Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Docket 26-09-13

Application of Green Mountain Power Corporation for Qualification of Bolton Falls Hydro, Winooski River, Duxbury, VT as a Class I Renewable Energy Source Hydro

Closed October 28, 2026

Filed September 22, 2026 by BOLTON FALLS. 2 public filings and 7 documents, the latest on October 28, 2026.

Documents filed to open the docket5

Filings2

1 filing of the selected types

About this docket

Docket number
26-09-13
Status
Closed October 28, 2026
Type of matter
Renewable Energy Source Certification; Class I
Filed by
Green Mountain Power
Concerns
BOLTON FALLS
Date filed
September 22, 2026
First filing
October 22, 2026
Latest filing
October 28, 2026
Public filings
2
Documents
7 (1.7 MB)

This docket on the current system (opens in a new tab)

Search this docket

Finds words in this docket's filings and in the text of its documents.

Reading a docket

  • Motions ask the Authority for something; each gets a ruling.
  • Interrogatories are written questions, usually from Authority staff; the answers are filed as responses.
  • A draft decision comes before the final decision; participants may file exceptions to it.

All terms explained