Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 5, 7, 8, 13, 15, 17, 18

Files9

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 28, 2026 ALLCO-008 Attachment 1 Page 1 of 1 Substations with DER Constraints Substation Name Available Capacity (MW) DER DER In Queue DER online Total DER (MW) (MW) (MW) 32P SHUNOCK 7.4 17.1 26.1 43.2 12S TUNNEL 0 21.3 79.4 100.7 12Y ROCKY RIVER 0 8.2 77.5 85.7 13B FRYBROOK 0 60.0 9.6 69.6 14M TRACY 0 62.5 53.2 115.7 11F CARD ST 0 32.1 27.4 59.5 30K DOOLEY 9.4 29.4 15.0 44.4 43F NE SIMSBURY 0 27.2 31.3 58.5

Text of ALLCO-013_Final.pdf

Extracted from the file

Text of ALLCO-015_Final.pdf

Extracted from the file

Text of ALLCO-015 Attachment 1.pdf

Extracted from the file

Text of ALLCO-017_Final.pdf

Extracted from the file

Text of ALLCO-018_Final.pdf

Extracted from the file

As listed on the current system

Question(s) Answered 5, 7, 8, 13, 15, 17, 18 (CL&P) Date Filed: 09/14/2026

This filing on the current system (opens in a new tab)