Eversource rate increase is on 7 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match

Text of Motion Filing Dated November 23, 2026 - Attachment 1.pdf

Extracted from the file · 1 page · 747 characters

Text of Motion Filing Dated November 23, 2026 - Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

1 page match
1 part match

Text of Rate EV-S.01-01-27_REDLINED.pdf

Extracted from the file · 5 pages · 8,142 characters

Text of Rate EV-S.01-01-27.pdf

Extracted from the file · 5 pages · 7,843 characters

Text of Rate EV-MHD.01-01-27_REDLINED.pdf

Extracted from the file · 6 pages · 11,133 characters

Text of Rate EV-MHD.01-01-27.pdf

Extracted from the file · 6 pages · 10,682 characters

Text of Rate EV-M.01-01-27_REDLINED.pdf

Extracted from the file · 5 pages · 10,630 characters

Text of Rate EV-M.01-01-27.pdf

Extracted from the file · 5 pages · 10,275 characters

Text of Rate EV-L.01-01-27_REDLINED.pdf

Extracted from the file · 6 pages · 11,493 characters

Text of Rate EV-L.01-01-27.pdf

Extracted from the file · 6 pages · 11,034 characters

Text of Rate 117.01-01-27_REDLINED.pdf

Extracted from the file · 5 pages · 9,899 characters

Text of Rate 117.01-01-27.pdf

Extracted from the file · 5 pages · 9,552 characters

Text of Rate 116.01-01-27_REDLINED.pdf

Extracted from the file · 9 pages · 17,638 characters

Text of Rate 116.01-01-27.pdf

Extracted from the file · 9 pages · 17,018 characters

Text of Rate 115.01-01-27_REDLINED.pdf

Extracted from the file · 2 pages · 3,791 characters

Text of Rate 115.01-01-27.pdf

Extracted from the file · 2 pages · 3,660 characters

Text of Rate 58.01-01-27_REDLINED.pdf

Extracted from the file · 5 pages · 9,530 characters

Text of Rate 58.01-01-27.pdf

Extracted from the file · 5 pages · 9,139 characters

Text of Rate 57.01-01-27_REDLINED.pdf

Extracted from the file · 5 pages · 9,821 characters

Text of Rate 57.01-01-27.pdf

Extracted from the file · 5 pages · 9,433 characters

Text of Rate 56.01-01-27_REDLINED.pdf

Extracted from the file · 5 pages · 9,200 characters

Text of Rate 56.01-01-27.pdf

Extracted from the file · 5 pages · 8,797 characters

Words on different pages
  1. Page 1

    THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 1 of 4 AVAILABLE for the electrical requirements of customers delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters. APPLICABLE to customers (1) who are manufacturers, as defined by Connecticut General Statute 12-412 (3) (A) (ii) and (iii), or who are engaged in manufacturing as defined in PA 92-193 amending Subsections 12-81(72) and 12-94c, or who are classified as supermarkets located in distressed municipalities, as defined by Connecticut General Statute Section 32-9p (b), and have an annual load factor of 65 percent or greater and agree to participate or have participated in the Company's conservation programs, and (2) are taking service on the effective date of this rate whose demand equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 350 kW but less than 1,000 kW. However, a customer on this rate whose maximum demand does not exceed 350 kW for 12 consecutive months, or whose prospective maximum demand shall not exceed 350 kW due to demonstrable conservation and load management measures may elect to take service under Rate 35 or Rate 37. Customers whose meters are not yet capable of measuring kilovolt-ampere (kVA) demand will be measured on a kW basis. Customers who migrate to this rate due to the withdrawal of Rates 985 and 39 have the option to be measured on a kW basis. In such cases the Distribution Demand Charge will be divided by .812 and the Production/Transmission Demand charges will be divided by .806. MONTHLY RATE: ON-PEAK (Weekdays 12 Noon - 8 p.m. during Eastern Standard Time) (Weekdays 1 p.m. - 9 p.m. during Daylight Saving Time) OFF-PEAK (All other hours) DISTRIBUTION SERVICE RATE: CUSTOMER CHARGE DIST. DEMAND CHARGE $350.00 $6.65 per kVA ELECTRIC SYSTEM IMPROVEMENTS: DIST. DEMAND CHARGE $1.65 per kVA REVENUE ADJUSTMENT MECHANISM: CHARGE PER kWh Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED $0.00011 Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01
  2. Page 2

    THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 2 of 4 TRANSMISSION SERVICE RATE: PROD./TRAN. DEMAND CHARGE $12.00 per kVA SYSTEMS BENEFITS CHARGE: CHARGE PER kWh -$0.00034 COMPETITIVE TRANSITION ASSESSMENT: PROD./TRAN. DEMAND CHARGE $1.48 per kVA CONSERVATION CHARGE: CHARGE PER kWh $0.00000 CONSERVATION ADJUSTMENT MECHANISM: CHARGE PER kWh $0.00600 RENEWABLE ENERGY: CHARGE PER kWh $0.00100 FMCC DELIVERY CHARGE: (as per FMCC tariff) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK -$0.03407 -$0.00773 SUPPLIER SERVICE OPTIONS: (as per the Generation Services tariff) GENERATION SERVICE: STANDARD SERVICE (max demand less than 500 kW) CHARGE PER kWh ON-PEAK CHARGE PER kWh OFF-PEAK $0.1358716514 $0.1058713514 GENERATION SERVICE: LAST RESORT SERVICE (max demand equal to or greater than 500 kW) CHARGE PER kWh ON-PEAK October2026January2027 $0.0897524910 per kWh November 2026February 2027 $0.1148121620 per kWh December 2026March 2027 $0.2081110970 per kWh Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01
  3. Page 3

    THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 3 of 4 CHARGE PER kWh OFF-PEAK October2026January2027$0.0846723850 per kWh November 2026February 2027 $0.1049721110 per kWh December 2026March 2027 $0.2012011090 per kWh THIRD-PARTY SERVICE as per contract FMCC GENERATION CHARGE: (as per FMCC tariff – not applicable to customers taking THIRD-PARTY SERVICE above) CHARGE PER kWh -$0.0021000250 POWER FACTOR: If a customer is found to have a power factor of less than 90% lagging, the Company may require correction to at least 90% lagging as a condition of service. If the customer does not correct the power factor to at least 90% lagging and the Company corrects the condition, the customer will reimburse the Company for all costs which it incurs. COMBINED PUBLIC BENEFITS CHARGE: Pursuant to Conn. Agencies Regs. § 16-245-1(a)(2)(A) the Systems Benefits Charge, the Conservation Charge, the Conservation Adjustment Mechanism, and the Renewable Energy Charge are combined for billing purposes into the Combined Public Benefits Charge effective January 1, 2014. DETERMINATION OF PRODUCTION/TRANSMISSION DEMAND: The production/transmission demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand recorded during the billing month in the on-peak hours as defined above. DETERMINATION OF DISTRIBUTION DEMAND: The distribution demand shall be the highest average 30-minute kilovolt-ampere (kVA) demand in the current month or the preceding eleven (11) months. The customer may, upon not less than three (3) months' prior written notice to the Company, decrease the Distribution Demand solely to reflect lower load levels from demonstrable conservation and load management. SPECIAL PROVISIONS: 1. Primary Metering: If the service is metered on the primary side of the transformers supplying the customer, 2% of the metered kilowatt-hours will be deducted in computing the bill. Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01
  4. Page 4

    THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY INTERMEDIATE TIME-OF-DAY ELECTRIC SERVICE MANUFACTURERS RATE 55 Page 4 of 4 2. Facilities Ownership: If the service is taken at the property line and the Company is relieved of owning and maintaining all electrical distribution equipment on private property, except the metering equipment, a credit shall be applied to the bill equal to $.20 per kW of the Distribution Demand billed. 3. Transmission Voltage Delivery Allowance: Where service is supplied at transmission voltage, 69,000 volts and higher, and the Company is relieved of all investment on the customer's property, except the metering equipment, the Distribution Demand Charge under the Distribution Service Rate shall be waived, and all Energy Charges adjusted for the differential between line losses at transmission and primary distribution service. This Energy Charge shall be implemented by multiplying on-peak and off-peak charges by .9735 and .9787 respectively. Service supplied at transmission voltage is unregulated. RATE ADJUSTMENTS: This rate will be adjusted as provided in the Company’s Energy and Transmission Adjustment Clauses. COMPETITIVE TRANSITION ASSESSMENT COST ADJUSTMENT: Competitive Transition Assessment (CTA) charges and terms under this rate includes a CTA Cost Adjustment Charge set in accordance with the Company's CTA Cost Adjustment. SYSTEMS BENEFITS COST ADJUSTMENT: Systems Benefits service charges for all customers taking service under this rate shall be set in accordance with the Company’s Systems Benefits Cost Adjustment. MINIMUM CHARGE: The minimum charge is the customer charge plus the distribution demand charges in any rate category. METER COMMUNICATIONS REQUIREMENT: Dependent on the meter technologies available and supported by the Company, the Customer agrees that it is necessary to install communication equipment for the Company to read the meter(s). The type and location of such remote communication equipment shall be at the sole discretion of the Company, and it is the sole responsibility of the Customer to provide communication equipment in the proximity of the electric meter as determined by the Company’s specifications. The Customer shall be the owner of communication equipment and shall maintain such equipment in operable condition at all times. The Company will be responsible for the installation and maintenance of the connection between the meter communication equipment and the Company’s meter. TERM OF CONTRACT: One year and thereafter unless canceled by one month's written notice. Supersedes Rate 55 Effective JulyOctober 1, 2026 By Motion Ruling No. 57 dated May 20August 21, 2026 Docket No. 26-01-01 Rate 55.01-01-27_REDLINED Effective OctoberJanuary 1, 20262027 By Motion Ruling No. 7 dated August 21, 2026 Docket No. 2627-01-01

Text of Rate 55.01-01-27.pdf

Extracted from the file · 4 pages · 8,708 characters

Text of Rate 41.01-01-27_REDLINED.pdf

Extracted from the file · 4 pages · 7,357 characters

Text of Rate 41.01-01-27.pdf

Extracted from the file · 4 pages · 7,013 characters

Text of Rate 40.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 3,787 characters

Text of Rate 40.01-01-27.pdf

Extracted from the file · 3 pages · 3,573 characters

Text of Rate 39.01-01-27_REDLINED.pdf

Extracted from the file · 4 pages · 8,528 characters

Text of Rate 39.01-01-27.pdf

Extracted from the file · 4 pages · 8,258 characters

Text of Rate 37.01-01-27_REDLINED.pdf

Extracted from the file · 4 pages · 7,739 characters

Text of Rate 37.01-01-27.pdf

Extracted from the file · 4 pages · 7,461 characters

Text of Rate 35.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 6,173 characters

Text of Rate 35.01-01-27.pdf

Extracted from the file · 3 pages · 5,959 characters

Text of Rate 30A.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 6,181 characters

Text of Rate 30A.01-01-27.pdf

Extracted from the file · 3 pages · 5,967 characters

Text of Rate 30.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 5,870 characters

Text of Rate 30.01-01-27.pdf

Extracted from the file · 3 pages · 5,656 characters

Text of Rate 29.01-01-27_REDLINED.pdf

Extracted from the file · 2 pages · 2,729 characters

Text of Rate 29.01-01-27.pdf

Extracted from the file · 2 pages · 2,603 characters

Text of Rate 27A.01-01-27_REDLINED.pdf

Extracted from the file · 4 pages · 7,369 characters

Text of Rate 27A.01-01-27.pdf

Extracted from the file · 4 pages · 7,083 characters

Text of Rate 27.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 6,591 characters

Text of Rate 27.01-01-27.pdf

Extracted from the file · 4 pages · 6,714 characters

Text of Rate 18.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of Rate 18.01-01-27.pdf

Extracted from the file · 3 pages · 3,742 characters

Text of Rate 7.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 5,510 characters

Text of Rate 7.01-01-27.pdf

Extracted from the file · 3 pages · 5,292 characters

Words on different pagesRead the text of Rate 7.01-01-27.pdf

Text of Rate 5.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 6,387 characters

Text of Rate 5.01-01-27.pdf

Extracted from the file · 3 pages · 6,164 characters

Words on different pagesRead the text of Rate 5.01-01-27.pdf

Text of Rate 1.01-01-27_REDLINED.pdf

Extracted from the file · 3 pages · 5,340 characters

Text of Rate 1.01-01-27.pdf

Extracted from the file · 3 pages · 5,126 characters

Words on different pagesRead the text of Rate 1.01-01-27.pdf

As listed on the current system

Response to Motion No.: 001 - 11/23/2026 (Eversource Energy) - Type Response = Other [27-01-01]

This filing on the current system (opens in a new tab)