Interrogatory responses

Answers to questions 1, 2, 3

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 42 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
21 pages match
5 pages match
  1. Page 1 of 17

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 1 of 17 Date Filed: October 07, 2026 Witness: Douglas P. Horton Request from: CLF and Acadia Center Question: (Performance-based Regulation) Refer to Exhibit CLP-PBR-1, page 42. (a) Please confirm whether the Company is proposing in Docket 26-05-10 the Revenue Cap Formula proposed in the RE01 PFD, which applies to the Company's total revenue requirement (both capital and O&M). (b) Please confirm whether under the Company’s proposal referenced in CLF-AC-2(a), the Xfactor is applied only to OM&A costs, while capital costs are adjusted based on actual capital placed in service. (c) Please confirm whether the Company considered proposing a revenue cap applied to its total revenue requirement. If so, please produce written discussions, written analyses, workpapers, or other documentary materials used in making that decision. (d) If the Company did not consider proposing a revenue cap applied to its total revenue requirement, please explain why it did not do so. Response: (a) The revenue cap formula itself is generally consistent with the formula outlined in the Docket No. 21-05-15RE01 proposed final decision (“RE01-PFD”), insofar as the current year revenue is based on the prior year’s revenue requirement adjusted for inflation, productivity factor, stretch factor, capital funding, and exogenous cost recovery. However, the construction of the individual components of the Company’s proposal differ from those of the RE01-PFD. For example, while both the RE01-PFD and the Company’s proposal included capital funding components in their respective revenue cap formulas, the RE01PFD’s capital funding mechanism, which was called “CT-Bar,” was a variation of the Company’s own K-bar mechanism in Massachusetts, although calculated differently from the Company’s F-Factor proposed in the present case. For reference, those differences are discussed in the Company’s various other responses, such as to interrogatories CLF-AC003 i, OCC-423 ii, and OCC-859 iii). (b) This is correct.
  2. Page 2 of 17

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 2 of 17 (c) For clarity, the incremental revenue adjustments resulting from the Company’s proposal collectively do apply to the total revenue requirement under the revenue cap formula. However, the Company interprets this question as meaning “did the Company consider a construct in which the revenue cap is adjusted by a single percentage factor, such as “IX”? As a general practice, the Company would consider alternative ratemaking constructs, with potentially differing elements and mechanisms from its own proposal, so long as the alternative framework supports the same objectives outlined in the Company’s proposal, which are ensuring: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers. Based on its own experiences in the state of Connecticut as well as those of its affiliates, combined with its expectations of significant capital infrastructure investments required in the years ahead on the Connecticut distribution system, the Company concluded that a single adjustment, such as “I-X,” would not be an adequate mechanism to propose in this docket in order to facilitate a multi-year stay-out period between rate cases. Consequently, the Company’s proposal introduces a necessary link between the capital investments necessary to achieve the performance objectives outlined in this docket with the revenues necessary to support those investments, including the cost of capital, while also attempting to build off the PFD and the prior PBR docketed proceedings. This essential link between performance, capital infrastructure investment, and revenue support form the basis for the long-term viability of the Company’s proposed PBMRP. (d) Please refer to the Company’s response to subpart (c) above. Prior Referenced Response: i CLF-AC-003 Question: (Performance-based Regulation) Refer to Exhibit CLP-PBR-1, pages 69-71. (a) Please confirm whether the capital funding mechanism proposed in Exhibit CLP-PBR-1 is the same asor different from the K-Bar mechanism the Company proposed in Docket No. 21-05-15RE01. If there are differences, please identify with specificity each difference. (b) State whether the capital funding mechanism proposed in Exhibit CLP-PBR-1 is the same as, or different from the CT-Bar mechanism described in RE01 2025 PFD. If it is different, please identify with specificity each difference.
  3. Page 3 of 17

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 3 of 17 (c) Please confirm whether or not the Company considered proposing the CT-Bar mechanism as described in the RE01 2025 PFD. Please produce written discussions, written analyses, workpapers, or other documentary materials used in making the decision to utilize or not utilize the CT-Bar mechanism. CLF-AC-003 Response: (a) Although there are several mechanical differences between the K-bar and F-Factor mechanisms, there are two primary differences as well as several similarities. Most importantly, both mechanisms do attempt to estimate the level of revenues necessary to support capital investments through the rate year, including the cost of capital. Cash is a scarce resource, which, when taken with the fact that there is unlimited demand for it, means that there is a real cost to acquire it. Because the regulated utility business is capital intensive and because the Company’s net operating cash flows are insufficient to cover the level of investment the system requires, particularly in the near future, the Company must fund that gap in capital with debt and equity. That means the real cost of service that customers receive truly has a capital cost for rate year investments. Both mechanisms necessarily include this cost of service in the revenue support calculations. There are two primary differences between the Company’s proposed F-Factor and the K-bar discussed in Docket No. 21-05-15RE01. First, the K-bar does not include an annual reconciliation component, while the F-Factor incorporates a downward-only reconciliation in the event the Company’s actual plant additions are lower than the level assumed in the F-Factor calculation. The K-bar’s purpose is to provide an allowance of revenues to support ongoing capital investment necessary in the provision of electric service. Because the mechanism, as discussed in Docket No. 21-05-15RE01, is built with a combination of historic plant additions and inflation that lag true current year investment needs, there was little need for reconciliation. As stated elsewhere in this docket, the Company’s proposal does not circumvent prudence reviews, nor does the Company want that. Prudence reviews are necessary aspects of the regulated utility business model, which the Company fundamentally embraces and instills in the behaviors of its workforce. With K-bar as discussed in Docket No. 21-05-15RE01, for which there was no annual reconciliation, the prudence reviews would necessarily happen with the utility’s rebasing at its next general rate case. Second, the F-Factor revenue allowances are informed by the capital investment needs of the future, as discussed at length in this docket, specifically with the TSP. This provides an essential link between the performance goals of tomorrow with the system investments needed to achieve those objectives, and the revenues necessary to support those investments. (b) Please refer to the Company’s response to interrogatories OCC-423i, OCC-859i, and EOE-156,i discussing key differences between the Company’s F-Factor and the CT-bar outlined in the draft proposed final decision in Docket No. 21-05-15RE01. (c) As explained in the Company’s response to OCC-423 and others, including its response to CLF-AC-002i, the Company remains supportive of solutions that achieve these objectives: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers. As described in those responses, the RE01-PFD could not achieve those objectives for one fundamental reason -- the Company would not, nor would any other utility, be in a position to agree to the multi-year rate plan outlined in the RE01-PFD, thus undermining the primary driver of the cost efficiency promise PBR offers, which is the stay-out. As outlined in its response to OCC-423, the single-most deficient quality of the RE01-PFD was the purposeful exclusion of the cost of capital on incremental prudent system investment from revenue support (i.e. in CT-bar), particularly one operating in the present Connecticut business environment.
  4. Page 4 of 17

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 4 of 17 ii OCC-423 Question: Exhibit CLP-ELP-1 Please explain in detail why the Company believes its proposed treatment of capital expenditures under the PBMRP, including the use of forecasted capital expenditures and the F-Factor, is preferable to including capital expenditures within the Revenue Cap Formula framework as proposed in the Docket No. 21-05-15RE01 Proposed Final Decision. In your response, a. b. c. Please explain why the Company believes O&M expenses are appropriately subject to an externally indexed revenue cap, while capital expenditures require separate recovery through an F-Factor based on a fixed annual capital investment forecast. Please explain how the Company's proposed treatment of capital expenditures is expected to produce customer cost savings or otherwise improve customer affordability relative to including capital expenditures within a revenue cap formula. Please explain how the proposed F-Factor mitigates or avoids any incentive to favor capital expenditures over O&M solutions, including in circumstances where either a capital or O&M solution could be used to address the same system need. OCC-423 Response: The Company appreciates OCC’s thoughtful and analytical questions on the Company’s proposed performance based multi-year rate plan (“PBMRP”) and looks forward to further discussion on the development of a workable PBR framework for the Company’s customers. To cover the issues raised in the question, the Company’s response is organized as follows: 1. Review of relevant aspects of the Company’s PBMRP. 2. Considerations on the design of capital-driven revenue support. 3. Specific responses to parts (a), (b) and (c), above. 1. Review of the Relevant Aspects of the Company’s PBMRP Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that advances electric utility service in the State of Connecticut in an affordable manner for customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-0515RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stay-out terms. For any multi-year rate plan to be successful, it needs to be grounded in the reality of the utility’s costs, while also incorporating features that innately push the utility to be more efficient. That is not to say every dollar of the utility’s costs will be (or should be) recovered. Rather, the allowed revenues need to be sufficient to afford the utility a
  5. Page 5 of 17

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 5 of 17 reasonable opportunity to cover its cost of service to customers, including a reasonable rate of return on equity (“ROE”) where the utility is operating prudently and efficiently, as required by state law. A framework in which the utility has no reasonable opportunity to earn its ROE, regardless of how hard it strives for efficiency, simply becomes self-defeating because the utility will exercise its statutory rights to a distribution rate proceeding, thereby muting the most powerful efficiency feature of a multi-year rate plan, which is the stay-out term. A framework that underestimates the actual cost to run the system and/or affords the utility no reasonable chance to earn its allowed ROE, year after year, also results in under-investment and a system that not only lacks innovation, but falls further and further behind at a significant – albeit potentially unseen – cost to customers. As a result, a lasting, productive framework is one that is soundly informed by – not detached from – the drivers of the utility’s real cost of service, including its cost of capital. In this context, the two most critical features of the Company’s PBMRP are as follows: • A going-in revenue requirement that reasonably reflects the Company’s actual operating expenses and cost of investment in the Rate Year, so that through effective management and prudent decision making, the Company can achieve the true efficiency gains that will be needed to stretch the approved revenue requirement over the stay-out term. Without a reasonable opportunity to maintain financial integrity over a stay-out period, as measured by the authorized ROE, the utility cannot focus on innovation and efficiency gains – and will instead file for the next rate case to make up ground. To accomplish this goal, the overall paradigm must “hang” together, making the base revenue requirement a pivotal element. The many components of a PBR plan, including going-in rates, as well as the subsequent rate adjustments, must work in concert with performance objectives and the capital investment requirements expected of the Company – for the benefit of customers, i.e., the entire framework must work to the benefit of customers, not only in relation to the price they will pay, but also in relation to supporting the level of service that they need and expect. • Revenue support for incremental capital investment to support long-term system goals. The Company operates in a capital-intensive industry and has a substantial need to acquire cash on a systematic basis to operate its business. As annual capital investments regularly exceed net cash from operations (i.e. cash receipts from customers net of operating cash outflows), the Company must look to other capital sources to fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets. This means the Company must compete with all other entities participating in those markets to attract capital. It is simply not possible for the Company to go to those markets and demand cash for free, or at below-market rates relative to the investor’s risk when other entities participating in the same capital markets offer compensation for the use of funds over time. The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 2105-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to going-in revenue requirements as well as any ongoing capital-driven revenue support mechanism, such as CT-Bar, is paramount to whether the Company, with effective management and sound decision-making, can responsibly cede its right to file for a rate amendment, whereas that is otherwise the only tool the utility has to align its revenues and costs and have a reasonable chance at earning its authorized ROE, which, over time, is necessary in order to attract the capital necessary to meet the standards of service expected of the Company’s customers. The lack of a valid revenue requirement component within the CT-Bar that would allow recovery of the cost of capital associated with incremental capital investment over the term of the PBMRP is a non-starter from a policy perspective, creating an obstacle that would block a utility from giving up its right to file for rate modifications over the multi-year period in question. This is particularly accurate in the present environment
  6. Page 6 of 17Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 6 of 17 in which significant increases in the level of necessary system investments are expected (and planned). Simply put, the CT-Bar, as previously envisioned in PURA’s draft PBR decision, fully prevented the Company from having any practical chance at staying out of a rate case, and therefore, would never work to create a reasonable PBR framework. The Company’s proposed PBMRP in this docket is designed to track the design of the CT-Bar as closely as possible, given that this was PURA’s developing framework. However, the Company’s PBMRP addresses the two primary faults in PURA’s RE01 framework that would prevent the implementation of a workable PBR framework, which are (1) the deviations from ratemaking fundamentals that grossly understate the “going in” revenue requirement; and (2) modification of the CT-Bar to reflect the revenue requirement applicable to capital investment, which would include recovery of the cost of capital and the cost of removal over the course of the PBMRP term. The Company’s F-Factor also corrects for the mechanical error of deducting depreciation expense from new plant additions, rather than from rate base. In particular, the Company’s proposed F-Factor is designed to recover no more than the revenue necessary to support a discrete amount of ongoing system investment, recognizing that the cost of capital is a lawful and factual cost of service that must be incorporated into the revenue requirement calculation for the Company, as it is for any utility. 2. Considerations on the Design of Capital Driven Revenue Support CT-Bar, as defined in PURA’s Proposed Final Decision, issued in Docket No. 21-05-15RE01, on July 14, 2025 (the “RE01-PFD”), had several sensible qualities that the Company supported. However, those “sensible” qualities were overcome by certain critically flawed concepts that would need to be modified or eliminated in order for the Company to consider committing to a stay-out. The positive and negative CT-Bar qualities are outlined briefly here and discussed in greater detail below, including with respect to similarities or differences to the Company’s proposed F-Factor. Summary of constructive features of PURA’s RE01-PFD: 1) Acknowledgement that current revenue support for ongoing investment is essential; 2) No category of capital investment was summarily or preemptively excluded from CT-Bar; 3) CT-Bar takes effect with Rate Year 1; and 4) CT-Bar aligns capital revenue support with the capital investments of the DSP. Summary of unworkable features of PURA’s RE01-PFD: 1) Exclusion of the recognition in the CT-Bar of the cost of capital between rate cases. 2) Exclusion of cost of removal in the CT-Bar. 3) Application of depreciation expense as a reduction to plant additions rather than rate base. Constructive features of PURA’s RE01-PFD: 1) Positive #1: Acknowledgement that current revenue support for ongoing investment is essential to the integrity of the PBR framework. First, that the CT-Bar even existed in PURA’s RE01-PFD is genuine acknowledgement that some form of revenue support for rate year investment is essential to support a PBR framework. As discussed at length in that docket, the Company anticipates significant system investment over the next five years to advance the state’s clean energy and reliability goals. Revenue support for ongoing system investment is crucial for any multi-year rate plan, whether in the form of the Company’s proposed PBMRP, step
  7. Page 7 of 17Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 7 of 17 increases, or any other ratemaking framework. CT-Bar’s inclusion in RE01-PFD is a clear indication that incremental revenue support for ongoing system investments is a necessity. 2) Positive #2: No category of capital investment was summarily or preemptively excluded from CT-Bar. Second, the RE01-PFD did not exclude particular categories of capital investment. For example, capital investments in facilities, fleet and information technology are viewed as permissible categories for revenue support in the CT-Bar framework. This is consistent with the Company’s proposed F-Factor in this proceeding. 3) Positive #3: CT-Bar takes effect as of Month 1 of Rate Year 1. The Company provided extensive discussion and analysis throughout Docket No. 21-05-15RE01 technical sessions and data responses regarding the “going-in” revenue requirement and the detrimental financial consequences of limiting capital investments to a period of time removed from the rate year. Ignoring for a moment the CT-Bar’s deficiencies, having the mechanism take effect Month 1 of Rate Year 1 minimizes or eliminates those detrimental timing consequences, particularly in light of the fact that PURA has in recent years moved away from its prior practice of implementing future-test years in base rate proceedings, instead favoring a strict historical test year practice as it relates to plant additions. Revenue decoupling is a factor to consider here because the revenue decoupling mechanism (“RDM”) subsumes all sales growth to the extent that it is occurring, funneling incremental sales revenues back to customers. RDM is supported by valid policy reasons; however, the fact is that there are capital costs associated with adding new customers. Historically, when consistent and steady levels in the range of ~3$ per year of annual growth in sales and revenues was available to a utility to help offset the cost of incremental capital additions between rate cases, the pressing need for incremental revenue support was mitigated. Without the ability to capture that sales growth, and combined with the absence of an ongoing revenue support mechanism such as an F Factor taking effect on Month 1 of Rate Year 1, the Company would not be in a position to commit to a stay-out of any duration. This is because the Company would never be in a position to cover its cost of service (inclusive of its authorized cost of capital) because its rates would be set on a historical level of plant additions, despite the fact that its capital expenditures are higher than historical levels of depreciation, and because revenue decoupling ensures that even if load growth exists (and even if such load growth is enabled by the Company’s increased level of capital expenditures) the Company is unable to retain additional revenues contributed by new customers, or new load. 4) Positive #4: CT-Bar was designed to align capital revenue support with the DSP. Ignoring its deficiencies, the CT-Bar’s connection to the Distribution System Plan (“DSP”) constituted an essential link between ongoing system investments necessary to meet the objectives of the DSP with the revenues necessary to support those investments. Throughout Docket No. 21-05-15RE01, the Company advocated strongly for clearly defined linkages across all three tracks (RE01, RE02 and RE03), including proposing what would be the final technical session touching upon revenue requirements, in which those linkages were discussed. The Company’s F-Factor is similarly aligned with the capital investment forecast provided in this proceeding for the DSP. The Company’s capital investment forecast serves as the basis for a cap on the level of investment for the F-Factor.
  8. Page 8 of 17Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 8 of 17 Unworkable Features of PURA’s RE01-PFD: 1) Negative #1: No recovery of cost of capital in the revenue requirement for capital investment between rate cases. The single-most problematic feature of the CT-Bar was its intentional exclusion of the cost of capital associated with completing capital plant additions to the benefit of customers. Costs of capital are real costs of providing electric distribution service to customers in the State of Connecticut (or anywhere) and are recognized in statute. Although the cost of capital may be a more challenging cost to conceptualize, it is nonetheless as real as vegetation management, insurance, customer service, or any other cost of service. Cash is not free, a fact arising from its scarcity. Fundamentally, capital markets are where people, banks, corporations and other institutions provide their surplus of cash -- which is limited, to those entities that have cash needs -- which are generally unlimited. Consequently, and unsurprisingly, those entities providing the cash for some period of time expect to be compensated for providing it, thus establishing real cost to acquire capital. The Company, operating in the capital-intensive industry of regulated utilities, is one of those entities that needs to acquire cash to operate its business. As annual capital investments regularly exceed its net cash from operations (i.e. cash from customers), the Company must look to other sources to fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets. This means the Company must compete with ALL other entities participating in those markets. It is simply not possible for the Company to go to those markets and demand cash for free (or for below-market rates, relative to market expectations of risk and reward) when other entities participating in those capital markets offer adequate compensation for the use of funds over time. Therefore, there is a real and tangible cost to acquiring that capital. Please refer to the Company’s pre-filed cost of capital testimony for in-depth discussion of the cost of capital. The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to goingin revenue requirements as well as any ongoing capital revenue support mechanism, such as CT-Bar, is paramount to whether the Company, with effective management and sound decision-making, has the opportunity, but not a guarantee, to cover its cost of service to customers, and to earn its allowed return. The absence of the cost of capital from the CT-Bar, particularly in the present environment where significant increases in the level of necessary system investments are expected, prevents the Company from having any practical opportunity to commit to a stay-out to avoid the next rate case. As discussed in the Company’s response to OCC-435, based on the Company’s current assessment of system investment needs in the near future, the revenue requirement associated exclusively with the cost of capital pertaining to future capital additions (excluding GET and Uncollectible) would amount to an incremental $15.6 million for Rate Year 1; an incremental $32.8 million for Rate Year 2; an incremental $36.4 million for Rate Year 3; and an incremental $39.5 million for Rate Year 4, or $124.1 million in total. This means that -- even if 100% of those future plant additions were only partially supported with CTBar revenues (i.e. revenue covering depreciation expense and property taxes only); and even if the Company’s future cost of service otherwise was 100% supported with rates; and even with perfect operational decision making -- the Company would still need to find $124.1 million of annual savings by Rate Year 4 in order to offset the loss of revenue associated with carrying costs on incremental investment over the term of the PBMRP, which would be necessary to commit to a stay-out term.
  9. Page 9 of 17Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 9 of 17 For perspective, the total O&M expense included in the Company’s cost of service filed in this proceeding is $547.5 million. Thus, to earn its authorized ROE, all else equal, the Company would have to generate cost savings amounting to $124.1 million, or nearly 23%, of its Rate Year O&M level by Year 4, to offset the impact of the accumulating carrying costs on the incremental capital additions completed on the system after base rates are set in this case. This is nearly 34% of operating expense, excluding vegetation management and storm restoration costs, which is a very substantial proportion of the cost of service. For example, the amount of $124M is nearly two-thirds of the Company’s labor and labor-related operating expense, or 60% more than the entire vegetation management program. It simply is not possible for the Company to cut this level of O&M expense without grossly debilitating the Company’s ability to provide service to customers. In fact, it is not plausible to expect that the Company could generate even 10% in annual incremental O&M savings in the face of 2-3% annual inflation and, as a result, the Company could not agree to a stay out under circumstances where there is no recovery of the cost of capital on incremental investment over the PBMRP term. Moreover, even if the Company were somehow able to find such remarkable cost savings, the going-in revenue requirement of the subsequent multi-year rate plan would capture those cost savings. Assuming continuation of the same PBR framework and required system investment, the Company would again be in the position of having to find an additional 34% of O&M savings (i.e. more than 60% cumulatively from Rate Year 1) in order to sustain itself over the next PBR term. Clearly, a framework that does not provide revenue supporting the full cost of incremental investment over a four-year period, as well as the next four-year period, is not a plausible or lasting framework. Thus, exclusion of the cost of capital from a capital support mechanism in an environment in which significant increases in capital investments are expected all but ensures the Company has no realistic opportunity to survive the PBR term without a critical need for a rate case to realign costs and rates. Consequently, the overall framework as outlined in the REO1-PFD had no practical chance of sustaining the Company financially for the four-year term, nor would the Company have been able to even agree to a stay-out. To address this indelible flaw, the Company’s proposed PBMRP in this docket is designed to produce the revenue necessary to support ongoing system investment through the F-Factor, which calculates a revenue requirement inclusive of the costs of capital unlike the CT-Bar, while preserving the customer benefits and inherent incentives of a PBR plan. 2) Negative #2: Exclusion of cost of removal from the revenue requirement on capital investment between rate cases. CT-Bar excluded the cost of removal, which is a real cost for all utilities. As a simple example, to install a new utility pole where there is an existing one that needs replacement, the Company must first remove the existing utility pole. That cost is separate and distinct from the cost of the utility pole itself; yet, similarly recovered (as an estimate) over the life a utility pole. The Company’s capital investment forecast in the present docket includes approximately $136 million of cost of removal for January 1, 2026 through June 30, 2028, and approximately $60-70 million per year thereafter. A total of $60-70 million in annual investment equates to pre-tax cost of capital of $6-7 million annual incremental revenue requirement (e.g. $6 million year 1, $12 million year 2, $18 million year 3, etc.). The CT-Bar revenue requirement intentionally excluded this component of the capital investment revenue requirement. The Company’s proposed F-Factor calculation properly restores this component to the rate base computation.
  10. Page 10 of 17

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-002 Page 10 of 17 3) Negative #3: Depreciation expense is used as a reduction to plant additions rather than to total rate base, consistent with fundamental ratemaking principles. CT-Bar’s calculation treats depreciation expense as a net against plant additions. Although the Company appreciated that PURA found it important to capture ongoing depreciation expense in the annual revenue requirement calculations, the overall execution of the computation was not correct. The Company’s FFactor corrects for this methodological error. Please refer to the example below outlining the mathematical problem: ($ Millions) 1 Correct treatment of depreciation's accumulation in rate base 2 Rate Base 3 Year 1 Year 2 4 Plant Additions $1,000 $1,000 5 Cumulative Gross Plant $1,000 $2,000 x 3.6% Depreciation 6 Accumulated Depreciation -$300 -$600 7 Cumulative Rate Base $700 $1,400 x 9.8% Cost of Capital 8 $209.2 9 10 11 12 13 Plant Additions 14 Depreciation Expense 15 Net Plant Additions 16 Cumulative Depreciable Base 17 Cumulative Rate Base 18 18 RevReq Year 1 Year 2 $36.0 $72.0 $68.6 $137.2 Total Revenue Requirement $104.6 CT Bar Rate Base Year 1 Year 2 $1,000 $1,000 -$300 -$300 $700 $700 $700 $700 $1,400 $1,400 RevReq Year 1 Year 2 x 3.6% Depreciation $25.2 $50.4 x 9.8% Cost of Capital $68.6 $137.2 Total Revenue Requirement $93.8 $187.6 Error -$10.8 -$21.6 The table above is a simplified example of CT-Bar’s improper incorporation of ongoing depreciation in a revenue-requirement calculation. Effectively, the CT-Bar reduces plant additions by depreciation expense, which improperly reduces the total amount of plant to be depreciated, thereby reducing the incremental depreciation expense to be supported by the rate mechanism. The correct approach is to handle the plant additions separately from accumulated depreciation (see lines 4 and 6 in the table above). Note that both methods result in the same return on rate base, demonstrating that both calculations reflect the reduction to return on rate base resulting from ongoing/accumulating depreciation. The error is limited to the resulting new depreciation expense reflected in the revenue requirement, which is understated in the above example by $10.8 million in Year 1 and $21.6 million in Year 2 under the CT-Bar as compared to the Company’s proposal in this proceeding, which mirrors in concept to how the Company records depreciation expense on gross plant additions (not on net plant additions, as in the CTBar). Characteristics of the Company’s Proposed F-Factor (same as CT-Bar, except for three features). The Company is proposing a capital support mechanism (the “F” factor in the formula) that tracks as close as possible to PURA’s CT-Bar, except that it addresses the three major impairments described above, which would prevent the Company from being able to agree to a stay-out. These three items are the exclusion of the cost of
16 pages match

As listed on the current system

Question(s) Answered 1, 2, 3 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)