Interrogatory responses
Answers to questions 1, 2, 3
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
CLF-AC-001_Final.pdf
PDF · 570 KB · 45 pagesText searchable
Download CLF-AC-001_Final.pdfRead the text of CLF-AC-001_Final.pdf
CLF-AC-002_Final.pdf
PDF · 357 KB · 17 pagesText searchable
Download CLF-AC-002_Final.pdfRead the text of CLF-AC-002_Final.pdf
CLF-AC-003_Final.pdf
PDF · 476 KB · 29 pagesText searchable
Download CLF-AC-003_Final.pdfRead the text of CLF-AC-003_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 1 of 45
Date Filed: October 07, 2026
Witness:
Douglas P. Horton
Request from: CLF and Acadia Center
Question:
(Performance-based Regulation) Refer to Exhibit CLP-PBR-1 (Frayer Direct Testimony), page
60.
(a) Please confirm whether the Company’s proposed Performance-Based Multi-Year Rate
Plan (“PBMRP”) differs from the mechanisms adopted in the Proposed Final Decision
issued July 14, 2025 in Docket No. 21-05-15RE01 (“RE01 2025 PFD”).
(b) Referencing the Company’s answer to CLF-AC-1 (a), identify and describe each respect
in which the PBMRP differs from the mechanisms adopted in the RE01 2025 PFD.
(c) For each identified mechanism difference provided under CLF-AC-1 (b), please identify
confirm or deny that the whether the Company evaluated considered proposing the
mechanism in its proposed PBMRP as originally adopted in the RE01 2025 PFD. If the
Company did evaluate whether or not to propose the mechanism as originally set forth in
RE01 2025 PFD, instead of as proposed in this Docket, please provide any written
discussions, written analyses, workpapers, or other documentary materials used in making
that determination.
Response:
(a) The Company’s proposed Performance-Based Multi-Year Rate Plan (“PBMRP”) has
several similarities with the Proposed Final Decision (“PFD”) of Docket No. 21-0515RE01; however, it also has key differences. To make its proposal in this case, the
Company started with the ratemaking framework under discussion in Docket No. 21-0515RE01, while introducing certain modifications to remediate the flaws that would have
ultimately hindered PURA’s (draft) PBR model in terms of supporting the stay-out aspect
of the PBR plan. The Company’s perspective is, and has always been, that a
comprehensive and cohesive PBR framework produces benefits for customers, while
enabling investment by the Company in safe and reliable service, provided it is designed
in a way that fairly balances interests. If the scales are tipped in either direction it
introduces risk that rates will be set either too high or too low, diminishing (or eliminating)
the incentives inherent in a properly constructed PBR framework.
The Company’s analysis of the framework presented in Docket No. 21-05-15RE01
demonstrated that the draft framework was designed in a way that would programmatically
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 2 of 45
provide insufficient revenues to sustain the cost of ongoing electric service, which would
mean that the Company would need to file more frequent rate cases to increase revenues,
and therefore would not be able to commit to a rate case stay-out of any duration, thereby
eliminating PBR entirely as an option. The response below and elsewhere in this docket
compares the Company’s proposed PBMRP against PURA’s July 2025 proposed final
decision in Docket No. 21-05-15RE01 (“RE01-PFD”), in its draft form.
(b) For this response the Company focuses on the most substantial differences of the PBMRP
related to the revenue cap formula. This response is organized as follows:
1) Summary
2) Capital funding
3) Cost of capital
4) “I-X”
5) Consumer dividend, and
6) Exogenous cost recovery.
1) Summary
The objective of performance-based regulation is to establish a regulatory
framework that promotes efficiency, innovation, accountability, and customer value
while preserving a reasonable opportunity to recover the prudently incurred costs
necessary to satisfy the utility's obligation to provide safe, adequate, reliable, and
resilient service, including the cost of debt and equity capital.
Successful performance-based regulation may reduce reliance on traditional costof-service ratemaking, but it does not eliminate the expenditures, investments,
financing requirements, and operational obligations necessary to provide utility
service. Nor does it eliminate the economic realities associated with attracting the
capital required to fund those obligations. Capital is a finite and scarce resource that
is continuously allocated among competing investment opportunities across
industries, sectors, and jurisdictions. Investors providing capital to utility
infrastructure companies necessarily forego alternative investment opportunities and
therefore require a return on their investment that is commensurate with the risks
assumed. A framework that is disconnected from utility costs, investment
requirements, and financing realities risks producing revenues that bear little
relationship to the services customers require, the obligations the utility is expected
to satisfy, or the capital necessary to support those obligations. Accordingly, a
successful performance-based framework is one that remains informed by utility
costs and capital requirements.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 3 of 45
A successful performance-based framework must also recognize the operational
realities of managing a dynamic electric distribution system. Equipment failures
occur unexpectedly. Infrastructure conditions evolve. Reliability, resiliency,
cybersecurity, and modernization needs change over time. Customer expectations
and public-policy requirements continue to develop. A framework that ignores those
realities cannot effectively support fulfillment of the utility's obligation to serve.
Sound regulatory design requires that revenue-adjustment mechanisms remain
aligned with the costs and obligations they are intended to address. Operating-cost
adjustments are appropriately informed by, for example, labor costs, contractor
costs, materials costs, purchased services, and productivity trends. Capital-related
revenue support is appropriately informed by the investments necessary to satisfy
utility obligations, the financing required to support those investments, and the
revenue requirements associated with obtaining and maintaining access to capital on
reasonable terms.
The Company's goal in this proceeding is to establish a sustainable, cohesive
ratemaking framework that advances electric utility service in the State of
Connecticut in an affordable manner for customers over the long term. This is the
Company's goal because the distribution system requires significant capital
investment for reliability, resiliency, and modernization. For this investment to be
affordable for customers, a coherent ratemaking plan needs to be instituted that
balances customer interests, both in terms of the rates that customers pay and the
services (and quality of service) received in exchange. Such a framework should
recognize that maintaining access to capital at reasonable cost is itself a critical
component of customer affordability. When investors perceive a stable, predictable,
and sustainable regulatory environment, capital can be raised at a lower cost,
reducing financing expenses borne by customers over time. Conversely, a
framework that fails to provide reasonable revenue support for necessary
investments risks increasing financing costs, constraining access to capital, delaying
infrastructure improvements, and ultimately risks increasing long-term costs for
customers while degrading quality of service.
Therefore, the framework must balance: (1) the reliability and performance
requirements of the Company's customers and the broader State of Connecticut;
(2) customer rate stability and affordability; (3) incentives for cost efficiency in
utility operations; and (4) implementation of a revenue support mechanism
sufficient to attract and maintain the capital necessary to deliver these objectives and
support the safe, reliable, resilient, and modern electric distribution system that
customers expect and require.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 4 of 45
2) Capital Funding
Please also refer to the Company’s responses to interrogatories OCC-423 i, OCC859 ii, and EOE-156, iii all of which compare and contrast the Company’s F-Factor
proposal with the CT-bar outlined in the RE01-PFD. In summary, the CT-bar has
several features that, in the Company’s view, are appropriate for a PBR framework,
and have been retained in the design of the Company’s proposed PBRMP, inclusive
of the F-Factor component. The Company’s proposal excludes or augments only
those negative aspects of the CT-bar as outlined in the PFD that, in the Company’s
analysis, all but guarantee that a utility operating under that framework would have
revenues that, by design, were insufficient to sustain the business. The following is
an excerpt of the Company’s response to interrogatory EOE-156 at pages 6-9:
1. Like the CT-Bar, the Company's F-Factor would take effect the
first day of the first Rate Year coming out of the rate case, which
eliminates the need for Rate Year capital to be embedded in base
rates, subject to later downward only reconciliation. To the extent
capital investment currently factored into the Company's proposed
revenue requirement for Rate Year 1 is "rolled back" to an earlier date
(for example, to a capital investment cutoff date of February 28, 2027
for inclusion in base rates), the F-Factor revenue-requirement
calculation would inherently adjust to reflect capital investment as of
that cutoff date.
2. Like the CT-Bar, the Company's F-Factor does not pre-emptively
or categorically exclude any type of capital investment. The
Company regularly makes capital investments that do not directly
affect the performance of the electric grid the way utility poles,
transformers, lines, substations, etc. clearly do, but are nonetheless
essential capital investments in the provision of service to customers.
Capital investments for facilities safeguarding equipment,
information technology enabling self-service customer portals, and
vehicles needed for transporting materials to work sites are but a few
examples of core capital investments that are necessary and, therefore,
inform the F-Factor allowance.
3. Like the CT-Bar, the Company's F-Factor aligns the capital
investment necessary for the target performance of the electric
grid outlined in the Company's Targeted System Plan, with the
revenues required to support those investments. In developing the
F-Factor, the Company sought to establish a means of tying the F-
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 5 of 45
Factor revenue allowances to the capital investment forecast that
would be discussed extensively in this docket. This allows the focus
of the TSP to remain on the system needs and plan objectives while
simultaneously acknowledging that those needs and objectives,
whatever they may be, require some measure of revenue support. The
F-Factor serves as a necessary link between the system needs
evaluated in this docket and necessary revenues.
4. The Company's F-Factor properly includes the cost of capital. If
CT-Bar is evaluated separately from going-in revenue requirements,
no single design factor would guarantee its failure more so than the
absence of the cost of capital from its revenue requirement
calculations. Though the cost of capital is not visible the way other
costs of service are, such as the maintenance cost that keeps an older
piece of equipment online or the cost of gasoline in a line truck, it is
just as real a cost of service.
The Company regularly operates with a cash deficit. That is, the cash
necessary to support ongoing operations exceeds the cash received
from customers through bills. The direct result is the Company must
secure funds through some other means. Those other means are debt
and equity investors: the individuals, banks, corporations and other
institutions supplying funds to capital markets. Those entities have
choice in terms of the entities to whom they provide their funds,
choices that weigh other utility companies, industries, countries and
continents, type of security, duration, expected return, the presence (or
absence) of dividends, environmental, social, and governance
characteristics, and countless other variables against the investor's
tolerance for risk. Not surprisingly, the Company cannot expect that
investors, facing the choice between the Company and essentially all
other investment opportunities, would or should accept zero return in
exchange for their funds. Thus, the cost to acquire the funds necessary
to perform the ongoing capital investments required of the system is
real, fundamentally non-zero, and more specifically the Company's
cost of capital filed in this proceeding.
5. The Company's F-Factor captures all elements of the Company's
capital investment base, including plant additions, plant
retirements, accumulated depreciation, cost of removal, and
accumulated deferred income taxes. The Company's F-Factor
calculation fundamentally captures the impact of ongoing
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 6 of 45
depreciation accumulating in rate base, which has the effect of
reducing overall revenue requirements. Additionally, the Company's
F-Factor calculation inherently captures the reduced revenue
requirement resulting from plant retirements and accumulated
deferred income taxes, while also incorporating the effect of cost of
removal on rate base.
Like the CT-Bar, annual reconciliation of the revenue
requirement ensures customers ultimately pay only for prudent
capital investment while balancing the utility's need to cover the
ongoing costs of providing ongoing service. Critically, the
Company's F-Factor proposal does not circumvent prudence reviews,
essential pillars of properly functioning regulatory frameworks, nor
undermine the value that effective prudence reviews bring customers.
Ultimately, the Company is acutely aware that any capital investment
must successfully withstand the scrutiny of a prudence review.
Whether that review happens next year, three years from now, or at
any other interval, the Company knows the decisions made today must
withstand a prudence examination. Any eventual findings of
imprudence regarding capital investments made today have
significant, negative financial implications, regardless of when those
findings are made. Thus, the very expectation of future prudence
reviews reinforces the prudence ingrained in decision-making today.
Further, the risk of a future finding of imprudence and the negative
financial implications thereof eliminates any perceived financial
benefit
for the Company
to
"over invest"
today.
Annual reconciliation, including the prudence reviews involved, is a
critical element of the Company's PBMRP proposal. As part of each
annual PBMRP adjustment effective July 1 each year of the
PBMRP,[2] the Company's actual capital additions for the Prior Year
are allowed for inclusion in the calculation of the F-Factor to the
extent that the actual capital additions do not exceed the Forecasted
Budget (referred to as the F-Factor allowance).
To the extent that the cumulative actual capital costs in-service
through the Prior Year, in aggregate, exceeds the Forecasted Budget
through the Prior Year, then the F-Factor allowance is capped at the
cumulative Forecasted Budget. This downward-only reconciliation
will ensure that, in the end upon reconciliation, customer bills reflect
the costs associated only with projects that are in service to customers
and no more, and that if the Company invests more than the
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 7 of 45
Forecasted Budget, customer bills will not reflect amounts above the
Forecasted Budget until such time as those capital investments are
allowed into rates at the time of the Company's next rate case.The
prior-period reconciliation will be reflected in the F-Factor, in
addition to the revenue requirement associated with the Forecasted
Budget for the upcoming rate year, effective July 1 annually. The FFactor allowance will be calculated to determine the revenue
requirement (inclusive of depreciation expense, property tax expense,
return on rate base, and income tax) on actual plant additions
(including plant additions, cost of removal, plant retirements,
accumulated depreciation, and plant-related accumulated deferred
income taxes ("ADIT")) up to the Forecasted Budget amount, and to
reflect the revenue requirement for the Prior Year and through the
Rate Year on in-service capital additions placed in service in the Prior
Year, provided that those in-service capital additions are not reflected
in base rates or in another rate mechanism. In addition, the F-Factor
allowance will reflect the revenue requirement for rate year capital,
established at the Forecasted Budget, subject to downward-only
reconciliation in the subsequent F-Factor filing.
As noted above, annual reconciliation will consider plant-related
ADIT on the Company's books through the end of the calendar year
prior to a given annual filing. To the extent the Company has recorded
cumulative plant additions in excess of the capital expenditure
forecast provided in this docket or supported by a mechanism other
than the F-Factor, the plant-related ADIT will be adjusted in the
Company's annual reconciliation to avoid overstating the ADIT
relevant to the F-Factor.
In total, the Company's proposed F-Factor will provide revenue
support for, and ultimately reconcile, the capital investment placed
into service from the cutoff date for inclusion in base rates through the
effective date of the Company's subsequent rate case at the conclusion
of the proposed PBMRP term. Per the Company's proposal, and as
depicted in the illustrative attachments for this response, the F-Factor
would ultimately reconcile capital investments made up to July 1,
2031 (the effective date of the subsequent rate case). Should the
subsequent rate case be effective later than the July 1, 2031 illustrative
date, the F-Factor would continue to reconcile capital investments
placed into service until such time as that rate case does take effect.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 8 of 45
Footnote 2: In this proceeding the Company is proposing that the first
F-Factor take effect commensurate with new base rates authorized in
this proceeding, for effect July 1, 2027, and annually thereafter for the
duration of the PBMRP. However, the Company has reflected rate
year capital in the revenue requirement proposed in this proceeding,
such that the Rate Year 1 F-Factor is set to 0, since rate year capital
that would otherwise be reflected in the F-Factor on a forecasted basis
is reflected in base rates. If PURA declines to include rate year capital
in base rates, the F-Factor would be calculated to reflect the revenue
requirement on capital through the rate year, subject to later
reconciliation.
3) Cost of Capital
Please also refer to the Company’s response to interrogatory OCC-758, iv which
discusses the role of equity capital in the Company’s operations.
As described in its discussion in that response as well as its discussion above
comparing the F-Factor and CT-bar, the exclusion from the CT-bar of the cost of
capital on incremental capital investment is a fatal flaw that all but guarantees no
utility would have sufficient revenues to cover its cost of service during the PBR
term, and therefore would not be in a position to commit to a stay-out of any
duration. In an environment in which significant increases in the level of system
investment is needed on the distribution system, purposefully excluding the cost of
capital from any revenue support mechanism ensures the utility has no realistic
opportunity on a regular basis to earn its authorized return on equity, which is a
necessary component of any regulatory framework so that the utility is in a position
to cover its cost of service and be able to attract ongoing capital necessary to support
needed and ongoing system investment.
As the Company stated in its response to OCC-423 (at pages 7-8):
As discussed in the Company’s response to OCC-435, based on the
Company’s current assessment of system investment needs in the near future,
the revenue requirement associated exclusively with the cost of capital
pertaining to future capital additions (excluding GET and Uncollectible)
would amount to an incremental $15.6 million for Rate Year 1; an
incremental $32.8 million for Rate Year 2; an incremental $36.4 million for
Rate Year 3; and an incremental $39.5 million for Rate Year 4, or $124.1
million in total.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 9 of 45
This means that -- even if 100% of [the future incremental capital investment
was] only partially supported with CT-Bar revenues (i.e. revenue covering
depreciation expense and property taxes only); and even if the Company’s
future cost of service otherwise was 100% supported with rates; and even
with perfect operational decision making -- the Company would still need to
find $124.1 million of annual savings by Rate Year 4 in order to offset the loss
of revenue associated with carrying costs on incremental investment over the
term of the PBMRP, which would be necessary to commit to a stay-out term.
For perspective, the total O&M expense included in the Company’s cost of
service filed in this proceeding is $547.5 million. Thus, to earn its authorized
ROE, all else equal, the Company would have to generate cost savings
amounting to $124.1 million, or nearly 23%, of its Rate Year O&M level by
Year 4, to offset the impact of the accumulating carrying costs on the
incremental capital additions completed on the system after base rates are set
in this case. This is nearly 34% of operating expense, excluding vegetation
management and storm restoration costs, which is a very substantial
proportion of the cost of service. For example, the amount of $124M is nearly
two-thirds of the Company’s labor and labor-related operating expense, or
60% more than the entire vegetation management program. It simply is not
possible for the Company to cut this level of O&M expense without grossly
debilitating the Company’s ability to provide service to customers. In fact, it
is not plausible to expect that the Company could generate even 10% in
annual incremental O&M savings in the face of 2-3% annual inflation and,
as a result, the Company could not agree to a stay out under circumstances
where there is no recovery of the cost of capital on incremental investment
over the PBMRP term.
Moreover, even if the Company were somehow able to find such remarkable
cost savings, the going-in revenue requirement of the subsequent multi-year
rate plan would capture those cost savings. Assuming continuation of the
same PBR framework and required system investment, the Company would
again be in the position of having to find an additional 34% of O&M savings
(i.e. more than 60% cumulatively from Rate Year 1) in order to sustain itself
over the next PBR term. Clearly, a framework that does not provide revenue
supporting the full cost of incremental investment over a four-year period, as
well as the next four-year period, is not a plausible or lasting framework.
Thus, exclusion of the cost of capital from a capital support mechanism in an
environment in which significant increases in capital investments are
expected all but ensures the Company has no realistic opportunity to survive
the PBR term without a critical need for a rate case to realign costs and rates.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 10 of 45
Consequently, the overall framework as outlined in the REO1-PFD had no
practical chance of sustaining the Company financially for the four-year
term, nor would the Company have been able to even agree to a stay-out.
The Company fully embraces the notion of incentivizing the utility to strive for cost
efficiency under a PBR framework. However, excluding the cost of the capital,
which is a fundamental and necessary cost associated with the infrastructure
investment necessary to achieve the objectives outlined in the PBR plan is not a tool
capable of delivering that outcome. Based on its current assessment of the
substantial distribution system needs, the Company expects that it would need to file
rate cases every 18 months or sooner, if possible, if the CT-bar were to be
implemented as contemplated in the RE01-PFD. Please refer to the Company’s
response to interrogatory EOE-156 for additional discussion of the alternatives
available to the Company in the absence of a viable, sustainable multi-year rate plan.
Thus, this critical deficiency of CT-bar is not a design feature of a sustainable multiyear framework and as such is not included in the Company’s proposed F-Factor.
4) “I-X”
Both the RE01-PFD and the Company's proposed PBMRP include an inflationbased component within the revenue cap formula. However, the two approaches
differ fundamentally with respect to both (1) the revenue base to which inflation is
applied and (2) the economic purpose the inflation mechanism is intended to serve.
Under the RE01-PFD, the I-Factor would be applied broadly to the utility's revenue
requirement, including capital funding mechanisms. As the RE01-PFD states:
[t]he Authority will apply the I-Factor to all variables within the
Revenue Cap Formula, capital funding mechanisms (i.e., CT-Bar
and any potential Capital Cost Trackers), PIMs, SSMs, and
regulatory assets and liabilities." (PFD Appendix A, page vi).
In contrast, the Company's PBMRP proposal intentionally limits application of the
I-X mechanism to operating and maintenance ("O&M") costs, excluding
catastrophic storm expense. The Company does so because the proposed PBMRP
separately addresses capital-investment-related revenue requirements through the FFactor, which directly reflects the revenue requirement associated with incremental
capital investment, including plant additions, cost of removal, depreciation, taxes,
and the cost of capital.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 11 of 45
This distinction reflects an important economic principle. Inflation measures are
reasonably suited to address changes in operating costs such as labor, contractor
services, materials, and other routine expenditures that are consumed in providing
service. Capital-investment requirements, however, are not determined by general
inflation. Rather, they are determined by the actual infrastructure needs of the
electric distribution system, including reliability, resiliency, modernization, asset
replacement, cybersecurity, and other system requirements. The revenue support
necessary for those investments is further determined by the financing required to
attract capital from investors in competitive capital markets.
Accordingly, the Company's PBMRP separates the revenue support necessary for
operating expenses from revenue support adjustment associated with capital
infrastructure investment. The I-X mechanism addresses changes in operating costs
while the F-Factor addresses changes in capital-related revenue requirements. Each
mechanism is therefore aligned with the category of costs it is intended to support.
The RE01-PFD framework did not make this distinction. Because the RE01- PFD
would apply the I-Factor to revenue streams associated with capital-support
mechanisms while also maintaining separate capital-recovery mechanisms such as
CT-Bar, the inflation adjustment and capital-funding mechanisms become
interrelated rather than functionally distinct. By contrast, the Company's proposal
establishes a clearer allocation of responsibility between mechanisms: operatingcost changes are addressed through I-X, while capital-investment requirements are
addressed through the F-Factor.
Consistent with this approach, the Company proposes an inflation measure based on
Gross Domestic Product Price Index ("GDPPI") and Employment Cost Index
("ECI"), indices that are more closely associated with the underlying drivers of
utility operating costs. Because capital-investment-related revenue requirements are
separately addressed through the F-Factor, there is no need for the inflation
mechanism to provide additional revenue support for capital additions.
The result is a more transparent and internally consistent framework in which each
component of the revenue cap formula serves a distinct purpose. The I-X
mechanism addresses operating-cost pressures and efficiency incentives, while the
F-Factor provides revenue support for prudent capital investment necessary to
maintain a safe, reliable, resilient, and modern electric distribution system.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 12 of 45
5) Consumer Dividend
While the Company's proposed S-Factor includes a benchmarking-based tiered
approach that adjusts based on the Company's core O&M performance per customer
relative to a benchmark, it does not align with the methodology described in the
RE01-PFD in Docket No. 21-05-15RE01, under which highly efficient utilities
would have an S-Factor of zero. Under the Company's proposal, the S-Factor has a
floor of 30 basis points, meaning customers receive a 30-basis-point reduction
relative to inflation even when the Company is classified in the highest performance
tier. By contrast, the PFD described a framework under which highly efficient
utilities would have an S-Factor of zero, resulting in no reduction relative to
inflation.
Further, the PFD's discussion of the S-Factor was conceptual in nature. The PFD
described potential benchmarking and tiering concepts and provided illustrative
examples, but it did not establish the specific benchmarks, indices, thresholds, tiers,
or other parameters that would be necessary to implement such a mechanism.
Accordingly, while the Company's proposal incorporates benchmarking and tiering
concepts similar to those discussed in the PFD, it does not adopt the specific zerofloor approach described therein.
6) Exogenous Cost Recovery
The Company provided comparison of its exogenous cost recovery proposal to the
RE01-PFD in response to interrogatory OCC-430 v. In summary, the RE01-PFD’s
setting of the exogenous cost recovery threshold at 0.75% is considerably higher
than the thresholds established in other jurisdictions. The Company’s proposed
0.5% is more closely to those other jurisdictions, as shown in the footnote the RE01PFD references. The Company’s complete response to OCC-430 is provided here:
The 0.75% materiality threshold proposed in the Docket No. 21-05-15RE01
Proposed Final Decision is unnecessarily high, and inconsistent with other
jurisdictions. Although the Company supports the intention of establishing a
materiality threshold as a means of balancing administrative burden with the
Company’s need to cover the costs of service, including those over which it has
no control, a materiality threshold set too high actually renders the mechanism
increasingly ineffective, raising the likelihood that the utility cannot commit to
the PBR stay-out because it will be unable to obtain a fair or reasonable level
of recovery of its operating costs, also barring customers from benefitting from
the efficiency gains that come from an extended stay-out.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 13 of 45
In the extreme, a materiality threshold of 10%, for example, would indicate that
for an event to qualify as exogenous in terms of its materiality, it must be at least
$192.19 million ($1,921.9 million revenue requirement x 10%, using the
Company’s cost of service filed in this proceeding). The likelihood of a single
event meeting this criteria is exceedingly rare, meaning the Z-factor, in practice,
would be effectively rendered moot.
Additionally, PURA provided no basis for how it determined a threshold of
0.75% was appropriate. In fact, in its proposed final decision, PURA stated,
“[t]he threshold [of 0.75%] better aligns with the thresholds established in other
PBR jurisdictions,” and then provided the following footnote referencing those
other jurisdictions, each one of which is substantially below the 0.75% it
proposed:
“Hawaii set thresholds equivalent to 0.2%, 0.25%, and 0.28%; Ontario set
a threshold equivalent to 0.5%; Massachusetts set a threshold equivalent
to 0.37%; and Alberta Utilities Commission set a threshold equivalent to
0.25%.”
The Company’s proposed Z-Factor of 0.5% is more closely aligned to those
other jurisdictions. (emphasis added)
(c) As discussed in the Company’s response to (a) above, the Company’s proposal
intentionally tracks with the developing framework outlined in the RE01-PFD, yet reflects
the modifications necessary for the overall function of the plan to be a sustainable, lasting
framework for the state of Connecticut, one capable of delivering on the promise of PBR.
As discussed extensively in the Company’s responses above as well as in its written
comments in response to the RE01-PFD, the draft framework outlined in the RE01-PFD
had fatal flaws that all but guaranteed failure as a ratemaking construct for the state of
Connecticut. The Company’s own extensive involvement throughout that docket,
including participation in technical sessions, data requests, and analysis provided on the
record, informed the conclusions stated above. Consequently, the Company did not
perform additional analysis to (again) confirm that the framework outlined in the RE01PFD was deficient, without modification, as a long-term ratemaking solution and incapable
of realizing the essential benefits to Connecticut and its customers that a successful PBR
plan offers.
Prior Referenced Responses:
i
OCC-423 Question:
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 14 of 45
Exhibit CLP-ELP-1 Please explain in detail why the Company believes its proposed treatment of capital expenditures
under the PBMRP, including the use of forecasted capital expenditures and the F-Factor, is preferable to including
capital expenditures within the Revenue Cap Formula framework as proposed in the Docket No. 21-05-15RE01
Proposed Final Decision. In your response,
a. Please explain why the Company believes O&M expenses are appropriately subject to an externally indexed
revenue cap, while capital expenditures require separate recovery through an F-Factor based on a fixed annual
capital investment forecast.
b. Please explain how the Company's proposed treatment of capital expenditures is expected to produce
customer cost savings or otherwise improve customer affordability relative to including capital expenditures
within a revenue cap formula.
c. Please explain how the proposed F-Factor mitigates or avoids any incentive to favor capital expenditures
over O&M solutions, including in circumstances where either a capital or O&M solution could be used to
address the same system need.
OCC-423 Response:
The Company appreciates OCC’s thoughtful and analytical questions on the Company’s proposed performance based
multi-year rate plan (“PBMRP”) and looks forward to further discussion on the development of a workable PBR
framework for the Company’s customers.
To cover the issues raised in the question, the Company’s response is organized as follows:
1. Review of relevant aspects of the Company’s PBMRP.
2. Considerations on the design of capital-driven revenue support.
3. Specific responses to parts (a), (b) and (c), above.
1.
Review of the Relevant Aspects of the Company’s PBMRP
Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that
advances electric utility service in the State of Connecticut in an affordable manner for customers, over a long term.
This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization.
For this investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider
the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the
reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2)
customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation
of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers.
The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company
started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-05-15RE01), while
also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model
from supporting the necessary stay-out terms.
For any multi-year rate plan to be successful, it needs to be grounded in the reality of the utility’s costs, while also
incorporating features that innately push the utility to be more efficient. That is not to say every dollar of the utility’s
costs will be (or should be) recovered. Rather, the allowed revenues need to be sufficient to afford the utility a
reasonable opportunity to cover its cost of service to customers, including a reasonable rate of return on equity
(“ROE”) where the utility is operating prudently and efficiently, as required by state law. A framework in which the
utility has no reasonable opportunity to earn its ROE, regardless of how hard it strives for efficiency, simply becomes
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 15 of 45
self-defeating because the utility will exercise its statutory rights to a distribution rate proceeding, thereby muting the
most powerful efficiency feature of a multi-year rate plan, which is the stay-out term.
A framework that underestimates the actual cost to run the system and/or affords the utility no reasonable chance to
earn its allowed ROE, year after year, also results in under-investment and a system that not only lacks innovation,
but falls further and further behind at a significant – albeit potentially unseen – cost to customers. As a result, a lasting,
productive framework is one that is soundly informed by – not detached from – the drivers of the utility’s real cost of
service, including its cost of capital.
In this context, the two most critical features of the Company’s PBMRP are as follows:
•
A going-in revenue requirement that reasonably reflects the Company’s actual operating expenses and cost
of investment in the Rate Year, so that through effective management and prudent decision making, the
Company can achieve the true efficiency gains that will be needed to stretch the approved revenue
requirement over the stay-out term. Without a reasonable opportunity to maintain financial integrity over a
stay-out period, as measured by the authorized ROE, the utility cannot focus on innovation and efficiency
gains – and will instead file for the next rate case to make up ground. To accomplish this goal, the overall
paradigm must “hang” together, making the base revenue requirement a pivotal element. The many
components of a PBR plan, including going-in rates, as well as the subsequent rate adjustments, must work
in concert with performance objectives and the capital investment requirements expected of the Company –
for the benefit of customers, i.e., the entire framework must work to the benefit of customers, not only in
relation to the price they will pay, but also in relation to supporting the level of service that they need and
expect.
•
Revenue support for incremental capital investment to support long-term system goals. The Company
operates in a capital-intensive industry and has a substantial need to acquire cash on a systematic basis to
operate its business. As annual capital investments regularly exceed net cash from operations (i.e. cash
receipts from customers net of operating cash outflows), the Company must look to other capital sources to
fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets.
This means the Company must compete with all other entities participating in those markets to attract capital.
It is simply not possible for the Company to go to those markets and demand cash for free, or at belowmarket rates relative to the investor’s risk when other entities participating in the same capital markets offer
compensation for the use of funds over time.
The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 2105-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to going-in revenue
requirements as well as any ongoing capital-driven revenue support mechanism, such as CT-Bar, is
paramount to whether the Company, with effective management and sound decision-making, can responsibly
cede its right to file for a rate amendment, whereas that is otherwise the only tool the utility has to align its
revenues and costs and have a reasonable chance at earning its authorized ROE, which, over time, is necessary
in order to attract the capital necessary to meet the standards of service expected of the Company’s customers.
The lack of a valid revenue requirement component within the CT-Bar that would allow recovery of the cost
of capital associated with incremental capital investment over the term of the PBMRP is a non-starter from
a policy perspective, creating an obstacle that would block a utility from giving up its right to file for rate
modifications over the multi-year period in question. This is particularly accurate in the present environment
in which significant increases in the level of necessary system investments are expected (and planned).
Simply put, the CT-Bar, as previously envisioned in PURA’s draft PBR decision, fully prevented the
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 16 of 45
Company from having any practical chance at staying out of a rate case, and therefore, would never work to
create a reasonable PBR framework.
The Company’s proposed PBMRP in this docket is designed to track the design of the CT-Bar as closely as
possible, given that this was PURA’s developing framework. However, the Company’s PBMRP addresses
the two primary faults in PURA’s RE01 framework that would prevent the implementation of a workable
PBR framework, which are (1) the deviations from ratemaking fundamentals that grossly understate the
“going in” revenue requirement; and (2) modification of the CT-Bar to reflect the revenue requirement
applicable to capital investment, which would include recovery of the cost of capital and the cost of removal
over the course of the PBMRP term. The Company’s F-Factor also corrects for the mechanical error of
deducting depreciation expense from new plant additions, rather than from rate base.
In particular, the Company’s proposed F-Factor is designed to recover no more than the revenue necessary
to support a discrete amount of ongoing system investment, recognizing that the cost of capital is a lawful
and factual cost of service that must be incorporated into the revenue requirement calculation for the
Company, as it is for any utility.
2.
Considerations on the Design of Capital Driven Revenue Support
CT-Bar, as defined in PURA’s Proposed Final Decision, issued in Docket No. 21-05-15RE01, on July 14, 2025
(the “RE01-PFD”), had several sensible qualities that the Company supported. However, those “sensible”
qualities were overcome by certain critically flawed concepts that would need to be modified or eliminated in
order for the Company to consider committing to a stay-out. The positive and negative CT-Bar qualities are
outlined briefly here and discussed in greater detail below, including with respect to similarities or differences to
the Company’s proposed F-Factor.
Summary of constructive features of PURA’s RE01-PFD:
1)
Acknowledgement that current revenue support for ongoing investment is essential;
2)
No category of capital investment was summarily or preemptively excluded from CT-Bar;
3)
CT-Bar takes effect with Rate Year 1; and
4)
CT-Bar aligns capital revenue support with the capital investments of the DSP.
Summary of unworkable features of PURA’s RE01-PFD:
1)
Exclusion of the recognition in the CT-Bar of the cost of capital between rate cases.
2)
Exclusion of cost of removal in the CT-Bar.
3)
Application of depreciation expense as a reduction to plant additions rather than rate base.
Constructive features of PURA’s RE01-PFD:
1)
Positive #1: Acknowledgement that current revenue support for ongoing investment is essential to
the integrity of the PBR framework.
First, that the CT-Bar even existed in PURA’s RE01-PFD is genuine acknowledgement that some form
of revenue support for rate year investment is essential to support a PBR framework. As discussed at
length in that docket, the Company anticipates significant system investment over the next five years to
advance the state’s clean energy and reliability goals. Revenue support for ongoing system investment
is crucial for any multi-year rate plan, whether in the form of the Company’s proposed PBMRP, step
increases, or any other ratemaking framework. CT-Bar’s inclusion in RE01-PFD is a clear indication
that incremental revenue support for ongoing system investments is a necessity.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 17 of 45
2) Positive #2: No category of capital investment was summarily or preemptively
excluded from CT-Bar.
Second, the RE01-PFD did not exclude particular categories of capital investment. For example, capital
investments in facilities, fleet and information technology are viewed as permissible categories for
revenue support in the CT-Bar framework. This is consistent with the Company’s proposed F-Factor in
this proceeding.
3) Positive #3: CT-Bar takes effect as of Month 1 of Rate Year 1.
The Company provided extensive discussion and analysis throughout Docket No. 21-05-15RE01
technical sessions and data responses regarding the “going-in” revenue requirement and the detrimental
financial consequences of limiting capital investments to a period of time removed from the rate year.
Ignoring for a moment the CT-Bar’s deficiencies, having the mechanism take effect Month 1 of Rate
Year 1 minimizes or eliminates those detrimental timing consequences, particularly in light of the fact
that PURA has in recent years moved away from its prior practice of implementing future-test years in
base rate proceedings, instead favoring a strict historical test year practice as it relates to plant additions.
Revenue decoupling is a factor to consider here because the revenue decoupling mechanism (“RDM”)
subsumes all sales growth to the extent that it is occurring, funneling incremental sales revenues back to
customers. RDM is supported by valid policy reasons; however, the fact is that there are capital costs
associated with adding new customers. Historically, when consistent and steady levels in the range of
~3$ per year of annual growth in sales and revenues was available to a utility to help offset the cost of
incremental capital additions between rate cases, the pressing need for incremental revenue support was
mitigated. Without the ability to capture that sales growth, and combined with the absence of an ongoing
revenue support mechanism such as an F Factor taking effect on Month 1 of Rate Year 1, the Company
would not be in a position to commit to a stay-out of any duration. This is because the Company would
never be in a position to cover its cost of service (inclusive of its authorized cost of capital) because its
rates would be set on a historical level of plant additions, despite the fact that its capital expenditures are
higher than historical levels of depreciation, and because revenue decoupling ensures that even if load
growth exists (and even if such load growth is enabled by the Company’s increased level of capital
expenditures) the Company is unable to retain additional revenues contributed by new customers, or new
load.
4) Positive #4: CT-Bar was designed to align capital revenue support with the DSP.
Ignoring its deficiencies, the CT-Bar’s connection to the Distribution System Plan (“DSP”) constituted an
essential link between ongoing system investments necessary to meet the objectives of the DSP with the
revenues necessary to support those investments. Throughout Docket No. 21-05-15RE01, the Company
advocated strongly for clearly defined linkages across all three tracks (RE01, RE02 and RE03), including
proposing what would be the final technical session touching upon revenue requirements, in which those
linkages were discussed. The Company’s F-Factor is similarly aligned with the capital investment
forecast provided in this proceeding for the DSP. The Company’s capital investment forecast serves as
the basis for a cap on the level of investment for the F-Factor.
Unworkable Features of PURA’s RE01-PFD:
1)
Negative #1: No recovery of cost of capital in the revenue requirement for capital investment
between rate cases.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 18 of 45
The single-most problematic feature of the CT-Bar was its intentional exclusion of the cost of capital
associated with completing capital plant additions to the benefit of customers. Costs of capital are real
costs of providing electric distribution service to customers in the State of Connecticut (or anywhere)
and are recognized in statute. Although the cost of capital may be a more challenging cost to
conceptualize, it is nonetheless as real as vegetation management, insurance, customer service, or any
other cost of service. Cash is not free, a fact arising from its scarcity. Fundamentally, capital markets are
where people, banks, corporations and other institutions provide their surplus of cash -- which is limited,
to those entities that have cash needs -- which are generally unlimited. Consequently, and unsurprisingly,
those entities providing the cash for some period of time expect to be compensated for providing it, thus
establishing real cost to acquire capital.
The Company, operating in the capital-intensive industry of regulated utilities, is one of those entities
that needs to acquire cash to operate its business. As annual capital investments regularly exceed its net
cash from operations (i.e. cash from customers), the Company must look to other sources to fund those
investments. Those sources are the debt and equity investors supplying the cash to capital markets. This
means the Company must compete with ALL other entities participating in those markets. It is simply
not possible for the Company to go to those markets and demand cash for free (or for below-market
rates, relative to market expectations of risk and reward) when other entities participating in those capital
markets offer adequate compensation for the use of funds over time. Therefore, there is a real and
tangible cost to acquiring that capital. Please refer to the Company’s pre-filed cost of capital testimony
for in-depth discussion of the cost of capital.
The Company provided extensive analysis and discussion on the cost of capital throughout Docket No.
21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to goingin revenue requirements as well as any ongoing capital revenue support mechanism, such as CT-Bar, is
paramount to whether the Company, with effective management and sound decision-making, has the
opportunity, but not a guarantee, to cover its cost of service to customers, and to earn its allowed return.
The absence of the cost of capital from the CT-Bar, particularly in the present environment where
significant increases in the level of necessary system investments are expected, prevents the Company
from having any practical opportunity to commit to a stay-out to avoid the next rate case.
As discussed in the Company’s response to OCC-435, based on the Company’s current assessment of
system investment needs in the near future, the revenue requirement associated exclusively with the cost
of capital pertaining to future capital additions (excluding GET and Uncollectible) would amount to an
incremental $15.6 million for Rate Year 1; an incremental $32.8 million for Rate Year 2; an incremental
$36.4 million for Rate Year 3; and an incremental $39.5 million for Rate Year 4, or $124.1 million in
total.
This means that -- even if 100% of those future plant additions were only partially supported with CTBar revenues (i.e. revenue covering depreciation expense and property taxes only); and even if the
Company’s future cost of service otherwise was 100% supported with rates; and even with perfect
operational decision making -- the Company would still need to find $124.1 million of annual savings
by Rate Year 4 in order to offset the loss of revenue associated with carrying costs on incremental
investment over the term of the PBMRP, which would be necessary to commit to a stay-out term.
For perspective, the total O&M expense included in the Company’s cost of service filed in this proceeding
is $547.5 million. Thus, to earn its authorized ROE, all else equal, the Company would have to generate
cost savings amounting to $124.1 million, or nearly 23%, of its Rate Year O&M level by Year 4, to offset
the impact of the accumulating carrying costs on the incremental capital additions completed on the
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 19 of 45
system after base rates are set in this case. This is nearly 34% of operating expense, excluding vegetation
management and storm restoration costs, which is a very substantial proportion of the cost of service.
For example, the amount of $124M is nearly two-thirds of the Company’s labor and labor-related
operating expense, or 60% more than the entire vegetation management program. It simply is not
possible for the Company to cut this level of O&M expense without grossly debilitating the Company’s
ability to provide service to customers. In fact, it is not plausible to expect that the Company could
generate even 10% in annual incremental O&M savings in the face of 2-3% annual inflation and, as a
result, the Company could not agree to a stay out under circumstances where there is no recovery of the
cost of capital on incremental investment over the PBMRP term.
Moreover, even if the Company were somehow able to find such remarkable cost savings, the going-in
revenue requirement of the subsequent multi-year rate plan would capture those cost savings. Assuming
continuation of the same PBR framework and required system investment, the Company would again be
in the position of having to find an additional 34% of O&M savings (i.e. more than 60% cumulatively
from Rate Year 1) in order to sustain itself over the next PBR term. Clearly, a framework that does not
provide revenue supporting the full cost of incremental investment over a four-year period, as well as
the next four-year period, is not a plausible or lasting framework. Thus, exclusion of the cost of capital
from a capital support mechanism in an environment in which significant increases in capital investments
are expected all but ensures the Company has no realistic opportunity to survive the PBR term without
a critical need for a rate case to realign costs and rates. Consequently, the overall framework as outlined
in the REO1-PFD had no practical chance of sustaining the Company financially for the four-year term,
nor would the Company have been able to even agree to a stay-out.
To address this indelible flaw, the Company’s proposed PBMRP in this docket is designed to produce
the revenue necessary to support ongoing system investment through the F-Factor, which calculates a
revenue requirement inclusive of the costs of capital unlike the CT-Bar, while preserving the customer
benefits and inherent incentives of a PBR plan.
2)
Negative #2: Exclusion of cost of removal from the revenue requirement on capital investment
between rate cases.
CT-Bar excluded the cost of removal, which is a real cost for all utilities. As a simple example, to install
a new utility pole where there is an existing one that needs replacement, the Company must first remove
the existing utility pole. That cost is separate and distinct from the cost of the utility pole itself; yet,
similarly recovered (as an estimate) over the life a utility pole. The Company’s capital investment
forecast in the present docket includes approximately $136 million of cost of removal for January 1, 2026
through June 30, 2028, and approximately $60-70 million per year thereafter. A total of $60-70 million
in annual investment equates to pre-tax cost of capital of $6-7 million annual incremental revenue
requirement (e.g. $6 million year 1, $12 million year 2, $18 million year 3, etc.). The CT-Bar revenue
requirement intentionally excluded this component of the capital investment revenue requirement. The
Company’s proposed F-Factor calculation properly restores this component to the rate base computation.
3)
Negative #3: Depreciation expense is used as a reduction to plant additions rather than to total
rate base, consistent with fundamental ratemaking principles.
CT-Bar’s calculation treats depreciation expense as a net against plant additions. Although the Company
appreciated that PURA found it important to capture ongoing depreciation expense in the annual revenue
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CLF-AC-01
Date Issued September 16, 2026
CLF-AC-001
Page 20 of 45
requirement calculations, the overall execution of the computation was not correct. The Company’s FFactor corrects for this methodological error. Please refer to the example below outlining the
mathematical problem:
($ Millions)
1 Correct treatment of depreciation's accumulation in rate base
2
Rate Base
RevReq
3
Year 1
Year 2
Year 1 Year 2
4 Plant Additions
$1,000 $1,000
5 Cumulative Gross Plant
$1,000 $2,000
x 3.6% Depreciation
$36.0 $72.0
6 Accumulated Depreciation
-$300
-$600
7 Cumulative Rate Base
$700 $1,400
x 9.8% Cost of Capital
$68.6 $137.2
8
Total Revenue Requirement $104.6
$209.2
9
10
CT
Bar
11
12
13
14
15
16
17
18
18
Plant Additions
Depreciation Expense
Net Plant Additions
Cumulative Depreciable Base
Cumulative Rate Base
Rate Base
Year 1
Year 2
$1,000 $1,000
-$300
-$300
$700
$700
$700 $1,400
$700 $1,400
RevReq
Year 1 Year 2
x 3.6% Depreciation
$25.2 $50.4
x 9.8% Cost of Capital
$68.6 $137.2
Total Revenue Requirement $93.8 $187.6
Error -$10.8
As listed on the current system
Question(s) Answered 1, 2, 3 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/07/2026