STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
APPLICATION OF THE
CONNECTICUT LIGHT AND
POWER COMPANY D/B/A
EVERSOURCE ENERGY TO
AMEND ITS RATE SCHEDULES
:
:
:
:
:
Docket No. 26-05-10
September 8, 2026
THE INTERCONNECTION CUSTOMER COALITION’S
FIRST SET OF INTERROGATORIES
The Interconnection Customer Coalition (“ICC”) requests responses from The Connecticut Light
and Power Company d/b/a Eversource Energy (“Eversource”) to the following interrogatories in
the above-captioned proceeding on or before September 22, 2026. If there are objections to any
questions, or if providing responses to certain questions would be unduly burdensome, please
contact Kate Boucher as soon as possible.
INSTRUCTIONS
The responses to these interrogatories and production requests must be submitted in the
following manner:
A. Documents provided shall be complete and, unless privileged, unredacted,
submitted as found in the company’s files (e.g., documents that in their original
condition were stapled, clipped or otherwise fastened together or maintained in
separate file folders shall be produced in such form). The company may submit
photocopies (with color photocopies where necessary to accurately reproduce the
document), in lieu of original documents, provided that such copies are true,
correct and complete copies of the original documents.
B. Documents submitted shall be produced in the order in which they appear in the
company’s files and shall not be shuffled or otherwise rearranged. Mark each
page with corporate identification and consecutive document control numbers.
C. Data must be produced in the data format in which it is typically used and
maintained. Moreover, to the extent a responsive document has been
electronically scanned (for any purpose), that document must be produced in a
readable and accessible electronic format, with the opportunity provided to review
the original document.
D. Provide English translations of all responsive evidence that exists in foreign
language.
E. Documents to be produced include all documents in the possession, custody or
control of the company, wherever located, including documents in the possession,
1
ACTIVE/8.10/KEBOUCHER/21297260v1
custody or control of the company’s directors, officers, employees,
representatives or agents. Without limitation on the term “control,” a document is
deemed to be in your control if you have the right to secure that document or a
copy thereof from another person.
CLAIMS OF PRIVILEGE
If you contend that any answer to any interrogatory or any document demanded by these
interrogatories is privileged in whole or in part, file with your response to these Interrogatories a
statement in writing and under oath and in such statement: (1) identify each such interrogatory
answer or document; (2) state its general subject matter; and (3) state in detail the basis for each
claim of privilege made with respect to it. If a claim of privilege is made to only a part of a
document, then in addition to the statement required herein, produce a public copy of such
document from which the alleged privileged portion has been redacted, noting where in the
document such redactions have been made.
SCOPE
If subsequent to your initial compliance with these interrogatories and production request you
discover additional or new material or information responsive to any interrogatory or request for
production, or you discover that any response you provide herein was totally or partially
incorrect or, though correction was made, is no longer true, you must promptly (a) file any
additional responsive documents that come into your possession, custody or control or (b) file
supplemented, corrected, and sworn responses. You are specifically directed to supplement,
modify or correct your responses to each of these interrogatories and production throughout until
a final decision in adopted by the Authority in this Docket.
II.
INTERROGATORIES
ICC-1.
Reference Exhibit CLP-ELP-1 at Page 109 and Exhibit CLP-CUSTOMER-1 at 34.
Provide the currently operative versions of any Connecticut Light and Power Company
governing documents related to the interconnection process, including, but not limited
to, the Generator Interconnection Technical Requirements, the Information &
Requirements for Electric Supply (a/k/a the “Yellow Book”) and any other documents
that specify interconnection timelines (together referred to herein as the “Eversource
Interconnection Policies”).
ICC-2.
Reference ICC-1. Since January 1, 2020, provide all versions of the Eversource
Interconnection Policies, including:
Date of Revision
Summary of Inclusions/Deletions
Rationale for Inclusions/Deletions
The review and approval process for finalization of each version
2
ACTIVE/8.10/KEBOUCHER/21297260v1
ICC-3.
Reference ICC-1. Are any of the Eversource Interconnection Policies joint documents
with United Illuminating? If so, state which ones and explain the timeline and purpose
for which the document(s) were integrated.
ICC-4.
Reference ICC-1. Provide the equivalent current versions of Eversource Massachusetts
and Eversource New Hampshire Interconnection Policies. Explain in a narrative
summary the differences between the Eversource Connecticut, Massachusetts and New
Hampshire policies.
ICC-5.
In a narrative response, describe the Eversource process for interconnecting a
generation project in Connecticut, in the following categories:
a. Residential Inverter-Based Generators 50 kW or less;
b. Fast Track: Residential Inverters greater than 50 kW;
c. Commercial & Industrial less than or equal to 2 MW; and
d. Study Process: Complex projects greater than 2 MW.
Include relevant Eversource business units that must review/sign off/be consulted,
describe approvals to move on to the next stage, and required timelines or deadlines
that must be met.
ICC-6.
Reference ICC-5. For each Eversource business unit described in the response, provide
in a chart, current, proposed and near-term staffing plans, as follows:
Business Unit
Current Staffing
Numbers (Internal
and Contractors,
separated)
Proposed Staffing
Changes Under This
Rate Case
Proposed Staffing
Changes Within the
Next 5 Years
ICC-7.
Reference ICC-5. Describe any consequences if the Interconnection Customer does not
meet the identified timelines.
ICC-8.
Reference ICC-5. Describe any consequences if Eversource does not meet the
identified timelines.
ICC-9.
Reference ICC-5. Eversource has proposed competitive base salary and variable
compensation, and intends to hire 58 new employees to support these initiatives. See
Exhibit CL&P-REVREQ-2, WP C-3.5 – Incremental FTE Calculation. Specifically
identify if any of these new employees will support interconnection process activities
as identified in ICC-5. Also specifically describe any related plans to hire/retain
3
ACTIVE/8.10/KEBOUCHER/21297260v1
contract employees to support interconnection process activities as identified in ICC5.
ICC-10.
Reference ICC-5. Provide any Eversource policies governing internal review timelines
for identified interconnection process review and describe how employees are trained
on these policies. Provide all training related to adherence to timelines. Identify the
revision date of the relevant training, how often it is updated, and whether review of
such training is mandatory for employees.
ICC-11.
Reference ICC-6. In a chart, provide monthly mean, median and average time each
identified Eversource department spent reviewing interconnection applications since
January 1, 2020.
ICC-12.
Provide a chart showing the annual number of a) Interconnection Applications received
and b) Interconnection Agreements issued in each calendar year from 2010-2026.
ICC-13.
Since January 1, 2020, provide mean, median and average times for each month
quantifying the length of time between when an Interconnection Application was
initially received to when an Interconnection Agreement was issued.
ICC-14.
Since January 1, 2020, provide mean, median and average times for each month
quantifying the length of time between when an Interconnection Agreement was issued
and when a project received its Permission to Operate.
ICC-15.
Reference ICC-13 and ICC-14. Provide a chart showing the same information based
on the following project categories: buy-all to new service (i.e., NRES/SCEF), buy-all
to existing service, and netting projects.
ICC-16.
Reference ICC-13 and ICC-14. Provide a chart showing the same information based
on the following project categories: Residential Inverter-Based Generators 50 kW or
less; Fast Track: Residential Inverters greater than 50 kW; Commercial & Industrial
less than or equal to 2 MW; and Study Process: Complex projects greater than 2 MW.
ICC-17.
Reference Exhibit CLP-ELP-1 at Page 109 and Exhibit CLP-CUSTOMER-1 at 34.
Describe any and all data Eversource currently uses to track whether it is meeting its
own milestones in interconnection agreements. Provide software used, describe which
milestones are tracked. Provide the most current outputs showing whether Eversource
is currently meeting those milestones.
ICC-18.
Reference ICC-19. Describe whether and if so how this data is used internally by
Eversource to refine processes, train employees or propose changes to Eversource
Interconnection Documents. Specifically describe whether this data is used to
determine appropriate staffing, employee incentives and/or compensation in any
manner.
4
ACTIVE/8.10/KEBOUCHER/21297260v1
ICC-19.
Provide in a chart, separated by year: 1) the number of formal interconnection disputes
initiated, 2) the number of formal interconnection disputes that required mediation, 3)
the number of formal interconnection disputes that required PURA adjudication.
ICC-20.
Provide:
a. current template Interconnection Agreement(s) for Connecticut projects;
b. current template Interconnection Agreement(s) for New Hampshire projects; and
c. current template Interconnection Agreement(s) for Massachusetts projects.
The undersigned certifies that a copy of this submission has been sent to all participants of record
via electronic mail. A copy of this document also has been filed with the Authority as an electronic
web filing and is complete.
Respectfully submitted,
THE INTERCONNECTION CUSTOMER COALITION
__________________________
Kathryn E. Boucher, Esq.
Lee D. Hoffman, Esq.
Pullman & Comley, LLC
90 State House Square
Hartford, CT 06103
[email removed]
[email removed]
[phone removed]
5
ACTIVE/8.10/KEBOUCHER/21297260v1
As listed on the current system
Interrogs from Interconnection Customer Coalition to CL&P 1 thru 20-Issued 09/08/2026 [26-05-10]