A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Docket 26-09-13ClosedOctober 28, 2026

Application of Green Mountain Power Corporation for Qualification of Bolton Falls Hydro, Winooski River, Duxbury, VT as a Class I Renewable Energy Source Hydro

Filed by
Green Mountain Power
Concerns
BOLTON FALLS
Type of matter
Renewable Energy Source Certification; Class I
Date filed
September 22, 2026
Status
Closed October 28, 2026
First filing
October 22, 2026
Latest filing
October 28, 2026
Filings
2
Documents
7 (1.7 MB)

This docket's record on the current system (opens in a new tab)

Decisions and notices

What the Authority has issued in this docket, newest first.

Documents filed to open the docket

Filings

2 filings.

  1. October 2026