.088119 0.388067 95.424%

Text of Motion Filing Dated November 23, 2026 - Attachment 1.xlsx

Extracted from the file · 1,489 characters
[Sheet: Overall Weighting] Weighting Factors By Customer Class Year | Month | Period | LCI-On | LCI-Off | RES-On | RES-Off | SCI-On | SCI-Off | SL-On | SL-Off 2027 | Jan | 1H2027 | 0.18618008587218293 | 0.2042120985096966 | 0.21994987613985295 | 0.22345846681939027 | 0.1942305303149036 | 0.2039997288422164 | 0.44257984583245374 | 0.13061254643902756 2027 | Feb | 1H2027 | 0.16408497971109043 | 0.16817811938480123 | 0.18400194134566814 | 0.1826840692276933 | 0.17312017084776146 | 0.1732058816798496 | 0.41634758235718006 | 0.1420154598283707 2027 | Mar | 1H2027 | 0.16828773182912274 | 0.16376880714366648 | 0.16086741351765138 | 0.16411945473582829 | 0.16363830201646637 | 0.16127553554417334 | 0.14014842974129504 | 0.11314217705304495 2027 | Apr | 1H2027 | 0.14824533941118032 | 0.14412578828989842 | 0.12539484418428998 | 0.13245276153914745 | 0.13787001912136684 | 0.14066156162146082 | 0.0009241420690711557 | 0.138044718426965 2027 | May | 1H2027 | 0.1517212070118358 | 0.15728781958057 | 0.1237627791222314 | 0.1359298237645959 | 0.1364680648459498 | 0.14711285542304056 | 0 | 0.0881185016380589 2027 | Jun | 1H2027 | 0.18148065616458767 | 0.1624273670913672 | 0.18602314569030615 | 0.16135542391334476 | 0.1946729128535521 | 0.17374443688925928 | 0 | 0.38806659661453274 Overall Jan. - Jun. 2027 Weighting | 0.25386463367751233 | 0.7461353663224877 | 0.25320563167599147 | 0.7467943683240086 | 0.25726267299611216 | 0.7427373270038878 | 0.04575772466906446 | 0.9542422753309355

Text of Att CL&P 27-01-01 filing 11-23-26 Exhibits 3-9.pdf

Extracted from the file · 60,000 characters (the first 60,000 are kept)
EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 Rate 1 - Residential Electric Service 3 4 5 Customer Charge 6 Distribution 7 8 Total 9 10 11 Energy Charge All kWh 12 Distribution 13 Electric System Improvements 14 Revenue Decoupling Mechanism 15 Transmission 16 Conservation 17 Conservation Adjustment Mechanism 18 Renewable Energy 19 Systems Benefits Charge 20 Competitive Transition Assessment 21 FMCC-Delivery 22 FMCC-Generation 23 Generation Services 24 25 Total Page 1 of 18 Current Rate Proposed Rate Plus GET Diff vs Cur Rate $ 9.62 $ 8.97 $ 9.62 $ - $ 9.62 $ 8.97 $ 9.62 $ - $ 0.05844 0.02031 0.00011 0.05050 0.00600 0.00100 (0.00196) 0.00496 (0.01911) (0.00210) 0.11787 $ 0.05447 $ 0.02031 0.00011 0.05050 0.00600 0.00100 (0.00196) 0.00496 (0.01911) (0.00250) 0.15179 0.05844 $ 0.02031 0.00011 0.05050 0.00600 0.00100 (0.00196) 0.00496 (0.01911) (0.00250) 0.15179 (0.00040) 0.03392 $ 0.23602 $ 0.26557 0.26954 0.03352 $ $ % Chg 0.0% 14.2% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 Rate 5 - Residential Electric-Heat 3 4 5 Customer Charge 6 Distribution 7 8 Total 9 10 11 Energy Charge All kWh 12 Distribution 13 Electric System Improvements 14 Revenue Decoupling Mechanism 15 Transmission 16 Conservation 17 Conservation Adjustment Mechanism 18 Renewable Energy 19 Systems Benefits Charge 20 Competitive Transition Assessment 21 FMCC-Delivery 22 FMCC-Generation 23 Generation Services 24 25 Total Page 2 of 18 Current Rate Proposed Rate Plus GET Diff vs Cur Rate $ 23.75 $ 23.75 $ 23.75 $ - $ 23.75 $ 23.75 $ 23.75 $ - $ 0.03847 0.01717 0.00011 0.04901 0.00600 0.00100 (0.00196) 0.00496 (0.01840) (0.00210) 0.11787 $ 0.03425 $ 0.01717 0.00011 0.04901 0.00600 0.00100 (0.00196) 0.00496 (0.01840) (0.00250) 0.15179 0.03847 $ 0.01717 0.00011 0.04901 0.00600 0.00100 (0.00196) 0.00496 (0.01840) (0.00250) 0.15179 (0.00040) 0.03392 $ 0.21213 $ 0.24143 0.24565 0.03352 $ $ % Chg 0.0% 15.8% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 Page 3 of 18 Rate 7 - Residential Time-of-Day Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 9.62 $ 8.97 $ 9.62 $ - Total $ 9.62 $ 8.97 $ 9.62 $ - $ 0.05513 0.02031 0.00011 0.11741 0.00600 0.00100 (0.00196) 0.00496 (0.04443) (0.00210) 0.14339 $ 0.05138 $ 0.02031 0.00011 0.11741 0.00600 0.00100 (0.00196) 0.00496 (0.04443) (0.00250) 0.17793 0.05513 $ 0.02031 0.00011 0.11741 0.00600 0.00100 (0.00196) 0.00496 (0.04443) (0.00250) 0.17793 (0.00040) 0.03454 $ 0.29982 $ 0.33021 0.33396 $ 0.03414 $ 0.05513 0.02031 0.00011 0.02525 0.00600 0.00100 (0.00196) 0.00496 (0.00955) (0.00210) 0.10839 $ 0.05138 $ 0.02031 0.00011 0.02525 0.00600 0.00100 (0.00196) 0.00496 (0.00955) (0.00250) 0.14293 0.05513 $ 0.02031 0.00011 0.02525 0.00600 0.00100 (0.00196) 0.00496 (0.00955) (0.00250) 0.14293 (0.00040) 0.03454 $ 0.20754 $ 0.23793 0.24168 0.03414 Energy Charge On-Peak kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Total Energy Charge Off-Peak kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Total $ $ $ % Chg 0.0% 11.4% 16.4% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 Rate 18 - Controlled Water Heating 3 4 5 Customer Charge 6 Distribution 7 8 Total 9 10 11 Energy Charge All kWh 12 Distribution 13 Electric System Improvements 14 Revenue Decoupling Mechanism 15 Transmission 16 Conservation 17 Conservation Adjustment Mechanism 18 Renewable Energy 19 Systems Benefits Charge 20 Competitive Transition Assessment 21 FMCC-Delivery 22 FMCC-Generation 23 Generation Services 24 25 Total Page 4 of 18 Current Rate Proposed Rate Plus GET Diff vs Cur Rate $ 11.00 $ 11.00 $ 11.00 $ - $ 11.00 $ 11.00 $ 11.00 $ - $ 0.02351 0.01530 0.00011 0.04419 0.00600 0.00100 (0.00038) 0.00505 (0.01684) (0.00210) 0.11439 $ 0.01882 $ 0.01530 0.00011 0.04419 0.00600 0.00100 (0.00038) 0.00505 (0.01684) (0.00250) 0.14371 0.02351 $ 0.01530 0.00011 0.04419 0.00600 0.00100 (0.00038) 0.00505 (0.01684) (0.00250) 0.14371 (0.00040) 0.02932 $ 0.19023 $ 0.21446 0.21915 0.02892 $ $ % Chg 0.0% 15.2% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Page 5 of 18 Rate 27 Small Time-of-Day General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 44.00 $ 40.26 $ 44.00 $ - Total $ 44.00 $ 40.26 $ 44.00 $ - $ 14.22 3.78 6.42 1.47 $ 13.01 3.78 6.42 1.47 $ 14.22 3.78 6.42 1.47 $ - $ 25.89 $ 24.68 $ 25.89 $ - Demand Charge Greater Than 2 KW Distribution Electric System Improvements Transmission Competitive Transition Assessment Total Energy Charge On-Peak kWh Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00210) 0.13584 $ Energy Charge Off-Peak kWh Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.15223 $ 0.00011 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00210) 0.10584 $ 0.11310 $ 0.00011 $ 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00250) 0.16599 0.00011 $ 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00250) 0.16599 (0.00040) 0.03015 0.18198 0.18198 $ 0.02975 0.00011 $ 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00250) 0.13599 0.00011 $ 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00250) 0.13599 (0.00040) 0.03015 0.14285 0.14285 0.02975 $ $ $ % Chg 0.0% 0.0% 19.5% 26.3% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Page 6 of 18 Rate 27A Small Time-of-Day General Service Alternative Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 44.00 $ 40.26 $ 44.00 $ - Total $ 44.00 $ 40.26 $ 44.00 $ - $ 9.16 3.78 6.42 1.47 $ 8.38 3.78 6.42 1.47 $ 9.16 3.78 6.42 1.47 $ - $ 20.83 $ 20.05 $ 20.83 $ - $ 0.04126 0.00011 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00210) 0.13584 $ 0.04126 $ 0.00011 $ 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00250) 0.16599 0.04126 $ 0.00011 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00250) 0.16599 (0.00040) 0.03015 $ 0.19349 $ 0.22324 0.22324 $ 0.02975 $ 0.00922 0.00011 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00210) 0.10584 $ 0.00922 0.00011 $ 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00250) 0.13599 $0.00922 $ 0.00011 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00250) 0.13599 (0.00040) 0.03015 $ 0.12232 $ 0.15207 0.15207 0.02975 Demand Charge Greater Than 2 KW Distribution Electric System Improvements Transmission Competitive Transition Assessment Total Energy Charge On-Peak kWh Distribution Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total Energy Charge Off-Peak kWh Distribution Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total $ $ $ % Chg 0.0% 0.0% 15.4% 24.3% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 Rate 29 - Outdoor Recreation Lighting 3 4 5 Customer Charge 6 Distribution 7 8 Total 9 10 11 Energy Charge All kWh 12 Distribution 13 Electric System Improvements 14 Revenue Decoupling Mechanism 15 Transmission 16 Conservation 17 Conservation Adjustment Mechanism 18 Renewable Energy 19 Systems Benefits Charge 20 Competitive Transition Assessment 21 FMCC-Delivery 22 FMCC-Generation 23 Generation Services 24 25 Total Page 7 of 18 Current Rate Proposed Rate Plus GET Diff vs Cur Rate $ 30.00 $ 30.00 $ 30.00 $ - $ 30.00 $ 30.00 $ 30.00 $ - $ 0.12715 0.04292 0.00011 0.04419 0.00600 0.00100 (0.00037) 0.00505 (0.01684) (0.00210) 0.11439 $ 0.11398 $ 0.04292 0.00011 0.04419 0.00600 0.00100 (0.00037) 0.00505 (0.01684) (0.00250) 0.14371 0.12715 $ 0.04292 0.00011 0.04419 0.00600 0.00100 (0.00037) 0.00505 (0.01684) (0.00250) 0.14371 (0.00040) 0.02932 $ 0.32150 $ 0.33725 0.35042 0.02892 $ $ % Chg 0.0% 9.0% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Page 8 of 18 Rate 30 - Small General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 44.00 $ 40.26 $ 44.00 $ - Total $ 44.00 $ 40.26 $ 44.00 $ - $ 14.22 3.78 12.84 1.47 $ 13.01 3.78 12.84 1.47 $ 14.22 3.78 12.84 1.47 $ - $ 32.31 $ 31.10 $ 32.31 $ - Demand Charge Greater Than 2 KW Distribution Electric System Improvements Transmission Competitive Transition Assessment Total Energy Charge First 300 Hours Use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00210) 0.11439 $ Energy Charge Over 300 Hours Use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.10218 $ 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00210) 0.11439 $ 0.10218 $ 0.00011 $ 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 0.00011 $ 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 (0.00040) 0.02932 0.13110 0.13110 $ 0.02892 0.00011 $ 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 0.00011 $ 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 (0.00040) 0.02932 0.13110 0.13110 0.02892 $ $ $ % Chg 0.0% 0.0% 28.3% 28.3% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 35 36 37 38 39 40 41 42 43 44 Page 9 of 18 Rate 30A - Small General Service Alternative Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 44.00 $ 40.26 $ 44.00 $ - Total $ 44.00 $ 40.26 $ 44.00 $ - $ 9.16 3.78 12.84 1.47 $ 8.38 3.78 12.84 1.47 $ 9.16 3.78 12.84 1.47 $ - $ 27.25 $ 26.47 $ 27.25 $ - $ 0.01843 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00210) 0.11439 $ 0.01843 $ 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 0.01843 $ 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 (0.00040) 0.02932 $ 0.12061 $ 0.14953 0.14953 $ 0.02892 $ 0.01843 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00210) 0.11439 $ 0.01843 $ 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 0.01843 $ 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 (0.00040) 0.02932 $ 0.12061 $ 0.14953 0.14953 0.02892 Demand Charge Greater Than 2 KW Distribution Electric System Improvements Transmission Competitive Transition Assessment Total Energy Charge First 300 Hours Use Distribution Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total Energy Charge Over 300 Hours Use Distribution Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total $ $ $ % Chg 0.0% 0.0% 24.0% 24.0% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Page 10 of 18 Rate 35 Intermediate General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 270.00 $ 247.05 $ 270.00 $ - Total $ 270.00 $ 247.05 $ 270.00 $ - $ $ 8.69 2.22 $ $ 7.95 2.22 $ $ 8.69 2.22 $ $ - $ 10.91 $ 10.17 $ 10.91 $ - $ 14.58 1.78 $ 14.58 1.78 $ 14.58 1.78 $ - $ 16.36 $ 16.36 $ 16.36 $ - Distribution Demand Charge KW Distribution Electric System Improvements Total P/T Demand Charge KW Transmission Competitive Transition Assessment Total Energy Charge First 400 Hours Use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.00600 0.00100 (0.00034) (0.01559) (0.00210) 0.11439 $ Energy Charge Over 400 Hours Use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.10347 $ 0.00011 0.00600 0.00100 (0.00034) (0.01559) (0.00210) 0.11439 $ 0.10347 0.00011 $ 0.00600 0.00100 (0.00034) (0.01559) (0.00250) 0.14371 0.00011 $ 0.00600 0.00100 (0.00034) (0.01559) (0.00250) 0.14371 (0.00040) 0.02932 0.13239 0.13239 0.02892 $ 0.00011 0.00600 0.00100 (0.00034) (0.01559) (0.00250) 0.14371 $ 0.13239 $ 0.00011 0.00600 0.00100 (0.00034) (0.01559) (0.00250) 0.14371 $ 0.13239 % Chg 0.0% 0.0% 0.0% 28.0% (0.00040) 0.02932 $ 0.02892 28.0% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Page 11 of 18 Rate 37 Intermediate Time-Of-Day General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 270.00 $ 247.05 $ 270.00 $ - Total $ 270.00 $ 247.05 $ 270.00 $ - $ $ 8.69 2.22 $ $ 7.95 2.22 $ $ 8.69 2.22 $ $ - $ 10.91 $ 10.17 $ 10.91 $ - $ 7.29 1.78 $ 7.29 1.78 $ 7.29 1.78 $ - $ 9.07 $ 9.07 $ 9.07 $ - Distribution Demand Charge KW Distribution Electric System Improvements Total P/T Demand Charge KW Transmission Competitive Transition Assessment Total Energy Charge On-Peak kWh Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.04609 0.00600 0.00100 (0.00034) (0.03474) (0.00210) 0.13584 $ Energy Charge Off-Peak kWh Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.15186 $ 0.00011 0.01034 0.00600 0.00100 (0.00034) (0.00779) (0.00210) 0.10584 $ 0.11306 $ 0.00011 $ 0.04609 0.00600 0.00100 (0.00034) (0.03474) (0.00250) 0.16599 0.00011 $ 0.04609 0.00600 0.00100 (0.00034) (0.03474) (0.00250) 0.16599 (0.00040) 0.03015 0.18161 0.18161 $ 0.02975 0.00011 $ 0.01034 0.00600 0.00100 (0.00034) (0.00779) (0.00250) 0.13599 0.00011 $ 0.01034 0.00600 0.00100 (0.00034) (0.00779) (0.00250) 0.13599 (0.00040) 0.03015 0.14281 0.14281 0.02975 $ $ $ % Chg 0.0% 0.0% 0.0% 19.6% 26.3% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 Rate 40 - Church and School 3 4 5 Customer Charge 6 Distribution 7 8 Total 9 10 11 Energy Charge All kWh 12 Distribution 13 Electric System Improvements 14 Revenue Decoupling Mechanism 15 Transmission 16 Conservation 17 Conservation Adjustment Mechanism 18 Renewable Energy 19 Systems Benefits Charge 20 Competitive Transition Assessment 21 FMCC-Delivery 22 FMCC-Generation 23 Generation Services 24 25 Total Page 12 of 18 Current Rate Proposed Rate Plus GET Diff vs Cur Rate $ 65.00 $ 65.00 $ 65.00 $ - $ 65.00 $ 65.00 $ 65.00 $ - $ 0.04701 0.01637 0.00011 0.04286 0.00600 0.00100 (0.00038) 0.00505 (0.01586) (0.00210) 0.11439 $ 0.04170 $ 0.01637 0.00011 0.04286 0.00600 0.00100 (0.00038) 0.00505 (0.01586) (0.00250) 0.14371 0.04701 $ 0.01637 0.00011 0.04286 0.00600 0.00100 (0.00038) 0.00505 (0.01586) (0.00250) 0.14371 (0.00040) 0.02932 $ 0.21445 $ 0.23806 0.24337 0.02892 $ $ % Chg 0.0% 13.5% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Page 13 of 18 Rate 41 - Large Church and School Current Rate Customer Charge Proposed Rate Plus GET Diff vs Cur Rate Distribution $ 350.00 $ 350.00 $ 350.00 $ - Total $ 350.00 $ 350.00 $ 350.00 $ - $ 8.10 22.44 $ 8.10 22.44 $ 8.10 22.44 $ - $ 30.54 $ 30.54 $ 30.54 $ - $ 0.04717 0.01138 0.00011 0.06400 0.00600 0.00100 (0.00034) 0.00505 (0.03248) (0.00210) 0.13587 $ 0.04247 $ 0.01138 0.00011 0.06400 0.00600 0.00100 (0.00034) 0.00505 (0.03248) (0.00250) 0.16514 0.04717 $ 0.01138 0.00011 0.06400 0.00600 0.00100 (0.00034) 0.00505 (0.03248) (0.00250) 0.16514 (0.00040) 0.02927 $ 0.23566 $ 0.25983 0.26453 $ 0.02887 $ 0.04717 0.01138 0.00011 0.01419 0.00600 0.00100 (0.00034) 0.00505 (0.00720) (0.00210) 0.10587 $ 0.04247 $ 0.01138 0.00011 0.01419 0.00600 0.00100 (0.00034) 0.00505 (0.00720) (0.00250) 0.13514 0.04717 $ 0.01138 0.00011 0.01419 0.00600 0.00100 (0.00034) 0.00505 (0.00720) (0.00250) 0.13514 (0.00040) 0.02927 $ 0.18113 $ 0.20530 0.21000 0.02887 Demand Charge Over 300 KW Distribution Transmission Total Energy Charge On-Peak kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Total Energy Charge Off-Peak kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Total $ $ $ % Chg 0.0% 0.0% 12.3% 15.9% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Page 14 of 18 Rate 55 Intermediate TOD General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution $ 350.00 $ 350.00 $ 350.00 $ - Total $ 350.00 $ 350.00 $ 350.00 $ - $ 6.65 1.65 $ 6.05 1.65 $ 6.65 1.65 $ - $ 8.30 $ 7.70 $ 8.30 $ - $ 12.00 1.48 $ 12.00 1.48 $ 12.00 1.48 $ - $ 13.48 $ 13.48 $ 13.48 $ - Distribution Demand Charge kVA Distribution Electric System Improvements Total P/T Demand Charge kVA Transmission Competitive Transition Assessment Total Energy Charge On-Peak kWh Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.00600 0.00100 (0.00034) (0.03407) (0.00210) 0.14089 $ Energy Charge Off-Peak kWh Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.11149 $ 0.00011 0.00600 0.00100 (0.00034) (0.00773) (0.00210) 0.13313 $ 0.13007 0.00011 $ 0.00600 0.00100 (0.00034) (0.03407) (0.00250) 0.18875 0.00011 $ 0.00600 0.00100 (0.00034) (0.03407) (0.00250) 0.18875 (0.00040) 0.04786 0.15895 0.15895 0.04746 $ 0.00011 0.00600 0.00100 (0.00034) (0.00773) (0.00250) 0.18668 $ 0.18322 $ 0.00011 0.00600 0.00100 (0.00034) (0.00773) (0.00250) 0.18668 $ 0.18322 % Chg 0.0% 0.0% 0.0% 42.6% (0.00040) 0.05355 $ 0.05315 40.9% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Page 15 of 18 Rate 56 Intermediate TOD General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate % Chg Customer Charge Distribution $ 350.00 $ 350.00 $ 350.00 $ - Total $ 350.00 $ 350.00 $ 350.00 $ - $ $ 7.91 1.86 $ $ 7.19 1.86 $ $ 7.91 1.86 $ $ - $ 9.77 $ 9.05 $ 9.77 $ - $ 14.93 1.85 $ 14.93 1.85 $ 14.93 1.85 $ - $ 16.78 $ 16.78 $ 16.78 $ - Distribution Demand Charge kVA Distribution Electric System Improvements Total P/T Demand Charge kVA Transmission Competitive Transition Assessment Total Energy Charge On-Peak kWh Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.00600 0.00100 (0.00034) (0.03468) (0.00210) 0.14089 $ Energy Charge Off-Peak kWh Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.11088 $ 0.00011 0.00600 0.00100 (0.00034) (0.00767) (0.00210) 0.13313 $ 0.13013 $ 0.00011 $ 0.00600 0.00100 (0.00034) (0.03468) (0.00250) 0.18875 0.00011 $ 0.00600 0.00100 (0.00034) (0.03468) (0.00250) 0.18875 (0.00040) 0.04786 0.15834 0.15834 $ 0.04746 0.00011 $ 0.00600 0.00100 (0.00034) (0.00767) (0.00250) 0.18668 0.00011 $ 0.00600 0.00100 (0.00034) (0.00767) (0.00250) 0.18668 (0.00040) 0.05355 0.18328 0.18328 0.05315 $ $ $ 0.0% 0.0% 0.0% 42.8% 40.8% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 Rate 57 3 Large TOD General Service 4 5 6 Customer Charge 7 Distribution 8 Customer Months < 2000 kW 9 Customer Months 2000 - 5000 kW 10 Customer Months > 5000 kW 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Distribution Demand Charge kVA Distribution Electric System Improvements Total P/T Demand Charge kVA Transmission Competitive Transition Assessment Total Page 16 of 18 Current Rate $ $ $ 1,100.00 2,200.00 4,200.00 $ 1,100.00 2,200.00 4,200.00 $ $ $ 1,100.00 2,200.00 4,200.00 $ $ $ - $ $ 5.45 1.51 $ $ 4.93 1.51 $ 5.45 1.51 $ - $ 6.96 $ 6.44 $ 6.96 $ - $ 13.13 1.65 $ 13.13 1.65 $ 13.13 1.65 $ - $ 14.78 $ 14.78 $ 14.78 $ - Energy Charge On-Peak kWh Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total 0.00011 0.00600 0.00100 (0.00034) (0.03522) (0.00210) 0.14089 $ Energy Charge Off-Peak kWh Revenue Decoupling Mechanism Conservation Conservation Adjustment Mechanism Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services Total Proposed Rate Plus GET Diff vs Cur Rate 0.11034 $ 0.00011 0.00600 0.00100 (0.00034) (0.00759) (0.00210) 0.13313 $ 0.13021 $ 0.00011 $ 0.00600 0.00100 (0.00034) (0.03522) (0.00250) 0.18875 0.00011 $ 0.00600 0.00100 (0.00034) (0.03522) (0.00250) 0.18875 (0.00040) 0.04786 0.15780 0.15780 $ 0.04746 0.00011 $ 0.00600 0.00100 (0.00034) (0.00759) (0.00250) 0.18668 0.00011 $ 0.00600 0.00100 (0.00034) (0.00759) (0.00250) 0.18668 (0.00040) 0.05355 0.18336 0.18336 0.05315 $ $ $ % Chg 0.0% 0.0% 0.0% 0.0% 0.0% 43.0% 40.8% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Page 17 of 18 Rate 58 Large TOD General Service Current Rate Proposed Rate Plus GET Diff vs Cur Rate Customer Charge Distribution Customer Months < 2000 kW Customer Months 2000 - 5000 kW Customer Months > 5000 kW $ $ $ 1,100.00 2,200.00 4,200.00 $ $ $ 1,100.00 2,200.00 4,200.00 $ $ $ 1,100.00 2,200.00 4,200.00 $ $ $ - Distribution Demand Charge kVA Distribution Electric System Improvements $ $ 7.53 1.91 $ $ 6.83 1.91 $ $ 7.53 1.91 $ $ - $ 9.44 $ 8.74 $ 9.44 $ - $ 17.04 2.19 $ 17.04 2.19 $ 17.04 2.19 $ - $ 19.23 $ 19.23 $ 19.23 $ - Total P/T Demand Charge kVA Transmission Competitive Transition Assessment Total 26 27 Energy Charge On-Peak kWh 28 Revenue Decoupling Mechanism 29 Conservation 30 Conservation Adjustment Mechanism 31 Renewable Energy 32 Systems Benefits Charge 33 FMCC-Delivery 34 FMCC-Generation 35 Generation Services 36 37 Total 38 39 40 Energy Charge Off-Peak kWh 41 Revenue Decoupling Mechanism 42 Conservation 43 Conservation Adjustment Mechanism 44 Renewable Energy 45 Systems Benefits Charge 46 FMCC-Delivery 47 FMCC-Generation 48 Generation Services 49 50 Total 0.00011 0.00600 0.00100 (0.00034) (0.03455) (0.00210) 0.14089 $ 0.11101 $ 0.00011 0.00600 0.00100 (0.00034) (0.00739) (0.00210) 0.13313 $ 0.13041 $ 0.00011 $ 0.00600 0.00100 (0.00034) (0.03455) (0.00250) 0.18875 0.00011 $ 0.00600 0.00100 (0.00034) (0.03455) (0.00250) 0.18875 (0.00040) 0.04786 0.15847 0.15847 $ 0.04746 0.00011 $ 0.00600 0.00100 (0.00034) (0.00739) (0.00250) 0.18668 0.00011 $ 0.00600 0.00100 (0.00034) (0.00739) (0.00250) 0.18668 (0.00040) 0.05355 0.18356 0.18356 0.05315 $ $ $ % Chg 0.0% 0.0% 0.0% 0.0% 0.0% 42.8% 40.8% EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 2 3 4 5 6 7 8 Page 18 of 18 Rate 115 Unmetered Service Minimum Bill Charge Demand Charge Billed kWh 9 10 Rate 116 & 117 11 Street & Security Lighting $ $ $ Current Rate 6.60 11.86 0.19615 Rate $ $ $ See Exhibit 7, pages 18-20 6.60 11.86 0.22049 $ $ $ Proposed Rate Plus GET Diff vs Cur 6.60 $ 11.86 $ 0.22547 $ 0.02932 % Chg 0.0% 0.0% 14.9% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 EXHIBIT 4 2027 Bypassable FMCC Rate (January through June 2027) ( $000's) The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 1 of 1 Congestion and Losses ($12,911) Divide by January to June 2027 Sales (MWh) (See Note 1) 5,164,286 Proposed Bypassable FMCC Rate Note 1 - MWhs represent Standard Service and Last Resort Service sales only. (0.250) cents/kWh 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 EXHIBIT 5 CL&P Standard Service GSC Rates (January through June 2027) Page 1 of 3 The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 January - June 2027 On-Peak Cents Per kWh Off-Peak Total Residential Supply Price DPUC 3.5 c/kwh Diff GSC Trueup GSC Rate 15.322 17.863 (0.070) 17.793 15.225 14.363 (0.070) 14.293 15.249 15.249 (0.070) 15.179 14.416 16.669 (0.070) 16.599 14.450 13.669 (0.070) 13.599 14.441 14.441 (0.070) 14.371 Supply Price DPUC 3.0 c/kwh Diff GSC Trueup GSC Rate 14.215 16.584 (0.070) 16.514 14.390 13.584 (0.070) 13.514 14.345 14.345 (0.070) 14.275 Street Lighting Supply Price GSC Trueup GSC Rate 19.571 (0.070) 19.501 13.427 (0.070) 13.357 13.708 (0.070) 13.638 Small C&I Supply Price DPUC 3.0 c/kwh Diff GSC Trueup GSC Rate Large C&I 1 2 3 4 5 6 EXHIBIT 5 Rate Calculation for CL&P's Projected 2026 GSC Over-recovery and 2027 Other Expenses (January through December 2027) ( $000's) 7 The Connecticut Light & Power Company dba Eversource Energy 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 November 23, 2026 Docket No. 27-01-01 Projected 2026 GSC Under (Over)-recovery Page 2 of 3 $ (19,728) Projected 2027 Regulatory Commission Expense 4,647 Projected 2027 Alloc. Of Uncollectible Expenses 8,159 Projected 2027 Return on Negative Working Capital (729) Projected 2027 Return on Prepaid Regulatory Assessments 35 Projected 2027 Generation Information System (GIS) Expense 148 Total Identified (Over)/Under recovery* Divide by 2027 Sales (MWh) (See Note 1) GSC True up Rate to be Added to 2027 Supplier Rate Note 1 - MWhs represent Standard Service and Last Resort Service sales only. * Amount may not add due to rounding. $ (7,470) 10,661,556 (0.070) cents/kWh 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 EXHIBIT 5 CL&P Standard Service Total Generation (January through June 2027) Page 3 of 3 The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Rate/Description GSC Rate Standard Service (¢/kWh) FMCC-Generation Total Generation Rate Supply Rate (A) (B) C=A+B Rates 1 & 5 15.179 -0.250 14.929 Rate 7 On-Peak Off-Peak 17.793 14.293 -0.250 -0.250 17.543 14.043 Rates 18, 29, 30, 35, 40 & 115 14.371 -0.250 14.121 Rates 27 & 37 On-Peak Off-Peak 16.599 13.599 -0.250 -0.250 16.349 13.349 Rates 41, 55 & 56 (less than 500 kW) On-Peak Off-Peak 16.514 13.514 -0.250 -0.250 16.264 13.264 Rates 116 & 117 13.638 -0.250 13.388 Rate 119 14.275 -0.250 14.025 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 EXHIBIT 6 Last Resort Service GSC Rates (January through March 2027) Page 1 of 3 The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 On-Peak Cents Per kWh Off-Peak Total January 2027 Supply Price GSC Trueup GSC Rate 24.980 (0.070) 24.910 23.920 (0.070) 23.850 24.173 (0.070) 24.103 February 2027 Supply Price GSC Trueup GSC Rate 21.690 (0.070) 21.620 21.180 (0.070) 21.110 21.309 (0.070) 21.239 Supply Price GSC Trueup GSC Rate 11.040 (0.070) 10.970 11.160 (0.070) 11.090 11.129 (0.070) 11.059 Average January - March 2027 Supply Price GSC Trueup GSC Rate 18.945 (0.070) 18.875 18.738 (0.070) 18.668 18.790 (0.070) 18.720 March 2027 1 2 3 4 5 6 EXHIBIT 6 Rate Calculation for CL&P's Projected 2026 GSC Over-recovery and 2027 Other Expenses (January through December 2027) ( $000's) 7 The Connecticut Light & Power Company dba Eversource Energy 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 November 23, 2026 Docket No. 27-01-01 Projected 2026 GSC Under (Over)-recovery Page 2 of 3 $ (19,728) Projected 2027 Regulatory Commission Expense 4,647 Projected 2027 Alloc. Of Uncollectible Expenses 8,159 Projected 2027 Return on Negative Working Capital (729) Projected 2027 Return on Prepaid Regulatory Assessments 35 Projected 2027 Generation Information System (GIS) Expense 148 Total Identified (Over)/Under recovery* Divide by 2027 Sales (MWh) (See Note 1) GSC True up Rate to be Added to 2027 Supplier Rate Note 1 - MWhs represent Standard Service and Last Resort Service sales only. * Amount may not add due to rounding. $ (7,470) 10,661,556 (0.070) cents/kWh 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 EXHIBIT 6 Last Resort Service Total Generation (January through March 2027) Page 3 of 3 The Connecticut Light & Power Company dba Eversource Energy 23-Nov-26 Docket No. 27-01-01 Last Resort Service (¢/kWh) GSC FMCC-Generation Total Generation Rate/Description Rate Rate Supply Rate (A) (B) C=A+B Rate 39 January 2027 24.103 -0.250 23.853 February 2027 21.239 -0.250 20.989 March 2027 11.059 -0.250 10.809 Rates 41, 55 & 56 (greater than or equal to 500 kW) On-peak January 2027 February 2027 March 2027 Off-peak January 2027 February 2027 March 2027 Rates 57 & 58 On-peak January 2027 February 2027 March 2027 Off-peak January 2027 February 2027 March 2027 24.910 21.620 10.970 -0.250 -0.250 -0.250 24.660 21.370 10.720 23.850 21.110 11.090 -0.250 -0.250 -0.250 23.600 20.860 10.840 24.910 21.620 10.970 -0.250 -0.250 -0.250 24.660 21.370 10.720 23.850 21.110 11.090 -0.250 -0.250 -0.250 23.600 20.860 10.840 1 EXHIBIT 7 2 3 4 5 Rate Year 2020 Proposed Rate Revenue (With Distribution GET) The Connecticut Light & Power Company dba Eversource Energy 6 November 23, 2026 7 Docket No. 27-01-01 8 9 10 Rate Year 11 2020 12 Rate Billed Sales * 13 14 1 7,911,217 15 16 5 1,669,921 17 18 7 5,488 19 20 18 740 21 22 27 84,997 25 26 29 2,716 27 28 30 3,416,731 31 32 35 609,547 33 34 37 1,179,017 35 36 40 100,656 37 38 41 15,346 39 40 55 621,413 41 42 56 1,812,419 43 44 57 840,031 45 46 58 1,688,030 47 48 115 54,172 49 50 116 77,082 51 52 117 30,923 53 54 39 274,029 55 56 119 7,149 57 58 Total Retail 59 60 61 62 63 64 65 Page 1 of 22 Proposed Rate Revenues $(000) Current $ Distribution Revenue c/kWh 1,984,619 25.086 393,529 1,323 ESI RDM C&LM / CAM Renewable Energy Transmission SBC CTA Revenue c/kWh Revenue c/kWh Revenue c/kWh Revenue c/kWh Revenue c/kWh Revenue c/kWh Revenue 579,746 7.328 $ 160,677 2.031 $ 870 0.011 $ 47,467 0.600 $ 7,911 0.100 $ 399,516 5.050 $ (15,506) (0.196) 23.566 103,530 6.200 28,673 1.717 184 0.011 10,020 0.600 1,670 0.100 81,843 4.901 (3,273) (0.196) 8,283 24.099 357 6.506 111 2.031 1 0.011 33 0.600 5 0.100 267 4.874 (11) (0.196) 27 164 22.194 41 5.522 11 1.530 0 0.011 4 0.600 1 0.100 33 4.419 (0.3) (0.038) 3.7 18,810 22.131 4,561 5.366 1,192 1.402 9 0.011 510 0.600 85 0.100 3,903 4.592 (32) (0.038) 464 $ c/kWh Revenue c/kWh $ 0.496 39,240 FMCC-Delivery Revenue c/kWh (151,183) (1.911) 0.496 (30,727) 0.496 (101) 0.505 0.545 $ FMCC-Gen Generation Service Total Revenue c/kWh Revenue c/kWh Revenue c/kWh % Change (19,778) (0.250) $ 1,200,844 15.179 $ 2,249,803 28.438 13.36% (1.840) (4,175) (0.250) 253,477 15.179 449,505 26.918 14.22% (1.844) (14) (0.250) 833 15.185 1,510 27.513 14.17% (12) (1.684) (2) (0.250) 106 14.371 186 25.086 13.03% (1,432) (1.684) (212) (0.250) 12,292 14.461 21,339 25.106 13.44% $ 949 34.926 421 15.491 117 4.292 0 0.011 16 0.600 3 0.100 120 4.419 (1) (0.037) 14 0.505 (46) (1.684) (7) (0.250) 390 14.371 1,027 37.818 8.28% 781,288 22.867 219,683 6.430 44,400 1.299 376 0.011 20,500 0.600 3,417 0.100 150,817 4.414 (1,298) (0.038) 17,266 0.505 (57,538) (1.684) (8,542) (0.250) 491,018 14.371 880,100 25.759 12.65% 119,460 19.598 23,528 3.860 4,698 0.771 67 0.011 3,657 0.600 610 0.100 25,100 4.118 (207) (0.034) 3,064 0.503 (9,503) (1.559) (1,524) (0.250) 87,598 14.371 137,088 22.490 14.76% 229,995 19.507 43,058 3.652 9,932 0.842 130 0.011 7,074 0.600 1,179 0.100 48,876 4.146 (401) (0.034) 5,980 0.507 (18,376) (1.559) (2,948) (0.250) 170,566 14.467 265,071 22.482 15.25% 23,143 22.992 6,289 6.248 1,648 1.637 11 0.011 604 0.600 101 0.100 4,314 4.286 (38) (0.038) 508 0.505 (1,596) (1.586) (252) (0.250) 14,465 14.371 26,054 25.884 12.58% 3,288 21.423 848 5.526 175 1.138 2 0.011 92 0.600 15 0.100 581 3.785 (5) (0.034) 77 0.505 (221) (1.440) (38) (0.250) 2,205 14.369 3,731 24.310 13.48% 129,490 20.838 18,865 3.036 4,692 0.755 68 0.011 3,728 0.600 621 0.100 25,365 4.082 (211) (0.034) 3,128 0.503 (9,606) (1.546) (1,554) (0.250) 116,383 18.729 161,480 25.986 24.71% 378,119 20.863 56,549 3.120 12,378 0.683 199 0.011 10,875 0.600 1,812 0.100 74,064 4.086 (616) (0.034) 9,177 0.506 (27,790) (1.533) (4,531) (0.250) 339,407 18.727 471,523 26.016 24.70% 166,051 19.767 18,291 2.177 4,897 0.583 92 0.011 5,040 0.600 840 0.100 33,815 4.025 (286) (0.034) 4,249 0.506 (12,747) (1.517) (2,100) (0.250) 157,294 18.725 209,386 24.926 26.10% 334,535 19.818 39,312 2.329 9,123 0.540 186 0.011 10,128 0.600 1,688 0.100 66,357 3.931 (574) (0.034) 8,528 0.505 (24,963) (1.479) (4,220) (0.250) 316,073 18.724 421,638 24.978 26.04% 11,568 21.354 3,175 5.861 569 1.050 6 0.011 325 0.600 54 0.100 1,757 3.243 (21) (0.038) 274 0.505 (654) (1.207) (135) (0.250) 7,785 14.371 13,134 24.246 13.54% 28,156 36.527 14,301 18.553 2,802 3.635 8 0.011 462 0.600 77 0.100 2,348 3.046 (29) (0.037) 389 0.505 (873) (1.133) (193) (0.250) 10,512 13.638 29,806 38.668 5.86% 6,818 22.050 1,267 4.098 1,124 3.635 3 0.011 186 0.600 31 0.100 931 3.012 (11) (0.037) 156 0.505 (347) (1.121) (77) (0.250) 4,217 13.638 7,481 24.191 9.71% 43,929 16.031 1,414 0.516 426 0.155 30 0.011 1,644 0.600 274 0.100 3,666 1.338 (93) (0.034) 1,383 0.505 (1,271) (0.464) (685) (0.250) 51,298 18.720 58,085.7 21.197 32.23% 2,102 29.411 965 13.493 102 1.427 1 0.011 43 0.600 7 0.100 237 3.314 (2.4) (0.034) 36.1 0.505 (88) (1.233) (17.9) (0.250) 1,020 14.275 2,302 32.208 9.51% 20,401,626 $ 4,657,338 22.828 $ 1,136,201 5.569 $ 287,744 1.410 $ 2,244 0.011 $ 122,410 0.600 $ 20,402 0.100 $ 923,911 4.529 $ (22,617) (0.111) $ 102,249 0.501 $ (349,075) (1.711) $ (51,004) (0.250) $ 3,237,787 15.870 $ 5,410,251 26.519 16.17% Standard Service 15,165,703 $ 3,605,213 23.772 $ 1,001,770 6.605 $ 256,229 1.690 $ 1,668 0.011 $ 90,994 0.600 $ 15,166 0.100 $ 720,644 4.752 $ (20,836) (0.137) $ 75,783 0.500 $ (272,697) (1.798) $ (37,914) (0.250) $ 2,257,331 14.884 $ 4,088,138 26.956 13.40% Last Resort 5,235,923 $ 1,052,124 20.094 $ 2.567 $ 0.602 $ 576 0.011 $ 31,416 0.600 $ 0.100 $ 203,267 3.882 $ (1,780) (0.034) $ 26,466 0.505 $ (76,378) (1.459) $ (13,090) (0.250) $ 18.726 $ 1,322,113 25.251 25.661% 134,431 31,515 NOTE: * Rate Year 2020 Billed Sales (20,401,626) equals Forecasted Sales (20,434,799 MWh) minus Primary Metering Credits (33,173 MWh). 5,236 980,456 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 2 of 22 Rate 1 - Residential Electric Service Price Block Customer Charge Energy Charge Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services GET Refund Rate Year 2020 Units 12,205,228 Rate $ Current Rate Revenue $(000)'s 9.62 $ Rate $ Proposed Revenue $(000)'s 117,414 8.97 0.05844 0.02031 0.00011 0.05050 0.00600 0.00100 (0.00196) 0.00496 (0.01911) (0.00210) 0.11787 462,332 160,677 870 399,516 47,467 7,911 (15,506) 39,240 (151,183) (16,614) 932,495 0.05447 0.02031 0.00011 0.05050 0.00600 0.00100 (0.00196) 0.00496 (0.01911) (0.00250) 0.15179 -0.00005% (0.28) $ 109,481 GET Adjustment 6.8 % Rate $ Revenue $(000)'s 0.65 $ Proposed + GET Rate $ Revenue $(000)'s 7,933 9.62 117,414 0.00397 31,408 0.05844 0.02031 0.00011 0.05050 0.00600 0.00100 (0.00196) 0.00496 (0.01911) (0.00250) 0.15179 462,332 160,677 870 399,516 47,467 7,911 (15,506) 39,240 (151,183) (19,778) 1,200,844 -0.00005% (0.28) -0.00005% (0.28) 7,911,217 $ 1,984,619 430,924 160,677 870 399,516 47,467 7,911 (15,506) 39,240 (151,183) (19,778) 1,200,844 $ 2,210,463 $ 39,341 $ % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services $ Current Rate Revenue cents/kWh $ 579,746 7.328 160,677 2.031 870 0.011 399,516 5.050 0 0.000 47,467 0.600 7,911 0.100 (15,506) (0.196) 39,240 0.496 (151,183) (1.911) (16,614) (0.210) 932,495 11.787 $ 1,984,619 25.086 Proposed Revenue cents/kWh $ 540,405 6.831 160,677 2.031 870 0.011 399,516 5.050 0 0.000 47,467 0.600 7,911 0.100 (15,506) (0.196) 39,240 0.496 (151,183) (1.911) (19,778) (0.250) 1,200,844 15.179 $ 2,210,463 27.941 Proposed + GET Revenue cents/kWh $ 579,746 7.328 160,677 2.031 870 0.011 399,516 5.050 0.000 47,467 0.600 7,911 0.100 (15,506) (0.196) 39,240 0.496 (151,183) (1.911) (19,778) (0.250) 1,200,844 15.179 $ 2,249,803 28.438 $ 13.4% Difference cents/kWh (3,164) (0.040) 268,348 3.392 265,184 3.352 Revenue $ 2,249,803 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 3 of 22 Rate 5 - Residential Electric Heating Service Rate Year 2020 Units Price Block Customer Charge 1,654,253 Energy Charge Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services 1,669,921 Rate $ Current Rate Rev $(000)'s Rate $ Proposed Rev $(000)'s 23.75 39,289 23.75 39,289 0.03847 0.01717 0.00011 0.04901 0.00000 0.00600 0.00100 (0.00196) 0.00496 (0.01840) (0.00210) 0.11787 64,242 28,673 184 81,843 0 10,020 1,670 (3,273) 8,283 (30,727) (3,507) 196,834 0.03425 0.01717 0.00011 0.04901 0.00000 0.00600 0.00100 (0.00196) 0.00496 (0.01840) (0.00250) 0.15179 57,195 28,673 184 81,843 0 10,020 1,670 (3,273) 8,283 (30,727) (4,175) 253,477 $ 393,529 $ GET Adjustment 6.8 % Rate $ Rev $(000)'s 0.00422 442,458 Proposed + GET Rate $ Rev $(000)'s $7,040 $ 23.75 39,289 0.03847 0.01717 0.00011 0.04901 0.00000 0.00600 0.00100 (0.00196) 0.00496 (0.01840) (0.00250) 0.15179 64,242 28,673 184 81,843 10,020 1,670 (3,273) 8,283 (30,727) (4,175) 253,477 7,040 $ % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services $ $ Current Rate Revenue cents/kWh 103,530 6.200 28,673 1.717 184 0.011 81,843 4.901 0 0.000 10,020 0.600 1,670 0.100 (3,273) -0.196 8,283 0.496 (30,727) -1.840 (3,506.83) (0.210) 196,834 11.787 393,529 23.566 Proposed Revenue cents/kWh $ 96,483 5.778 28,673 1.717 184 0.011 81,843 4.901 0 0.000 10,020 0.600 1,670 0.100 (3,273) -0.196 8,283 0.496 (30,727) -1.840 (4,174.80) (0.250) 253,477 15.179 $ 442,458 26.496 $ $ Proposed + GET Revenue cents/kWh 103,530 6.200 28,673 1.717 184 0.011 81,843 4.901 0 0.000 10,020 0.600 1,670 0.100 (3,273) -0.196 8,283 0.496 (30,727) -1.840 (4,174.80) (0.250) 253,477 15.179 449,505 26.918 14.2% Difference cents/kWh $ (668) (0.040) 56,644 3.392 55,976 3.352 Revenue $ - $ 449,505 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 4 of 22 Rate 7 - Residential Time-of-Day Price Block Rate Year 2020 Units Customer Charge 5,666 Energy Charge On-Peak kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services 1,399 Energy Charge Off-Peak kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services 4,089 Rate $ Current Rate Rev $(000)'s Rate $ Proposed Rev $(000)'s GET Adjustment 6.8 % Rate $ Rev $(000)'s Proposed + GET Rate $ Rev $(000)'s 9.62 54.5 8.97 50.8 0.65 $3.7 9.62 54.5 0.05513 0.02031 0.00011 0.11741 0.00600 0.00100 (0.00196) 0.00496 (0.04443) (0.00210) 0.14339 77.1 28.4 0.2 164.2 8.4 1.4 (2.7) 6.9 (62.2) (2.9) 200.6 0.05138 0.02031 0.00011 0.11741 0.00600 0.00100 (0.00196) 0.00496 (0.04443) (0.00250) 0.17793 71.9 28.4 0.2 164.2 8.4 1.4 (2.7) 6.9 (62.2) (3.5) 248.9 0.00375 $5.2 0.05513 0.02031 0.00011 0.11741 0.00600 0.00100 (0.00196) 0.00496 (0.04443) (0.00250) 0.17793 77.1 28.4 0.2 164.2 8.4 1.4 (2.7) 6.9 (62.2) (3.5) 248.9 0.05513 0.02031 0.00011 0.02525 0.00600 0.00100 (0.00196) 0.00496 (0.00955) (0.00210) 0.10839 225.4 83.0 0.4 103.2 24.5 4.1 (8.0) 20.3 (39.1) (8.6) 443.2 0.05138 0.02031 0.00011 0.02525 0.00600 0.00100 (0.00196) 0.00496 (0.00955) (0.00250) 0.14293 210.1 83.0 0.4 103.2 24.5 4.1 (8.0) 20.3 (39.1) (10.2) 584.5 0.00375 $15.3 0.05513 0.02031 0.00011 0.02525 0.00600 0.00100 (0.00196) 0.00496 (0.00955) (0.00250) 0.14293 225.4 83.0 0.4 103.2 24.5 4.1 (8.0) 20.3 (39.1) (10.2) 584.5 $ 1,322.6 $ 1,485.6 $ 24.3 $ % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Current Rate Revenue cents/kWh $ 357.1 6.506 111.5 2.031 0.6 0.011 267.5 4.874 0.0 0.000 32.9 0.600 5.5 0.100 (10.8) -0.196 27.2 0.496 (101.2) -1.844 (11.5) (0.210) 643.8 11.731 $ 1,322.6 24.099 $ $ Proposed Revenue cents/kWh 332.8 6.064 111.5 2.031 0.6 0.011 267.5 4.874 0.0 0.000 32.9 0.600 5.5 0.100 (10.8) -0.196 27.2 0.496 (101.2) -1.844 (13.7) ($0.250) 833.3 15.185 1,485.6 27.071 $ $ Proposed + GET Revenue cents/kWh 357.1 6.506 111.5 2.031 0.6 0.011 267.5 4.874 0.0 0.000 32.9 0.600 5.5 0.100 (10.8) -0.196 27.2 0.496 (101.2) -1.844 (13.7) ($0.250) 833.3 15.185 1,509.9 27.513 14.2% Difference cents/kWh (2.2) (0.040) 189.6 3.454 187.4 3.414 Revenue $ 1,509.9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 5 of 22 Rate 18 - Controlled Water Heating Price Block Customer Charge Energy Charge Per kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Rate Year 2020 Units 2,134 Current Rate Rate $ Rev $(000) Proposed Rate $ GET Adjustment 8.5 % Rate $ Rev $(000) Rev $(000) 11.00 23.5 11.00 23.5 0.02351 0.01530 0.00011 0.04419 0.00000 0.00600 0.00100 (0.00038) 0.00505 (0.01684) (0.00210) 0.11439 17.4 11.3 0.1 32.7 0.0 4.4 0.7 (0.3) 3.7 (12.5) (1.55) 84.7 0.01882 0.01530 0.00011 0.04419 0.00000 0.00600 0.00100 (0.00038) 0.00505 (0.01684) (0.00250) 0.14371 13.9 11.3 0.1 32.7 0.0 4.4 0.7 (0.3) 3.7 (12.5) (1.85) 106.4 Proposed + GET Rate $ Rev $(000) 11.00 23.5 0.02351 0.01530 0.00011 0.04419 0.00600 0.00100 (0.00038) 0.00505 (0.01684) (0.00250) 0.14371 17.4 11.3 0.1 32.7 4.4 0.7 (0.3) 3.7 (12.5) (1.9) 106.4 740 $ 164.3 $ 0.00469 182.2 $3.5 $ 3.5 $ % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Current Rate Revenue cents/kWh $ 40.9 5.522 11.3 1.530 0.1 0.011 32.7 4.419 0.0 0.000 4.4 0.600 0.7 0.100 (0.3) -0.038 3.7 0.505 (12.5) -1.684 (1.55) (0.210) 84.7 11.439 $ 164.3 22.194 $ $ Proposed Revenue cents/kWh 37.4 5.053 11.3 1.530 0.1 0.011 32.7 4.419 0.0 0.000 4.4 0.600 0.7 0.100 (0.3) -0.038 3.7 0.505 (12.5) -1.684 (1.85) (0.250) 106.4 14.371 182.2 24.617 $ $ Proposed + GET Revenue cents/kWh 40.9 5.522 11.3 1.530 0.1 0.011 32.7 4.419 4.4 0.600 0.7 0.100 (0.3) (0.038) 3.7 0.505 (12.5) (1.684) (1.9) (0.250) 106.4 14.371 185.7 25.086 185.7 13.0% Difference Revenue cents/kWh $ (0.3) (0.040) 21.7 2.932 $ 21.4 2.892 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 6 of 22 Rate 27 - Small Time-of-Day General Service Price Block Customer Charge Rate Year 2020 Units Current Rate Rate $ Rev $(000) 2,898 Demand On-Peak GT 2KW Distribution Electric System Improvements Transmission Competitive Transition Assessment 315,360 Energy Charge On-Peak kWh Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services 24,432 Energy Charge Off-Peak kWh Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services 60,565 GET Refund Rate $ Proposed Rev $(000) GET Adjustment 8.5 % Rate $ Rev $(000) Proposed + GET Rate $ Rev $(000) 44.00 128 40.26 117 3.74 $11 44.00 128 14.22 3.78 6.42 1.47 4,484 1,192 2,025 464 13.01 3.78 6.42 1.47 4,103 1,192 2,025 464 1.21 $381 14.22 3.78 6.42 1.47 4,484 1,192 2,025 464 0.00011 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00210) 0.13584 3 1,209 147 24 (9) (922) (51) 3,319 0.00011 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00250) 0.16599 3 1,209 147 24 (9) (922) (61) 4,055 0.00011 0.04948 0.00600 0.00100 (0.00038) (0.03772) (0.00250) 0.16599 3 1,209 147 24 (9) (922) (61) 4,055 0.00011 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00210) 0.10584 7 669 363 61 (23) (510) (127) 6,410 0.00011 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00250) 0.13599 7 669 363 61 (23) (510) (151) 8,236 0.00011 0.01105 0.00600 0.00100 (0.00038) (0.00842) (0.00250) 0.13599 7 669 363 61 (23) (510) (151) 8,236 -1.103% (51) -1.103% -1.103% (51) $ 18,810 -1.103% $ 20,998 (51) $ 341 $ % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Current Rate Revenue cents/kWh 4,561 5.366 1,192 1.402 9 0.011 3,903 4.592 0 510 0.600 85 0.100 (32) (0.038) 464 0.545 (1,432) (1.684) (178.49) (0.210) 9,729 11.446 $ 18,810 22.131 $ $ $ Proposed Revenue cents/kWh 4,220 4.964 1,192 1.402 9 0.011 3,903 4.592 0 510 0.600 85 0.100 (32) (0.038) 464 0.545 (1,432) (1.684) (212) (0.250) 12,292 14.461 20,998 24.704 $ $ Proposed + GET Revenue cents/kWh 4,561 5.366 1,192 1.402 9 0.011 3,903 4.592 0 0.000 510 0.600 85 0.100 (32) -0.038 464 0.545 (1,432) -1.684 (212) (0.250) 12,292 14.461 21,339 25.106 21,339 13.4% Difference Revenue cents/kWh (34) (0.040) 2,563 3.015 $ 2,529 2.975 $ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 7 of 22 Rate 29 - Outdoor Recreation Lighting Price Block Rate Year 2020 Units Customer Charge 2,513 Charge Per kWh Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services 2,716 Current Rate Rate $ Rev $(000) Rate $ Proposed Rev $(000) 30.00 75.4 30.00 75.4 0.12715 0.04292 0.00011 0.04419 0.00600 0.00100 (0.00037) 0.00505 (0.01684) (0.00210) 0.11439 345.4 116.6 0.3 120.0 16.3 2.7 (1.0) 13.7 (45.7) (5.7) 310.7 0.11398 0.04292 0.00011 0.04419 0.00600 0.00100 (0.00037) 0.00505 (0.01684) (0.00250) 0.14371 309.6 116.6 0.3 120.0 16.3 2.7 (1.0) 13.7 (45.7) (6.8) 390.3 $ 948.6 $ GET Adjustment 8.5 % Rate $ Rev $(000) 0.01317 991.4 Proposed + GET Rate $ Rev $(000) $35.8 $ 30.00 75.4 0.12715 0.04292 0.00011 0.04419 0.00600 0.00100 (0.00037) 0.00505 (0.01684) (0.00250) 0.14371 345.4 116.6 0.3 120.0 16.3 2.7 (1.0) 13.7 (45.7) (6.8) 390.3 35.8 $ % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Current Rate Revenue cents/kWh $ 420.7 15.491 116.6 4.292 0.3 0.011 120.0 4.419 0.0 16.3 0.600 2.7 0.100 (1.0) (0.037) 13.7 0.505 (45.7) (1.684) (5.70) (0.210) 310.7 11.439 $ 948.6 34.926 Proposed Revenue cents/kWh $ 385.0 14.174 116.6 4.292 0.3 0.011 120.0 4.419 0.0 16.3 0.600 2.7 0.100 (1.0) (0.037) 13.7 0.505 (45.7) (1.684) (6.79) (0.250) 390.3 14.371 $ 991.4 36.501 $ $ Proposed + GET Revenue cents/kWh 420.7 15.491 116.6 4.292 0.3 0.011 120.0 4.419 0.0 16.3 0.600 2.7 0.100 (1.0) (0.037) 13.7 0.505 (45.7) (1.684) (6.79) (0.250) 390.3 14.371 1,027.2 37.818 $ 8.3% Difference cents/kWh (1) (0.040) 80 2.932 78.6 2.892 Revenue $ 1,027.2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 8 of 22 Rate 30 - Small General Service Price Block Rate Year 2020Units Customer Charge 1,219,949 Demand Charge Over 2KW Distribution Electric System Improvements Transmission Competitive Transition Assessment 11,745,906 KW Credit - Energy Charge First 300 Hours use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services 2,917,088 Energy Charge Over 300 Hours Use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services 499,643 GET Refund Current Rate Rate $ Rev $(000) Rate $ Proposed Rev $(000) GET Adjustment 8.5 % Rate $ Rev $(000) Proposed + GET Rate $ Rev $(000) 44.00 53,678 40.26 49,115 3.74 $4,563 44.00 53,678 14.22 3.78 12.84 1.47 167,027 44,400 150,817 17,266 13.01 3.78 12.84 1.47 152,814 44,400 150,817 17,266 1.21 $14,196 14.22 3.78 12.84 1.47 167,027 44,400 150,817 17,266 (0.20) - (0.20) - (0.20) - 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00210) 0.11439 321 17,503 2,917 (1,108) (49,124) (6,126) 333,686 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 321 17,503 2,917 (1,108) (49,124) (7,293) 419,215 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 321 17,503 2,917 (1,108) (49,124) (7,293) 419,215 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00210) 0.11439 55 2,998 500 (190) (8,414) (1,049) 57,154 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 55 2,998 500 (190) (8,414) (1,249) 71,804 0.00011 0.00600 0.00100 (0.00038) (0.01684) (0.00250) 0.14371 55 2,998 500 (190) (8,414) (1,249) 71,804 (1,021) -0.46% -0.46% $ 781,288 -0.46% $ 862,346 (1,021) $ -0.46% 17,737 % Change Functional Category Distribution Electric System Improvements Revenue Decoupling Mechanism Transmission Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge Competitive Transition Assessment FMCC-Delivery FMCC-Generation Generation Services Current Rate Revenue cents/kWh $ 219,683 6.430 44,400 1.299 376 0.011 150,817 4.414 0 20,500 0.600 3,417 0.100 (1,298) (0.038) 17,266 0.505 (57,538) (1.684) (7,175.14) (0.210) 390,840 11.439 $ 781,288 22.867 Proposed Revenue cents/kWh $ 201,929 5.910 $ 44,400 1.299 376 0.011 150,817 4.414 0 20,500 0.600 3,417 0.100 (1,298) (0.038) 17,266 0.505 (57,538) (1.684) (8,541.83) (0.250) 491,018 14.371 $ 862,346 25.239 Proposed + GET Revenue cents/kWh $ 219,683 6.430 $ 44,400 1.299 376 0.011 150,817 4.414 0 20,500 0.600 3,417 0.100 (1,298) (0.038) 17,266 0.505 (57,538) (1.684) (8,541.83) (0.250) 491,018 14.371 $ 880,100 25.759 (1,021) $ 880,100 12.6% Difference Revenue cents/kWh $ (1,367) (0.040) 100,179 2.932 $ 98,812 2.892 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 EXHIBIT 7 RATE YEAR ENDING 2020 WORKPAPERS The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 Page 9 of 22 Rate 35 - Intermediate General Electric Service Price Block Customer Charge Rate Year 2020 Units 19,830 Distribution Demand KW Distribution Electric System Improvements 2,116,269 P/T Demand KW Transmission Competitive Transition Assessment 1,721,515 KW Credit 7,624 Energy Charge First 400 Hours use Revenue Decoupling Mechanism Conservation Conservation Adjustment Mech. Renewable Energy Systems Benefits Charge FMCC-Delivery FMCC-Generation Generation Services 546,677 Energy Charge Over 400 Hours Use Revenue Decoupling Me

Text of Att CL&P 27-01-01 filing 11-23-26 Exhibits 3-9.xlsx

Extracted from the file · 60,000 characters (the first 60,000 are kept)
[Sheet: Exh 3] EXHIBIT 3 Comparison of Current Rates vs Proposed Rates The Connecticut Light & Power Company dba Eversource Energy November 23, 2026 Docket No. 27-01-01 1 | Page 1 of 18 2 | Rate 1 - Residential Electric Service 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 9.62 | 8.97 | 9.62 | 0 7 8 | Total | 9.62 | 8.97 | 9.62 | 0 | 0 9 10 11 | Energy Charge All kWh 12 | Distribution | 0.05844 | 0.05447 | 0.05844 | 0 13 | Electric System Improvements | 0.02031 | 0.02031 | 0.02031 | 0 14 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 15 | Transmission | 0.0505 | 0.0505 | 0.0505 | 0 16 | Conservation | 0 | 0 | 0 | 0 17 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 18 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 19 | Systems Benefits Charge | -0.00196 | -0.00196 | -0.00196 | 0 20 | Competitive Transition Assessment | 0.00496 | 0.00496 | 0.00496 | 0 21 | FMCC-Delivery | -0.01911 | -0.01911 | -0.01911 | 0 22 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 23 | Generation Services | 0.11787 | 0.15179 | 0.15179 | 0.033920000000000006 24 25 | Total | 0.23602 | 0.26557000000000003 | 0.26954 | 0.03352000000000001 | 0.14202186255402083 1 | Page 2 of 18 2 | Rate 5 - Residential Electric-Heat 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 23.75 | 23.75 | 23.75 | 0 7 8 | Total | 23.75 | 23.75 | 23.75 | 0 | 0 9 10 11 | Energy Charge All kWh 12 | Distribution | 0.03847 | 0.03425 | 0.03847 | 0 13 | Electric System Improvements | 0.01717 | 0.01717 | 0.01717 | 0 14 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 15 | Transmission | 0.04901 | 0.04901 | 0.04901 | 0 16 | Conservation | 0 | 0 | 0 | 0 17 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 18 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 19 | Systems Benefits Charge | -0.00196 | -0.00196 | -0.00196 | 0 20 | Competitive Transition Assessment | 0.00496 | 0.00496 | 0.00496 | 0 21 | FMCC-Delivery | -0.0184 | -0.0184 | -0.0184 | 0 22 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 23 | Generation Services | 0.11787 | 0.15179 | 0.15179 | 0.033920000000000006 24 25 | Total | 0.21212999999999999 | 0.24143000000000003 | 0.24565 | 0.03352000000000001 | 0.15801631075284028 1 | Page 3 of 18 2 | Rate 7 - Residential Time-of-Day 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 9.62 | 8.97 | 9.62 | 0 7 8 | Total | 9.62 | 8.97 | 9.62 | 0 | 0 9 10 11 | Energy Charge On-Peak kWh 12 | Distribution | 0.05513 | 0.05138 | 0.05513 | 0 13 | Electric System Improvements | 0.02031 | 0.02031 | 0.02031 | 0 14 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 15 | Transmission | 0.11741 | 0.11741 | 0.11741 | 0 16 | Conservation | 0 | 0 | 0 | 0 17 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 18 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 19 | Systems Benefits Charge | -0.00196 | -0.00196 | -0.00196 | 0 20 | Competitive Transition Assessment | 0.00496 | 0.00496 | 0.00496 | 0 21 | FMCC-Delivery | -0.04443 | -0.04443 | -0.04443 | 0 22 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 23 | Generation Services | 0.14339 | 0.17793 | 0.17793 | 0.034540000000000015 24 25 | Total | 0.29982000000000003 | 0.33021 | 0.33396000000000003 | 0.03414000000000002 | 0.11386832099259547 26 27 28 | Energy Charge Off-Peak kWh 29 | Distribution | 0.05513 | 0.05138 | 0.05513 | 0 30 | Electric System Improvements | 0.02031 | 0.02031 | 0.02031 | 0 31 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 32 | Transmission | 0.02525 | 0.02525 | 0.02525 | 0 33 | Conservation | 0 | 0 | 0 | 0 34 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 35 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 36 | Systems Benefits Charge | -0.00196 | -0.00196 | -0.00196 | 0 37 | Competitive Transition Assessment | 0.00496 | 0.00496 | 0.00496 | 0 38 | FMCC-Delivery | -0.00955 | -0.00955 | -0.00955 | 0 39 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 40 | Generation Services | 0.10839 | 0.14293 | 0.14293 | 0.03454 41 42 | Total | 0.20754 | 0.23793 | 0.24168 | 0.034140000000000004 | 0.1644984099450708 1 | Page 4 of 18 2 | Rate 18 - Controlled Water Heating 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 11 | 11 | 11 | 0 7 8 | Total | 11 | 11 | 11 | 0 | 0 9 10 11 | Energy Charge All kWh 12 | Distribution | 0.02351 | 0.01882 | 0.02351 | 0 13 | Electric System Improvements | 0.0153 | 0.0153 | 0.0153 | 0 14 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 15 | Transmission | 0.04419 | 0.04419 | 0.04419 | 0 16 | Conservation | 0 | 0 | 0 | 0 17 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 18 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 19 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 20 | Competitive Transition Assessment | 0.00505 | 0.00505 | 0.00505 | 0 21 | FMCC-Delivery | -0.01684 | -0.01684 | -0.01684 | 0 22 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 23 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 24 25 | Total | 0.19022999999999998 | 0.21445999999999998 | 0.21914999999999998 | 0.028919999999999998 | 0.1520264942438101 1 | Page 5 of 18 2 | Rate 27 3 | Small Time-of-Day General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution | 44 | 40.26 | 44 | 0 8 9 | Total | 44 | 40.26 | 44 | 0 | 0 10 11 12 | Demand Charge Greater Than 2 KW 13 | Distribution | 14.22 | 13.01 | 14.22 | 0 14 | Electric System Improvements | 3.78 | 3.78 | 3.78 | 0 15 | Transmission | 6.42 | 6.42 | 6.42 | 0 16 | Competitive Transition Assessment | 1.47 | 1.47 | 1.47 | 0 17 18 | Total | 25.89 | 24.68 | 25.89 | 0 | 0 19 20 21 | Energy Charge On-Peak kWh 22 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 23 | Transmission | 0.04948 | 0.04948 | 0.04948 | 0 24 | Conservation | 0 | 0 | 0 | 0 25 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 26 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 27 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 28 | FMCC-Delivery | -0.03772 | -0.03772 | -0.03772 | 0 29 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 30 | Generation Services | 0.13584 | 0.16599 | 0.16599 | 0.03015000000000001 31 32 | Total | 0.15223 | 0.18198 | 0.18198 | 0.02975000000000001 | 0.19542797083360708 33 34 35 | Energy Charge Off-Peak kWh 36 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 37 | Transmission | 0.01105 | 0.01105 | 0.01105 | 0 38 | Conservation | 0 | 0 | 0 | 0 39 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 40 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 41 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 42 | FMCC-Delivery | -0.00842 | -0.00842 | -0.00842 | 0 43 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 44 | Generation Services | 0.10584 | 0.13599 | 0.13599 | 0.030149999999999996 45 46 | Total | 0.1131 | 0.14285 | 0.14285 | 0.029749999999999995 | 0.26304155614500435 1 | Page 6 of 18 2 | Rate 27A 3 | Small Time-of-Day General Service Alternative 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution | 44 | 40.26 | 44 | 0 8 9 | Total | 44 | 40.26 | 44 | 0 | 0 10 11 12 | Demand Charge Greater Than 2 KW 13 | Distribution | 9.16 | 8.38 | 9.16 | 0 14 | Electric System Improvements | 3.78 | 3.78 | 3.78 | 0 15 | Transmission | 6.42 | 6.42 | 6.42 | 0 16 | Competitive Transition Assessment | 1.47 | 1.47 | 1.47 | 0 17 18 | Total | 20.83 | 20.049999999999997 | 20.83 | 0 | 0 19 20 21 | Energy Charge On-Peak kWh 22 | Distribution | 0.04126 | 0.04126 | 0.04126 | 0 23 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 24 | Transmission | 0.04948 | 0.04948 | 0.04948 | 0 25 | Conservation | 0 | 0 | 0 | 0 26 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 27 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 28 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 29 | FMCC-Delivery | -0.03772 | -0.03772 | -0.03772 | 0 30 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 31 | Generation Services | 0.13584 | 0.16599 | 0.16599 | 0.03015000000000001 32 33 | Total | 0.19349 | 0.22324 | 0.22324 | 0.02975000000000001 | 0.1537547160059951 34 35 36 | Energy Charge Off-Peak kWh 37 | Distribution | 0.00922 | 0.00922 | 0.00922 | 0 38 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 39 | Transmission | 0.01105 | 0.01105 | 0.01105 | 0 40 | Conservation | 0 | 0 | 0 | 0 41 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 42 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 43 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 44 | FMCC-Delivery | -0.00842 | -0.00842 | -0.00842 | 0 45 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 46 | Generation Services | 0.10584 | 0.13599 | 0.13599 | 0.030149999999999996 47 48 | Total | 0.12232000000000001 | 0.15207 | 0.15207 | 0.029749999999999995 | 0.2432145192936559 1 | Page 7 of 18 2 | Rate 29 - Outdoor Recreation Lighting 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 30 | 30 | 30 | 0 7 8 | Total | 30 | 30 | 30 | 0 | 0 9 10 11 | Energy Charge All kWh 12 | Distribution | 0.12715 | 0.11398000000000001 | 0.12715 | 0 13 | Electric System Improvements | 0.04292 | 0.04292 | 0.04292 | 0 14 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 15 | Transmission | 0.04419 | 0.04419 | 0.04419 | 0 16 | Conservation | 0 | 0 | 0 | 0 17 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 18 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 19 | Systems Benefits Charge | -0.00037 | -0.00037 | -0.00037 | 0 20 | Competitive Transition Assessment | 0.00505 | 0.00505 | 0.00505 | 0 21 | FMCC-Delivery | -0.01684 | -0.01684 | -0.01684 | 0 22 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 23 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 24 25 | Total | 0.3215 | 0.33725000000000005 | 0.35042 | 0.028919999999999998 | 0.08995334370139974 1 | Page 8 of 18 2 | Rate 30 - Small General Service 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 44 | 40.26 | 44 | 0 7 8 | Total | 44 | 40.26 | 44 | 0 | 0 9 10 11 | Demand Charge Greater Than 2 KW 12 | Distribution | 14.22 | 13.01 | 14.22 | 0 13 | Electric System Improvements | 3.78 | 3.78 | 3.78 | 0 14 | Transmission | 12.84 | 12.84 | 12.84 | 0 15 | Competitive Transition Assessment | 1.47 | 1.47 | 1.47 | 0 16 17 | Total | 32.31 | 31.099999999999998 | 32.31 | 0 | 0 18 19 20 | Energy Charge First 300 Hours Use 21 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 22 | Conservation | 0 | 0 | 0 | 0 23 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 24 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 25 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 26 | FMCC-Delivery | -0.01684 | -0.01684 | -0.01684 | 0 27 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 28 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 29 30 | Total | 0.10218 | 0.1311 | 0.1311 | 0.028919999999999998 | 0.2830299471520845 31 32 33 | Energy Charge Over 300 Hours Use 34 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 35 | Conservation | 0 | 0 | 0 | 0 36 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 37 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 38 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 39 | FMCC-Delivery | -0.01684 | -0.01684 | -0.01684 | 0 40 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 41 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 42 43 | Total | 0.10218 | 0.1311 | 0.1311 | 0.028919999999999998 | 0.2830299471520845 1 | Page 9 of 18 2 | Rate 30A - Small General Service Alternative 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 44 | 40.26 | 44 | 0 7 8 | Total | 44 | 40.26 | 44 | 0 | 0 9 10 11 | Demand Charge Greater Than 2 KW 12 | Distribution | 9.16 | 8.38 | 9.16 | 0 13 | Electric System Improvements | 3.78 | 3.78 | 3.78 | 0 14 | Transmission | 12.84 | 12.84 | 12.84 | 0 15 | Competitive Transition Assessment | 1.47 | 1.47 | 1.47 | 0 16 17 | Total | 27.25 | 26.47 | 27.25 | 0 | 0 18 19 20 | Energy Charge First 300 Hours Use 21 | Distribution | 0.01843 | 0.01843 | 0.01843 | 0 22 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 23 | Conservation | 0 | 0 | 0 | 0 24 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 25 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 26 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 27 | FMCC-Delivery | -0.01684 | -0.01684 | -0.01684 | 0 28 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 29 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 30 31 | Total | 0.12061000000000001 | 0.14953 | 0.14953 | 0.028919999999999998 | 0.23978111267722402 32 33 34 | Energy Charge Over 300 Hours Use 35 | Distribution | 0.01843 | 0.01843 | 0.01843 | 0 35 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 36 | Conservation | 0 | 0 | 0 | 0 37 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 38 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 39 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 40 | FMCC-Delivery | -0.01684 | -0.01684 | -0.01684 | 0 41 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 42 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 43 44 | Total | 0.12061000000000001 | 0.14953 | 0.14953 | 0.028919999999999998 | 0.23978111267722402 1 | Page 10 of 18 2 | Rate 35 3 | Intermediate General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution | 270 | 247.05 | 270 | 0 8 9 | Total | 270 | 247.05 | 270 | 0 | 0 10 11 12 | Distribution Demand Charge KW 13 | Distribution | 8.69 | 7.950000000000001 | 8.69 | 0 14 | Electric System Improvements | 2.2199999999999998 | 2.2199999999999998 | 2.2199999999999998 | 0 15 16 | Total | 10.91 | 10.170000000000002 | 10.91 | 0 | 0 17 18 19 | P/T Demand Charge KW 20 | Transmission | 14.58 | 14.58 | 14.58 | 0 21 | Competitive Transition Assessment | 1.78 | 1.78 | 1.78 | 0 22 23 | Total | 16.36 | 16.36 | 16.36 | 0 | 0 24 25 26 | Energy Charge First 400 Hours Use 27 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 28 | Conservation | 0 | 0 | 0 | 0 29 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 30 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 31 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 32 | FMCC-Delivery | -0.01559 | -0.01559 | -0.01559 | 0 33 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 34 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 35 36 | Total | 0.10347 | 0.13239 | 0.13239 | 0.028919999999999998 | 0.27950130472600754 37 38 39 | Energy Charge Over 400 Hours Use 40 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 41 | Conservation | 0 | 0 | 0 | 0 42 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 43 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 44 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 45 | FMCC-Delivery | -0.01559 | -0.01559 | -0.01559 | 0 46 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 47 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 48 49 | Total | 0.10347 | 0.13239 | 0.13239 | 0.028919999999999998 | 0.27950130472600754 1 | Page 11 of 18 2 | Rate 37 3 | Intermediate Time-Of-Day General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution | 270 | 247.05 | 270 | 0 8 9 | Total | 270 | 247.05 | 270 | 0 | 0 10 11 12 | Distribution Demand Charge KW 13 | Distribution | 8.69 | 7.950000000000001 | 8.69 | 0 14 | Electric System Improvements | 2.2199999999999998 | 2.2199999999999998 | 2.2199999999999998 | 0 15 16 | Total | 10.91 | 10.170000000000002 | 10.91 | 0 | 0 17 18 19 | P/T Demand Charge KW 20 | Transmission | 7.29 | 7.29 | 7.29 | 0 21 | Competitive Transition Assessment | 1.78 | 1.78 | 1.78 | 0 22 23 | Total | 9.07 | 9.07 | 9.07 | 0 | 0 24 25 26 | Energy Charge On-Peak kWh 27 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 28 | Transmission | 0.04609 | 0.04609 | 0.04609 | 0 29 | Conservation | 0 | 0 | 0 | 0 30 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 31 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 32 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 33 | FMCC-Delivery | -0.03474 | -0.03474 | -0.03474 | 0 34 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 35 | Generation Services | 0.13584 | 0.16599 | 0.16599 | 0.03015000000000001 36 37 | Total | 0.15186 | 0.18161 | 0.18161 | 0.02975000000000001 | 0.19590412221783216 38 39 | Energy Charge Off-Peak kWh 40 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 41 | Transmission | 0.01034 | 0.01034 | 0.01034 | 0 42 | Conservation | 0 | 0 | 0 | 0 43 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 44 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 45 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 46 | FMCC-Delivery | -0.00779 | -0.00779 | -0.00779 | 0 47 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 48 | Generation Services | 0.10584 | 0.13599 | 0.13599 | 0.030149999999999996 49 50 | Total | 0.11306000000000001 | 0.14281 | 0.14281 | 0.029749999999999995 | 0.2631346187864849 1 | Page 12 of 18 2 | Rate 40 - Church and School 3 | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Customer Charge 6 | Distribution | 65 | 65 | 65 | 0 7 8 | Total | 65 | 65 | 65 | 0 | 0 9 10 11 | Energy Charge All kWh 12 | Distribution | 0.04701 | 0.0417 | 0.04701 | 0 13 | Electric System Improvements | 0.01637 | 0.01637 | 0.01637 | 0 14 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 15 | Transmission | 0.04286 | 0.04286 | 0.04286 | 0 16 | Conservation | 0 | 0 | 0 | 0 17 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 18 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 19 | Systems Benefits Charge | -0.00038 | -0.00038 | -0.00038 | 0 20 | Competitive Transition Assessment | 0.00505 | 0.00505 | 0.00505 | 0 21 | FMCC-Delivery | -0.01586 | -0.01586 | -0.01586 | 0 22 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 23 | Generation Services | 0.11439 | 0.14371 | 0.14371 | 0.02932 24 25 | Total | 0.21445 | 0.23806 | 0.24337 | 0.028919999999999998 | 0.13485660993238513 1 | Page 13 of 18 2 | Rate 41 - Large Church and School 3 4 | Current | Proposed Rate 5 | Customer Charge | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 7 | Distribution | 350 | 350 | 350 | 0 8 9 | Total | 350 | 350 | 350 | 0 | 0 10 11 12 | Demand Charge Over 300 KW 13 | Distribution | 8.1 | 8.1 | 8.1 | 0 14 | Transmission | 22.44 | 22.44 | 22.44 | 0 15 16 | Total | 30.54 | 30.54 | 30.54 | 0 | 0 17 18 19 | Energy Charge On-Peak kWh 20 | Distribution | 0.04717 | 0.042469999999999994 | 0.04717 | 0 21 | Electric System Improvements | 0.01138 | 0.01138 | 0.01138 | 0 22 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 23 | Transmission | 0.064 | 0.064 | 0.064 | 0 24 | Conservation | 0 | 0 | 0 | 0 25 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 26 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 27 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 28 | Competitive Transition Assessment | 0.00505 | 0.00505 | 0.00505 | 0 29 | FMCC-Delivery | -0.03248 | -0.03248 | -0.03248 | 0 30 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 31 | Generation Services | 0.13587 | 0.16514 | 0.16514 | 0.029270000000000018 32 33 | Total | 0.23565999999999998 | 0.25983 | 0.26453 | 0.028870000000000017 | 0.1225070016124925 34 35 36 | Energy Charge Off-Peak kWh 37 | Distribution | 0.04717 | 0.042469999999999994 | 0.04717 | 0 38 | Electric System Improvements | 0.01138 | 0.01138 | 0.01138 | 0 39 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 40 | Transmission | 0.01419 | 0.01419 | 0.01419 | 0 41 | Conservation | 0 | 0 | 0 | 0 42 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 43 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 44 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 45 | Competitive Transition Assessment | 0.00505 | 0.00505 | 0.00505 | 0 46 | FMCC-Delivery | -0.0072 | -0.0072 | -0.0072 | 0 47 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 48 | Generation Services | 0.10587 | 0.13514 | 0.13514 | 0.029270000000000004 49 50 | Total | 0.18113 | 0.20529999999999998 | 0.21000000000000002 | 0.028870000000000003 | 0.15938828465742838 1 | Page 14 of 18 2 | Rate 55 3 | Intermediate TOD General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution | 350 | 350 | 350 | 0 8 9 | Total | 350 | 350 | 350 | 0 | 0 10 11 12 | Distribution Demand Charge kVA 13 | Distribution | 6.65 | 6.049999999999999 | 6.65 | 0 14 | Electric System Improvements | 1.65 | 1.65 | 1.65 | 0 15 16 | Total | 8.3 | 7.699999999999999 | 8.3 | 0 | 0 17 18 19 | P/T Demand Charge kVA 20 | Transmission | 12 | 12 | 12 | 0 21 | Competitive Transition Assessment | 1.48 | 1.48 | 1.48 | 0 22 23 | Total | 13.48 | 13.48 | 13.48 | 0 | 0 24 25 26 | Energy Charge On-Peak kWh 27 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 28 | Conservation | 0 | 0 | 0 | 0 29 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 30 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 31 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 32 | FMCC-Delivery | -0.03407 | -0.03407 | -0.03407 | 0 33 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 34 | Generation Services | 0.14089 | 0.18875 | 0.18875 | 0.047860000000000014 35 36 | Total | 0.11148999999999998 | 0.15895 | 0.15895 | 0.047460000000000016 | 0.425688402547314 37 38 39 | Energy Charge Off-Peak kWh 40 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 41 | Conservation | 0 | 0 | 0 | 0 42 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 43 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 44 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 45 | FMCC-Delivery | -0.00773 | -0.00773 | -0.00773 | 0 46 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 47 | Generation Services | 0.13313 | 0.18668 | 0.18668 | 0.053550000000000014 48 49 | Total | 0.13007 | 0.18322000000000002 | 0.18322000000000002 | 0.05315000000000002 | 0.40862612439455703 1 | Page 15 of 18 2 | Rate 56 3 | Intermediate TOD General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 8 | Distribution | 350 | 350 | 350 | 0 9 10 | Total | 350 | 350 | 350 | 0 | 0 11 12 13 | Distribution Demand Charge kVA 14 | Distribution | 7.91 | 7.1899999999999995 | 7.91 | 0 15 | Electric System Improvements | 1.8599999999999999 | 1.8599999999999999 | 1.8599999999999999 | 0 16 17 | Total | 9.77 | 9.049999999999999 | 9.77 | 0 | 0 18 19 20 | P/T Demand Charge kVA 21 | Transmission | 14.93 | 14.93 | 14.93 | 0 22 | Competitive Transition Assessment | 1.85 | 1.85 | 1.85 | 0 23 24 | Total | 16.78 | 16.78 | 16.78 | 0 | 0 25 26 27 | Energy Charge On-Peak kWh 28 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 29 | Conservation | 0 | 0 | 0 | 0 30 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 31 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 32 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 33 | FMCC-Delivery | -0.03468 | -0.03468 | -0.03468 | 0 34 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 35 | Generation Services | 0.14089 | 0.18875 | 0.18875 | 0.047860000000000014 36 37 | Total | 0.11087999999999998 | 0.15834 | 0.15834 | 0.047460000000000016 | 0.4280303030303034 38 39 40 | Energy Charge Off-Peak kWh 41 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 42 | Conservation | 0 | 0 | 0 | 0 43 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 44 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 45 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 46 | FMCC-Delivery | -0.00767 | -0.00767 | -0.00767 | 0 47 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 48 | Generation Services | 0.13313 | 0.18668 | 0.18668 | 0.053550000000000014 49 50 | Total | 0.13013 | 0.18328000000000003 | 0.18328000000000003 | 0.05315000000000002 | 0.4084377161300241 1 | Page 16 of 18 2 | Rate 57 3 | Large TOD General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution 8 | Customer Months < 2000 kW | 1100 | 1100 | 1100 | 0 | 0 9 | Customer Months 2000 - 5000 kW | 2200 | 2200 | 2200 | 0 | 0 10 | Customer Months > 5000 kW | 4200 | 4200 | 4200 | 0 | 0 11 12 13 | Distribution Demand Charge kVA 14 | Distribution | 5.45 | 4.93 | 5.45 | 0 15 | Electric System Improvements | 1.5099999999999998 | 1.5099999999999998 | 1.5099999999999998 | 0 16 17 | Total | 6.96 | 6.4399999999999995 | 6.96 | 0 | 0 18 19 20 | P/T Demand Charge kVA 21 | Transmission | 13.13 | 13.13 | 13.13 | 0 22 | Competitive Transition Assessment | 1.65 | 1.65 | 1.65 | 0 23 24 | Total | 14.780000000000001 | 14.780000000000001 | 14.780000000000001 | 0 | 0 25 26 27 | Energy Charge On-Peak kWh 28 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 29 | Conservation | 0 | 0 | 0 | 0 30 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 31 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 32 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 33 | FMCC-Delivery | -0.03522 | -0.03522 | -0.03522 | 0 34 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 35 | Generation Services | 0.14089 | 0.18875 | 0.18875 | 0.047860000000000014 36 37 | Total | 0.11033999999999998 | 0.1578 | 0.1578 | 0.047460000000000016 | 0.4301250679717239 38 39 40 | Energy Charge Off-Peak kWh 41 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 42 | Conservation | 0 | 0 | 0 | 0 43 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 44 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 45 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 46 | FMCC-Delivery | -0.00759 | -0.00759 | -0.00759 | 0 47 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 48 | Generation Services | 0.13313 | 0.18668 | 0.18668 | 0.053550000000000014 49 50 | Total | 0.13021 | 0.18336000000000002 | 0.18336000000000002 | 0.05315000000000002 | 0.4081867752092776 1 | Page 17 of 18 2 | Rate 58 3 | Large TOD General Service 4 | Current | Proposed Rate 5 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 6 | Customer Charge 7 | Distribution 8 | Customer Months < 2000 kW | 1100 | 1100 | 1100 | 0 | 0 9 | Customer Months 2000 - 5000 kW | 2200 | 2200 | 2200 | 0 | 0 10 | Customer Months > 5000 kW | 4200 | 4200 | 4200 | 0 | 0 11 12 13 | Distribution Demand Charge kVA 14 | Distribution | 7.53 | 6.83 | 7.53 | 0 15 | Electric System Improvements | 1.91 | 1.91 | 1.91 | 0 16 17 | Total | 9.44 | 8.74 | 9.44 | 0 | 0 18 19 20 | P/T Demand Charge kVA 21 | Transmission | 17.04 | 17.04 | 17.04 | 0 22 | Competitive Transition Assessment | 2.19 | 2.19 | 2.19 | 0 23 24 | Total | 19.23 | 19.23 | 19.23 | 0 | 0 25 26 27 | Energy Charge On-Peak kWh 28 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 29 | Conservation | 0 | 0 | 0 | 0 30 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 31 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 32 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 33 | FMCC-Delivery | -0.03455 | -0.03455 | -0.03455 | 0 34 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 35 | Generation Services | 0.14089 | 0.18875 | 0.18875 | 0.047860000000000014 36 37 | Total | 0.11100999999999998 | 0.15847 | 0.15847 | 0.047460000000000016 | 0.42752905143680775 38 39 40 | Energy Charge Off-Peak kWh 41 | Revenue Decoupling Mechanism | 0.00011 | 0.00011 | 0.00011 | 0 42 | Conservation | 0 | 0 | 0 | 0 43 | Conservation Adjustment Mechanism | 0.006 | 0.006 | 0.006 | 0 44 | Renewable Energy | 0.001 | 0.001 | 0.001 | 0 45 | Systems Benefits Charge | -0.00034 | -0.00034 | -0.00034 | 0 46 | FMCC-Delivery | -0.00739 | -0.00739 | -0.00739 | 0 47 | FMCC-Generation | -0.0021 | -0.0025 | -0.0025 | -0.0004000000000000002 48 | Generation Services | 0.13313 | 0.18668 | 0.18668 | 0.053550000000000014 49 50 | Total | 0.13041 | 0.18356 | 0.18356 | 0.05315000000000002 | 0.40756076987961043 1 | Page 18 of 18 2 | Rate 115 3 | Unmetered Service | Current | Proposed Rate 4 | Rate | Rate | Plus GET | Diff vs Cur | % Chg 5 | Minimum Bill Charge | 6.6000000000000005 | 6.6000000000000005 | 6.6000000000000005 | 0 | 0 6 | Demand Charge | 11.86 | 11.86 | 11.86 | 0 | 0 7 | Billed kWh | 0.19615 | 0.22049000000000002 | 0.22547 | 0.029320000000000013 | 0.14947744073413216 8 9 10 | Rate 116 & 117 | See Exhibit 7, pages 18-20 11 | Street & Security Lighting [Sheet: Exh 4] 1 | EXHIBIT 4 2 3 | 2027 Bypassable FMCC Rate 4 | (January through June 2027) 5 | ( $000's) 6 7 | The Connecticut Light & Power Company dba Eversource Energy 8 | November 23, 2026 9 | Docket No. 27-01-01 | Page 1 of 1 10 11 12 13 | Congestion and Losses | -12910.715685448926 14 15 | Divide by January to June 2027 Sales (MWh) (See Note 1) | 5164286.27417957 16 17 | Proposed Bypassable FMCC Rate | -0.25 | cents/kWh 18 19 20 21 22 23 | Note 1 - MWhs represent Standard Service and Last Resort Service sales only. [Sheet: Exh 5, 1 of 3] 1 | EXHIBIT 5 2 3 | CL&P Standard Service GSC Rates 4 | (January through June 2027) 5 | Page 1 of 3 6 | The Connecticut Light & Power Company dba Eversource Energy 7 | November 23, 2026 8 | Docket No. 27-01-01 9 10 | January - June 2027 11 | Cents Per kWh 12 | On-Peak | Off-Peak | Total 13 14 | Residential 15 | Supply Price | 15.322264517192602 | 15.224699528427 | 15.249403533036855 16 | DPUC 3.5 c/kwh Diff | 17.863183822170885 | 14.363183822170884 | 15.249403533036855 17 | GSC Trueup | -0.07 | -0.07 | -0.07 18 | GSC Rate | 17.793183822170885 | 14.293183822170883 | 15.179403533036854 19 20 21 | Small C&I 22 | Supply Price | 14.41591577657539 | 14.44995283847409 | 14.441196372949097 23 | DPUC 3.0 c/kwh Diff | 16.669408353960762 | 13.66940835396076 | 14.4411963729491 24 | GSC Trueup | -0.07 | -0.07 | -0.07 25 | GSC Rate | 16.59940835396076 | 13.59940835396076 | 14.3711963729491 26 27 28 | Large C&I 29 | Supply Price | 14.214595122274726 | 14.38975948047078 | 14.34529144484398 30 | DPUC 3.0 c/kwh Diff | 16.583697543811443 | 13.583697543811443 | 14.34529144484398 31 | GSC Trueup | -0.07 | -0.07 | -0.07 32 | GSC Rate | 16.513697543811443 | 13.513697543811443 | 14.27529144484398 33 34 | Street Lighting 35 | Supply Price | 19.570740268295552 | 13.427269086238427 | 13.70838034909933 36 | GSC Trueup | -0.07 | -0.07 | -0.07 37 | GSC Rate | 19.50074026829555 | 13.357269086238427 | 13.63838034909933 [Sheet: Exh 5, 2 of 3] 1 | EXHIBIT 5 2 3 | Rate Calculation for CL&P's Projected 2026 GSC Over-recovery and 2027 Other Expenses 4 | (January through December 2027) 5 | ( $000's) 6 7 | The Connecticut Light & Power Company dba Eversource Energy 8 | November 23, 2026 9 | Docket No. 27-01-01 | Page 2 of 3 10 11 12 13 | Projected 2026 GSC Under (Over)-recovery | -19728.368885028853 14 15 | Projected 2027 Regulatory Commission Expense | 4646.721 16 17 | Projected 2027 Alloc. Of Uncollectible Expenses | 8158.859495706 18 19 | Projected 2027 Return on Negative Working Capital | -729.341 20 21 | Projected 2027 Return on Prepaid Regulatory Assessments | 34.678 22 23 | Projected 2027 Generation Information System (GIS) Expense | 147.51773333333335 24 25 | Total Identified (Over)/Under recovery* | -7469.93365598952 26 27 | Divide by 2027 Sales (MWh) (See Note 1) | 10661556 28 29 | GSC True up Rate to be Added to 2027 Supplier Rate | -0.07 | cents/kWh 30 31 32 33 34 | Note 1 - MWhs represent Standard Service and Last Resort Service sales only. 35 | * Amount may not add due to rounding. [Sheet: Exh 5, 3 of 3] 1 | EXHIBIT 5 2 3 | CL&P Standard Service Total Generation 4 | (January through June 2027) 5 | Page 3 of 3 6 | The Connecticut Light & Power Company dba Eversource Energy 7 | November 23, 2026 8 | Docket No. 27-01-01 9 | Standard Service (¢/kWh) 10 | GSC | FMCC-Generation | Total Generation 11 | Rate/Description | Rate | Rate | Supply Rate 12 | (A) | (B) | C = A + B 13 14 | Rates 1 & 5 | 15.179403533036854 | -0.25 | 14.929403533036854 15 16 | Rate 7 17 | On-Peak | 17.793183822170885 | -0.25 | 17.543183822170885 18 | Off-Peak | 14.293183822170883 | -0.25 | 14.043183822170883 19 20 | Rates 18, 29, 30, 35, 40 & 115 | 14.3711963729491 | -0.25 | 14.1211963729491 21 22 | Rates 27 & 37 23 | On-Peak | 16.59940835396076 | -0.25 | 16.34940835396076 24 | Off-Peak | 13.59940835396076 | -0.25 | 13.34940835396076 25 26 | Rates 41, 55 & 56 (less than 500 kW) 27 | On-Peak | 16.513697543811443 | -0.25 | 16.263697543811443 28 | Off-Peak | 13.513697543811443 | -0.25 | 13.263697543811443 29 30 | Rates 116 & 117 | 13.63838034909933 | -0.25 | 13.38838034909933 31 32 | Rate 119 | 14.27529144484398 | -0.25 | 14.02529144484398 [Sheet: Exh 6, 1 of 3] 1 | EXHIBIT 6 2 3 | Last Resort Service GSC Rates 4 | (January through March 2027) 5 | Page 1 of 3 6 | The Connecticut Light & Power Company dba Eversource Energy 7 | November 23, 2026 8 | Docket No. 27-01-01 9 10 11 | Cents Per kWh 12 | On-Peak | Off-Peak | Total 13 14 | 2027-01-01 00:00:00 15 | Supply Price | 24.98 | 23.92 | 24.173220669189263 16 | GSC Trueup | -0.07 | -0.07 | -0.07 17 | GSC Rate | 24.91 | 23.85 | 24.103220669189263 18 19 20 | 2027-02-01 00:00:00 21 | Supply Price | 21.69 | 21.180000000000003 | 21.30896688966716 22 | GSC Trueup | -0.07 | -0.07 | -0.07 23 | GSC Rate | 21.62 | 21.110000000000003 | 21.23896688966716 24 25 26 | 2027-03-01 00:00:00 27 | Supply Price | 11.04 | 11.16 | 11.128584016703192 28 | GSC Trueup | -0.07 | -0.07 | -0.07 29 | GSC Rate | 10.969999999999999 | 11.09 | 11.058584016703191 30 31 32 | Average January - March 2027 33 | Supply Price | 18.944953753731976 | 18.73750189381372 | 18.789608581397587 34 | GSC Trueup | -0.07 | -0.07 | -0.07 35 | GSC Rate | 18.874953753731976 | 18.66750189381372 | 18.719608581397587 [Sheet: Exh 6, 2 of 3] 1 | EXHIBIT 6 2 3 | Rate Calculation for CL&P's Projected 2026 GSC Over-recovery and 2027 Other Expenses 4 | (January through December 2027) 5 | ( $000's) 6 7 | The Connecticut Light & Power Company dba Eversource Energy 8 | November 23, 2026 9 | Docket No. 27-01-01 | Page 2 of 3 10 11 12 13 | Projected 2026 GSC Under (Over)-recovery | -19728.368885028853 14 15 | Projected 2027 Regulatory Commission Expense | 4646.721 16 17 | Projected 2027 Alloc. Of Uncollectible Expenses | 8158.859495706 18 19 | Projected 2027 Return on Negative Working Capital | -729.341 20 21 | Projected 2027 Return on Prepaid Regulatory Assessments | 34.678 22 23 | Projected 2027 Generation Information System (GIS) Expense | 147.51773333333335 24 25 | Total Identified (Over)/Under recovery* | -7469.93365598952 26 27 | Divide by 2027 Sales (MWh) (See Note 1) | 10661556 28 29 | GSC True up Rate to be Added to 2027 Supplier Rate | -0.07 | cents/kWh 30 31 32 33 34 | Note 1 - MWhs represent Standard Service and Last Resort Service sales only. 35 | * Amount may not add due to rounding. [Sheet: Exh 6, 3 of 3] 1 | EXHIBIT 6 2 3 | Last Resort Service Total Generation 4 | (January through March 2027) 5 | Page 3 of 3 6 | The Connecticut Light & Power Company dba Eversource Energy 7 | 2026-11-23 00:00:00 8 | Docket No. 27-01-01 9 | Last Resort Service (¢/kWh) 10 | GSC | FMCC-Generation | Total Generation 11 | Rate/Description | Rate | Rate | Supply Rate 12 | (A) | (B) | C = A + B 13 | Rate 39 14 | January 2027 | 24.103220669189263 | -0.25 | 23.853220669189263 15 | February 2027 | 21.23896688966716 | -0.25 | 20.98896688966716 16 | March 2027 | 11.058584016703191 | -0.25 | 10.808584016703191 17 18 | Rates 41, 55 & 56 19 | (greater than or equal to 500 kW) 20 | On-peak 21 | January 2027 | 24.91 | -0.25 | 24.66 22 | February 2027 | 21.62 | -0.25 | 21.37 23 | March 2027 | 10.969999999999999 | -0.25 | 10.719999999999999 24 | Off-peak 25 | January 2027 | 23.85 | -0.25 | 23.6 26 | February 2027 | 21.110000000000003 | -0.25 | 20.860000000000003 27 | March 2027 | 11.09 | -0.25 | 10.84 28 29 | Rates 57 & 58 30 | On-peak 31 | January 2027 | 24.91 | -0.25 | 24.66 32 | February 2027 | 21.62 | -0.25 | 21.37 33 | March 2027 | 10.969999999999999 | -0.25 | 10.719999999999999 34 | Off-peak 35 | January 2027 | 23.85 | -0.25 | 23.6 36 | February 2027 | 21.110000000000003 | -0.25 | 20.860000000000003 37 | March 2027 | 11.09 | -0.25 | 10.84 [Sheet: Exh 7, 1 of 22 ] 1 | EXHIBIT 7 2 3 | Rate Year 2020 Proposed Rate Revenue 4 | (With Distribution GET) 5 | The Connecticut Light & Power Company dba Eversource Energy 6 | November 23, 2026 7 | Docket No. 27-01-01 | Page 1 of 22 8 9 10 | Rate Year | Proposed Rate Revenues $(000) 11 | 2020 | Current | Distribution | ESI | RDM | C&LM / CAM | Renewable Energy | Transmission | SBC | CTA | FMCC-Delivery | FMCC-Gen | Generation Service | Total 12 | Rate | Billed Sales * | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | Revenue | c/kWh | % Change 13 14 | 1 | 7911217.140019587 | 1984619.4906232997 | 25.08614610745454 | 579745.5508986213 | 7.328146107454534 | 160676.82011379782 | 2.031 | 870.2338854021547 | 0.011000000000000001 | 47467.302840117525 | 0.6 | 7911.2171400195875 | 0.1 | 399516.4655709892 | 5.050000000000001 | -15505.98559443839 | -0.196 | 39239.63701449715 | 0.496 | -151183.3595457743 | -1.9109999999999998 | -19778.04285004897 | -0.25 | 1200843.6496835733 | 15.179 | 2249803.4891567566 | 28.438146107454536 | 0.13361956777425976 15 16 | 5 | 1669921.422 | 393528.9352488599 | 23.56571573155494 | 103530.38110433999 | 6.199715731554941 | 28672.550815740004 | 1.717 | 183.69135642 | 0.011000000000000001 | 10019.528532 | 0.6 | 1669.9214220000001 | 0.1 | 81842.84889222 | 4.901000000000001 | -3273.04598712 | -0.196 | 8282.81025312 | 0.496 | -30726.5541648 | -1.8399999999999999 | -4174.803555 | -0.25 | 253477.37264538 | 15.179 | 449504.70131429995 | 26.917715731554935 | 0.1422405344350144 17 18 | 7 | 5487.916236328086 | 1322.5503629309153 | 24.099317591185056 | 357.05172504685515 | 6.506143856265474 | 111.45957875982343 | 2.031 | 0.6036707859960895 | 0.011000000000000001 | 32.92749741796851 | 0.6 | 5.487916236328085 | 0.1 | 267.4873479926 | 4.8741149914411475 | -10.756315823203046 | -0.19599999999999995 | 27.220064532187305 | 0.496 | -101.20127877137566 | -1.844074771066267 | -13.719790590820214 | -0.25 | 833.3474076527966 | 15.185133514544708 | 1509.9078232391562 | 27.51331759118506 | 0.1416637623485555 19 20 | 18 | 740.227 | 164.28298221 | 22.193594966138765 | 40.872336770000004 | 5.521594966138766 | 11.3254731 | 1.53 | 0.08142497 | 0.011000000000000001 | 4.441362 | 0.6 | 0.740227 | 0.1 | 32.710631129999996 | 4.419 | -0.28128626 | -0.038 | 3.7381463499999996 | 0.505 | -12.46542268 | -1.6840000000000002 | -1.8505675 | -0.25 | 106.37802217 | 14.371 | 185.69034704999996 | 25.085594966138757 | 0.13030786604929845 21 22 | 27 | 84996.79546203262 | 18810.463736476268 | 22.130791677762428 | 4561.053056442178 | 5.366147078426696 | 1192.0608 | 1.4024773446105787 | 9.349647500823588 | 0.011000000000000001 | 509.9807727721957 | 0.6 | 84.99679546203262 | 0.1 | 3902.7453433254677 | 4.5916382166064045 | -32.29878227557239 | -0.038 | 463.5792 | 0.5454078562374473 | -1431.5289354762683 | -1.6842151844603608 | -212.49198865508154 | -0.25 | 12291.672492375967 | 14.461336366341667 | 21339.11840147174 | 25.10579167776243 | 0.1344280874953676 25 26 | 29 | 2716.1193486496372 | 948.6223705908583 | 34.92565122598465 | 420.7445751808014 | 15.490651225984653 | 116.57584244404244 | 4.292 | 0.2987731283514601 | 0.011 | 16.296716091897824 | 0.6 | 2.716119348649637 | 0.1 | 120.02531401682747 | 4.419 | -1.0049641590003657 | -0.037 | 13.716402710680667 | 0.505 | -45.73944983125989 | -1.6840000000000002 | -6.790298371624093 | -0.25 | 390.33351159443936 | 14.371 | 1027.1725421538058 | 37.81765122598465 | 0.08280446887840287 27 28 | 30 | 3416731.0815852177 | 781288.211987452 | 22.866540951913823 | 219683.19053107456 | 6.429630699210629 | 44399.52468 | 1.299473784146937 | 375.84041897437396 | 0.011000000000000001 | 20500.386489511307 | 0.6 | 3416.731081585218 | 0.1 | 150817.43304 | 4.414085552499119 | -1298.3578110023827 | -0.038 | 17266.48182 | 0.5053509160571422 | -57537.75141389507 | -1.6840000000000002 | -8541.827703963045 | -0.25 | 491018.42373461166 | 14.371 | 880100.0748668965 | 25.758540951913826 | 0.1264729985213593 31 32 | 35 | 609546.896898481 | 119460.3755543972 | 19.598225528214464 | 23528.44754981101 | 3.859989718515397 | 4698.11718 | 0.7707556553737102 | 67.05015865883291 | 0.011000000000000001 | 3657.281381390886 | 0.6000000000000001 | 609.546896898481 | 0.1 | 25099.695831812656 | 4.1177628759207625 | -207.24594494548356 | -0.03400000000000001 | 3064.297570687691 | 0.5027172784045926 | -9502.836122647319 | -1.5590000000000002 | -1523.8672422462023 | -0.25 | 87597.9845532807 | 14.371 | 137088.47181270126 | 22.490225528214463 | 0.14756438004229255 33 34 | 37 | 1179017.076535319 | 229994.90043026846 | 19.50734259983203 | 43057.60480320649 | 3.6519916174358005 | 9931.67838 | 0.8423693411791295 | 129.6918784188851 | 0.011000000000000001 | 7074.102459211915 | 0.6000000000000001 | 1179.0170765353191 | 0.1 | 48876.424074532806 | 4.145522999392168 | -400.8658060220085 | -0.034 | 5980.32168010203 | 0.5072294370558154 | -18376.148822892595 | -1.5585990388615134 | -2947.5426913382976 | -0.25 | 170566.37542543968 | 14.466828243630628 | 265070.6584571942 | 22.48234259983203 | 0.1525066771537411 35 36 | 40 | 100656.37564484851 | 23143.341757037764 | 22.99242507866139 | 6289.438219064329 | 6.2484250786613895 | 1647.74486930617 | 1.637 | 11.072201320933337 | 0.011000000000000001 | 603.9382538690911 | 0.6000000000000001 | 100.65637564484851 | 0.1 | 4314.132260138207 | 4.2860000000000005 | -38.24942274504244 | -0.038 | 508.31469700648495 | 0.505 | -1596.4101177272973 | -1.5859999999999999 | -251.6409391121213 | -0.25 | 14465.32774392118 | 14.371 | 26054.324140686782 | 25.884425078661387 | 0.1257805555571423 37 38 | 41 | 15346.234999999999 | 3287.5533675992247 | 21.422540236085432 | 848.1089049499999 | 5.526494967332378 | 174.64015429999998 | 1.138 | 1.68808585 | 0.011000000000000001 | 92.07741 | 0.6 | 15.346235 | 0.1 | 580.783923032026 | 3.784536878472316 | -5.2177199000000005 | -0.03400000000000001 | 77.49848674999998 | 0.5049999999999999 | -221.0499035056739 | -1.4404178191307115 | -38.3655875 | -0.25 | 2205.0891830728724 | 14.368926209411445 | 3730.5991720492248 | 24.309540236085432 | 0.13476459692380294 39 40 | 55 | 621412.5556762142 | 129489.68247276382 | 20.837957213763502 | 18864.71685138582 | 3.0357798018511946 | 4691.76675 | 0.7550164069173774 | 68.35538112438357 | 0.011000000000000001 | 3728.4753340572856 | 0.6000000000000001 | 621.4125556762142 | 0.1 | 25365.48 | 4.081906580145869 | -211.28026892991284 | -0.034 | 3128.4092 | 0.5034351448846572 | -9606.275614717943 | -1.5458772963260294 | -1553.5313891905357 | -0.25000000000000006 | 116382.73348201212 | 18.72873864857232 | 161480.26228141744 | 25.98599928604539 | 0.24705118738230247 41 42 | 56 | 1812419.3286952046 | 378119.2051387364 | 20.862677811483707 | 56548.72307519631 | 3.120068417936528 | 12377.639700000002 | 0.6829346555750374 | 199.36612615647252 | 0.011000000000000001 | 10874.515972171228 | 0.6 | 1812.419328695205 | 0.10000000000000002 | 74063.87806 | 4.08646480907484 | -616.2225717563697 | -0.03400000000000001 | 9177.372700000002 | 0.5063603413789991 | -27790.058725102746 | -1.5333128644743237 | -4531.0483217380115 | -0.25 | 339406.85424310155 | 18.726728901498035 | 471523.43958672363 | 26.01624426098912 | 0.247023248696707 43 44 | 57 | 840031.0823748615 | 166050.63247196085 | 19.76720099481524 | 18291.287804381736 | 2.1774536904837176 | 4896.54797 | 0.5829008084030549 | 92.40341906123476 | 0.011 | 5040.186494249169 | 0.6000000000000001 | 840.0310823748615 | 0.1 | 33814.50306 | 4.025387127867059 | -285.6105680074529 | -0.034 | 4249.347299999999 | 0.505855960470727 | -12746.589303459621 | -1.5173949596512062 | -2100.077705937154 | -0.25000000000000006 | 157294.2901708642 | 18.724817863426637 | 209386.31972352698 | 24.92602049099999 | 0.2609787545306925 45 46 | 58 | 1688030.442866138 | 334535.3485450289 | 19.818087402322863 | 39311.75276237628 | 2.3288533052536735 | 9122.967929999999 | 0.540450438471355 | 185.6833487152752 | 0.011000000000000001 | 10128.182657196829 | 0.6 | 1688.030442866138 | 0.1 | 66356.89536 | 3.9310248011482187 | -573.930350574487 | -0.034 | 8528.262959999998 | 0.5052197367672886 | -24963.357702909452 | -1.4788452310447497 | -4220.076107165345 | -0.25 | 316073.3582123717 | 18.72438732062823 | 421637.769512877 | 24.97809037122402 | 0.26036836270569474 47 48 | 115 | 54172.45599999999 | 11567.785109705397 | 21.35362869592879 | 3174.8465016253995 | 5.860628695928795 | 568.8107879999999 | 1.0499999999999998 | 5.958970159999999 | 0.011000000000000001 | 325.03473599999995 | 0.6 | 54.17245599999999 | 0.1 | 1756.8127480799997 | 3.243 | -20.585533279999996 | -0.038 | 273.57090279999994 | 0.505 | -653.8615439199999 | -1.207 | -135.43113999999997 | -0.25 | 7785.123651759999 | 14.371 | 13134.452537225397 | 24.245628695928794 | 0.13543365585219624 49 50 | 116 | 77081.957 | 28155.934251910312 | 36.52726960721861 | 14301.223300730315 | 18.553269607218606 | 2801.9291369499997 | 3.6350000000000002 | 8.47901527 | 0.011000000000000001 | 462.491742 | 0.6 | 77.081957 | 0.1 | 2347.9164102199998 | 3.046 | -28.52032409 | -0.037 | 389.26388284999996 | 0.505 | -873.33857281 | -1.133 | -192.7048925 | -0.25 | 10512.43729566 | 13.638 | 29806.25895128031 | 38.668269607218605 | 0.058613743184814604 51 52 | 117 | 30923.016 | 6818.498473521009 | 22.049914127137562 | 1267.1986412010085 | 4.097914127137561 | 1124.0516316 | 3.6350000000000002 | 3.40153176 | 0.011000000000000001 | 185.538096 | 0.6 | 30.923016 | 0.1 | 931.40124192 | 3.0119999999999996 | -11.44151592 | -0.037 | 156.1612308 | 0.505 | -346.64700935999997 | -1.121 | -77.30754 | -0.25 | 4217.28092208 | 13.638 | 7480.560246081009 | 24.190914127137564 | 0.09709788381284445 53 54 | 39 | 274029.302 | 43929.34512425542 | 16.030893340105436 | 1414.1371329154101 | 0.5160532551060579 | 425.8188 | 0.155391703329595 | 30.143223220000003 | 0.011000000000000001 | 1644.1758120000002 | 0.6 | 274.02930200000003 | 0.1 | 3665.9597200000003 | 1.3377984373364566 | -93.16996268000001 | -0.034 | 1382.88872 | 0.5046499443333252 | -1271.49596128 | -0.464 | -685.0732550000001 | -0.25 | 51298.2853344 | 18.72 | 58085.69886557541 | 21.196893340105433 | 0.32225278344756414 55 56 | 119 | 7148.6410000000005 | 2102.452057691475 | 29.410513938124396 | 964.5313833114753 | 13.492513938124398 | 102.01110707000001 | 1.427 | 0.7863505100000001 | 0.011000000000000001 | 42.891846 | 0.6 | 7.1486410000000005 | 0.1 | 236.90596274000004 | 3.314 | -2.4305379400000002 | -0.034 | 36.10063705 | 0.505 | -88.14274353000002 | -1.2330000000000003 | -17.8716025 | -0.25 | 1020.46850275 | 14.274999999999999 | 2302.399546461475 | 32.207513938124386 | 0.0951020443194055 57 58 | Total Retail | 20401626.067342874 | 4657337.612066697 | 22.8282667111606 | 1136200.861157631 | 5.569168150652272 | 287744.0417010679 | 1.4103975866985583 | 2244.1788674077175 | 0.011000000000000006 | 122409.75640405728 | 0.6000000000000002 | 20401.626067342884 | 0.10000000000000005 | 923910.5047921496 | 4.528612090734592 | -22616.501267869306 | -0.11085636602305837 | 102248.99286925622 | 0.5011806045839032 | -349074.81235509086 | -1.7110146573750757 | -51004.065168357214 | -0.2500000000000001 | 3237786.7862180723 | 15.870238850229864 | 5410251.369285667 | 26.518726259501058 | 0.16166183771351372 59 60 | Standard Service | 15165703.355730455 | 3605213.3983139517 | 23.772147679202092 | 1001770.2435313754 | 6.605498077033468 | 256229.30055106786 | 1.6895312702674619 | 1668.2273691303515 | 0.011000000000000008 | 90994.22013438276 | 0.6000000000000002 | 15165.703355730466 | 0.10000000000000006 | 720643.7885921496 | 4.751799317766887 | -20836.287545921085 | -0.13739084206765764 | 75782.71198925622 | 0.49969797121622617 | -272697.0350476211 | -1.798116636275764 | -37914.25838932617 | -0.2500000000000002 | 2257331.2647753228 | 14.88444823050278 | 4088137.8793155467 | 26.9564673884434 | 0.13395170483595886 61 62 | Last Resort | 5235922.711612418 | 1052124.2137527454 | 20.094341947013586 | 134430.61762625555 | 2.567467570293016 | 31514.74115 | 0.601894697186906 | 575.951498277366 | 0.011000000000000001 | 31415.536269674514 | 0.6000000000000001 | 5235.922711612418 | 0.1 | 203266.71620000002 | 3.8821565442359907 | -1780.2137219482224 | -0.034 | 26466.280880000002 | 0.5054750105707659 | -76377.77730746976 | -1.458726217216239 | -13089.806779031045 | -0.25 | 980455.5214427495 | 18.72555374563226 | 1322113.4899701204 | 25.2508213507027 | 0.2566134993266336 63 64 65 | NOTE: | * Rate Year 2020 Billed Sales (20,401,626) equals Forecasted Sales (20,434,799 MWh) minus Primary Metering Credits (33,173 MWh). [Sheet: Exh 7, 2 of 22] 1 | EXHIBIT 7 2 3 | RATE YEAR ENDING 2020 WORKPAPERS 4 5 | The Connecticut Light & Power Company dba Eversource Energy 6 | November 23, 2026 7 | Docket No. 27-01-01 8 | Page 2 of 22 9 10 | Rate 1 - Residential Electric Service 11 12 13 | Rate Year | Current Rate | Proposed | GET Adjustment 6.8 % | Proposed + GET 14 | Price Block | 2020 Units | Rate $ | Revenue $(000)'s | Rate $ | Revenue $(000)'s | Rate $ | Revenue $(000)'s | Rate $ | Revenue $(000)'s 15 16 | Customer Charge | 12205228.43121963 | 9.62 | 117414.29750833283 | 8.97 | 109480.89902804008 | 0.65 | 7933.39848029276 | 9.62 | 117414.29750833283 17 18 | Energy Charge | 7911217.140019587 19 | Distribution | 0.05844 | 462331.52966274467 | 0.05447 | 430923.9976168669 | 0.00397 | 31407.532045877757 | 0.05844 | 462331.52966274467 20 | Electric System Improvements | 0.02031 | 160676.82011379782 | 0.02031 | 160676.82011379782 | 0.02031 | 160676.82011379782 21 | Revenue Decoupling Mechanism | 0.00011 | 870.2338854021547 | 0.00011 | 870.2338854021547 | 0.00011 | 870.2338854021547 22 | Transmission | 0.0505 | 399516.4655709892 | 0.0505 | 399516.4655709892 | 0.0505 | 399516.4655709892 23 | Conservation | 0 | 0 | 0 | 0 | 0 | 0 24 | Conservation Adjustment Mech. | 0.006 | 47467.302840117525 | 0.006 | 47467.302840117525 | 0.006 | 47467.302840117525 25 | Renewable Energy | 0.001 | 7911.2171400195875 | 0.001 | 7911.2171400195875 | 0.001 | 7911.2171400195875 26 | Systems Benefits Charge | -0.00196 | -15505.98559443839 | -0.00196 | -15505.98559443839 | -0.00196 | -15505.98559443839 27 | Competitive Transition Assessment | 0.00496 | 39239.63701449715 | 0.00496 | 39239.63701449715 | 0.00496 | 39239.63701449715 28 | FMCC-Delivery | -0.01911 | -151183.3595457743 | -0.01911 | -151183.3595457743 | -0.01911 | -151183.3595457743 29 | FMCC-Generation | -0.0021 | -16613.555994041133 | -0.0025 | -19778.04285004897 | -0.0025 | -19778.04285004897 30 | Generation Services | 0.11787 | 932495.1642941087 | 0.15179 | 1200843.6496835733 | 0.15179 | 1200843.6496835733 31 32 | GET Refund | -4.765406548489051e-07 | -0.2762724561260254 | -4.765406548489051e-07 | -0.2762724561260254 | -4.765406548489051e-07 | -0.2762724561260254 33 34 | 1984619.4906232997 | 2210462.834903042 | 39340.65425371439 | 2249803.4891567566 35 36 | % Change | 0.13361956777425976 37 38 39 | Current Rate | Proposed | Proposed + GET | Difference 40 | Functional Category | Revenue | cents/kWh | Revenue | cents/kWh | Revenue | cents/kWh | Revenue | cents/kWh 41 | Distribution | 579745.5508986213 | 7.328146107454534 | 540404.896644907 | 6.830869221263329 | 579745.5508986213 | 7.328146107454534 | 0 | 0 42 | Electric System Improvements | 160676.82011379782 | 2.031 | 160676.82011379782 | 2.031 | 160676.82011379782 | 2.031 | 0 | 0 43 | Revenue Decoupling Mechanism | 870.2338854021547 | 0.011000000000000001 | 870.2338854021547 | 0.011000000000000001 | 870.2338854021547 | 0.011000000000000001 | 0 | 0 44 | Transmission | 399516.4655709892 | 5.050000000000001 | 399516.4655709892 | 5.050000000000001 | 399516.4655709892 | 5.050000000000001 | 0 | 0 45 | Conservation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 46 | Conservation Adjustment Mech. | 47467.302840117525 | 0.6 | 47467.302840117525 | 0.6 | 47467.302840117525 | 0.6 | 0 | 0 47 | Renewable Energy | 7911.2171400195875 | 0.1 | 7911.2171400195875 | 0.1 | 7911.2171400195875 | 0.1 | 0 | 0 48 | Systems Benefits Charge | -15505.98559443839 | -0.196 | -15505.98559443839 | -0.196 | -15505.98559443839 | -0.196 | 0 | 0 49 | Competitive Transition Assessment | 39239.63701449715 | 0.496 | 39239.63701449715 | 0.496 | 39239.63701449715 | 0.496 | 0 | 0 50 | FMCC-Delivery | -151183.3595457743 | -1.9109999999999998 | -151183.3595457743 | -1.9109999999999998 | -151183.3595457743 | -1.9109999999999998 | 0 | 0 51 | FMCC-Generation | -16613.555994041133 | -0.21 | -19778.04285004897 | -0.25 | -19778.04285004897 | -0.25 | -3164.4868560078357 | -0.040000000000000015 52 | Generation Services | 932495.1642941087 | 11.787 | 1200843.6496835733 | 15.179 | 1200843.6496835733 | 15.179 | 268348.48538946453 | 3.392000000000002 53 | 1984619.4906232997 | 25.08614610745454 | 2210462.834903042 | 27.94086922126333 | 2249803.4891567566 | 28.438146107454536 | 265183.9985334567 | 3.3520000000000016 [Sheet: Exh 7, 3 of 22] 1 | EXHIBIT 7 2 3 | RATE YEAR ENDING 2020 WORKPAPERS 4 5 | The Connecticut Light & Power Company dba Eversource Energy 6 | November 23, 2026 7 | Docket No. 27-01-01 8 | Page 3 of 22 9 10 | Rate 5 - Residential Electric Heating Service 11 12 | Rate Year | Current Rate | Proposed | GET Adjustment 6.8 % | Proposed + GET 13 | Price Block | 2020 Units | Rate $ | Rev $(000)'s | Rate $ | Rev $(000)'s | Rate $ | Rev $(000)'s | Rate $ | Rev $(000)'s 14 15 | Customer Charge | 1654252.7999999998 | 23.75 | 39288.50399999999 | 23.75 | 39288.50399999999 | 23.75 | 39288.50399999999 16 17 | Energy Charge | 1669921.422 18 | Distribution | 0.03847 | 64241.87710434 | 0.03425 | 57194.808703500006 | 0.0042155007483448085 | 7039.555004118027 | 0.03847 | 64241.87710434 19 | Electric System Improvements | 0.01717 | 28672.550815740004 | 0.01717 | 28672.550815740004 | 0.01717 | 28672.550815740004 20 | Revenue Decoupling Mechanism | 0.00011 | 183.69135642 | 0.00011 | 183.69135642 | 0.00011 | 183.69135642 21 | Transmission | 0.04901 | 81842.84889222 | 0.04901 | 81842.84889222 | 0.04901 | 81842.84889222 22 | Conservation | 0 | 0 | 0 | 0 | 0 | 0 23 | Conservation Adjustment Mech. | 0.006 | 10019.528532 | 0.006 | 10019.528532 | 0.006 | 10019.528532 24 | Renewable Energy | 0.001 | 1669.9214220000001 | 0.001 | 1669.9214220000001 | 0.001 | 1669.9214220000001 25 | Systems Benefits Charge | -0.00196 | -3273.04598712 | -0.00196 | -3273.04598712 | -0.00196 | -3273.04598712 26 | Competitive Transition Assessment | 0.00496 | 8282.81025312 | 0.00496 | 8282.81025312 | 0.00496 | 8282.81025312 27 | FMCC-Delivery | -0.0184 | -30726.5541648 | -0.0184 | -30726.5541648 | -0.0184 | -30726.5541648 28 | FMCC-Generation | -0.0021 | -3506.8349862 | -0.0025 | -4174.803555 | -0.0025 | -4174.803555 29 | Generation Services | 0.11787 | 196833.63801114 | 0.15179 | 253477.37264538 | 0.15179 | 253477.37264538 30 31 | 393528.9352488599 | 442457.63291346 | 7039.555004118027 | 449504.70131429995 32 33 | % Change | 0.1422405344350144 34 35 36 | Current Rate | Proposed | Proposed + GET | Difference 37 | Functional Category | Revenue | cents/kWh | Revenue | cents/kWh | Revenue | cents/kWh | Revenue | cents/kWh 38 | Distribution | 103530.38110433999 | 6.199715731554941 | 96483.3127035 | 5.777715731554943 | 103530.38110433999 | 6.199715731554941 | 0 | 0 39 | Electric System Improvements | 28672.550815740004 | 1.717 | 28672.550815740004 | 1.717 | 28672.550815740004 | 1.717 | 0 | 0 40 | Revenue Decoupling Mechanism | 183.69135642 | 0.011000000000000001 | 183.69135642 | 0.011000000000000001 | 183.69135642 | 0.011000000000000001 | 0 | 0 41 | Transmission | 81842.84889222 | 4.901000000000001 | 81842.84889222 | 4.901000000000001 | 81842.84889222 | 4.901000000000001 | 0 | 0 42 | Conservation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 43 | Conservation Adjustment Mech. | 10019.528532 | 0.6 | 10019.528532 | 0.6 | 10019.528532 | 0.6 | 0 | 0 44 | Renewable Energy | 1669.9214220000001 | 0.1 | 1669.9214220000001 | 0.1 | 1669.9214220000001 | 0.1 | 0 | 0 45 | Systems Benefits Charge | -3273.04598712 | -0.196 | -3273.04598712 | -0.196 | -3273.04598712 | -0.196 | 0 | 0 46 | Competitive Transition Assessment | 8282.81025312 | 0.496 | 8282.81025312 | 0.496 | 8282.81025312 | 0.496 | 0 | 0 47 | FMCC-Delivery | -30726.5541648 | -1.8399999999999999 | -30726.5541648 | -1.8399999999999999 | -30726.5541648 | -1.8399999999999999 | 0 | 0 48 | FMCC-Generation | -3506.8349862 | -0.21 | -4174.803555 | -0.25 | -4174.803555 | -0.25 | -667.9685688000004 | -0.04000000000000002 49 | Generation Services | 196833.63801114 | 11.786999999999999 | 253477.37264538 | 15.179 | 253477.37264538 | 15.179 | 56643.73463424001 | 3.3920000000000003 50 | 393528.9352488599 | 23.56571573155494 | 442457.63291346 | 26.49571573155494 | 449504.70131429995 | 26.917715731554935 | 55975.76606544001 | 3.3520000000000008 [Sheet: Exh 7, 4 of 22] 1 | EXHIBIT 7 2 3 | RATE YEAR ENDING 2020 WORKPAPERS 4 | The Connecticut Light & Power Company dba Eversource Energy 5 | November 23, 2026 6 | Docket No. 27-01-01 7 | Page 4 of 22 8 9 | Rate 7 - Residential Time-of-Day 10 11 12 | Rate Year | Current Rate | Proposed | GET Adjustment 6.8 % | Proposed + GET 13 | Price Block | 2020 Units | Rate $ | Rev $(000)'s | Rate $ | Rev $(000)'s | Rate $ | Rev $(000)'s | Rate $ | Rev $(000)'s 14 15 | Customer Charge | 5665.582425996659 | 9.62 | 54.50290293808786 | 8.97 | 50.82027436119004 | 0.6544635193133047 | 3.7079170134773842 | 9.62 | 54.50290293808786 16 17 18 | Energy Charge On-Peak kWh | 1398.8439998406666 19 | Distribution | 0.05513 | 77.11826971121594 | 0.05138 | 71.87260471181345 | 0.003748755364806867 | 5.243923948930595 | 0.05513 | 77.11826971121594 20 | Electric System Improvements | 0.02031 | 28.410521636763942 | 0.02031 | 28.410521636763942 | 0.02031 | 28.410521636763942 21 | Revenue Decoupling Mechanism | 0.00011 | 0.15387283998247334 | 0.00011 | 0.15387283998247334 | 0.00011 | 0.15387283998247334 22 | Transmission | 0.11741 | 164.23827402129265 | 0.11741 | 164.23827402129265 | 0.11741 | 164.23827402129265 23 | Conservation | 0 | 0 | 0 | 0 | 0 | 0 24 | Conservation Adjustment Mech. | 0.006 | 8.393063999044 | 0.006 | 8.393063999044 | 0.006 | 8.393063999044 25 | Renewable Energy | 0.001 | 1.3988439998406665 | 0.001 | 1.3988439998406665 | 0.001 | 1.3988439998406665 26 | Systems Benefits Charge |

Text of Rate EV-S.01-01-27_REDLINED.pdf

Extracted from the file · 8,154 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 1 of 5 AVAILABLE to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public. The Company defines public charging stations as those made available and accessible by, the public and may include on-street parking spaces and public parking spaces in lots or parking garages. Additionally, this rate is available to Medium to Heavy Duty (MHD) Fleet electric vehicles for (EV) charging stations on an interim basis until the corresponding MHD tariff is approved in Docket No. 21-09-17 and available for billing of MHD EV charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. This rate is also available for non-public use to direct current fast chargers (“DCFCs”) and installations of four or more networked Level 2 electric vehicle supply equipment (“EVSE”) that are enrolled in a managed charging program under the Workplace & Light-Duty Fleet Charging Program, per PURA decision in Docket No. 17-12-03RE04. Eligibility and acceptance of a customer for service under this rider is subject to the review and approval by the Company. Service under this rider shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company, where the customer’s maximum demand in the current or prior eleven (11) months is less than or equal to 100 kW. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 KW CHARGE PER KWH $44.00 PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW CHARGE PER KWH PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER KWH Supersedes Rate EV-S Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-S.01-01-27_REDLINED $0.00011 Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 2 of 5 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 KW CHARGE PER KWH PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER KWH -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 KW CHARGE PER KWH PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER KWH $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE CHARGE PER KWH THIRD-PARTY SERVICE $0.1143914371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) Supersedes Rate EV-S Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-S.01-01-27_REDLINED Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE CHARGE PER KWH RATE EV-S Page 3 of 5 -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. §16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month, but not less than 2 kilowatts. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-S, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 5%). Supersedes Rate EV-S Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-S.01-01-27_REDLINED Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 4 of 5 SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed, prorated in accordance with Schedule A. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate EV-S Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-S.01-01-27_REDLINED Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 5 of 5 Schedule A Pricing by Load Factor Monthly Load Factor: Tier 1 (0-5%) Tier 2 (5-10%) Tier 3 (10-15%) Tier 4 (15-20%) Tier 5 (20-25%) Tier 6 (25-30%) Tier 7 (30-35%) Tier 8 (>35%) $ $ $ $ $ $ $ $ Distribution Charge Per KW - 2.03 4.06 6.09 8.13 10.16 12.19 14.22 Charge Per kWh 0.04888 0.04190 0.03491 0.02793 0.02095 0.01397 0.00698 - Charge Per KW - 0.54 1.08 1.62 2.16 2.70 3.24 3.78 Charge Per kWh 0.01299 0.01113 0.00928 0.00742 0.00557 0.00371 0.00186 - ESI Transmission Charge Per KW - 1.83 3.67 5.50 7.34 9.17 11.01 12.84 Charge Per kWh 0.04414 0.03783 0.03153 0.02522 0.01892 0.01261 0.00631 - CTA Charge Per KW - 0.21 0.42 0.63 0.84 1.05 1.26 1.47 Charge Per kWh 0.00505 0.00433 0.00361 0.00289 0.00216 0.00144 0.00072 - Supersedes Rate EV-S Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-S.01-01-27_REDLINED Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate EV-S.01-01-27.pdf

Extracted from the file · 7,855 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 1 of 5 AVAILABLE to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public. The Company defines public charging stations as those made available and accessible by, the public and may include on-street parking spaces and public parking spaces in lots or parking garages. Additionally, this rate is available to Medium to Heavy Duty (MHD) Fleet electric vehicles for (EV) charging stations on an interim basis until the corresponding MHD tariff is approved in Docket No. 21-09-17 and available for billing of MHD EV charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. This rate is also available for non-public use to direct current fast chargers (“DCFCs”) and installations of four or more networked Level 2 electric vehicle supply equipment (“EVSE”) that are enrolled in a managed charging program under the Workplace & Light-Duty Fleet Charging Program, per PURA decision in Docket No. 17-12-03RE04. Eligibility and acceptance of a customer for service under this rider is subject to the review and approval by the Company. Service under this rider shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company, where the customer’s maximum demand in the current or prior eleven (11) months is less than or equal to 100 kW. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 KW CHARGE PER KWH $44.00 PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW CHARGE PER KWH PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER KWH Supersedes Rate EV-S Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-S.01-01-27 $0.00011 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 2 of 5 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 KW CHARGE PER KWH PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER KWH -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 KW CHARGE PER KWH PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER KWH $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE CHARGE PER KWH THIRD-PARTY SERVICE $0.14371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) Supersedes Rate EV-S Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-S.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE CHARGE PER KWH RATE EV-S Page 3 of 5 -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. §16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month, but not less than 2 kilowatts. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-S, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 5%). Supersedes Rate EV-S Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-S.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 4 of 5 SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed, prorated in accordance with Schedule A. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate EV-S Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-S.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL ELECTRIC VEHICLE CHARGING SERVICE RATE EV-S Page 5 of 5 Schedule A Pricing by Load Factor Monthly Load Factor: Tier 1 (0-5%) Tier 2 (5-10%) Tier 3 (10-15%) Tier 4 (15-20%) Tier 5 (20-25%) Tier 6 (25-30%) Tier 7 (30-35%) Tier 8 (>35%) $ $ $ $ $ $ $ $ Distribution Charge Per KW - 2.03 4.06 6.09 8.13 10.16 12.19 14.22 Charge Per kWh 0.04888 0.04190 0.03491 0.02793 0.02095 0.01397 0.00698 - Charge Per KW - 0.54 1.08 1.62 2.16 2.70 3.24 3.78 Charge Per kWh 0.01299 0.01113 0.00928 0.00742 0.00557 0.00371 0.00186 - ESI Transmission Charge Per KW - 1.83 3.67 5.50 7.34 9.17 11.01 12.84 Charge Per kWh 0.04414 0.03783 0.03153 0.02522 0.01892 0.01261 0.00631 - Charge Per KW - 0.21 0.42 0.63 0.84 1.05 1.26 1.47 Charge Per kWh 0.00505 0.00433 0.00361 0.00289 0.00216 0.00144 0.00072 - CTA Supersedes Rate EV-S Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-S.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate EV-MHD.01-01-27_REDLINED.pdf

Extracted from the file · 11,148 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 1 of 6 AVAILABLE for Commercial and Industrial customers to serve the entire requirements of Medium to Heavy (MHD) Fleet electric vehicle (EV) charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. Eligibility and acceptance of a customer for service under this rate is subject to the review and approval by the Company. Service under this rate shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. Customers whose meters are not capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .906 and the Production/Transmission Demand charges will be divided by .906. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK $350.00 PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGES Supersedes Rate EV-MHD Effective MayOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27_REDLINED PER SCHEDULE A Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK RATE EV-MHD Page 2 of 6 PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03468 -$0.00767 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.1358716514 $0.1058713514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK October 2026January 2027 $0.0897524910 per kWh Supersedes Rate EV-MHD Effective MayOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 3 of 6 November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh CHARGE PER kWh OFF-PEAK October 2026January 2027 $0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. For new services, the average monthly load factor used for billing tier selection will be evaluated after 12 months of billing data become available and the appropriate billing tier will be assigned Supersedes Rate EV-MHD Effective MayOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 4 of 6 for the following month based on the average monthly load factor for the 12 month period. Going forward the account will follow the process as stated in the “DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR”. LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-MHD, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 7%). SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote Supersedes Rate EV-MHD Effective MayOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 5 of 6 communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate EV-MHD Effective MayOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 6 of 6 Schedule A Pricing by Load Factor Monthly Load Factor: Tier-1 (0-7%) $ Tier-2 (7-14%) $ Tier-3 (14-21%) $ Tier-4 (21-28%) $ Tier-5 (28-35%) $ Tier-6 (35-42%) $ Tier-7 (42-49%) $ Tier-8 (>49%) $ Distribution Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh - 1.13 2.26 3.39 4.52 5.65 6.78 7.91 0.03262 0.02796 0.02330 0.01864 0.01398 0.00932 0.00466 - 0.02762 0.02367 0.01973 0.01578 0.01184 0.00789 0.00395 - - 0.27 0.53 0.80 1.06 1.33 1.59 1.86 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - - 2.13 4.27 6.40 8.53 10.66 12.80 14.93 0.06593 0.05651 0.04709 0.03767 0.02826 0.01884 0.00942 - 0.03093 0.02651 0.02209 0.01767 0.01326 0.00884 0.00442 - - 0.26 0.53 0.79 1.06 1.32 1.59 1.85 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - ESI Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Transmission Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh CTA Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Supersedes Rate EV-MHD Effective MayOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate EV-MHD.01-01-27.pdf

Extracted from the file · 10,697 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 1 of 6 AVAILABLE for Commercial and Industrial customers to serve the entire requirements of Medium to Heavy (MHD) Fleet electric vehicle (EV) charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. Eligibility and acceptance of a customer for service under this rate is subject to the review and approval by the Company. Service under this rate shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. Customers whose meters are not capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .906 and the Production/Transmission Demand charges will be divided by .906. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK $350.00 PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGES Supersedes Rate EV-MHD Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27 PER SCHEDULE A Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK RATE EV-MHD Page 2 of 6 PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03468 -$0.00767 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.16514 $0.13514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK Supersedes Rate EV-MHD Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27 January 2027 $0.24910 per kWh Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE CHARGE PER kWh OFF-PEAK THIRD-PARTY SERVICE RATE EV-MHD Page 3 of 6 February 2027 March 2027 $0.21620 per kWh $0.10970 per kWh January 2027 February 2027 March 2027 $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. For new services, the average monthly load factor used for billing tier selection will be evaluated after 12 months of billing data become available and the appropriate billing tier will be assigned Supersedes Rate EV-MHD Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 4 of 6 for the following month based on the average monthly load factor for the 12 month period. Going forward the account will follow the process as stated in the “DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR”. LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EVMHD, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 7%). SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such Supersedes Rate EV-MHD Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 5 of 6 remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate EV-MHD Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM HEAVY DUTY ELECTRIC VEHICLE CHARGING SERVICE RATE EV-MHD Page 6 of 6 Schedule A Pricing by Load Factor Monthly Load Factor: Tier-1 (0-7%) $ Tier-2 (7-14%) $ Tier-3 (14-21%) $ Tier-4 (21-28%) $ Tier-5 (28-35%) $ Tier-6 (35-42%) $ Tier-7 (42-49%) $ Tier-8 (>49%) $ Distribution Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh - 1.13 2.26 3.39 4.52 5.65 6.78 7.91 0.03262 0.02796 0.02330 0.01864 0.01398 0.00932 0.00466 - 0.02762 0.02367 0.01973 0.01578 0.01184 0.00789 0.00395 - - 0.27 0.53 0.80 1.06 1.33 1.59 1.86 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - - 2.13 4.27 6.40 8.53 10.66 12.80 14.93 0.06593 0.05651 0.04709 0.03767 0.02826 0.01884 0.00942 - 0.03093 0.02651 0.02209 0.01767 0.01326 0.00884 0.00442 - - 0.26 0.53 0.79 1.06 1.32 1.59 1.85 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - ESI Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Transmission Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh CTA Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Supersedes Rate EV-MHD Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-MHD.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate EV-M.01-01-27_REDLINED.pdf

Extracted from the file · 10,642 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 1 of 5 AVAILABLE to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public. The Company defines public charging stations as those made available and accessible by, the public and may include on-street parking spaces and public parking spaces in lots or parking garages. Additionally, this rate is available to Medium to Heavy Duty (MHD) Fleet electric vehicles for (EV) charging stations on an interim basis until the corresponding MHD tariff is approved in Docket No. 21-09-17 and available for billing of MHD EV charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. This rate is also available for non-public use to direct current fast chargers (“DCFCs”) and installations of four or more networked Level 2 electric vehicle supply equipment (“EVSE”) that are enrolled in a managed charging program under the Workplace & Light-Duty Fleet Charging Program, per PURA decision in Docket No. 17-12-03RE04. Eligibility and acceptance of a customer for service under this rider is subject to the review and approval by the Company. Service under this rider shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company, where the customer’s maximum demand in the current or prior eleven (11) months is 100 kW or greater and less than 350 kW. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DISTRIBUTION DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK $270.00 PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DISTRIBUTION DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER KWH Supersedes Rate EV-M Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-M.01-01-27_REDLINED $0.00011 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 2 of 5 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER KWH -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER KWH $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK -$0.03474 -$0.00779 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (MAX DEMAND LESS THAN 500 KW) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK Supersedes Rate EV-M Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-M.01-01-27_REDLINED $0.1358416599 $0.1058413599 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE THIRD-PARTY SERVICE FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH RATE EV-M Page 3 of 5 as per contract -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. §16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt demand in the current month or the preceding eleven (11) months. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. Supersedes Rate EV-M Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-M.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 4 of 5 LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-M, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 5%). SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed, prorated in accordance with Schedule A. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate EV-M Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-M.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 5 of 5 Schedule A Pricing by Load Factor Monthly Load Factor: Tier 1 (0-5%) Tier 2 (5-10%) Tier 3 (10-15%) Tier 4 (15-20%) Tier 5 (20-25%) Tier 6 (25-30%) Tier 7 (30-35%) Tier 8 (>35%) $ $ $ $ $ $ $ $ Distribution Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh - 1.24 2.48 3.72 4.97 6.21 7.45 8.69 0.03652 0.03130 0.02609 0.02087 0.01565 0.01043 0.00522 - 0.03152 0.02702 0.02251 0.01801 0.01351 0.00901 0.00450 - - 0.32 0.63 0.95 1.27 1.59 1.90 2.22 0.00842 0.00722 0.00601 0.00481 0.00361 0.00241 0.00120 - 0.00842 0.00722 0.00601 0.00481 0.00361 0.00241 0.00120 - - 1.04 2.08 3.12 4.17 5.21 6.25 7.29 0.06686 0.06389 0.06093 0.05796 0.05499 0.05202 0.04906 0.04609 0.03111 0.02814 0.02518 0.02221 0.01924 0.01627 0.01331 0.01034 - 0.25 0.51 0.76 1.02 1.27 1.53 1.78 0.00507 0.00435 0.00362 0.00290 0.00217 0.00145 0.00072 - 0.00507 0.00435 0.00362 0.00290 0.00217 0.00145 0.00072 - ESI Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh Transmission Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh CTA Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh Supersedes Rate EV-M Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate EV-M.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate EV-M.01-01-27.pdf

Extracted from the file · 10,287 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 1 of 5 AVAILABLE to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public. The Company defines public charging stations as those made available and accessible by, the public and may include on-street parking spaces and public parking spaces in lots or parking garages. Additionally, this rate is available to Medium to Heavy Duty (MHD) Fleet electric vehicles for (EV) charging stations on an interim basis until the corresponding MHD tariff is approved in Docket No. 21-09-17 and available for billing of MHD EV charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. This rate is also available for non-public use to direct current fast chargers (“DCFCs”) and installations of four or more networked Level 2 electric vehicle supply equipment (“EVSE”) that are enrolled in a managed charging program under the Workplace & Light-Duty Fleet Charging Program, per PURA decision in Docket No. 17-12-03RE04. Eligibility and acceptance of a customer for service under this rider is subject to the review and approval by the Company. Service under this rider shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company, where the customer’s maximum demand in the current or prior eleven (11) months is 100 kW or greater and less than 350 kW. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DISTRIBUTION DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK $270.00 PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DISTRIBUTION DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER KWH Supersedes Rate EV-M Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-M.01-01-27 $0.00011 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 2 of 5 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER KWH -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGES CHARGES PER KWH ON-PEAK CHARGES PER KWH OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER KWH $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK -$0.03474 -$0.00779 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (MAX DEMAND LESS THAN 500 KW) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK Supersedes Rate EV-M Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-M.01-01-27 $0.16599 $0.13599 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE THIRD-PARTY SERVICE FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH RATE EV-M Page 3 of 5 as per contract -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. §16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt demand in the current month or the preceding eleven (11) months. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. Supersedes Rate EV-M Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-M.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 4 of 5 LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-M, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 5%). SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed, prorated in accordance with Schedule A. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate EV-M Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-M.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY MEDIUM ELECTRIC VEHICLE CHARGING SERVICE RATE EV-M Page 5 of 5 Schedule A Pricing by Load Factor Monthly Load Factor: Tier 1 (0-5%) Tier 2 (5-10%) Tier 3 (10-15%) Tier 4 (15-20%) Tier 5 (20-25%) Tier 6 (25-30%) Tier 7 (30-35%) Tier 8 (>35%) $ $ $ $ $ $ $ $ Distribution Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh - 1.24 2.48 3.72 4.97 6.21 7.45 8.69 0.03652 0.03130 0.02609 0.02087 0.01565 0.01043 0.00522 - 0.03152 0.02702 0.02251 0.01801 0.01351 0.00901 0.00450 - - 0.32 0.63 0.95 1.27 1.59 1.90 2.22 0.00842 0.00722 0.00601 0.00481 0.00361 0.00241 0.00120 - 0.00842 0.00722 0.00601 0.00481 0.00361 0.00241 0.00120 - - 1.04 2.08 3.12 4.17 5.21 6.25 7.29 0.06686 0.06389 0.06093 0.05796 0.05499 0.05202 0.04906 0.04609 0.03111 0.02814 0.02518 0.02221 0.01924 0.01627 0.01331 0.01034 - 0.25 0.51 0.76 1.02 1.27 1.53 1.78 0.00507 0.00435 0.00362 0.00290 0.00217 0.00145 0.00072 - 0.00507 0.00435 0.00362 0.00290 0.00217 0.00145 0.00072 - ESI Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh Transmission Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh CTA Charge Per KW On Peak Charge Per kWh Off-Peak Charge Per kWh Supersedes Rate EV-M Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate EV-M.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate EV-L.01-01-27_REDLINED.pdf

Extracted from the file · 11,508 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 1 of 6 AVAILABLE to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public. The Company defines public charging stations as those made available and accessible by, the public and may include on-street parking spaces and public parking spaces in lots or parking garages. Additionally, this rate is available to Medium to Heavy Duty (MHD) Fleet electric vehicles for (EV) charging stations on an interim basis until the corresponding MHD tariff is approved in Docket No. 21-09-17 and available for billing of MHD EV charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. This rate is also available for non-public use to direct current fast chargers (“DCFCs”) and installations of four or more networked Level 2 electric vehicle supply equipment (“EVSE”) that are enrolled in a managed charging program under the Workplace & Light-Duty Fleet Charging Program, per PURA decision in Docket No. 17-12-03RE04. Eligibility and acceptance of a customer for service under this rider is subject to the review and approval by the Company. Service under this rider shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company, where the customer’s maximum demand in the current or prior eleven (11) months equals or exceeds 350 kW. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. Customers whose meters are not capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .906 and the Production/Transmission Demand charges will be divided by .906. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK $350.00 PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK Supersedes Rate EV-L Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27_REDLINED PER SCHEDULE A PER SCHEDULE A Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE CHARGES PER kWh OFF-PEAK RATE EV-L Page 2 of 6 PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03468 -$0.00767 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) Supersedes Rate EV-L Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 3 of 6 GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.1358716514 $0.1058713514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK October 2026January 2027 $0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh CHARGE PER kWh OFF-PEAK October 2026January 2027 $0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. Supersedes Rate EV-L Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 4 of 6 DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-L, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 5%). SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. Supersedes Rate EV-L Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 5 of 6 SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate EV-L Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 6 of 6 Schedule A Pricing by Load Factor Monthly Load Factor: Tier-1 (0-5%) $ Tier-2 (5-10%) $ Tier-3 (10-15%) $ Tier-4 (15-20%) $ Tier-5 (20-25%) $ Tier-6 (25-30%) $ Tier-7 (30-35%) $ Tier-8 (>35%) $ Distribution Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh - 1.13 2.26 3.39 4.52 5.65 6.78 7.91 0.03262 0.02796 0.02330 0.01864 0.01398 0.00932 0.00466 - 0.02762 0.02367 0.01973 0.01578 0.01184 0.00789 0.00395 - - 0.27 0.53 0.80 1.06 1.33 1.59 1.86 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - - 2.13 4.27 6.40 8.53 10.66 12.80 14.93 0.06593 0.05651 0.04709 0.03767 0.02826 0.01884 0.00942 - 0.03093 0.02651 0.02209 0.01767 0.01326 0.00884 0.00442 - - 0.26 0.53 0.79 1.06 1.32 1.59 1.85 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - ESI Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Transmission Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh CTA Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Supersedes Rate EV-L Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate EV-L.01-01-27.pdf

Extracted from the file · 11,049 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 1 of 6 AVAILABLE to serve the entire requirements of electric vehicle (EV) charging stations, which are available to the public. The Company defines public charging stations as those made available and accessible by, the public and may include on-street parking spaces and public parking spaces in lots or parking garages. Additionally, this rate is available to Medium to Heavy Duty (MHD) Fleet electric vehicles for (EV) charging stations on an interim basis until the corresponding MHD tariff is approved in Docket No. 21-09-17 and available for billing of MHD EV charging stations. MHD Fleet electric vehicles have a Gross Vehicle Weight Rating (GVWR) of 8,501 lbs. and greater. This rate is also available for non-public use to direct current fast chargers (“DCFCs”) and installations of four or more networked Level 2 electric vehicle supply equipment (“EVSE”) that are enrolled in a managed charging program under the Workplace & Light-Duty Fleet Charging Program, per PURA decision in Docket No. 17-12-03RE04. Eligibility and acceptance of a customer for service under this rider is subject to the review and approval by the Company. Service under this rider shall be separately metered and is available only to the load of an electric vehicle charging station approved by the Company, where the customer’s maximum demand in the current or prior eleven (11) months equals or exceeds 350 kW. Electricity shall be delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters, at a location determined by the Company. Customers whose meters are not capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .906 and the Production/Transmission Demand charges will be divided by .906. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DISTRIBUTION DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK $350.00 PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A ELECTRIC SYSTEM IMPROVEMENTS: DISTRIBUTION DEMAND CHARGES Supersedes Rate EV-L Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27 PER SCHEDULE A Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK RATE EV-L Page 2 of 6 PER SCHEDULE A PER SCHEDULE A REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGES CHARGES PER kWh ON-PEAK CHARGES PER kWh OFF-PEAK PER SCHEDULE A PER SCHEDULE A PER SCHEDULE A CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK Supersedes Rate EV-L Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27 -$0.03468 -$0.00767 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 3 of 6 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.16514 $0.13514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK January 2027 February 2027 March 2027 $0.24910 per kWh $0.21620 per kWh $0.10970 per kWh CHARGE PER kWh OFF-PEAK January 2027 February 2027 March 2027 $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Supersedes Rate EV-L Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 4 of 6 Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. DETERMINATION OF AVERAGE MONTHLY LOAD FACTOR: The average monthly load factor used for billing will be determined by the customer’s monthly load factors averaged over the year. This calculation will be determined at the end of each year for billing in the succeeding calendar year. LOAD FACTOR AND SCHEDULE A RATES: Rates for the Distribution, Electric Service Improvement, Transmission and CTA under this tariff schedule in a given month are determined by the Customer’s monthly average load factor and the corresponding rates provided in EV-L, Schedule A. Load factor is defined as the total amount of energy consumed during a month, divided by the maximum demand and number of hours over which electric service is provided during such month, as determined by readings from the Company’s meter. In the event that an eligible account is a new service or does not yet have 12 prior monthly billing periods, the Monthly Load Factor shall be set to Tier 1 (greater than or equal to 0% and less than 5%). SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Supersedes Rate EV-L Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 5 of 6 Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate EV-L Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE ELECTRIC VEHICLE CHARGING SERVICE RATE EV-L Page 6 of 6 Schedule A Pricing by Load Factor Monthly Load Factor: Tier-1 (0-5%) $ Tier-2 (5-10%) $ Tier-3 (10-15%) $ Tier-4 (15-20%) $ Tier-5 (20-25%) $ Tier-6 (25-30%) $ Tier-7 (30-35%) $ Tier-8 (>35%) $ Distribution Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh - 1.13 2.26 3.39 4.52 5.65 6.78 7.91 0.03262 0.02796 0.02330 0.01864 0.01398 0.00932 0.00466 - 0.02762 0.02367 0.01973 0.01578 0.01184 0.00789 0.00395 - - 0.27 0.53 0.80 1.06 1.33 1.59 1.86 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - 0.00683 0.00585 0.00488 0.00390 0.00293 0.00195 0.00098 - - 2.13 4.27 6.40 8.53 10.66 12.80 14.93 0.06593 0.05651 0.04709 0.03767 0.02826 0.01884 0.00942 - 0.03093 0.02651 0.02209 0.01767 0.01326 0.00884 0.00442 - - 0.26 0.53 0.79 1.06 1.32 1.59 1.85 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - 0.00506 0.00434 0.00361 0.00289 0.00217 0.00145 0.00072 - ESI Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Transmission Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh CTA Charge Per kVA On Peak Charge Per kWh Off-Peak Charge Per kWh Supersedes Rate EV-L Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate EV-L.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 117.01-01-27_REDLINED.pdf

Extracted from the file · 9,911 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 1 of 5 AVAILABLE for municipal street and highway lighting for “dusk to dawn” or “midnight” lighting services as provided below within the Company service area where all street lighting equipment within a specifically defined geographic area of the municipality is owned and maintained by the municipality, and the municipality and the Company have executed an agreement for service under this rate. For purposes hereof, such a specifically defined geographic area installation of a municipality's street lighting equipment shall consist of not less than all lighting equipment on a public way lying between the intersections of that public way and two other public ways or one other public way and a dead end or the municipal boundary. INSTALLATION AND MAINTENANCE: The Municipality will provide, own and maintain the street lighting bracket, luminaire, lamp, photocell, fixture conductor wire, hardware and controls for daily dusk-to-dawn operation for each lighting unit, and municipality owned mounting poles. Dedicated street lighting conductors will be owned and maintained by the Company. On an annual basis, the Municipality shall certify to the Company in writing the inventory of the Municipal-owned lights. The inventory shall be identified in the format as shown on Exhibit A of the agreement for service under this rate. All newly installed municipal-owned equipment must include an ownership identification marking or label, on the fixture, which is readily visible from the ground during daylight hours. All municipalowned luminaires purchased from the Company shall be labeled by the municipality at the time of sale but in no case later than six (6) months from the time of sale. In addition, the equipment shall have lamp fixture identification in accordance with the latest "ANSI Standard for High Intensity Discharge Lamps and Luminaires" (ANSI Publication Cl36.15 - 1980 and subsequent revisions). Changes to the street lighting equipment, other than replacement by like size and type, shall be reported to the Company within 30 days of the time of the change. The changes shall be in the format as shown on Exhibit B of the agreement for service under this rate. No street lighting equipment may be installed unless it includes controls for daily dusk (one-half hour after sunset)to-dawn (one-half hour before sunrise) operation resulting in annual illumination of approximately 4,150 hours or for daily dusk (one-half hour after sunset)-to-midnight operation, resulting in annual illumination of approximately 2,210 hours. The services necessary to install, remove, replace, relocate or transfer street lighting equipment attached to Company poles may, at the Municipality’s request, be performed by the Company or by the Municipality’s qualified contractor or qualified municipal employees at the expense of the municipality. When the municipality requests the Company to fix a service to a municipal-owned street light and the problem is found to be with the municipal-owned street lighting equipment, the municipality will be billed the Company’s actual cost for the service call. QUALIFICATIONS FOR CONTRACTORS AND MUNICIPAL EMPLOYEES: Any contractor or municipal employee utilized by the Municipality to perform street light maintenance work on Company owned poles shall be properly trained, certified (i.e., licensed) and, in the case of a contractor, properly insured, prior to performing such work. Such work shall be performed in Supersedes Rate 117 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 117.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 2 of 5 accordance with all applicable federal, state, and local laws, regulations, safety codes and ordinances. Prior to the commencement of any work on Company or jointly owned poles, the municipality shall provide written certification of contractor and employee qualifications to the Company. The installation, maintenance, and removal of connections to the Company’s secondary distribution system is restricted to authorized Company personnel only. MONTHLY DISTRIBUTION RATE: The monthly distribution rates below are calculated with a fixed charge of $0.35 per fixture and a per watt charge of $0.01062 per connected watt. Monthly Charge Components Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand Monthly Charge Incandescent 600 1,000 2,500 4,000 6,000 10,000 59 104 203 328 449 691 0.35 0.35 0.35 0.35 0.35 0.35 0.63 1.10 2.16 3.48 4.77 7.34 $0.98 $1.46 $2.51 $3.84 $5.12 $7.69 Mercury Vapor 4,000 8,000 12,500 22,500 60,000 118 206 287 455 1,103 0.35 0.35 0.35 0.35 0.35 1.25 2.19 3.05 4.83 11.71 $1.61 $2.54 $3.40 $5.19 $12.07 High Pressure Sodium 4,000 6,300 9,500 16,000 13,000 27,500 50,000 140,000 59 84 118 172 190 311 472 1,103 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.63 0.89 1.25 1.83 2.02 3.30 5.01 11.71 $0.98 $1.25 $1.61 $2.18 $2.37 $3.66 $5.37 $12.07 Metal Halide 3,450 5,200 8,500 14,400 22,000 36,000 110,000 72 89 119 207 289 451 1,080 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.76 0.95 1.26 2.20 3.07 4.79 11.47 $1.12 $1.30 $1.62 $2.55 $3.42 $5.14 $11.82 Supersedes Rate 117 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 117.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE Nominal Ratings in Lumens Light-Emitting Diode (LED) Twin Lamps: Other Wattage: RATE 117 Page 3 of 5 Lamp and Ballast Wattage 2,500 4,100 4,800 8,500 13,300 24,500 Monthly Charge Components Customer Demand Monthly Charge 0.35 0.35 0.35 0.35 0.35 0.35 0.30 0.47 0.57 1.08 1.79 2.92 $0.65 $0.82 $0.93 $1.44 $2.15 $3.27 28 44 54 102 169 275 Two times the above wattage and rate $0.35 per fixture plus $0.01062 per connected watt MIDNIGHT SERVICE OPTION: The lights for customers selecting this option will turn off at midnight, and the kWh-based charges for street lighting service will be reduced accordingly. Customers will be responsible for purchasing, installing and maintaining control equipment that meets Company standards in order to receive service under this option. DETERMINATION OF MONTHLY KWH: The determination of monthly lighting kilowatt-hours for purposes of determining monthly sales and computing the fuel adjustment is as follows: Wattage divided by 1,000 times the monthly burning hours below: Standard Dusk to Dawn Service: January February March April May June 433 365 (leap year - 377) 364 310 280 251 July August September October November December 269 301 334 388 413 442 July August September October November December 144 161 181 213 225 236 Optional Midnight Service: January February March April May June 224 185 (leap year - 192) 187 164 153 137 Supersedes Rate 117 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 117.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 4 of 5 MONTHLY PER KWH RATES: ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.03635 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.03012 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00037 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01121 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) Supersedes Rate 117 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 117.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 5 of 5 GENERATION SERVICE CHARGE: CHARGE PER kWh $0.1145713638 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company's Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. Supersedes Rate 117 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 117.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 117.01-01-27.pdf

Extracted from the file · 9,564 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 1 of 5 AVAILABLE for municipal street and highway lighting for “dusk to dawn” or “midnight” lighting services as provided below within the Company service area where all street lighting equipment within a specifically defined geographic area of the municipality is owned and maintained by the municipality, and the municipality and the Company have executed an agreement for service under this rate. For purposes hereof, such a specifically defined geographic area installation of a municipality's street lighting equipment shall consist of not less than all lighting equipment on a public way lying between the intersections of that public way and two other public ways or one other public way and a dead end or the municipal boundary. INSTALLATION AND MAINTENANCE: The Municipality will provide, own and maintain the street lighting bracket, luminaire, lamp, photocell, fixture conductor wire, hardware and controls for daily dusk-to-dawn operation for each lighting unit, and municipality owned mounting poles. Dedicated street lighting conductors will be owned and maintained by the Company. On an annual basis, the Municipality shall certify to the Company in writing the inventory of the Municipal-owned lights. The inventory shall be identified in the format as shown on Exhibit A of the agreement for service under this rate. All newly installed municipal-owned equipment must include an ownership identification marking or label, on the fixture, which is readily visible from the ground during daylight hours. All municipal-owned luminaires purchased from the Company shall be labeled by the municipality at the time of sale but in no case later than six (6) months from the time of sale. In addition, the equipment shall have lamp fixture identification in accordance with the latest "ANSI Standard for High Intensity Discharge Lamps and Luminaires" (ANSI Publication Cl36.15 - 1980 and subsequent revisions). Changes to the street lighting equipment, other than replacement by like size and type, shall be reported to the Company within 30 days of the time of the change. The changes shall be in the format as shown on Exhibit B of the agreement for service under this rate. No street lighting equipment may be installed unless it includes controls for daily dusk (one-half hour after sunset)-to-dawn (one-half hour before sunrise) operation resulting in annual illumination of approximately 4,150 hours or for daily dusk (one-half hour after sunset)-to-midnight operation, resulting in annual illumination of approximately 2,210 hours. The services necessary to install, remove, replace, relocate or transfer street lighting equipment attached to Company poles may, at the Municipality’s request, be performed by the Company or by the Municipality’s qualified contractor or qualified municipal employees at the expense of the municipality. When the municipality requests the Company to fix a service to a municipal-owned street light and the problem is found to be with the municipal-owned street lighting equipment, the municipality will be billed the Company’s actual cost for the service call. QUALIFICATIONS FOR CONTRACTORS AND MUNICIPAL EMPLOYEES: Any contractor or municipal employee utilized by the Municipality to perform street light maintenance work on Company owned poles shall be properly trained, certified (i.e., licensed) and, in the case of a contractor, properly insured, prior to performing such work. Such work shall be performed in Supersedes Rate 117 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 117.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 2 of 5 accordance with all applicable federal, state, and local laws, regulations, safety codes and ordinances. Prior to the commencement of any work on Company or jointly owned poles, the municipality shall provide written certification of contractor and employee qualifications to the Company. The installation, maintenance, and removal of connections to the Company’s secondary distribution system is restricted to authorized Company personnel only. MONTHLY DISTRIBUTION RATE: The monthly distribution rates below are calculated with a fixed charge of $0.35 per fixture and a per watt charge of $0.01062 per connected watt. Monthly Charge Components Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand Monthly Charge Incandescent 600 1,000 2,500 4,000 6,000 10,000 59 104 203 328 449 691 0.35 0.35 0.35 0.35 0.35 0.35 0.63 1.10 2.16 3.48 4.77 7.34 $0.98 $1.46 $2.51 $3.84 $5.12 $7.69 Mercury Vapor 4,000 8,000 12,500 22,500 60,000 118 206 287 455 1,103 0.35 0.35 0.35 0.35 0.35 1.25 2.19 3.05 4.83 11.71 $1.61 $2.54 $3.40 $5.19 $12.07 High Pressure Sodium 4,000 6,300 9,500 16,000 13,000 27,500 50,000 140,000 59 84 118 172 190 311 472 1,103 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.63 0.89 1.25 1.83 2.02 3.30 5.01 11.71 $0.98 $1.25 $1.61 $2.18 $2.37 $3.66 $5.37 $12.07 Metal Halide 3,450 5,200 8,500 14,400 22,000 36,000 110,000 72 89 119 207 289 451 1,080 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.76 0.95 1.26 2.20 3.07 4.79 11.47 $1.12 $1.30 $1.62 $2.55 $3.42 $5.14 $11.82 Supersedes Rate 117 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 117.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE Nominal Ratings in Lumens Light-Emitting Diode (LED) Twin Lamps: Other Wattage: 2,500 4,100 4,800 8,500 13,300 24,500 RATE 117 Page 3 of 5 Lamp and Ballast Wattage Monthly Charge Components Customer Demand Monthly Charge 0.35 0.35 0.35 0.35 0.35 0.35 0.30 0.47 0.57 1.08 1.79 2.92 $0.65 $0.82 $0.93 $1.44 $2.15 $3.27 28 44 54 102 169 275 Two times the above wattage and rate $0.35 per fixture plus $0.01062 per connected watt MIDNIGHT SERVICE OPTION: The lights for customers selecting this option will turn off at midnight, and the kWh-based charges for street lighting service will be reduced accordingly. Customers will be responsible for purchasing, installing and maintaining control equipment that meets Company standards in order to receive service under this option. DETERMINATION OF MONTHLY KWH: The determination of monthly lighting kilowatt-hours for purposes of determining monthly sales and computing the fuel adjustment is as follows: Wattage divided by 1,000 times the monthly burning hours below: Standard Dusk to Dawn Service: January February March April May June 433 365 (leap year - 377) 364 310 280 251 July August September October November December 269 301 334 388 413 442 July August September October November December 144 161 181 213 225 236 Optional Midnight Service: January February March April May June 224 185 (leap year - 192) 187 164 153 137 Supersedes Rate 117 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 117.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 4 of 5 MONTHLY PER KWH RATES: ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.03635 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.03012 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00037 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01121 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) Supersedes Rate 117 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 117.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY PARTIAL STREET LIGHTING SERVICE RATE 117 Page 5 of 5 GENERATION SERVICE CHARGE: CHARGE PER kWh $0.13638 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company's Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. Supersedes Rate 117 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 117.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 116.01-01-27_REDLINED.pdf

Extracted from the file · 17,662 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 1 of 9 AVAILABLE for street, highway, off-street and security lighting for “dusk to dawn” or “midnight” lighting services as provided below. Excludes service off the public highway except where the fixture is mounted on a Company owned distribution pole. MONTHLY DISTRIBUTION RATE: Effective May 26, 2018 only Light-Emitting Diode (LED) luminaires will be installed. Overhead Service: Includes street lights, flood lights, and spot lights served overhead and mounted on an existing distribution supply pole with existing secondary distribution. Underground Service: Includes street lights, flood lights, and spot lights served underground and mounted 15 feet or higher on a direct buried, center-bored wood or fiberglass pole. If mounted on an anchor base metal or fiberglass pole installed after May 1, 1980, add $10.45 to the monthly rate below. Equipment Overhead Monthly Charge Underground Monthly Charge 2.32 2.32 2.32 2.32 2.32 2.32 2.32 2.32 5.02 5.21 5.12 5.44 5.44 5.67 6.64 10.95 $8.31 $8.77 $9.04 $10.12 $9.93 $11.64 $14.32 $25.33 $14.96 $15.42 $15.69 $16.77 $16.58 $18.29 $20.97 $31.98 0.76 0.95 1.26 2.00 2.20 3.07 4.79 11.47 2.32 2.32 2.32 2.32 2.32 2.32 2.32 2.32 5.51 5.54 5.54 5.70 5.70 5.24 6.96 11.30 $8.94 $9.15 $9.47 $10.37 $10.57 $10.98 $14.42 $25.44 $15.59 $15.80 $16.12 $17.02 $17.22 $17.63 $21.07 $32.09 0.30 0.38 0.54 0.98 1.51 2.34 0.23 0.23 0.23 0.23 0.23 0.23 6.52 6.42 6.42 7.00 7.62 9.16 $7.40 $7.38 $7.54 $8.56 $9.71 $12.07 $14.05 $14.03 $14.19 $15.21 $16.36 $18.72 Monthly Charge Components Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand O&M 4,000 6,300 9,500 13,000 16,000 27,500 50,000 140,000 59 84 118 190 172 311 472 1,103 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.63 0.89 1.25 2.02 1.83 3.30 5.01 11.71 Metal Halide* 3,450 5,200 8,500 12,900 14,400 22,000 36,000 110,000 72 89 119 188 207 289 451 1,080 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 Light-Emitting Diode (LED) 2,500 4,100 4,800 8,500 13,300 24,500 28 36 51 92 142 220 0.35 0.35 0.35 0.35 0.35 0.35 High Pressure Sodium* Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING LED Floodlights RATE 116 Page 2 of 9 Equipment Overhead Monthly Charge Underground Monthly Charge 9.10 9.91 13.45 $10.95 $12.61 $18.18 $17.60 $19.26 $24.83 Monthly Charge Components Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand 14,579 23,067 48,004 119 199 391 0.35 0.35 0.35 1.26 2.11 4.15 O&M 0.23 0.23 0.23 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. The Company may install LED street lighting comparable to the options listed above, but that have different wattage ratings. The Distribution wattage charge for such installations shall be based on the approved demand charge per connected watt. All other charges, including the Distribution customer, O&M and equipment charges, apply as stated in this schedule. Light Glare Shield: $3.32 per month Vandal Shield for Cutoff Fixtures: $4.74 per month Overhead Twin Lamps: Two times the above wattage and rate. As an option to the above monthly charges for underground lighting, the customer may make a one-time payment, plus any applicable compensation for tax liability, and pay the rate for Overhead Service. Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 3 of 9 Standard Decorative Lighting: Includes standard decorative lighting fixtures (post-top Traditional or Contemporary) served underground on a low mounting, direct buried, wood**, metal**, or fiberglass pole, and installed on or after May 1, 1977. **The Company no longer uses wood or metal low-mounting poles for new installations. For customers taking service hereunder as of May 1, 1977, deduct $2.32 from the monthly rate below. Nominal Ratings in Lumens Lamp and Ballast Wattage High Pressure Sodium* 4,000 6,300 9,500 16,000 Metal Halide* Monthly Charge Components Customer Demand O&M Equipment Monthly Charge 59 84 118 172 0.35 0.35 0.35 0.35 0.63 0.89 1.25 1.83 2.32 2.32 2.32 2.32 7.29 7.48 7.39 7.71 $10.58 $11.04 $11.31 $12.20 3,450 5,200 8,500 12,900 14,400 72 89 119 188 207 0.35 0.35 0.35 0.35 0.35 0.76 0.95 1.26 2.00 2.20 2.32 2.32 2.32 2.32 2.32 7.78 7.81 7.81 7.97 7.97 $11.21 $11.42 $11.74 $12.64 $12.84 LED Contemporary 2,788 3,898 36 51 0.35 0.35 0.38 0.54 0.23 0.23 9.70 9.70 $10.66 $10.82 LED Traditional 3,311 4,643 28 51 0.35 0.35 0.30 0.54 0.23 0.23 9.80 9.70 $10.68 $10.82 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. As an option to the above monthly charges for decorative lighting, the customer may make a onetime payment, plus any applicable compensation for tax liability, and pay the rate for Overhead Service. Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 4 of 9 Premium Decorative Lighting Includes premium decorative lighting fixture served underground on an anchor base and cast aluminum pole either 12 or 14 feet. Nominal Ratings in Lumens Lamp and Ballast Wattage Metal Halide* 8,500 Light Emitting Diode (LED) 4,234 Monthly Charge Components Customer Demand O&M Equipment Monthly Charge 119 0.35 1.26 2.32 30.66 $34.60 51 0.35 0.54 0.23 32.74 $33.86 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. Premium Decorative Lighting (Categories A - D) - Closed to new customers effective January 1, 2008: Includes premium decorative lighting fixtures (e.g., acorn style) served underground on an anchor base, pole (as described below), or similar cost installation. Extruded Aluminum Pole Fiberglass Pole Cast Aluminum Pole Anchor Base Cast Iron Pole High Pressure Sodium* (Category A) (Category B) (Category C) (Category D) Category Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand O&M Equipment Monthly Charge A A A A 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $29.51 $29.51 $29.51 $29.51 $33.07 $33.43 $34.01 $35.48 B B B B 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $34.62 $34.62 $34.62 $34.62 $38.18 $38.54 $39.12 $40.59 C C C C 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $39.46 $39.46 $39.46 $39.46 $43.02 $43.38 $43.95 $45.43 D D D D 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $49.49 $49.49 $49.49 $49.49 $53.05 $53.41 $53.98 $55.46 Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Monthly Charge Components Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING Metal Halide* RATE 116 Page 5 of 9 A A A A 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $30.66 $30.66 $30.66 $30.66 $34.28 $34.60 $35.53 $36.40 B B B B 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $35.64 $35.64 $35.64 $35.64 $39.26 $39.58 $40.51 $41.38 C C C C 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $40.62 $40.62 $40.62 $40.62 $44.23 $44.55 $45.49 $46.36 D D D D 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $50.48 $50.48 $50.48 $50.48 $54.09 $54.41 $55.34 $56.22 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. Customized Decorative Fixture: Add $4.17 to the monthly rate above. As an option to the above monthly charges for decorative lighting, the customer may make a onetime payment, plus any applicable compensation for tax liability, and pay the rate for Overhead Service. OVERHEAD POLES ON PRIVATE PROPERTY: (Available only to present customers as of July 31, 1971): Where required only for streetlighting purposes, the customer will pay outright for overhead poles or in the case of a single wood overhead pole may pay a monthly charge of $2.93. MIDNIGHT SERVICE OPTION: The lights for customers selecting this option will turn off at midnight, and the kWh-based charges for streetlighting service will be reduced accordingly. Customers shall pay an upfront charge for the incremental cost of controls required to be installed by the Company to provide this service. Such control equipment shall normally be installed during group re-lamping. When such installation is not performed during group re-lamping, the upfront charge shall also include the additional cost of labor associated with the installation. Other costs, such as traffic control, are not included in these charges, and will be charged to the customer as per standard Company practice. Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 6 of 9 DETERMINATION OF MONTHLY KWH: The determination of monthly lighting kilowatt-hours for purposes of determining monthly sales and computing the fuel adjustment is as follows: Wattage divided by 1,000 times ninety-nine percent (99%) of the monthly burning hours below (as per Docket No. 03-07-02): Standard Dusk to Dawn Service: January February March April May June 433 365 (leap year - 377) 364 310 280 251 July August September October November December 269 301 334 388 413 442 July August September October November December 144 161 181 213 225 236 Optional Midnight Service: January February March April May June 224 185 (leap year - 192) 187 164 153 137 MONTHLY PER KWH RATES: ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.03635 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.03046 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED -$0.00037 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 7 of 9 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01133 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICES: CHARGE PER kWh $0.1145713638 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company's Energy and Transmission Adjustment Clauses. Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 8 of 9 COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SERVICE AND SUPPLY OF FACILITIES: All street lights shall be operated continually each and every night from approximately one-half hour after sunset until one-half hour before sunrise for dusk to dawn service, or until midnight for midnight service. All poles, lamps, brackets, luminaires and related equipment shall be furnished and maintained by the Company. All energy and normal renewal of lamps shall be furnished and controlled by the Company at its expense. Broken, cracked and damaged lamps and other equipment shall be replaced by the Company at the customer's expense. The Company shall supply street lights whenever requested by the customer, including the poles, lamps, brackets, luminaires and related equipment therefore. All such poles, lamps, brackets, luminaires and related equipment shall be of a modern type approved for normal use by the Company. The Company shall bear the full cost of such lights except that the additional cost of underground distribution facilities required to supply street lighting service and the incremental, installed cost of midnight service control equipment shall be paid by the customer. Conversions from incandescent or mercury vapor to high pressure sodium lights will be scheduled according to the resources of the Company. Priority for conversions will be given to those customers who have agreed to an overall conversion plan. If at the request of the customer a luminaire is removed prior to being installed for at least fourteen (14) years, the customer upon removal of the luminaire will be billed an amount representative of the original installed cost less the depreciated cost and less the salvage value of the luminaire and related equipment. If a municipality elects to purchase the Company's streetlighting equipment prior to being installed for at least fourteen (14) years, the purchase price shall equal the original installed cost of the existing equipment less the depreciation together with any unrecovered cost of facilities replaced by the existing equipment, and the municipality will thereafter be billed on Rate 117. FAILURE OF LAMPS TO LIGHT: The Company will replace inoperative lamps within three working days after written notification by the customer. No credit will be allowed for periods during which lamps are out of service. Written notification shall be deemed sufficient if it includes the exact location of the light. Exact Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 9 of 9 location includes either the street and pole number or the street number in front of which the light is located. MUNICIPALITY PURCHASE OPTION: A Municipality may purchase street lighting equipment over a period not to exceed five years. If the Municipality elects to phase-in the purchase of the Company’s street lights over multiple years, the Municipality must purchase all street lights billed to the Municipality’s account(s) within five years from the date of the first purchase. All purchase phases shall consist of contiguous geographic sections as described in Rate 117. Partial Street Lighting Service Rate 117 is the applicable Rate for street lighting equipment owned by a Municipality. Supersedes Rate 116 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 116.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 116.01-01-27.pdf

Extracted from the file · 17,042 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 1 of 9 AVAILABLE for street, highway, off-street and security lighting for “dusk to dawn” or “midnight” lighting services as provided below. Excludes service off the public highway except where the fixture is mounted on a Company owned distribution pole. MONTHLY DISTRIBUTION RATE: Effective May 26, 2018 only Light-Emitting Diode (LED) luminaires will be installed. Overhead Service: Includes street lights, flood lights, and spot lights served overhead and mounted on an existing distribution supply pole with existing secondary distribution. Underground Service: Includes street lights, flood lights, and spot lights served underground and mounted 15 feet or higher on a direct buried, center-bored wood or fiberglass pole. If mounted on an anchor base metal or fiberglass pole installed after May 1, 1980, add $10.45 to the monthly rate below. Equipment Overhead Monthly Charge Underground Monthly Charge 2.32 2.32 2.32 2.32 2.32 2.32 2.32 2.32 5.02 5.21 5.12 5.44 5.44 5.67 6.64 10.95 $8.31 $8.77 $9.04 $10.12 $9.93 $11.64 $14.32 $25.33 $14.96 $15.42 $15.69 $16.77 $16.58 $18.29 $20.97 $31.98 0.76 0.95 1.26 2.00 2.20 3.07 4.79 11.47 2.32 2.32 2.32 2.32 2.32 2.32 2.32 2.32 5.51 5.54 5.54 5.70 5.70 5.24 6.96 11.30 $8.94 $9.15 $9.47 $10.37 $10.57 $10.98 $14.42 $25.44 $15.59 $15.80 $16.12 $17.02 $17.22 $17.63 $21.07 $32.09 0.30 0.38 0.54 0.98 1.51 2.34 0.23 0.23 0.23 0.23 0.23 0.23 6.52 6.42 6.42 7.00 7.62 9.16 $7.40 $7.38 $7.54 $8.56 $9.71 $12.07 $14.05 $14.03 $14.19 $15.21 $16.36 $18.72 Monthly Charge Components Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand O&M 4,000 6,300 9,500 13,000 16,000 27,500 50,000 140,000 59 84 118 190 172 311 472 1,103 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.63 0.89 1.25 2.02 1.83 3.30 5.01 11.71 Metal Halide* 3,450 5,200 8,500 12,900 14,400 22,000 36,000 110,000 72 89 119 188 207 289 451 1,080 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 Light-Emitting Diode (LED) 2,500 4,100 4,800 8,500 13,300 24,500 28 36 51 92 142 220 0.35 0.35 0.35 0.35 0.35 0.35 High Pressure Sodium* Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING LED Floodlights RATE 116 Page 2 of 9 Equipment Overhead Monthly Charge Underground Monthly Charge 9.10 9.91 13.45 $10.95 $12.61 $18.18 $17.60 $19.26 $24.83 Monthly Charge Components Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand 14,579 23,067 48,004 119 199 391 0.35 0.35 0.35 1.26 2.11 4.15 O&M 0.23 0.23 0.23 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. The Company may install LED street lighting comparable to the options listed above, but that have different wattage ratings. The Distribution wattage charge for such installations shall be based on the approved demand charge per connected watt. All other charges, including the Distribution customer, O&M and equipment charges, apply as stated in this schedule. Light Glare Shield: $3.32 per month Vandal Shield for Cutoff Fixtures: $4.74 per month Overhead Twin Lamps: Two times the above wattage and rate. As an option to the above monthly charges for underground lighting, the customer may make a one-time payment, plus any applicable compensation for tax liability, and pay the rate for Overhead Service. Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 3 of 9 Standard Decorative Lighting: Includes standard decorative lighting fixtures (post-top Traditional or Contemporary) served underground on a low mounting, direct buried, wood**, metal**, or fiberglass pole, and installed on or after May 1, 1977. **The Company no longer uses wood or metal low-mounting poles for new installations. For customers taking service hereunder as of May 1, 1977, deduct $2.32 from the monthly rate below. Nominal Ratings in Lumens Lamp and Ballast Wattage High Pressure Sodium* 4,000 6,300 9,500 16,000 Metal Halide* Monthly Charge Components Customer Demand O&M Equipment Monthly Charge 59 84 118 172 0.35 0.35 0.35 0.35 0.63 0.89 1.25 1.83 2.32 2.32 2.32 2.32 7.29 7.48 7.39 7.71 $10.58 $11.04 $11.31 $12.20 3,450 5,200 8,500 12,900 14,400 72 89 119 188 207 0.35 0.35 0.35 0.35 0.35 0.76 0.95 1.26 2.00 2.20 2.32 2.32 2.32 2.32 2.32 7.78 7.81 7.81 7.97 7.97 $11.21 $11.42 $11.74 $12.64 $12.84 LED Contemporary 2,788 3,898 36 51 0.35 0.35 0.38 0.54 0.23 0.23 9.70 9.70 $10.66 $10.82 LED Traditional 3,311 4,643 28 51 0.35 0.35 0.30 0.54 0.23 0.23 9.80 9.70 $10.68 $10.82 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. As an option to the above monthly charges for decorative lighting, the customer may make a one-time payment, plus any applicable compensation for tax liability, and pay the rate for Overhead Service. Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 4 of 9 Premium Decorative Lighting Includes premium decorative lighting fixture served underground on an anchor base and cast aluminum pole either 12 or 14 feet. Nominal Ratings in Lumens Lamp and Ballast Wattage Metal Halide* 8,500 Light Emitting Diode (LED) 4,234 Monthly Charge Components Customer Demand O&M Equipment Monthly Charge 119 0.35 1.26 2.32 30.66 $34.60 51 0.35 0.54 0.23 32.74 $33.86 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. Premium Decorative Lighting (Categories A - D) - Closed to new customers effective January 1, 2008: Includes premium decorative lighting fixtures (e.g., acorn style) served underground on an anchor base, pole (as described below), or similar cost installation. Extruded Aluminum Pole Fiberglass Pole Cast Aluminum Pole Anchor Base Cast Iron Pole High Pressure Sodium* (Category A) (Category B) (Category C) (Category D) Category Nominal Ratings in Lumens Lamp and Ballast Wattage Customer Demand O&M Equipment Monthly Charge A A A A 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $29.51 $29.51 $29.51 $29.51 $33.07 $33.43 $34.01 $35.48 B B B B 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $34.62 $34.62 $34.62 $34.62 $38.18 $38.54 $39.12 $40.59 C C C C 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $39.46 $39.46 $39.46 $39.46 $43.02 $43.38 $43.95 $45.43 D D D D 6,300 9,500 16,000 27,500 84 118 172 311 0.35 0.35 0.35 0.35 0.89 1.25 1.83 3.30 2.32 2.32 2.32 2.32 $49.49 $49.49 $49.49 $49.49 $53.05 $53.41 $53.98 $55.46 Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Monthly Charge Components Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING Metal Halide* RATE 116 Page 5 of 9 A A A A 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $30.66 $30.66 $30.66 $30.66 $34.28 $34.60 $35.53 $36.40 B B B B 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $35.64 $35.64 $35.64 $35.64 $39.26 $39.58 $40.51 $41.38 C C C C 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $40.62 $40.62 $40.62 $40.62 $44.23 $44.55 $45.49 $46.36 D D D D 5,200 8,500 14,400 22,000 89 119 207 289 0.35 0.35 0.35 0.35 0.95 1.26 2.20 3.07 2.32 2.32 2.32 2.32 $50.48 $50.48 $50.48 $50.48 $54.09 $54.41 $55.34 $56.22 *No additional luminaires of these types will be installed. Existing High Pressure Sodium and Metal Halide luminaires will be replaced by comparable LED luminaires at the time of replacement. Customized Decorative Fixture: Add $4.17 to the monthly rate above. As an option to the above monthly charges for decorative lighting, the customer may make a one-time payment, plus any applicable compensation for tax liability, and pay the rate for Overhead Service. OVERHEAD POLES ON PRIVATE PROPERTY: (Available only to present customers as of July 31, 1971): Where required only for streetlighting purposes, the customer will pay outright for overhead poles or in the case of a single wood overhead pole may pay a monthly charge of $2.93. MIDNIGHT SERVICE OPTION: The lights for customers selecting this option will turn off at midnight, and the kWh-based charges for streetlighting service will be reduced accordingly. Customers shall pay an upfront charge for the incremental cost of controls required to be installed by the Company to provide this service. Such control equipment shall normally be installed during group re-lamping. When such installation is not performed during group re-lamping, the upfront charge shall also include the additional cost of labor associated with the installation. Other costs, such as traffic control, are not included in these charges, and will be charged to the customer as per standard Company practice. Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 6 of 9 DETERMINATION OF MONTHLY KWH: The determination of monthly lighting kilowatt-hours for purposes of determining monthly sales and computing the fuel adjustment is as follows: Wattage divided by 1,000 times ninety-nine percent (99%) of the monthly burning hours below (as per Docket No. 03-07-02): Standard Dusk to Dawn Service: January February March April May June 433 365 (leap year - 377) 364 310 280 251 July August September October November December 269 301 334 388 413 442 July August September October November December 144 161 181 213 225 236 Optional Midnight Service: January February March April May June 224 185 (leap year - 192) 187 164 153 137 MONTHLY PER KWH RATES: ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.03635 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.03046 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 -$0.00037 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 7 of 9 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01133 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICES: CHARGE PER kWh $0.13638 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company's Energy and Transmission Adjustment Clauses. Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 8 of 9 COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SERVICE AND SUPPLY OF FACILITIES: All street lights shall be operated continually each and every night from approximately one-half hour after sunset until one-half hour before sunrise for dusk to dawn service, or until midnight for midnight service. All poles, lamps, brackets, luminaires and related equipment shall be furnished and maintained by the Company. All energy and normal renewal of lamps shall be furnished and controlled by the Company at its expense. Broken, cracked and damaged lamps and other equipment shall be replaced by the Company at the customer's expense. The Company shall supply street lights whenever requested by the customer, including the poles, lamps, brackets, luminaires and related equipment therefore. All such poles, lamps, brackets, luminaires and related equipment shall be of a modern type approved for normal use by the Company. The Company shall bear the full cost of such lights except that the additional cost of underground distribution facilities required to supply street lighting service and the incremental, installed cost of midnight service control equipment shall be paid by the customer. Conversions from incandescent or mercury vapor to high pressure sodium lights will be scheduled according to the resources of the Company. Priority for conversions will be given to those customers who have agreed to an overall conversion plan. If at the request of the customer a luminaire is removed prior to being installed for at least fourteen (14) years, the customer upon removal of the luminaire will be billed an amount representative of the original installed cost less the depreciated cost and less the salvage value of the luminaire and related equipment. If a municipality elects to purchase the Company's streetlighting equipment prior to being installed for at least fourteen (14) years, the purchase price shall equal the original installed cost of the existing equipment less the depreciation together with any unrecovered cost of facilities replaced by the existing equipment, and the municipality will thereafter be billed on Rate 117. FAILURE OF LAMPS TO LIGHT: The Company will replace inoperative lamps within three working days after written notification by the customer. No credit will be allowed for periods during which lamps are out of service. Written notification shall be deemed sufficient if it includes the exact location of the light. Exact Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY STREET AND SECURITY LIGHTING RATE 116 Page 9 of 9 location includes either the street and pole number or the street number in front of which the light is located. MUNICIPALITY PURCHASE OPTION: A Municipality may purchase street lighting equipment over a period not to exceed five years. If the Municipality elects to phase-in the purchase of the Company’s street lights over multiple years, the Municipality must purchase all street lights billed to the Municipality’s account(s) within five years from the date of the first purchase. All purchase phases shall consist of contiguous geographic sections as described in Rate 117. Partial Street Lighting Service Rate 117 is the applicable Rate for street lighting equipment owned by a Municipality. Supersedes Rate 116 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 116.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 115.01-01-27_REDLINED.pdf

Extracted from the file · 3,794 characters
CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY UNMETERED ELECTRIC SERVICE RATE 115 Page 1 of 2 AVAILABLE for traffic, airfield, navigation, sign lighting, cable tv, and similar uses, where distribution facilities are suitable for the service requested, subject to the following conditions: (1) (2) (3) A. When such equipment is operated daily on a fixed schedule and the monthly demand and energy use of each installation can be accurately predicted. The customer shall install, own, operate, and maintain all equipment. The customer shall notify the Company, in writing, of all load changes within thirty (30) days. MONTHLY RATE: DEMAND CHARGE CHARGE PER kWh MINIMUM MONTHLY BILL $11.86 per kW $0.1961522547 $6.60 per Unit The determination of the MONTHLY RATE for an unmetered service is the greater of the MINIMUM MONTHLY BILL amount, or the bill amount based on the sum of the kW Demand times the DEMAND CHARGE and the kWh usage times the CHARGE PER kWh. The 30-minute kilowatthour demand and the kilowatthour usage used in the MONTHLY RATE calculation are based upon an engineering analysis of the load and operating characteristics of the unmetered service as submitted by the Customer, reviewed by the Company, and agreed to in a signed contract. ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER KWH $0.01050 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01207 CHARGES INCLUDED IN THE ABOVE RATES, ON AN EQUIVALENT PER-KWH BASIS: REVENUE ADJUSTMENT MECHANISM TRANSMISSION SYSTEMS BENEFITS CHARGE COMPETITIVE TRANSITION ASSESSMENT GENERATION SERVICE CONSERVATION CHARGE CONSERVATION ADJUSTMENT MECHANISM RENEWABLE ENERGY CHARGE $0.00011 per kWh $0.03243 per kWh -$0.00038 per kWh $0.00505 per kWh $0.1143914371 per kWh $0.00000 per kWh $0.00600 per kWh $0.00100 per kWh DISTRIBUTION CHARGE equals the total charge less the above equivalent per kWh charges. Supersedes Rate 115 Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 115.01-01-27_REDLINED Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY UNMETERED ELECTRIC SERVICE RATE 115 Page 2 of 2 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company's Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. ANNUAL REPORT: The Company provides an annual unmetered services bill summary report by account for customer review. The report provides a summary of the number and types of equipment being billed. Supersedes Rate 115 Effective MayJuly 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 115.01-01-27_REDLINED Effective JulyJanuary 1, 20262027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 115.01-01-27.pdf

Extracted from the file · 3,663 characters
CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY UNMETERED ELECTRIC SERVICE RATE 115 Page 1 of 2 AVAILABLE for traffic, airfield, navigation, sign lighting, cable tv, and similar uses, where distribution facilities are suitable for the service requested, subject to the following conditions: (1) (2) (3) A. When such equipment is operated daily on a fixed schedule and the monthly demand and energy use of each installation can be accurately predicted. The customer shall install, own, operate, and maintain all equipment. The customer shall notify the Company, in writing, of all load changes within thirty (30) days. MONTHLY RATE: DEMAND CHARGE CHARGE PER kWh MINIMUM MONTHLY BILL $11.86 per kW $0.22547 $6.60 per Unit The determination of the MONTHLY RATE for an unmetered service is the greater of the MINIMUM MONTHLY BILL amount, or the bill amount based on the sum of the kW Demand times the DEMAND CHARGE and the kWh usage times the CHARGE PER kWh. The 30-minute kilowatthour demand and the kilowatthour usage used in the MONTHLY RATE calculation are based upon an engineering analysis of the load and operating characteristics of the unmetered service as submitted by the Customer, reviewed by the Company, and agreed to in a signed contract. ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER KWH $0.01050 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01207 CHARGES INCLUDED IN THE ABOVE RATES, ON AN EQUIVALENT PER-KWH BASIS: REVENUE ADJUSTMENT MECHANISM TRANSMISSION SYSTEMS BENEFITS CHARGE COMPETITIVE TRANSITION ASSESSMENT GENERATION SERVICE CONSERVATION CHARGE CONSERVATION ADJUSTMENT MECHANISM RENEWABLE ENERGY CHARGE $0.00011 per kWh $0.03243 per kWh -$0.00038 per kWh $0.00505 per kWh $0.14371 per kWh $0.00000 per kWh $0.00600 per kWh $0.00100 per kWh DISTRIBUTION CHARGE equals the total charge less the above equivalent per kWh charges. Supersedes Rate 115 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 115.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY UNMETERED ELECTRIC SERVICE RATE 115 Page 2 of 2 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company's Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. ANNUAL REPORT: The Company provides an annual unmetered services bill summary report by account for customer review. The report provides a summary of the number and types of equipment being billed. Supersedes Rate 115 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 115.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 58.01-01-27_REDLINED.pdf

Extracted from the file · 9,542 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 1 of 5 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers who are not manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are not engaged in manufacturing as defined in PA 92193 amending Subsections 12-81 (72) and 12-94c, and are taking service on the effective date of this rate whose demand has previously equaled or exceeded 1,000 kW. Customers whose projected demand is expected to exceed 1,000 kW must demonstrate that this level of demand is not transitory. Customers whose maximum demand has not exceeded 1,000 kW for 12 consecutive months must take service under Rate 56. Customers on Rate 56 whose maximum demand is below 1,000 kW may not take service under this rate. If a customer's prospective maximum demand is below 1,000 kW due to demonstrable conservation and load management measures then the customer may take service immediately under the appropriate general service rate. Customers whose meters are not yet capable of measuring kVA demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .903 and the Production/Transmission Demand charges will be divided by .895. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: Customer Service Charge: The Customer Service Charge shall be based on the customer’s highest average 30minute kilowatt demand in the current month and the preceding 11 months (on- or offpeak) as follows: FOR LESS THAN 2,000 kW DEMAND FOR 2,000 kW BUT LESS THAN 5,000 kW DEMAND FOR 5,000 kW DEMAND AND OVER $1,100.00 $2,200.00 $4,200.00 DIST. DEMAND CHARGE $7.53 per kVA Supersedes Rate 58 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 2 of 5 ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.91 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $17.04 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $2.19 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK Supersedes Rate 58 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27_REDLINED -$0.03455 -$0.00739 Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 3 of 5 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: CHARGE PER kWh ON-PEAK October 2026January 2027 $0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh CHARGE PER kWh OFF-PEAK October2026January 2027 $0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 58 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 4 of 5 DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kVA demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand ratchet solely to reflect lower lead levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit based on the highest average 30-minute kilowatt demand in the current month or the preceding (11) months shall be applied to the bill equal to: First 1,000 kW All over 1,000 kW 3. $.20/kW $.10/kW Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. Supersedes Rate 58 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 5 of 5 METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 58 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate 58.01-01-27.pdf

Extracted from the file · 9,151 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 1 of 5 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers who are not manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are not engaged in manufacturing as defined in PA 92193 amending Subsections 12-81 (72) and 12-94c, and are taking service on the effective date of this rate whose demand has previously equaled or exceeded 1,000 kW. Customers whose projected demand is expected to exceed 1,000 kW must demonstrate that this level of demand is not transitory. Customers whose maximum demand has not exceeded 1,000 kW for 12 consecutive months must take service under Rate 56. Customers on Rate 56 whose maximum demand is below 1,000 kW may not take service under this rate. If a customer's prospective maximum demand is below 1,000 kW due to demonstrable conservation and load management measures then the customer may take service immediately under the appropriate general service rate. Customers whose meters are not yet capable of measuring kVA demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .903 and the Production/Transmission Demand charges will be divided by .895. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: Customer Service Charge: The Customer Service Charge shall be based on the customer’s highest average 30minute kilowatt demand in the current month and the preceding 11 months (on- or offpeak) as follows: FOR LESS THAN 2,000 kW DEMAND FOR 2,000 kW BUT LESS THAN 5,000 kW DEMAND FOR 5,000 kW DEMAND AND OVER $1,100.00 $2,200.00 $4,200.00 DIST. DEMAND CHARGE $7.53 per kVA Supersedes Rate 58 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 2 of 5 ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.91 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $17.04 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $2.19 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK Supersedes Rate 58 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27 -$0.03455 -$0.00739 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 3 of 5 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: CHARGE PER kWh ON-PEAK January 2027 February 2027 March 2027 $0.24910 per kWh $0.21620 per kWh $0.10970 per kWh CHARGE PER kWh OFF-PEAK January 2027 February 2027 March 2027 $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 58 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 4 of 5 DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kVA demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand ratchet solely to reflect lower lead levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit based on the highest average 30-minute kilowatt demand in the current month or the preceding (11) months shall be applied to the bill equal to: First 1,000 kW All over 1,000 kW 3. $.20/kW $.10/kW Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. Supersedes Rate 58 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 58 Page 5 of 5 METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 58 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 58.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 57.01-01-27_REDLINED.pdf

Extracted from the file · 9,833 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 1 of 5 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81 (72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand has previously equaled or exceeded 1,000 kW. Customers whose projected demand is expected to exceed 1,000 kW must demonstrate that this level of demand is not transitory. Customers whose maximum demand has not exceeded 1,000 kW for 12 consecutive months must take service under Rate 55. Customers on Rate 55 whose maximum demand is below 1,000 kW may not take service under this rate. If a customer's prospective maximum demand is below 1,000 kW due to demonstrable conservation and load management measures then the customer may take service immediately under the appropriate general service rate. Customers whose meters are not yet capable of measuring kVA demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .816 and the Production/Transmission Demand charges will be divided by .815. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: Customer Service Charge: The Customer Service Charge shall be based on the customer’s highest average 30minute kilowatt demand in the current month and the preceding 11 months (on- or offpeak) as follows: Supersedes Rate 57 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 2 of 5 FOR LESS THAN 2,000 kW DEMAND FOR 2,000 kW BUT LESS THAN 5,000 kW DEMAND FOR 5,000 kW DEMAND AND OVER $1,100.00 $2,200.00 $4,200.00 DIST. DEMAND CHARGE $5.45 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.51 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $13.13 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.65 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK Supersedes Rate 57 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27_REDLINED -$0.03522 -$0.00759 Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 3 of 5 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: CHARGE PER kWh ON-PEAK October 2026January 2027 $0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh CHARGE PER kWh OFF-PEAK October 2026January 2027 $0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 57 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 4 of 5 DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand ratchet solely to reflect lower load levels resulting from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit based on the highest average 30-minute kilowatt demand in the current month or the preceding (11) months shall be applied to the bill equal to: First 1,000 kW All over 1,000 kW 3. $.20/kW $.10/kW Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. Supersedes Rate 57 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 5 of 5 MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 57 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate 57.01-01-27.pdf

Extracted from the file · 9,445 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 1 of 5 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81 (72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand has previously equaled or exceeded 1,000 kW. Customers whose projected demand is expected to exceed 1,000 kW must demonstrate that this level of demand is not transitory. Customers whose maximum demand has not exceeded 1,000 kW for 12 consecutive months must take service under Rate 55. Customers on Rate 55 whose maximum demand is below 1,000 kW may not take service under this rate. If a customer's prospective maximum demand is below 1,000 kW due to demonstrable conservation and load management measures then the customer may take service immediately under the appropriate general service rate. Customers whose meters are not yet capable of measuring kVA demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .816 and the Production/Transmission Demand charges will be divided by .815. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: Customer Service Charge: The Customer Service Charge shall be based on the customer’s highest average 30minute kilowatt demand in the current month and the preceding 11 months (on- or offpeak) as follows: Supersedes Rate 57 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 2 of 5 FOR LESS THAN 2,000 kW DEMAND FOR 2,000 kW BUT LESS THAN 5,000 kW DEMAND FOR 5,000 kW DEMAND AND OVER $1,100.00 $2,200.00 $4,200.00 DIST. DEMAND CHARGE $5.45 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.51 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $13.13 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.65 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK Supersedes Rate 57 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27 -$0.03522 -$0.00759 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 3 of 5 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: CHARGE PER kWh ON-PEAK January 2027 February 2027 March 2027 $0.24910 per kWh $0.21620 per kWh $0.10970 per kWh CHARGE PER kWh OFF-PEAK January 2027 February 2027 March 2027 $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 57 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 4 of 5 DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand ratchet solely to reflect lower load levels resulting from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit based on the highest average 30-minute kilowatt demand in the current month or the preceding (11) months shall be applied to the bill equal to: First 1,000 kW All over 1,000 kW 3. $.20/kW $.10/kW Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. Supersedes Rate 57 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 57 Page 5 of 5 MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 57 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 57.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 56.01-01-27_REDLINED.pdf

Extracted from the file · 9,212 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 56 Page 1 of 5 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers who are not manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are not engaged in manufacturing as defined in PA 92193 amending Subsections 12-81 (72) and 12-94c, and are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due to demonstrable conservation and load management measures may elect to take service under Rate 35 or Rate 37. Customers whose meters are not yet capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .906 and the Production/Transmission Demand charges will be divided by .906. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $350.00 $7.91 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.86 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE Supersedes Rate 56 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27_REDLINED $14.93 per kVA Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 56 Page 2 of 5 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.85 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03468 -$0.00767 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.1358716514 $0.1058713514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK October 2026January 2027$0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh Supersedes Rate 56 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 56 Page 3 of 5 CHARGE PER kWh OFF-PEAK October2026January 2027 $0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand ratchet solely to reflect lower load levels resulting from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Supersedes Rate 56 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS 2. RATE 56 Page 4 of 5 Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. Supersedes Rate 56 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS 3. RATE 56 Page 5 of 5 Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 56 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate 56.01-01-27.pdf

Extracted from the file · 8,809 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 56 Page 1 of 5 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers who are not manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are not engaged in manufacturing as defined in PA 92193 amending Subsections 12-81 (72) and 12-94c, and are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due to demonstrable conservation and load management measures may elect to take service under Rate 35 or Rate 37. Customers whose meters are not yet capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .906 and the Production/Transmission Demand charges will be divided by .906. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $350.00 $7.91 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.86 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE Supersedes Rate 56 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27 $14.93 per kVA Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS RATE 56 Page 2 of 5 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.85 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03468 -$0.00767 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.16514 $0.13514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK Supersedes Rate 56 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27 January 2027 February 2027 March 2027 $0.24910 per kWh $0.21620 per kWh $0.10970 per kWh Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS CHARGE PER kWh OFF-PEAK THIRD-PARTY SERVICE RATE 56 Page 3 of 5 January 2027 February 2027 March 2027 $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand ratchet solely to reflect lower load levels resulting from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Supersedes Rate 56 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS 2. RATE 56 Page 4 of 5 Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. Supersedes Rate 56 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE NON-MANUFACTURERS 3. RATE 56 Page 5 of 5 Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 56 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 56.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 55.01-01-27_REDLINED.pdf

Extracted from the file · 9,059 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 1 of 4 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81(72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due to demonstrable conservation and load management measures may elect to take service under Rate 35 or Rate 37. Customers whose meters are not yet capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .812 and the Production/Transmission Demand charges will be divided by .806. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. - 9 p.m. during Daylight Saving Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $350.00 $6.65 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.65 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED $0.00011 Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 2 of 4 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $12.00 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.48 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03407 -$0.00773 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.1358716514 $0.1058713514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK October2026January2027 $0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 3 of 4 CHARGE PER kWh OFF-PEAK October2026January2027$0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 4 of 4 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate 55.01-01-27.pdf

Extracted from the file · 8,717 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 1 of 4 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81(72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due to demonstrable conservation and load management measures may elect to take service under Rate 35 or Rate 37. Customers whose meters are not yet capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .812 and the Production/Transmission Demand charges will be divided by .806. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. - 9 p.m. during Daylight Saving Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $350.00 $6.65 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.65 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh Supersedes Rate 55 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27 $0.00011 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 2 of 4 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $12.00 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.48 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03407 -$0.00773 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.16514 $0.13514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK Supersedes Rate 55 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27 January 2027 February 2027 March 2027 $0.24910 per kWh $0.21620 per kWh $0.10970 per kWh Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS CHARGE PER kWh OFF-PEAK RATE 55 Page 3 of 4 January 2027 February 2027 March 2027 THIRD-PARTY SERVICE $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Supersedes Rate 55 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 4 of 4 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 55 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 41.01-01-27_REDLINED.pdf

Extracted from the file · 7,366 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 1 of 4 APPLICABLE to the electrical requirements of full requirement churches and tax exempt schools where the customer's maximum demand equaled or exceeded 350 kW at any time after December 31, 1985 and where service is delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. This rate is available only to customers receiving service on this rate or on Rate 40 as of the effective date hereof. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand is reduced beneath 350 kW due to demonstrable conservation and load management measures, may elect to take service under Rate 40 or any other applicable non-mandatory general service rate. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 300 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $350.00 $8.10 per kW $0.04717 $0.04717 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01138 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 300 kW CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $22.44 per kW $0.06400 $0.01419 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 41 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27_REDLINED -$0.00034 Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 2 of 4 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK -$0.03248 -$0.00720 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.1358716514 $0.1058713514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK October2026January 2027 $0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh CHARGE PER kWh OFF-PEAK October 2026January 2027 $0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE Supersedes Rate 41 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27_REDLINED as per contract Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 3 of 4 FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company’s CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. SPECIAL PROVISIONS: 1. 2. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to: Supersedes Rate 41 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 4 of 4 First 1,000 kW of demand All over 1,000 kW of demand $.20/kW $.10/kW MINIMUM CHARGE: The minimum charge is the customer charge. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 41 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate 41.01-01-27.pdf

Extracted from the file · 7,022 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 1 of 4 APPLICABLE to the electrical requirements of full requirement churches and tax exempt schools where the customer's maximum demand equaled or exceeded 350 kW at any time after December 31, 1985 and where service is delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. This rate is available only to customers receiving service on this rate or on Rate 40 as of the effective date hereof. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand is reduced beneath 350 kW due to demonstrable conservation and load management measures, may elect to take service under Rate 40 or any other applicable non-mandatory general service rate. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 300 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $350.00 $8.10 per kW $0.04717 $0.04717 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01138 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 300 kW CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $22.44 per kW $0.06400 $0.01419 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 41 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27 -$0.00034 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 2 of 4 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK -$0.03248 -$0.00720 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.16514 $0.13514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK January 2027 February 2027 March 2027 $0.24910 per kWh $0.21620 per kWh $0.10970 per kWh CHARGE PER kWh OFF-PEAK January 2027 February 2027 March 2027 $0.23850 per kWh $0.21110 per kWh $0.11090 per kWh THIRD-PARTY SERVICE Supersedes Rate 41 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27 as per contract Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 3 of 4 FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company’s CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. SPECIAL PROVISIONS: 1. 2. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to: Supersedes Rate 41 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE CHURCH AND SCHOOL ELECTRIC SERVICE RATE 41 Page 4 of 4 First 1,000 kW of demand All over 1,000 kW of demand $.20/kW $.10/kW MINIMUM CHARGE: The minimum charge is the customer charge. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 41 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 41.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 40.01-01-27_REDLINED.pdf

Extracted from the file · 3,793 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL CHURCH AND SCHOOL ELECTRIC SERVICE RATE 40 Page 1 of 3 AVAILABLE for the electrical requirements of churches and tax exempt schools where the customer's maximum demand is less than 350 kW and only for those customers receiving service on this rate as of the effective date hereof, or for customers returning from Rate 41 due to a decline in the customer's maximum load due to demonstrable conservation and load management measures. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $65.00 $0.04701 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01637 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04286 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh Supersedes Rate 40 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 40.01-01-27_REDLINED $0.00100 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL CHURCH AND SCHOOL ELECTRIC SERVICE RATE 40 Page 2 of 3 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01586 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1143914371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. Supersedes Rate 40 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 40.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL CHURCH AND SCHOOL ELECTRIC SERVICE 2. RATE 40 Page 3 of 3 Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. MINIMUM CHARGE: The minimum charge is the customer charge. Supersedes Rate 40 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 40.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 40.01-01-27.pdf

Extracted from the file · 3,579 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL CHURCH AND SCHOOL ELECTRIC SERVICE RATE 40 Page 1 of 3 AVAILABLE for the electrical requirements of churches and tax exempt schools where the customer's maximum demand is less than 350 kW and only for those customers receiving service on this rate as of the effective date hereof, or for customers returning from Rate 41 due to a decline in the customer's maximum load due to demonstrable conservation and load management measures. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $65.00 $0.04701 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01637 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04286 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh Supersedes Rate 40 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 40.01-01-27 $0.00100 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL CHURCH AND SCHOOL ELECTRIC SERVICE RATE 40 Page 2 of 3 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01586 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.14371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. Supersedes Rate 40 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 40.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL CHURCH AND SCHOOL ELECTRIC SERVICE 2. RATE 40 Page 3 of 3 Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. MINIMUM CHARGE: The minimum charge is the customer charge. Supersedes Rate 40 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 40.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 39.01-01-27_REDLINED.pdf

Extracted from the file · 8,537 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 1 of 4 AVAILABILITY: This rate is available to any primary voltage customer who, by contract, agrees to interrupt a connected load of at least 2000 kilowatts above the customer's Firm Contract Demand (defined below) during periods when the Company requests such interruptions because of capacity deficiency, system or local emergencies, or an ISO-NE demand response or audit call. The Company’s Mandatory Reduction Rider is an availability requirement. This rate is not available to new applications after February 5, 1999. DEFINITIONS: INTERRUPTIBLE AND FIRM CONTRACT DEMAND: Interruptible Contract Demand is the maximum connected load subject to interruption. Firm Contract Demand is that level of demand, measured in kilowatts, below which the customer expects to receive firm service. Firm Contract Demand may be zero. FIRM SERVICE: Firm service (if any) shall be provided under the applicable firm service rate schedule, and all kilowatt-hour sales at demand levels up to the Firm Contract Demand shall be billed under that rate schedule. NONFIRM SERVICE: All kilowatt-hour sales shall be billed at the applicable per kWh rates as provided below. INCREASING CONTRACT DEMAND LEVELS: During the term of this contract, the customer may, by written notice to the Company, increase the Interruptible Contract Demand or Firm Contract Demand at any time. When the customer's maximum demand, in a noninterrupt period, exceeds the sum of the Firm Contract Demand and Interruptible Contract Demand, a new Firm Contract Demand, equal to the customer's maximum demand minus the Interruptible Contract Demand, shall be established for the next twelve months of service under this or any other rate schedule. REDUCING CONTRACT DEMAND LEVELS: If during the last twelve (12) months, the customer has complied with all of the Company's requests for interruption, then the customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Firm Contract Demand. The customer may also, upon not less than three (3) months' prior written notice to the Company, decrease the Interruptible Contract Demand solely to reflect lower load levels from demonstrable conservation and load management. NOTICE OF INTERRUPTION: Upon Company notification, customers have four (4) hours to achieve their Firm Contract Demand. Failure to reduce demand to the Firm Contract Demand shall result in actions as per FAILURE TO INTERRUPT as described below. Interruptible load enrolled in the Mandatory Reduction Rider’s Direct Enrollment program will receive the appropriate 30-minute or 2-hour ISO-NE’s notice to implement load reduction. Supersedes Rate 39 Effective July 1, 2026Effective October 1, 2026 By Motion Ruling No. 5 dated May 20, 20267 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 2 of 4 FAILURE TO INTERRUPT: In the event the customer fails to reduce load to the Firm Contract Demand at the time and for the period specified by the Company, the customer's demand in excess of the Firm Contract Demand shall be deemed as establishing a new level of Firm Contract Demand, which shall determine the charges of the applicable firm service rate for twelve (12) months. LIMITS OF INTERRUPTION: Interruptions will be limited to no more than five (5) times per calendar year, and for a minimum of four (4) hours per interruption. INTERRUPTION CRITERIA: Company call(s) to interrupt load will be triggered by ISO-NE’s Action During A Capacity Deficiency Operating Procedure No. 4. The Company reserves the right to call to interrupt load due to system or local emergencies. METERING: In the event the Company, or any agency having jurisdiction, determines that telemetering and/or automatic control equipment is required, such equipment shall be installed and maintained by the Company at the customer's expense. Such expense shall also include the costs of any dedicated communication lines or auxiliary facilities associated with telemetering and/or control. MONTHLY CHARGES: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. - 9 p.m. during Daylight Saving Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $2,350.00 $6.24 per kW ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.98 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $5.62 per kW SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 39 Effective July 1, 2026Effective October 1, 2026 By Motion Ruling No. 5 dated May 20, 20267 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27_REDLINED -$0.00034 Effective January 1, 2027 By Motion Ruling No. Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 3 of 4 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $2.12 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) Generation Service October 2026January 2027 $0.0860024103 November 2026February 2027 $0.1074621239 December 2026March 2027 $0.2030111059 Third-Party Service As Per Contract FMCC DELIVERY CHARGE: CHARGE PER KWH -$0.00464 FMCC GENERATION CHARGE: CHARGE PER KWH -$0.0021000250 RATE ADJUSTMENTS: Customers taking service under this rate schedule shall be subject to all applicable charges as provided in the Company’s Energy and Transmission Adjustment Clauses. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilowatt (kW) demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 39 Effective July 1, 2026Effective October 1, 2026 By Motion Ruling No. 5 dated May 20, 20267 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 4 of 4 DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt (kW) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived. Service supplied at transmission voltage is unregulated. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate include a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. TERM OF CONTRACT: Service under this rate schedule may be terminated with at least one (1) month prior written notice by the customer or six (6) months prior written notification by the Company. Supersedes Rate 39 Effective July 1, 2026Effective October 1, 2026 By Motion Ruling No. 5 dated May 20, 20267 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. Docket No. 2627-01-01

Text of Rate 39.01-01-27.pdf

Extracted from the file · 8,267 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 1 of 4 AVAILABILITY: This rate is available to any primary voltage customer who, by contract, agrees to interrupt a connected load of at least 2000 kilowatts above the customer's Firm Contract Demand (defined below) during periods when the Company requests such interruptions because of capacity deficiency, system or local emergencies, or an ISO-NE demand response or audit call. The Company’s Mandatory Reduction Rider is an availability requirement. This rate is not available to new applications after February 5, 1999. DEFINITIONS: INTERRUPTIBLE AND FIRM CONTRACT DEMAND: Interruptible Contract Demand is the maximum connected load subject to interruption. Firm Contract Demand is that level of demand, measured in kilowatts, below which the customer expects to receive firm service. Firm Contract Demand may be zero. FIRM SERVICE: Firm service (if any) shall be provided under the applicable firm service rate schedule, and all kilowatt-hour sales at demand levels up to the Firm Contract Demand shall be billed under that rate schedule. NONFIRM SERVICE: All kilowatt-hour sales shall be billed at the applicable per kWh rates as provided below. INCREASING CONTRACT DEMAND LEVELS: During the term of this contract, the customer may, by written notice to the Company, increase the Interruptible Contract Demand or Firm Contract Demand at any time. When the customer's maximum demand, in a noninterrupt period, exceeds the sum of the Firm Contract Demand and Interruptible Contract Demand, a new Firm Contract Demand, equal to the customer's maximum demand minus the Interruptible Contract Demand, shall be established for the next twelve months of service under this or any other rate schedule. REDUCING CONTRACT DEMAND LEVELS: If during the last twelve (12) months, the customer has complied with all of the Company's requests for interruption, then the customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Firm Contract Demand. The customer may also, upon not less than three (3) months' prior written notice to the Company, decrease the Interruptible Contract Demand solely to reflect lower load levels from demonstrable conservation and load management. NOTICE OF INTERRUPTION: Upon Company notification, customers have four (4) hours to achieve their Firm Contract Demand. Failure to reduce demand to the Firm Contract Demand shall result in actions as per FAILURE TO INTERRUPT as described below. Interruptible load enrolled in the Mandatory Reduction Rider’s Direct Enrollment program will receive the appropriate 30-minute or 2-hour ISO-NE’s notice to implement load reduction. Supersedes Rate 39 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 2 of 4 FAILURE TO INTERRUPT: In the event the customer fails to reduce load to the Firm Contract Demand at the time and for the period specified by the Company, the customer's demand in excess of the Firm Contract Demand shall be deemed as establishing a new level of Firm Contract Demand, which shall determine the charges of the applicable firm service rate for twelve (12) months. LIMITS OF INTERRUPTION: Interruptions will be limited to no more than five (5) times per calendar year, and for a minimum of four (4) hours per interruption. INTERRUPTION CRITERIA: Company call(s) to interrupt load will be triggered by ISO-NE’s Action During A Capacity Deficiency Operating Procedure No. 4. The Company reserves the right to call to interrupt load due to system or local emergencies. METERING: In the event the Company, or any agency having jurisdiction, determines that telemetering and/or automatic control equipment is required, such equipment shall be installed and maintained by the Company at the customer's expense. Such expense shall also include the costs of any dedicated communication lines or auxiliary facilities associated with telemetering and/or control. MONTHLY CHARGES: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. - 9 p.m. during Daylight Saving Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $2,350.00 $6.24 per kW ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.98 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $5.62 per kW SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 39 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27 -$0.00034 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 3 of 4 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $2.12 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) Generation Service January 2027 February 2027 March 2027 Third-Party Service $0.24103 $0.21239 $0.11059 As Per Contract FMCC DELIVERY CHARGE: CHARGE PER KWH -$0.00464 FMCC GENERATION CHARGE: CHARGE PER KWH -$0.00250 RATE ADJUSTMENTS: Customers taking service under this rate schedule shall be subject to all applicable charges as provided in the Company’s Energy and Transmission Adjustment Clauses. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilowatt (kW) demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 39 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY LARGE INTERRUPTIBLE SERVICE RATE 39 Page 4 of 4 DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt (kW) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived. Service supplied at transmission voltage is unregulated. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate include a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. TERM OF CONTRACT: Service under this rate schedule may be terminated with at least one (1) month prior written notice by the customer or six (6) months prior written notification by the Company. Supersedes Rate 39 Effective October 1, 2026 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 26-01-01 Rate 39.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 37.01-01-27_REDLINED.pdf

Extracted from the file · 7,748 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 1 of 4 AVAILABLE for the electrical requirements where the customer's maximum demand is less than 350 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $270.00 $8.69 per kW ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $2.22 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $7.29 per kW $0.04609 $0.01034 SYSTEMS BENEFITS CHARGE: CHARGE PER KWH -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE Supersedes Rate 37 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-03 Rate 37.01-01-27_REDLINED $1.78 per kW Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 2 of 4 CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER KWH $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK -$0.03474 -$0.00779 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (MAX DEMAND LESS THAN 500 KW) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $0.1358416599 $0.1058413599 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. §16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Supersedes Rate 37 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-03 Rate 37.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 3 of 4 Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. Supersedes Rate 37 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-03 Rate 37.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 4 of 4 METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 37 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-03 Rate 37.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 37.01-01-27.pdf

Extracted from the file · 7,470 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 1 of 4 AVAILABLE for the electrical requirements where the customer's maximum demand is less than 350 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $270.00 $8.69 per kW ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $2.22 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $7.29 per kW $0.04609 $0.01034 SYSTEMS BENEFITS CHARGE: CHARGE PER KWH -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE Supersedes Rate 37 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 37.01-01-27 $1.78 per kW Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 2 of 4 CONSERVATION CHARGE: CHARGE PER KWH $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER KWH $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK -$0.03474 -$0.00779 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (MAX DEMAND LESS THAN 500 KW) CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $0.16599 $0.13599 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. §16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Supersedes Rate 37 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 37.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 3 of 4 Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. Supersedes Rate 37 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 37.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 37 Page 4 of 4 METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate 37 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 37.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 35.01-01-27_REDLINED.pdf

Extracted from the file · 6,179 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE GENERAL ELECTRIC SERVICE RATE 35 Page 1 of 3 AVAILABLE for the electrical requirements where the customer's maximum demand is less than 200 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $270.00 $8.69 per kW ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $2.22 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $14.58 per kW SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.78 per kW CONSERVATION CHARGE: CHARGE PER kWh Supersedes Rate 35 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 35.01-01-27_REDLINED $0.00000 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE GENERAL ELECTRIC SERVICE RATE 35 Page 2 of 3 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01559 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh $0.1143914371 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. Supersedes Rate 35 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 35.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE GENERAL ELECTRIC SERVICE RATE 35 Page 3 of 3 COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND (also defined as ACTUAL DEMAND): The production/ transmission demand shall be the highest average 30-minute kilowatt demand in the current month. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels resulting from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 35 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 35.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 35.01-01-27.pdf

Extracted from the file · 5,965 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE GENERAL ELECTRIC SERVICE RATE 35 Page 1 of 3 AVAILABLE for the electrical requirements where the customer's maximum demand is less than 200 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $270.00 $8.69 per kW ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $2.22 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $14.58 per kW SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.78 per kW CONSERVATION CHARGE: CHARGE PER kWh Supersedes Rate 35 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 35.01-01-27 $0.00000 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE GENERAL ELECTRIC SERVICE RATE 35 Page 2 of 3 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01559 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh $0.14371 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. The Company shall have the right to conduct periodic tests at reasonable intervals to determine the customer’s power factor. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. Supersedes Rate 35 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 35.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE GENERAL ELECTRIC SERVICE RATE 35 Page 3 of 3 COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND (also defined as ACTUAL DEMAND): The production/ transmission demand shall be the highest average 30-minute kilowatt demand in the current month. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilowatt demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels resulting from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatthours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate 35 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 35.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 30A.01-01-27_REDLINED.pdf

Extracted from the file · 6,187 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 30A Page 1 of 3 Interim Rate 30A establishes a volumetric component (kWh) for Distribution on an interim basis until the Company’s next rate case proceeding. This optional rate is designed to benefit small business customers with low load factors. AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 200 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27, Rate 27A or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 27 after March 1, 1992. The term of contract for customers eligible to take service under this paragraph shall be one year and shall continue thereafter until canceled by one month's written notice by the customer. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 KW CHARGE PER kWh $44.00 $9.16 per kW $0.01843 ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW Supersedes Rate 30A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 30A.01-01-27_REDLINED $12.84 per kW Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 30A Page 2 of 3 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1143914371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. Supersedes Rate 30A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 30A.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 30A Page 3 of 3 COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month, but not less than 2 kilowatts. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: None, except as provided above. Supersedes Rate 30A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 30A.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 30A.01-01-27.pdf

Extracted from the file · 5,973 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 30A Page 1 of 3 Interim Rate 30A establishes a volumetric component (kWh) for Distribution on an interim basis until the Company’s next rate case proceeding. This optional rate is designed to benefit small business customers with low load factors. AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 200 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27, Rate 27A or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 27 after March 1, 1992. The term of contract for customers eligible to take service under this paragraph shall be one year and shall continue thereafter until canceled by one month's written notice by the customer. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 KW CHARGE PER kWh $44.00 $9.16 per kW $0.01843 ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW Supersedes Rate 30A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 30A.01-01-27 $12.84 per kW Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 30A Page 2 of 3 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.14371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. Supersedes Rate 30A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 30A.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 30A Page 3 of 3 COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month, but not less than 2 kilowatts. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: None, except as provided above. Supersedes Rate 30A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 30A.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 30.01-01-27_REDLINED.pdf

Extracted from the file · 5,876 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE RATE 30 Page 1 of 3 AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 200 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-1003. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 27 after March 1, 1992. The term of contract for customers eligible to take service under this paragraph shall be one year and shall continue thereafter until canceled by one month's written notice by the customer. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 KW $44.00 $14.22 per kW ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW $12.84 per kW SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 30 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 30.01-01-27_REDLINED -$0.00038 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE RATE 30 Page 2 of 3 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1143914371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. Supersedes Rate 30 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 30.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE RATE 30 Page 3 of 3 SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month, but not less than 2 kilowatts. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: None, except as provided above. Supersedes Rate 30 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 30.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 30.01-01-27.pdf

Extracted from the file · 5,662 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE RATE 30 Page 1 of 3 AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 200 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 0510-03. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 27 after March 1, 1992. The term of contract for customers eligible to take service under this paragraph shall be one year and shall continue thereafter until canceled by one month's written notice by the customer. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 KW $44.00 $14.22 per kW ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW $12.84 per kW SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 30 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 30.01-01-27 -$0.00038 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE RATE 30 Page 2 of 3 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.14371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. Supersedes Rate 30 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 30.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL GENERAL ELECTRIC SERVICE RATE 30 Page 3 of 3 SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month, but not less than 2 kilowatts. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: None, except as provided above. Supersedes Rate 30 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 30.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 29.01-01-27_REDLINED.pdf

Extracted from the file · 2,732 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY OUTDOOR RECREATIONAL LIGHTING ELECTRIC SERVICE RATE 29 Page 1 of 2 AVAILABLE for outdoor recreational lighting loads which are energized only between 7 p.m. and 7 a.m. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $30.00 $0.12715 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.04292 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04419 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00037 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh Supersedes Rate 29 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 10 dated April 29, 20265 dated May 20, 2026 Docket No. 26-01-03 01 Rate 29.01-01-27_REDLINED $0.00100 Effective January 1, 2027 By Motion Ruling No. Docket No. 2627-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY OUTDOOR RECREATIONAL LIGHTING ELECTRIC SERVICE RATE 29 Page 2 of 2 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1143914371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 29 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 10 dated April 29, 20265 dated May 20, 2026 Docket No. 26-01-03 01 Rate 29.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. Docket No. 2627-01-01

Text of Rate 29.01-01-27.pdf

Extracted from the file · 2,606 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY OUTDOOR RECREATIONAL LIGHTING ELECTRIC SERVICE RATE 29 Page 1 of 2 AVAILABLE for outdoor recreational lighting loads which are energized only between 7 p.m. and 7 a.m. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $30.00 $0.12715 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.04292 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04419 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00037 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh Supersedes Rate 29 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 29.01-01-27 $0.00100 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY OUTDOOR RECREATIONAL LIGHTING ELECTRIC SERVICE RATE 29 Page 2 of 2 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.14371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 29 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 29.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 27A.01-01-27_REDLINED.pdf

Extracted from the file · 7,378 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 1 of 4 Interim Rate 27A establishes a volumetric component (kWh) for Distribution on an interim basis until the Company’s next rate case proceeding. This optional rate is designed to benefit small business customers with low load factors. AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 350 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27, Rate 27A or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 30 after March 1, 1992. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $44.00 $9.16 per kW $0.04126 $0.00922 ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh Supersedes Rate 27A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 27A.01-01-27_REDLINED $0.00011 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 2 of 4 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $6.42 per kW $0.04948 $0.01105 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03772 -$0.00842 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh ON-PEAK GENERATION SERVICE PER kWh OFF-PEAK $0.1358416599 $0.1058413599 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh Supersedes Rate 27A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 27A.01-01-27_REDLINED -$0.0021000250 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 3 of 4 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the customer's property line and the Company is relieved of installing the service transformers and substation equipment, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric Supersedes Rate 27A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 27A.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 4 of 4 meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 27A Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 27A.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 27A.01-01-27.pdf

Extracted from the file · 7,092 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 1 of 4 Interim Rate 27A establishes a volumetric component (kWh) for Distribution on an interim basis until the Company’s next rate case proceeding. This optional rate is designed to benefit small business customers with low load factors. AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 350 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27, Rate 27A or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-10-03. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 30 after March 1, 1992. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $44.00 $9.16 per kW $0.04126 $0.00922 ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh Supersedes Rate 27A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27A.01-01-27 $0.00011 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 2 of 4 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $6.42 per kW $0.04948 $0.01105 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03772 -$0.00842 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh ON-PEAK GENERATION SERVICE PER kWh OFF-PEAK $0.16599 $0.13599 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh Supersedes Rate 27A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27A.01-01-27 -$0.00250 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 3 of 4 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the customer's property line and the Company is relieved of installing the service transformers and substation equipment, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the Supersedes Rate 27A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27A.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE ALTERNATIVE RATE 27A Page 4 of 4 electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate 27A Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27A.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 27.01-01-27_REDLINED.pdf

Extracted from the file · 6,597 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 27 Page 1 of 3 AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 350 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 05-1003. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 30 after March 1, 1992. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 kW $44.00 $14.22 per kW ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $6.42 per kW $0.04948 $0.01105 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh Supersedes Rate 27 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 10 dated April 29, 20265 dated May 20, 2026 Docket No. 26-01-0301 Rate 27.01-01-27_REDLINED -$0.00038 Effective January 1, 2027 By Motion Ruling No Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 27 Page 2 of 3 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03772 -$0.00842 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh ON-PEAK GENERATION SERVICE PER kWh OFF-PEAK $0.1358416599 $0.1058413599 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. Supersedes Rate 27 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 10 dated April 29, 20265 dated May 20, 2026 Docket No. 26-01-0301 Rate 27.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 27 Page 3 of 3 RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the customer's property line and the Company is relieved of installing the service transformers and substation equipment, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 27 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 10 dated April 29, 20265 dated May 20, 2026 Docket No. 26-01-0301 Rate 27.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No Docket No. 26-0127-01-01

Text of Rate 27.01-01-27.pdf

Extracted from the file · 6,723 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 27 Page 1 of 4 AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 350 kW. Customers with maximum demands that are equal to or greater than 200 kW, but are less than 350 kW, must take service under Rate 27 or Rate 37, and are not eligible to return to Rate 30 or Rate 35 if their maximum demands drop below 200 kW, per DPUC decision in Docket No. 0510-03. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 30 after March 1, 1992. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. – 9 p.m. during Daylight Savings Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DEMAND CHARGE OVER 2 kW $44.00 $14.22 per kW ELECTRIC SYSTEM IMPROVEMENTS: DEMAND CHARGE OVER 2 KW $3.78 per kW REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: DEMAND CHARGE OVER 2 kW CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK Supersedes Rate 27 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27.01-01-27 $6.42 per kW $0.04948 $0.01105 Effective January 1, 2027 By Motion Ruling No Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 27 Page 2 of 4 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: DEMAND CHARGE OVER 2 kW $1.47 per kW CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03772 -$0.00842 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh ON-PEAK GENERATION SERVICE PER kWh OFF-PEAK $0.16599 $0.13599 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-2451(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. Supersedes Rate 27 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27.01-01-27 Effective January 1, 2027 By Motion Ruling No Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE RATE 27 Page 3 of 4 DETERMINATION OF DEMAND: The demand shall be the highest average 30-minute kilowatt demand recorded during the billing month in the on-peak hours as defined above. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. 2. Facilities Ownership: If the service is taken at the customer's property line and the Company is relieved of installing the service transformers and substation equipment, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. MINIMUM CHARGE: The minimum charge is the customer charge. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. Supersedes Rate 27 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27.01-01-27 Effective January 1, 2027 By Motion Ruling No Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate 27 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 27.01-01-27 RATE 27 Page 4 of 4 Effective January 1, 2027 By Motion Ruling No Docket No. 27-01-01

Text of Rate 18.01-01-27_REDLINED.pdf

Extracted from the file · 3,963 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY CONTROLLED WATER HEATING ELECTRIC SERVICE RATE 18 Page 1 of 3 AVAILABLE only for controlled water heating electric service to any customer other than residential, except as noted herein. Controlled storage electric water heaters shall meet the Company's specifications. These units shall be installed and wired for control in accordance with the Company's specifications. This rate is available for solar water heating used in conjunction with a storage unit which meets the Company's specifications. Available to residential customers where electricity supplies a portion of, but is not the sole source of, domestic hot water. Also available for centrally supplied water heating in apartment buildings. This rate is not available for any space heating or for commercial or industrial processes. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $11.00 $0.02351 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01530 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04419 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh Supersedes Rate 18 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 18.01-01-27_REDLINED $0.00000 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY CONTROLLED WATER HEATING ELECTRIC SERVICE RATE 18 Page 2 of 3 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1143914371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. Supersedes Rate 18 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 18.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY CONTROLLED WATER HEATING ELECTRIC SERVICE RATE 18 Page 3 of 3 SPECIAL PROVISIONS: Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 18 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 18.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 18.01-01-27.pdf

Extracted from the file · 3,748 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY CONTROLLED WATER HEATING ELECTRIC SERVICE RATE 18 Page 1 of 3 AVAILABLE only for controlled water heating electric service to any customer other than residential, except as noted herein. Controlled storage electric water heaters shall meet the Company's specifications. These units shall be installed and wired for control in accordance with the Company's specifications. This rate is available for solar water heating used in conjunction with a storage unit which meets the Company's specifications. Available to residential customers where electricity supplies a portion of, but is not the sole source of, domestic hot water. Also available for centrally supplied water heating in apartment buildings. This rate is not available for any space heating or for commercial or industrial processes. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $11.00 $0.02351 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01530 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04419 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00038 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00505 CONSERVATION CHARGE: CHARGE PER kWh Supersedes Rate 18 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 18.01-01-27 $0.00000 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY CONTROLLED WATER HEATING ELECTRIC SERVICE RATE 18 Page 2 of 3 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01684 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.14371 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. Supersedes Rate 18 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 18.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY CONTROLLED WATER HEATING ELECTRIC SERVICE RATE 18 Page 3 of 3 SPECIAL PROVISIONS: Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 18 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 18.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 7.01-01-27_REDLINED.pdf

Extracted from the file · 5,516 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL TIME-OF-DAY ELECTRIC SERVICE RATE 7 Page 1 of 3 AVAILABLE for the entire electrical requirements of single-family residences, residential outbuildings, individual apartments, and general service use in apartment buildings, where residential use constitutes over 50 percent of the metered energy, and also available to farm customers. In compliance with PA 99-29 military veterans’ posts and organizations (i.e. VFW, American Legion, Disabled American Veterans, etc) that are exempt from federal taxation under Section 501(c) of the Internal Revenue Code may receive service under this rate. In compliance with PA 98-149 amending Subsection 16-19ff (a) of the Connecticut General Statutes, residential use in recreational campgrounds may receive service under this rate. The campground owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. In compliance with Public Act 02-17, amending Subsection 16-19ff (a) of the Connecticut General Statutes, use at a marina that qualifies for residential type use may receive service under this rate. A marina must have PURA-approved policies and procedures prior to billing any submetered customer. The marina owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. A marina must have PURAapproved policies and procedures prior to billing any submetered customer. To ensure the quality of service and equitable treatment of the metered campsites and boat slips (i.e. “Submetered Party”), campgrounds and marinas are required to follow Conn. Agencies Regs. Section 16-11-236 Calculating Submetered Party’s Cost, Section 16-11-237 Installation and Maintenance of Submeters, and Section 16-11-238 Meter Test and Record Retention. Section 16-11-100 Definitions defines a Submetering Customer, a Submetered Party, and “Average Cost” as used in Section 16-11-236. This rate is available for customers who have a solar heating system which is used as a source of space heating and for which electricity provides backup. This rate is not available for service to apartments except where each apartment is metered and billed individually. An apartment is defined as a room or group of rooms with separate cooking facilities. Supersedes Rate 7 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 7.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL TIME-OF-DAY ELECTRIC SERVICE RATE 7 Page 2 of 3 MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. Eastern Prevailing Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $9.62 $0.05513 $0.05513 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.02031 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh ON-PEAK CHARGE PER KWH OFF-PEAK $0.11741 $0.02525 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00196 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00496 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh Supersedes Rate 7 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 7.01-01-27_REDLINED $0.00100 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL TIME-OF-DAY ELECTRIC SERVICE RATE 7 Page 3 of 3 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER KWH OFF-PEAK -$0.04443 -$0.00955 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER KWH ON PEAK GENERATION SERVICE PER KWH OFF PEAK $0.1433917793 $0.1083914293 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 7 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 7.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 7.01-01-27.pdf

Extracted from the file · 5,298 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL TIME-OF-DAY ELECTRIC SERVICE RATE 7 Page 1 of 3 AVAILABLE for the entire electrical requirements of single-family residences, residential outbuildings, individual apartments, and general service use in apartment buildings, where residential use constitutes over 50 percent of the metered energy, and also available to farm customers. In compliance with PA 99-29 military veterans’ posts and organizations (i.e. VFW, American Legion, Disabled American Veterans, etc) that are exempt from federal taxation under Section 501(c) of the Internal Revenue Code may receive service under this rate. In compliance with PA 98-149 amending Subsection 16-19ff (a) of the Connecticut General Statutes, residential use in recreational campgrounds may receive service under this rate. The campground owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. In compliance with Public Act 02-17, amending Subsection 16-19ff (a) of the Connecticut General Statutes, use at a marina that qualifies for residential type use may receive service under this rate. A marina must have PURA-approved policies and procedures prior to billing any submetered customer. The marina owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. A marina must have PURAapproved policies and procedures prior to billing any submetered customer. To ensure the quality of service and equitable treatment of the metered campsites and boat slips (i.e. “Submetered Party”), campgrounds and marinas are required to follow Conn. Agencies Regs. Section 16-11-236 Calculating Submetered Party’s Cost, Section 16-11-237 Installation and Maintenance of Submeters, and Section 16-11-238 Meter Test and Record Retention. Section 16-11-100 Definitions defines a Submetering Customer, a Submetered Party, and “Average Cost” as used in Section 16-11-236. This rate is available for customers who have a solar heating system which is used as a source of space heating and for which electricity provides backup. This rate is not available for service to apartments except where each apartment is metered and billed individually. An apartment is defined as a room or group of rooms with separate cooking facilities. Supersedes Rate 7 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 7.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL TIME-OF-DAY ELECTRIC SERVICE RATE 7 Page 2 of 3 MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. Eastern Prevailing Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER KWH ON-PEAK CHARGE PER KWH OFF-PEAK $9.62 $0.05513 $0.05513 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.02031 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh ON-PEAK CHARGE PER KWH OFF-PEAK $0.11741 $0.02525 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00196 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00496 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh Supersedes Rate 7 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 7.01-01-27 $0.00100 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL TIME-OF-DAY ELECTRIC SERVICE RATE 7 Page 3 of 3 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER KWH OFF-PEAK -$0.04443 -$0.00955 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER KWH ON PEAK GENERATION SERVICE PER KWH OFF PEAK $0.17793 $0.14293 THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: notice. One year and thereafter unless canceled by one month's written Supersedes Rate 7 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 7.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 5.01-01-27_REDLINED.pdf

Extracted from the file · 6,393 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC HEATING SERVICE RATE 5 Page 1 of 3 AVAILABLE for the entire electrical requirements of single-family residences, residential outbuildings, individual apartments, and general service use (i.e. common areas) in apartment buildings, where residential use constitutes over 50 percent of the metered energy. Service to a room or group of rooms which regularly separate cooking facilities shall be considered as service to a separate/individual apartment for metering and billing purposes. This Rate is also available for agricultural/farm customers who meet the CT definition of Agriculture. The over 50% residential use requirement does not apply to agricultural/farm customers. This rate is not available to new applicants after December 21, 2006. However, this rate is available for requests for electric service at a service location assigned to Rate 5 on or before December 21, 2006. In compliance with PA 99-29 military veterans’ posts and organizations (i.e. VFW, American Legion, Disabled American Veterans, etc) that are exempt from federal taxation under Section 501(c) of the Internal Revenue Code may receive service under this rate. In compliance with PA 98-149 amending Subsection 16-19ff (a) of the Connecticut General Statutes, residential use in recreational campgrounds may receive service under this rate. The campground owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. In compliance with Public Act 02-17, amending Subsection 16-19ff (a) of the Connecticut General Statutes, use at a marina that qualifies for residential type use may receive service under this rate. A marina must have PURA-approved policies and procedures prior to billing any submetered customer. The marina owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. A marina must have PURAapproved policies and procedures prior to billing any submetered customer. To ensure the quality of service and equitable treatment of the metered campsites and boat slips (i.e. “Submetered Party”), campgrounds and marinas are required to follow Conn. Agencies Regs. Section 16-11-236 Calculating Submetered Party’s Cost, Section 16-11-237 Installation and Maintenance of Submeters, and Section 16-11-238 Meter Test and Record Retention. Section 16-11-100 Definitions defines a Submetering Customer, a Submetered Party, and “Average Cost” as used in Section 16-11-236. AVAILABLE only to customers who use electric energy as the primary space heating source, and who enter into an agreement with the Company for a period of not less than twelve (12) months. The primary space heating source criteria will be considered to be met if the majority of the rooms in the dwelling unit have a permanently installed electric heating system. Available to a new dwelling unit for which a building permit is issued on or after July 1, 1993, only if certification is provided that the dwelling meets the thermal standards contained in the Construction Standard Rider. An application for service in which a certification is based on a building permit issued on or before December 21, 2006 shall be eligible for service under this rate. Supersedes Rate 5 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 5.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC HEATING SERVICE RATE 5 Page 2 of 3 MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $23.75 $0.03847 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01717 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04901 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00196 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00496 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH Supersedes Rate 5 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 5.01-01-27_REDLINED -$0.01840 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC HEATING SERVICE RATE 5 Page 3 of 3 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1178715179 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.0021000250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 5 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 5.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 5.01-01-27.pdf

Extracted from the file · 6,170 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC HEATING SERVICE RATE 5 Page 1 of 3 AVAILABLE for the entire electrical requirements of single-family residences, residential outbuildings, individual apartments, and general service use (i.e. common areas) in apartment buildings, where residential use constitutes over 50 percent of the metered energy. Service to a room or group of rooms which regularly separate cooking facilities shall be considered as service to a separate/individual apartment for metering and billing purposes. This Rate is also available for agricultural/farm customers who meet the CT definition of Agriculture. The over 50% residential use requirement does not apply to agricultural/farm customers. This rate is not available to new applicants after December 21, 2006. However, this rate is available for requests for electric service at a service location assigned to Rate 5 on or before December 21, 2006. In compliance with PA 99-29 military veterans’ posts and organizations (i.e. VFW, American Legion, Disabled American Veterans, etc) that are exempt from federal taxation under Section 501(c) of the Internal Revenue Code may receive service under this rate. In compliance with PA 98-149 amending Subsection 16-19ff (a) of the Connecticut General Statutes, residential use in recreational campgrounds may receive service under this rate. The campground owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. In compliance with Public Act 02-17, amending Subsection 16-19ff (a) of the Connecticut General Statutes, use at a marina that qualifies for residential type use may receive service under this rate. A marina must have PURA-approved policies and procedures prior to billing any submetered customer. The marina owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. A marina must have PURAapproved policies and procedures prior to billing any submetered customer. To ensure the quality of service and equitable treatment of the metered campsites and boat slips (i.e. “Submetered Party”), campgrounds and marinas are required to follow Conn. Agencies Regs. Section 16-11-236 Calculating Submetered Party’s Cost, Section 16-11-237 Installation and Maintenance of Submeters, and Section 16-11-238 Meter Test and Record Retention. Section 16-11-100 Definitions defines a Submetering Customer, a Submetered Party, and “Average Cost” as used in Section 16-11-236. AVAILABLE only to customers who use electric energy as the primary space heating source, and who enter into an agreement with the Company for a period of not less than twelve (12) months. The primary space heating source criteria will be considered to be met if the majority of the rooms in the dwelling unit have a permanently installed electric heating system. Available to a new dwelling unit for which a building permit is issued on or after July 1, 1993, only if certification is provided that the dwelling meets the thermal standards contained in the Construction Standard Rider. An application for service in which a certification is based on a building permit issued on or before December 21, 2006 shall be eligible for service under this rate. Supersedes Rate 5 Effective July 1, 2026 Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 5.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC HEATING SERVICE RATE 5 Page 2 of 3 MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $23.75 $0.03847 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh $0.01717 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.04901 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00196 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00496 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH Supersedes Rate 5 Effective July 1, 2026 Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 5.01-01-27 -$0.01840 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC HEATING SERVICE RATE 5 Page 3 of 3 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.15179 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH -$0.00250 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 5 Effective July 1, 2026 Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 5.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01

Text of Rate 1.01-01-27_REDLINED.pdf

Extracted from the file · 5,346 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC SERVICE RATE 1 Page 1 of 3 AVAILABLE for the entire electrical requirements of single-family residences, residential outbuildings, individual apartments and general service use (i.e. common areas) in apartment buildings, where residential use constitutes over 50 percent of the metered energy. Service to a room or group of rooms which regularly separate cooking facilities shall be considered as service to a separate/individual apartment for metering and billing purposes. This Rate is also available for agricultural/farm customers who meet the Connecticut definition of Agriculture. The over 50% residential use requirement does not apply to agricultural/farm customers. In compliance with PA 99-29 military veterans’ posts and organizations (i.e. VFW, American Legion, Disabled American Veterans, etc) that are exempt from federal taxation under Section 501(c) of the Internal Revenue Code may receive service under this rate. In compliance with PA 98-149 amending Subsection 16-19ff (a) of the Connecticut General Statutes, residential use in recreational campgrounds may receive service under this rate. The campground owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. In compliance with Public Act 02-17, amending Subsection 16-19ff (a) of the Connecticut General Statutes, use at a marina that qualifies for residential type use may receive service under this rate. A marina must have PURA-approved policies and procedures prior to billing any submetered customer. The marina owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. A marina must have PURAapproved policies and procedures prior to billing any submetered customer. To ensure the quality of service and equitable treatment of the metered campsites and boat slips (i.e. “Submetered Party”), campgrounds and marinas are required to follow Conn. Agencies Regs. Section 16-11-236 Calculating Submetered Party’s Cost, Section 16-11-237 Installation and Maintenance of Submeters, and Section 16-11-238 Meter Test and Record Retention. Section 16-11-100 Definitions defines a Submetering Customer, a Submetered Party, and “Average Cost” as used in Section 16-11-236. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $9.62 $0.05844 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh Supersedes Rate 1 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 1.01-01-27_REDLINED $0.02031 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC SERVICE RATE 1 Page 2 of 3 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.05050 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00196 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00496 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01911 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.1178715179 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH Supersedes Rate 1 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 1.01-01-27_REDLINED -$0.0021000250 Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC SERVICE RATE 1 Page 3 of 3 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: NONE. Supersedes Rate 1 Effective May 1, 2026Effective July 1, 2026 By Motion Ruling No. 105 dated April 29May 20, 2026 Docket No. 26-01-0301 Rate 1.01-01-27_REDLINED Effective January 1, 2027 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-0127-01-01

Text of Rate 1.01-01-27.pdf

Extracted from the file · 5,132 characters
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC SERVICE RATE 1 Page 1 of 3 AVAILABLE for the entire electrical requirements of single-family residences, residential outbuildings, individual apartments and general service use (i.e. common areas) in apartment buildings, where residential use constitutes over 50 percent of the metered energy. Service to a room or group of rooms which regularly separate cooking facilities shall be considered as service to a separate/individual apartment for metering and billing purposes. This Rate is also available for agricultural/farm customers who meet the Connecticut definition of Agriculture. The over 50% residential use requirement does not apply to agricultural/farm customers. In compliance with PA 99-29 military veterans’ posts and organizations (i.e. VFW, American Legion, Disabled American Veterans, etc) that are exempt from federal taxation under Section 501(c) of the Internal Revenue Code may receive service under this rate. In compliance with PA 98-149 amending Subsection 16-19ff (a) of the Connecticut General Statutes, residential use in recreational campgrounds may receive service under this rate. The campground owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. In compliance with Public Act 02-17, amending Subsection 16-19ff (a) of the Connecticut General Statutes, use at a marina that qualifies for residential type use may receive service under this rate. A marina must have PURA-approved policies and procedures prior to billing any submetered customer. The marina owner (i.e. the “Submetering Customer”) must comply with The Regulations of Connecticut State Agencies listed below. A marina must have PURAapproved policies and procedures prior to billing any submetered customer. To ensure the quality of service and equitable treatment of the metered campsites and boat slips (i.e. “Submetered Party”), campgrounds and marinas are required to follow Conn. Agencies Regs. Section 16-11-236 Calculating Submetered Party’s Cost, Section 16-11-237 Installation and Maintenance of Submeters, and Section 16-11-238 Meter Test and Record Retention. Section 16-11-100 Definitions defines a Submetering Customer, a Submetered Party, and “Average Cost” as used in Section 16-11-236. MONTHLY RATE: DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE CHARGE PER kWh $9.62 $0.05844 ELECTRIC SYSTEM IMPROVEMENTS: CHARGE PER kWh Supersedes Rate 1 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 1.01-01-27 $0.02031 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC SERVICE RATE 1 Page 2 of 3 REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00011 TRANSMISSION SERVICE RATE: CHARGE PER kWh $0.05050 SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00196 COMPETITIVE TRANSITION ASSESSMENT: CHARGE PER kWh $0.00496 CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER KWH -$0.01911 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE PER kWh THIRD-PARTY SERVICE $0.15179 as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER KWH Supersedes Rate 1 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 1.01-01-27 -$0.00250 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY RESIDENTIAL ELECTRIC SERVICE RATE 1 Page 3 of 3 COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. SPECIAL PROVISIONS: Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. MINIMUM CHARGE: The minimum charge is the customer charge. TERM OF CONTRACT: NONE. Supersedes Rate 1 Effective July 1, 2026 By Motion Ruling No. 5 dated May 20, 2026 Docket No. 26-01-01 Rate 1.01-01-27 Effective January 1, 2027 By Motion Ruling No. Docket No. 27-01-01