Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 5, 7, 8, 13, 15, 17, 18

Files9

Text of ALLCO-008 Attachment 1.pdf

Extracted from the file

Text of ALLCO-013_Final.pdf

Extracted from the file

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-015 Page 1 of 1 Date Filed: September 14, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: In addition to the milestone-component information requested in OCC-137, produce the "recent historical performance" data on which the Company based the proposed 35-business-day target for the Level 1 DER Interconnection Processing component of the Customer PIM Suite (Exhibit CLP-CUSTOMER-1 at 35), including, for each year 2020 through 2025, the annual average number of business days from (a) receipt of a complete DER interconnection application to conditional approval, and (b) municipal inspection to issuance of Permission to Operate, reported separately for residential and non-residential projects. Response: Please refer to ALLCO-015, Attachment 1, for the recent historical performance data on which the Company based the proposed 35-business-day target for the Level 1 DER Interconnection Processing component of the Customer PIM Suite. Only residential projects qualify to apply as Level 1 thus, ALLCO-015, Attachment 1, does not include separately reported non-residential data. Although ALLCO-015, Attachment 1, includes the requested range of 2020-2025, note the metric development only considered the years 2022 through 2025, as the implementation of the Residential Renewable Energy Solutions (RRES) program in 2022 necessitated changes to the interconnection application process to include RRES qualification review. Data prior to 2022 is not representative of the current process. The historical data also may contain time in the applicant queue due to tracking capabilities available in those years.

Text of ALLCO-015 Attachment 1.pdf

Extracted from the file

Text of ALLCO-017_Final.pdf

Extracted from the file

Text of ALLCO-018_Final.pdf

Extracted from the file

As listed on the current system

Question(s) Answered 5, 7, 8, 13, 15, 17, 18 (CL&P) Date Filed: 09/14/2026

This filing on the current system (opens in a new tab)