Interrogatory responses
Answers to questions 16 thru 16
Filed by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Files1
CIEC-016_Final.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC-016_Final.pdfRead the text of CIEC-016_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set CIEC-02
Date Issued August 25, 2026
CIEC-016
Page 1 of 1
Date Filed: September 08, 2026
Witness:
Edward A. Davis and Kimberly R. Parsons
Request from: Connecticut Industrial Energy Consumers
Question:
Exhibit CLP-RATES-3, Schedule E-1.1 includes a “clean” version of the Mandatory Reduction
Rider (see Pages 387-88 of 439) but Schedule E-1.0 of the same Exhibit does not include a scored
copy of the Mandatory Reduction Rider with proposed changes. Specify whether the Panel is
proposing any modifications to the Mandatory Reduction Rider. If the Panel is proposing any such
changes, provide (i) a scored version of the Mandatory Reduction Rider with all proposed changes
indicated in redline, and (ii) a narrative description of the proposed changes and the rationale
underlying each such proposal.
Response:
The Company is not proposing any modifications to the Mandatory Reduction Rider as part of this
proceeding.
As listed on the current system
Question(s) Answered 16 thru 16 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/08/2026