DecisionFiled
Final Decision
Part of
Docket 26-09-13Closed
Application of Green Mountain Power Corporation for Qualification of Bolton Falls Hydro, Winooski River, Duxbury, VT as a Class I Renewable Energy Source Hydro
- Type of filing
- Decision (Final Decision)
- Date filed
- October 28, 2026
- Filed by
- Not recorded
- Files
- 1
As listed on the current system: Final Decision, 10/28/2026 [26-09-13]
Files
260913-102826.pdf
PDF · 171 KB · 4 pagesText searchable
Download 260913-102826.pdfRead the text of 260913-102826.pdf
Text of 260913-102826.pdf
Extracted from the file · 4,746 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-09-13
APPLICATION OF GREEN MOUNTAIN POWER
CORPORATION FOR QUALIFICATION OF BOLTON
FALLS HYDRO, WINOOSKI RIVER, DUXBURY, VT AS
A CLASS I RENEWABLE ENERGY SOURCE
October 28, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
DECISION
DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority determines that the
Bolton Falls hydropower generation facility located on the Winooski River in Duxbury,
Vermont qualifies as a Class I renewable energy source.
B.
BACKGROUND OF THE PROCEEDING
By Application received September 22, 2026 (Application), Green Mountain
Power Corporation (Company) requests that the Public Utilities Regulatory Authority
(Authority) determine that the Bolton Falls hydropower generation facility (Bolton Falls
or Project) qualifies as a Class I renewable energy source.
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding: Green
Mountain Power Corporation, 163 Acorn Lane, Colchester, VT 05404; the Office of
Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the
Commissioner of the Department of Energy and Environmental Protection, 79 Elm
Street, Hartford, CT 06106.
II.
STANDARD REVIEW
Pursuant to General Statutes § 16-1(a)(20), “Class I renewable energy source”
includes energy derived from a run-of-river hydropower facility that received a new
license after January 1, 2018, has a generating capacity of not more than 60 megawatts,
is not based on a new dam or a dam identified as a candidate for removal, and meets
applicable state and federal requirements, including state dam safety requirements and
applicable site-specific standards for water quality and fish passage.
III.
AUTHORITY ANALYSIS
As provided in the Application, Bolton Falls generates electricity using hydropower.
The Project is located on the Winooski River in Duxbury, Vermont. Bolton Falls originally
began commercial operation on February 5, 1982, and received an Order Issuing New
License from FERC on October 5, 2022 (New License). The New License requires the
Project to operate on a peaking basis and fluctuate the reservoir level between 391.00
Docket No. 26-09-13
Page 2
and 397.00 feet while discharging through the powerhouse a minimum flow of 300 cfs10
or inflow, whichever is less, downstream into the Winooski River. However, the Company
voluntarily operates the project in a run-of-the-river mode with project outflows
approximating inflows to the impoundment at any given point in time.
Bolton Falls has an installed capacity of 7.5 MW. The Project's NEPOOL GIS
Identification Number is MSS346. Bolton Falls is a grid-connected generation facility
located in Vermont, which is within the control area of the ISO-NE.
According to its New License, the Project is not based on a new dam or a dam
identified as a candidate for removal. Bolton Falls meets all applicable requirements,
including state dam safety requirements and applicable site-specific standards for water
quality and fish passage.
IV.
CONCLUSION
The Authority reviewed all information in the record and finds that pursuant to
General Statutes § 16-1(a)(20), the Facility qualifies as a Class I renewable energy
source, effective July 1, 2026. The Authority assigns the Facility Connecticut
Renewable Portfolio Standard Registration No. CT260913.
The Authority’s determination in this docket is based on the information
submitted by the Company. The Authority may reverse its ruling or revoke the
Company’s registration if any material information provided proves to be false or
misleading. The Company is reminded that it is obligated to notify the Authority within
10 days of any changes to any of the information it has provided.
DOCKET NO. 26-09-13
APPLICATION OF GREEN MOUNTAIN POWER
CORPORATION FOR QUALIFICATION OF BOLTON
FALLS HYDRO, WINOOSKI RIVER, DUXBURY, VT AS
A CLASS I RENEWABLE ENERGY SOURCE
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
Holly H. Cheeseman
David Arconti, Jr.
Janice A. Beecher
Everett Smith, III
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
October 28, 2026
Date