Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 16 thru 16

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files1

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-02 Date Issued August 25, 2026 CIEC-016 Page 1 of 1 Date Filed: September 08, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Exhibit CLP-RATES-3, Schedule E-1.1 includes a “clean” version of the Mandatory Reduction Rider (see Pages 387-88 of 439) but Schedule E-1.0 of the same Exhibit does not include a scored copy of the Mandatory Reduction Rider with proposed changes. Specify whether the Panel is proposing any modifications to the Mandatory Reduction Rider. If the Panel is proposing any such changes, provide (i) a scored version of the Mandatory Reduction Rider with all proposed changes indicated in redline, and (ii) a narrative description of the proposed changes and the rationale underlying each such proposal. Response: The Company is not proposing any modifications to the Mandatory Reduction Rider as part of this proceeding.

As listed on the current system

Question(s) Answered 16 thru 16 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/08/2026

This filing on the current system (opens in a new tab)